2. Presentation Overview
Overview of the Project
ERS, ATIS – Event Reporting System, Advanced
Traveller Inforamation System
ATMS – Advanced Traffic Management System
Review of the i-traffic.co.za website and feedback
IBI Group
SANRAL
ATMS – Training Material
19 September 2012
2
3. TETI Traffic (Consortium)
• Tollink,
• Efkon
• IBI Group (15%)
• 5 Year DBOM Contract with SANRAL
• Largest ITS project in South Africa to date
IBI Group
SANRAL
ATMS – Training Material
January 3, 2014
3
5. Project Overview
• Across 3 Provinces – GP, KZN, WC
–
–
–
–
–
–
–
IBI Group
SANRAL
VMS
CCTV
Weather Monitoring (future)
Emergency Dispatch
Integration with existing systems
Traffic Management System (ATMS)
Public facing website (i-traffic.co.za) (ATIS)
ATMS – Training Material
January 3, 2014
5
6. Project Coverage
• Gauteng
– New TMC in Midrand
– Backup Operations in Midrand (old TMC)
– Disaster Recovery in Rivonia
• KZN
– TMC in Pietermaritzburg
– Disaster Recovery in Durban
• Western Cape
– TMC in Goodwood
– Disaster Recovery at the Huguenot Tunnel
IBI Group
SANRAL
ATMS – Training Material
January 3, 2014
6
13. • TETI proposed the delivery of an Event
Reporting System to support the entry of
events into the ATIS and an early ATIS
deployment.
– Phase A (May-June 2012) – integrate, test and
deploy ERS System, ATIS Website and train
Operations staff
– Phase C (Jan 2013) – full functionality for ATIS
delivered.
NOTE – Phase B (June – Sept 2012) is the delivery
of the first ATMS
IBI Group
SANRAL
ATMS – Training Material
January 3, 2014
13
14. ATIS
For the life of the project, IBI will:
• Maintain all systems
• Provide a 24/7 Help Desk support
• Fix software defects
• Implement required changes/updates
IBI Group
SANRAL
ATMS – Training Material
January 3, 2014
14
15. ATIS ERS
• The ATIS will include the provinces of:
– Gauteng
– Western Cape
– KwaZulu-Natal
• Include content from the three regional Traffic
Management Centres (TMCs)
IBI Group
SANRAL
ATMS – Training Material
January 3, 2014
15
16. ATIS – Traveller Information Data Collection
Data collected to distribute on the Website:
• Real Time Highway Traffic Events (Phase A)
• Real-Time Road Closures (Phase A)
• Static content (Phase A)
• API available for providing data to 3rd parties
(Phase A)
IBI Group
SANRAL
ATMS – Training Material
January 3, 2014
16
18. ATMS Overview - Objectives
Safety
• Monitor road conditions before, during and after events
• Reducing incidents
• Clearing accidents quickly
• Monitor daily traffic volume
Inform
• Improved efficiency by managing congestion
• Giving motorists more information
Efficiency of Operation
• Integration of systems
IBI Group
SANRAL
ATMS – Training Material
25 July 2012
18
19. ATMS Overview - Glossary of Common Terms
Events
• Unplanned: An event such as Incident
• Planned: An event known before it started such as Road
Construction
• Confirmed or Unconfirmed
• Future (scheduled)
• Owned or Un-owned
• Closed
Devices – Phase B VMS: Variable Message Sign
Devices Phase C – CCTV, Weather, Force Link (field device
database)
