Strategic deployment of Program Management best-practice model
in financial institutions.
Author Name: Kaushik Pramanik, PMP, MSP, PGDOL(Oxford), DOL(LSE), Mtech (IIT), B.M.E
Introduction:
Structuredand industrystandard best-practiceProgramManagementframeworkisverymuchessential
to smooth execution of company strategy and objectives, achieve the result and gain the increased
customer satisfaction globally.
Financial institutionslikeBanks,Insurance companies,Financialdataproviders, Stockexchangesexecute
many multi-million dollars cross-functional and cross-divisional transformation programs spanning
across different geographic regions and divisions.
This article is focused on industry-standard practices and briefly describes how to deploy such a
framework in the global financial institutions.
Programme Management may be defined as the co-ordinated organisation, direction and
implementation of a portfolio of projects and activities that together achieve outcomes and realise
benefits that are of strategic importance.
Effective and efficient Program Management is the key success factor to any financial institutions to
transformthe company’s visionandvariousinter-relatedstrategic objectives spanning across different
sectors like core business, IT, operation, HR, finance; etc.
There are number of Program Management framework exists within the industry; as example, PMI
(ProjectManagementInstitute) basedSPM(Standard for Program Management) framework, TSO (The
Stationary Office,UKGovernment) basedMSP(Managing SuccessfulPrograms) framework,Universityof
Oxford Program Management framework, George Washington University Program Management
framework, Big 4 consultancy firm’s Program Management framework etc.
However, veryfewcompaniesaroundthe world follow the best-practice framework provided by major
institutesand universities even though there is a high level of benefit for using the industry-standard
program management framework. This article will provide a very brief overview of PMI based SPM
approach and TSO (The Stationary Office,UKGovernment) based MSP approach and how to deploy any
of these models through-out a global company through strategic execution.
Brief Overview of PMI based Standard for Program Management (SPM) approach:
Program delivers benefits to organizations by developing new capabilities or enhancing current
capabilities.Programsare initiatedfor achievingorganizationalgoalsandstrategicobjectivesthat are so
large scale that theycannotbe achievedbysingle project. Diagrammaticview of Standard for Program
Management framework is given below.
Source: THE STANDARD FOR THE PROGRAM MANAGEMENT, Second Edition, PMI, Chapter 1, 2 & 3
PMI based Standard for Program Management framework mainly consists of following key areas.
 Program Governance and Stakeholder Management: This area spans all the program life cycle
phases. Program governance overseas the progress of the program and the delivery of the
coordinated benefits from its components.
Programs are often too complex to be managed by a single individual, which is why appropriate
implementation of program governance is the critical factor for a program to succeed. Program
governance helps in managing risks, stakeholders’ benefits, resources, and quality across the
program life cycle. Furthermore, program governance ensures decision-making and delivery
managementactivitiesare focused on achieving program goals in a consistent manner, addressing
appropriate risks, and fulfilling stakeholder requirements.
Program governance also provides an appropriate organizational structure, the policies and
procedures necessary to support program delivery through formal program reviews. This is
facilitatedbythe regularandphase-gate-basedmonitoringof deliverables, performance, risks, and
issues by the program board.
Program stakeholder management identifies how the program will affect stakeholders (e.g., the
organizations’ culture, the local population, country-specific culture, resistance or barriers to
change, bureaucracy, etc.) and then develops a communication strategy to engage the affected
stakeholders,manage theirexpectationsandmanage acceptance of the objectives of the program.
Program stakeholdermanagementis the very importantfactortoestablish the programgovernance
and program organizational structure, which is monitored and reviewed through-out the program
life cycle.
 Program Life Cycle: Typical program life cycle consists of five phases (Pre-Program Preparations,
Program Initiation, Program Set-up, Delivery of Program Benefits, and Program Closure) as
mentioned in the above picture. End of each phase works as an entry point to the next phase.
Duringthe variousstagesof programlife cycle,programmanagerunderstandsthe strategicbenefits
of the program, develop the plan to initiate the program, define the program objectives and their
alignment with the organizations’ goals and vision, develop the high-level business case
demonstratinganunderstandingof the needs,businessbenefits, feasibility and justification of the
program,establishthe program governance mechanism, risk management protocols, and program
schedule.The programlife cycle complieswiththe needsof corporate governance and also ensures
that the expected benefits are realized in a predictable and coordinated manner.
 ProgramBenefits Management: Programdeliversbenefitstothe organization.Benefitsrealization
planning is part of program management which consists of interdependencies between benefits,
alignmentwith the strategic goals of the organization, benefit of delivery scheduling, metrics and
measurement, responsibilityfordeliveryof the final andintermediate benefits within the program,
and benefit realization.
At the end of the program, the benefits delivered should always be compared against those
promisedinthe initial businesscase toensure that the program actually delivered the full benefits
for which it was created.
 Program Management Process Groups: Program management process groups are a set of
interrelated actions, and activities performed to achieve a pre-specified outcome. Program
management processes are primarily integrative in that they coordinate the outputs of various
projects to derive the desired program outcomes.
A showninthe above picture,there are five processes (Initiation,Planning,Executing, Monitoring &
Controlling and Closing) in program management. Processes receive inputs from processes that
logicallyprecedethemandsendoutputstosuccessorprocesses. A guidingrule forapplyingprogram
management processes is to ensure that the program manager effectively delegates authority,
autonomyandresponsibilityfor day-to-day management of the projects to the designated project
managers.
Brief Overview of TSO based Managing Successful Programs (MSP) approach:
TSO (The Stationary Office, UK Government) based MSP approach is basically based on a two-layer
framework.Asshownbelowinthe diagram, the outerlayerconcentrateson various program principals
like empowerment,leadingthe change,envisioning,addingvalue,focusingon benefits, alignment with
corporate strategy,capabilitydevelopmentandlearningexperience.These principalsare veryimportant
to execute aglobal transformationprograminthe organizationandmostlylinked with leadership skills
associated with Program Management.
TSO (The Stationary Office) - Frameworkand Process
Remainingalignedwith
corporate strategy
Organisation
Closing a
Programme
Defining a
Programme
Identifying a
Programme
Managing
theTranches
Delivering the
Capability
Realising
the Benefits
Sources:
1. MSP framework and concepts, published by The Stationary Office (TSO), UK Government
2. http://www.managing-successful-programmes.com/
3. Managing Successful Programmes Manual - 4th Edition
4. Swiss Program Management Conference, 2012
The second layer core consists of program management activities like program vision development,
organization, stakeholder management, business case development, blue print design, planning &
control, program risk management, quality management, program delivery, benefit realization
management, etc.
Present Scenario:
Many global financial institutes do not follow any industry-standard program management framework
rather thanfollowtheirowncustomizedframeworkandguidelinestoexecute the program. Sometimes
the in-house framework is not consistent enough.
The usage of inconsistent approach results various downside risks like increased financial risk (e.g.;
budget overrun), reduced customer satisfaction, low quality ends deliverables, slippage on schedule,
usage of differentprogramterminology,processesandtools, below the standard management and KPI
reporting, and lacking of controlled governance mechanism.
The main reasonbehindthisisthat Sr. Management of the organization doesn’t value best practice, or
theyare notaware of the latestindustrystandard.Many program managers are not properly trained to
execute acomplex cross-divisional andcross-functional program in the large organization and very few
people in the company are aware of strategic implications of program management and portfolio
management.
To overcome this problem, it is very much essential to form a central program management control
departmentwhich willbe responsible for rolling-out the best-practice framework across divisions and
regions through effective communication, collaboration and hands-on training to program managers.
Deployment Model:
Deployment of Program Management best practice framework in the global organization across
divisions and regions is a herculean task. To achieve the goal, several strategic measures have to be
taken into consideration.
As shown in the below figure, three work streams have to be formed. The Communication and
Communities Work stream is responsible for creating the awareness about program management,
communicatingguidelines & policies about the best-practice framework and establishing the program
management community across the organization.
Deployment model: Work Stream concept
“Program
Management – Best
Practice”: Deployment
Communication &
Communities Work Stream
Training, Tools & Techniques,
and Support Work Stream
Cross-functional
collaboration Work
Stream
GovernanceGovernance
Setthe strategicdirection
Establishdisciplinedexecution
Define variousactions
Prioritise & communicate
Establishthe accountability
Define rewards&recognition
Evaluate framework &roadmap
Investmentdecision
Source: Own idea
Training,Tools & Techniques,and Support workstreamisresponsible for developmentandexecution of
a frameworkrelatedtotraining,tools& techniques, and user support of “Program Management – Best
Practice” to increase the quality and efficiency of numerous program management environments in
the global organization.
Finally, Cross – functional collaboration work stream will be responsible for collaboration and
coordination between above two work streams across organizational divisions and regions, corporate
trainingdepartment,externalpartiestofacilitate smoothdeploymentof “Program Management – Best
Practice” framework in the company.
Furthermore, astronggovernance model must be in place to integrate three work streams mentioned
above. The main responsibilities of the governance model are setting-up the strategic direction,
disciplinedexecution, prioritize andcommunicate,establishmentof accountability,definition of reward
& recognitionand various investment decisions. A sample governance model for deployment is given
below.
COO/
DOO/
GIO
Governan
ce
Program Management– Best Practice Governance
Strongfocus from top.
Endto end governance.
Topto bottom transparency.
High-level of accountability.
Resultorientedstructure.
Clearstrategy & big picture.
Long-termsustainability.
Well drawnroad map.
Teamforce inaction.
Fosteringcollaboration.
Catalystto transformation.
Rewardand recognition.
COO/ DOO GIO
Governance triangle
Consistsof
Headof Program
ManagementPractice,
Workstream leaders(3)
Frequency(2permonth)
Consistsof
Workstream leaders,
Regional participants,
Frequency(2permonth)
Each work stream will have governance mechanism…
Workstream Governance
CoEEnterprise Transformation
Governance
Source: Own idea
Conclusion:
All major financial institutions are continuously lacking of standard program management practice. In
today’s volatile economic and global environment, it is very important to streamline program
management practice across the organization which will help to achieve company’s vision, goals and
strategicobjectives inasystematicmanner.The industrystandard best-practicemethodology providesa
sustainable framework that is clear, complete, relevant and generally recognized as good practices on
most programs, most of the time.
References:
1. The Standard For Program Management, Second Edition by PMI (Project Management
Institute)
2. http://www.managing-successful-programmes.com/
3. Managing Successful Programmes Manual - 4th Edition
4. Swiss Program Management Conference, 2012

