]project-open[

Open Source Enterprise Business Application

Project Invoicing

Version: 0.8
Date: October 31th, 2013
Author: Frank Bergmann
frank.bergmann@project-open.com
Benefits

•
•
•
•

Free and open-source, SaaS available
Reduce administrative overhead
Don’t loose invoiceable hours anymore
Separate between billable and nonbillable time
• Integrated with timesheet management,
budget management, vacation
management and project tracking
Features
•
•
•
•

•
•
•
•
•

Elegant invoices
Invoice templates customizable by the user
Management of customer data, customer contact and multiple billing
addresses per customer
Project billing from very simple to very complex
– Ad-hoc invoicing – write your invoice in 20 seconds
– Billing time and material projects
– Billing complex projects – warranty, discounts and non-billable time

Billing wizard for billing logged hours
Price lists per customer or default global price list. Prices per “material”
or service type
Multi currency. Automatic currency updates available (add-on)
Powerful financial reporting, including data-warehouse (add-on
module)
Configurable billing modes
– Material per task or per logged hour
– Force billing on sub-projects
Issues Addressed
•
•
•
•
•
•
•
•

•
•
•

Many different types of contracts
Difficult distinction between billable and non-billable hours
Contracts with many different parameters
Difficulty to assign delivered hours to specific projects
Difficulty to assign hours to multiple concurrent projects of a single
customer
Re-assignment of delivered services between projects (for example:
product development vs. customer server)
Difficulty to distinguish between service hours delivered as part of a fixedprice contract and additional billable hours
Informal negotiations during the project execution lead to a complex
situation with respect to billable and non billable project item. The results
from informal negotiations can be captured in the KM module and kept
together with the project.
Difficulty in the financial department to determine services to be “activated”
in the balance sheet, for example for product development vs. customer
service
Difficulty to capture the results of informal negotiations for the invoicing
process
The informal negotiations make it very difficult for a billing department to
write an invoice
Lifecycle
• Contract design

– List of deliverables
– Project phases & milestones
– Billing conditions and parameters

• Project Execution
–
–
–
–

Advance on defined deliverables
Change requests modify the list of deliverables
Change requests modify the effort to produce deliverables
Project Management represents an ongoing negotiation process
between all project stakeholders. Negotiation results are documented
together with the project.

• Project Closing

– Sign-off of individual deliverables
– Billing of individual project phases or milestones
Challenges
•
•
•
•
•
•
•
•

Service organizations need to provide flexible responses to customer requirements
The scope and contents of projects may change during the project lifecycle
Projects may contain fixed-cost as well as variable cost phases.
It is difficult to distinguish billable hours from non-billable sales and warranty parts.
Senior management may lose considerable time resolving this type of questions.
The customer may be “flexibly” mixing planned with already delivered work to be
invoice
Difficult distinction between billable and non-billable time.
Partial invoicing at the end of project phases or milestones
Invoicing may depend on a lot of fuzzy information from different sources:
–
–
–
–

Verbal agreements between sales and the customer
Change requests incurred during the project execution
Timesheet information about planned, billable and logged hours
External costs of material and freelance project members
•
•
•
•
•

The initial quote and its rules
Verbal agreements between sales and the customer
Change requests incurred during the project execution
Timesheet information about planned, billable and logged hours
External costs of material and freelance project members
Complex Contract Structure
Service companies frequently have to deal
with complex contract structures. Variables:
• Fixed-price vs. variable-price (based on time and
material) or a mix of both.
• The definition of “billable time” can be complex:
–
–
–
–

During sales: Presales time vs. consulting time
In the last project phase: Features vs. corrections.
During support: Paid support time vs. warranty time
During support: Issue fixing vs. user training

• Contracts changes during the project:

– Formal changes as “Change request”
– Informal changes as part of negotiations between PM, key
account and customer.
Configuration & Parameters

•
•
•
•
•

Log on super-projects?
Invoice from scratch?
Logging hours with budget control?
Budget-control switched on?
Material per task or material per hour?
Overview

We will guide you through ]po[ invoicing based
on 4 real-world cases:
• “My First Invoice” – Invoicing a simple fixed
price contract
• “Fractioned Invoicing” – Writing more then one
invoice per project
• “Warranty and Presales” – Dealing with nonbillable time
• “Time and Material” – Invoicing timesheet
hours
My First Invoice

