Excel PowerPivot Based Dashboard

    Problem: The client was spending significant amounts
      for manual monthly analysis of data around
      marketing campaigns and results but also had a small
      budget for IT Development.
    Solution: Create a PowerPivot based dashboard
      combining data from multiple sources including SQL
      Databases, Data Cubes, Share Point Lists, and Excel
      Spreadsheets.
    Results: An aesthetically semi-automated dashboard
      dramatically decreasing monthly reporting costs.


1
Excel PowerPivot Based Dashboard




2
Partner Segmentation Tool


     Problem: The prior year partner segmentation tool
       (narrowing 500,000 partners to 20,000 managed
       partners) cost roughly $2 million and did not deliver
       as expected.
     Solution: Create a tool combining data from 8 sources
       applying strategy based selection criteria using
       around 100 DAX expressions in an easy to use tool in
       PowerPivot.
     Results: A well received PowerPivot based tool
       delivered for 5% of the prior year costs providing
       more and better data than previously available.


 3
Partner Category Recommendation Sample




4
BI Solution


     Problem: As the launch manager, analyst and strategist
       for a project, pulling data for analysis grew to take up
       75% of each month.
     Solution: Learn SQL and Microsoft Reporting Services
       to automate the monthly reporting.
     Results: The monthly reporting cycle was reduced from
       3 weeks to 3 days with better data and teams asked
       “which BI Team had developed the solution”.




 5
Sample Reporting Services Report




6
Sample Reporting Services Report




7
Sample Reporting Services Report




8
Measuring Customer Experience


     Problem: The client’s market share is under threat
       from several companies that offer a more intimate
       customer experience.
     Solution: Benchmark the customer experience of 8
       targets in various industries for best practices.
     Results: CONFIDENTIAL




 9
Benchmarking: We Benchmarked 9 Companies to Assess Industry Best
                          Practices Around Specific Customer Interactions


                                                                             Experience Takeaways:
                  Customer Experience Landscape
                                                                             •



                                 Proactive
                                                                                 Proactive + Relationship
                                                                                 Oriented=Customer Centric
                                                                             •   Loyalty and higher Lifetime Time
                                             Attractors                          Value (LTV) = Approachability
                                                                             •   56% of the Companies
                                                                                 Benchmarked have a 360 degree
                                                                                 view but aren’t fully utilizing
                                                                             •   Complexity of business is not an
Transaction Oriented
                                                                                 excuse for bad customer
                                                     Relationship Oriented
                                                                                 experience
                                                                             •   A good product does not equal a
                                                                                 good customer experience


               Deflectors
                                                                                               The Fine Print
                               Reactive




                                                                             •   The number of company interactions is not statistically
                                                                                 significant and scoring may vary with further
                                                                                 interactions
                                                                             •   The relative location of each company is a good
                                                                                 representation of how “Joe Customer” interpreted his
                                                                                 interactions
Methodology


                    Define                        Develop                        Interact                     Measure                        Identify

            Identified a                 Created realistic             Used all available            Developed 70+                  Performed GAP
            Customer Service             customer                      channels to                   measurement                    Analysis to extract
            Life Cycle*                  scenarios to drive            interact with target          attributes within              best practices for
            encompassing the             customer                      companies, in-                the phases of the              inclusion in the
            experience from              interactions along            store, web, phone             Customer Service               business case.
            pre-purchase to              the Customer                  and chat to                   Life to allow
 Primary




            disposition.                 Service Life Cycle*           research,                     comparison.
                                                                       purchase goods
                                                                       and service,
                                                                       create and resolve
                                                                       support issues and
                                                                       return products or
                                                                       cancel services.
Secondary




                                     Utilized Forester, Gartner and performed extensive internet research.



