Procurement and Risk Management
The following report discusses the procurement management
process in alignment with risk management, as outlined by
Learning Team 4 and their collaborative impression of the
lessons learned while attending this course. The intent of this
outline is to discuss prior procurement management knowledge,
real-world examples thereof, along with learned tools and
techniques and their usage within a real-world example.
Risk and Procurement Management Tools and Techniques
Experience
Collectively, most of the team members have never been in a
project management role, but, see it as a career goal. Most
members have been involved in the project process, serving
team roles such as executive assistant. An executive assistant
works directly with the project manager, remaining active
within the management of procurement itself.
Typically, an executive assistant is responsible for ordering and
maintaining supplies, the issue of SOW, and the processing of
invoices. The executive assistant can also be involved with
various risk assessment situations, working alongside members
within the operational risk department.
2
Real World Project Management Examples
In project management, the procurement process is
regularly used and if performed well, will prove to be a
contributing factor in the project success. An example of
procurement can be taken from a construction project. Within
the procurement process, the project requirements will be
assessed, which would include expected deliverables within an
expected timeline. Once this information is obtained, the
availability of resources and material will be determined.
For resources needed from an outside vendor, the procurement
team shall qualify the available external resources to find which
may be the most suitable. Through negotiations with the vendor,
all the while referring to the risk assessment, contracts will be
created and executed, each carrying terms and conditions for the
buyer and seller to adhere to.
Upon full performance and delivery of the project, the
procurement process would then initiate a closing process. The
closing process would be executed so that the assurance of all
deliverables produced, and all invoices submitted and paid so
that no further obligations exist within the verbiage of each
contract. The overall Procurement process for the construction
company would end with the project itself, with documentation
delivered to the client reviewing the lifecycle of the project
processes along with lessons learned.
Tools and Techniques Learned While Taking this Course
During this course, a lot was learned about procurement,
especially when in alignment with risk management. The course
also emphasized the importance of a procurement strategy plan
which carefully analyzes risks associated with the project.
The team recognized two valuable tasks that showed evidence
of being utilized within the project setting in the future:
· Procurement Evaluation – The evaluation of procurements
finds the project manager performing a make or buy analysis,
purchasing as compared to leasing evaluations, and whether to
use internal or external resources.
A real-world example of procurement evaluation can be taken
from the processing industry, and the project determination of
how to produce a necessary part needed for a mission-critical
process. This scenario would see the evaluation of the
availability of the part produced and delivered from an exterior
source, as compared to the in-house resource and material
availability for the organization to produce it themselves.
· Strategic Purchasing – Strategic purchasing fins the project
manager determining the acquisition of resources through the
analysis of quality, capability, cost, and availability.
The processing industry offers a real-world example in terms of
strategic purchasing, as well. In evaluation of the project, the
project manager finds that a filter material can be purchased at a
lesser cost if bought in bulk. Though the filter material is not
used on a day to day basis, this evaluation finds the project
requiring an excessive amount before completion. This leads to
further evaluation by the project manager, who finds that
although it appears as a major purchase now, the cost savings of
buying bulk along with storage costs is much less than only
bought when needed.
Conclusion
The value of a properly executed procurement management
process has become strongly evident amongst the team,
resulting in a broader knowledge as to project activities when
aligned with risk management. Throughout this course, a
common theme of success was projected through the repeated
task of breaking the procurement process into much smaller,
more manageable ones. With this project environment mindset,
it is expected the members of this team should have a promising
career within the project management field.
Procurement and risk management paper kimberly hernandez, spencer o

More Related Content

What's hot

Know your suppliers? How can you manage supplier risk?
Know your suppliers? How can you manage supplier risk?Know your suppliers? How can you manage supplier risk?
Know your suppliers? How can you manage supplier risk?
Bureau van Dijk
 
Supply Chain Risk Management
Supply Chain Risk ManagementSupply Chain Risk Management
Supply Chain Risk Management
Togap Siagian, CPSM
 
Project Controls Expo 18th Nov 2014 - "Practical Applications of a Risk Manag...
Project Controls Expo 18th Nov 2014 - "Practical Applications of a Risk Manag...Project Controls Expo 18th Nov 2014 - "Practical Applications of a Risk Manag...
Project Controls Expo 18th Nov 2014 - "Practical Applications of a Risk Manag...
Project Controls Expo
 
Strategic Risk: Linking Risk Management & Strategy Management processes
Strategic Risk: Linking Risk Management & Strategy Management processesStrategic Risk: Linking Risk Management & Strategy Management processes
Strategic Risk: Linking Risk Management & Strategy Management processes
GlobalStrategyTribe
 
What Every Procurement Professional Should Know About Supplier Risk Managemen...
What Every Procurement Professional Should Know About Supplier Risk Managemen...What Every Procurement Professional Should Know About Supplier Risk Managemen...
What Every Procurement Professional Should Know About Supplier Risk Managemen...
IBM Watson Commerce
 
Risk Management in supply chain
Risk Management in supply chainRisk Management in supply chain
Risk Management in supply chain
michaelnieuwboer
 
Strategic Risk Management in the Face of Uncertainty and Unexpected Risks
Strategic Risk Management in the Face of Uncertainty and Unexpected RisksStrategic Risk Management in the Face of Uncertainty and Unexpected Risks
Strategic Risk Management in the Face of Uncertainty and Unexpected Risks
International Federation of Accountants
 
Risk management of supply chain
Risk management of supply chainRisk management of supply chain
Risk management of supply chain
Abdulaziz Alshammari ( aljanfawi )
 
Risk Management 1 (2)
Risk Management 1 (2)Risk Management 1 (2)
Operational Risk Management & Strategic Planning
Operational Risk Management & Strategic PlanningOperational Risk Management & Strategic Planning
Operational Risk Management & Strategic Planning
Eneni Oduwole
 