More Related Content

What's hot

Benefit Realisation - a whitepaper
Benefit Realisation - a whitepaperBenefit Realisation - a whitepaper
Benefit Realisation - a whitepaper
Newport Consulting
 
Overview of Program Management
Overview of Program ManagementOverview of Program Management
Overview of Program Management
Flevy.com Best Practices
 
041006-Program Management PMI NB - PMI Logo
041006-Program Management PMI NB - PMI Logo041006-Program Management PMI NB - PMI Logo
041006-Program Management PMI NB - PMI Logo
David Whelbourn, MBA, PMP, PRINCE2, MSP
 
MSP 2011 part 2
MSP 2011 part 2MSP 2011 part 2
MSP 2011 part 2
Robert Edward Pinnington
 
Program management - Fundamentals
Program management   - FundamentalsProgram management   - Fundamentals
Program management - Fundamentals
Julen Mohanty
 
Niloofer darbary orchestrating change final-111710
Niloofer darbary   orchestrating change final-111710Niloofer darbary   orchestrating change final-111710
Niloofer darbary orchestrating change final-111710
PMInstituteIndia
 
Ext Q2 2016 Guy DiNapoli
Ext Q2 2016 Guy DiNapoliExt Q2 2016 Guy DiNapoli
Ext Q2 2016 Guy DiNapoli
Guy DiNapoli
 
Project Relationship Management (PRM)
Project Relationship Management (PRM)Project Relationship Management (PRM)
Project Relationship Management (PRM)
Ruffin Veal and Associates, Inc.
 
Value Proposition
Value Proposition Value Proposition
Value Proposition
BART RADKA
 
MSP 2011 part 1
MSP 2011 part 1MSP 2011 part 1
MSP 2011 part 1
Robert Edward Pinnington
 
CCP_SEC5_ Project Management
CCP_SEC5_ Project ManagementCCP_SEC5_ Project Management
CCP_SEC5_ Project Management
Hisham Haridy MBA, PMP®, RMP®, SP®
 
Moskalyk, C (Resume) Branch Manager
Moskalyk, C (Resume) Branch ManagerMoskalyk, C (Resume) Branch Manager
Moskalyk, C (Resume) Branch Manager
Cindy Moskalyk
 
Exit strategy in development programme
Exit strategy in development programmeExit strategy in development programme
Exit strategy in development programme
Aira Tose
 
Pm Student Ho
Pm Student HoPm Student Ho
Pm Student Ho
Gajjala vivekananda
 
Strausser Pmi Global Congress 2009 Na Paper
Strausser Pmi Global Congress 2009 Na PaperStrausser Pmi Global Congress 2009 Na Paper
Strausser Pmi Global Congress 2009 Na Paper
jciman
 
Maturity Models
Maturity ModelsMaturity Models
Maturity Models
Tom Milner
 
What is Program Management - An Overview
What is Program Management - An OverviewWhat is Program Management - An Overview
What is Program Management - An Overview
Yolanda Williams
 
Prince2017 part 1
Prince2017   part 1Prince2017   part 1
Prince2017 part 1
Robert Edward Pinnington
 
Srinivasa desikanraghavan
Srinivasa desikanraghavanSrinivasa desikanraghavan
Srinivasa desikanraghavan
PMI2011
 

What's hot (19)

