PROJECT OVERVIEW
Name of Project:              A Balancing Act                                                                       Duration: 15 hours
Subject/Course: Life Science                                     Teacher(s): Johnson Liu                            Grade Level: 7th

Other subject areas to
be included, if any:


Project Idea
Summary of the issue,         Students act as “set designers” for a TV reality show who need to propose a working ecosystem for an artificial
challenge, investigation,     biosphere. Each team is assigned a particular ecosystem: a rain forest, a desert, fresh water ponds and swamps,
scenario, or problem:         tundra, grasslands, coniferous forest, and a deciduous forest. Students conduct research on their ecosystem as they
                              learn about the characteristics of all ecosystems and build understanding of what makes a balanced ecosystem work. In
                              preparation for an oral presentation of their proposals, student groups create detailed posters and a written report.


Driving Question              How can we design a completely self-sustaining ecosystem?

Content and Skills            The factors of ecology such as biotic and abiotic features, symbiosis, predator/prey relationships, animal
Standards to be               adaptations, non-native species, and the effect of human interactions on ecosystems.
addressed:
                                                                                   T+A    E                                                     T+A        E
21st Century Skills           Collaboration                                                   Find and use information from online             X
to be explicitly taught and
                                                                                  X
assessed (T+A) or that
will be encouraged (E) by
                              Presentation                                        X           Use graphic design skills to create              X
project work, but not                                                                         posters
taught or assessed:
                              Critical Thinking: Conduct research                 X           Time managment                                   X
                                                                                                                              Presentation Audience:




                                                                                                                         © 2008 Buck Institute for Education   1
Group:                                                                                                                                        X
Culminating                        Written report on a particular ecosystem; detailed poster showing “set design” of the                     Class:
Products and                       ecosystem; oral presentation of set design proposal; second written report on a disturbance to
Performances                       the ecosystem.
                                                                                                                                            School:


                                                                                                                                         Community:
                                                                                                                                           Experts:
                   Individual:
                                                                                                                                              Web:
                                                                                                                                     Other:

                                                  PROJECT OVERVIEW
Entry event to
launch inquiry,     A Balancing Act began when students received a “memo from Wolf Television,” explaining their goals for the success of a new
engage students:    reality show, “Beat the Biosphere.” The set design teams are asked to come up with proposals for a variety of functioning
                    ecosystems, such as a rain forest, desert, fresh water ponds and swamps, tundra, grasslands, coniferous forest, and a deciduous
                    forest. They are told to present their ideas to Wolf executives with detailed drawings and submit a written report.
Assessments                            Quizzes/Tests                                               Practice Presentations                                             X
                      Formative
                     Assessments       Journal/Learning Log                                        Notes                                                              X
                        (During
                        Project)       Preliminary Plans/Outlines/Prototypes                  X    Checklists

                                       Rough Drafts                                           X    Concept Maps

                                       Online Tests/Exams                                          Other:

                                       Written Product(s), with rubric:                       X    Other Product(s) or Performance(s), with rubric:                   X
                      Summative        __________________________________________________          __________________________________________________
                     Assessments
                    (End of Project)   Oral Presentation, with rubric                         X    Peer Evaluation                                                    X
                                       Multiple Choice/Short Answer Test                           Self-Evaluation

                                       Essay Test                                                  Other:
                                                                             .




                                                                                                                                © 2008 Buck Institute for Education       2
Resources    On-site people, facilities:                         Teacher and peers.
Needed
             Equipment:                                Computer or laptop with internet access
             Materials:                                      Poster board, color markers
             Community resources:


Reflection                    Journal/Learning Log                X   Focus Group                                                 X
Methods       (Individual,
             Group, and/or    Whole-Class Discussion              X   Fishbowl Discussion
             Whole Class)
                              Survey                              X   Other:




                                                                                            © 2008 Buck Institute for Education       3
PROJECT TEACHING AND LEARNING GUIDE
Project: A Balancing Act                                   Course/Semester: Life Science/Fall


          Knowledge and Skills Needed By Students                 Scaffolding / Materials/ Lessons To Be Provided
       to successfully complete culminating products and            by the project teacher, other teachers, experts,
     performances, and do well on summative assessments                    mentors, or community members
How to find and use information from online and print          Scaffolding
sources?                                                       Computer with internet access
                                                              Printer
                                                               Lessons to be provided by the project teacher

How to make an oral presentation?                              Lessons to be provided by the project teacher
                                                           


How to use graphic design skills to create effective           Scaffolding
posters?                                                       Poster board
                                                              Color markers
                                                               Lessons to be provided by the project teacher

Collaboration skills.                                          Scaffolding
                                                               Lessons to be provided by the project teacher
                                                           


Organization and time management.                              Scaffolding
                                                               Lessons to be provided by the project teacher
                                                           




                                                                                                 © 2008 Buck Institute for Education   4
PROJECT           CALENDAR
Project:                                         Start Date:

     MONDAY             TUESDAY           WEDNESDAY           THURSDAY                     FRIDAY
                                        Project Week One
  Introduction:     How to find and       Lesson to be        How to use         Students finish
 Project name,      use information         provided by     graphic design        their detailed
  project idea,     from online and      project teacher    skills to create        poster and
driving question,   print resources?     on collaboration      effective         present it to the
   entry event.       Scaffolding,             skills.     posters? Lesson            class.
Students divide       lesson to be         Independent    to be provided by
into groups and        provided by           research      project teacher.
    select an       project teacher.                       Students create
 ecosystem to                                                  a poster.
   work with.
                                        Project Week Two
     Teacher        Collaboration       Research and     First draft due on Students finish
  introduce the     skills.             start writing    the written        written report.
   rubric for a     Independent on-     report.          report. Peer
  written report.   line research to                     critique on the
                    find information.                    first draft.