The Case:
• You are an employee of “Tigerpond Inc.”.
Tigerpond offers consulting and IT services.
• We have just received an order from “Big
Customer” for 3 days of training services.
Actions:
• Create a project so that you can log hours
and other costs
• Choose “Create Invoice from Scratch” to
create an invoice manually
Overview

• There are different types of projects:
– Fixed Price
– Time & Material
– Mixed
– Recurring (Service Contracts, …)
Simple Fixed Price Invoicing

• Create a Project
• Write an Invoice
• Mark the invoice as paid
Time & Material based Invoicing

• Create a Project
• Define a number of tasks
– Estimated, Billable and Logged Hours
– Material to describe the type of service

• Log some hours on the project
• Use the “New Customer Invoice from
Timesheet Tasks” wizard to create an
invoice
Understanding Materials

• “Material” is a type of service
• Material is the link into the customer’s
price list
• Billable vs. non-billable materials
Understanding Timesheet Tasks

• Tasks describe an activity of one or
more persons
• Task Characteristics
– Estimated, Billable and Logged Hours
– Material to describe the type of service

• Billable/Non-Billable time is per Task
and not per logged hours. Each project
may have a task for unbillable time.
Understanding the Price List

• The price list maps materials to prices
• There is a default price list defined in the
“Internal” company
• Specific price lists can be defined per
customer
• UoM is usually “hour” here. The other
UoMs are used for simple invoicing and
may be used in future extensions of the
system.
Tracking the Project Progress

• Number of logged hours per task vs.
• Task progress (not the same!)
• Compare task progress with time logged
for early indications of the project being
late
Invoicing Monthly Activities

• UoM: Month
• Modelling: One project with multiple subprojects
• This way, the financials will accumulate
• Define this project as an “SLA” to enable
use for the helpdesk module
Project Quoting using ]po[

• Create a schedule via GanttProject or
OpenProj
• Define the materials in ]po[
• Use the Wizard to create a quote
Details
Summary
The Problem
•
•
•

Project invoicing frequently represents an important challenge
Not all billable hours are captured or invoiced
High workload for senior management to manage invoicing

Why?
•
•
•
•

Project management is a continuous negotiation process
Project scope changes during the project execution
Negotiation results may documented informally or not documented at all
Bug vs. Feature: It can be very challenging to decide whether a service is
billable (feature/ extension) or non billable (bug/ warranty)

The Solution
•
•
•
•

]po[ allows to capture informal negotiation results
]po[ allows to model complex projects and contracts
]po[ provides integrated timesheet management
]po[ flexible invoicing wizards allow to create invoices based on captured
information
]project-open[ Billing Benefits

• Increases the number of billable hours
• Reduces the administrative overhead
• Reduces the senior management’s time for
invoicing
• Shortens the time from project to cash
• Provides accurate profit & loss per project and
customer by integration with project controlling
• Integration with travel expenses management
allows to distinguish between billable and nonbillable travel costs.
]project-open[ is Open-Source Software

•
•
•
•

Cost efficient
Flexible and adaptable
Low up-front risk
No vendor lock-in
Functional Description
Sample Scenario
Costs

Revenues
Project Plan

Sales

1

1st phase

Initial
Quote

2nd Phase
Support

External
Provider
Bills

Travel
Expenses

2

Billable
Hours

1st
Partial
Invoice

Project Plan

Sales

1st phase

Change
Request

2nd Phase
Support

3
2nd
Invoice

External
Provider
Bills

Travel
Expenses
Billable
Hours

1. Provider and customer agree to an
initial project plan with a number of
phases and deliverables
2. After finishing the first project phase,
provider bills customer for part of the
work. However:

• The project team has already started
tasks of the next phase
• Not all deliverable of the 1st phase have
been finished
• Additional deliverables have been
added to both the 1st and 2nd phase.

3. A 2nd invoice is based on a modified
project plan. It needs to include the
hours that have been delivered
before issuing the 1st invoice.
Sample Scenario Schema
The Customer

Specs

Quote

Order

eMail
eMail
eMail

The Project

Sales / Planning
Execution

Invoice

Change
Request

Milestone
2nd Phase

Sign-Off
Support

Purchase
Order

Timesheet Logging
by Employees

Travel
Expen.

