PROJECT OVERVIEW
Name of Project:              Chemical Identity Masks                                                                 Duration: 4 weeks
                              http://hightechhigh.org/unboxed/issue3/cards/9.php

Subject/Course: Chemistry A                                                 Teacher(s): D. Collins                    Grade Level: 11

Other subject areas to
be included, if any:


Project Idea
Summary of the issue,         Student created a two-sided identity mask. On one side, they represented their personal identity, as family,
challenge, investigation,     friends, and the media have formed it through their socialization. On the other side they represented a
scenario, or problem:
                              chemical element that they felt best symbolized their personality.

Driving Question              Using masks as a media allusion are students able to personify properties elements of the periodic table to
                              their perceived cultural identity and/or personal distinctiveness.


Content and Skills            1 a, b, c, d, e, g* (10%)
Standards to be               1. The periodic table displays the elements in increasing atomic number and shows how periodicity of
addressed:                    the physical and chemical properties of the elements relates to atomic structure. As a basis for
                              understanding this concept:
                              a. Students know how to relate the position of an element in the periodic table to its atomic number and
                              atomic mass.
                              b. Students know how to use the periodic table to identify metals, semimetals, nonmetals, and halogens.
                              c. Students know how to use the periodic table to identify alkali metals, alkaline earth metals and transition
                              metals, trends in ionization energy, electronegativity, and the relative sizes of ions and atoms.
                              d. Students know how to use the periodic table to determine the number of electrons available for bonding.
                              e. Students know the nucleus of the atom is much smaller than the atom yet contains most of its mass.
                                                                                           T+A       E                                      T+A     E
  st
21 Century Skills             Collaboration (Critical Friends Critique)                                  Other:
to be explicitly taught and                                                                x
assessed (T+A) or that
will be encouraged (E) by
                              Presentation                                                           x
project work, but not
taught or assessed:           Critical Thinking:                                           x

                                                                                                                  © 2008 Buck Institute for Education   1
Presentation Audience:
                   Group:                                                                                                                            x
Culminating                                                                                                                           Class:
Products and
Performances
                                                                                                                                     School:
                                                                                                                                                     x
                                                                                                                                   Community:

                                                                                                                                  Middle school

                                   Students will give an oral presentation to the class and create a written                         Experts:
                   Individual:     explanation of their mask to the our new middle school partners                                    Web:
                                                                                                                                Other:

                                                    PROJECT OVERVIEW
Entry event to
launch inquiry,     The students will view a PowerPoint of one word/image allusions that are already apart of the students schema.
engage students:    After the PowerPoint students will engage in a “Think Pair Share” activity to discuss the allusions.


Assessments                            Quizzes/Tests                                        x   Practice Presentations
                      Formative
                     Assessments       Journal/Learning Log                                 x   Notes
                        (During
                        Project)       Preliminary Plans/Outlines/Prototypes                    Checklists                                               x
                                       Rough Drafts                                         x   Concept Maps                                             x
                                       Online Tests/Exams                                   x   Other:

                                       Written Product(s), with rubric:                     x   Other Product(s) or Performance(s), with rubric:
                      Summative        __________________________________________________       __________________________________________________
                     Assessments
                    (End of Project)   Oral Presentation, with rubric                           Peer Evaluation

                                       Multiple Choice/Short Answer Test                    x   Self-Evaluation

                                       Essay Test                                               Other:

                                                                                                                  © 2008 Buck Institute for Education        2
.
Resources    On-site people,            Lunch benches for mask creation (sloppy),
Needed       facilities:                Football field (check with coaches, only need side lines)
             Equipment:                 Internet connect computers
             Materials:                 Check for supplies for paper Mache mask making, paints, paintbrushes, and spray
                                        clear coating.
             Community resources:       Check with middle science chair or seven-grade teacher.