                                        Project Week Three



                                                                               © 2008 Buck Institute for Education   5
Teacher               Collaboration       Students work on    First draft of oral    Students present
introduce the         skills. Introduce   their PowerPoint    presentation due.      their oral
rubric for the oral   and teach           or Prezi            Peer critique on       presentation to
report.               PowerPoint or       presentation.       the first draft.       the class.
                      Prezi to students



                                          Project Week Four




                                                                                    © 2008 Buck Institute for Education   6
© 2008 Buck Institute for Education   7

Final product project planning forms

  • 1.
    PROJECT OVERVIEW Name ofProject: A Balancing Act Duration: 15 hours Subject/Course: Life Science Teacher(s): Johnson Liu Grade Level: 7th Other subject areas to be included, if any: Project Idea Summary of the issue, Students act as “set designers” for a TV reality show who need to propose a working ecosystem for an artificial challenge, investigation, biosphere. Each team is assigned a particular ecosystem: a rain forest, a desert, fresh water ponds and swamps, scenario, or problem: tundra, grasslands, coniferous forest, and a deciduous forest. Students conduct research on their ecosystem as they learn about the characteristics of all ecosystems and build understanding of what makes a balanced ecosystem work. In preparation for an oral presentation of their proposals, student groups create detailed posters and a written report. Driving Question How can we design a completely self-sustaining ecosystem? Content and Skills The factors of ecology such as biotic and abiotic features, symbiosis, predator/prey relationships, animal Standards to be adaptations, non-native species, and the effect of human interactions on ecosystems. addressed: T+A E T+A E 21st Century Skills Collaboration Find and use information from online X to be explicitly taught and X assessed (T+A) or that will be encouraged (E) by Presentation X Use graphic design skills to create X project work, but not posters taught or assessed: Critical Thinking: Conduct research X Time managment X Presentation Audience: © 2008 Buck Institute for Education 1
  • 2.
    Group: X Culminating Written report on a particular ecosystem; detailed poster showing “set design” of the Class: Products and ecosystem; oral presentation of set design proposal; second written report on a disturbance to Performances the ecosystem. School: Community: Experts: Individual: Web: Other: PROJECT OVERVIEW Entry event to launch inquiry, A Balancing Act began when students received a “memo from Wolf Television,” explaining their goals for the success of a new engage students: reality show, “Beat the Biosphere.” The set design teams are asked to come up with proposals for a variety of functioning ecosystems, such as a rain forest, desert, fresh water ponds and swamps, tundra, grasslands, coniferous forest, and a deciduous forest. They are told to present their ideas to Wolf executives with detailed drawings and submit a written report. Assessments Quizzes/Tests Practice Presentations X Formative Assessments Journal/Learning Log Notes X (During Project) Preliminary Plans/Outlines/Prototypes X Checklists Rough Drafts X Concept Maps Online Tests/Exams Other: Written Product(s), with rubric: X Other Product(s) or Performance(s), with rubric: X Summative __________________________________________________ __________________________________________________ Assessments (End of Project) Oral Presentation, with rubric X Peer Evaluation X Multiple Choice/Short Answer Test Self-Evaluation Essay Test Other: . © 2008 Buck Institute for Education 2
  • 3.
    Resources On-site people, facilities: Teacher and peers. Needed Equipment: Computer or laptop with internet access Materials: Poster board, color markers Community resources: Reflection Journal/Learning Log X Focus Group X Methods (Individual, Group, and/or Whole-Class Discussion X Fishbowl Discussion Whole Class) Survey X Other: © 2008 Buck Institute for Education 3
  • 4.
    PROJECT TEACHING ANDLEARNING GUIDE Project: A Balancing Act Course/Semester: Life Science/Fall Knowledge and Skills Needed By Students Scaffolding / Materials/ Lessons To Be Provided to successfully complete culminating products and by the project teacher, other teachers, experts, performances, and do well on summative assessments mentors, or community members How to find and use information from online and print Scaffolding sources? Computer with internet access  Printer Lessons to be provided by the project teacher How to make an oral presentation? Lessons to be provided by the project teacher  How to use graphic design skills to create effective Scaffolding posters? Poster board  Color markers Lessons to be provided by the project teacher Collaboration skills. Scaffolding Lessons to be provided by the project teacher  Organization and time management. Scaffolding Lessons to be provided by the project teacher  © 2008 Buck Institute for Education 4
  • 5.
    PROJECT CALENDAR Project: Start Date: MONDAY TUESDAY WEDNESDAY THURSDAY FRIDAY Project Week One Introduction: How to find and Lesson to be How to use Students finish Project name, use information provided by graphic design their detailed project idea, from online and project teacher skills to create poster and driving question, print resources? on collaboration effective present it to the entry event. Scaffolding, skills. posters? Lesson class. Students divide lesson to be Independent to be provided by into groups and provided by research project teacher. select an project teacher. Students create ecosystem to a poster. work with. Project Week Two Teacher Collaboration Research and First draft due on Students finish introduce the skills. start writing the written written report. rubric for a Independent on- report. report. Peer written report. line research to critique on the find information. first draft. Project Week Three © 2008 Buck Institute for Education 5
  • 6.
    Teacher Collaboration Students work on First draft of oral Students present introduce the skills. Introduce their PowerPoint presentation due. their oral rubric for the oral and teach or Prezi Peer critique on presentation to report. PowerPoint or presentation. the first draft. the class. Prezi to students Project Week Four © 2008 Buck Institute for Education 6
  • 7.
    © 2008 BuckInstitute for Education 7