Introduction:
A truly global professional service firm with high visibility in the BFSI domain; structured and industry
standard best-practice Program Management framework is very much essential to gain the increased
customer satisfaction.
This article is focused on industry-standard practices and briefly describes how to deploy such a
framework in the global financial institutions.
Financial institutions like Banks, Insurance companies, Financial data providers, Stock exchanges execute
many multi-million dollars cross-functional and cross-divisional transformation programs spanning
across different geographic regions and divisions.
Programme Management may be defined as the co-ordinated organisation, direction and
implementation of a portfolio of projects and activities that together achieve outcomes and realise
benefits that are of strategic importance.
Effective and efficient Program Management is the key success factor to any financial institutions to
transform the company’s vision and various inter-related strategic objectives spanning across different
sectors like core business, IT, operation, HR, finance; etc.
There are number of Program Management framework exists within the industry; as example, PMI
(Project Management Institute) based SPM (Standard for Program Management) framework, TSO (The
Stationary Office, UK Government) based MSP (Managing Successful Programs) framework, University of
Oxford Program Management framework, George Washington University Program Management
framework, etc.
However, very few companies around the world follow the best-practice framework provided by major
institutes and universities even though there is a high level of benefit for using the industry-standard
program management framework. This article will provide a very brief overview of PMI based SPM
approach and TSO (The Stationary Office, UK Government) based MSP approach and how to deploy any
of these models through-out a global company through strategic execution.
Brief Overview of PMI based Standard for Program Management (SPM) approach:
Program delivers benefits to organizations by developing new capabilities or enhancing current
capabilities. Programs are initiated for achieving organizational goals and strategic objectives that are so
large scale that they cannot be achieved by single project. Diagrammatic view of Standard for Program
Management framework is given below.
Source: THE STANDARD FOR THE PROGRAM MANAGEMENT, Second Edition, PMI, Chapter 1, 2 & 3
PMI based Standard for Program Management framework mainly consists of following key areas.
• Program Governance and Stakeholder Management: This area spans all the program life cycle
phases. Program governance overseas the progress of the program and the delivery of the
coordinated benefits from its components.
Programs are often too complex to be managed by a single individual, which is why appropriate
implementation of program governance is the critical factor for a program to succeed. Program
governance helps in managing risks, stakeholders’ benefits, resources, and quality across the
program life cycle. Furthermore, program governance ensures decision-making and delivery
management activities are focused on achieving program goals in a consistent manner, addressing
appropriate risks, and fulfilling stakeholder requirements.
Program governance also provides an appropriate organizational structure, the policies and
procedures necessary to support program delivery through formal program reviews. This is
facilitated by the regular and phase-gate-based monitoring of deliverables, performance, risks, and
issues by the program board.
Program stakeholder management identifies how the program will affect stakeholders (e.g., the
organizations’ culture, the local population, country-specific culture, resistance or barriers to
change, bureaucracy, etc.) and then develops a communication strategy to engage the affected
stakeholders, manage their expectations and manage acceptance of the objectives of the program.
Program stakeholder management is the very important factor to establish the program governance
and program organizational structure, which is monitored and reviewed through-out the program
life cycle.
• Program Life Cycle: Typical program life cycle consists of five phases (Pre-Program Preparations,
Program Initiation, Program Set-up, Delivery of Program Benefits, and Program Closure) as
mentioned in the above picture. End of each phase works as an entry point to the next phase.
During the various stages of program life cycle, program manager understands the strategic benefits
of the program, develop the plan to initiate the program, define the program objectives and their
alignment with the organizations’ goals and vision, develop the high-level business case
demonstrating an understanding of the needs, business benefits, feasibility and justification of the
program, establish the program governance mechanism, risk management protocols, and program
schedule. The program life cycle complies with the needs of corporate governance and also ensures
that the expected benefits are realized in a predictable and coordinated manner.
• Program Benefits Management: Program delivers benefits to the organization. Benefits realization
planning is part of program management which consists of interdependencies between benefits,
alignment with the strategic goals of the organization, benefit of delivery scheduling, metrics and
measurement, responsibility for delivery of the final and intermediate benefits within the program,
and benefit realization.
At the end of the program, the benefits delivered should always be compared against those
promised in the initial business case to ensure that the program actually delivered the full benefits
for which it was created.
• Program Management Process Groups: Program management process groups are a set of
interrelated actions, and activities performed to achieve a pre-specified outcome. Program
management processes are primarily integrative in that they coordinate the outputs of various
projects to derive the desired program outcomes.
A shown in the above picture, there are five processes (Initiation, Planning, Executing, Monitoring &
Controlling and Closing) in program management. Processes receive inputs from processes that
logically precede them and send outputs to successor processes. A guiding rule for applying program
management processes is to ensure that the program manager effectively delegates authority,