Reflection                   Journal/Learning Log                          x   Focus Group
Methods       (Individual,
             Group, and/or   Whole-Class Discussion                            Fishbowl Discussion
             Whole Class)
                             Survey                                        x   Other:




                                                                                              © 2008 Buck Institute for Education   3
PROJECT TEACHING AND LEARNING GUIDE
Project: Chemical Identity Masks                            Course/Semester: Chemistry A


           Knowledge and Skills Needed By Students                 Scaffolding / Materials/ Lessons To Be Provided
        to successfully complete culminating products and            by the project teacher, other teachers, experts,
      performances, and do well on summative assessments                    mentors, or community members
K: Subatomic Particles – How many and where for their           Atomic Structure
individual elements                                             SLL: Football field analogy activity
                                                                Creating Scale model of atom.
                                                               Bohr’s Online model

                                                                GATE: Classic Exp. for atom structure (gold foil)

K: Atomic Masses                                                Atomic Number & Mass
                                                                SLL: Atomic particle worksheet
                                                                Atomic Mass with Marbles
                                                            
                                                                GATE: PHET simulation lab

K: Periodic Table Classifications                               Periodicity: Who’s My Family
                                                               SLL: Atomic Radii with Straws

K: Periodic Trends                                              Trends: Getting the Big Picture
                                                                SLL - Periodic radii straw activity
                                                            

K & S: Personification                                          Look for examples of literary personification of animals, places
                                                                etc.
                                                            
                                                                Create worksheet where students must create their own
                                                                personification of an event or object. – Share out to class
K& S: Allusions                                                 Create lesson on allusions in popular culture.
                                                               Create worksheet where students can practice using
                                                                Allusions.
                                                                                             © 2008 Buck Institute for Education   4
S: Paper Mache Masks       Creating Masks
                       

                       

                       




                                            © 2008 Buck Institute for Education   5
PROJECT CALENDAR
Project: Chemical Identity Masks                                                   Start Date: September

            MONDAY                           TUESDAY                 WEDNESDAY                          THURSDAY                           FRIDAY
                                                                    Project Week One
Entry Event: Video of the new    Pre-assessment                   Warm-up: Atomic structure       Warm-up: Atomic Structure       Quiz: Atomic Structure
middle schools, especially the         Atomic Structure                                                                           Hopefully Core12, if not That
blank walls                                                       Activity: Atomic Structure      Activity:                       Quiz.
                                 Activity: Four Corners: Atomic                                     • Football field analogy
Activity: Who, What, When?       Structure + Gallery walk                                           • Bohr online model           Activity:
                                                                  Journal: Look at your Journal                                   Critical Friends Critique
Journal: Describe yourself in    Journal: Browse your notes,      for Monday. Do you want to      Journal: Look at your           Share your face drawing and
one word, but give 3 reasons     Which of the subatomic           keep the word you used? Why     personality allusion.           explanation.
why you choose the word.         particles do you think is the    or Why not?                     Sketch a face to match your
                                 most important – give 3                                          allusion, describe the main     1. Finish Atomic Structure
                                 reasons.                                                         feature of the face.            activity
                                                                                                                                  2. Using colors create a rough
                                                                                                                                  draft of your Allusion-face.