Benefit Realisation - a whitepaper
Benefit Realisation - a whitepaperBenefit Realisation - a whitepaper
Benefit Realisation - a whitepaper
 
Overview of Program Management
Overview of Program ManagementOverview of Program Management
Overview of Program Management
 
041006-Program Management PMI NB - PMI Logo
041006-Program Management PMI NB - PMI Logo041006-Program Management PMI NB - PMI Logo
041006-Program Management PMI NB - PMI Logo
 
MSP 2011 part 2
MSP 2011 part 2MSP 2011 part 2
MSP 2011 part 2
 
Program management - Fundamentals
Program management   - FundamentalsProgram management   - Fundamentals
Program management - Fundamentals
 
Niloofer darbary orchestrating change final-111710
Niloofer darbary   orchestrating change final-111710Niloofer darbary   orchestrating change final-111710
Niloofer darbary orchestrating change final-111710
 
Ext Q2 2016 Guy DiNapoli
Ext Q2 2016 Guy DiNapoliExt Q2 2016 Guy DiNapoli
Ext Q2 2016 Guy DiNapoli
 
Project Relationship Management (PRM)
Project Relationship Management (PRM)Project Relationship Management (PRM)
Project Relationship Management (PRM)
 
Value Proposition
Value Proposition Value Proposition
Value Proposition
 
MSP 2011 part 1
MSP 2011 part 1MSP 2011 part 1
MSP 2011 part 1
 
CCP_SEC5_ Project Management
CCP_SEC5_ Project ManagementCCP_SEC5_ Project Management
CCP_SEC5_ Project Management
 
Moskalyk, C (Resume) Branch Manager
Moskalyk, C (Resume) Branch ManagerMoskalyk, C (Resume) Branch Manager
Moskalyk, C (Resume) Branch Manager
 
Exit strategy in development programme
Exit strategy in development programmeExit strategy in development programme
Exit strategy in development programme
 
Pm Student Ho
Pm Student HoPm Student Ho
Pm Student Ho
 
Strausser Pmi Global Congress 2009 Na Paper
Strausser Pmi Global Congress 2009 Na PaperStrausser Pmi Global Congress 2009 Na Paper
Strausser Pmi Global Congress 2009 Na Paper
 
Maturity Models
Maturity ModelsMaturity Models
Maturity Models
 
What is Program Management - An Overview
What is Program Management - An OverviewWhat is Program Management - An Overview
What is Program Management - An Overview
 
Prince2017 part 1
Prince2017   part 1Prince2017   part 1
Prince2017 part 1
 
Srinivasa desikanraghavan
Srinivasa desikanraghavanSrinivasa desikanraghavan
Srinivasa desikanraghavan
 

Viewers also liked

PMI Global Congress 2005: Portfolio and Program Management implementation in ...
PMI Global Congress 2005: Portfolio and Program Management implementation in ...PMI Global Congress 2005: Portfolio and Program Management implementation in ...
PMI Global Congress 2005: Portfolio and Program Management implementation in ...
Thomas Walenta, PMI Fellow
 
Les abeilles qui construisent des rayons de ruches parfaits. french. français
Les abeilles qui construisent des rayons de ruches parfaits. french. françaisLes abeilles qui construisent des rayons de ruches parfaits. french. français
Les abeilles qui construisent des rayons de ruches parfaits. french. français
HarunyahyaFrench
 
Las redes sociales y su aplicación en la educación.
Las redes sociales y su aplicación en la educación.Las redes sociales y su aplicación en la educación.
Las redes sociales y su aplicación en la educación.
priscila2007
 
François Duguay Resume - Duguay Industrial LTD.
François Duguay Resume - Duguay Industrial LTD.François Duguay Resume - Duguay Industrial LTD.
François Duguay Resume - Duguay Industrial LTD.
Francois Duguay
 
Isquemia criticay celulas madre (1)
Isquemia criticay celulas madre (1)Isquemia criticay celulas madre (1)
Isquemia criticay celulas madre (1)
enriqueta jimenez cuadra
 
Le vrai visage de ce monde. french. français
Le vrai visage de ce monde. french. françaisLe vrai visage de ce monde. french. français
Le vrai visage de ce monde. french. français
HarunyahyaFrench
 
Philippine History
Philippine HistoryPhilippine History
Philippine History
Imee Gamez Abeleda
 
Investigacion perpectivas de cuidadoras por Dra Jimenez Cuadra
Investigacion perpectivas de cuidadoras por Dra Jimenez CuadraInvestigacion perpectivas de cuidadoras por Dra Jimenez Cuadra
Investigacion perpectivas de cuidadoras por Dra Jimenez Cuadra
enriqueta jimenez cuadra
 
JAC2011
JAC2011JAC2011
finalidades de la comunicación
 finalidades de la comunicación finalidades de la comunicación
finalidades de la comunicación
Andrea Erika Meza Juarez
 
Nimesh Patel - Event
Nimesh Patel - EventNimesh Patel - Event
Nimesh Patel - Event
Nimesh Patel
 
Jatio songit
Jatio songitJatio songit
Jatio songit
chanislam
 
Cardiopatia isquemica
Cardiopatia isquemicaCardiopatia isquemica
Cardiopatia isquemica
enriqueta jimenez cuadra
 
Supporting Financial Services with a More Flexible Approach to Big Data
Supporting Financial Services with a More Flexible Approach to Big DataSupporting Financial Services with a More Flexible Approach to Big Data
Supporting Financial Services with a More Flexible Approach to Big Data
WANdisco Plc
 
División de la pedagogía y su relación con la psicología
División de la pedagogía y su relación con la psicologíaDivisión de la pedagogía y su relación con la psicología
División de la pedagogía y su relación con la psicología
sayda molina
 
P3M - Project, Program, Portfolio Management Framework
P3M - Project, Program, Portfolio Management FrameworkP3M - Project, Program, Portfolio Management Framework
P3M - Project, Program, Portfolio Management Framework
Robert M. Buhrman, Jr. PMP, PgMP, CSM, SPC, ITIL
 

Viewers also liked (16)

PMI Global Congress 2005: Portfolio and Program Management implementation in ...
PMI Global Congress 2005: Portfolio and Program Management implementation in ...PMI Global Congress 2005: Portfolio and Program Management implementation in ...
PMI Global Congress 2005: Portfolio and Program Management implementation in ...
 
Les abeilles qui construisent des rayons de ruches parfaits. french. français
Les abeilles qui construisent des rayons de ruches parfaits. french. françaisLes abeilles qui construisent des rayons de ruches parfaits. french. français
Les abeilles qui construisent des rayons de ruches parfaits. french. français
 
Las redes sociales y su aplicación en la educación.
Las redes sociales y su aplicación en la educación.Las redes sociales y su aplicación en la educación.
Las redes sociales y su aplicación en la educación.
 
François Duguay Resume - Duguay Industrial LTD.
François Duguay Resume - Duguay Industrial LTD.François Duguay Resume - Duguay Industrial LTD.
François Duguay Resume - Duguay Industrial LTD.
 
