DISCUSSION ON BRIDGE
DESIGN REVIEW
AMIT KUMAR VARMA
SUPERSTRUCTURE
HYDROLOGICAL AND GEOTECHNICAL
HYDROLOGICAL
1) DISCHARGE (THUMB RULE, CATCHMENT VERIFICATION) AND INCREMENT
AS PER CATCHMENT AREA.
2) CONSTRICTED LINEAR WATERWAY.
3) FREEBOARD: CONSIDERED IN THE NEW HY DROLOGICAL GUIDELINE
4) MEAN PARTICLE SIZE (FROM GEOTECHNICAL REPORT).
GEOTECHNICAL
1) MEAN PARTICLE SIZE (EITHER CALCULATED AS IRC 5:2015 OR D50 OR
GEOTECHNICAL ER. JUDGEMENT WITH VALID REASON).
2) BEARING CAPACITY (WITH CONSIDERATION OF SCOUR LEVEL)
3) LIQUEFACTION OR ARTESIAN
4) LAB REPORTS
HYDROLOGICAL AND GEOTECHNICAL
HORIZONTAL PILE CAPACITY/DEFLECTION
1) SOIL MODULUS OR SOIL STIFFNESS, KH (TABLE 3 IS 2911) BASED ON SPT
VALUE. AND STIFFNESS FACTOR, T (SAND/NORMALLY LOADED CLAYS) =
(EL/KH)1/5
2) PILE LENGTH IN SCOUR ZONE, L1. AND THEN L1/T AND THEN LF/T AS PER
FIGURE 4 OF IS 2911.
3) DEPTH OF FIXITY, LF
HORIZONTAL PILE CAPACITY/DEFLECTION
10) CONFINEMENT REBAR
LENGTH = 3 TIMES THE
DIAMETER OF PILE
4) FIXED HEAD PILE: STATIC HORIZONTAL
LOAD CAPACITY = 12EIY/(L1+LF)3 ;
WHERE Y IS THE PERMISSIBLE
DEFLECTION = 1% OF PILE DIA.
5) LENGTH OF EQUIVALENT CANTILEVER =
L1+LF
6) HORIZONTAL LOAD ON PILE = TOTAL
HORIZONTAL LOAD/NOS. OF PILE
7) FIXED END MOMENT IN PILE =
H*(L1+LF)/2
8) PERMANENT STEEL LINER AS PER CODE.
9) CURTAILMENT OF REBAR IN PILE:
DEPTH OF FIXITY (OR LENGTH OF
EQUIVALENT CANTILEVER) +
DEVELOPMENT LENGTH (X 1 OR X 2)
LOAD
VERIFICATION:
REBAR
DETAILING
(ABUTMENT):
REBAR DETAILING:
CONFINEMENT REBAR
(PIER):
MIN. : 16MM DIA. REBAR @
100 C/C AT BOTTOM AND
16MM @ 150 C/C AT OTHER
PLACE
PILE:
10-12MM @ 80-100MM C/C
BEARING STOPPER:
18% OF VERTICAL LOAD
SHOULD BE CONSIDERED.
20-25MM DIA. REBAR @
100-150 MM C/C
PIER/PILE
PIER
CURTAILMENT OF REBAR:
CHAPTER: 17 OF IRC 112
WHERE LONGITUDINAL REINFORCEMENT IS
CURTAILED POTENTIAL OF FORMATION OF
HINGE SHALL BE AVOIDED JUST BEYOND
THE POINT OF CURTAILMENT. NOT MORE
THAN 1/3 OF LONGITUDINAL
REINFORCEMENT AVAILABLE AT THE
SECTION SHALL BE CURTAILED.