autonomy and responsibility for day-to-day management of the projects to the designated project
managers.
Brief Overview of TSO based Managing Successful Programs (MSP) approach:
TSO (The Stationary Office, UK Government) based MSP approach is basically based on a two-layer
framework. As shown below in the diagram, the outer layer concentrates on various program principals
like empowerment, leading the change, envisioning, adding value, focusing on benefits, alignment with
corporate strategy, capability development and learning experience. These principals are very important
to execute a global transformation program in the organization and mostly linked with leadership skills
associated with Program Management.
TSO (The Stationary Office) - Frameworkand Process
Remainingalignedwith
corporate strategy
Organisation
Closing a
Programme
Defining a
Programme
Identifying a
Programme
Managing
theTranches
Delivering the
Capability
Realising
the Benefits
Sources:
1. MSP framework and concepts, published by The Stationary Office (TSO), UK Government
2. http://www.managing-successful-programmes.com/
3. Managing Successful Programmes Manual - 4th Edition
4. Swiss Program Management Conference, 2012
The second layer core consists of program management activities like program vision development,
organization, stakeholder management, business case development, blue print design, planning &
control, program risk management, quality management, program delivery, benefit realization
management, etc.
Present Scenario:
Many global financial institutes do not follow any industry-standard program management framework
rather than follow their own customized framework and guidelines to execute the program. Sometimes
the in-house framework is not consistent enough.
The usage of inconsistent approach results various downside risks like increased financial risk (e.g.;
budget overrun), reduced customer satisfaction, low quality ends deliverables, slippage on schedule,
usage of different program terminology, processes and tools, below the standard management and KPI
reporting, and lacking of controlled governance mechanism.
The main reason behind this is that Sr. Management of the organization doesn’t value best practice, or
they are not aware of the latest industry standard. Many program managers are not properly trained to
execute a complex cross-divisional and cross-functional program in the large organization and very few
people in the company are aware of strategic implications of program management and portfolio
management.
To overcome this problem, it is very much essential to form a central program management control
department which will be responsible for rolling-out the best-practice framework across divisions and
regions through effective communication, collaboration and hands-on training to program managers.
Deployment Model:
Deployment of Program Management best practice framework in the global organization across
divisions and regions is a herculean task. To achieve the goal, several strategic measures have to be
taken into consideration.
As shown in the below figure, three work streams have to be formed. The Communication and
Communities Work stream is responsible for creating the awareness about program management,
communicating guidelines & policies about the best-practice framework and establishing the program
management community across the organization.
Deployment model: Work Stream concept
“Program
Management – Best
Practice”: Deployment
Communication &
Communities Work Stream
Training, Tools & Techniques,
and Support Work Stream
Cross-functional
collaboration Work
Stream
GovernanceGovernance
Setthe strategicdirection
Establishdisciplinedexecution
Define variousactions
Prioritise & communicate
Establishthe accountability
Define rewards &recognition
Evaluate framework &roadmap
Investmentdecision
Source: Own idea
Training, Tools & Techniques, and Support work stream is responsible for development and execution of
a framework related to training, tools & techniques, and user support of “Program Management – Best
Practice” to increase the quality and efficiency of numerous program management environments in
the global organization.
Finally, Cross – functional collaboration work stream will be responsible for collaboration and
coordination between above two work streams across organizational divisions and regions, corporate
training department, external parties to facilitate smooth deployment of “Program Management – Best
Practice” framework in the company.
Furthermore, a strong governance model must be in place to integrate three work streams mentioned
above. The main responsibilities of the governance model are setting-up the strategic direction,
disciplined execution, prioritize and communicate, establishment of accountability, definition of reward
& recognition and various investment decisions. A sample governance model for deployment is given
below.
COO/
DOO/
GIO
Governan
ce
Program Management– Best Practice Governance
Strongfocus from top.
Endto end governance.
Topto bottom transparency.
High-level ofaccountability.
Resultorientedstructure.
Clearstrategy & big picture.
Long-termsustainability.
Well drawnroad map.
Teamforce inaction.
Fosteringcollaboration.
Catalystto transformation.
Rewardand recognition.
COO / DOO GIO
Governance triangle
Consistsof
Headof Program
ManagementPractice,
Workstream leaders(3)
Frequency(2permonth)
Consistsof
Workstream leaders,
Regional participants,
Frequency(2permonth)
Each work stream will have governance mechanism…
Workstream Governance
CoEEnterprise Transformation
Governance
Source: Own idea
Conclusion:
All major financial institutions are continuously lacking of standard program management practice. In
today’s volatile economic and global environment, it is very important to streamline program
management practice across the organization which will help to achieve company’s vision, goals and
strategic objectives in a systematic manner. The industry standard best-practice methodology provides a
sustainable framework that is clear, complete, relevant and generally recognized as good practices on
most programs, most of the time.
References:
1. The Standard For Program Management, Second Edition by PMI (Project Management
Institute)
2. http://www.managing-successful-programmes.com/
3. Managing Successful Programmes Manual - 4th Edition
4. Swiss Program Management Conference, 2012

