SUMMARY
1
2
The Lagos Red Line and Blue Line Light Rail Projects are the two rail lines project
currently being implemented in Lagos State. The Blue line runs from Marina to Mile 2
while the red line runs from Oyingbo to Agbado. Both lines when completed shall daily
convey a large number of passenger flow, and as such would invariably have impacts on
the traffic flow of adjoining roads near the stations along each line. Therefore, it is
critical to carry out effective traffic planning and infrastructure enhancements for each
station area to facilitate effective traffic circulation.
CCECC is a reputed construction company with years of expertise and
professionalism in railways, highways, bridges, housing, construction and operation.
The CCECC planning and design team can aid LAMATA in making effective suggestions
for transportation planning and smooth operability as well as for highways, bridges,
parking lots and other infrastructure to propose planning and design proposals. This will
go a long way in providing a solid assurance for the effective and seamless functioning
of each station following the opening of the Red and Blue Lines of the light rail.
1. SUMMARY
Iju
Agege
Ikeja
Oshidi
Mushin
Yaba
Oyinbo
Mile2
Alaba
Iganmu
National
Theatre Marina
3
2. STATION STATUS & ANALYSIS
2.1 Red Line-Oyingbo Station
2.1.1 Regional Connectivity
The green line in the diagram
represents the access road section
connecting the two transportation
hubs. Once the Red Line is
completed and operational, this
road section shall be necessary for
transporting passengers between
Oyingbo Station and the two
nearest bus stops. As a result, the
present capacity of this road
stretch will have an impact on
traffic in this region in future. At
the moment, several portions of
this road section are severely
damaged. Therefore, CCECC
suggests that the road section and
other close access roads be
adequately rehabilitated.
Costain
Oyingbo
4
2.1.2 Station Traffic Flow Planning
Presently, the traffic circulation around
Oyingbo station area is shown in the figure.
The yellow dotted line denotes the
pedestrian path, the solid line shows the car
path, and the red line indicates the parking
lot. Since this area is currently a one-way
traffic lane, it is recommended to create an
exit at the back of the station. The main
entry will only be for incoming vehicles,
significantly reducing traffic flow and
pressure. Simultaneously, CCECC proposes
fixing the most badly damaged road
portions in order to increase road efficient
capacity.
2. STATION STATUS & ANALYSIS
2.1 Red Line-Oyingbo Station
5
2. STATION STATUS & ANALYSIS
2.2.1 Regional Connectivity
The green line in the image represents
the primary route that connects the
Yaba area including Ojuelegba. During
the Red line operation, this segment will
be essential for conveying passengers
between Yaba Station and Ojuelegba,
Onike, and Jibowu. As a result, the
section’s effective capacity will have an
impact on the traffic situation in this
regions. This road stretch is currently in
good shape and does not require
maintenance. CCECC advises adequate
traffic flow planning in this region to
facilitate smooth operation.
2.2 Red-Yaba Station
Ojuelegba
Yaba
Onike
Jibowu
6
2. STATION STATUS & ANALYSIS
2.4.1 Regional Connectivity
The green line in the picture is the
major connecting road in the Oshodi
area. When the Red line operation
commences, this section will be
responsible for transporting passengers
from Oshodi station between Airport-
Anthony-Mushin respectively. The
aforementioned areas traffic will be
influenced by the station during the
operation the rail line.
The road shown are major expressways
are in good conditions and motorable.
CCECC suggests that a proper and
sustainable Traffic Management Plan
be put in place to avert future traffic
related challenges
2.4 Red-Oshodi Station
Ikeja GRA
Airport
Mushin
7
Papa Ajao
Anthony
2.4 Red Line-Oshodi Station
2.4.2 Station Traffic Flow Planning
Momentarily, the traffic flow in the Oshodi
station area is shown in the figure. The yellow
dotted line indicates the pedestrian pathways for
direct connection into the station, the red
indicates the parking area.
The arc shaped road is for a smooth vehicular
access around the station and beyond. CCECC
suggest his road needs complete repair works
because it is a deplorable state it will ensure
vehicles access the station directly during rail
operations.
