This document outlines a group presentation for an engineering project. It includes:
1. An introduction of the group members and an overview of the presentation contents.
2. Descriptions of 5 designs implemented to improve the baseline controller by addressing problems related to truck efficiency and cargo delivery times.
3. An explanation of why an adaptive controller was not used.
4. Results showing the new controller improved scores on 5 scenarios over the baseline controller.
This presentation was prepared by Ishara Amarasekera and Prabath Weerasinghe based on the paper, Feedback Queueing Models for Time Shared Systems by Edward G. Coffman and Leonard Kleinrock.
This presentation contains a summary of the content provided in this research paper and was presented as a paper discussion for the course, Advanced Operating Systems in Computer Science.
Process Optimisation at the Ordnance Survey Great BritainSafe Software
The session discusses a case for best practice in FME Workspace design and process optimisation from Ornance Survey Great Britain . Presented by David Eagle of 1Spatial.
This is a presentation created to facilitate a research paper discussion on 'Feedback queuing models for time shared systems' for a final year undergraduate course. This includes a summary of the concepts presented with the paper, excluding their statistical proofs.
This presentation was prepared by Ishara Amarasekera and Prabath Weerasinghe based on the paper, Feedback Queueing Models for Time Shared Systems by Edward G. Coffman and Leonard Kleinrock.
This presentation contains a summary of the content provided in this research paper and was presented as a paper discussion for the course, Advanced Operating Systems in Computer Science.
Process Optimisation at the Ordnance Survey Great BritainSafe Software
The session discusses a case for best practice in FME Workspace design and process optimisation from Ornance Survey Great Britain . Presented by David Eagle of 1Spatial.
This is a presentation created to facilitate a research paper discussion on 'Feedback queuing models for time shared systems' for a final year undergraduate course. This includes a summary of the concepts presented with the paper, excluding their statistical proofs.
SIMUL8 User Group - Visual8 Case Study - Plywood Manufacturing. SIMUL8 Corporation
A presentation by Matthew Concannon of Visual8 at the SIMUL8 East Coast User Group on December 11, 2013. This case study looks at plywood manufacturing and optimizing the process to reduce time and wasted materials.
SIMUL8 User Group - Visual8 Case Study - Plywood Manufacturing. SIMUL8 Corporation
A presentation by Matthew Concannon of Visual8 at the SIMUL8 East Coast User Group on December 11, 2013. This case study looks at plywood manufacturing and optimizing the process to reduce time and wasted materials.
Tugger Route Generation - Flow Planner - Dr. Dave SlyProplanner Asia
Proplanner's Flow Planner tool works inside AutoCAD to generate shortest path tugger routes to streamline material flow and minimize material handling costs.
Companies that define tugger routes using Excel and guesswork stand to benefit greatly from the world's leading software for tugger route generation and analysis.
Kanban Coaching Exchange Meet up group slides. A look at Scaling Kanban and the 7 Cadences (Daily Kanban, Strategy Review, Service Delivery Review, Operations Review, Risk Review, Queue Replenishment and Delivery Planning Meeting)
An introduction to the cryptocurrency investment platform Binance Savings.Any kyc Account
Learn how to use Binance Savings to expand your bitcoin holdings. Discover how to maximize your earnings on one of the most reliable cryptocurrency exchange platforms, as well as how to earn interest on your cryptocurrency holdings and the various savings choices available.
Tata Group Dials Taiwan for Its Chipmaking Ambition in Gujarat’s DholeraAvirahi City Dholera
The Tata Group, a titan of Indian industry, is making waves with its advanced talks with Taiwanese chipmakers Powerchip Semiconductor Manufacturing Corporation (PSMC) and UMC Group. The goal? Establishing a cutting-edge semiconductor fabrication unit (fab) in Dholera, Gujarat. This isn’t just any project; it’s a potential game changer for India’s chipmaking aspirations and a boon for investors seeking promising residential projects in dholera sir.
Visit : https://www.avirahi.com/blog/tata-group-dials-taiwan-for-its-chipmaking-ambition-in-gujarats-dholera/
Taurus Zodiac Sign: Unveiling the Traits, Dates, and Horoscope Insights of th...my Pandit
Dive into the steadfast world of the Taurus Zodiac Sign. Discover the grounded, stable, and logical nature of Taurus individuals, and explore their key personality traits, important dates, and horoscope insights. Learn how the determination and patience of the Taurus sign make them the rock-steady achievers and anchors of the zodiac.
