Total procurement volume
• The Swedish Transport Administration's total purchasing
volume in 2021 amounted to Euro 4,985 billion, an
increase of approximately 5 percent compared with
previous years.
• Investments and maintenance measures make up
approximately 94 percent of the total volume. Traffic type
rail accounts for the majority of the volume increase of
9.6 percent.
• Purchasing volumes follow the operating volume
development fairly well over the years and purchasing
volumes share of the total operating volume corresponds
to an average of 75 percent.
• The Swedish Transport Administration's supplier market
analysis is now published on Trafikverket.se
• Supplier market analyses - Bransch (trafikverket.se)
Type of contracts, total
69 procurements are still ongoing in year of publication 2021 and have not been completed yet. These are not included in the above presentation.
The procurement volume includes both investment and maintenance contracts.
During the years 2017-2020, the contract volume is distributed on average;
40 percent performance contract
60 percent design and build contract
Top 10 suppliers 2019-2021
• The Swedish Transport Administration's
10 largest suppliers account for 2 261
million Euro and correspond to
approximately 45% of total purchase
volume.
• The Swedish Transport Administration's
100 largest suppliers correspond to
approximately 85% of total purchase
volume
• 80 per cent of the total volume value is
represented by approximately 62 suppliers
• There were approximately 7,900 suppliers
to the Swedish Transport Administration.
The Transport Administration’s largest suppliers are reported on the basis of group relationships

More Related Content

Similar to Procurement of major infrastructure projects 2017-22 - B. Hasselgren, Senior Advisor, Trafikverket

UIRR 2014-2015 Annual report
UIRR 2014-2015 Annual reportUIRR 2014-2015 Annual report
UIRR 2014-2015 Annual reportCombinant nv
 
Session 1 Holger.ppsx
Session 1 Holger.ppsxSession 1 Holger.ppsx
Session 1 Holger.ppsx
franciscobarraza18
 
Refocusing on regional cooperation
Refocusing on regional cooperationRefocusing on regional cooperation
Refocusing on regional cooperation
Fingrid Oyj
 
EPC CoC 10th Newsletter
EPC CoC 10th NewsletterEPC CoC 10th Newsletter
EPC CoC 10th Newsletter
Kiril Raytchev
 
Mega projects -- Kaj V. Holm, Denmark
Mega projects -- Kaj V. Holm, DenmarkMega projects -- Kaj V. Holm, Denmark
Mega projects -- Kaj V. Holm, Denmark
OECD Governance
 
Mega projects -- Why are they difficult and what can be done about it? - Kaj ...
Mega projects -- Why are they difficult and what can be done about it? - Kaj ...Mega projects -- Why are they difficult and what can be done about it? - Kaj ...
Mega projects -- Why are they difficult and what can be done about it? - Kaj ...
OECD Governance
 
Snam - 2017 1H Results
Snam - 2017 1H ResultsSnam - 2017 1H Results
Snam - 2017 1H Results
Snam
 
Department of Works NIP - NIPA
Department of Works NIP - NIPADepartment of Works NIP - NIPA
Department of Works NIP - NIPAGibson Ali Holemba
 
Matthew Thomas, Southend Borough Council & Rochford District Council - Positi...
Matthew Thomas, Southend Borough Council & Rochford District Council - Positi...Matthew Thomas, Southend Borough Council & Rochford District Council - Positi...
Matthew Thomas, Southend Borough Council & Rochford District Council - Positi...
PAS_Team
 
Opening passenger rail transport to competition in Finland, Minister Anne Ber...
Opening passenger rail transport to competition in Finland, Minister Anne Ber...Opening passenger rail transport to competition in Finland, Minister Anne Ber...
Opening passenger rail transport to competition in Finland, Minister Anne Ber...
Liikenne- ja viestintäministeriö
 
Eu strategy for ertms deployment j. schlichting and p. buhrsch
Eu strategy for ertms deployment   j. schlichting and p. buhrschEu strategy for ertms deployment   j. schlichting and p. buhrsch
Eu strategy for ertms deployment j. schlichting and p. buhrsch
European Commission
 
Klöckner & Co SE - Analysts' and Investors' Conference FY 2016
Klöckner & Co SE - Analysts' and Investors' Conference FY 2016Klöckner & Co SE - Analysts' and Investors' Conference FY 2016
Klöckner & Co SE - Analysts' and Investors' Conference FY 2016
Klöckner & Co SE
 