2. STATION STATUS & ANALYSIS
8
2. STATION STATUS & ANALYSIS
2.5.1 Regional Connectivity
The green line in the picture is the
major connecting road in the Ikeja
Station. There are several locations
that will be accessible to this station,
Airport, Dopemu, Ikeja and others; the
roads in green line are in good
position. The areas’ traffic will be
influenced by the station during Red
line operation.
2.5 Red-Ikeja Station Dopemu
Airport
Ikeja GRA
9
Ikeja
Ikeja GRA
Ikeja GRA
2.5 Red Line-Ikeja Station
2.5.2 Station Traffic Flow Planning
Momentarily, the traffic flow in the Ikeja
station area is shown in the figure. The
yellow dotted line indicates the access roads
and the traffic directions are indicated with
the arrows, these roads need to be repaired
because they are not in good shape. The red
line in the image indicates the parking area.
The magenta line indicates a proposed
Multi-Storey Parking Lot for both private
and commercial usage. This will ensure
super smooth transportation around the
station’s environs and beyond.
2. STATION STATUS & ANALYSIS
10
2. STATION STATUS & ANALYSIS
2.6.1 Regional Connectivity
The green lines in the picture are major
roads connecting the Agege region.
When the Red line is in operation, this
road section will be responsible for the
flow of passengers to and from Agege
station between Ijaiye and Agege, so the
efficient capacity of this road section
will affect the traffic situation in this
area.
Presently, the road conditions are good,
but the width is relatively narrow.
CCECC recommends repairing the
damaged area of this road section and
widening the road section if certain
conditions are permitted.
2.6 Red Line-Agege Station
Ijaiye
Agege
Ijaiye
Agege
11
2.6.2 Station Traffic Flow Planning
Momentarily, the traffic flow in the Agege
station area is shown in the figure. The
yellow dotted line indicates the pedestrian
pathways, the solid line indicates the
vehicular routes and the red indicates the
parking area, while line in blue represent a
proposed pedestrian bridge.
Community Access Road ① intersects with
the main road in the region, but there is a
three-storey building at the intersection,
which is difficult to demolish, so it is
recommended to carry out minor repairs
only.
Community Access Roads ③ and ④ are
good shape overall, simple repair work is
recommended.
Community Access Road ⑤ is in bad
condition, and it is suggested that it be
repaired and upgraded.
2. STATION STATUS & ANALYSIS
2.6 Red Line-Agege Station
①
② ③ ④
⑤
12
2. STATION STATUS & ANALYSIS
2.7.1 Regional Connectivity
The green line in the image represents the primary
community access road that connects Iju Station (other
roads are narrower and need to be demolished if used
as the main road). After the red line is operational, this
road portion will be responsible for transferring the
passengers in Iju Station surrounding , therefore its
efficiency will have an effect on the road traffic
conditions
This road section's current road conditions are poor,
and its width is rather narrow. However, due to the
length of the road, there are other alternative routes.
As a result, CCECC suggests that minor repairs be
carried out on the damaged region of this road
segment, and that the full road section be repaired if
permitted.
2.7 Red Line-Iju Station
Ishaga
Ifako-Ijaiye
13
2.7.2 Station Traffic Flow Planning
The image depicts the current traffic flow in
the Iju station area. The yellow dotted line
denotes the pedestrian path, the solid line
shows the vehicular path, and the red line
indicates the parking lot, while line in blue
represent a proposed pedestrian bridge.
Because this stretch is currently designated
as the closest community road from the
station to the main road, it is suggested that
it should be restored.
2. STATION STATUS & ANALYSIS
2.7 Red Line-Iju Station
14
2. STATION STATUS & ANALYSIS
2.8.1 Regional Connectivity
The image shows the current state of the
National Station environs. The green line is
an existing road which connects Costain
and the National Theatre without the usage
seamlessly. The road overall conditions of
this road is good but repair works will be
required.
2.8 Blue Line-National Theatre Station
National Theater
Costain
15
SUGGESTIONS
3
16
3. SUGGESTIONS
1. Rigid, Flexible, Interlocking stone pavements
2. 0.9m*0.9m drainages are proposed , also used as sidewalks 3. Installation solar street lights and station signs
17