IBI Group
SANRAL
ATMS – Training Material
25 July 2012
19
20. ATMS Overview - What is Incident Management?
• Identify incidents/queues
• Confirm incident or queues (CCTV and/or external
sources)
• Initiate and coordinate response actions
• Disseminate information to the public and related
agencies (via ATIS, etc)
IBI Group
SANRAL
ATMS – Training Material
25 July 2012
20
21. ATMS Overview - Incident Management
Inputs
• External Agencies (i.e. police, fire, other)
• General Public
• CCTV Monitoring
Outputs
• VMS
• i-traffic website (ATIS i-traffic.co.za), media
• Emergency Response
• On road services
IBI Group
SANRAL
ATMS – Training Material
25 July 2012
21
22. ATMS Overview - Incident Management Objectives
• Improved safety by warning of accidents, traffic queues,
lane closures
– Reduce secondary accidents, collisions and
bumper bashes
– Reduce pedestrian injuries and/or fatalities
– Quickly clear lane blockages
• Reduced traffic congestion
– Quickly clear lane blockages
– Provide alternative routing information to
motorists
IBI Group
SANRAL
ATMS – Training Material
25 July 2012
22
23. ATMS Overview - Overall System Architecture (Gauteng)
IBI Group
SANRAL
ATMS – Training Material
25 July 2012
23
24. ATMS Overview - Field Subsystems
IBI Group
SANRAL
ATMS – Training Material
25 July 2012
24
25. ATMS Overview – TMC Subsystems
IBI Group
SANRAL
ATMS – Training Material
25 July 2012
25
26. Topics
Advanced Traffic Management System (ATMS)
Features
Terminology
ATMS GUI
Purpose
Features
Terminology
GUI Functions
o Main Screen
o Map
o Top Panel
o Side Panel
IBI Group
SANRAL
ATMS – Training Material
25 July 2012
26
27. ATMS Map View – Top Panel & Side Panel
IBI Group
SANRAL
ATMS – Training Material
January 3, 2014
27
28. Features - Detection, Confirmation & Response
Detection
Devices: CCTV cameras
Other reliable sources (i.e. police)
Confirmation
CCTV or reliable sources
Confirmation entered into ATMS
Response
VMS – manual response
IBI Group
SANRAL
ATMS – Training Material
25 July 2012
28
30. Purpose of the GUI
Supports system functionality:
Problem detection, confirmation, response
o
o
o
o
o
IBI Group
SANRAL
System monitoring data
Process/forms for operator input
Information/processes for confirmation
Displays system-generated responses
Process/forms for operator approval or changes
ATMS – Training Material
January 3, 2014
30
31. Purpose of GUI (cont’d)
Reminders
o Notification alarms
o Email and SMS
Tracking and documentation
o Reports
o Historical Data
IBI Group
SANRAL
ATMS – Training Material
January 3, 2014
31
32. Terminology
Events
• Unplanned: An event such as Incident
• Planned: An event known before it started such as
Road Construction
• Confirmed or Unconfirmed
• Future (scheduled)
• Owned or Un-owned
• Closed
IBI Group
SANRAL
ATMS – Training Material
January 3, 2014
32
34. Side Panel Tab
Side Panel Expansion Tab
IBI Group
SANRAL
ATMS – Training Material
January 3, 2014
34
35. Side Panel - Expansion
Search
Filters
IBI Group
SANRAL
ATMS – Training Material
January 3, 2014
35
36. Side Panel - Expansion
Subscriptions
Notifications
IBI Group
SANRAL
ATMS – Training Material
January 3, 2014
36
37. Side Panel - Expansion
Map Views
Lists
IBI Group
SANRAL
ATMS – Training Material
January 3, 2014
37
38. Event Management – Manage Event
Action Panel
Note: Icons vary based the status and
ownership of an event.