Risk Leadership Perspectives Breakfast Risk Manager of the Year Karl Davey
Risk Leadership Perspectives Breakfast Risk Manager of the Year Karl DaveyRisk Leadership Perspectives Breakfast Risk Manager of the Year Karl Davey
Risk Leadership Perspectives Breakfast Risk Manager of the Year Karl Davey
karld
 
ERM overview
ERM overviewERM overview
Project Management From The Top
Project Management From The TopProject Management From The Top
Project Management From The Top
Endeavor Management
 
BCG-Five-Practices-of-Operational-Risk-Leaders-Oct-2016_tcm80-214941
BCG-Five-Practices-of-Operational-Risk-Leaders-Oct-2016_tcm80-214941BCG-Five-Practices-of-Operational-Risk-Leaders-Oct-2016_tcm80-214941
BCG-Five-Practices-of-Operational-Risk-Leaders-Oct-2016_tcm80-214941
Dr. Marc D. Grüter
 
Adr calculating the_right_audit_coverage_part_2_rationalizing_audit_activities
Adr calculating the_right_audit_coverage_part_2_rationalizing_audit_activitiesAdr calculating the_right_audit_coverage_part_2_rationalizing_audit_activities
Adr calculating the_right_audit_coverage_part_2_rationalizing_audit_activities
Gaiani (CarnCorpAudit)
 
160513 Study Sourcing in risk and compliance functions
160513 Study Sourcing in risk and compliance functions160513 Study Sourcing in risk and compliance functions
160513 Study Sourcing in risk and compliance functions
Dr. Marc D. Grüter
 
Enterprise risk management
Enterprise risk managementEnterprise risk management
Enterprise risk management
Andre Knipe
 
Supply Chain Risk 2009
Supply Chain Risk 2009Supply Chain Risk 2009
Supply Chain Risk 2009
Jan Husdal
 
1895 GRCM
1895 GRCM1895 GRCM
Supply Chain Risk
Supply Chain RiskSupply Chain Risk
Supply Chain Risk
Jan Husdal
 

What's hot (20)

Know your suppliers? How can you manage supplier risk?
Know your suppliers? How can you manage supplier risk?Know your suppliers? How can you manage supplier risk?
Know your suppliers? How can you manage supplier risk?
 
Supply Chain Risk Management
Supply Chain Risk ManagementSupply Chain Risk Management
Supply Chain Risk Management
 
Project Controls Expo 18th Nov 2014 - "Practical Applications of a Risk Manag...
Project Controls Expo 18th Nov 2014 - "Practical Applications of a Risk Manag...Project Controls Expo 18th Nov 2014 - "Practical Applications of a Risk Manag...
Project Controls Expo 18th Nov 2014 - "Practical Applications of a Risk Manag...
 
Strategic Risk: Linking Risk Management & Strategy Management processes
Strategic Risk: Linking Risk Management & Strategy Management processesStrategic Risk: Linking Risk Management & Strategy Management processes
Strategic Risk: Linking Risk Management & Strategy Management processes
 
What Every Procurement Professional Should Know About Supplier Risk Managemen...
What Every Procurement Professional Should Know About Supplier Risk Managemen...What Every Procurement Professional Should Know About Supplier Risk Managemen...
What Every Procurement Professional Should Know About Supplier Risk Managemen...
 
Risk Management in supply chain
Risk Management in supply chainRisk Management in supply chain
Risk Management in supply chain
 
Strategic Risk Management in the Face of Uncertainty and Unexpected Risks
Strategic Risk Management in the Face of Uncertainty and Unexpected RisksStrategic Risk Management in the Face of Uncertainty and Unexpected Risks
Strategic Risk Management in the Face of Uncertainty and Unexpected Risks
 
Risk management of supply chain
Risk management of supply chainRisk management of supply chain
Risk management of supply chain
 
Risk Management 1 (2)
Risk Management 1 (2)Risk Management 1 (2)
Risk Management 1 (2)
 
Operational Risk Management & Strategic Planning
Operational Risk Management & Strategic PlanningOperational Risk Management & Strategic Planning
Operational Risk Management & Strategic Planning
 
Risk Leadership Perspectives Breakfast Risk Manager of the Year Karl Davey
Risk Leadership Perspectives Breakfast Risk Manager of the Year Karl DaveyRisk Leadership Perspectives Breakfast Risk Manager of the Year Karl Davey
Risk Leadership Perspectives Breakfast Risk Manager of the Year Karl Davey
 
ERM overview
ERM overviewERM overview
ERM overview
 
Project Management From The Top
Project Management From The TopProject Management From The Top
Project Management From The Top
 
BCG-Five-Practices-of-Operational-Risk-Leaders-Oct-2016_tcm80-214941
BCG-Five-Practices-of-Operational-Risk-Leaders-Oct-2016_tcm80-214941BCG-Five-Practices-of-Operational-Risk-Leaders-Oct-2016_tcm80-214941
BCG-Five-Practices-of-Operational-Risk-Leaders-Oct-2016_tcm80-214941
 
Adr calculating the_right_audit_coverage_part_2_rationalizing_audit_activities
Adr calculating the_right_audit_coverage_part_2_rationalizing_audit_activitiesAdr calculating the_right_audit_coverage_part_2_rationalizing_audit_activities
Adr calculating the_right_audit_coverage_part_2_rationalizing_audit_activities
 
160513 Study Sourcing in risk and compliance functions
160513 Study Sourcing in risk and compliance functions160513 Study Sourcing in risk and compliance functions
160513 Study Sourcing in risk and compliance functions
 
Enterprise risk management
Enterprise risk managementEnterprise risk management
Enterprise risk management
 
Supply Chain Risk 2009
Supply Chain Risk 2009Supply Chain Risk 2009
Supply Chain Risk 2009
 