More Related Content

Similar to PROJECT CONSTRUCTION MGT.pptx

Project brief updated_aug081
Project brief updated_aug081Project brief updated_aug081
Project brief updated_aug081
Anush verma
 
Western Segment Open House - spring 2019
Western Segment Open House - spring 2019 Western Segment Open House - spring 2019
Western Segment Open House - spring 2019
Crosstown TO
 
Appraisal of airport roundabout on the antoa road, kumasi ghana using micro s...
Appraisal of airport roundabout on the antoa road, kumasi ghana using micro s...Appraisal of airport roundabout on the antoa road, kumasi ghana using micro s...
Appraisal of airport roundabout on the antoa road, kumasi ghana using micro s...
eSAT Journals
 
Appraisal of airport roundabout on the antoa road,
Appraisal of airport roundabout on the antoa road,Appraisal of airport roundabout on the antoa road,
Appraisal of airport roundabout on the antoa road,
eSAT Publishing House
 
TRAFFIC ANALYSIS AND DESIGN OF FLYOVER AT PERUMBAVOOR SIGNAL
TRAFFIC ANALYSIS AND DESIGN OF FLYOVER AT PERUMBAVOOR SIGNALTRAFFIC ANALYSIS AND DESIGN OF FLYOVER AT PERUMBAVOOR SIGNAL
TRAFFIC ANALYSIS AND DESIGN OF FLYOVER AT PERUMBAVOOR SIGNAL
IRJET Journal
 
Identification of vehicular growth and its management on nh 202 in ranga redd...
Identification of vehicular growth and its management on nh 202 in ranga redd...Identification of vehicular growth and its management on nh 202 in ranga redd...
Identification of vehicular growth and its management on nh 202 in ranga redd...
EditorIJAERD
 
Status of roads in nairobi by ps mo r 2nd august 2012
Status of roads in nairobi  by ps mo r 2nd august 2012Status of roads in nairobi  by ps mo r 2nd august 2012
Status of roads in nairobi by ps mo r 2nd august 2012
Functional Eco
 
Project I civil engineering for engineering student
Project I civil engineering for engineering studentProject I civil engineering for engineering student
Project I civil engineering for engineering student
kuchhal014
 
Potential and impact study of amman high frequency speed bus, a case study
Potential and impact study of amman high frequency speed bus, a case studyPotential and impact study of amman high frequency speed bus, a case study
Potential and impact study of amman high frequency speed bus, a case study
IJECEIAES
 
ProjectReport.pdf
ProjectReport.pdfProjectReport.pdf
ProjectReport.pdf
ParveenMalik26
 
doubling project synopsis
doubling project synopsisdoubling project synopsis
doubling project synopsis
Neha Singh
 
IRJET- Critical Assessment of Road Capacitiesand Solutions for Traffic Proble...
IRJET- Critical Assessment of Road Capacitiesand Solutions for Traffic Proble...IRJET- Critical Assessment of Road Capacitiesand Solutions for Traffic Proble...
IRJET- Critical Assessment of Road Capacitiesand Solutions for Traffic Proble...
IRJET Journal
 
Union City Letter to Samtrans Dumbarton Corridor
Union City Letter to Samtrans Dumbarton CorridorUnion City Letter to Samtrans Dumbarton Corridor
Union City Letter to Samtrans Dumbarton Corridor
Adina Levin
 
Theoritical framework
Theoritical frameworkTheoritical framework
Theoritical framework
Isha Kirti
 
IRJET- Financial Feasibility Study of the Indian Bullet Train
IRJET-  	  Financial Feasibility Study of the Indian Bullet TrainIRJET-  	  Financial Feasibility Study of the Indian Bullet Train
IRJET- Financial Feasibility Study of the Indian Bullet Train
IRJET Journal
 
Ijciet 10 01_199
Ijciet 10 01_199Ijciet 10 01_199
Ijciet 10 01_199
IAEME Publication
 
IRJET- Feasibility Check and Analysis of a Flyover Over a Railway Cross
IRJET-  	  Feasibility Check and Analysis of a Flyover Over a Railway CrossIRJET-  	  Feasibility Check and Analysis of a Flyover Over a Railway Cross
IRJET- Feasibility Check and Analysis of a Flyover Over a Railway Cross
IRJET Journal
 
Improvement and Asphalting of State Highway and Major District Road of Koppal...
Improvement and Asphalting of State Highway and Major District Road of Koppal...Improvement and Asphalting of State Highway and Major District Road of Koppal...
Improvement and Asphalting of State Highway and Major District Road of Koppal...
IRJET Journal
 
Avance 1
Avance 1Avance 1
Avance 1
guidoespinoza13
 
Rethinking the Jonio Metro station as a Transport Hub
Rethinking the Jonio Metro station as a Transport HubRethinking the Jonio Metro station as a Transport Hub
Rethinking the Jonio Metro station as a Transport Hub
Oleg Buyanov
 

Similar to PROJECT CONSTRUCTION MGT.pptx (20)

Project brief updated_aug081
Project brief updated_aug081Project brief updated_aug081
Project brief updated_aug081
 
Western Segment Open House - spring 2019
Western Segment Open House - spring 2019 Western Segment Open House - spring 2019
Western Segment Open House - spring 2019
 
Appraisal of airport roundabout on the antoa road, kumasi ghana using micro s...
Appraisal of airport roundabout on the antoa road, kumasi ghana using micro s...Appraisal of airport roundabout on the antoa road, kumasi ghana using micro s...
Appraisal of airport roundabout on the antoa road, kumasi ghana using micro s...
 