Isquemia criticay celulas madre (1)
Isquemia criticay celulas madre (1)Isquemia criticay celulas madre (1)
Isquemia criticay celulas madre (1)
 
Le vrai visage de ce monde. french. français
Le vrai visage de ce monde. french. françaisLe vrai visage de ce monde. french. français
Le vrai visage de ce monde. french. français
 
Philippine History
Philippine HistoryPhilippine History
Philippine History
 
Investigacion perpectivas de cuidadoras por Dra Jimenez Cuadra
Investigacion perpectivas de cuidadoras por Dra Jimenez CuadraInvestigacion perpectivas de cuidadoras por Dra Jimenez Cuadra
Investigacion perpectivas de cuidadoras por Dra Jimenez Cuadra
 
JAC2011
JAC2011JAC2011
JAC2011
 
finalidades de la comunicación
 finalidades de la comunicación finalidades de la comunicación
finalidades de la comunicación
 
Nimesh Patel - Event
Nimesh Patel - EventNimesh Patel - Event
Nimesh Patel - Event
 
Jatio songit
Jatio songitJatio songit
Jatio songit
 
Cardiopatia isquemica
Cardiopatia isquemicaCardiopatia isquemica
Cardiopatia isquemica
 
Supporting Financial Services with a More Flexible Approach to Big Data
Supporting Financial Services with a More Flexible Approach to Big DataSupporting Financial Services with a More Flexible Approach to Big Data
Supporting Financial Services with a More Flexible Approach to Big Data
 
División de la pedagogía y su relación con la psicología
División de la pedagogía y su relación con la psicologíaDivisión de la pedagogía y su relación con la psicología
División de la pedagogía y su relación con la psicología
 
P3M - Project, Program, Portfolio Management Framework
P3M - Project, Program, Portfolio Management FrameworkP3M - Project, Program, Portfolio Management Framework
P3M - Project, Program, Portfolio Management Framework
 

Similar to PROGRAMME MANAGEMENT BEST PRATICE

Program Management: 3 Pillars, Benefits, & Challenges | Enterprise Wired
Program Management: 3 Pillars, Benefits, & Challenges | Enterprise WiredProgram Management: 3 Pillars, Benefits, & Challenges | Enterprise Wired
Program Management: 3 Pillars, Benefits, & Challenges | Enterprise Wired
Enterprise Wired
 
How to get started - managing a programme
How to get started - managing a programmeHow to get started - managing a programme
How to get started - managing a programme
Maven
 
EFFICACY OF PROJECT MANAGEMENT
EFFICACY OF PROJECT MANAGEMENTEFFICACY OF PROJECT MANAGEMENT
EFFICACY OF PROJECT MANAGEMENT
Assignment Studio
 
Project Management From The Top
Project Management From The TopProject Management From The Top
Project Management From The Top
Endeavor Management
 
ACT College Arlington Project Management and Company Performance Paper.docx
ACT College Arlington Project Management and Company Performance Paper.docxACT College Arlington Project Management and Company Performance Paper.docx
ACT College Arlington Project Management and Company Performance Paper.docx
write30
 
ACT College Arlington Project Management and Company Performance Paper.docx
ACT College Arlington Project Management and Company Performance Paper.docxACT College Arlington Project Management and Company Performance Paper.docx
ACT College Arlington Project Management and Company Performance Paper.docx
write22
 
Pg mp study notes (updated)
Pg mp study notes (updated)Pg mp study notes (updated)
Pg mp study notes (updated)
Adil Elhaj, PfMP
 
Pmbok
PmbokPmbok
Pmbok
ahsan riaz
 
Srinivasadesikanraghavan 131008015759-phpapp01
Srinivasadesikanraghavan 131008015759-phpapp01Srinivasadesikanraghavan 131008015759-phpapp01
Srinivasadesikanraghavan 131008015759-phpapp01
PMI_IREP_TP
 
Corporate Portfolio Management E&Y POV
Corporate Portfolio Management E&Y POVCorporate Portfolio Management E&Y POV
Corporate Portfolio Management E&Y POV
Niresh Rajah
 
Change and project_management
Change and project_managementChange and project_management
Change and project_management
Kuraktur Primary School
 
Module One Project Management and the Role of the ProjectMa.docx
Module One Project Management and the Role of the ProjectMa.docxModule One Project Management and the Role of the ProjectMa.docx
Module One Project Management and the Role of the ProjectMa.docx
gilpinleeanna
 
Effective Talent Management Strategy: Adapting Practices and Plans
Effective Talent Management Strategy: Adapting Practices and PlansEffective Talent Management Strategy: Adapting Practices and Plans
Effective Talent Management Strategy: Adapting Practices and Plans
Wowledge
 
Fp Martinelli Graykowski
Fp Martinelli GraykowskiFp Martinelli Graykowski
Fp Martinelli Graykowski
Steve Graykowski
 
software project management software engineering.pptx
software project management software engineering.pptxsoftware project management software engineering.pptx
software project management software engineering.pptx
05sheetalkumari
 
Erp-PMO
Erp-PMOErp-PMO
Erp-PMO
Sunayan Pal
 
PROJECT MANAGEMENT 2 (1) STADIO COURSES.pdf
PROJECT MANAGEMENT 2  (1) STADIO COURSES.pdfPROJECT MANAGEMENT 2  (1) STADIO COURSES.pdf
PROJECT MANAGEMENT 2 (1) STADIO COURSES.pdf
Alison Tutors
 
Program Management - Steps for Success and Customer Satisfaction
Program Management - Steps for Success and Customer SatisfactionProgram Management - Steps for Success and Customer Satisfaction
Program Management - Steps for Success and Customer Satisfaction
Manish Srivastava
 
Project Management vs. Program Management: Strategies for Transition Success
Project Management vs. Program Management: Strategies for Transition SuccessProject Management vs. Program Management: Strategies for Transition Success
Project Management vs. Program Management: Strategies for Transition Success
Ruffin Veal and Associates, Inc.
 