1895 GRCM
1895 GRCM1895 GRCM
1895 GRCM
 
Supply Chain Risk
Supply Chain RiskSupply Chain Risk
Supply Chain Risk
 

Similar to Procurement and risk management paper kimberly hernandez, spencer o

Choosing Innovation Projects
Choosing Innovation ProjectsChoosing Innovation Projects
Choosing Innovation Projects
Fadli Luthfi
 
Strategic Management.pptx
Strategic Management.pptxStrategic Management.pptx
Strategic Management.pptx
GermelynPea1
 
Chapter 8 .
Chapter 8 .Chapter 8 .
Chapter 8 .
agungSuprapto3
 
Schilling (2017pp.129 151) choosing innovation projects (chapter 7)
Schilling (2017pp.129 151) choosing innovation projects (chapter 7)Schilling (2017pp.129 151) choosing innovation projects (chapter 7)
Schilling (2017pp.129 151) choosing innovation projects (chapter 7)
NandiNoprita
 
Angga efriansyah chapter 8[1]
Angga efriansyah chapter 8[1]Angga efriansyah chapter 8[1]
Angga efriansyah chapter 8[1]
anggaefriansyah
 
CRG DevCo’s advantages of outsourcing Project Management
CRG DevCo’s advantages of outsourcing Project ManagementCRG DevCo’s advantages of outsourcing Project Management
CRG DevCo’s advantages of outsourcing Project Management
Chris Gorga
 
PMP integration review
PMP integration reviewPMP integration review
PMP integration review
M Maged Hegazy, LLM, MBA, CCP, P3O
 
Chapter 2 procurment process
Chapter 2 procurment processChapter 2 procurment process
Chapter 2 procurment process
YonasSisayAragie
 
Pm ppt p roject selection and solicitation
Pm ppt p roject selection and solicitationPm ppt p roject selection and solicitation
Pm ppt p roject selection and solicitation
Bhanu Tanwar
 
L7_PROJECT PROCUREMENT Management.pdf
L7_PROJECT PROCUREMENT Management.pdfL7_PROJECT PROCUREMENT Management.pdf
L7_PROJECT PROCUREMENT Management.pdf
MUST
 
Chapter 8
Chapter 8Chapter 8
Chapter 8
muhammadrizal149
 
Project management
Project managementProject management
Project management
Abhishek Singh
 
Tactical Vs Strategic Procurement Shifting Focus Towards Value Creation
Tactical Vs  Strategic Procurement   Shifting Focus Towards Value CreationTactical Vs  Strategic Procurement   Shifting Focus Towards Value Creation
Tactical Vs Strategic Procurement Shifting Focus Towards Value Creation
jamie.mahoney
 
Project Procurement Management
Project Procurement ManagementProject Procurement Management
Project Procurement Management
Andersson Lujan Ojeda
 
Enterprise 360 degree risk management
Enterprise 360 degree risk managementEnterprise 360 degree risk management
Enterprise 360 degree risk management
Infosys
 
Strategic Planning an Antidote to Change
Strategic Planning an Antidote to ChangeStrategic Planning an Antidote to Change
Strategic Planning an Antidote to Change
Charlotte Lawson
 
Chapter 8 information system Strategy
Chapter 8 information system StrategyChapter 8 information system Strategy
Chapter 8 information system Strategy
ahmadjaini_97
 
Initiating a new project framework orientation: Innovate Vancouver
Initiating a new project framework orientation: Innovate VancouverInitiating a new project framework orientation: Innovate Vancouver
Initiating a new project framework orientation: Innovate Vancouver
Innovate Vancouver
 
Precurement manual 'Reach Vulnerable' annex 12
Precurement manual 'Reach Vulnerable' annex 12Precurement manual 'Reach Vulnerable' annex 12
Precurement manual 'Reach Vulnerable' annex 12
World Without Borders Movement
 
2 asca 2- purcasing [compatibility mode]
2 asca 2- purcasing [compatibility mode]2 asca 2- purcasing [compatibility mode]
2 asca 2- purcasing [compatibility mode]
Firly Zulkifli
 

Similar to Procurement and risk management paper kimberly hernandez, spencer o (20)

Choosing Innovation Projects
Choosing Innovation ProjectsChoosing Innovation Projects
Choosing Innovation Projects
 
Strategic Management.pptx
Strategic Management.pptxStrategic Management.pptx
Strategic Management.pptx
 
Chapter 8 .
Chapter 8 .Chapter 8 .
Chapter 8 .
 
Schilling (2017pp.129 151) choosing innovation projects (chapter 7)
Schilling (2017pp.129 151) choosing innovation projects (chapter 7)Schilling (2017pp.129 151) choosing innovation projects (chapter 7)
Schilling (2017pp.129 151) choosing innovation projects (chapter 7)
 
Angga efriansyah chapter 8[1]
Angga efriansyah chapter 8[1]Angga efriansyah chapter 8[1]
Angga efriansyah chapter 8[1]
 
CRG DevCo’s advantages of outsourcing Project Management
CRG DevCo’s advantages of outsourcing Project ManagementCRG DevCo’s advantages of outsourcing Project Management
CRG DevCo’s advantages of outsourcing Project Management
 
PMP integration review
PMP integration reviewPMP integration review
PMP integration review
 
Chapter 2 procurment process
Chapter 2 procurment processChapter 2 procurment process
Chapter 2 procurment process
 
Pm ppt p roject selection and solicitation
Pm ppt p roject selection and solicitationPm ppt p roject selection and solicitation
Pm ppt p roject selection and solicitation
 
L7_PROJECT PROCUREMENT Management.pdf
L7_PROJECT PROCUREMENT Management.pdfL7_PROJECT PROCUREMENT Management.pdf
L7_PROJECT PROCUREMENT Management.pdf
 