View Event Summary icon
IBI Group
SANRAL
ATMS – Training Material
January 3, 2014
38
39. Event Management - Manage Event
Event Type, Cause and
SubCause icon
Severity icon
Lane Blockage / Patter icon
IBI Group
SANRAL
ATMS – Training Material
January 3, 2014
39
40. Event Management (cont’d)
Vehicle Involved Control icon
Event Injuries icon
Subscriptions icon
IBI Group
SANRAL
ATMS – Training Material
January 3, 2014
40
43. VMS
VMS icon
VMS Action Panel
View VMS Summary icon
IBI Group
SANRAL
ATMS – Training Material
25 July 2012
43
44. VMS – Message Library
Message Library icon
Message Queue icon
IBI Group
SANRAL
ATMS – Training Material
25 July 2012
44
45. VMS – Approved Words
Manage Approved Word
List icon
Enable and Disable Sign icons
IBI Group
SANRAL
ATMS – Training Material
25 July 2012
45
46. VMS – Other Functions
Configure VMS icon
Poll VMS icon
IBI Group
SANRAL
ATMS – Training Material
25 July 2012
46
47. Current Conditions
Starting the pre-SAT for Phase B ATMS next
week. GP, KZN, WC
SAT ends on November 2
30 Days TOT
Acceptance early December 2012
Phase C FAT – January 2013
Phase C Acceptance April 2012
Phase D – December 2013
IBI Group
SANRAL
ATMS – Training Material
January 3, 2014
47
48. Go to Site
• i-Traffic.co.za website
• Questions
IBI Group
SANRAL
ATMS – Training Material
January 3, 2014
48
Editor's Notes
Engineer., DPMIBI 1 yearPreviously 10y ago – Athens, Israel. Seattle, Phoenix, Orlando in USA
ATMS – Advanced Traffic Management SystemERS – Event Reporting SystemATIS – Advanced Traveller Information System
Project awarded January 2011Delays.. Started work in November 2011IBI – Toronto with technical support from Florida, UK, Greece
49 VMS in each province
N1, N4, R21, R24, N3, M1Central Operations Centre (on the N1 off Samrand offramp) - ORTRivonia Backup Centre (corner of N1 and Rivonia road)
flagship
N2, N3
N1, N7, N2, M5, R300N7 from N1 to PotsdamN2 Sir Lowry’s Pass
GoodwoodPolice, Fire
I will show you the system after this presentation and hope to get some feedback from you – end user.
Based on google maps API
Social Media based interface with newsfeeds, event histories,
From the ATMS Map View, the User can access the Top Panel for interactive access to the system, access the Side Panel, access existing or add new Map Views, add New Events or Log Out. Integrated approach to incident detection, management and responseBrowser and map based ATMSATMS and ATIS website integrationReal time traveller informationUser friendlyFacilitates accurate data entryCustomized visual aidsUser interface modelled after social media
The Top Panel provides interactive access to the system including access to the Side Panel, access to existing Map Views, the ability to add new Map Views, the ability to add New Events or to Log Out.
With the Top Panel displayed across the top of the screen, the User can view the Side Panel by clicking on the Side Panel expansion tab.
The Search Function allows Users to type in key words that they would like to look up in the system. There are three (3) areas a search can be performed on; Event, User and VMS. The first word in the search bar needs to be one of those three words, followed by a colon.
The Subscription function shows the User all the items they are receiving notifications for. The (G) represents GUI notifications and the (E) represents Email notifications. The Notification function shows all the GUI alerts received for items the User is subscribed to.
The Map Views function shows all the map views that have been added. Clicking the map view name will move the view to that location. Clicking the pin will make that the default map every time the User logs in. Clicking the X will remove the map view from the list.The Lists function provides links to various lists. If the User clicks a link, it will open a new tab.
The Action Panel shows all of the icons available to the User. View Event Summary icon displays the Summary Information box.
Clicking on the Vehicle Involved Control icon displays the Vehicle Involved Control dialogue box.Clicking on the Event Injuries icon displays the Event Injuries dialogue box.Clicking on the Responder Vehicle icon displays the Responder Vehicle dialogue box.
The User can also enter notes.By clicking on the Plus Sign, the User can add additional Responder Vehicles.Clicking the X on the title bar will close the dialogue box without saving any changes.When all fields for a responder vehicle are complete, the User can save the entry by selecting the Disk icon. The entry can be deleted by selecting the Do Not Save icon. By clicking on the Plus Sign, the User can add additional Responder Vehicles. Once an entry is saved, the User can edit the entry by selecting the Pencil icon. The entry can be deleted by selecting the Trash Can icon.
The Subscription icon is available for confirmed queuing and planned events. Clicking on the Subscription icon displays the Subscription information boxClicking on the Obtain Ownership icon transfers ownership to the User.Clicking on the Release Ownership icon displays the Release Ownership information box.Clicking on the Transfer Ownership icon will show the Transfer Ownership dialogue box.
The information displayed in the View VMS Summary information box includes:Message Sign number.The current status of the sign.The displayed message(s). Note: if there are multiple messages, they will cycle through every 5 seconds.The priority level.The last time the sign was updated.The User that last updated the sign.