                                                                    Project Week Two
Warm-up: Atomic Structure        Warm-up: Atomic Structure        Warm-up: Atomic Structure       Warm-up: Atomic Structure       Quiz: Atomic Structure,
                                 and Mass                         and Mass                        and Mass                        Number, Mass
Lecture: Atomic Number
& Mass                           Activity:                        Lecture:                        Lecture:                        Short answer question:
SLL: Atomic particle             Atomic Number & Mass             What is personification?                                        Using personification describe
                                 SLL: Atomic particle             Personifying                    Activity: Mask Making           3 characteristics of Atoms?
worksheet                                                                                         WooHoo
Atomic Mass with                 worksheet                        Activity:                                                       *(Critical Friends – Paragraph
Marbles                          Atomic Mass with                 Free write – Honors             SLL - Written instructions,     rubric) design a turn-in sheet
                                 Marbles                          SLL – Concept map               video                           for the pair.
Activity:                                                         My Room is Alive!
GATE: PHET                       GATE: PHET                       (Personification paragraph of   Journal:
                                                                  the students’ room)             Describe a situation/activity
simulation lab                   simulation lab                                                   where we can use “Mask
                                                                  “Heads Together” or “Think,     Making” with Nevin
Journal:                         Journal:                         Pair, Share”                    Elementary School?
Describe where you place         3 – Explain 3 atomic
yourself on the periodic table   concepts.                        Journal:
by weight.                       2 – Give 2 I wonders about       What is your definition of
                                 the project                      “Personification”?
                                 1 – The one thing I would
                                 change about my personality
                                 is….
                                                                                                                        © 2008 Buck Institute for Education        6
Project Week Three
Warm-up:                       Warm-up:                         Warm-up:                          Warm-up:                            Quiz:
Structure, Mass, Number        Structure, Mass, Number          Structure & Classification        Classification & Trends             Structure, Classification &
                                                                                                  Lecture:                            Trends.
Share: Ask for volunteers to                                    Lecture & Activity:
share Thursday’s journal       Lecture & Activity:              Periodicity: Who’s My             Activity:
                               Periodicity: Who’s My            Family                            Trends: Getting the Big             Activity:
Activity:                      Family                                                             Picture
Mask Making 02                                                  SLL: Atomic Radii with                                                I am like (insert element),
Painting of first mask &       SLL: Atomic Radii with           Straws                            SLL - Periodic radii                because….
Creation of second mask        Straws                                                             straw activity
                                                                Trends: Getting the Big                                               1. Critical Friends
Journal:                       Journal:                         Picture                           Journal:
Project Critical Friends:      Pick any 3 characteristic of a                                     Pick any 1 trend and personify      Revision
                               Classification and personify     SLL - Periodic radii              its meaning.
I like…
I wonder…                      those characteristic.            straw activity                                                        2. Critical Friends – Paragraph
Next steps for Collins…                                                                                                               rubric.
                                                                Journal:
                                                                Pick 3 different characteristic
                                                                of a Classification and
                                                                personify those characteristic.
                                                                  Project Week Four
Warm-up:                       Warm-up:                         Warm-up:                          Warm-up:                            Test: The Periodic Table!
Structure, Classification &    Structure, Classification &      Structure, Classification &       Structure, Classification &         Structure, Classification &
Trends                         Trends                           Trends                            Trends                              Trends.

Activity:                      Activity:                        Mask Presentations - Video        Mask Presentations - Video
Masking Making 03              Written Presentation
Paint mask two with element    SLL: Presentation outline.
and any revisions to first                                                                        Reflection Journal:
mask.                          Finish Masks                                                       Critical Friends for the Project.
                                                                                                  Think, Pair Share
Journal:                       Journal:
Which element do you feel      Which trend of the periodic
most resembles Mr. Collins?    table (personified) do your
Why?                           most resemble?