Chapter 8
Chapter 8Chapter 8
Chapter 8
 
Project management
Project managementProject management
Project management
 
Tactical Vs Strategic Procurement Shifting Focus Towards Value Creation
Tactical Vs  Strategic Procurement   Shifting Focus Towards Value CreationTactical Vs  Strategic Procurement   Shifting Focus Towards Value Creation
Tactical Vs Strategic Procurement Shifting Focus Towards Value Creation
 
Project Procurement Management
Project Procurement ManagementProject Procurement Management
Project Procurement Management
 
Enterprise 360 degree risk management
Enterprise 360 degree risk managementEnterprise 360 degree risk management
Enterprise 360 degree risk management
 
Strategic Planning an Antidote to Change
Strategic Planning an Antidote to ChangeStrategic Planning an Antidote to Change
Strategic Planning an Antidote to Change
 
Chapter 8 information system Strategy
Chapter 8 information system StrategyChapter 8 information system Strategy
Chapter 8 information system Strategy
 
Initiating a new project framework orientation: Innovate Vancouver
Initiating a new project framework orientation: Innovate VancouverInitiating a new project framework orientation: Innovate Vancouver
Initiating a new project framework orientation: Innovate Vancouver
 
Precurement manual 'Reach Vulnerable' annex 12
Precurement manual 'Reach Vulnerable' annex 12Precurement manual 'Reach Vulnerable' annex 12
Precurement manual 'Reach Vulnerable' annex 12
 
2 asca 2- purcasing [compatibility mode]
2 asca 2- purcasing [compatibility mode]2 asca 2- purcasing [compatibility mode]
2 asca 2- purcasing [compatibility mode]
 

More from YASHU40

April 19, 2018 Course #Title MATU-203 – Introduction.docx
April 19, 2018  Course #Title  MATU-203 – Introduction.docxApril 19, 2018  Course #Title  MATU-203 – Introduction.docx
April 19, 2018 Course #Title MATU-203 – Introduction.docx
YASHU40
 
APUS Assignment Rubric Undergraduate Level EXEMPLARYLEVEL4.docx
APUS Assignment Rubric Undergraduate Level EXEMPLARYLEVEL4.docxAPUS Assignment Rubric Undergraduate Level EXEMPLARYLEVEL4.docx
APUS Assignment Rubric Undergraduate Level EXEMPLARYLEVEL4.docx
YASHU40
 
Appropriate TopicsThe Research Report, select one of the fo.docx
Appropriate TopicsThe Research Report, select one of the fo.docxAppropriate TopicsThe Research Report, select one of the fo.docx
Appropriate TopicsThe Research Report, select one of the fo.docx
YASHU40
 
Approaches, Issues, Applications edited by Steffen.docx
Approaches, Issues, Applications edited by Steffen.docxApproaches, Issues, Applications edited by Steffen.docx
Approaches, Issues, Applications edited by Steffen.docx
YASHU40
 
Archaic sapiens, Neandertals and the Last 10,000 YearsWhat.docx
Archaic sapiens, Neandertals and the Last 10,000 YearsWhat.docxArchaic sapiens, Neandertals and the Last 10,000 YearsWhat.docx
Archaic sapiens, Neandertals and the Last 10,000 YearsWhat.docx
YASHU40
 
Applying Evidence-Based Practice”Population groups with differe.docx
Applying Evidence-Based Practice”Population groups with differe.docxApplying Evidence-Based Practice”Population groups with differe.docx
Applying Evidence-Based Practice”Population groups with differe.docx
YASHU40
 
Applying Learning Theory to LifePrior to beginning work on t.docx
Applying Learning Theory to LifePrior to beginning work on t.docxApplying Learning Theory to LifePrior to beginning work on t.docx
Applying Learning Theory to LifePrior to beginning work on t.docx
YASHU40
 
Apply the Symbolic Interaction Perspective to ImmigrationD.docx
Apply the Symbolic Interaction Perspective to ImmigrationD.docxApply the Symbolic Interaction Perspective to ImmigrationD.docx
Apply the Symbolic Interaction Perspective to ImmigrationD.docx
YASHU40
 
April is a fourth grader with a language impairment, but no physical.docx
April is a fourth grader with a language impairment, but no physical.docxApril is a fourth grader with a language impairment, but no physical.docx
April is a fourth grader with a language impairment, but no physical.docx
YASHU40
 
Approximately 1000 words.Synthesizing the theories (you do not.docx
Approximately 1000 words.Synthesizing the theories (you do not.docxApproximately 1000 words.Synthesizing the theories (you do not.docx
Approximately 1000 words.Synthesizing the theories (you do not.docx
YASHU40
 
Approaches to Forecasting Policy Outcomes Please respond to th.docx
Approaches to Forecasting Policy Outcomes Please respond to th.docxApproaches to Forecasting Policy Outcomes Please respond to th.docx
Approaches to Forecasting Policy Outcomes Please respond to th.docx
YASHU40
 
Apply the course concepts of the dark side of self-esteem and .docx
Apply the course concepts of the dark side of self-esteem and .docxApply the course concepts of the dark side of self-esteem and .docx
Apply the course concepts of the dark side of self-esteem and .docx
YASHU40
 
Apply information from the Aquifer Case Study to answer the foll.docx
Apply information from the Aquifer Case Study to answer the foll.docxApply information from the Aquifer Case Study to answer the foll.docx
Apply information from the Aquifer Case Study to answer the foll.docx
YASHU40
 
Apply appropriate elements of the U.S. legal system and the U.S. Con.docx
Apply appropriate elements of the U.S. legal system and the U.S. Con.docxApply appropriate elements of the U.S. legal system and the U.S. Con.docx
Apply appropriate elements of the U.S. legal system and the U.S. Con.docx
YASHU40
 