                          Target Companies: Microsoft, Apple, Dell, Amazon, Best Buy, Google, Comcast, T Mobile and Fidelity
             *”The Customer Service Life Cycle: A Framework for Improving Customer Service through Information Technology”. Gabriele Piccoli, PH.D. 6/01/2001

                                                                                                                                                                11
Customer Service Lifecycle* Phases

                                                              1. Establish Need
                                                              2. Determine attributes
These lifecycle phases were used
to identify and score interactions
 between the customer and the
        target companies




                                                                                                                              3.   Source selection
                                                                                                                              4.   Ordering
12. Transfer & Disposal                                                                                                       5.   Authorization & Payment
13. Auditing & Accounting                                                                                                     6.   Acquisition
                                                                                                                              7.   Testing & Acceptance




                                                             8.    Integration
                                                             9.    Usage monitoring
                                                             10.   Upgrading
                                                             11.   Maintain
  *”The Customer Service Life Cycle: A Framework for Improving Customer Service through Information Technology”. Gabriele Piccoli, PH.D. 6/01/2001

                                                                                                                                                         12
Customer Interaction Scenarios and Measurement Attributes


  Example Customer Interaction Scenarios
               Software Company #1                                                            Software Company #2

   • Utilized pre-purchase                                                          • Purchased and returned 2
     selection group, attempted 1                                                     Laptops, 2 Wifi Routers, 1
     chat support incident,                                                           Music Player, Applied for
     completed 2 technical support                                                    Credit Card, Utilized multiple
     calls plus prior experience and                                                  free selection services, trialed
     system knowledge                                                                 several pay services, and
                                                                                      called for support 5 times.

Example Attributes Used to Measure Each of the Scenarios for Each Benchmarked Company (over 70 were used)
Attribute #   Example Attributes                            -2                 -1               0                      1                             2
              Does the company provide access                                                                                           Extensive forums or
              to communities for additional                                                                                             discussion groups with
                                                                                                            Yes, some form of
              information?                                                                                                              ratings on participants,
      66                                                                                        No          community information
                                                                                                                                        moderators, other
                                                                                                            sharing
                                                                                                                                        methods to judge the
                                                                                                                                        value of the information

              Does the Customer register         Forced registration with no                                                            Registration encouraged but
      31      ownership of the product?         customer benefits, company                                   Customer registers with     not required for support,
                                                                                          No registration
                                                unaware of owner of product                                   minimal information      offers tangible benefits to the
                                                   even with registration.                                                                        customer.


                                                                                                                                                                13
Meet Joe Customer


The part of Joe Customer was played by Joe Dion.
Joe Customer is a particularly savvy customer pretending to be dense and needy. Joe Customer kept his
identity hidden as much as possible throughout the interactions (unless of course, that would create legal
issues or impede completion of the scenario), even when his real name was revealed, he has never heard of
his consulting firm and has no knowledge of this project. In fact if asked, he’s a freelance writer (yes,
several targets did ask during the needs assessment stage…) *Yes, I even removed my badge before entering
stores!]

Joe Customer acted within defined scenarios to fully test the Customer Service Lifecycle from before the
customer identifies a need through purchase and ownership to retirement and disposal. Joe Customer also
took liberties with the scenarios when circumstances allowed an even deeper interaction. Joe Customer
took every opportunity to ask extra questions, particularly dumb questions to demonstrated his naivety,
providing even greater opportunities for the targets to provide assistance

Joe Customer challenged any cancelation and restocking fees, but, was cordial in his challenge. (The
experience may have differed, had he become enraged). Where relationships already existed, new
relationships were established to avoid historical taint. (new email accounts, new affinity accounts, new
buyer accounts, etc.)

Joe Customer kept extensive notes of his experience including screen shots which can be seen at
<SHAREPOINT site here>

We hope you enjoy Joe Customer’s interactions…we certainly did .