More Related Content

What's hot

Business Process Management Introduction
Business Process Management IntroductionBusiness Process Management Introduction
Business Process Management IntroductionGBTEC Software AG
 
Hadoop Migration to databricks cloud project plan.pptx
Hadoop Migration to databricks cloud project plan.pptxHadoop Migration to databricks cloud project plan.pptx
Hadoop Migration to databricks cloud project plan.pptxyashodhannn
 
Business analyst interview questions and answers
Business analyst interview questions and answersBusiness analyst interview questions and answers
Business analyst interview questions and answersRobin G
 
Power BI Architecture
Power BI ArchitecturePower BI Architecture
Power BI ArchitectureArthur Graus
 
DAX and Power BI Training - 004 Power Query
DAX and Power BI Training - 004 Power QueryDAX and Power BI Training - 004 Power Query
DAX and Power BI Training - 004 Power QueryWill Harvey
 
Office 365: Migrating Your Business to Office 365!
Office 365: Migrating Your Business to Office 365!Office 365: Migrating Your Business to Office 365!
Office 365: Migrating Your Business to Office 365!Michael Frank
 
Framework Change Impact Analysis
Framework Change Impact AnalysisFramework Change Impact Analysis
Framework Change Impact AnalysisAd Ghauri
 
Using SharePoint & Office 365 for Digital Transformation
Using SharePoint & Office 365 for Digital TransformationUsing SharePoint & Office 365 for Digital Transformation
Using SharePoint & Office 365 for Digital TransformationJoel Oleson
 
Agile in Medical Software Development
Agile in Medical Software DevelopmentAgile in Medical Software Development
Agile in Medical Software DevelopmentBernhard Kappe
 
PL-900 Microsoft Power Platform Fundamentals
PL-900 Microsoft Power Platform FundamentalsPL-900 Microsoft Power Platform Fundamentals
PL-900 Microsoft Power Platform FundamentalsNanddeep Nachan
 
Business Process Automation PowerPoint Presentation Slides
Business Process Automation PowerPoint Presentation SlidesBusiness Process Automation PowerPoint Presentation Slides
Business Process Automation PowerPoint Presentation SlidesSlideTeam
 
INDUSTRY 4.0 (Economics for Engineers)
INDUSTRY 4.0 (Economics for Engineers)INDUSTRY 4.0 (Economics for Engineers)
INDUSTRY 4.0 (Economics for Engineers)MDHALIM7
 
Using Databricks as an Analysis Platform
Using Databricks as an Analysis PlatformUsing Databricks as an Analysis Platform
Using Databricks as an Analysis PlatformDatabricks
 
IT / Help Desk Support Service : Introduction, Advantage, Trend
IT / Help Desk Support Service : Introduction, Advantage, TrendIT / Help Desk Support Service : Introduction, Advantage, Trend
IT / Help Desk Support Service : Introduction, Advantage, TrendVoyage Services Inc.
 

What's hot (20)

Business Process Management Introduction
Business Process Management IntroductionBusiness Process Management Introduction
Business Process Management Introduction
 
BPMN to UML
BPMN to UMLBPMN to UML
BPMN to UML
 
Hadoop Migration to databricks cloud project plan.pptx
Hadoop Migration to databricks cloud project plan.pptxHadoop Migration to databricks cloud project plan.pptx
Hadoop Migration to databricks cloud project plan.pptx
 
Business analyst interview questions and answers
Business analyst interview questions and answersBusiness analyst interview questions and answers
Business analyst interview questions and answers
 
Power bi
Power biPower bi
Power bi
 
Power BI Architecture
Power BI ArchitecturePower BI Architecture
Power BI Architecture
 
DAX and Power BI Training - 004 Power Query
DAX and Power BI Training - 004 Power QueryDAX and Power BI Training - 004 Power Query
DAX and Power BI Training - 004 Power Query
 
Office 365: Migrating Your Business to Office 365!
Office 365: Migrating Your Business to Office 365!Office 365: Migrating Your Business to Office 365!
Office 365: Migrating Your Business to Office 365!
 
Framework Change Impact Analysis
Framework Change Impact AnalysisFramework Change Impact Analysis
Framework Change Impact Analysis
 
Using SharePoint & Office 365 for Digital Transformation
Using SharePoint & Office 365 for Digital TransformationUsing SharePoint & Office 365 for Digital Transformation
Using SharePoint & Office 365 for Digital Transformation
 
Agile in Medical Software Development
Agile in Medical Software DevelopmentAgile in Medical Software Development
Agile in Medical Software Development
 
PL-900 Microsoft Power Platform Fundamentals
PL-900 Microsoft Power Platform FundamentalsPL-900 Microsoft Power Platform Fundamentals
PL-900 Microsoft Power Platform Fundamentals
 
Business Process Automation PowerPoint Presentation Slides
Business Process Automation PowerPoint Presentation SlidesBusiness Process Automation PowerPoint Presentation Slides
Business Process Automation PowerPoint Presentation Slides
 
INDUSTRY 4.0 (Economics for Engineers)
INDUSTRY 4.0 (Economics for Engineers)INDUSTRY 4.0 (Economics for Engineers)
INDUSTRY 4.0 (Economics for Engineers)
 
Business Process Management Training 1
Business Process Management Training 1Business Process Management Training 1
Business Process Management Training 1
 
Infographic: Data Governance Best Practices
Infographic: Data Governance Best Practices Infographic: Data Governance Best Practices
Infographic: Data Governance Best Practices
 
Microsoft power platform
Microsoft power platformMicrosoft power platform
Microsoft power platform
 
Using Databricks as an Analysis Platform
Using Databricks as an Analysis PlatformUsing Databricks as an Analysis Platform
Using Databricks as an Analysis Platform
 
RPA in a Day
RPA in a Day RPA in a Day
RPA in a Day
 
IT / Help Desk Support Service : Introduction, Advantage, Trend
IT / Help Desk Support Service : Introduction, Advantage, TrendIT / Help Desk Support Service : Introduction, Advantage, Trend
IT / Help Desk Support Service : Introduction, Advantage, Trend
 

Similar to A white paper on Program Management

Program Management: 3 Pillars, Benefits, & Challenges | Enterprise Wired
Program Management: 3 Pillars, Benefits, & Challenges | Enterprise WiredProgram Management: 3 Pillars, Benefits, & Challenges | Enterprise Wired
Program Management: 3 Pillars, Benefits, & Challenges | Enterprise WiredEnterprise Wired
 
Program management - Fundamentals
Program management   - FundamentalsProgram management   - Fundamentals
Program management - FundamentalsJulen Mohanty
 