Projects
ProjectsProjects
Projects
roo10ney
 

Similar to PROGRAMME MANAGEMENT BEST PRATICE (20)

Program Management: 3 Pillars, Benefits, & Challenges | Enterprise Wired
Program Management: 3 Pillars, Benefits, & Challenges | Enterprise WiredProgram Management: 3 Pillars, Benefits, & Challenges | Enterprise Wired
Program Management: 3 Pillars, Benefits, & Challenges | Enterprise Wired
 
How to get started - managing a programme
How to get started - managing a programmeHow to get started - managing a programme
How to get started - managing a programme
 
EFFICACY OF PROJECT MANAGEMENT
EFFICACY OF PROJECT MANAGEMENTEFFICACY OF PROJECT MANAGEMENT
EFFICACY OF PROJECT MANAGEMENT
 
Project Management From The Top
Project Management From The TopProject Management From The Top
Project Management From The Top
 
ACT College Arlington Project Management and Company Performance Paper.docx
ACT College Arlington Project Management and Company Performance Paper.docxACT College Arlington Project Management and Company Performance Paper.docx
ACT College Arlington Project Management and Company Performance Paper.docx
 
ACT College Arlington Project Management and Company Performance Paper.docx
ACT College Arlington Project Management and Company Performance Paper.docxACT College Arlington Project Management and Company Performance Paper.docx
ACT College Arlington Project Management and Company Performance Paper.docx
 
Pg mp study notes (updated)
Pg mp study notes (updated)Pg mp study notes (updated)
Pg mp study notes (updated)
 
Pmbok
PmbokPmbok
Pmbok
 
Srinivasadesikanraghavan 131008015759-phpapp01
Srinivasadesikanraghavan 131008015759-phpapp01Srinivasadesikanraghavan 131008015759-phpapp01
Srinivasadesikanraghavan 131008015759-phpapp01
 
Corporate Portfolio Management E&Y POV
Corporate Portfolio Management E&Y POVCorporate Portfolio Management E&Y POV
Corporate Portfolio Management E&Y POV
 
Change and project_management
Change and project_managementChange and project_management
Change and project_management
 
Module One Project Management and the Role of the ProjectMa.docx
Module One Project Management and the Role of the ProjectMa.docxModule One Project Management and the Role of the ProjectMa.docx
Module One Project Management and the Role of the ProjectMa.docx
 
Effective Talent Management Strategy: Adapting Practices and Plans
Effective Talent Management Strategy: Adapting Practices and PlansEffective Talent Management Strategy: Adapting Practices and Plans
Effective Talent Management Strategy: Adapting Practices and Plans
 
Fp Martinelli Graykowski
Fp Martinelli GraykowskiFp Martinelli Graykowski
Fp Martinelli Graykowski
 
software project management software engineering.pptx
software project management software engineering.pptxsoftware project management software engineering.pptx
software project management software engineering.pptx
 
Erp-PMO
Erp-PMOErp-PMO
Erp-PMO
 
PROJECT MANAGEMENT 2 (1) STADIO COURSES.pdf
PROJECT MANAGEMENT 2  (1) STADIO COURSES.pdfPROJECT MANAGEMENT 2  (1) STADIO COURSES.pdf
PROJECT MANAGEMENT 2 (1) STADIO COURSES.pdf
 
Program Management - Steps for Success and Customer Satisfaction
Program Management - Steps for Success and Customer SatisfactionProgram Management - Steps for Success and Customer Satisfaction
Program Management - Steps for Success and Customer Satisfaction
 
Project Management vs. Program Management: Strategies for Transition Success
Project Management vs. Program Management: Strategies for Transition SuccessProject Management vs. Program Management: Strategies for Transition Success
Project Management vs. Program Management: Strategies for Transition Success
 
Projects
ProjectsProjects
Projects
 

More from Eagle-Eye Management Consultancy (UK) Limited

Mifid ii governance1
Mifid ii governance1Mifid ii governance1
Volcker Rules
Volcker RulesVolcker Rules
Basel Committe on Banking Supervision (BCBS - 239)
Basel Committe on Banking Supervision (BCBS - 239)Basel Committe on Banking Supervision (BCBS - 239)
Basel Committe on Banking Supervision (BCBS - 239)
Eagle-Eye Management Consultancy (UK) Limited
 
Personnel Philosophy
Personnel PhilosophyPersonnel Philosophy
MIFID 2
MIFID 2MIFID 2
Hard and Soft Skills of a Program Director
Hard and Soft Skills of a Program DirectorHard and Soft Skills of a Program Director
Hard and Soft Skills of a Program Director
Eagle-Eye Management Consultancy (UK) Limited
 
Employee Stock Option -- Cross Border Mechanism
Employee Stock Option -- Cross Border MechanismEmployee Stock Option -- Cross Border Mechanism
Employee Stock Option -- Cross Border Mechanism
Eagle-Eye Management Consultancy (UK) Limited
 
Wealth Management Marketing High Level Operational View
Wealth Management Marketing High Level Operational ViewWealth Management Marketing High Level Operational View
Wealth Management Marketing High Level Operational View
Eagle-Eye Management Consultancy (UK) Limited
 
Strategic Investment Prioritisation in Investment Banking IT division.
Strategic Investment Prioritisation in Investment Banking IT division.Strategic Investment Prioritisation in Investment Banking IT division.
Strategic Investment Prioritisation in Investment Banking IT division.
Eagle-Eye Management Consultancy (UK) Limited
 
Basel II
Basel IIBasel II
Global Trade Solutions
Global Trade SolutionsGlobal Trade Solutions
Communication Management
Communication ManagementCommunication Management

More from Eagle-Eye Management Consultancy (UK) Limited (12)

Mifid ii governance1
Mifid ii governance1Mifid ii governance1
Mifid ii governance1
 
Volcker Rules
Volcker RulesVolcker Rules
Volcker Rules
 
Basel Committe on Banking Supervision (BCBS - 239)
Basel Committe on Banking Supervision (BCBS - 239)Basel Committe on Banking Supervision (BCBS - 239)
Basel Committe on Banking Supervision (BCBS - 239)
 
Personnel Philosophy
Personnel PhilosophyPersonnel Philosophy
Personnel Philosophy
 
MIFID 2
MIFID 2MIFID 2
MIFID 2
 
Hard and Soft Skills of a Program Director
Hard and Soft Skills of a Program DirectorHard and Soft Skills of a Program Director
Hard and Soft Skills of a Program Director
 
Employee Stock Option -- Cross Border Mechanism
Employee Stock Option -- Cross Border MechanismEmployee Stock Option -- Cross Border Mechanism
Employee Stock Option -- Cross Border Mechanism
 
Wealth Management Marketing High Level Operational View
Wealth Management Marketing High Level Operational ViewWealth Management Marketing High Level Operational View
Wealth Management Marketing High Level Operational View
 
Strategic Investment Prioritisation in Investment Banking IT division.
Strategic Investment Prioritisation in Investment Banking IT division.Strategic Investment Prioritisation in Investment Banking IT division.
Strategic Investment Prioritisation in Investment Banking IT division.
 