Presentation of the Modernization of Local Public Services in the RM Project
Presentation of the Modernization of Local Public Services in the RM ProjectPresentation of the Modernization of Local Public Services in the RM Project
Presentation of the Modernization of Local Public Services in the RM ProjectGIZ Moldova
 
Result presentation Q3 2017
Result presentation Q3 2017Result presentation Q3 2017
Result presentation Q3 2017
Wärtsilä Corporation
 
Prezentare MLPS Comitet Director din 19 noiembrie 2012
Prezentare MLPS Comitet Director din 19 noiembrie 2012Prezentare MLPS Comitet Director din 19 noiembrie 2012
Prezentare MLPS Comitet Director din 19 noiembrie 2012GIZ Moldova
 
BPF-Delivering-the-Goods-Dec-15-web
BPF-Delivering-the-Goods-Dec-15-webBPF-Delivering-the-Goods-Dec-15-web
BPF-Delivering-the-Goods-Dec-15-webDavid Smith
 
From Discontent to UK Content
From Discontent to UK ContentFrom Discontent to UK Content
From Discontent to UK Content
BVG Associates
 
Result presentation Q1 2021
Result presentation Q1 2021Result presentation Q1 2021
Result presentation Q1 2021
Wärtsilä Corporation
 
Director Jan Jackholt (EBRD) - EBRD and Procurement
Director Jan Jackholt (EBRD) - EBRD and ProcurementDirector Jan Jackholt (EBRD) - EBRD and Procurement
Director Jan Jackholt (EBRD) - EBRD and Procurement
Ulkoministeriö - Eurooppatiedotus
 

Similar to Procurement of major infrastructure projects 2017-22 - B. Hasselgren, Senior Advisor, Trafikverket (20)

UIRR 2014-2015 Annual report
UIRR 2014-2015 Annual reportUIRR 2014-2015 Annual report
UIRR 2014-2015 Annual report
 
Session 1 Holger.ppsx
Session 1 Holger.ppsxSession 1 Holger.ppsx
Session 1 Holger.ppsx
 
Refocusing on regional cooperation
Refocusing on regional cooperationRefocusing on regional cooperation
Refocusing on regional cooperation
 
EPC CoC 10th Newsletter
EPC CoC 10th NewsletterEPC CoC 10th Newsletter
EPC CoC 10th Newsletter
 
Mega projects -- Kaj V. Holm, Denmark
Mega projects -- Kaj V. Holm, DenmarkMega projects -- Kaj V. Holm, Denmark
Mega projects -- Kaj V. Holm, Denmark
 
Mega projects -- Why are they difficult and what can be done about it? - Kaj ...
Mega projects -- Why are they difficult and what can be done about it? - Kaj ...Mega projects -- Why are they difficult and what can be done about it? - Kaj ...
Mega projects -- Why are they difficult and what can be done about it? - Kaj ...
 
Snam - 2017 1H Results
Snam - 2017 1H ResultsSnam - 2017 1H Results
Snam - 2017 1H Results
 
Department of Works NIP - NIPA
Department of Works NIP - NIPADepartment of Works NIP - NIPA
Department of Works NIP - NIPA
 
Matthew Thomas, Southend Borough Council & Rochford District Council - Positi...
Matthew Thomas, Southend Borough Council & Rochford District Council - Positi...Matthew Thomas, Southend Borough Council & Rochford District Council - Positi...
Matthew Thomas, Southend Borough Council & Rochford District Council - Positi...
 
Opening passenger rail transport to competition in Finland, Minister Anne Ber...
Opening passenger rail transport to competition in Finland, Minister Anne Ber...Opening passenger rail transport to competition in Finland, Minister Anne Ber...
Opening passenger rail transport to competition in Finland, Minister Anne Ber...
 
Eu strategy for ertms deployment j. schlichting and p. buhrsch
Eu strategy for ertms deployment   j. schlichting and p. buhrschEu strategy for ertms deployment   j. schlichting and p. buhrsch
Eu strategy for ertms deployment j. schlichting and p. buhrsch
 
Klöckner & Co SE - Analysts' and Investors' Conference FY 2016
Klöckner & Co SE - Analysts' and Investors' Conference FY 2016Klöckner & Co SE - Analysts' and Investors' Conference FY 2016
Klöckner & Co SE - Analysts' and Investors' Conference FY 2016
 
Session 7 Karolina Isaksson
Session 7 Karolina IsakssonSession 7 Karolina Isaksson
Session 7 Karolina Isaksson
 