Efficacy of Project Management,
Efficacy of Project Management, Efficacy of Project Management,
Efficacy of Project Management, Assignment Studio
 
How to get started - managing a programme
How to get started - managing a programmeHow to get started - managing a programme
How to get started - managing a programmeMaven
 
Pg mp study notes (updated)
Pg mp study notes (updated)Pg mp study notes (updated)
Pg mp study notes (updated)Adil Elhaj, PfMP
 
EFFICACY OF PROJECT MANAGEMENT
EFFICACY OF PROJECT MANAGEMENTEFFICACY OF PROJECT MANAGEMENT
EFFICACY OF PROJECT MANAGEMENTAssignment Studio
 
Program management scope management
Program management   scope managementProgram management   scope management
Program management scope managementJulen Mohanty
 
Project Management vs. Program Management: Strategies for Transition Success
Project Management vs. Program Management: Strategies for Transition SuccessProject Management vs. Program Management: Strategies for Transition Success
Project Management vs. Program Management: Strategies for Transition SuccessRuffin Veal and Associates, Inc.
 
Corporate Portfolio Management E&Y POV
Corporate Portfolio Management E&Y POVCorporate Portfolio Management E&Y POV
Corporate Portfolio Management E&Y POVNiresh Rajah
 
Program Management - Steps for Success and Customer Satisfaction
Program Management - Steps for Success and Customer SatisfactionProgram Management - Steps for Success and Customer Satisfaction
Program Management - Steps for Success and Customer SatisfactionManish Srivastava
 
ACT College Arlington Project Management and Company Performance Paper.docx
ACT College Arlington Project Management and Company Performance Paper.docxACT College Arlington Project Management and Company Performance Paper.docx
ACT College Arlington Project Management and Company Performance Paper.docxwrite30
 
ACT College Arlington Project Management and Company Performance Paper.docx
ACT College Arlington Project Management and Company Performance Paper.docxACT College Arlington Project Management and Company Performance Paper.docx
ACT College Arlington Project Management and Company Performance Paper.docxwrite22
 
Srinivasadesikanraghavan 131008015759-phpapp01
Srinivasadesikanraghavan 131008015759-phpapp01Srinivasadesikanraghavan 131008015759-phpapp01
Srinivasadesikanraghavan 131008015759-phpapp01PMI_IREP_TP
 
Srinivasa desikanraghavan
Srinivasa desikanraghavanSrinivasa desikanraghavan
Srinivasa desikanraghavanPMI2011
 

Similar to A white paper on Program Management (20)

PROGRAMME MANAGEMENT BEST PRATICE
PROGRAMME MANAGEMENT BEST PRATICEPROGRAMME MANAGEMENT BEST PRATICE
PROGRAMME MANAGEMENT BEST PRATICE
 
Program Management: 3 Pillars, Benefits, & Challenges | Enterprise Wired
Program Management: 3 Pillars, Benefits, & Challenges | Enterprise WiredProgram Management: 3 Pillars, Benefits, & Challenges | Enterprise Wired
Program Management: 3 Pillars, Benefits, & Challenges | Enterprise Wired
 
MSP 2011 part 1
MSP 2011 part 1MSP 2011 part 1
MSP 2011 part 1
 
Overview of Program Management
Overview of Program ManagementOverview of Program Management
Overview of Program Management
 
Program management - Fundamentals
Program management   - FundamentalsProgram management   - Fundamentals
Program management - Fundamentals
 
Efficacy of Project Management,
Efficacy of Project Management, Efficacy of Project Management,
Efficacy of Project Management,
 
How to get started - managing a programme
How to get started - managing a programmeHow to get started - managing a programme
How to get started - managing a programme
 
Pg mp study notes (updated)
Pg mp study notes (updated)Pg mp study notes (updated)
Pg mp study notes (updated)
 
EFFICACY OF PROJECT MANAGEMENT
EFFICACY OF PROJECT MANAGEMENTEFFICACY OF PROJECT MANAGEMENT
EFFICACY OF PROJECT MANAGEMENT
 
Program management scope management
Program management   scope managementProgram management   scope management
Program management scope management
 
Project Management vs. Program Management: Strategies for Transition Success
Project Management vs. Program Management: Strategies for Transition SuccessProject Management vs. Program Management: Strategies for Transition Success
Project Management vs. Program Management: Strategies for Transition Success
 
Corporate Portfolio Management E&Y POV
Corporate Portfolio Management E&Y POVCorporate Portfolio Management E&Y POV
Corporate Portfolio Management E&Y POV
 
Program Management - Steps for Success and Customer Satisfaction
Program Management - Steps for Success and Customer SatisfactionProgram Management - Steps for Success and Customer Satisfaction
Program Management - Steps for Success and Customer Satisfaction
 
How to become CEO of your programme webinar, 27 September 2019
How to become CEO of your programme webinar, 27 September 2019How to become CEO of your programme webinar, 27 September 2019
How to become CEO of your programme webinar, 27 September 2019
 
Project Management From The Top
Project Management From The TopProject Management From The Top
Project Management From The Top
 
Projects
ProjectsProjects
Projects
 
ACT College Arlington Project Management and Company Performance Paper.docx
ACT College Arlington Project Management and Company Performance Paper.docxACT College Arlington Project Management and Company Performance Paper.docx
ACT College Arlington Project Management and Company Performance Paper.docx
 
ACT College Arlington Project Management and Company Performance Paper.docx
ACT College Arlington Project Management and Company Performance Paper.docxACT College Arlington Project Management and Company Performance Paper.docx
ACT College Arlington Project Management and Company Performance Paper.docx
 