Invoice

External Providers
Supported Contract Types Overview
“Ideal” Contract Types
•

Fixed price

•

Fixed price with partial/multiple invoicing

•
•
•

Customer and provider close a fixed-price project.

The fixed price project consists of several independently invoiced phases.

Time and material

Provider bills customer for time and external costs, plus a defined margin.

Periodic

Recurring invoices for support contracts etc.

"Many Small Projects“

Invoicing of independent helpdesk tickets or small but repeating projects such as translation.

“Real-World” Contract Types
•

Fixed price + warranty

•

Fixed price + change requests

•

Provider needs to provide additional service to fix errors or mistakes
A fixed price contract forms the base of the project, but additional elements are added during
the project during “change requests” or when correcting deficiencies.

Maintenance contract + extra time

Customer and provider have agreed on a monthly maintenance fee, but extra services exceed
the covered amount of services and have to be billed in addition
Additional Use-Cases
• Employees might correct hours in the past. How
to invoice these hours?
“Fixed Price” Without Project Schedule
]po[ can create invoice documents “manually”:
1.
Go to the your project’s financial page and
1
click on “New Customer Invoice from Scratch”
2.
You get an empty invoice form where you can
enter your project details
3.
A template renders your invoice ready to be
sent to the customer
2

3
Fixed Price with Project Schedule
1.
2.
3.
4.
5.

The PM creates a project schedule using
GanttProject
The PM can add the information on
“estimated” and “billable” hours for each task.
The PM starts the wizard “New Customer
Invoice from Timesheet Tasks”
The Invoicing Wizard allows to select
“planned” or “billable” units to create the…
…invoice

1

2

3
5

4
“Time and Material” Contracts
1.

2.

“New Customer Invoice from Timesheet
Tasks” lets you create an invoice based
on a project schedule
From the schedule you can select
individual

1

2
Mixed “Fixed Prices” with “Time and Material”
It is best practice for “Time and Material”
contracts to specify project tasks
according to the billing type of different
tasks.
Here is an example:
• Sales and Presales:
Not billable

•

Implementation and training:

•

Travel Time:

•

Warranty Support:

•

Paid Support:

Fully billable

Billable 50% of the time, with a maximum of
8hours/journey
Clear product deficiencies are not billable
Product enhancements are fully billable
“Time and Material” Contracts
1.

2.

“New Customer Invoice from Timesheet
Tasks” lets you create an invoice based
on a project schedule
From the schedule you can select
individual

1

2
“Time and Material” Contracts

• This billing mode allows you
to
• Planned Units
• Billable Units
• All Reported Units
• Reported Units in Interval
• All Unbilled Units

1

2
Tools
Tools Overview
The ]project-open[ solution consists of a number of building blocks to capture project
billing information plus a number of tools to process the captured information:

Capturing Financial Information
•

Project Plan/Schedule:

•

Timesheet Logging:

•
•

Defines the project phases and their tasks and deliverables.
Prices are defined via “Service Types” (i.e. “Senior Developer Hour”, …) per task.
Allows employees to log hours on projects and tasks

Travel Expenses:

This module captures travel expenses, including partially billable expenses.

Provider Management:

Captures external provider costs

Capturing Fuzzy Information
•

Project Filestorage:

•

Project Forum:

•

Allows PMs to store change requests and other project documents for reference
Forum discussion can be used to capture “notes” about informal negotiation results for reference

CRM Mail Tracking:

Captures mails going back and forth between the PM and the customer.

Processing Invoicing Information
•

Quoting Wizard:

•

Invoicing Wizard:

•

Calculates a quote based on the project schedule with its “billable hours” duration per task.
Calculates (partial) invoices based on:
module captures travel expenses, including partially billable expenses.
Tools: Project Plan/Schedule
•
•

•

]po[ allows for project and
subprojects of any level
]po[ supports the external
GanttProject Java Application to
define schedules quickly
Each Task includes three
timesheet hours:
– Planned Hours:
Best guess for task duration
– Billable Hours:
Hours billable to customer and
– Logged Hours:
Actually logged hours by staff
Tools: Timesheet Logging
• Sophisticated timesheet
logging with permissions
per project, subprojects
or task
• Logging per day or per
week
• Optional approval
workflow for PM to
confirm hours logged to a
project
How to Create an Invoice
Sales / Planning

The Project

Execution

Invoice

Milestone
2nd Phase
Sign-Off
Support

Timesheet

Invoice

Quote
Quote
Quote

Invoice

Invoice

•
•

Create an invoice from Gantt chart
task durations. ]po[ maintains a
price list per customer.
Create an invoice from timesheet
information (actual hours logged
by employees)
Create an invoice from one or
more quotes.