Presentation of the Modernization of Local Public Services in the RM Project
Presentation of the Modernization of Local Public Services in the RM ProjectPresentation of the Modernization of Local Public Services in the RM Project
Presentation of the Modernization of Local Public Services in the RM Project
 
Result presentation Q3 2017
Result presentation Q3 2017Result presentation Q3 2017
Result presentation Q3 2017
 
Prezentare MLPS Comitet Director din 19 noiembrie 2012
Prezentare MLPS Comitet Director din 19 noiembrie 2012Prezentare MLPS Comitet Director din 19 noiembrie 2012
Prezentare MLPS Comitet Director din 19 noiembrie 2012
 
BPF-Delivering-the-Goods-Dec-15-web
BPF-Delivering-the-Goods-Dec-15-webBPF-Delivering-the-Goods-Dec-15-web
BPF-Delivering-the-Goods-Dec-15-web
 
From Discontent to UK Content
From Discontent to UK ContentFrom Discontent to UK Content
From Discontent to UK Content
 
Result presentation Q1 2021
Result presentation Q1 2021Result presentation Q1 2021
Result presentation Q1 2021
 
Director Jan Jackholt (EBRD) - EBRD and Procurement
Director Jan Jackholt (EBRD) - EBRD and ProcurementDirector Jan Jackholt (EBRD) - EBRD and Procurement
Director Jan Jackholt (EBRD) - EBRD and Procurement
 

More from OECD Governance

Public Integrity Indicators Slides
Public Integrity Indicators SlidesPublic Integrity Indicators Slides
Public Integrity Indicators Slides
OECD Governance
 
Summary of the OECD expert meeting: Construction Risk Management in Infrastru...
Summary of the OECD expert meeting: Construction Risk Management in Infrastru...Summary of the OECD expert meeting: Construction Risk Management in Infrastru...
Summary of the OECD expert meeting: Construction Risk Management in Infrastru...
OECD Governance
 
Using AI led assurance to deliver projects on time and on budget - D. Amratia...
Using AI led assurance to deliver projects on time and on budget - D. Amratia...Using AI led assurance to deliver projects on time and on budget - D. Amratia...
Using AI led assurance to deliver projects on time and on budget - D. Amratia...
OECD Governance
 
ECI in Sweden - A. Kadefors, KTH Royal Institute of Technology, Stockholm (SE)
 ECI in Sweden - A. Kadefors, KTH Royal Institute of Technology, Stockholm (SE) ECI in Sweden - A. Kadefors, KTH Royal Institute of Technology, Stockholm (SE)
ECI in Sweden - A. Kadefors, KTH Royal Institute of Technology, Stockholm (SE)
OECD Governance
 
Building Client Capability to Deliver Megaprojects - J. Denicol, professor at...
Building Client Capability to Deliver Megaprojects - J. Denicol, professor at...Building Client Capability to Deliver Megaprojects - J. Denicol, professor at...
Building Client Capability to Deliver Megaprojects - J. Denicol, professor at...
OECD Governance
 
Procurement strategy in major infrastructure: The AS-IS and STEPS - D. Makovš...
Procurement strategy in major infrastructure: The AS-IS and STEPS - D. Makovš...Procurement strategy in major infrastructure: The AS-IS and STEPS - D. Makovš...
Procurement strategy in major infrastructure: The AS-IS and STEPS - D. Makovš...
OECD Governance
 
ECI Dutch Experience - A. Chao, Partner, Bird&Bird & J. de Koning, Head of Co...
ECI Dutch Experience - A. Chao, Partner, Bird&Bird & J. de Koning, Head of Co...ECI Dutch Experience - A. Chao, Partner, Bird&Bird & J. de Koning, Head of Co...
ECI Dutch Experience - A. Chao, Partner, Bird&Bird & J. de Koning, Head of Co...
OECD Governance
 
ECI in Sweden - A. Kadefors, KTH Royal Institute of Technology, Stockholm
ECI in Sweden - A. Kadefors, KTH Royal Institute of Technology, StockholmECI in Sweden - A. Kadefors, KTH Royal Institute of Technology, Stockholm
ECI in Sweden - A. Kadefors, KTH Royal Institute of Technology, Stockholm
OECD Governance
 
EPEC's perception of market developments - E. Farquharson, Principal Adviser,...
EPEC's perception of market developments - E. Farquharson, Principal Adviser,...EPEC's perception of market developments - E. Farquharson, Principal Adviser,...
EPEC's perception of market developments - E. Farquharson, Principal Adviser,...
OECD Governance
 