Srinivasadesikanraghavan 131008015759-phpapp01
Srinivasadesikanraghavan 131008015759-phpapp01Srinivasadesikanraghavan 131008015759-phpapp01
Srinivasadesikanraghavan 131008015759-phpapp01
 
Srinivasa desikanraghavan
Srinivasa desikanraghavanSrinivasa desikanraghavan
Srinivasa desikanraghavan
 

More from Eagle-Eye Management Consultancy (UK) Limited

More from Eagle-Eye Management Consultancy (UK) Limited (14)

Mifid ii governance1
Mifid ii governance1Mifid ii governance1
Mifid ii governance1
 
JAC2011
JAC2011JAC2011
JAC2011
 
Volcker Rules
Volcker RulesVolcker Rules
Volcker Rules
 
Basel Committe on Banking Supervision (BCBS - 239)
Basel Committe on Banking Supervision (BCBS - 239)Basel Committe on Banking Supervision (BCBS - 239)
Basel Committe on Banking Supervision (BCBS - 239)
 
Personnel Philosophy
Personnel PhilosophyPersonnel Philosophy
Personnel Philosophy
 
MIFID 2
MIFID 2MIFID 2
MIFID 2
 
Hard and Soft Skills of a Program Director
Hard and Soft Skills of a Program DirectorHard and Soft Skills of a Program Director
Hard and Soft Skills of a Program Director
 
Employee Stock Option -- Cross Border Mechanism
Employee Stock Option -- Cross Border MechanismEmployee Stock Option -- Cross Border Mechanism
Employee Stock Option -- Cross Border Mechanism
 
Wealth Management Marketing High Level Operational View
Wealth Management Marketing High Level Operational ViewWealth Management Marketing High Level Operational View
Wealth Management Marketing High Level Operational View
 
Strategic Investment Prioritisation in Investment Banking IT division.
Strategic Investment Prioritisation in Investment Banking IT division.Strategic Investment Prioritisation in Investment Banking IT division.
Strategic Investment Prioritisation in Investment Banking IT division.
 
Basel II
Basel IIBasel II
Basel II
 
Global Trade Solutions
Global Trade SolutionsGlobal Trade Solutions
Global Trade Solutions
 
Program Management Deployment Concept Consulting
Program Management Deployment Concept ConsultingProgram Management Deployment Concept Consulting
Program Management Deployment Concept Consulting
 
Communication Management
Communication ManagementCommunication Management
Communication Management
 

Recently uploaded

VIP Call Girl Jamshedpur Aashi 8250192130 Independent Escort Service Jamshedpur
VIP Call Girl Jamshedpur Aashi 8250192130 Independent Escort Service JamshedpurVIP Call Girl Jamshedpur Aashi 8250192130 Independent Escort Service Jamshedpur
VIP Call Girl Jamshedpur Aashi 8250192130 Independent Escort Service JamshedpurSuhani Kapoor
 
Intro to BCG's Carbon Emissions Benchmark_vF.pdf
Intro to BCG's Carbon Emissions Benchmark_vF.pdfIntro to BCG's Carbon Emissions Benchmark_vF.pdf
Intro to BCG's Carbon Emissions Benchmark_vF.pdfpollardmorgan
 
Insurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usageInsurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usageMatteo Carbone
 
Call Girls In Panjim North Goa 9971646499 Genuine Service
Call Girls In Panjim North Goa 9971646499 Genuine ServiceCall Girls In Panjim North Goa 9971646499 Genuine Service
Call Girls In Panjim North Goa 9971646499 Genuine Serviceritikaroy0888
 
A DAY IN THE LIFE OF A SALESMAN / WOMAN
A DAY IN THE LIFE OF A  SALESMAN / WOMANA DAY IN THE LIFE OF A  SALESMAN / WOMAN
A DAY IN THE LIFE OF A SALESMAN / WOMANIlamathiKannappan
 
Sales & Marketing Alignment: How to Synergize for Success
Sales & Marketing Alignment: How to Synergize for SuccessSales & Marketing Alignment: How to Synergize for Success
Sales & Marketing Alignment: How to Synergize for SuccessAggregage
 
Tech Startup Growth Hacking 101 - Basics on Growth Marketing
Tech Startup Growth Hacking 101  - Basics on Growth MarketingTech Startup Growth Hacking 101  - Basics on Growth Marketing
Tech Startup Growth Hacking 101 - Basics on Growth MarketingShawn Pang
 
7.pdf This presentation captures many uses and the significance of the number...
7.pdf This presentation captures many uses and the significance of the number...7.pdf This presentation captures many uses and the significance of the number...
7.pdf This presentation captures many uses and the significance of the number...Paul Menig
 
0183760ssssssssssssssssssssssssssss00101011 (27).pdf
0183760ssssssssssssssssssssssssssss00101011 (27).pdf0183760ssssssssssssssssssssssssssss00101011 (27).pdf
0183760ssssssssssssssssssssssssssss00101011 (27).pdfRenandantas16
 
VIP Call Girls Pune Kirti 8617697112 Independent Escort Service Pune
VIP Call Girls Pune Kirti 8617697112 Independent Escort Service PuneVIP Call Girls Pune Kirti 8617697112 Independent Escort Service Pune
VIP Call Girls Pune Kirti 8617697112 Independent Escort Service PuneCall girls in Ahmedabad High profile
 