APA format Analysis of the Culture using a Culturally Competent.docx
APA format Analysis of the Culture using a Culturally Competent.docxAPA format Analysis of the Culture using a Culturally Competent.docx
APA format Analysis of the Culture using a Culturally Competent.docx
YASHU40
 
APA less than 10 similarityWeek 7 Discussion Question Chapter.docx
APA less than 10  similarityWeek 7 Discussion Question Chapter.docxAPA less than 10  similarityWeek 7 Discussion Question Chapter.docx
APA less than 10 similarityWeek 7 Discussion Question Chapter.docx
YASHU40
 
APPLE 13Business Analytics Plan for BIAM300Author Miguel .docx
APPLE 13Business Analytics Plan for BIAM300Author Miguel .docxAPPLE 13Business Analytics Plan for BIAM300Author Miguel .docx
APPLE 13Business Analytics Plan for BIAM300Author Miguel .docx
YASHU40
 
APAless than 10 similarityWeek 4 Discussion Question .docx
APAless than 10  similarityWeek 4 Discussion Question .docxAPAless than 10  similarityWeek 4 Discussion Question .docx
APAless than 10 similarityWeek 4 Discussion Question .docx
YASHU40
 
APA Style [Sources, included] single-spaced, one to two-page paper r.docx
APA Style [Sources, included] single-spaced, one to two-page paper r.docxAPA Style [Sources, included] single-spaced, one to two-page paper r.docx
APA Style [Sources, included] single-spaced, one to two-page paper r.docx
YASHU40
 
Application Case Siemens Builds a Strategy-Oriented HR System.docx
Application Case Siemens Builds a Strategy-Oriented HR System.docxApplication Case Siemens Builds a Strategy-Oriented HR System.docx
Application Case Siemens Builds a Strategy-Oriented HR System.docx
YASHU40
 

More from YASHU40 (20)

April 19, 2018 Course #Title MATU-203 – Introduction.docx
April 19, 2018  Course #Title  MATU-203 – Introduction.docxApril 19, 2018  Course #Title  MATU-203 – Introduction.docx
April 19, 2018 Course #Title MATU-203 – Introduction.docx
 
APUS Assignment Rubric Undergraduate Level EXEMPLARYLEVEL4.docx
APUS Assignment Rubric Undergraduate Level EXEMPLARYLEVEL4.docxAPUS Assignment Rubric Undergraduate Level EXEMPLARYLEVEL4.docx
APUS Assignment Rubric Undergraduate Level EXEMPLARYLEVEL4.docx
 
Appropriate TopicsThe Research Report, select one of the fo.docx
Appropriate TopicsThe Research Report, select one of the fo.docxAppropriate TopicsThe Research Report, select one of the fo.docx
Appropriate TopicsThe Research Report, select one of the fo.docx
 
Approaches, Issues, Applications edited by Steffen.docx
Approaches, Issues, Applications edited by Steffen.docxApproaches, Issues, Applications edited by Steffen.docx
Approaches, Issues, Applications edited by Steffen.docx
 
Archaic sapiens, Neandertals and the Last 10,000 YearsWhat.docx
Archaic sapiens, Neandertals and the Last 10,000 YearsWhat.docxArchaic sapiens, Neandertals and the Last 10,000 YearsWhat.docx
Archaic sapiens, Neandertals and the Last 10,000 YearsWhat.docx
 
Applying Evidence-Based Practice”Population groups with differe.docx
Applying Evidence-Based Practice”Population groups with differe.docxApplying Evidence-Based Practice”Population groups with differe.docx
Applying Evidence-Based Practice”Population groups with differe.docx
 
Applying Learning Theory to LifePrior to beginning work on t.docx
Applying Learning Theory to LifePrior to beginning work on t.docxApplying Learning Theory to LifePrior to beginning work on t.docx
Applying Learning Theory to LifePrior to beginning work on t.docx
 
Apply the Symbolic Interaction Perspective to ImmigrationD.docx
Apply the Symbolic Interaction Perspective to ImmigrationD.docxApply the Symbolic Interaction Perspective to ImmigrationD.docx
Apply the Symbolic Interaction Perspective to ImmigrationD.docx
 
April is a fourth grader with a language impairment, but no physical.docx
April is a fourth grader with a language impairment, but no physical.docxApril is a fourth grader with a language impairment, but no physical.docx
April is a fourth grader with a language impairment, but no physical.docx
 
Approximately 1000 words.Synthesizing the theories (you do not.docx
Approximately 1000 words.Synthesizing the theories (you do not.docxApproximately 1000 words.Synthesizing the theories (you do not.docx
Approximately 1000 words.Synthesizing the theories (you do not.docx
 
Approaches to Forecasting Policy Outcomes Please respond to th.docx
Approaches to Forecasting Policy Outcomes Please respond to th.docxApproaches to Forecasting Policy Outcomes Please respond to th.docx
Approaches to Forecasting Policy Outcomes Please respond to th.docx
 
Apply the course concepts of the dark side of self-esteem and .docx
Apply the course concepts of the dark side of self-esteem and .docxApply the course concepts of the dark side of self-esteem and .docx
Apply the course concepts of the dark side of self-esteem and .docx
 
Apply information from the Aquifer Case Study to answer the foll.docx
Apply information from the Aquifer Case Study to answer the foll.docxApply information from the Aquifer Case Study to answer the foll.docx
Apply information from the Aquifer Case Study to answer the foll.docx
 
Apply appropriate elements of the U.S. legal system and the U.S. Con.docx
Apply appropriate elements of the U.S. legal system and the U.S. Con.docxApply appropriate elements of the U.S. legal system and the U.S. Con.docx
Apply appropriate elements of the U.S. legal system and the U.S. Con.docx
 
APA format Analysis of the Culture using a Culturally Competent.docx
APA format Analysis of the Culture using a Culturally Competent.docxAPA format Analysis of the Culture using a Culturally Competent.docx
APA format Analysis of the Culture using a Culturally Competent.docx
 
