1. SUMMER TRAINING PRESENTATION
On
SIGNALLING
In
LUCKNOW METRO RAIL CORPORATION
Presented by
ANUMODITA SINGH (1512231035)
DEPARTMENT OF ELECTRONICS AND COMMUNICATION ENGINEERING
SHRI RAMSWAROOP MEMORIAL GROUP OF PROFESSIONAL
COLLEGES, LUCKNOW
Affiliated to
Dr. A.P.J ABDUL KALAM TECHNICAL UNIVERSITY
LUCKNOW
2. INTRODUCTION
Lucknow Metro is a rapid transit system serving the city
of Lucknow in the northern Indian state of Uttar
Pradesh.
Construction of the line began on 27 September 2014
with 8.5 km stretch from Transport Nagar to Charbagh
railway station.
It began its commercial operation on 5 September 2017,
making it the fastest built metro rail system in the
country.
2
3. HISTORY
Initially Lucknow Metro Rail Project was planned to
include two corridors: North-South and East-West; with
links through Gomti Nagar.
The estimated construction cost was Rs.74.13 billion for
north-south corridor, Rs.48.79 billion for east-west
corridor and Rs.4.95 billion for Gomti Nagar link.
The designed speed of metro would be 90 km/h while the
scheduled speed would be 34 km/h for north-south
corridor and 32 km/h for east-west corridor.
3
4. SIGNAL
It is an indication given to train operator for controlling the
movement of train.
On railways all over the world, signals are used to indicate
to the driver of the train how he should proceed. The driver,
using his knowledge of the line and of the train he is
controlling, will make a judgement about how fast he can
safely let his train go and will proceed accordingly.
4
5. FUNCTIONS OF SIGNALING
SYSTEM
To drive the train and regulate traffic
Avoid collision and derailment
Manage safe passenger exchange
Ensure passenger protection
Insert/ remove train from the mainline
Ensure maintenance and statistics
5
6. SIGNALASPECTS
ON ASPECT: It is the most restrictive aspect of the signal. TO (Train
operator) is not allowed to pass this signal.
6
7. OFF ASPECT: It is the permissive aspect of the signal
and TO is allowed to pass this signal.
7
13. POINT AND POINT MACHINE
Point is an arrangement used to connect one line to
another for the purpose of making a movement from one
line to other line.
A Point is a mechanical installation enabling trains to be
guided from one track to another.
13
14. Point Position can be
Normal
Reverse
NORMAL: In this case train moves in straight direction
14
15. REVERSE: In this position point causes
diversion of train from one line to another.15