GD Birla and his contribution in management
GD Birla and his contribution in managementGD Birla and his contribution in management
GD Birla and his contribution in managementchhavia330
 
Grateful 7 speech thanking everyone that has helped.pdf
Grateful 7 speech thanking everyone that has helped.pdfGrateful 7 speech thanking everyone that has helped.pdf
Grateful 7 speech thanking everyone that has helped.pdfPaul Menig
 
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...Dave Litwiller
 
Call Girls In Radisson Blu Hotel New Delhi Paschim Vihar ❤️8860477959 Escorts...
Call Girls In Radisson Blu Hotel New Delhi Paschim Vihar ❤️8860477959 Escorts...Call Girls In Radisson Blu Hotel New Delhi Paschim Vihar ❤️8860477959 Escorts...
Call Girls In Radisson Blu Hotel New Delhi Paschim Vihar ❤️8860477959 Escorts...lizamodels9
 
Progress Report - Oracle Database Analyst Summit
Progress  Report - Oracle Database Analyst SummitProgress  Report - Oracle Database Analyst Summit
Progress Report - Oracle Database Analyst SummitHolger Mueller
 
Monte Carlo simulation : Simulation using MCSM
Monte Carlo simulation : Simulation using MCSMMonte Carlo simulation : Simulation using MCSM
Monte Carlo simulation : Simulation using MCSMRavindra Nath Shukla
 
Mondelez State of Snacking and Future Trends 2023
Mondelez State of Snacking and Future Trends 2023Mondelez State of Snacking and Future Trends 2023
Mondelez State of Snacking and Future Trends 2023Neil Kimberley
 
BEST Call Girls In Old Faridabad ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
BEST Call Girls In Old Faridabad ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,BEST Call Girls In Old Faridabad ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
BEST Call Girls In Old Faridabad ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,noida100girls
 
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...lizamodels9
 
VIP Kolkata Call Girl Howrah 👉 8250192130 Available With Room
VIP Kolkata Call Girl Howrah 👉 8250192130  Available With RoomVIP Kolkata Call Girl Howrah 👉 8250192130  Available With Room
VIP Kolkata Call Girl Howrah 👉 8250192130 Available With Roomdivyansh0kumar0
 

Recently uploaded (20)

VIP Call Girl Jamshedpur Aashi 8250192130 Independent Escort Service Jamshedpur
VIP Call Girl Jamshedpur Aashi 8250192130 Independent Escort Service JamshedpurVIP Call Girl Jamshedpur Aashi 8250192130 Independent Escort Service Jamshedpur
VIP Call Girl Jamshedpur Aashi 8250192130 Independent Escort Service Jamshedpur
 
Intro to BCG's Carbon Emissions Benchmark_vF.pdf
Intro to BCG's Carbon Emissions Benchmark_vF.pdfIntro to BCG's Carbon Emissions Benchmark_vF.pdf
Intro to BCG's Carbon Emissions Benchmark_vF.pdf
 
Insurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usageInsurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usage
 
Call Girls In Panjim North Goa 9971646499 Genuine Service
Call Girls In Panjim North Goa 9971646499 Genuine ServiceCall Girls In Panjim North Goa 9971646499 Genuine Service
Call Girls In Panjim North Goa 9971646499 Genuine Service
 
A DAY IN THE LIFE OF A SALESMAN / WOMAN
A DAY IN THE LIFE OF A  SALESMAN / WOMANA DAY IN THE LIFE OF A  SALESMAN / WOMAN
A DAY IN THE LIFE OF A SALESMAN / WOMAN
 
Sales & Marketing Alignment: How to Synergize for Success
Sales & Marketing Alignment: How to Synergize for SuccessSales & Marketing Alignment: How to Synergize for Success
Sales & Marketing Alignment: How to Synergize for Success
 
Tech Startup Growth Hacking 101 - Basics on Growth Marketing
Tech Startup Growth Hacking 101  - Basics on Growth MarketingTech Startup Growth Hacking 101  - Basics on Growth Marketing
Tech Startup Growth Hacking 101 - Basics on Growth Marketing
 
7.pdf This presentation captures many uses and the significance of the number...
7.pdf This presentation captures many uses and the significance of the number...7.pdf This presentation captures many uses and the significance of the number...
7.pdf This presentation captures many uses and the significance of the number...
 
0183760ssssssssssssssssssssssssssss00101011 (27).pdf
0183760ssssssssssssssssssssssssssss00101011 (27).pdf0183760ssssssssssssssssssssssssssss00101011 (27).pdf
0183760ssssssssssssssssssssssssssss00101011 (27).pdf
 
VIP Call Girls Pune Kirti 8617697112 Independent Escort Service Pune
VIP Call Girls Pune Kirti 8617697112 Independent Escort Service PuneVIP Call Girls Pune Kirti 8617697112 Independent Escort Service Pune
VIP Call Girls Pune Kirti 8617697112 Independent Escort Service Pune
 
GD Birla and his contribution in management
GD Birla and his contribution in managementGD Birla and his contribution in management
GD Birla and his contribution in management
 
Grateful 7 speech thanking everyone that has helped.pdf
Grateful 7 speech thanking everyone that has helped.pdfGrateful 7 speech thanking everyone that has helped.pdf
Grateful 7 speech thanking everyone that has helped.pdf
 
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
 
Call Girls In Radisson Blu Hotel New Delhi Paschim Vihar ❤️8860477959 Escorts...
Call Girls In Radisson Blu Hotel New Delhi Paschim Vihar ❤️8860477959 Escorts...Call Girls In Radisson Blu Hotel New Delhi Paschim Vihar ❤️8860477959 Escorts...
Call Girls In Radisson Blu Hotel New Delhi Paschim Vihar ❤️8860477959 Escorts...
 