APA less than 10 similarityWeek 7 Discussion Question Chapter.docx
APA less than 10  similarityWeek 7 Discussion Question Chapter.docxAPA less than 10  similarityWeek 7 Discussion Question Chapter.docx
APA less than 10 similarityWeek 7 Discussion Question Chapter.docx
 
APPLE 13Business Analytics Plan for BIAM300Author Miguel .docx
APPLE 13Business Analytics Plan for BIAM300Author Miguel .docxAPPLE 13Business Analytics Plan for BIAM300Author Miguel .docx
APPLE 13Business Analytics Plan for BIAM300Author Miguel .docx
 
APAless than 10 similarityWeek 4 Discussion Question .docx
APAless than 10  similarityWeek 4 Discussion Question .docxAPAless than 10  similarityWeek 4 Discussion Question .docx
APAless than 10 similarityWeek 4 Discussion Question .docx
 
APA Style [Sources, included] single-spaced, one to two-page paper r.docx
APA Style [Sources, included] single-spaced, one to two-page paper r.docxAPA Style [Sources, included] single-spaced, one to two-page paper r.docx
APA Style [Sources, included] single-spaced, one to two-page paper r.docx
 
Application Case Siemens Builds a Strategy-Oriented HR System.docx
Application Case Siemens Builds a Strategy-Oriented HR System.docxApplication Case Siemens Builds a Strategy-Oriented HR System.docx
Application Case Siemens Builds a Strategy-Oriented HR System.docx
 

Recently uploaded

BÀI TẬP BỔ TRỢ TIẾNG ANH LỚP 9 CẢ NĂM - GLOBAL SUCCESS - NĂM HỌC 2024-2025 - ...
BÀI TẬP BỔ TRỢ TIẾNG ANH LỚP 9 CẢ NĂM - GLOBAL SUCCESS - NĂM HỌC 2024-2025 - ...BÀI TẬP BỔ TRỢ TIẾNG ANH LỚP 9 CẢ NĂM - GLOBAL SUCCESS - NĂM HỌC 2024-2025 - ...
BÀI TẬP BỔ TRỢ TIẾNG ANH LỚP 9 CẢ NĂM - GLOBAL SUCCESS - NĂM HỌC 2024-2025 - ...
Nguyen Thanh Tu Collection
 
Pengantar Penggunaan Flutter - Dart programming language1.pptx
Pengantar Penggunaan Flutter - Dart programming language1.pptxPengantar Penggunaan Flutter - Dart programming language1.pptx
Pengantar Penggunaan Flutter - Dart programming language1.pptx
Fajar Baskoro
 
Wound healing PPT
Wound healing PPTWound healing PPT
Wound healing PPT
Jyoti Chand
 
How to Build a Module in Odoo 17 Using the Scaffold Method
How to Build a Module in Odoo 17 Using the Scaffold MethodHow to Build a Module in Odoo 17 Using the Scaffold Method
How to Build a Module in Odoo 17 Using the Scaffold Method
Celine George
 
How to Setup Warehouse & Location in Odoo 17 Inventory
How to Setup Warehouse & Location in Odoo 17 InventoryHow to Setup Warehouse & Location in Odoo 17 Inventory
How to Setup Warehouse & Location in Odoo 17 Inventory
Celine George
 
Hindi varnamala | hindi alphabet PPT.pdf
Hindi varnamala | hindi alphabet PPT.pdfHindi varnamala | hindi alphabet PPT.pdf
Hindi varnamala | hindi alphabet PPT.pdf
Dr. Mulla Adam Ali
 
NEWSPAPERS - QUESTION 1 - REVISION POWERPOINT.pptx
NEWSPAPERS - QUESTION 1 - REVISION POWERPOINT.pptxNEWSPAPERS - QUESTION 1 - REVISION POWERPOINT.pptx
NEWSPAPERS - QUESTION 1 - REVISION POWERPOINT.pptx
iammrhaywood
 
Exploiting Artificial Intelligence for Empowering Researchers and Faculty, In...
Exploiting Artificial Intelligence for Empowering Researchers and Faculty, In...Exploiting Artificial Intelligence for Empowering Researchers and Faculty, In...
Exploiting Artificial Intelligence for Empowering Researchers and Faculty, In...
Dr. Vinod Kumar Kanvaria
 
ANATOMY AND BIOMECHANICS OF HIP JOINT.pdf
ANATOMY AND BIOMECHANICS OF HIP JOINT.pdfANATOMY AND BIOMECHANICS OF HIP JOINT.pdf
ANATOMY AND BIOMECHANICS OF HIP JOINT.pdf
Priyankaranawat4
 
Life upper-Intermediate B2 Workbook for student
Life upper-Intermediate B2 Workbook for studentLife upper-Intermediate B2 Workbook for student
Life upper-Intermediate B2 Workbook for student
NgcHiNguyn25
 
ISO/IEC 27001, ISO/IEC 42001, and GDPR: Best Practices for Implementation and...
ISO/IEC 27001, ISO/IEC 42001, and GDPR: Best Practices for Implementation and...ISO/IEC 27001, ISO/IEC 42001, and GDPR: Best Practices for Implementation and...
ISO/IEC 27001, ISO/IEC 42001, and GDPR: Best Practices for Implementation and...
PECB
 
How to Fix the Import Error in the Odoo 17
How to Fix the Import Error in the Odoo 17How to Fix the Import Error in the Odoo 17
How to Fix the Import Error in the Odoo 17
Celine George
 
Main Java[All of the Base Concepts}.docx
Main Java[All of the Base Concepts}.docxMain Java[All of the Base Concepts}.docx
Main Java[All of the Base Concepts}.docx
adhitya5119
 