Appraisal of airport roundabout on the antoa road,
Appraisal of airport roundabout on the antoa road,Appraisal of airport roundabout on the antoa road,
Appraisal of airport roundabout on the antoa road,
 
TRAFFIC ANALYSIS AND DESIGN OF FLYOVER AT PERUMBAVOOR SIGNAL
TRAFFIC ANALYSIS AND DESIGN OF FLYOVER AT PERUMBAVOOR SIGNALTRAFFIC ANALYSIS AND DESIGN OF FLYOVER AT PERUMBAVOOR SIGNAL
TRAFFIC ANALYSIS AND DESIGN OF FLYOVER AT PERUMBAVOOR SIGNAL
 
Identification of vehicular growth and its management on nh 202 in ranga redd...
Identification of vehicular growth and its management on nh 202 in ranga redd...Identification of vehicular growth and its management on nh 202 in ranga redd...
Identification of vehicular growth and its management on nh 202 in ranga redd...
 
Status of roads in nairobi by ps mo r 2nd august 2012
Status of roads in nairobi  by ps mo r 2nd august 2012Status of roads in nairobi  by ps mo r 2nd august 2012
Status of roads in nairobi by ps mo r 2nd august 2012
 
Project I civil engineering for engineering student
Project I civil engineering for engineering studentProject I civil engineering for engineering student
Project I civil engineering for engineering student
 
Potential and impact study of amman high frequency speed bus, a case study
Potential and impact study of amman high frequency speed bus, a case studyPotential and impact study of amman high frequency speed bus, a case study
Potential and impact study of amman high frequency speed bus, a case study
 
ProjectReport.pdf
ProjectReport.pdfProjectReport.pdf
ProjectReport.pdf
 
doubling project synopsis
doubling project synopsisdoubling project synopsis
doubling project synopsis
 
IRJET- Critical Assessment of Road Capacitiesand Solutions for Traffic Proble...
IRJET- Critical Assessment of Road Capacitiesand Solutions for Traffic Proble...IRJET- Critical Assessment of Road Capacitiesand Solutions for Traffic Proble...
IRJET- Critical Assessment of Road Capacitiesand Solutions for Traffic Proble...
 
Union City Letter to Samtrans Dumbarton Corridor
Union City Letter to Samtrans Dumbarton CorridorUnion City Letter to Samtrans Dumbarton Corridor
Union City Letter to Samtrans Dumbarton Corridor
 
Theoritical framework
Theoritical frameworkTheoritical framework
Theoritical framework
 
IRJET- Financial Feasibility Study of the Indian Bullet Train
IRJET-  	  Financial Feasibility Study of the Indian Bullet TrainIRJET-  	  Financial Feasibility Study of the Indian Bullet Train
IRJET- Financial Feasibility Study of the Indian Bullet Train
 
Ijciet 10 01_199
Ijciet 10 01_199Ijciet 10 01_199
Ijciet 10 01_199
 
IRJET- Feasibility Check and Analysis of a Flyover Over a Railway Cross
IRJET-  	  Feasibility Check and Analysis of a Flyover Over a Railway CrossIRJET-  	  Feasibility Check and Analysis of a Flyover Over a Railway Cross
IRJET- Feasibility Check and Analysis of a Flyover Over a Railway Cross
 
Improvement and Asphalting of State Highway and Major District Road of Koppal...
Improvement and Asphalting of State Highway and Major District Road of Koppal...Improvement and Asphalting of State Highway and Major District Road of Koppal...
Improvement and Asphalting of State Highway and Major District Road of Koppal...
 
Avance 1
Avance 1Avance 1
Avance 1
 
Rethinking the Jonio Metro station as a Transport Hub
Rethinking the Jonio Metro station as a Transport HubRethinking the Jonio Metro station as a Transport Hub
Rethinking the Jonio Metro station as a Transport Hub
 

Recently uploaded

Embedded machine learning-based road conditions and driving behavior monitoring
Embedded machine learning-based road conditions and driving behavior monitoringEmbedded machine learning-based road conditions and driving behavior monitoring
Embedded machine learning-based road conditions and driving behavior monitoring
IJECEIAES
 
IEEE Aerospace and Electronic Systems Society as a Graduate Student Member
IEEE Aerospace and Electronic Systems Society as a Graduate Student MemberIEEE Aerospace and Electronic Systems Society as a Graduate Student Member
IEEE Aerospace and Electronic Systems Society as a Graduate Student Member
VICTOR MAESTRE RAMIREZ
 
ISPM 15 Heat Treated Wood Stamps and why your shipping must have one
ISPM 15 Heat Treated Wood Stamps and why your shipping must have oneISPM 15 Heat Treated Wood Stamps and why your shipping must have one
ISPM 15 Heat Treated Wood Stamps and why your shipping must have one
Las Vegas Warehouse
 
gray level transformation unit 3(image processing))
gray level transformation unit 3(image processing))gray level transformation unit 3(image processing))
gray level transformation unit 3(image processing))
shivani5543
 