Progress Report - Oracle Database Analyst Summit
Progress  Report - Oracle Database Analyst SummitProgress  Report - Oracle Database Analyst Summit
Progress Report - Oracle Database Analyst Summit
 
Monte Carlo simulation : Simulation using MCSM
Monte Carlo simulation : Simulation using MCSMMonte Carlo simulation : Simulation using MCSM
Monte Carlo simulation : Simulation using MCSM
 
Mondelez State of Snacking and Future Trends 2023
Mondelez State of Snacking and Future Trends 2023Mondelez State of Snacking and Future Trends 2023
Mondelez State of Snacking and Future Trends 2023
 
BEST Call Girls In Old Faridabad ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
BEST Call Girls In Old Faridabad ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,BEST Call Girls In Old Faridabad ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
BEST Call Girls In Old Faridabad ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
 
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...
 
VIP Kolkata Call Girl Howrah 👉 8250192130 Available With Room
VIP Kolkata Call Girl Howrah 👉 8250192130  Available With RoomVIP Kolkata Call Girl Howrah 👉 8250192130  Available With Room
VIP Kolkata Call Girl Howrah 👉 8250192130 Available With Room
 

A white paper on Program Management

  • 1. Article Title: Strategic deployment of Program Management best-practice model in financial institutions. Author Name: Kaushik Pramanik Article: Introduction: A truly global professional service firm with high visibility in the BFSI domain; structured and industry standard best-practice Program Management framework is very much essential to gain the increased customer satisfaction. This article is focused on industry-standard practices and briefly describes how to deploy such a framework in the global financial institutions. Financial institutions like Banks, Insurance companies, Financial data providers, Stock exchanges execute many multi-million dollars cross-functional and cross-divisional transformation programs spanning across different geographic regions and divisions. Programme Management may be defined as the co-ordinated organisation, direction and implementation of a portfolio of projects and activities that together achieve outcomes and realise benefits that are of strategic importance. Effective and efficient Program Management is the key success factor to any financial institutions to transform the company’s vision and various inter-related strategic objectives spanning across different sectors like core business, IT, operation, HR, finance; etc. There are number of Program Management framework exists within the industry; as example, PMI (Project Management Institute) based SPM (Standard for Program Management) framework, TSO (The Stationary Office, UK Government) based MSP (Managing Successful Programs) framework, University of Oxford Program Management framework, George Washington University Program Management framework, etc.
  • 2. However, very few companies around the world follow the best-practice framework provided by major institutes and universities even though there is a high level of benefit for using the industry-standard program management framework. This article will provide a very brief overview of PMI based SPM approach and TSO (The Stationary Office, UK Government) based MSP approach and how to deploy any of these models through-out a global company through strategic execution. Brief Overview of PMI based Standard for Program Management (SPM) approach: Program delivers benefits to organizations by developing new capabilities or enhancing current capabilities. Programs are initiated for achieving organizational goals and strategic objectives that are so large scale that they cannot be achieved by single project. Diagrammatic view of Standard for Program Management framework is given below. Source: THE STANDARD FOR THE PROGRAM MANAGEMENT, Second Edition, PMI, Chapter 1, 2 & 3 PMI based Standard for Program Management framework mainly consists of following key areas.
  • 3. • Program Governance and Stakeholder Management: This area spans all the program life cycle phases. Program governance overseas the progress of the program and the delivery of the coordinated benefits from its components. Programs are often too complex to be managed by a single individual, which is why appropriate implementation of program governance is the critical factor for a program to succeed. Program governance helps in managing risks, stakeholders’ benefits, resources, and quality across the program life cycle. Furthermore, program governance ensures decision-making and delivery management activities are focused on achieving program goals in a consistent manner, addressing appropriate risks, and fulfilling stakeholder requirements. Program governance also provides an appropriate organizational structure, the policies and procedures necessary to support program delivery through formal program reviews. This is facilitated by the regular and phase-gate-based monitoring of deliverables, performance, risks, and issues by the program board. Program stakeholder management identifies how the program will affect stakeholders (e.g., the organizations’ culture, the local population, country-specific culture, resistance or barriers to change, bureaucracy, etc.) and then develops a communication strategy to engage the affected stakeholders, manage their expectations and manage acceptance of the objectives of the program. Program stakeholder management is the very important factor to establish the program governance and program organizational structure, which is monitored and reviewed through-out the program life cycle. • Program Life Cycle: Typical program life cycle consists of five phases (Pre-Program Preparations, Program Initiation, Program Set-up, Delivery of Program Benefits, and Program Closure) as mentioned in the above picture. End of each phase works as an entry point to the next phase. During the various stages of program life cycle, program manager understands the strategic benefits of the program, develop the plan to initiate the program, define the program objectives and their alignment with the organizations’ goals and vision, develop the high-level business case demonstrating an understanding of the needs, business benefits, feasibility and justification of the program, establish the program governance mechanism, risk management protocols, and program schedule. The program life cycle complies with the needs of corporate governance and also ensures that the expected benefits are realized in a predictable and coordinated manner. • Program Benefits Management: Program delivers benefits to the organization. Benefits realization planning is part of program management which consists of interdependencies between benefits, alignment with the strategic goals of the organization, benefit of delivery scheduling, metrics and measurement, responsibility for delivery of the final and intermediate benefits within the program, and benefit realization. At the end of the program, the benefits delivered should always be compared against those promised in the initial business case to ensure that the program actually delivered the full benefits for which it was created.