How to Implement a Real Estate CRM SoftwareSalesTown
To implement a CRM for real estate, set clear goals, choose a CRM with key real estate features, and customize it to your needs. Migrate your data, train your team, and use automation to save time. Monitor performance, ensure data security, and use the CRM to enhance marketing. Regularly check its effectiveness to improve your business.
Anny Serafina Love - Letter of Recommendation by Kellen Harkins, MS.AnnySerafinaLove
This letter, written by Kellen Harkins, Course Director at Full Sail University, commends Anny Love's exemplary performance in the Video Sharing Platforms class. It highlights her dedication, willingness to challenge herself, and exceptional skills in production, editing, and marketing across various video platforms like YouTube, TikTok, and Instagram.
Recruiting in the Digital Age: A Social Media MasterclassLuanWise
In this masterclass, presented at the Global HR Summit on 5th June 2024, Luan Wise explored the essential features of social media platforms that support talent acquisition, including LinkedIn, Facebook, Instagram, X (formerly Twitter) and TikTok.
3.0 Project 2_ Developing My Brand Identity Kit.pptxtanyjahb
A personal brand exploration presentation summarizes an individual's unique qualities and goals, covering strengths, values, passions, and target audience. It helps individuals understand what makes them stand out, their desired image, and how they aim to achieve it.
Structural Design Process: Step-by-Step Guide for BuildingsChandresh Chudasama
The structural design process is explained: Follow our step-by-step guide to understand building design intricacies and ensure structural integrity. Learn how to build wonderful buildings with the help of our detailed information. Learn how to create structures with durability and reliability and also gain insights on ways of managing structures.
3 Simple Steps To Buy Verified Payoneer Account In 2024SEOSMMEARTH
Buy Verified Payoneer Account: Quick and Secure Way to Receive Payments
Buy Verified Payoneer Account With 100% secure documents, [ USA, UK, CA ]. Are you looking for a reliable and safe way to receive payments online? Then you need buy verified Payoneer account ! Payoneer is a global payment platform that allows businesses and individuals to send and receive money in over 200 countries.
If You Want To More Information just Contact Now:
Skype: SEOSMMEARTH
Telegram: @seosmmearth
Gmail: seosmmearth@gmail.com
Building Your Employer Brand with Social MediaLuanWise
Presented at The Global HR Summit, 6th June 2024
In this keynote, Luan Wise will provide invaluable insights to elevate your employer brand on social media platforms including LinkedIn, Facebook, Instagram, X (formerly Twitter) and TikTok. You'll learn how compelling content can authentically showcase your company culture, values, and employee experiences to support your talent acquisition and retention objectives. Additionally, you'll understand the power of employee advocacy to amplify reach and engagement – helping to position your organization as an employer of choice in today's competitive talent landscape.
LA HUG - Video Testimonials with Chynna Morgan - June 2024Lital Barkan
Have you ever heard that user-generated content or video testimonials can take your brand to the next level? We will explore how you can effectively use video testimonials to leverage and boost your sales, content strategy, and increase your CRM data.🤯
We will dig deeper into:
1. How to capture video testimonials that convert from your audience 🎥
2. How to leverage your testimonials to boost your sales 💲
3. How you can capture more CRM data to understand your audience better through video testimonials. 📊
3. • 1. Steps we have taken in this project
• 2. How we design our improvement on
baseline controller
• 3. Design 1-5 for problem observed in baseline
controller
• 4. The reason why we didn’t use adaptive
controller
• 5. Overall outcome of our improvement
design
4. Steps we have taken in this project
• Observing the baseline controller’s problem in
different scenario .
• Thinking of ideas to improve the controller on
handling cargoes with higher efficiency.
• Doing countless experiments and observing
the outcomes whether they are positive or
negative .
5. How we design our improvement on
baseline controller
• We observed the baseline controller in
different scenarios and we noticed some
problems in the baseline controller . These
problems might lead to low efficiency in
delivering cargoes to stops in zone 1 and 2.