Basel II
Basel IIBasel II
Basel II
 
Global Trade Solutions
Global Trade SolutionsGlobal Trade Solutions
Global Trade Solutions
 
Communication Management
Communication ManagementCommunication Management
Communication Management
 

Recently uploaded

Integrity in leadership builds trust by ensuring consistency between words an...
Integrity in leadership builds trust by ensuring consistency between words an...Integrity in leadership builds trust by ensuring consistency between words an...
Integrity in leadership builds trust by ensuring consistency between words an...
Ram V Chary
 
The Management Guide: From Projects to Portfolio
The Management Guide: From Projects to PortfolioThe Management Guide: From Projects to Portfolio
The Management Guide: From Projects to Portfolio
Ahmed AbdelMoneim
 
W.H.Bender Quote 66 - ServPoints Sequence of Service™ should be Identified fo...
W.H.Bender Quote 66 - ServPoints Sequence of Service™ should be Identified fo...W.H.Bender Quote 66 - ServPoints Sequence of Service™ should be Identified fo...
W.H.Bender Quote 66 - ServPoints Sequence of Service™ should be Identified fo...
William (Bill) H. Bender, FCSI
 
20240608 QFM019 Engineering Leadership Reading List May 2024
20240608 QFM019 Engineering Leadership Reading List May 202420240608 QFM019 Engineering Leadership Reading List May 2024
20240608 QFM019 Engineering Leadership Reading List May 2024
Matthew Sinclair
 
All the Small Things - XP2024 Bolzano/Bozen
All the Small Things - XP2024 Bolzano/BozenAll the Small Things - XP2024 Bolzano/Bozen
All the Small Things - XP2024 Bolzano/Bozen
Alberto Brandolini
 
Sethurathnam Ravi: A Legacy in Finance and Leadership
Sethurathnam Ravi: A Legacy in Finance and LeadershipSethurathnam Ravi: A Legacy in Finance and Leadership
Sethurathnam Ravi: A Legacy in Finance and Leadership
Anjana Josie
 
一比一原版(QU毕业证)皇后大学毕业证如何办理
一比一原版(QU毕业证)皇后大学毕业证如何办理一比一原版(QU毕业证)皇后大学毕业证如何办理
一比一原版(QU毕业证)皇后大学毕业证如何办理
8p28uk6g
 
原版制作(CDU毕业证书)查尔斯达尔文大学毕业证PDF成绩单一模一样
原版制作(CDU毕业证书)查尔斯达尔文大学毕业证PDF成绩单一模一样原版制作(CDU毕业证书)查尔斯达尔文大学毕业证PDF成绩单一模一样
原版制作(CDU毕业证书)查尔斯达尔文大学毕业证PDF成绩单一模一样
tdt5v4b
 
原版制作(澳洲WSU毕业证书)西悉尼大学毕业证文凭证书一模一样
原版制作(澳洲WSU毕业证书)西悉尼大学毕业证文凭证书一模一样原版制作(澳洲WSU毕业证书)西悉尼大学毕业证文凭证书一模一样
原版制作(澳洲WSU毕业证书)西悉尼大学毕业证文凭证书一模一样
tdt5v4b
 
Impact of Effective Performance Appraisal Systems on Employee Motivation and ...
Impact of Effective Performance Appraisal Systems on Employee Motivation and ...Impact of Effective Performance Appraisal Systems on Employee Motivation and ...
Impact of Effective Performance Appraisal Systems on Employee Motivation and ...
Dr. Nazrul Islam
 
Risk-Management-presentation for cooperatives
Risk-Management-presentation for cooperativesRisk-Management-presentation for cooperatives
Risk-Management-presentation for cooperatives
bernanbumatay1
 
Employment Practices Regulation and Multinational Corporations
Employment PracticesRegulation and Multinational CorporationsEmployment PracticesRegulation and Multinational Corporations
Employment Practices Regulation and Multinational Corporations
RoopaTemkar
 
Credit Management training seminar power point presentation
Credit Management training seminar power point presentationCredit Management training seminar power point presentation
Credit Management training seminar power point presentation
bernanbumatay1
 
Strategic Org Design with Org Topologies™
Strategic Org Design with Org Topologies™Strategic Org Design with Org Topologies™
Strategic Org Design with Org Topologies™
Alexey Krivitsky
 
12 steps to transform your organization into the agile org you deserve
12 steps to transform your organization into the agile org you deserve12 steps to transform your organization into the agile org you deserve
12 steps to transform your organization into the agile org you deserve
Pierre E. NEIS
 
Resource-mobilization-guide-for-community-based-organizations1.pdf
Resource-mobilization-guide-for-community-based-organizations1.pdfResource-mobilization-guide-for-community-based-organizations1.pdf
Resource-mobilization-guide-for-community-based-organizations1.pdf
FeteneA
 
Comparing Stability and Sustainability in Agile Systems
Comparing Stability and Sustainability in Agile SystemsComparing Stability and Sustainability in Agile Systems
Comparing Stability and Sustainability in Agile Systems
Rob Healy
 
Addiction to Winning Across Diverse Populations.pdf
Addiction to Winning Across Diverse Populations.pdfAddiction to Winning Across Diverse Populations.pdf
Addiction to Winning Across Diverse Populations.pdf
Bill641377
 
在线办理(Murdoch毕业证书)莫道克大学毕业证电子版成绩单一模一样
在线办理(Murdoch毕业证书)莫道克大学毕业证电子版成绩单一模一样在线办理(Murdoch毕业证书)莫道克大学毕业证电子版成绩单一模一样
在线办理(Murdoch毕业证书)莫道克大学毕业证电子版成绩单一模一样
tdt5v4b
 
Ganpati Kumar Choudhary Indian Ethos PPT.pptx
Ganpati Kumar Choudhary Indian Ethos PPT.pptxGanpati Kumar Choudhary Indian Ethos PPT.pptx
Ganpati Kumar Choudhary Indian Ethos PPT.pptx
GanpatiKumarChoudhar
 

Recently uploaded (20)

Integrity in leadership builds trust by ensuring consistency between words an...
Integrity in leadership builds trust by ensuring consistency between words an...Integrity in leadership builds trust by ensuring consistency between words an...
Integrity in leadership builds trust by ensuring consistency between words an...
 
The Management Guide: From Projects to Portfolio
The Management Guide: From Projects to PortfolioThe Management Guide: From Projects to Portfolio
The Management Guide: From Projects to Portfolio
 
W.H.Bender Quote 66 - ServPoints Sequence of Service™ should be Identified fo...
W.H.Bender Quote 66 - ServPoints Sequence of Service™ should be Identified fo...W.H.Bender Quote 66 - ServPoints Sequence of Service™ should be Identified fo...
W.H.Bender Quote 66 - ServPoints Sequence of Service™ should be Identified fo...
 