Geographical scope of the lines in Design and Build - B.Dupuis, Executive Dir...
Geographical scope of the lines in Design and Build - B.Dupuis, Executive Dir...Geographical scope of the lines in Design and Build - B.Dupuis, Executive Dir...
Geographical scope of the lines in Design and Build - B.Dupuis, Executive Dir...
OECD Governance
 
Executive Agency of the Dutch Ministry of Infrastructure and Water Management...
Executive Agency of the Dutch Ministry of Infrastructure and Water Management...Executive Agency of the Dutch Ministry of Infrastructure and Water Management...
Executive Agency of the Dutch Ministry of Infrastructure and Water Management...
OECD Governance
 
Presentation of OECD Government at a Glance 2023
Presentation of OECD Government at a Glance 2023Presentation of OECD Government at a Glance 2023
Presentation of OECD Government at a Glance 2023
OECD Governance
 
The Protection and Promotion of Civic Space: Strengthening Alignment with Int...
The Protection and Promotion of Civic Space: Strengthening Alignment with Int...The Protection and Promotion of Civic Space: Strengthening Alignment with Int...
The Protection and Promotion of Civic Space: Strengthening Alignment with Int...
OECD Governance
 
Digital Government Review Türkiye - Assessment and Recommendations
Digital Government Review Türkiye - Assessment and RecommendationsDigital Government Review Türkiye - Assessment and Recommendations
Digital Government Review Türkiye - Assessment and Recommendations
OECD Governance
 
Buliding-Financial-Resilience-to climate-Impacts.pdf
Buliding-Financial-Resilience-to climate-Impacts.pdfBuliding-Financial-Resilience-to climate-Impacts.pdf
Buliding-Financial-Resilience-to climate-Impacts.pdf
OECD Governance
 
Session-7-OECD-Strengthening-climate.pptx
Session-7-OECD-Strengthening-climate.pptxSession-7-OECD-Strengthening-climate.pptx
Session-7-OECD-Strengthening-climate.pptx
OECD Governance
 
Session-6-Building-Financial-Resilience.pptx
Session-6-Building-Financial-Resilience.pptxSession-6-Building-Financial-Resilience.pptx
Session-6-Building-Financial-Resilience.pptx
OECD Governance
 
Session-5-Assurance-on-sustainability-Peter-Welch.pptx
Session-5-Assurance-on-sustainability-Peter-Welch.pptxSession-5-Assurance-on-sustainability-Peter-Welch.pptx
Session-5-Assurance-on-sustainability-Peter-Welch.pptx
OECD Governance
 
Session-4-Sovereign-green-bonds-Fatos-Koc.pptx
Session-4-Sovereign-green-bonds-Fatos-Koc.pptxSession-4-Sovereign-green-bonds-Fatos-Koc.pptx
Session-4-Sovereign-green-bonds-Fatos-Koc.pptx
OECD Governance
 
Session-3-GOV-Green-Budgeting-in-the-Budget-Cycle.pptx
Session-3-GOV-Green-Budgeting-in-the-Budget-Cycle.pptxSession-3-GOV-Green-Budgeting-in-the-Budget-Cycle.pptx
Session-3-GOV-Green-Budgeting-in-the-Budget-Cycle.pptx
OECD Governance
 

More from OECD Governance (20)

Public Integrity Indicators Slides
Public Integrity Indicators SlidesPublic Integrity Indicators Slides
Public Integrity Indicators Slides
 
Summary of the OECD expert meeting: Construction Risk Management in Infrastru...
Summary of the OECD expert meeting: Construction Risk Management in Infrastru...Summary of the OECD expert meeting: Construction Risk Management in Infrastru...
Summary of the OECD expert meeting: Construction Risk Management in Infrastru...
 
Using AI led assurance to deliver projects on time and on budget - D. Amratia...
Using AI led assurance to deliver projects on time and on budget - D. Amratia...Using AI led assurance to deliver projects on time and on budget - D. Amratia...
Using AI led assurance to deliver projects on time and on budget - D. Amratia...
 