                                                                                                             14
Current State Competitve Customer Experience:
Joe Customer© buys a computer




                      Approachable and Resolution Oriented =
                          Positive Customer Experience
                                                               15
Current State Competitive Customer Experience:
Joe Customer© buys a computer




                           Approachable and Resolution Oriented =
                               Positive Customer Experience         16
Measuring “Confusion”

      Problem: Competitors are intentionally creating confusion
        about the benefits of open source software and software
        based on open standards to compete against the client in
        selling to the public sector.
      Solution: A methodology to measure “confusion” over the
        terms open source and open standards to determine if the
        “confusion” is leading to open source preferences in
        legislative activities.
      Results: A correlation was found to exist between “confusion”
        about the benefits of open source software and government
        procurement mandates; the client developed strategies to
        counteract the “confusion” and neutralize the procurement
        preferences.


 17
Measuring Confusion

            Define                     Develop                  Measure                 Validate                 Analyze

     Read a sample of          Identified a set of        Read documents        Provided the             Analyzed the
     legislative               confusion points,          (49 from 25           clients leading          results of all
     documents to              (statements which          countries) to         Open                     documents and
     identify an               attributed the             identify confusion    Standards/Open           identified
     approach to               value of open              points in their       Source Law Firm          correlation
     measuring                 standards to open          native language       with the                 between confusion
     confusion over the        source), and a             (English, French,     documents and            and preference as
     terms open source         body of                    Spanish, Italian,     measurement              well as areas of
     and open                  measurement                and Portuguese)       system for               greatest confusion
     standards.                rules to allow             and verified          comparative              to be targeted with
                               objective                  understanding         analysis.                PR and training
                               treatment of all           using translation     Reconciled all           efforts.
                               documents.                 software.             differences.


                                                                                Open Standard: A standard that is developed or
          Open Source: software that is distributed
                                                                                ratified in a consensus based process, which is
      according to a licensing model that grants access
                                                                               available to implementers and which has the goal
     to the source code of a program and requires that
                                                                                of requiring that the IP necessary to implement
      the source be made available to third parties for
                                                                                 the standard be licensed to implementers on
            further distribution and modification
                                                                                   reasonable and non-discriminatory terms.


18
Greater Confusion=Hard Preference

                                                                            Preference by Confusion Points
                                                100%


                                                90%


                                                80%
       % of Documents with type of Preference




                                                70%


                                                60%


                                                50%                                                                  Hard Preference
                                                                                                                     Soft Preference
                                                40%                                                                  Neutral


                                                30%


                                                20%


                                                10%


                                                 0%
     Confusion Points                                  0          1      2             3           4         5   6

     # of Documents                                        8      10    7             6            7         4   1



19
Measuring “Awareness & Understanding”

      Problem: The client faces billions of dollars in risk if employees
        violate the intellectual property of other parties; the client
        has developed intellectual property policies and expends
        substantial training effort to reduce the risk of intellectual
        property violation, however, had no way of knowing whether
        employees knew or understood the policies.
      Solution: A methodology to measure awareness and
        understanding of intellectual properties among employees
        using a scenario driven quiz delivered as a survey with a 60%
        response rate from those sampled.
      Results: Employees were found to be more knowledgeable than
        expected, however results were used to increase training
        efforts in problem areas, and attorneys utilized the
        information in working with their internal clients.

 20
Demonstrating Understanding

Scenario: Marc Zimmerman was just hired by Microsoft from a competing
company. He was hired primarily because he led a group at his prior employer that           A realistic scenario developed in
was developing the same types of products he will now be working on at
Microsoft. Marc developed many of the ideas that formed the basis of those products
                                                                                            conjunction with attorney subject
and still has copies of schematics, software code and other items. To speed up the          matter experts.
development process, Marc is considering making this information available to his
team.