Create an Invoice from “scratch”
(manually entering quote lines)

]project-open[ offers a wide range of options on how to create an invoice,
taking advantage of all available information
]project-open[ provides maximum flexibility in terms of how to combine all
available information to create invoices.
Document Type Permissions
Employees

Project
Managers

Accounting

-

read and create
project’s Quotes

read, create and
modify everything

-

read and create
project’s Delivery
Notes

read, create and
modify everything

-

read project’s
Invoice (but no
right to create)

read, create and
modify everything

-

read and create
project’s Purchase
Orders

read, create and
modify everything

-

read project’s
Provider Bills (but
no right to
create)
read project’s travel
expenses

read, create and
modify everything

read project’s
timesheet costs

read, create and
modify everything

Quote

Delivery
Note

Invoice

Purchase
Order
Bill

(Provider
Invoice)

Travel
Expense
Time
sheet
Cost

read own expenses,
create new travel
expenses
log hours (which
creates timesheet
cost items)

read, create and
modify everything

• ]project-open[ allows to
specify per profile who
should be able to read or
write certain financial
documents.
• The table at the left shows
a typical configuration.
• The configuration at the
left implies a workflow
between project managers
(create quotes and
purchase orders) with
accounting (write invoices)
• The configuration can be
modified using ]projectopen[ maintenance
screens.
Decentralized Invoicing
The Customer
Quote

Order

Delivery
Note

Invoice

The Company
Purchase
Order

Bill

(Provider
Invoice)

Travel
Expense

Time
sheet
Cost

Providers

• The ]project-open[ workflow engine allows to
formalize important processes, while other processes
may be kept flexible.
Solution

• ]project-open[ provides a single place to store and process
both formalized and semi-formalized data including quotes,
timesheet, documents, email traffic etc.
• ]project-open[ has been designed for the level of flexibility
needed by small and medium service organizations (3-300
employees).
• ]project-open[ workflow engine can enforce certain policies
such as order or sign-off phases in larger organizations
• ]project-open[ includes wizards to create quotes and invoices
from production information such as planned or spent hours
• The ]project-open[ workflow engine allows to formalize
important processes, while other processes may be kept
flexible.
Process Overview

• Sales & Quoting
• Project Planning
• Project Execution
– Timesheet Logging
– Project progress tracking
– Project cost tracking
Quoting Options in ]project-open[

• Quoting using Project Plan:

– Create a project schedule via GanttProject
– Assign “materials” to tasks
– Use the Timesheet Quoting Wizard to sum up the planned
hours multiplied with the customer’s price list.

• Repeating Project Structures:

– Create a “new project from template” to create a copy of a
previous project.

• Complex Projects:
–
–
–
–

Write a quote using MS-Word,
Create a new ]po[ project in status “quoting”
Store the MS-Word in the ]po[ project’s Filestorage
Create a ]po[ quote document for financial tracking
Sales & Quoting

• The Sales & Quoting phase starts during the first contact with
the customer.
• Deliverables:

– A textual description of the scope of the project (MS-Word document)
– A “quote” document as a baseline for the invoicing process

• PO can keep track of potential projects and the size of the sales
pipeline
• A PO workflow can check the completeness of quote
information before a “potential” project becomes executed.
• PO allows to store unstructured information such as email,
meeting and conversation protocols together with the project as
a reference for the invoicing process.
Project Planning

• The planning phase intents to specify the
tasks to execute the project. It may overlap
with the sales phase or start afterwards
• Deliverables:

– A detailed project plan consisting of a number of
tasks
– Each task consists of a number of “planned” and
“billable” hours, apart from other project information
Project Planning

• The planning phase intents to specify the
tasks to execute the project. It may overlap
with the sales phase or start afterwards
• Deliverables:

– A detailed project plan consisting of a number of
tasks

• Each task consists of a number of “planned”
and “billable” hours, apart from other project
information
Thanks for your attention
]project-open[
Ronda Sant Antonio 51, 1o 2a
08011 Barcelona
Spain
Tel: +34 933 250 914
Cell: +34 609 953 751
Fax: +34 932 890 729
www.project-open.com
www.project-open.org

]project-open[ Timesheet Project Invoicing

  • 1.
    ]project-open[ Open Source EnterpriseBusiness Application Project Invoicing Version: 0.8 Date: October 31th, 2013 Author: Frank Bergmann frank.bergmann@project-open.com
  • 2.
    Benefits • • • • Free and open-source,SaaS available Reduce administrative overhead Don’t loose invoiceable hours anymore Separate between billable and nonbillable time • Integrated with timesheet management, budget management, vacation management and project tracking
  • 3.
    Features • • • • • • • • • Elegant invoices Invoice templatescustomizable by the user Management of customer data, customer contact and multiple billing addresses per customer Project billing from very simple to very complex – Ad-hoc invoicing – write your invoice in 20 seconds – Billing time and material projects – Billing complex projects – warranty, discounts and non-billable time Billing wizard for billing logged hours Price lists per customer or default global price list. Prices per “material” or service type Multi currency. Automatic currency updates available (add-on) Powerful financial reporting, including data-warehouse (add-on module) Configurable billing modes – Material per task or per logged hour – Force billing on sub-projects
  • 4.
    Issues Addressed • • • • • • • • • • • Many differenttypes of contracts Difficult distinction between billable and non-billable hours Contracts with many different parameters Difficulty to assign delivered hours to specific projects Difficulty to assign hours to multiple concurrent projects of a single customer Re-assignment of delivered services between projects (for example: product development vs. customer server) Difficulty to distinguish between service hours delivered as part of a fixedprice contract and additional billable hours Informal negotiations during the project execution lead to a complex situation with respect to billable and non billable project item. The results from informal negotiations can be captured in the KM module and kept together with the project. Difficulty in the financial department to determine services to be “activated” in the balance sheet, for example for product development vs. customer service Difficulty to capture the results of informal negotiations for the invoicing process The informal negotiations make it very difficult for a billing department to write an invoice
  • 5.
    Lifecycle • Contract design –List of deliverables – Project phases & milestones – Billing conditions and parameters • Project Execution – – – – Advance on defined deliverables Change requests modify the list of deliverables Change requests modify the effort to produce deliverables Project Management represents an ongoing negotiation process between all project stakeholders. Negotiation results are documented together with the project. • Project Closing – Sign-off of individual deliverables – Billing of individual project phases or milestones
  • 6.
    Challenges • • • • • • • • Service organizations needto provide flexible responses to customer requirements The scope and contents of projects may change during the project lifecycle Projects may contain fixed-cost as well as variable cost phases. It is difficult to distinguish billable hours from non-billable sales and warranty parts. Senior management may lose considerable time resolving this type of questions. The customer may be “flexibly” mixing planned with already delivered work to be invoice Difficult distinction between billable and non-billable time. Partial invoicing at the end of project phases or milestones Invoicing may depend on a lot of fuzzy information from different sources: – – – – Verbal agreements between sales and the customer Change requests incurred during the project execution Timesheet information about planned, billable and logged hours External costs of material and freelance project members • • • • • The initial quote and its rules Verbal agreements between sales and the customer Change requests incurred during the project execution Timesheet information about planned, billable and logged hours External costs of material and freelance project members
  • 7.
    Complex Contract Structure Servicecompanies frequently have to deal with complex contract structures. Variables: • Fixed-price vs. variable-price (based on time and material) or a mix of both. • The definition of “billable time” can be complex: – – – – During sales: Presales time vs. consulting time In the last project phase: Features vs. corrections. During support: Paid support time vs. warranty time During support: Issue fixing vs. user training • Contracts changes during the project: – Formal changes as “Change request” – Informal changes as part of negotiations between PM, key account and customer.