ECI in Sweden - A. Kadefors, KTH Royal Institute of Technology, Stockholm (SE)
 ECI in Sweden - A. Kadefors, KTH Royal Institute of Technology, Stockholm (SE) ECI in Sweden - A. Kadefors, KTH Royal Institute of Technology, Stockholm (SE)
ECI in Sweden - A. Kadefors, KTH Royal Institute of Technology, Stockholm (SE)
 
Building Client Capability to Deliver Megaprojects - J. Denicol, professor at...
Building Client Capability to Deliver Megaprojects - J. Denicol, professor at...Building Client Capability to Deliver Megaprojects - J. Denicol, professor at...
Building Client Capability to Deliver Megaprojects - J. Denicol, professor at...
 
Procurement strategy in major infrastructure: The AS-IS and STEPS - D. Makovš...
Procurement strategy in major infrastructure: The AS-IS and STEPS - D. Makovš...Procurement strategy in major infrastructure: The AS-IS and STEPS - D. Makovš...
Procurement strategy in major infrastructure: The AS-IS and STEPS - D. Makovš...
 
ECI Dutch Experience - A. Chao, Partner, Bird&Bird & J. de Koning, Head of Co...
ECI Dutch Experience - A. Chao, Partner, Bird&Bird & J. de Koning, Head of Co...ECI Dutch Experience - A. Chao, Partner, Bird&Bird & J. de Koning, Head of Co...
ECI Dutch Experience - A. Chao, Partner, Bird&Bird & J. de Koning, Head of Co...
 
ECI in Sweden - A. Kadefors, KTH Royal Institute of Technology, Stockholm
ECI in Sweden - A. Kadefors, KTH Royal Institute of Technology, StockholmECI in Sweden - A. Kadefors, KTH Royal Institute of Technology, Stockholm
ECI in Sweden - A. Kadefors, KTH Royal Institute of Technology, Stockholm
 
EPEC's perception of market developments - E. Farquharson, Principal Adviser,...
EPEC's perception of market developments - E. Farquharson, Principal Adviser,...EPEC's perception of market developments - E. Farquharson, Principal Adviser,...
EPEC's perception of market developments - E. Farquharson, Principal Adviser,...
 
Geographical scope of the lines in Design and Build - B.Dupuis, Executive Dir...
Geographical scope of the lines in Design and Build - B.Dupuis, Executive Dir...Geographical scope of the lines in Design and Build - B.Dupuis, Executive Dir...
Geographical scope of the lines in Design and Build - B.Dupuis, Executive Dir...
 
Executive Agency of the Dutch Ministry of Infrastructure and Water Management...
Executive Agency of the Dutch Ministry of Infrastructure and Water Management...Executive Agency of the Dutch Ministry of Infrastructure and Water Management...
Executive Agency of the Dutch Ministry of Infrastructure and Water Management...
 
Presentation of OECD Government at a Glance 2023
Presentation of OECD Government at a Glance 2023Presentation of OECD Government at a Glance 2023
Presentation of OECD Government at a Glance 2023
 
The Protection and Promotion of Civic Space: Strengthening Alignment with Int...
The Protection and Promotion of Civic Space: Strengthening Alignment with Int...The Protection and Promotion of Civic Space: Strengthening Alignment with Int...
The Protection and Promotion of Civic Space: Strengthening Alignment with Int...
 
Digital Government Review Türkiye - Assessment and Recommendations
Digital Government Review Türkiye - Assessment and RecommendationsDigital Government Review Türkiye - Assessment and Recommendations
Digital Government Review Türkiye - Assessment and Recommendations
 
Buliding-Financial-Resilience-to climate-Impacts.pdf
Buliding-Financial-Resilience-to climate-Impacts.pdfBuliding-Financial-Resilience-to climate-Impacts.pdf
Buliding-Financial-Resilience-to climate-Impacts.pdf
 
Session-7-OECD-Strengthening-climate.pptx
Session-7-OECD-Strengthening-climate.pptxSession-7-OECD-Strengthening-climate.pptx
Session-7-OECD-Strengthening-climate.pptx
 
Session-6-Building-Financial-Resilience.pptx
Session-6-Building-Financial-Resilience.pptxSession-6-Building-Financial-Resilience.pptx
Session-6-Building-Financial-Resilience.pptx
 
Session-5-Assurance-on-sustainability-Peter-Welch.pptx
Session-5-Assurance-on-sustainability-Peter-Welch.pptxSession-5-Assurance-on-sustainability-Peter-Welch.pptx
Session-5-Assurance-on-sustainability-Peter-Welch.pptx
 
