ATTACHMENT 01: PROCUREMENT COORDINATOR RESPONSIBILITIES
 Responsible for the formulation of project specific commercial and contract conditions for all
types of procurement documents.
 Review enquiry documentation.
 Review tender/proposal submissions and input into the adjudications.
 Attend contract clarification meetings and negotiation of contracts.
 Obtain clientapprovals with regards to selection ofcontractors and generation and placementof
contracts.
 Contract generation and award.
 Amendment generation and award.
 Attend kick-off meetings.
 Receipt of contractual deliverables.
 Coordinate feedback sessions with the project team regarding key legal contract
ramifications/issues affecting the project, if any.
 As necessary, liaise with legal counsel or management for clarification and/or direction with
regards to any legal aspects and/or liabilities that may arise.
 Investigate claims, issues and risks identified by the project team/contract to establish
responsibilities based on contract provisions.
 In conjunction with the project team, determine and agree the relevant course of action for
claims and notices, advising the client as necessary.
 Complete enquirydocumentation using either the DRA standard documentation or the Client’s
specific documentation and copy to the project e-mail address or the Document Controller;
 Issue the signed enquiry document to approved suppliers;
 Complete Sole Source motivations if required;
 Where the enquiryis limited in scope or a sole source, the Procurement Coordinator will issue
electronically in PDF format copied to the project e-mail address;
 Send “Invitation to Tender” letters to the Suppliers, stating that the enquiry documentation has
been e-mailed to the address listed on the enquiry documentation, or a fax / e-mail notifying
Suppliers to collect the hard copy enquiry documentation from DRA Offices (where applicable);
 Track receipt of all tender acknowledgements.Returned acknowledgements shall be copied to
the Document Controller for filing on the Document Control System.
 Issue the signed enquiry document to Document Control in hard copy and electronic format to
be filed into the Document Control System. The hardcopy is filed in the Contract file in a
controlled area within the project team’s offices, until the Tender closes.
 Complete the Procurement Enquiry Details form (PED) at the tender opening;
 Notify the Package Engineer as soon as is practical, after collecting tenders from the dedicated
tender box, of any missing tenders. This will be indicated on the PED by the Procurement Co-
ordinator;
 Arrange the date and time of the opening of tenders with the Client Representative (if required)
and Package Engineer;
 Open tenders,stamp pages containing monetary values, letterhead / covering letter, resolution,
programme,qualifications (and Annexure for site works) and complete the Procurement Enquiry
Details form (PED) with the main Contract Prices from each tender opened (and any/all
alternative prices where applicable).
 Hand the signed PED to Document Control for filing into the Document Management System
and the hard copy on the contract file.
 Generate the Order or Contract documentusing the Client’s templates or DRA Standard Order /
Contract documentation,and circulate for signature to the Package Engineer and both the DRA
and Client Project Manager’s (this function may be done by a commercial coordinator).
 Compile and issue regret letters to all unsuccessful Suppliers after the signature of the Order /
Contract, in electronic format.
 Complete the Order / Contract amendments based on the supporting documentation from the
package engineer.
 Generate, in conjunction with the cost controller, the close-out documentation.

More Related Content

What's hot

Tendering in Construction
Tendering in ConstructionTendering in Construction
Tendering in Construction
shillier38
 
CONTRACT ADMINISTRATION- Presentation dated 22.11.16
CONTRACT ADMINISTRATION- Presentation dated 22.11.16CONTRACT ADMINISTRATION- Presentation dated 22.11.16
CONTRACT ADMINISTRATION- Presentation dated 22.11.16
Arvind Solanki
 
HW - Preconstruction phase
HW - Preconstruction phaseHW - Preconstruction phase
HW - Preconstruction phase
HARLAND MIMS
 

What's hot (20)

14102008 - Nordic Ppp Forum Presentation Pja Peekel Final
14102008 - Nordic Ppp Forum   Presentation Pja Peekel   Final14102008 - Nordic Ppp Forum   Presentation Pja Peekel   Final
14102008 - Nordic Ppp Forum Presentation Pja Peekel Final
 
Tendering in Construction
Tendering in ConstructionTendering in Construction
Tendering in Construction
 
Tendering Document for the Procurement of Works
Tendering Document for the Procurement of WorksTendering Document for the Procurement of Works
Tendering Document for the Procurement of Works
 
ACH 216 Lecture 04b (Bidding) Part 1
ACH 216 Lecture 04b (Bidding) Part 1ACH 216 Lecture 04b (Bidding) Part 1
ACH 216 Lecture 04b (Bidding) Part 1
 
