PROJECT OVERVIEW
Name of Project:              Maximize your Buying Power by using Survey Results (Best                  Duration: 2 weeks
                              Prices/Item/Vendor)
Subject/Course: Math                                         Teacher(s): Maridel Tan                    Grade Level: Elementary (4th and 5th)

Other subject areas to
be included, if any:


Project Idea                  Making Better Purchasing Choices based on Survey Data Results
Summary of the issue,
challenge, investigation,
scenario, or problem:

Driving Question              How can I find the best deal to purchase my chosen items considering the current economic crisis and using minimal funds?

Content and Skills            Ratio and proportion, decimals, graphing points on a line, survey, frequency, tabulation of data, data
Standards to be               analysis
addressed:
                                                                                 T+A               E                                      T+A                          E
21st Century Skills           Collaboration                                                       x     Other:
to be explicitly taught and
assessed (T+A) or that
will be encouraged (E) by
                              Presentation (oral & visual)             x
project work, but not
taught or assessed:           Critical Thinking:                                                  x
                                                                                                                           Presentation Audience:




                                                                                                                                 © 2008 Buck Institute for Education       1
Group:         presentation                                                                                                               x
Culminating                                                                                                                        Class:
Products and
                                                                                                                                                                  x
Performances
                                                                                                                            School: cafeteria
                                                                                                                                                                  x
                                                                                                                               Community:

                                       Frequency charts and tabulated data                                                        Experts:
                        Individual:
                                                                                                                                    Web:
                                                                                                                     Other:

                                                PROJECT OVERVIEW
Entry event to launch
inquiry, engage         Video about a grocery shopper and choices made
students:
Assessments                                Quizzes/Tests                                           Practice Presentations                                             x
                         Formative
                        Assessments        Journal/Learning Log                                x   Notes
                        (During Project)

                                           Preliminary Plans/Outlines/Prototypes               x   Checklists                                                         x
                                           Rough Drafts                                        x   Concept Maps                                                       x
                                           Online Tests/Exams                                      Other:

                                           Written Product(s), with rubric:                    x   Other Product(s) or Performance(s), with
                         Summative         _________________________________________________       rubric:
                        Assessments        _                                                       __________________________________________________
                        (End of Project)
                                           Oral Presentation, with rubric                      x   Peer Evaluation                                                    x
                                           Multiple Choice/Short Answer Test                       Self-Evaluation                                                    x
                                           Essay Test                                              Other:
                                                                          .




                                                                                                                            © 2008 Buck Institute for Education           2
Resources    On-site people,                            Computer lab, internet, printer, librarian(?)
Needed       facilities:
             Equipment:

             Materials:                 Construction paper / poster board, colored pencils, markers, paste, scissors
             Community
             resources:


Reflection                     Journal/Learning Log                      x   Focus Group
Methods        (Individual,
              Group, and/or    Whole-Class Discussion                    x   Fishbowl Discussion
              Whole Class)
                               Survey                                    x   Other:




                                                                                                   © 2008 Buck Institute for Education   3
PROJECT TEACHING AND LEARNING GUIDE
Project: Maximize your Buying Power by using Survey Results (Best   Course/Semester: 2nd Semester
Prices/Item/Vendor)

          Knowledge and Skills Needed By Students                          Scaffolding / Materials/ Lessons To Be Provided
       to successfully complete culminating products and                    by the project teacher, other teachers, experts,
     performances, and do well on summative assessments                             mentors, or community members
Basic 4 Operations Mastery with Decimals And                            Jeopardy Game, Other Interactive Math Games
Estimation
                                                                    

Factoring and Fractions                                                 Divisibility Rules, Fraction Manipulatives, Videos
                                                                    


Computer Skills, Word Processing, Keyboarding Skills                    Mavis Beacon
                                                                    




                                                                    




                                                                    




                                                                                                          © 2008 Buck Institute for Education   4
PROJECT                  CALENDAR
Project: Take a Survey                                        Start Date: 2nd Semester

     MONDAY                  TUESDAY               WEDNESDAY                  THURSDAY                     FRIDAY
                                                 Project Week One
 Select favorite item     Get the prices and        Conduct survey            Conduct survey      Tabulate results on
Decide on 5 different    ads from the internet                                                    the data collection
categories of the item        printed out                                                               sheet
    and 5 vendors
     (checklist)