• So we thought of some ideas and tried to
implement it in customcontroller and
customcontrollerT2 to improve the baseline
controller for higher efficiency.
6. Design 1
• -Problem 1
• In baseline controller , the trucks waiting in
the terminal will only be delivered when their
loading size == their capacity or the tick
reached 400 n(where n =1,2,3,…) .Some trucks
may be sent away from the terminal even they
are only loaded with few or no cargoes .
• [picture of problem by running baseline
controller]
7. Design 1
• -Solution 1
• Therefore , for the tick smaller than 5000 , we set a waiting time
array for collecting the time the trucks stay in the terminal 1 and 2
for the controller to determine which trucks should go first .
• For the tick greater than 5000 , no waiting time array is needed
because no cargoes would be generated from terminal 1 , and
hence the cargoes in terminal loaded to trucks will be the last group
of cargoes.
• (the truck with longest waiting time most likely goes first)
• By doing countless experiment , we finally decided the waiting time
should be 200.
• -Outcome 1
• NO trucks with few cargoes or without any cargoes are sent away
from terminal 1 and 2 before tick >= 5000.
8. Design 2
• -Problem 2
• In baseline controller , we noticed that in the
scenario 5,many cargoes will be generated for
stop 6.So the trucks that are allocated in fixed
routes in baseline controller would greatly
increase the overall delivery time of cargoes.
• [picture of problem by running baseline
controller]
9. Design 2
• -Solution 2
• Find the stop with the greatest number of
cargoes waiting in the terminal 1 or 2 and
handle it by allocating more trucks if the
number of cargoes is rising very fast.
• -Outcome 2
• The overall delivery time is greatly reduced in
scenario 5.
10. Design 3
• -Problem 3
• In baseline controller , if there are more than one
trucks moving on the same route , the slower
trucks might slow down the faster trucks as the
faster trucks can’t overtake the slower trucks
ahead during delivering cargoes, and hence
would lower the delivering efficiency.
• [picture of problem by running baseline
controller]
11. Design 3
• -Solution 3
• If the number of cargoes for stop 4 is greater than the
capacity of slowest trucks waiting in the terminal 1,the
cargoes will be loaded to the slowest trucks
immediately.
• By doing countless experiment , we got the result of
using slower trucks to deliver cargoes with the number
greater than 240[which is the capacity of slowest truck]
is the most efficient way.
• -Outcome 3
• Fewer trucks are slowed by the slower trucks leading
ahead in the same route.
12. Design 4
• -Problem 4
• In baseline controller , ToT2Cargoes
sometimes might be loaded to trucks that are
set to route 2 and get returned since those
trucks can’t go to T2 by using the route 2.
• [picture of problem by running baseline
controller]
13. Design 4
• -Solution 4
• ToT2cargoes waiting in T1 will be loaded to
the trucks that was set to route 0 or 1.
• -Outcome 4
• It increases the efficiency of delivering cargoes
as no space will be wasted for loading
ToT2cargoes to trucks that were set to route 2
14. Design 5
• -Problem 5
• In baseline controller , no trucks are reserved
for fast delivery to terminal 2 . This problem
increases the overall delivery time of trucks as
the trucks in terminal 2 are left idle and might
go after the tick == 400 n (where n
=1,2,3,…)even with few cargoes or no cargoes.
• [picture of problem by running baseline
controller]
15. Design 5
• -Solution 5
• We set the controller always reserve fastest
idling trucks in the terminal 1 to deliver the
cargoes for the ToT2cargoes .
• -Outcome 5
• Fewer trucks in terminal 2 will be sent with
few or no cargoes .
16. Extra design
• Terminal 1
• We created handleS4Cargoes and anotherstop
class in terminal 1 for (some reasons)
• Terminal 2
• We created (new classes) in terminal 2 for
(some reasons)
17. Why we didn’t use adaptive controller
• After discussion , we decided not to utilize the
adaptive controller method as we thought
having a very general solution for custom
controller to control the trucks is already
enough . (Reason why multiple controllers
should not be used)
18. Result
• The controller we designed does improve the
outcome . By running “My simulation.java” we
got score for scenario 1,2,3,4,5 as below
respectively:
• And we got the final grand score:
19. To be added later
• Detailed pictures for easy understanding of
audience