Session-4-Sovereign-green-bonds-Fatos-Koc.pptx
Session-4-Sovereign-green-bonds-Fatos-Koc.pptxSession-4-Sovereign-green-bonds-Fatos-Koc.pptx
Session-4-Sovereign-green-bonds-Fatos-Koc.pptx
 
Session-3-GOV-Green-Budgeting-in-the-Budget-Cycle.pptx
Session-3-GOV-Green-Budgeting-in-the-Budget-Cycle.pptxSession-3-GOV-Green-Budgeting-in-the-Budget-Cycle.pptx
Session-3-GOV-Green-Budgeting-in-the-Budget-Cycle.pptx
 

Recently uploaded

PPT Item # 8 - Tuxedo Columbine 3way Stop
PPT Item # 8 - Tuxedo Columbine 3way StopPPT Item # 8 - Tuxedo Columbine 3way Stop
PPT Item # 8 - Tuxedo Columbine 3way Stop
ahcitycouncil
 
Uniform Guidance 3.0 - The New 2 CFR 200
Uniform Guidance 3.0 - The New 2 CFR 200Uniform Guidance 3.0 - The New 2 CFR 200
Uniform Guidance 3.0 - The New 2 CFR 200
GrantManagementInsti
 
一比一原版(UQ毕业证)昆士兰大学毕业证成绩单
一比一原版(UQ毕业证)昆士兰大学毕业证成绩单一比一原版(UQ毕业证)昆士兰大学毕业证成绩单
一比一原版(UQ毕业证)昆士兰大学毕业证成绩单
ehbuaw
 
Russian anarchist and anti-war movement in the third year of full-scale war
Russian anarchist and anti-war movement in the third year of full-scale warRussian anarchist and anti-war movement in the third year of full-scale war
Russian anarchist and anti-war movement in the third year of full-scale war
Antti Rautiainen
 
Many ways to support street children.pptx
Many ways to support street children.pptxMany ways to support street children.pptx
Many ways to support street children.pptx
SERUDS INDIA
 
What is the point of small housing associations.pptx
What is the point of small housing associations.pptxWhat is the point of small housing associations.pptx
What is the point of small housing associations.pptx
Paul Smith
 
Understanding the Challenges of Street Children
Understanding the Challenges of Street ChildrenUnderstanding the Challenges of Street Children
Understanding the Challenges of Street Children
SERUDS INDIA
 
PD-1602-as-amended-by-RA-9287-Anti-Illegal-Gambling-Law.pptx
PD-1602-as-amended-by-RA-9287-Anti-Illegal-Gambling-Law.pptxPD-1602-as-amended-by-RA-9287-Anti-Illegal-Gambling-Law.pptx
PD-1602-as-amended-by-RA-9287-Anti-Illegal-Gambling-Law.pptx
RIDPRO11
 
Effects of Extreme Temperatures From Climate Change on the Medicare Populatio...
Effects of Extreme Temperatures From Climate Change on the Medicare Populatio...Effects of Extreme Temperatures From Climate Change on the Medicare Populatio...
Effects of Extreme Temperatures From Climate Change on the Medicare Populatio...
Congressional Budget Office
 
PPT Item # 7 - BB Inspection Services Agmt
PPT Item # 7 - BB Inspection Services AgmtPPT Item # 7 - BB Inspection Services Agmt
PPT Item # 7 - BB Inspection Services Agmt
ahcitycouncil
 
2024: The FAR - Federal Acquisition Regulations, Part 37
2024: The FAR - Federal Acquisition Regulations, Part 372024: The FAR - Federal Acquisition Regulations, Part 37
2024: The FAR - Federal Acquisition Regulations, Part 37
JSchaus & Associates
 
PACT launching workshop presentation-Final.pdf
PACT launching workshop presentation-Final.pdfPACT launching workshop presentation-Final.pdf
PACT launching workshop presentation-Final.pdf
Mohammed325561
 
PPT Item # 6 - 7001 Broadway ARB Case # 933F
PPT Item # 6 - 7001 Broadway ARB Case # 933FPPT Item # 6 - 7001 Broadway ARB Case # 933F
PPT Item # 6 - 7001 Broadway ARB Case # 933F
ahcitycouncil
 
一比一原版(ANU毕业证)澳大利亚国立大学毕业证成绩单
一比一原版(ANU毕业证)澳大利亚国立大学毕业证成绩单一比一原版(ANU毕业证)澳大利亚国立大学毕业证成绩单
一比一原版(ANU毕业证)澳大利亚国立大学毕业证成绩单
ehbuaw
 