 Marc Should: (select one answer)
•Freely provide the information to everyone in his group                                    Survey respondents identified what they
•Not use this to create products but can distribute it to show what the competition is
doing                                                                                       believe to be the acceptable action in the
•Say he came up with the ideas after leaving his last job and freely distribute them
•Not provide or use the information from his prior employer in his Microsoft projects       given scenario.
•Have an LCA attorney present when he discloses information from his prior employer

Why? (select one answer)
•It's difficult to prove where ideas came from and he was hired by Microsoft for his
prior experience                                                                            Next the survey respondent selected an
•This is good competitive intelligence and usable as long as it doesn't go into Microsoft   appropriate justification. Each possible
products
•Marc's previous employer can keep the products Marc developed, but not the ideas           action in the first question had a logical
he developed
•An attorney present creates an attorney-client privilege and protects Microsoft from       paired reason to demonstrate policy
legal problems
•This may violate employment agreements with both companies and violate trade
                                                                                            understanding in the second question.
secret law

                                                                                            Completion was anonymous and voluntary,
                                                                                            yet designed to be entertaining and
                                                                                            challenging; surveys elicited responses
                                                                                            from 60% of the targeted population.

   21
Different Categories of Awareness=Different Training Challenges

                                                                  Trade Secret


       100%



        80%



        60%

                                                                            87                          93      83
                                                                                    86           90                       80
        40%
                                       65
               52      49                               52        50
                                                 44
        20%                                                                                                                        Unaware
                                                                                                                                   Confused
                                                                                                                                   Aware
        0%                                                                                                                         Intuitive