  • 8.
    Configuration & Parameters • • • • • Logon super-projects? Invoice from scratch? Logging hours with budget control? Budget-control switched on? Material per task or material per hour?
  • 9.
    Overview We will guideyou through ]po[ invoicing based on 4 real-world cases: • “My First Invoice” – Invoicing a simple fixed price contract • “Fractioned Invoicing” – Writing more then one invoice per project • “Warranty and Presales” – Dealing with nonbillable time • “Time and Material” – Invoicing timesheet hours
  • 10.
    My First Invoice TheCase: • You are an employee of “Tigerpond Inc.”. Tigerpond offers consulting and IT services. • We have just received an order from “Big Customer” for 3 days of training services. Actions: • Create a project so that you can log hours and other costs • Choose “Create Invoice from Scratch” to create an invoice manually
  • 11.
    Overview • There aredifferent types of projects: – Fixed Price – Time & Material – Mixed – Recurring (Service Contracts, …)
  • 12.
    Simple Fixed PriceInvoicing • Create a Project • Write an Invoice • Mark the invoice as paid
  • 13.
    Time & Materialbased Invoicing • Create a Project • Define a number of tasks – Estimated, Billable and Logged Hours – Material to describe the type of service • Log some hours on the project • Use the “New Customer Invoice from Timesheet Tasks” wizard to create an invoice
  • 14.
    Understanding Materials • “Material”is a type of service • Material is the link into the customer’s price list • Billable vs. non-billable materials
  • 15.
    Understanding Timesheet Tasks •Tasks describe an activity of one or more persons • Task Characteristics – Estimated, Billable and Logged Hours – Material to describe the type of service • Billable/Non-Billable time is per Task and not per logged hours. Each project may have a task for unbillable time.
  • 16.
    Understanding the PriceList • The price list maps materials to prices • There is a default price list defined in the “Internal” company • Specific price lists can be defined per customer • UoM is usually “hour” here. The other UoMs are used for simple invoicing and may be used in future extensions of the system.
  • 17.
    Tracking the ProjectProgress • Number of logged hours per task vs. • Task progress (not the same!) • Compare task progress with time logged for early indications of the project being late
  • 18.
    Invoicing Monthly Activities •UoM: Month • Modelling: One project with multiple subprojects • This way, the financials will accumulate • Define this project as an “SLA” to enable use for the helpdesk module
  • 19.
    Project Quoting using]po[ • Create a schedule via GanttProject or OpenProj • Define the materials in ]po[ • Use the Wizard to create a quote
  • 20.
  • 21.
    Summary The Problem • • • Project invoicingfrequently represents an important challenge Not all billable hours are captured or invoiced High workload for senior management to manage invoicing Why? • • • • Project management is a continuous negotiation process Project scope changes during the project execution Negotiation results may documented informally or not documented at all Bug vs. Feature: It can be very challenging to decide whether a service is billable (feature/ extension) or non billable (bug/ warranty) The Solution • • • • ]po[ allows to capture informal negotiation results ]po[ allows to model complex projects and contracts ]po[ provides integrated timesheet management ]po[ flexible invoicing wizards allow to create invoices based on captured information
  • 22.
    ]project-open[ Billing Benefits •Increases the number of billable hours • Reduces the administrative overhead • Reduces the senior management’s time for invoicing • Shortens the time from project to cash • Provides accurate profit & loss per project and customer by integration with project controlling • Integration with travel expenses management allows to distinguish between billable and nonbillable travel costs.
  • 23.
    ]project-open[ is Open-SourceSoftware • • • • Cost efficient Flexible and adaptable Low up-front risk No vendor lock-in
  • 24.
  • 25.
    Sample Scenario Costs Revenues Project Plan Sales 1 1stphase Initial Quote 2nd Phase Support External Provider Bills Travel Expenses 2 Billable Hours 1st Partial Invoice Project Plan Sales 1st phase Change Request 2nd Phase Support 3 2nd Invoice External Provider Bills Travel Expenses Billable Hours 1. Provider and customer agree to an initial project plan with a number of phases and deliverables 2. After finishing the first project phase, provider bills customer for part of the work. However: • The project team has already started tasks of the next phase • Not all deliverable of the 1st phase have been finished • Additional deliverables have been added to both the 1st and 2nd phase. 3. A 2nd invoice is based on a modified project plan. It needs to include the hours that have been delivered before issuing the 1st invoice.