                                                                                                                         © 2008 Buck Institute for Education        7

Project planning forms_0210_dar_col

  • 1.
    PROJECT OVERVIEW Name ofProject: Chemical Identity Masks Duration: 4 weeks http://hightechhigh.org/unboxed/issue3/cards/9.php Subject/Course: Chemistry A Teacher(s): D. Collins Grade Level: 11 Other subject areas to be included, if any: Project Idea Summary of the issue, Student created a two-sided identity mask. On one side, they represented their personal identity, as family, challenge, investigation, friends, and the media have formed it through their socialization. On the other side they represented a scenario, or problem: chemical element that they felt best symbolized their personality. Driving Question Using masks as a media allusion are students able to personify properties elements of the periodic table to their perceived cultural identity and/or personal distinctiveness. Content and Skills 1 a, b, c, d, e, g* (10%) Standards to be 1. The periodic table displays the elements in increasing atomic number and shows how periodicity of addressed: the physical and chemical properties of the elements relates to atomic structure. As a basis for understanding this concept: a. Students know how to relate the position of an element in the periodic table to its atomic number and atomic mass. b. Students know how to use the periodic table to identify metals, semimetals, nonmetals, and halogens. c. Students know how to use the periodic table to identify alkali metals, alkaline earth metals and transition metals, trends in ionization energy, electronegativity, and the relative sizes of ions and atoms. d. Students know how to use the periodic table to determine the number of electrons available for bonding. e. Students know the nucleus of the atom is much smaller than the atom yet contains most of its mass. T+A E T+A E st 21 Century Skills Collaboration (Critical Friends Critique) Other: to be explicitly taught and x assessed (T+A) or that will be encouraged (E) by Presentation x project work, but not taught or assessed: Critical Thinking: x © 2008 Buck Institute for Education 1
  • 2.
    Presentation Audience: Group: x Culminating Class: Products and Performances School: x Community: Middle school Students will give an oral presentation to the class and create a written Experts: Individual: explanation of their mask to the our new middle school partners Web: Other: PROJECT OVERVIEW Entry event to launch inquiry, The students will view a PowerPoint of one word/image allusions that are already apart of the students schema. engage students: After the PowerPoint students will engage in a “Think Pair Share” activity to discuss the allusions. Assessments Quizzes/Tests x Practice Presentations Formative Assessments Journal/Learning Log x Notes (During Project) Preliminary Plans/Outlines/Prototypes Checklists x Rough Drafts x Concept Maps x Online Tests/Exams x Other: Written Product(s), with rubric: x Other Product(s) or Performance(s), with rubric: Summative __________________________________________________ __________________________________________________ Assessments (End of Project) Oral Presentation, with rubric Peer Evaluation Multiple Choice/Short Answer Test x Self-Evaluation Essay Test Other: © 2008 Buck Institute for Education 2
  • 3.
    . Resources On-site people, Lunch benches for mask creation (sloppy), Needed facilities: Football field (check with coaches, only need side lines) Equipment: Internet connect computers Materials: Check for supplies for paper Mache mask making, paints, paintbrushes, and spray clear coating. Community resources: Check with middle science chair or seven-grade teacher. Reflection Journal/Learning Log x Focus Group Methods (Individual, Group, and/or Whole-Class Discussion Fishbowl Discussion Whole Class) Survey x Other: © 2008 Buck Institute for Education 3
  • 4.
    PROJECT TEACHING ANDLEARNING GUIDE Project: Chemical Identity Masks Course/Semester: Chemistry A Knowledge and Skills Needed By Students Scaffolding / Materials/ Lessons To Be Provided to successfully complete culminating products and by the project teacher, other teachers, experts, performances, and do well on summative assessments mentors, or community members K: Subatomic Particles – How many and where for their Atomic Structure individual elements SLL: Football field analogy activity Creating Scale model of atom.  Bohr’s Online model GATE: Classic Exp. for atom structure (gold foil) K: Atomic Masses Atomic Number & Mass SLL: Atomic particle worksheet Atomic Mass with Marbles  GATE: PHET simulation lab K: Periodic Table Classifications Periodicity: Who’s My Family  SLL: Atomic Radii with Straws K: Periodic Trends Trends: Getting the Big Picture SLL - Periodic radii straw activity  K & S: Personification Look for examples of literary personification of animals, places etc.  Create worksheet where students must create their own personification of an event or object. – Share out to class K& S: Allusions Create lesson on allusions in popular culture.  Create worksheet where students can practice using Allusions. © 2008 Buck Institute for Education 4