20240608 QFM019 Engineering Leadership Reading List May 2024
20240608 QFM019 Engineering Leadership Reading List May 202420240608 QFM019 Engineering Leadership Reading List May 2024
20240608 QFM019 Engineering Leadership Reading List May 2024
 
All the Small Things - XP2024 Bolzano/Bozen
All the Small Things - XP2024 Bolzano/BozenAll the Small Things - XP2024 Bolzano/Bozen
All the Small Things - XP2024 Bolzano/Bozen
 
Sethurathnam Ravi: A Legacy in Finance and Leadership
Sethurathnam Ravi: A Legacy in Finance and LeadershipSethurathnam Ravi: A Legacy in Finance and Leadership
Sethurathnam Ravi: A Legacy in Finance and Leadership
 
一比一原版(QU毕业证)皇后大学毕业证如何办理
一比一原版(QU毕业证)皇后大学毕业证如何办理一比一原版(QU毕业证)皇后大学毕业证如何办理
一比一原版(QU毕业证)皇后大学毕业证如何办理
 
原版制作(CDU毕业证书)查尔斯达尔文大学毕业证PDF成绩单一模一样
原版制作(CDU毕业证书)查尔斯达尔文大学毕业证PDF成绩单一模一样原版制作(CDU毕业证书)查尔斯达尔文大学毕业证PDF成绩单一模一样
原版制作(CDU毕业证书)查尔斯达尔文大学毕业证PDF成绩单一模一样
 
原版制作(澳洲WSU毕业证书)西悉尼大学毕业证文凭证书一模一样
原版制作(澳洲WSU毕业证书)西悉尼大学毕业证文凭证书一模一样原版制作(澳洲WSU毕业证书)西悉尼大学毕业证文凭证书一模一样
原版制作(澳洲WSU毕业证书)西悉尼大学毕业证文凭证书一模一样
 
Impact of Effective Performance Appraisal Systems on Employee Motivation and ...
Impact of Effective Performance Appraisal Systems on Employee Motivation and ...Impact of Effective Performance Appraisal Systems on Employee Motivation and ...
Impact of Effective Performance Appraisal Systems on Employee Motivation and ...
 
Risk-Management-presentation for cooperatives
Risk-Management-presentation for cooperativesRisk-Management-presentation for cooperatives
Risk-Management-presentation for cooperatives
 
Employment Practices Regulation and Multinational Corporations
Employment PracticesRegulation and Multinational CorporationsEmployment PracticesRegulation and Multinational Corporations
Employment Practices Regulation and Multinational Corporations
 
Credit Management training seminar power point presentation
Credit Management training seminar power point presentationCredit Management training seminar power point presentation
Credit Management training seminar power point presentation
 
Strategic Org Design with Org Topologies™
Strategic Org Design with Org Topologies™Strategic Org Design with Org Topologies™
Strategic Org Design with Org Topologies™
 
12 steps to transform your organization into the agile org you deserve
12 steps to transform your organization into the agile org you deserve12 steps to transform your organization into the agile org you deserve
12 steps to transform your organization into the agile org you deserve
 
Resource-mobilization-guide-for-community-based-organizations1.pdf
Resource-mobilization-guide-for-community-based-organizations1.pdfResource-mobilization-guide-for-community-based-organizations1.pdf
Resource-mobilization-guide-for-community-based-organizations1.pdf
 
Comparing Stability and Sustainability in Agile Systems
Comparing Stability and Sustainability in Agile SystemsComparing Stability and Sustainability in Agile Systems
Comparing Stability and Sustainability in Agile Systems
 
Addiction to Winning Across Diverse Populations.pdf
Addiction to Winning Across Diverse Populations.pdfAddiction to Winning Across Diverse Populations.pdf
Addiction to Winning Across Diverse Populations.pdf
 
在线办理(Murdoch毕业证书)莫道克大学毕业证电子版成绩单一模一样
在线办理(Murdoch毕业证书)莫道克大学毕业证电子版成绩单一模一样在线办理(Murdoch毕业证书)莫道克大学毕业证电子版成绩单一模一样
在线办理(Murdoch毕业证书)莫道克大学毕业证电子版成绩单一模一样
 
Ganpati Kumar Choudhary Indian Ethos PPT.pptx
Ganpati Kumar Choudhary Indian Ethos PPT.pptxGanpati Kumar Choudhary Indian Ethos PPT.pptx
Ganpati Kumar Choudhary Indian Ethos PPT.pptx
 