       -20%



       -40%

                                Trade Secret 1                                               Trade Secret 2

       -60%
                                                      BizDev




                                                                                                              BizDev
              All



                    Developer




                                                                           All



                                                                                 Developer
                                                 PM




                                                                                                        PM
                                                               Marketing




                                                                                                                       Marketing
                                     Tester




                                                                                               Tester




 22

Project Examples

  • 1.
    Excel PowerPivot BasedDashboard Problem: The client was spending significant amounts for manual monthly analysis of data around marketing campaigns and results but also had a small budget for IT Development. Solution: Create a PowerPivot based dashboard combining data from multiple sources including SQL Databases, Data Cubes, Share Point Lists, and Excel Spreadsheets. Results: An aesthetically semi-automated dashboard dramatically decreasing monthly reporting costs. 1
  • 2.
  • 3.
    Partner Segmentation Tool Problem: The prior year partner segmentation tool (narrowing 500,000 partners to 20,000 managed partners) cost roughly $2 million and did not deliver as expected. Solution: Create a tool combining data from 8 sources applying strategy based selection criteria using around 100 DAX expressions in an easy to use tool in PowerPivot. Results: A well received PowerPivot based tool delivered for 5% of the prior year costs providing more and better data than previously available. 3
  • 4.
  • 5.
    BI Solution Problem: As the launch manager, analyst and strategist for a project, pulling data for analysis grew to take up 75% of each month. Solution: Learn SQL and Microsoft Reporting Services to automate the monthly reporting. Results: The monthly reporting cycle was reduced from 3 weeks to 3 days with better data and teams asked “which BI Team had developed the solution”. 5
  • 6.
  • 7.
  • 8.
  • 9.
    Measuring Customer Experience Problem: The client’s market share is under threat from several companies that offer a more intimate customer experience. Solution: Benchmark the customer experience of 8 targets in various industries for best practices. Results: CONFIDENTIAL 9
  • 10.
    Benchmarking: We Benchmarked9 Companies to Assess Industry Best Practices Around Specific Customer Interactions Experience Takeaways: Customer Experience Landscape • Proactive Proactive + Relationship Oriented=Customer Centric • Loyalty and higher Lifetime Time Attractors Value (LTV) = Approachability • 56% of the Companies Benchmarked have a 360 degree view but aren’t fully utilizing • Complexity of business is not an Transaction Oriented excuse for bad customer Relationship Oriented experience • A good product does not equal a good customer experience Deflectors The Fine Print Reactive • The number of company interactions is not statistically significant and scoring may vary with further interactions • The relative location of each company is a good representation of how “Joe Customer” interpreted his interactions
  • 11.
    Methodology Define Develop Interact Measure Identify Identified a Created realistic Used all available Developed 70+ Performed GAP Customer Service customer channels to measurement Analysis to extract Life Cycle* scenarios to drive interact with target attributes within best practices for encompassing the customer companies, in- the phases of the inclusion in the experience from interactions along store, web, phone Customer Service business case. pre-purchase to the Customer and chat to Life to allow Primary disposition. Service Life Cycle* research, comparison. purchase goods and service, create and resolve support issues and return products or cancel services. Secondary Utilized Forester, Gartner and performed extensive internet research. Target Companies: Microsoft, Apple, Dell, Amazon, Best Buy, Google, Comcast, T Mobile and Fidelity *”The Customer Service Life Cycle: A Framework for Improving Customer Service through Information Technology”. Gabriele Piccoli, PH.D. 6/01/2001 11
  • 12.
    Customer Service Lifecycle*Phases 1. Establish Need 2. Determine attributes These lifecycle phases were used to identify and score interactions between the customer and the target companies 3. Source selection 4. Ordering 12. Transfer & Disposal 5. Authorization & Payment 13. Auditing & Accounting 6. Acquisition 7. Testing & Acceptance 8. Integration 9. Usage monitoring 10. Upgrading 11. Maintain *”The Customer Service Life Cycle: A Framework for Improving Customer Service through Information Technology”. Gabriele Piccoli, PH.D. 6/01/2001 12
  • 13.
    Customer Interaction Scenariosand Measurement Attributes Example Customer Interaction Scenarios Software Company #1 Software Company #2 • Utilized pre-purchase • Purchased and returned 2 selection group, attempted 1 Laptops, 2 Wifi Routers, 1 chat support incident, Music Player, Applied for completed 2 technical support Credit Card, Utilized multiple calls plus prior experience and free selection services, trialed system knowledge several pay services, and called for support 5 times. Example Attributes Used to Measure Each of the Scenarios for Each Benchmarked Company (over 70 were used) Attribute # Example Attributes -2 -1 0 1 2 Does the company provide access Extensive forums or to communities for additional discussion groups with Yes, some form of information? ratings on participants, 66 No community information moderators, other sharing methods to judge the value of the information Does the Customer register Forced registration with no Registration encouraged but 31 ownership of the product? customer benefits, company Customer registers with not required for support, No registration unaware of owner of product minimal information offers tangible benefits to the even with registration. customer. 13
  • 14.