Hematology Analyzer Machine - Complete Blood Count
Hematology Analyzer Machine - Complete Blood CountHematology Analyzer Machine - Complete Blood Count
Hematology Analyzer Machine - Complete Blood Count
shahdabdulbaset
 
DEEP LEARNING FOR SMART GRID INTRUSION DETECTION: A HYBRID CNN-LSTM-BASED MODEL
DEEP LEARNING FOR SMART GRID INTRUSION DETECTION: A HYBRID CNN-LSTM-BASED MODELDEEP LEARNING FOR SMART GRID INTRUSION DETECTION: A HYBRID CNN-LSTM-BASED MODEL
DEEP LEARNING FOR SMART GRID INTRUSION DETECTION: A HYBRID CNN-LSTM-BASED MODEL
gerogepatton
 
ML Based Model for NIDS MSc Updated Presentation.v2.pptx
ML Based Model for NIDS MSc Updated Presentation.v2.pptxML Based Model for NIDS MSc Updated Presentation.v2.pptx
ML Based Model for NIDS MSc Updated Presentation.v2.pptx
JamalHussainArman
 
KuberTENes Birthday Bash Guadalajara - K8sGPT first impressions
KuberTENes Birthday Bash Guadalajara - K8sGPT first impressionsKuberTENes Birthday Bash Guadalajara - K8sGPT first impressions
KuberTENes Birthday Bash Guadalajara - K8sGPT first impressions
Victor Morales
 
Casting-Defect-inSlab continuous casting.pdf
Casting-Defect-inSlab continuous casting.pdfCasting-Defect-inSlab continuous casting.pdf
Casting-Defect-inSlab continuous casting.pdf
zubairahmad848137
 
Engineering Drawings Lecture Detail Drawings 2014.pdf
Engineering Drawings Lecture Detail Drawings 2014.pdfEngineering Drawings Lecture Detail Drawings 2014.pdf
Engineering Drawings Lecture Detail Drawings 2014.pdf
abbyasa1014
 
john krisinger-the science and history of the alcoholic beverage.pptx
john krisinger-the science and history of the alcoholic beverage.pptxjohn krisinger-the science and history of the alcoholic beverage.pptx
john krisinger-the science and history of the alcoholic beverage.pptx
Madan Karki
 
Electric vehicle and photovoltaic advanced roles in enhancing the financial p...
Electric vehicle and photovoltaic advanced roles in enhancing the financial p...Electric vehicle and photovoltaic advanced roles in enhancing the financial p...
Electric vehicle and photovoltaic advanced roles in enhancing the financial p...
IJECEIAES
 
哪里办理(csu毕业证书)查尔斯特大学毕业证硕士学历原版一模一样
哪里办理(csu毕业证书)查尔斯特大学毕业证硕士学历原版一模一样哪里办理(csu毕业证书)查尔斯特大学毕业证硕士学历原版一模一样
哪里办理(csu毕业证书)查尔斯特大学毕业证硕士学历原版一模一样
insn4465
 
BPV-GUI-01-Guide-for-ASME-Review-Teams-(General)-10-10-2023.pdf
BPV-GUI-01-Guide-for-ASME-Review-Teams-(General)-10-10-2023.pdfBPV-GUI-01-Guide-for-ASME-Review-Teams-(General)-10-10-2023.pdf
BPV-GUI-01-Guide-for-ASME-Review-Teams-(General)-10-10-2023.pdf
MIGUELANGEL966976
 
Harnessing WebAssembly for Real-time Stateless Streaming Pipelines
Harnessing WebAssembly for Real-time Stateless Streaming PipelinesHarnessing WebAssembly for Real-time Stateless Streaming Pipelines
Harnessing WebAssembly for Real-time Stateless Streaming Pipelines
Christina Lin
 
Transformers design and coooling methods
Transformers design and coooling methodsTransformers design and coooling methods
Transformers design and coooling methods
Roger Rozario
 
Literature Review Basics and Understanding Reference Management.pptx
Literature Review Basics and Understanding Reference Management.pptxLiterature Review Basics and Understanding Reference Management.pptx
Literature Review Basics and Understanding Reference Management.pptx
Dr Ramhari Poudyal
 
BRAIN TUMOR DETECTION for seminar ppt.pdf
BRAIN TUMOR DETECTION for seminar ppt.pdfBRAIN TUMOR DETECTION for seminar ppt.pdf
BRAIN TUMOR DETECTION for seminar ppt.pdf
LAXMAREDDY22
 
Properties Railway Sleepers and Test.pptx
Properties Railway Sleepers and Test.pptxProperties Railway Sleepers and Test.pptx
Properties Railway Sleepers and Test.pptx
MDSABBIROJJAMANPAYEL
 