PROGRAMME MANAGEMENT BEST PRATICE

  • 1. Strategic deployment of Program Management best-practice model in financial institutions. Author Name: Kaushik Pramanik, PMP, MSP, PGDOL(Oxford), DOL(LSE), Mtech (IIT), B.M.E Introduction: Structuredand industrystandard best-practiceProgramManagementframeworkisverymuchessential to smooth execution of company strategy and objectives, achieve the result and gain the increased customer satisfaction globally. Financial institutionslikeBanks,Insurance companies,Financialdataproviders, Stockexchangesexecute many multi-million dollars cross-functional and cross-divisional transformation programs spanning across different geographic regions and divisions. This article is focused on industry-standard practices and briefly describes how to deploy such a framework in the global financial institutions. Programme Management may be defined as the co-ordinated organisation, direction and implementation of a portfolio of projects and activities that together achieve outcomes and realise benefits that are of strategic importance. Effective and efficient Program Management is the key success factor to any financial institutions to transformthe company’s visionandvariousinter-relatedstrategic objectives spanning across different sectors like core business, IT, operation, HR, finance; etc. There are number of Program Management framework exists within the industry; as example, PMI (ProjectManagementInstitute) basedSPM(Standard for Program Management) framework, TSO (The Stationary Office,UKGovernment) basedMSP(Managing SuccessfulPrograms) framework,Universityof Oxford Program Management framework, George Washington University Program Management framework, Big 4 consultancy firm’s Program Management framework etc. However, veryfewcompaniesaroundthe world follow the best-practice framework provided by major institutesand universities even though there is a high level of benefit for using the industry-standard program management framework. This article will provide a very brief overview of PMI based SPM approach and TSO (The Stationary Office,UKGovernment) based MSP approach and how to deploy any of these models through-out a global company through strategic execution.
  • 2. Brief Overview of PMI based Standard for Program Management (SPM) approach: Program delivers benefits to organizations by developing new capabilities or enhancing current capabilities.Programsare initiatedfor achievingorganizationalgoalsandstrategicobjectivesthat are so large scale that theycannotbe achievedbysingle project. Diagrammaticview of Standard for Program Management framework is given below. Source: THE STANDARD FOR THE PROGRAM MANAGEMENT, Second Edition, PMI, Chapter 1, 2 & 3 PMI based Standard for Program Management framework mainly consists of following key areas.  Program Governance and Stakeholder Management: This area spans all the program life cycle phases. Program governance overseas the progress of the program and the delivery of the coordinated benefits from its components. Programs are often too complex to be managed by a single individual, which is why appropriate implementation of program governance is the critical factor for a program to succeed. Program governance helps in managing risks, stakeholders’ benefits, resources, and quality across the program life cycle. Furthermore, program governance ensures decision-making and delivery
  • 3. managementactivitiesare focused on achieving program goals in a consistent manner, addressing appropriate risks, and fulfilling stakeholder requirements. Program governance also provides an appropriate organizational structure, the policies and procedures necessary to support program delivery through formal program reviews. This is facilitatedbythe regularandphase-gate-basedmonitoringof deliverables, performance, risks, and issues by the program board. Program stakeholder management identifies how the program will affect stakeholders (e.g., the organizations’ culture, the local population, country-specific culture, resistance or barriers to change, bureaucracy, etc.) and then develops a communication strategy to engage the affected stakeholders,manage theirexpectationsandmanage acceptance of the objectives of the program. Program stakeholdermanagementis the very importantfactortoestablish the programgovernance and program organizational structure, which is monitored and reviewed through-out the program life cycle.  Program Life Cycle: Typical program life cycle consists of five phases (Pre-Program Preparations, Program Initiation, Program Set-up, Delivery of Program Benefits, and Program Closure) as mentioned in the above picture. End of each phase works as an entry point to the next phase. Duringthe variousstagesof programlife cycle,programmanagerunderstandsthe strategicbenefits of the program, develop the plan to initiate the program, define the program objectives and their alignment with the organizations’ goals and vision, develop the high-level business case demonstratinganunderstandingof the needs,businessbenefits, feasibility and justification of the program,establishthe program governance mechanism, risk management protocols, and program schedule.The programlife cycle complieswiththe needsof corporate governance and also ensures that the expected benefits are realized in a predictable and coordinated manner.  ProgramBenefits Management: Programdeliversbenefitstothe organization.Benefitsrealization planning is part of program management which consists of interdependencies between benefits, alignmentwith the strategic goals of the organization, benefit of delivery scheduling, metrics and measurement, responsibilityfordeliveryof the final andintermediate benefits within the program, and benefit realization. At the end of the program, the benefits delivered should always be compared against those promisedinthe initial businesscase toensure that the program actually delivered the full benefits for which it was created.  Program Management Process Groups: Program management process groups are a set of interrelated actions, and activities performed to achieve a pre-specified outcome. Program management processes are primarily integrative in that they coordinate the outputs of various projects to derive the desired program outcomes.
  • 4. A showninthe above picture,there are five processes (Initiation,Planning,Executing, Monitoring & Controlling and Closing) in program management. Processes receive inputs from processes that logicallyprecedethemandsendoutputstosuccessorprocesses. A guidingrule forapplyingprogram management processes is to ensure that the program manager effectively delegates authority, autonomyandresponsibilityfor day-to-day management of the projects to the designated project managers. Brief Overview of TSO based Managing Successful Programs (MSP) approach: TSO (The Stationary Office, UK Government) based MSP approach is basically based on a two-layer framework.Asshownbelowinthe diagram, the outerlayerconcentrateson various program principals like empowerment,leadingthe change,envisioning,addingvalue,focusingon benefits, alignment with corporate strategy,capabilitydevelopmentandlearningexperience.These principalsare veryimportant to execute aglobal transformationprograminthe organizationandmostlylinked with leadership skills associated with Program Management. TSO (The Stationary Office) - Frameworkand Process Remainingalignedwith corporate strategy Organisation Closing a Programme Defining a Programme Identifying a Programme Managing theTranches Delivering the Capability Realising the Benefits
  • 5. Sources: 1. MSP framework and concepts, published by The Stationary Office (TSO), UK Government 2. http://www.managing-successful-programmes.com/ 3. Managing Successful Programmes Manual - 4th Edition 4. Swiss Program Management Conference, 2012 The second layer core consists of program management activities like program vision development, organization, stakeholder management, business case development, blue print design, planning & control, program risk management, quality management, program delivery, benefit realization management, etc. Present Scenario: Many global financial institutes do not follow any industry-standard program management framework rather thanfollowtheirowncustomizedframeworkandguidelinestoexecute the program. Sometimes the in-house framework is not consistent enough. The usage of inconsistent approach results various downside risks like increased financial risk (e.g.; budget overrun), reduced customer satisfaction, low quality ends deliverables, slippage on schedule, usage of differentprogramterminology,processesandtools, below the standard management and KPI reporting, and lacking of controlled governance mechanism. The main reasonbehindthisisthat Sr. Management of the organization doesn’t value best practice, or theyare notaware of the latestindustrystandard.Many program managers are not properly trained to execute acomplex cross-divisional andcross-functional program in the large organization and very few people in the company are aware of strategic implications of program management and portfolio management. To overcome this problem, it is very much essential to form a central program management control departmentwhich willbe responsible for rolling-out the best-practice framework across divisions and regions through effective communication, collaboration and hands-on training to program managers. Deployment Model: Deployment of Program Management best practice framework in the global organization across divisions and regions is a herculean task. To achieve the goal, several strategic measures have to be taken into consideration. As shown in the below figure, three work streams have to be formed. The Communication and Communities Work stream is responsible for creating the awareness about program management, communicatingguidelines & policies about the best-practice framework and establishing the program management community across the organization.
  • 6. Deployment model: Work Stream concept “Program Management – Best Practice”: Deployment Communication & Communities Work Stream Training, Tools & Techniques, and Support Work Stream Cross-functional collaboration Work Stream GovernanceGovernance Setthe strategicdirection Establishdisciplinedexecution Define variousactions Prioritise & communicate Establishthe accountability Define rewards&recognition Evaluate framework &roadmap Investmentdecision Source: Own idea Training,Tools & Techniques,and Support workstreamisresponsible for developmentandexecution of a frameworkrelatedtotraining,tools& techniques, and user support of “Program Management – Best Practice” to increase the quality and efficiency of numerous program management environments in the global organization. Finally, Cross – functional collaboration work stream will be responsible for collaboration and coordination between above two work streams across organizational divisions and regions, corporate trainingdepartment,externalpartiestofacilitate smoothdeploymentof “Program Management – Best Practice” framework in the company. Furthermore, astronggovernance model must be in place to integrate three work streams mentioned above. The main responsibilities of the governance model are setting-up the strategic direction, disciplinedexecution, prioritize andcommunicate,establishmentof accountability,definition of reward & recognitionand various investment decisions. A sample governance model for deployment is given below.
  • 7. COO/ DOO/ GIO Governan ce Program Management– Best Practice Governance Strongfocus from top. Endto end governance. Topto bottom transparency. High-level of accountability. Resultorientedstructure. Clearstrategy & big picture. Long-termsustainability. Well drawnroad map. Teamforce inaction. Fosteringcollaboration. Catalystto transformation. Rewardand recognition. COO/ DOO GIO Governance triangle Consistsof Headof Program ManagementPractice, Workstream leaders(3) Frequency(2permonth) Consistsof Workstream leaders, Regional participants, Frequency(2permonth) Each work stream will have governance mechanism… Workstream Governance CoEEnterprise Transformation Governance Source: Own idea Conclusion: All major financial institutions are continuously lacking of standard program management practice. In today’s volatile economic and global environment, it is very important to streamline program management practice across the organization which will help to achieve company’s vision, goals and strategicobjectives inasystematicmanner.The industrystandard best-practicemethodology providesa sustainable framework that is clear, complete, relevant and generally recognized as good practices on most programs, most of the time. References: 1. The Standard For Program Management, Second Edition by PMI (Project Management Institute) 2. http://www.managing-successful-programmes.com/ 3. Managing Successful Programmes Manual - 4th Edition 4. Swiss Program Management Conference, 2012