如何办理(uoit毕业证书)加拿大安大略理工大学毕业证文凭证书录取通知原版一模一样
如何办理(uoit毕业证书)加拿大安大略理工大学毕业证文凭证书录取通知原版一模一样如何办理(uoit毕业证书)加拿大安大略理工大学毕业证文凭证书录取通知原版一模一样
如何办理(uoit毕业证书)加拿大安大略理工大学毕业证文凭证书录取通知原版一模一样
850fcj96
 
一比一原版(QUT毕业证)昆士兰科技大学毕业证成绩单
一比一原版(QUT毕业证)昆士兰科技大学毕业证成绩单一比一原版(QUT毕业证)昆士兰科技大学毕业证成绩单
一比一原版(QUT毕业证)昆士兰科技大学毕业证成绩单
ukyewh
 
Canadian Immigration Tracker March 2024 - Key Slides
Canadian Immigration Tracker March 2024 - Key SlidesCanadian Immigration Tracker March 2024 - Key Slides
Canadian Immigration Tracker March 2024 - Key Slides
Andrew Griffith
 
ZGB - The Role of Generative AI in Government transformation.pdf
ZGB - The Role of Generative AI in Government transformation.pdfZGB - The Role of Generative AI in Government transformation.pdf
ZGB - The Role of Generative AI in Government transformation.pdf
Saeed Al Dhaheri
 
Get Government Grants and Assistance Program
Get Government Grants and Assistance ProgramGet Government Grants and Assistance Program
Get Government Grants and Assistance Program
Get Government Grants
 
一比一原版(UOW毕业证)伍伦贡大学毕业证成绩单
一比一原版(UOW毕业证)伍伦贡大学毕业证成绩单一比一原版(UOW毕业证)伍伦贡大学毕业证成绩单
一比一原版(UOW毕业证)伍伦贡大学毕业证成绩单
ehbuaw
 

Recently uploaded (20)

PPT Item # 8 - Tuxedo Columbine 3way Stop
PPT Item # 8 - Tuxedo Columbine 3way StopPPT Item # 8 - Tuxedo Columbine 3way Stop
PPT Item # 8 - Tuxedo Columbine 3way Stop
 
Uniform Guidance 3.0 - The New 2 CFR 200
Uniform Guidance 3.0 - The New 2 CFR 200Uniform Guidance 3.0 - The New 2 CFR 200
Uniform Guidance 3.0 - The New 2 CFR 200
 
一比一原版(UQ毕业证)昆士兰大学毕业证成绩单
一比一原版(UQ毕业证)昆士兰大学毕业证成绩单一比一原版(UQ毕业证)昆士兰大学毕业证成绩单
一比一原版(UQ毕业证)昆士兰大学毕业证成绩单
 
Russian anarchist and anti-war movement in the third year of full-scale war
Russian anarchist and anti-war movement in the third year of full-scale warRussian anarchist and anti-war movement in the third year of full-scale war
Russian anarchist and anti-war movement in the third year of full-scale war
 
Many ways to support street children.pptx
Many ways to support street children.pptxMany ways to support street children.pptx
Many ways to support street children.pptx
 
What is the point of small housing associations.pptx
What is the point of small housing associations.pptxWhat is the point of small housing associations.pptx
What is the point of small housing associations.pptx
 
Understanding the Challenges of Street Children
Understanding the Challenges of Street ChildrenUnderstanding the Challenges of Street Children
Understanding the Challenges of Street Children
 
PD-1602-as-amended-by-RA-9287-Anti-Illegal-Gambling-Law.pptx
PD-1602-as-amended-by-RA-9287-Anti-Illegal-Gambling-Law.pptxPD-1602-as-amended-by-RA-9287-Anti-Illegal-Gambling-Law.pptx
PD-1602-as-amended-by-RA-9287-Anti-Illegal-Gambling-Law.pptx
 
Effects of Extreme Temperatures From Climate Change on the Medicare Populatio...
Effects of Extreme Temperatures From Climate Change on the Medicare Populatio...Effects of Extreme Temperatures From Climate Change on the Medicare Populatio...
Effects of Extreme Temperatures From Climate Change on the Medicare Populatio...
 