Redefining brain tumor segmentation: a cutting-edge convolutional neural netw...
Redefining brain tumor segmentation: a cutting-edge convolutional neural netw...Redefining brain tumor segmentation: a cutting-edge convolutional neural netw...
Redefining brain tumor segmentation: a cutting-edge convolutional neural netw...
IJECEIAES
 

Recently uploaded (20)

Embedded machine learning-based road conditions and driving behavior monitoring
Embedded machine learning-based road conditions and driving behavior monitoringEmbedded machine learning-based road conditions and driving behavior monitoring
Embedded machine learning-based road conditions and driving behavior monitoring
 
IEEE Aerospace and Electronic Systems Society as a Graduate Student Member
IEEE Aerospace and Electronic Systems Society as a Graduate Student MemberIEEE Aerospace and Electronic Systems Society as a Graduate Student Member
IEEE Aerospace and Electronic Systems Society as a Graduate Student Member
 
ISPM 15 Heat Treated Wood Stamps and why your shipping must have one
ISPM 15 Heat Treated Wood Stamps and why your shipping must have oneISPM 15 Heat Treated Wood Stamps and why your shipping must have one
ISPM 15 Heat Treated Wood Stamps and why your shipping must have one
 
gray level transformation unit 3(image processing))
gray level transformation unit 3(image processing))gray level transformation unit 3(image processing))
gray level transformation unit 3(image processing))
 
Hematology Analyzer Machine - Complete Blood Count
Hematology Analyzer Machine - Complete Blood CountHematology Analyzer Machine - Complete Blood Count
Hematology Analyzer Machine - Complete Blood Count
 
DEEP LEARNING FOR SMART GRID INTRUSION DETECTION: A HYBRID CNN-LSTM-BASED MODEL
DEEP LEARNING FOR SMART GRID INTRUSION DETECTION: A HYBRID CNN-LSTM-BASED MODELDEEP LEARNING FOR SMART GRID INTRUSION DETECTION: A HYBRID CNN-LSTM-BASED MODEL
DEEP LEARNING FOR SMART GRID INTRUSION DETECTION: A HYBRID CNN-LSTM-BASED MODEL
 
ML Based Model for NIDS MSc Updated Presentation.v2.pptx
ML Based Model for NIDS MSc Updated Presentation.v2.pptxML Based Model for NIDS MSc Updated Presentation.v2.pptx
ML Based Model for NIDS MSc Updated Presentation.v2.pptx
 
KuberTENes Birthday Bash Guadalajara - K8sGPT first impressions
KuberTENes Birthday Bash Guadalajara - K8sGPT first impressionsKuberTENes Birthday Bash Guadalajara - K8sGPT first impressions
KuberTENes Birthday Bash Guadalajara - K8sGPT first impressions
 
Casting-Defect-inSlab continuous casting.pdf
Casting-Defect-inSlab continuous casting.pdfCasting-Defect-inSlab continuous casting.pdf
Casting-Defect-inSlab continuous casting.pdf
 
Engineering Drawings Lecture Detail Drawings 2014.pdf
Engineering Drawings Lecture Detail Drawings 2014.pdfEngineering Drawings Lecture Detail Drawings 2014.pdf
Engineering Drawings Lecture Detail Drawings 2014.pdf
 
john krisinger-the science and history of the alcoholic beverage.pptx
john krisinger-the science and history of the alcoholic beverage.pptxjohn krisinger-the science and history of the alcoholic beverage.pptx
john krisinger-the science and history of the alcoholic beverage.pptx
 
Electric vehicle and photovoltaic advanced roles in enhancing the financial p...
Electric vehicle and photovoltaic advanced roles in enhancing the financial p...Electric vehicle and photovoltaic advanced roles in enhancing the financial p...
Electric vehicle and photovoltaic advanced roles in enhancing the financial p...
 
哪里办理(csu毕业证书)查尔斯特大学毕业证硕士学历原版一模一样
哪里办理(csu毕业证书)查尔斯特大学毕业证硕士学历原版一模一样哪里办理(csu毕业证书)查尔斯特大学毕业证硕士学历原版一模一样
哪里办理(csu毕业证书)查尔斯特大学毕业证硕士学历原版一模一样
 
BPV-GUI-01-Guide-for-ASME-Review-Teams-(General)-10-10-2023.pdf
BPV-GUI-01-Guide-for-ASME-Review-Teams-(General)-10-10-2023.pdfBPV-GUI-01-Guide-for-ASME-Review-Teams-(General)-10-10-2023.pdf
BPV-GUI-01-Guide-for-ASME-Review-Teams-(General)-10-10-2023.pdf
 