  • 26.
    Sample Scenario Schema TheCustomer Specs Quote Order eMail eMail eMail The Project Sales / Planning Execution Invoice Change Request Milestone 2nd Phase Sign-Off Support Purchase Order Timesheet Logging by Employees Travel Expen. Invoice External Providers
  • 27.
    Supported Contract TypesOverview “Ideal” Contract Types • Fixed price • Fixed price with partial/multiple invoicing • • • Customer and provider close a fixed-price project. The fixed price project consists of several independently invoiced phases. Time and material Provider bills customer for time and external costs, plus a defined margin. Periodic Recurring invoices for support contracts etc. "Many Small Projects“ Invoicing of independent helpdesk tickets or small but repeating projects such as translation. “Real-World” Contract Types • Fixed price + warranty • Fixed price + change requests • Provider needs to provide additional service to fix errors or mistakes A fixed price contract forms the base of the project, but additional elements are added during the project during “change requests” or when correcting deficiencies. Maintenance contract + extra time Customer and provider have agreed on a monthly maintenance fee, but extra services exceed the covered amount of services and have to be billed in addition
  • 28.
    Additional Use-Cases • Employeesmight correct hours in the past. How to invoice these hours?
  • 29.
    “Fixed Price” WithoutProject Schedule ]po[ can create invoice documents “manually”: 1. Go to the your project’s financial page and 1 click on “New Customer Invoice from Scratch” 2. You get an empty invoice form where you can enter your project details 3. A template renders your invoice ready to be sent to the customer 2 3
  • 30.
    Fixed Price withProject Schedule 1. 2. 3. 4. 5. The PM creates a project schedule using GanttProject The PM can add the information on “estimated” and “billable” hours for each task. The PM starts the wizard “New Customer Invoice from Timesheet Tasks” The Invoicing Wizard allows to select “planned” or “billable” units to create the… …invoice 1 2 3 5 4
  • 31.
    “Time and Material”Contracts 1. 2. “New Customer Invoice from Timesheet Tasks” lets you create an invoice based on a project schedule From the schedule you can select individual 1 2
  • 32.
    Mixed “Fixed Prices”with “Time and Material” It is best practice for “Time and Material” contracts to specify project tasks according to the billing type of different tasks. Here is an example: • Sales and Presales: Not billable • Implementation and training: • Travel Time: • Warranty Support: • Paid Support: Fully billable Billable 50% of the time, with a maximum of 8hours/journey Clear product deficiencies are not billable Product enhancements are fully billable
  • 33.
    “Time and Material”Contracts 1. 2. “New Customer Invoice from Timesheet Tasks” lets you create an invoice based on a project schedule From the schedule you can select individual 1 2
  • 34.
    “Time and Material”Contracts • This billing mode allows you to • Planned Units • Billable Units • All Reported Units • Reported Units in Interval • All Unbilled Units 1 2
  • 35.
  • 36.
    Tools Overview The ]project-open[solution consists of a number of building blocks to capture project billing information plus a number of tools to process the captured information: Capturing Financial Information • Project Plan/Schedule: • Timesheet Logging: • • Defines the project phases and their tasks and deliverables. Prices are defined via “Service Types” (i.e. “Senior Developer Hour”, …) per task. Allows employees to log hours on projects and tasks Travel Expenses: This module captures travel expenses, including partially billable expenses. Provider Management: Captures external provider costs Capturing Fuzzy Information • Project Filestorage: • Project Forum: • Allows PMs to store change requests and other project documents for reference Forum discussion can be used to capture “notes” about informal negotiation results for reference CRM Mail Tracking: Captures mails going back and forth between the PM and the customer. Processing Invoicing Information • Quoting Wizard: • Invoicing Wizard: • Calculates a quote based on the project schedule with its “billable hours” duration per task. Calculates (partial) invoices based on: module captures travel expenses, including partially billable expenses.
  • 37.
    Tools: Project Plan/Schedule • • • ]po[allows for project and subprojects of any level ]po[ supports the external GanttProject Java Application to define schedules quickly Each Task includes three timesheet hours: – Planned Hours: Best guess for task duration – Billable Hours: Hours billable to customer and – Logged Hours: Actually logged hours by staff
  • 38.
    Tools: Timesheet Logging •Sophisticated timesheet logging with permissions per project, subprojects or task • Logging per day or per week • Optional approval workflow for PM to confirm hours logged to a project
  • 39.