CONTRACT ADMINISTRATION- Presentation dated 22.11.16
CONTRACT ADMINISTRATION- Presentation dated 22.11.16CONTRACT ADMINISTRATION- Presentation dated 22.11.16
CONTRACT ADMINISTRATION- Presentation dated 22.11.16
 
Tender & Tender Notice
Tender & Tender NoticeTender & Tender Notice
Tender & Tender Notice
 
HW - Preconstruction phase
HW - Preconstruction phaseHW - Preconstruction phase
HW - Preconstruction phase
 
Tendering documentation
Tendering documentationTendering documentation
Tendering documentation
 
Construction industry and estimating
Construction industry and estimatingConstruction industry and estimating
Construction industry and estimating
 
ACH 216 Lecture 04a (Estimating)
ACH 216 Lecture 04a (Estimating)ACH 216 Lecture 04a (Estimating)
ACH 216 Lecture 04a (Estimating)
 
Traditional procurement method
Traditional procurement methodTraditional procurement method
Traditional procurement method
 
Chapter 3- Contract Management
Chapter 3- Contract ManagementChapter 3- Contract Management
Chapter 3- Contract Management
 
sp - Copy
sp - Copysp - Copy
sp - Copy
 
Tendering clauses of contract
Tendering clauses of contractTendering clauses of contract
Tendering clauses of contract
 
Claims and Counterclaims Preparation, Analysis, Assessment and Successful Set...
Claims and Counterclaims Preparation, Analysis, Assessment and Successful Set...Claims and Counterclaims Preparation, Analysis, Assessment and Successful Set...
Claims and Counterclaims Preparation, Analysis, Assessment and Successful Set...
 
Measuring tendering and estimating for CBE
Measuring tendering and estimating for CBEMeasuring tendering and estimating for CBE
Measuring tendering and estimating for CBE
 
Tenders in professional practice
Tenders in professional practiceTenders in professional practice
Tenders in professional practice
 
Contract management
Contract managementContract management
Contract management
 
ACH 231 Lecture 07 (Contract Documents) Part 1
ACH 231 Lecture 07 (Contract Documents) Part 1ACH 231 Lecture 07 (Contract Documents) Part 1
ACH 231 Lecture 07 (Contract Documents) Part 1
 
Construction Management Services
Construction Management ServicesConstruction Management Services
Construction Management Services
 

Similar to Procurement Coord responsibilities

2.12 procurement management 1
2.12  procurement management 12.12  procurement management 1
2.12 procurement management 1
reddvise
 
ARLIE LLUNAR-Projects Presentations
ARLIE LLUNAR-Projects PresentationsARLIE LLUNAR-Projects Presentations
ARLIE LLUNAR-Projects Presentations
Arlie Llunar
 
Frances L. Vessell Resume 01.26.2017
Frances L. Vessell Resume 01.26.2017Frances L. Vessell Resume 01.26.2017
Frances L. Vessell Resume 01.26.2017
Frances Vessell
 
Senior Subcontracts officer-Mehadi
Senior Subcontracts officer-MehadiSenior Subcontracts officer-Mehadi
Senior Subcontracts officer-Mehadi
Md Mehadi Hasan
 
Procurement management-plan template
Procurement management-plan templateProcurement management-plan template
Procurement management-plan template
Vivek Srivastava
 
CV_ S Arunkumar -Procurement And Sub Contract
CV_ S  Arunkumar -Procurement And Sub ContractCV_ S  Arunkumar -Procurement And Sub Contract
CV_ S Arunkumar -Procurement And Sub Contract
Arunkumar Shirawalmath
 

Similar to Procurement Coord responsibilities (20)

Contract Management
Contract ManagementContract Management
Contract Management
 
2.12 procurement management 1
2.12  procurement management 12.12  procurement management 1
2.12 procurement management 1
 
ARLIE LLUNAR-Projects Presentations
ARLIE LLUNAR-Projects PresentationsARLIE LLUNAR-Projects Presentations
ARLIE LLUNAR-Projects Presentations
 
Project contracts
Project contractsProject contracts
Project contracts
 
Frances L. Vessell Resume 01.26.2017
Frances L. Vessell Resume 01.26.2017Frances L. Vessell Resume 01.26.2017
Frances L. Vessell Resume 01.26.2017
 
Tenders
TendersTenders
Tenders
 
Senior Subcontracts officer-Mehadi
Senior Subcontracts officer-MehadiSenior Subcontracts officer-Mehadi
Senior Subcontracts officer-Mehadi
 
Final presentation from shahida
Final presentation from shahidaFinal presentation from shahida
Final presentation from shahida
 