  • 4. • Program Management Process Groups: Program management process groups are a set of interrelated actions, and activities performed to achieve a pre-specified outcome. Program management processes are primarily integrative in that they coordinate the outputs of various projects to derive the desired program outcomes. A shown in the above picture, there are five processes (Initiation, Planning, Executing, Monitoring & Controlling and Closing) in program management. Processes receive inputs from processes that logically precede them and send outputs to successor processes. A guiding rule for applying program management processes is to ensure that the program manager effectively delegates authority, autonomy and responsibility for day-to-day management of the projects to the designated project managers. Brief Overview of TSO based Managing Successful Programs (MSP) approach: TSO (The Stationary Office, UK Government) based MSP approach is basically based on a two-layer framework. As shown below in the diagram, the outer layer concentrates on various program principals like empowerment, leading the change, envisioning, adding value, focusing on benefits, alignment with corporate strategy, capability development and learning experience. These principals are very important to execute a global transformation program in the organization and mostly linked with leadership skills associated with Program Management.
  • 5. TSO (The Stationary Office) - Frameworkand Process Remainingalignedwith corporate strategy Organisation Closing a Programme Defining a Programme Identifying a Programme Managing theTranches Delivering the Capability Realising the Benefits Sources: 1. MSP framework and concepts, published by The Stationary Office (TSO), UK Government 2. http://www.managing-successful-programmes.com/ 3. Managing Successful Programmes Manual - 4th Edition 4. Swiss Program Management Conference, 2012 The second layer core consists of program management activities like program vision development, organization, stakeholder management, business case development, blue print design, planning & control, program risk management, quality management, program delivery, benefit realization management, etc. Present Scenario: Many global financial institutes do not follow any industry-standard program management framework rather than follow their own customized framework and guidelines to execute the program. Sometimes the in-house framework is not consistent enough.
  • 6. The usage of inconsistent approach results various downside risks like increased financial risk (e.g.; budget overrun), reduced customer satisfaction, low quality ends deliverables, slippage on schedule, usage of different program terminology, processes and tools, below the standard management and KPI reporting, and lacking of controlled governance mechanism. The main reason behind this is that Sr. Management of the organization doesn’t value best practice, or they are not aware of the latest industry standard. Many program managers are not properly trained to execute a complex cross-divisional and cross-functional program in the large organization and very few people in the company are aware of strategic implications of program management and portfolio management. To overcome this problem, it is very much essential to form a central program management control department which will be responsible for rolling-out the best-practice framework across divisions and regions through effective communication, collaboration and hands-on training to program managers. Deployment Model: Deployment of Program Management best practice framework in the global organization across divisions and regions is a herculean task. To achieve the goal, several strategic measures have to be taken into consideration. As shown in the below figure, three work streams have to be formed. The Communication and Communities Work stream is responsible for creating the awareness about program management, communicating guidelines & policies about the best-practice framework and establishing the program management community across the organization.
  • 7. Deployment model: Work Stream concept “Program Management – Best Practice”: Deployment Communication & Communities Work Stream Training, Tools & Techniques, and Support Work Stream Cross-functional collaboration Work Stream GovernanceGovernance Setthe strategicdirection Establishdisciplinedexecution Define variousactions Prioritise & communicate Establishthe accountability Define rewards &recognition Evaluate framework &roadmap Investmentdecision Source: Own idea Training, Tools & Techniques, and Support work stream is responsible for development and execution of a framework related to training, tools & techniques, and user support of “Program Management – Best Practice” to increase the quality and efficiency of numerous program management environments in the global organization. Finally, Cross – functional collaboration work stream will be responsible for collaboration and coordination between above two work streams across organizational divisions and regions, corporate training department, external parties to facilitate smooth deployment of “Program Management – Best Practice” framework in the company. Furthermore, a strong governance model must be in place to integrate three work streams mentioned above. The main responsibilities of the governance model are setting-up the strategic direction, disciplined execution, prioritize and communicate, establishment of accountability, definition of reward & recognition and various investment decisions. A sample governance model for deployment is given below.
  • 8. COO/ DOO/ GIO Governan ce Program Management– Best Practice Governance Strongfocus from top. Endto end governance. Topto bottom transparency. High-level ofaccountability. Resultorientedstructure. Clearstrategy & big picture. Long-termsustainability. Well drawnroad map. Teamforce inaction. Fosteringcollaboration. Catalystto transformation. Rewardand recognition. COO / DOO GIO Governance triangle Consistsof Headof Program ManagementPractice, Workstream leaders(3) Frequency(2permonth) Consistsof Workstream leaders, Regional participants, Frequency(2permonth) Each work stream will have governance mechanism… Workstream Governance CoEEnterprise Transformation Governance Source: Own idea Conclusion: All major financial institutions are continuously lacking of standard program management practice. In today’s volatile economic and global environment, it is very important to streamline program management practice across the organization which will help to achieve company’s vision, goals and strategic objectives in a systematic manner. The industry standard best-practice methodology provides a sustainable framework that is clear, complete, relevant and generally recognized as good practices on most programs, most of the time. References: 1. The Standard For Program Management, Second Edition by PMI (Project Management Institute) 2. http://www.managing-successful-programmes.com/ 3. Managing Successful Programmes Manual - 4th Edition 4. Swiss Program Management Conference, 2012