Harnessing WebAssembly for Real-time Stateless Streaming Pipelines
Harnessing WebAssembly for Real-time Stateless Streaming PipelinesHarnessing WebAssembly for Real-time Stateless Streaming Pipelines
Harnessing WebAssembly for Real-time Stateless Streaming Pipelines
 
Transformers design and coooling methods
Transformers design and coooling methodsTransformers design and coooling methods
Transformers design and coooling methods
 
Literature Review Basics and Understanding Reference Management.pptx
Literature Review Basics and Understanding Reference Management.pptxLiterature Review Basics and Understanding Reference Management.pptx
Literature Review Basics and Understanding Reference Management.pptx
 
BRAIN TUMOR DETECTION for seminar ppt.pdf
BRAIN TUMOR DETECTION for seminar ppt.pdfBRAIN TUMOR DETECTION for seminar ppt.pdf
BRAIN TUMOR DETECTION for seminar ppt.pdf
 
Properties Railway Sleepers and Test.pptx
Properties Railway Sleepers and Test.pptxProperties Railway Sleepers and Test.pptx
Properties Railway Sleepers and Test.pptx
 
Redefining brain tumor segmentation: a cutting-edge convolutional neural netw...
Redefining brain tumor segmentation: a cutting-edge convolutional neural netw...Redefining brain tumor segmentation: a cutting-edge convolutional neural netw...
Redefining brain tumor segmentation: a cutting-edge convolutional neural netw...
 