Construction Project Management
Construction Project ManagementConstruction Project Management
Construction Project Management
 
CONTRACT MANAGEMENT.pptx
CONTRACT MANAGEMENT.pptxCONTRACT MANAGEMENT.pptx
CONTRACT MANAGEMENT.pptx
 
Conduct procurements
Conduct procurements Conduct procurements
Conduct procurements
 
12 procurement
12 procurement12 procurement
12 procurement
 
Faid daoud updated cv 19 july 2016
Faid daoud updated cv 19 july 2016Faid daoud updated cv 19 july 2016
Faid daoud updated cv 19 july 2016
 
Procurement management-plan template
Procurement management-plan templateProcurement management-plan template
Procurement management-plan template
 
CV_ S Arunkumar -Procurement And Sub Contract
CV_ S  Arunkumar -Procurement And Sub ContractCV_ S  Arunkumar -Procurement And Sub Contract
CV_ S Arunkumar -Procurement And Sub Contract
 
MODULE 5.pptx
MODULE 5.pptxMODULE 5.pptx
MODULE 5.pptx
 
Unit-2_Tender
Unit-2_TenderUnit-2_Tender
Unit-2_Tender
 
Sample agreement annex-d-20140525
Sample agreement annex-d-20140525Sample agreement annex-d-20140525
Sample agreement annex-d-20140525
 
infyy.pptx
infyy.pptxinfyy.pptx
infyy.pptx
 
9. project procurement management
9. project procurement management9. project procurement management
9. project procurement management
 

Procurement Coord responsibilities

  • 1. ATTACHMENT 01: PROCUREMENT COORDINATOR RESPONSIBILITIES  Responsible for the formulation of project specific commercial and contract conditions for all types of procurement documents.  Review enquiry documentation.  Review tender/proposal submissions and input into the adjudications.  Attend contract clarification meetings and negotiation of contracts.  Obtain clientapprovals with regards to selection ofcontractors and generation and placementof contracts.  Contract generation and award.  Amendment generation and award.  Attend kick-off meetings.  Receipt of contractual deliverables.  Coordinate feedback sessions with the project team regarding key legal contract ramifications/issues affecting the project, if any.  As necessary, liaise with legal counsel or management for clarification and/or direction with regards to any legal aspects and/or liabilities that may arise.  Investigate claims, issues and risks identified by the project team/contract to establish responsibilities based on contract provisions.  In conjunction with the project team, determine and agree the relevant course of action for claims and notices, advising the client as necessary.  Complete enquirydocumentation using either the DRA standard documentation or the Client’s specific documentation and copy to the project e-mail address or the Document Controller;  Issue the signed enquiry document to approved suppliers;  Complete Sole Source motivations if required;  Where the enquiryis limited in scope or a sole source, the Procurement Coordinator will issue electronically in PDF format copied to the project e-mail address;  Send “Invitation to Tender” letters to the Suppliers, stating that the enquiry documentation has been e-mailed to the address listed on the enquiry documentation, or a fax / e-mail notifying Suppliers to collect the hard copy enquiry documentation from DRA Offices (where applicable);  Track receipt of all tender acknowledgements.Returned acknowledgements shall be copied to the Document Controller for filing on the Document Control System.  Issue the signed enquiry document to Document Control in hard copy and electronic format to be filed into the Document Control System. The hardcopy is filed in the Contract file in a controlled area within the project team’s offices, until the Tender closes.  Complete the Procurement Enquiry Details form (PED) at the tender opening;  Notify the Package Engineer as soon as is practical, after collecting tenders from the dedicated tender box, of any missing tenders. This will be indicated on the PED by the Procurement Co- ordinator;  Arrange the date and time of the opening of tenders with the Client Representative (if required) and Package Engineer;  Open tenders,stamp pages containing monetary values, letterhead / covering letter, resolution, programme,qualifications (and Annexure for site works) and complete the Procurement Enquiry Details form (PED) with the main Contract Prices from each tender opened (and any/all alternative prices where applicable).  Hand the signed PED to Document Control for filing into the Document Management System and the hard copy on the contract file.  Generate the Order or Contract documentusing the Client’s templates or DRA Standard Order / Contract documentation,and circulate for signature to the Package Engineer and both the DRA and Client Project Manager’s (this function may be done by a commercial coordinator).  Compile and issue regret letters to all unsuccessful Suppliers after the signature of the Order / Contract, in electronic format.  Complete the Order / Contract amendments based on the supporting documentation from the package engineer.  Generate, in conjunction with the cost controller, the close-out documentation.