  • 5.
    S: Paper MacheMasks Creating Masks    © 2008 Buck Institute for Education 5
  • 6.
    PROJECT CALENDAR Project: ChemicalIdentity Masks Start Date: September MONDAY TUESDAY WEDNESDAY THURSDAY FRIDAY Project Week One Entry Event: Video of the new Pre-assessment Warm-up: Atomic structure Warm-up: Atomic Structure Quiz: Atomic Structure middle schools, especially the Atomic Structure Hopefully Core12, if not That blank walls Activity: Atomic Structure Activity: Quiz. Activity: Four Corners: Atomic • Football field analogy Activity: Who, What, When? Structure + Gallery walk • Bohr online model Activity: Journal: Look at your Journal Critical Friends Critique Journal: Describe yourself in Journal: Browse your notes, for Monday. Do you want to Journal: Look at your Share your face drawing and one word, but give 3 reasons Which of the subatomic keep the word you used? Why personality allusion. explanation. why you choose the word. particles do you think is the or Why not? Sketch a face to match your most important – give 3 allusion, describe the main 1. Finish Atomic Structure reasons. feature of the face. activity 2. Using colors create a rough draft of your Allusion-face. Project Week Two Warm-up: Atomic Structure Warm-up: Atomic Structure Warm-up: Atomic Structure Warm-up: Atomic Structure Quiz: Atomic Structure, and Mass and Mass and Mass Number, Mass Lecture: Atomic Number & Mass Activity: Lecture: Lecture: Short answer question: SLL: Atomic particle Atomic Number & Mass What is personification? Using personification describe SLL: Atomic particle Personifying Activity: Mask Making 3 characteristics of Atoms? worksheet WooHoo Atomic Mass with worksheet Activity: *(Critical Friends – Paragraph Marbles Atomic Mass with Free write – Honors SLL - Written instructions, rubric) design a turn-in sheet Marbles SLL – Concept map video for the pair. Activity: My Room is Alive! GATE: PHET GATE: PHET (Personification paragraph of Journal: the students’ room) Describe a situation/activity simulation lab simulation lab where we can use “Mask “Heads Together” or “Think, Making” with Nevin Journal: Journal: Pair, Share” Elementary School? Describe where you place 3 – Explain 3 atomic yourself on the periodic table concepts. Journal: by weight. 2 – Give 2 I wonders about What is your definition of the project “Personification”? 1 – The one thing I would change about my personality is…. © 2008 Buck Institute for Education 6
  • 7.
    Project Week Three Warm-up: Warm-up: Warm-up: Warm-up: Quiz: Structure, Mass, Number Structure, Mass, Number Structure & Classification Classification & Trends Structure, Classification & Lecture: Trends. Share: Ask for volunteers to Lecture & Activity: share Thursday’s journal Lecture & Activity: Periodicity: Who’s My Activity: Periodicity: Who’s My Family Trends: Getting the Big Activity: Activity: Family Picture Mask Making 02 SLL: Atomic Radii with I am like (insert element), Painting of first mask & SLL: Atomic Radii with Straws SLL - Periodic radii because…. Creation of second mask Straws straw activity Trends: Getting the Big 1. Critical Friends Journal: Journal: Picture Journal: Project Critical Friends: Pick any 3 characteristic of a Pick any 1 trend and personify Revision Classification and personify SLL - Periodic radii its meaning. I like… I wonder… those characteristic. straw activity 2. Critical Friends – Paragraph Next steps for Collins… rubric. Journal: Pick 3 different characteristic of a Classification and personify those characteristic. Project Week Four Warm-up: Warm-up: Warm-up: Warm-up: Test: The Periodic Table! Structure, Classification & Structure, Classification & Structure, Classification & Structure, Classification & Structure, Classification & Trends Trends Trends Trends Trends. Activity: Activity: Mask Presentations - Video Mask Presentations - Video Masking Making 03 Written Presentation Paint mask two with element SLL: Presentation outline. and any revisions to first Reflection Journal: mask. Finish Masks Critical Friends for the Project. Think, Pair Share Journal: Journal: Which element do you feel Which trend of the periodic most resembles Mr. Collins? table (personified) do your Why? most resemble? © 2008 Buck Institute for Education 7