How to deliver Powerpoint Presentations.pptx
How to deliver Powerpoint  Presentations.pptxHow to deliver Powerpoint  Presentations.pptx
How to deliver Powerpoint Presentations.pptx
HajraNaeem15
 
The History of Stoke Newington Street Names
The History of Stoke Newington Street NamesThe History of Stoke Newington Street Names
The History of Stoke Newington Street Names
History of Stoke Newington
 
Pollock and Snow "DEIA in the Scholarly Landscape, Session One: Setting Expec...
Pollock and Snow "DEIA in the Scholarly Landscape, Session One: Setting Expec...Pollock and Snow "DEIA in the Scholarly Landscape, Session One: Setting Expec...
Pollock and Snow "DEIA in the Scholarly Landscape, Session One: Setting Expec...
National Information Standards Organization (NISO)
 
Leveraging Generative AI to Drive Nonprofit Innovation
Leveraging Generative AI to Drive Nonprofit InnovationLeveraging Generative AI to Drive Nonprofit Innovation
Leveraging Generative AI to Drive Nonprofit Innovation
TechSoup
 
Natural birth techniques - Mrs.Akanksha Trivedi Rama University
Natural birth techniques - Mrs.Akanksha Trivedi Rama UniversityNatural birth techniques - Mrs.Akanksha Trivedi Rama University
Natural birth techniques - Mrs.Akanksha Trivedi Rama University
Akanksha trivedi rama nursing college kanpur.
 
BBR 2024 Summer Sessions Interview Training
BBR  2024 Summer Sessions Interview TrainingBBR  2024 Summer Sessions Interview Training
BBR 2024 Summer Sessions Interview Training
Katrina Pritchard
 
বাংলাদেশ অর্থনৈতিক সমীক্ষা (Economic Review) ২০২৪ UJS App.pdf
বাংলাদেশ অর্থনৈতিক সমীক্ষা (Economic Review) ২০২৪ UJS App.pdfবাংলাদেশ অর্থনৈতিক সমীক্ষা (Economic Review) ২০২৪ UJS App.pdf
বাংলাদেশ অর্থনৈতিক সমীক্ষা (Economic Review) ২০২৪ UJS App.pdf
eBook.com.bd (প্রয়োজনীয় বাংলা বই)
 

Recently uploaded (20)

BÀI TẬP BỔ TRỢ TIẾNG ANH LỚP 9 CẢ NĂM - GLOBAL SUCCESS - NĂM HỌC 2024-2025 - ...
BÀI TẬP BỔ TRỢ TIẾNG ANH LỚP 9 CẢ NĂM - GLOBAL SUCCESS - NĂM HỌC 2024-2025 - ...BÀI TẬP BỔ TRỢ TIẾNG ANH LỚP 9 CẢ NĂM - GLOBAL SUCCESS - NĂM HỌC 2024-2025 - ...
BÀI TẬP BỔ TRỢ TIẾNG ANH LỚP 9 CẢ NĂM - GLOBAL SUCCESS - NĂM HỌC 2024-2025 - ...
 
Pengantar Penggunaan Flutter - Dart programming language1.pptx
Pengantar Penggunaan Flutter - Dart programming language1.pptxPengantar Penggunaan Flutter - Dart programming language1.pptx
Pengantar Penggunaan Flutter - Dart programming language1.pptx
 
Wound healing PPT
Wound healing PPTWound healing PPT
Wound healing PPT
 
How to Build a Module in Odoo 17 Using the Scaffold Method
How to Build a Module in Odoo 17 Using the Scaffold MethodHow to Build a Module in Odoo 17 Using the Scaffold Method
How to Build a Module in Odoo 17 Using the Scaffold Method
 
How to Setup Warehouse & Location in Odoo 17 Inventory
How to Setup Warehouse & Location in Odoo 17 InventoryHow to Setup Warehouse & Location in Odoo 17 Inventory
How to Setup Warehouse & Location in Odoo 17 Inventory
 
Hindi varnamala | hindi alphabet PPT.pdf
Hindi varnamala | hindi alphabet PPT.pdfHindi varnamala | hindi alphabet PPT.pdf
Hindi varnamala | hindi alphabet PPT.pdf
 
NEWSPAPERS - QUESTION 1 - REVISION POWERPOINT.pptx
NEWSPAPERS - QUESTION 1 - REVISION POWERPOINT.pptxNEWSPAPERS - QUESTION 1 - REVISION POWERPOINT.pptx
NEWSPAPERS - QUESTION 1 - REVISION POWERPOINT.pptx
 
Exploiting Artificial Intelligence for Empowering Researchers and Faculty, In...
Exploiting Artificial Intelligence for Empowering Researchers and Faculty, In...Exploiting Artificial Intelligence for Empowering Researchers and Faculty, In...
Exploiting Artificial Intelligence for Empowering Researchers and Faculty, In...
 
ANATOMY AND BIOMECHANICS OF HIP JOINT.pdf
ANATOMY AND BIOMECHANICS OF HIP JOINT.pdfANATOMY AND BIOMECHANICS OF HIP JOINT.pdf
ANATOMY AND BIOMECHANICS OF HIP JOINT.pdf
 
Life upper-Intermediate B2 Workbook for student
Life upper-Intermediate B2 Workbook for studentLife upper-Intermediate B2 Workbook for student
Life upper-Intermediate B2 Workbook for student
 
ISO/IEC 27001, ISO/IEC 42001, and GDPR: Best Practices for Implementation and...
ISO/IEC 27001, ISO/IEC 42001, and GDPR: Best Practices for Implementation and...ISO/IEC 27001, ISO/IEC 42001, and GDPR: Best Practices for Implementation and...
ISO/IEC 27001, ISO/IEC 42001, and GDPR: Best Practices for Implementation and...
 