                                                 Project Week Two
Ratio and Proportion     Conclusion based on     Reflection               Oral Presentation     Final Presentation and
                         data collected                                   Practice              Grading
Graph results            Recommendation          Visual Lay-out                                 (self and peer)




                                                 Project Week Three




                                                                                               © 2008 Buck Institute for Education   5
Project Week Four




                    © 2008 Buck Institute for Education   6
© 2008 Buck Institute for Education   7

Project Planner (MT)

  • 1.
    PROJECT OVERVIEW Name ofProject: Maximize your Buying Power by using Survey Results (Best Duration: 2 weeks Prices/Item/Vendor) Subject/Course: Math Teacher(s): Maridel Tan Grade Level: Elementary (4th and 5th) Other subject areas to be included, if any: Project Idea Making Better Purchasing Choices based on Survey Data Results Summary of the issue, challenge, investigation, scenario, or problem: Driving Question How can I find the best deal to purchase my chosen items considering the current economic crisis and using minimal funds? Content and Skills Ratio and proportion, decimals, graphing points on a line, survey, frequency, tabulation of data, data Standards to be analysis addressed: T+A E T+A E 21st Century Skills Collaboration x Other: to be explicitly taught and assessed (T+A) or that will be encouraged (E) by Presentation (oral & visual) x project work, but not taught or assessed: Critical Thinking: x Presentation Audience: © 2008 Buck Institute for Education 1
  • 2.
    Group: presentation x Culminating Class: Products and x Performances School: cafeteria x Community: Frequency charts and tabulated data Experts: Individual: Web: Other: PROJECT OVERVIEW Entry event to launch inquiry, engage Video about a grocery shopper and choices made students: Assessments Quizzes/Tests Practice Presentations x Formative Assessments Journal/Learning Log x Notes (During Project) Preliminary Plans/Outlines/Prototypes x Checklists x Rough Drafts x Concept Maps x Online Tests/Exams Other: Written Product(s), with rubric: x Other Product(s) or Performance(s), with Summative _________________________________________________ rubric: Assessments _ __________________________________________________ (End of Project) Oral Presentation, with rubric x Peer Evaluation x Multiple Choice/Short Answer Test Self-Evaluation x Essay Test Other: . © 2008 Buck Institute for Education 2
  • 3.
    Resources On-site people, Computer lab, internet, printer, librarian(?) Needed facilities: Equipment: Materials: Construction paper / poster board, colored pencils, markers, paste, scissors Community resources: Reflection Journal/Learning Log x Focus Group Methods (Individual, Group, and/or Whole-Class Discussion x Fishbowl Discussion Whole Class) Survey x Other: © 2008 Buck Institute for Education 3
  • 4.
    PROJECT TEACHING ANDLEARNING GUIDE Project: Maximize your Buying Power by using Survey Results (Best Course/Semester: 2nd Semester Prices/Item/Vendor) Knowledge and Skills Needed By Students Scaffolding / Materials/ Lessons To Be Provided to successfully complete culminating products and by the project teacher, other teachers, experts, performances, and do well on summative assessments mentors, or community members Basic 4 Operations Mastery with Decimals And Jeopardy Game, Other Interactive Math Games Estimation  Factoring and Fractions Divisibility Rules, Fraction Manipulatives, Videos  Computer Skills, Word Processing, Keyboarding Skills Mavis Beacon    © 2008 Buck Institute for Education 4
  • 5.
    PROJECT CALENDAR Project: Take a Survey Start Date: 2nd Semester MONDAY TUESDAY WEDNESDAY THURSDAY FRIDAY Project Week One Select favorite item Get the prices and Conduct survey Conduct survey Tabulate results on Decide on 5 different ads from the internet the data collection categories of the item printed out sheet and 5 vendors (checklist) Project Week Two Ratio and Proportion Conclusion based on Reflection Oral Presentation Final Presentation and data collected Practice Grading Graph results Recommendation Visual Lay-out (self and peer) Project Week Three © 2008 Buck Institute for Education 5
  • 6.
    Project Week Four © 2008 Buck Institute for Education 6
  • 7.
    © 2008 BuckInstitute for Education 7