    Meet Joe Customer Thepart of Joe Customer was played by Joe Dion. Joe Customer is a particularly savvy customer pretending to be dense and needy. Joe Customer kept his identity hidden as much as possible throughout the interactions (unless of course, that would create legal issues or impede completion of the scenario), even when his real name was revealed, he has never heard of his consulting firm and has no knowledge of this project. In fact if asked, he’s a freelance writer (yes, several targets did ask during the needs assessment stage…) *Yes, I even removed my badge before entering stores!] Joe Customer acted within defined scenarios to fully test the Customer Service Lifecycle from before the customer identifies a need through purchase and ownership to retirement and disposal. Joe Customer also took liberties with the scenarios when circumstances allowed an even deeper interaction. Joe Customer took every opportunity to ask extra questions, particularly dumb questions to demonstrated his naivety, providing even greater opportunities for the targets to provide assistance Joe Customer challenged any cancelation and restocking fees, but, was cordial in his challenge. (The experience may have differed, had he become enraged). Where relationships already existed, new relationships were established to avoid historical taint. (new email accounts, new affinity accounts, new buyer accounts, etc.) Joe Customer kept extensive notes of his experience including screen shots which can be seen at <SHAREPOINT site here> We hope you enjoy Joe Customer’s interactions…we certainly did . 14
  • 15.
    Current State CompetitveCustomer Experience: Joe Customer© buys a computer Approachable and Resolution Oriented = Positive Customer Experience 15
  • 16.
    Current State CompetitiveCustomer Experience: Joe Customer© buys a computer Approachable and Resolution Oriented = Positive Customer Experience 16
  • 17.
    Measuring “Confusion” Problem: Competitors are intentionally creating confusion about the benefits of open source software and software based on open standards to compete against the client in selling to the public sector. Solution: A methodology to measure “confusion” over the terms open source and open standards to determine if the “confusion” is leading to open source preferences in legislative activities. Results: A correlation was found to exist between “confusion” about the benefits of open source software and government procurement mandates; the client developed strategies to counteract the “confusion” and neutralize the procurement preferences. 17
  • 18.
    Measuring Confusion Define Develop Measure Validate Analyze Read a sample of Identified a set of Read documents Provided the Analyzed the legislative confusion points, (49 from 25 clients leading results of all documents to (statements which countries) to Open documents and identify an attributed the identify confusion Standards/Open identified approach to value of open points in their Source Law Firm correlation measuring standards to open native language with the between confusion confusion over the source), and a (English, French, documents and and preference as terms open source body of Spanish, Italian, measurement well as areas of and open measurement and Portuguese) system for greatest confusion standards. rules to allow and verified comparative to be targeted with objective understanding analysis. PR and training treatment of all using translation Reconciled all efforts. documents. software. differences. Open Standard: A standard that is developed or Open Source: software that is distributed ratified in a consensus based process, which is according to a licensing model that grants access available to implementers and which has the goal to the source code of a program and requires that of requiring that the IP necessary to implement the source be made available to third parties for the standard be licensed to implementers on further distribution and modification reasonable and non-discriminatory terms. 18
  • 19.
    Greater Confusion=Hard Preference Preference by Confusion Points 100% 90% 80% % of Documents with type of Preference 70% 60% 50% Hard Preference Soft Preference 40% Neutral 30% 20% 10% 0% Confusion Points 0 1 2 3 4 5 6 # of Documents 8 10 7 6 7 4 1 19
  • 20.
    Measuring “Awareness &Understanding” Problem: The client faces billions of dollars in risk if employees violate the intellectual property of other parties; the client has developed intellectual property policies and expends substantial training effort to reduce the risk of intellectual property violation, however, had no way of knowing whether employees knew or understood the policies. Solution: A methodology to measure awareness and understanding of intellectual properties among employees using a scenario driven quiz delivered as a survey with a 60% response rate from those sampled. Results: Employees were found to be more knowledgeable than expected, however results were used to increase training efforts in problem areas, and attorneys utilized the information in working with their internal clients. 20
  • 21.
    Demonstrating Understanding Scenario: MarcZimmerman was just hired by Microsoft from a competing company. He was hired primarily because he led a group at his prior employer that A realistic scenario developed in was developing the same types of products he will now be working on at Microsoft. Marc developed many of the ideas that formed the basis of those products conjunction with attorney subject and still has copies of schematics, software code and other items. To speed up the matter experts. development process, Marc is considering making this information available to his team. Marc Should: (select one answer) •Freely provide the information to everyone in his group Survey respondents identified what they •Not use this to create products but can distribute it to show what the competition is doing believe to be the acceptable action in the •Say he came up with the ideas after leaving his last job and freely distribute them •Not provide or use the information from his prior employer in his Microsoft projects given scenario. •Have an LCA attorney present when he discloses information from his prior employer Why? (select one answer) •It's difficult to prove where ideas came from and he was hired by Microsoft for his prior experience Next the survey respondent selected an •This is good competitive intelligence and usable as long as it doesn't go into Microsoft appropriate justification. Each possible products •Marc's previous employer can keep the products Marc developed, but not the ideas action in the first question had a logical he developed •An attorney present creates an attorney-client privilege and protects Microsoft from paired reason to demonstrate policy legal problems •This may violate employment agreements with both companies and violate trade understanding in the second question. secret law Completion was anonymous and voluntary, yet designed to be entertaining and challenging; surveys elicited responses from 60% of the targeted population. 21
  • 22.
    Different Categories ofAwareness=Different Training Challenges Trade Secret 100% 80% 60% 87 93 83 86 90 80 40% 65 52 49 52 50 44 20% Unaware Confused Aware 0% Intuitive -20% -40% Trade Secret 1 Trade Secret 2 -60% BizDev BizDev All Developer All Developer PM PM Marketing Marketing Tester Tester 22