PROJECT CONSTRUCTION MGT.pptx

  • 1. CO NTENTS SUMMARY STATION STATUS & ANALYSIS SUGGESTIONS PROGRAMME 01 02 03 04 1
  • 3. The Lagos Red Line and Blue Line Light Rail Projects are the two rail lines project currently being implemented in Lagos State. The Blue line runs from Marina to Mile 2 while the red line runs from Oyingbo to Agbado. Both lines when completed shall daily convey a large number of passenger flow, and as such would invariably have impacts on the traffic flow of adjoining roads near the stations along each line. Therefore, it is critical to carry out effective traffic planning and infrastructure enhancements for each station area to facilitate effective traffic circulation. CCECC is a reputed construction company with years of expertise and professionalism in railways, highways, bridges, housing, construction and operation. The CCECC planning and design team can aid LAMATA in making effective suggestions for transportation planning and smooth operability as well as for highways, bridges, parking lots and other infrastructure to propose planning and design proposals. This will go a long way in providing a solid assurance for the effective and seamless functioning of each station following the opening of the Red and Blue Lines of the light rail. 1. SUMMARY Iju Agege Ikeja Oshidi Mushin Yaba Oyinbo Mile2 Alaba Iganmu National Theatre Marina 3
  • 4. 2. STATION STATUS & ANALYSIS 2.1 Red Line-Oyingbo Station 2.1.1 Regional Connectivity The green line in the diagram represents the access road section connecting the two transportation hubs. Once the Red Line is completed and operational, this road section shall be necessary for transporting passengers between Oyingbo Station and the two nearest bus stops. As a result, the present capacity of this road stretch will have an impact on traffic in this region in future. At the moment, several portions of this road section are severely damaged. Therefore, CCECC suggests that the road section and other close access roads be adequately rehabilitated. Costain Oyingbo 4
  • 5. 2.1.2 Station Traffic Flow Planning Presently, the traffic circulation around Oyingbo station area is shown in the figure. The yellow dotted line denotes the pedestrian path, the solid line shows the car path, and the red line indicates the parking lot. Since this area is currently a one-way traffic lane, it is recommended to create an exit at the back of the station. The main entry will only be for incoming vehicles, significantly reducing traffic flow and pressure. Simultaneously, CCECC proposes fixing the most badly damaged road portions in order to increase road efficient capacity. 2. STATION STATUS & ANALYSIS 2.1 Red Line-Oyingbo Station 5
  • 6. 2. STATION STATUS & ANALYSIS 2.2.1 Regional Connectivity The green line in the image represents the primary route that connects the Yaba area including Ojuelegba. During the Red line operation, this segment will be essential for conveying passengers between Yaba Station and Ojuelegba, Onike, and Jibowu. As a result, the section’s effective capacity will have an impact on the traffic situation in this regions. This road stretch is currently in good shape and does not require maintenance. CCECC advises adequate traffic flow planning in this region to facilitate smooth operation. 2.2 Red-Yaba Station Ojuelegba Yaba Onike Jibowu 6
  • 7. 2. STATION STATUS & ANALYSIS 2.4.1 Regional Connectivity The green line in the picture is the major connecting road in the Oshodi area. When the Red line operation commences, this section will be responsible for transporting passengers from Oshodi station between Airport- Anthony-Mushin respectively. The aforementioned areas traffic will be influenced by the station during the operation the rail line. The road shown are major expressways are in good conditions and motorable. CCECC suggests that a proper and sustainable Traffic Management Plan be put in place to avert future traffic related challenges 2.4 Red-Oshodi Station Ikeja GRA Airport Mushin 7 Papa Ajao Anthony
  • 8. 2.4 Red Line-Oshodi Station 2.4.2 Station Traffic Flow Planning Momentarily, the traffic flow in the Oshodi station area is shown in the figure. The yellow dotted line indicates the pedestrian pathways for direct connection into the station, the red indicates the parking area. The arc shaped road is for a smooth vehicular access around the station and beyond. CCECC suggest his road needs complete repair works because it is a deplorable state it will ensure vehicles access the station directly during rail operations. 2. STATION STATUS & ANALYSIS 8
  • 9. 2. STATION STATUS & ANALYSIS 2.5.1 Regional Connectivity The green line in the picture is the major connecting road in the Ikeja Station. There are several locations that will be accessible to this station, Airport, Dopemu, Ikeja and others; the roads in green line are in good position. The areas’ traffic will be influenced by the station during Red line operation. 2.5 Red-Ikeja Station Dopemu Airport Ikeja GRA 9 Ikeja Ikeja GRA Ikeja GRA
  • 10. 2.5 Red Line-Ikeja Station 2.5.2 Station Traffic Flow Planning Momentarily, the traffic flow in the Ikeja station area is shown in the figure. The yellow dotted line indicates the access roads and the traffic directions are indicated with the arrows, these roads need to be repaired because they are not in good shape. The red line in the image indicates the parking area. The magenta line indicates a proposed Multi-Storey Parking Lot for both private and commercial usage. This will ensure super smooth transportation around the station’s environs and beyond. 2. STATION STATUS & ANALYSIS 10
  • 11. 2. STATION STATUS & ANALYSIS 2.6.1 Regional Connectivity The green lines in the picture are major roads connecting the Agege region. When the Red line is in operation, this road section will be responsible for the flow of passengers to and from Agege station between Ijaiye and Agege, so the efficient capacity of this road section will affect the traffic situation in this area. Presently, the road conditions are good, but the width is relatively narrow. CCECC recommends repairing the damaged area of this road section and widening the road section if certain conditions are permitted. 2.6 Red Line-Agege Station Ijaiye Agege Ijaiye Agege 11
  • 12. 2.6.2 Station Traffic Flow Planning Momentarily, the traffic flow in the Agege station area is shown in the figure. The yellow dotted line indicates the pedestrian pathways, the solid line indicates the vehicular routes and the red indicates the parking area, while line in blue represent a proposed pedestrian bridge. Community Access Road ① intersects with the main road in the region, but there is a three-storey building at the intersection, which is difficult to demolish, so it is recommended to carry out minor repairs only. Community Access Roads ③ and ④ are good shape overall, simple repair work is recommended. Community Access Road ⑤ is in bad condition, and it is suggested that it be repaired and upgraded. 2. STATION STATUS & ANALYSIS 2.6 Red Line-Agege Station ① ② ③ ④ ⑤ 12
  • 13. 2. STATION STATUS & ANALYSIS 2.7.1 Regional Connectivity The green line in the image represents the primary community access road that connects Iju Station (other roads are narrower and need to be demolished if used as the main road). After the red line is operational, this road portion will be responsible for transferring the passengers in Iju Station surrounding , therefore its efficiency will have an effect on the road traffic conditions This road section's current road conditions are poor, and its width is rather narrow. However, due to the length of the road, there are other alternative routes. As a result, CCECC suggests that minor repairs be carried out on the damaged region of this road segment, and that the full road section be repaired if permitted. 2.7 Red Line-Iju Station Ishaga Ifako-Ijaiye 13
  • 14. 2.7.2 Station Traffic Flow Planning The image depicts the current traffic flow in the Iju station area. The yellow dotted line denotes the pedestrian path, the solid line shows the vehicular path, and the red line indicates the parking lot, while line in blue represent a proposed pedestrian bridge. Because this stretch is currently designated as the closest community road from the station to the main road, it is suggested that it should be restored. 2. STATION STATUS & ANALYSIS 2.7 Red Line-Iju Station 14
  • 15. 2. STATION STATUS & ANALYSIS 2.8.1 Regional Connectivity The image shows the current state of the National Station environs. The green line is an existing road which connects Costain and the National Theatre without the usage seamlessly. The road overall conditions of this road is good but repair works will be required. 2.8 Blue Line-National Theatre Station National Theater Costain 15
  • 17. 3. SUGGESTIONS 1. Rigid, Flexible, Interlocking stone pavements 2. 0.9m*0.9m drainages are proposed , also used as sidewalks 3. Installation solar street lights and station signs 17