PPT Item # 7 - BB Inspection Services Agmt
PPT Item # 7 - BB Inspection Services AgmtPPT Item # 7 - BB Inspection Services Agmt
PPT Item # 7 - BB Inspection Services Agmt
 
2024: The FAR - Federal Acquisition Regulations, Part 37
2024: The FAR - Federal Acquisition Regulations, Part 372024: The FAR - Federal Acquisition Regulations, Part 37
2024: The FAR - Federal Acquisition Regulations, Part 37
 
PACT launching workshop presentation-Final.pdf
PACT launching workshop presentation-Final.pdfPACT launching workshop presentation-Final.pdf
PACT launching workshop presentation-Final.pdf
 
PPT Item # 6 - 7001 Broadway ARB Case # 933F
PPT Item # 6 - 7001 Broadway ARB Case # 933FPPT Item # 6 - 7001 Broadway ARB Case # 933F
PPT Item # 6 - 7001 Broadway ARB Case # 933F
 
一比一原版(ANU毕业证)澳大利亚国立大学毕业证成绩单
一比一原版(ANU毕业证)澳大利亚国立大学毕业证成绩单一比一原版(ANU毕业证)澳大利亚国立大学毕业证成绩单
一比一原版(ANU毕业证)澳大利亚国立大学毕业证成绩单
 
如何办理(uoit毕业证书)加拿大安大略理工大学毕业证文凭证书录取通知原版一模一样
如何办理(uoit毕业证书)加拿大安大略理工大学毕业证文凭证书录取通知原版一模一样如何办理(uoit毕业证书)加拿大安大略理工大学毕业证文凭证书录取通知原版一模一样
如何办理(uoit毕业证书)加拿大安大略理工大学毕业证文凭证书录取通知原版一模一样
 
一比一原版(QUT毕业证)昆士兰科技大学毕业证成绩单
一比一原版(QUT毕业证)昆士兰科技大学毕业证成绩单一比一原版(QUT毕业证)昆士兰科技大学毕业证成绩单
一比一原版(QUT毕业证)昆士兰科技大学毕业证成绩单
 
Canadian Immigration Tracker March 2024 - Key Slides
Canadian Immigration Tracker March 2024 - Key SlidesCanadian Immigration Tracker March 2024 - Key Slides
Canadian Immigration Tracker March 2024 - Key Slides
 
ZGB - The Role of Generative AI in Government transformation.pdf
ZGB - The Role of Generative AI in Government transformation.pdfZGB - The Role of Generative AI in Government transformation.pdf
ZGB - The Role of Generative AI in Government transformation.pdf
 
Get Government Grants and Assistance Program
Get Government Grants and Assistance ProgramGet Government Grants and Assistance Program
Get Government Grants and Assistance Program
 
一比一原版(UOW毕业证)伍伦贡大学毕业证成绩单
一比一原版(UOW毕业证)伍伦贡大学毕业证成绩单一比一原版(UOW毕业证)伍伦贡大学毕业证成绩单
一比一原版(UOW毕业证)伍伦贡大学毕业证成绩单
 

Procurement of major infrastructure projects 2017-22 - B. Hasselgren, Senior Advisor, Trafikverket

  • 1. Procurement of major infrastructure projects 2017-22 Swedish Transport Administration Björn Hasselgren, PhD 17 May 2023 1
  • 2. Total procurement volume • The Swedish Transport Administration's total purchasing volume in 2021 amounted to Euro 4,985 billion, an increase of approximately 5 percent compared with previous years. • Investments and maintenance measures make up approximately 94 percent of the total volume. Traffic type rail accounts for the majority of the volume increase of 9.6 percent. • Purchasing volumes follow the operating volume development fairly well over the years and purchasing volumes share of the total operating volume corresponds to an average of 75 percent. • The Swedish Transport Administration's supplier market analysis is now published on Trafikverket.se • Supplier market analyses - Bransch (trafikverket.se)
  • 3. Type of contracts, total 69 procurements are still ongoing in year of publication 2021 and have not been completed yet. These are not included in the above presentation. The procurement volume includes both investment and maintenance contracts. During the years 2017-2020, the contract volume is distributed on average; 40 percent performance contract 60 percent design and build contract
  • 4. Top 10 suppliers 2019-2021 • The Swedish Transport Administration's 10 largest suppliers account for 2 261 million Euro and correspond to approximately 45% of total purchase volume. • The Swedish Transport Administration's 100 largest suppliers correspond to approximately 85% of total purchase volume • 80 per cent of the total volume value is represented by approximately 62 suppliers • There were approximately 7,900 suppliers to the Swedish Transport Administration. The Transport Administration’s largest suppliers are reported on the basis of group relationships