    How to Createan Invoice Sales / Planning The Project Execution Invoice Milestone 2nd Phase Sign-Off Support Timesheet Invoice Quote Quote Quote Invoice Invoice • • Create an invoice from Gantt chart task durations. ]po[ maintains a price list per customer. Create an invoice from timesheet information (actual hours logged by employees) Create an invoice from one or more quotes. Create an Invoice from “scratch” (manually entering quote lines) ]project-open[ offers a wide range of options on how to create an invoice, taking advantage of all available information ]project-open[ provides maximum flexibility in terms of how to combine all available information to create invoices.
  • 40.
    Document Type Permissions Employees Project Managers Accounting - readand create project’s Quotes read, create and modify everything - read and create project’s Delivery Notes read, create and modify everything - read project’s Invoice (but no right to create) read, create and modify everything - read and create project’s Purchase Orders read, create and modify everything - read project’s Provider Bills (but no right to create) read project’s travel expenses read, create and modify everything read project’s timesheet costs read, create and modify everything Quote Delivery Note Invoice Purchase Order Bill (Provider Invoice) Travel Expense Time sheet Cost read own expenses, create new travel expenses log hours (which creates timesheet cost items) read, create and modify everything • ]project-open[ allows to specify per profile who should be able to read or write certain financial documents. • The table at the left shows a typical configuration. • The configuration at the left implies a workflow between project managers (create quotes and purchase orders) with accounting (write invoices) • The configuration can be modified using ]projectopen[ maintenance screens.
  • 41.
    Decentralized Invoicing The Customer Quote Order Delivery Note Invoice TheCompany Purchase Order Bill (Provider Invoice) Travel Expense Time sheet Cost Providers • The ]project-open[ workflow engine allows to formalize important processes, while other processes may be kept flexible.
  • 42.
    Solution • ]project-open[ providesa single place to store and process both formalized and semi-formalized data including quotes, timesheet, documents, email traffic etc. • ]project-open[ has been designed for the level of flexibility needed by small and medium service organizations (3-300 employees). • ]project-open[ workflow engine can enforce certain policies such as order or sign-off phases in larger organizations • ]project-open[ includes wizards to create quotes and invoices from production information such as planned or spent hours • The ]project-open[ workflow engine allows to formalize important processes, while other processes may be kept flexible.
  • 43.
    Process Overview • Sales& Quoting • Project Planning • Project Execution – Timesheet Logging – Project progress tracking – Project cost tracking
  • 44.
    Quoting Options in]project-open[ • Quoting using Project Plan: – Create a project schedule via GanttProject – Assign “materials” to tasks – Use the Timesheet Quoting Wizard to sum up the planned hours multiplied with the customer’s price list. • Repeating Project Structures: – Create a “new project from template” to create a copy of a previous project. • Complex Projects: – – – – Write a quote using MS-Word, Create a new ]po[ project in status “quoting” Store the MS-Word in the ]po[ project’s Filestorage Create a ]po[ quote document for financial tracking
  • 45.
    Sales & Quoting •The Sales & Quoting phase starts during the first contact with the customer. • Deliverables: – A textual description of the scope of the project (MS-Word document) – A “quote” document as a baseline for the invoicing process • PO can keep track of potential projects and the size of the sales pipeline • A PO workflow can check the completeness of quote information before a “potential” project becomes executed. • PO allows to store unstructured information such as email, meeting and conversation protocols together with the project as a reference for the invoicing process.
  • 46.
    Project Planning • Theplanning phase intents to specify the tasks to execute the project. It may overlap with the sales phase or start afterwards • Deliverables: – A detailed project plan consisting of a number of tasks – Each task consists of a number of “planned” and “billable” hours, apart from other project information
  • 47.
    Project Planning • Theplanning phase intents to specify the tasks to execute the project. It may overlap with the sales phase or start afterwards • Deliverables: – A detailed project plan consisting of a number of tasks • Each task consists of a number of “planned” and “billable” hours, apart from other project information
  • 48.
    Thanks for yourattention ]project-open[ Ronda Sant Antonio 51, 1o 2a 08011 Barcelona Spain Tel: +34 933 250 914 Cell: +34 609 953 751 Fax: +34 932 890 729 www.project-open.com www.project-open.org