How to Fix the Import Error in the Odoo 17
How to Fix the Import Error in the Odoo 17How to Fix the Import Error in the Odoo 17
How to Fix the Import Error in the Odoo 17
 
Main Java[All of the Base Concepts}.docx
Main Java[All of the Base Concepts}.docxMain Java[All of the Base Concepts}.docx
Main Java[All of the Base Concepts}.docx
 
How to deliver Powerpoint Presentations.pptx
How to deliver Powerpoint  Presentations.pptxHow to deliver Powerpoint  Presentations.pptx
How to deliver Powerpoint Presentations.pptx
 
The History of Stoke Newington Street Names
The History of Stoke Newington Street NamesThe History of Stoke Newington Street Names
The History of Stoke Newington Street Names
 
Pollock and Snow "DEIA in the Scholarly Landscape, Session One: Setting Expec...
Pollock and Snow "DEIA in the Scholarly Landscape, Session One: Setting Expec...Pollock and Snow "DEIA in the Scholarly Landscape, Session One: Setting Expec...
Pollock and Snow "DEIA in the Scholarly Landscape, Session One: Setting Expec...
 
Leveraging Generative AI to Drive Nonprofit Innovation
Leveraging Generative AI to Drive Nonprofit InnovationLeveraging Generative AI to Drive Nonprofit Innovation
Leveraging Generative AI to Drive Nonprofit Innovation
 
Natural birth techniques - Mrs.Akanksha Trivedi Rama University
Natural birth techniques - Mrs.Akanksha Trivedi Rama UniversityNatural birth techniques - Mrs.Akanksha Trivedi Rama University
Natural birth techniques - Mrs.Akanksha Trivedi Rama University
 
BBR 2024 Summer Sessions Interview Training
BBR  2024 Summer Sessions Interview TrainingBBR  2024 Summer Sessions Interview Training
BBR 2024 Summer Sessions Interview Training
 
বাংলাদেশ অর্থনৈতিক সমীক্ষা (Economic Review) ২০২৪ UJS App.pdf
বাংলাদেশ অর্থনৈতিক সমীক্ষা (Economic Review) ২০২৪ UJS App.pdfবাংলাদেশ অর্থনৈতিক সমীক্ষা (Economic Review) ২০২৪ UJS App.pdf
বাংলাদেশ অর্থনৈতিক সমীক্ষা (Economic Review) ২০২৪ UJS App.pdf
 

Procurement and risk management paper kimberly hernandez, spencer o

  • 1. Procurement and Risk Management PaperKimberly Hernandez, Spencer O’Brien, Stephanie Robinson, De’Andra YoungCPMGT/302: Procurement and Risk Management August 10, 2020 Professor Pamela Hill Procurement and Risk Management The following report discusses the procurement management process in alignment with risk management, as outlined by Learning Team 4 and their collaborative impression of the lessons learned while attending this course. The intent of this outline is to discuss prior procurement management knowledge, real-world examples thereof, along with learned tools and techniques and their usage within a real-world example. Risk and Procurement Management Tools and Techniques Experience Collectively, most of the team members have never been in a project management role, but, see it as a career goal. Most members have been involved in the project process, serving team roles such as executive assistant. An executive assistant works directly with the project manager, remaining active within the management of procurement itself. Typically, an executive assistant is responsible for ordering and maintaining supplies, the issue of SOW, and the processing of invoices. The executive assistant can also be involved with various risk assessment situations, working alongside members within the operational risk department. 2
  • 2. Real World Project Management Examples In project management, the procurement process is regularly used and if performed well, will prove to be a contributing factor in the project success. An example of procurement can be taken from a construction project. Within the procurement process, the project requirements will be assessed, which would include expected deliverables within an expected timeline. Once this information is obtained, the availability of resources and material will be determined. For resources needed from an outside vendor, the procurement team shall qualify the available external resources to find which may be the most suitable. Through negotiations with the vendor, all the while referring to the risk assessment, contracts will be created and executed, each carrying terms and conditions for the buyer and seller to adhere to. Upon full performance and delivery of the project, the procurement process would then initiate a closing process. The closing process would be executed so that the assurance of all deliverables produced, and all invoices submitted and paid so that no further obligations exist within the verbiage of each contract. The overall Procurement process for the construction company would end with the project itself, with documentation delivered to the client reviewing the lifecycle of the project processes along with lessons learned. Tools and Techniques Learned While Taking this Course During this course, a lot was learned about procurement, especially when in alignment with risk management. The course also emphasized the importance of a procurement strategy plan which carefully analyzes risks associated with the project. The team recognized two valuable tasks that showed evidence of being utilized within the project setting in the future: · Procurement Evaluation – The evaluation of procurements finds the project manager performing a make or buy analysis, purchasing as compared to leasing evaluations, and whether to
  • 3. use internal or external resources. A real-world example of procurement evaluation can be taken from the processing industry, and the project determination of how to produce a necessary part needed for a mission-critical process. This scenario would see the evaluation of the availability of the part produced and delivered from an exterior source, as compared to the in-house resource and material availability for the organization to produce it themselves. · Strategic Purchasing – Strategic purchasing fins the project manager determining the acquisition of resources through the analysis of quality, capability, cost, and availability. The processing industry offers a real-world example in terms of strategic purchasing, as well. In evaluation of the project, the project manager finds that a filter material can be purchased at a lesser cost if bought in bulk. Though the filter material is not used on a day to day basis, this evaluation finds the project requiring an excessive amount before completion. This leads to further evaluation by the project manager, who finds that although it appears as a major purchase now, the cost savings of buying bulk along with storage costs is much less than only bought when needed. Conclusion The value of a properly executed procurement management process has become strongly evident amongst the team, resulting in a broader knowledge as to project activities when aligned with risk management. Throughout this course, a common theme of success was projected through the repeated task of breaking the procurement process into much smaller, more manageable ones. With this project environment mindset, it is expected the members of this team should have a promising career within the project management field.