More Related Content

Similar to Presentation draft related to design.pptx

4th athenian lecture
4th athenian lecture4th athenian lecture
4th athenian lecture
gefyra-rion
 
Int. J. Min. & Geo-Eng.
Int. J. Min. & Geo-Eng.Int. J. Min. & Geo-Eng.
Int. J. Min. & Geo-Eng.
majid taromi
 
GROUP_6_YOUNGMAN_L_ANNEX_15-16
GROUP_6_YOUNGMAN_L_ANNEX_15-16GROUP_6_YOUNGMAN_L_ANNEX_15-16
GROUP_6_YOUNGMAN_L_ANNEX_15-16
Leo Youngman
 
Propiedades de un reservorio de gas con hidratos
Propiedades de un reservorio de gas con hidratosPropiedades de un reservorio de gas con hidratos
Propiedades de un reservorio de gas con hidratos
George Jim
 
Scottish Government Guardbridge Geothermal Feasibility Report - March 2016
Scottish Government Guardbridge Geothermal Feasibility Report - March 2016Scottish Government Guardbridge Geothermal Feasibility Report - March 2016
Scottish Government Guardbridge Geothermal Feasibility Report - March 2016
Lucy McKay
 
Curtin University Department of Petroleum Engineering .docx
Curtin University Department of Petroleum Engineering  .docxCurtin University Department of Petroleum Engineering  .docx
Curtin University Department of Petroleum Engineering .docx
faithxdunce63732
 
Factors affecting def and asr in the concrete dam at vrané nad vltavou
Factors affecting def and asr in the concrete dam at vrané nad vltavouFactors affecting def and asr in the concrete dam at vrané nad vltavou
Factors affecting def and asr in the concrete dam at vrané nad vltavou
eSAT Publishing House
 
The Role of Geotechnical Site Investigations of Lekki Toll Road Infrastructur...
The Role of Geotechnical Site Investigations of Lekki Toll Road Infrastructur...The Role of Geotechnical Site Investigations of Lekki Toll Road Infrastructur...
The Role of Geotechnical Site Investigations of Lekki Toll Road Infrastructur...
Christian Olele
 

Similar to Presentation draft related to design.pptx (20)

A STUDY ON THE SEISMIC RESPONSE OF ELEVATED WATER TANK
A STUDY ON THE SEISMIC RESPONSE OF ELEVATED WATER TANKA STUDY ON THE SEISMIC RESPONSE OF ELEVATED WATER TANK
A STUDY ON THE SEISMIC RESPONSE OF ELEVATED WATER TANK
 
4th athenian lecture
4th athenian lecture4th athenian lecture
4th athenian lecture
 
Int. J. Min. & Geo-Eng.
Int. J. Min. & Geo-Eng.Int. J. Min. & Geo-Eng.
Int. J. Min. & Geo-Eng.
 
H0372040043
H0372040043H0372040043
H0372040043
 
design specification and problems of kuraz irrigation scheme
 design specification and problems  of kuraz irrigation scheme design specification and problems  of kuraz irrigation scheme
design specification and problems of kuraz irrigation scheme
 
TGS GPS- Post Well Analysis - Barents Sea
TGS GPS- Post Well Analysis - Barents SeaTGS GPS- Post Well Analysis - Barents Sea
TGS GPS- Post Well Analysis - Barents Sea
 
Implementation of a Finite Element Model to Generate Synthetic data for Open ...
Implementation of a Finite Element Model to Generate Synthetic data for Open ...Implementation of a Finite Element Model to Generate Synthetic data for Open ...
Implementation of a Finite Element Model to Generate Synthetic data for Open ...
 
Aoc sediment update_part2
Aoc sediment update_part2Aoc sediment update_part2
Aoc sediment update_part2
 
Hydrocarbon Trapping mechanism and petrophysical analysis of Afam field, offs...
Hydrocarbon Trapping mechanism and petrophysical analysis of Afam field, offs...Hydrocarbon Trapping mechanism and petrophysical analysis of Afam field, offs...
Hydrocarbon Trapping mechanism and petrophysical analysis of Afam field, offs...
 
GROUP_6_YOUNGMAN_L_ANNEX_15-16
GROUP_6_YOUNGMAN_L_ANNEX_15-16GROUP_6_YOUNGMAN_L_ANNEX_15-16
GROUP_6_YOUNGMAN_L_ANNEX_15-16
 
Propiedades de un reservorio de gas con hidratos
Propiedades de un reservorio de gas con hidratosPropiedades de un reservorio de gas con hidratos
Propiedades de un reservorio de gas con hidratos
 
CL:AIRE Technical Bulletin TB4
CL:AIRE Technical Bulletin TB4CL:AIRE Technical Bulletin TB4
CL:AIRE Technical Bulletin TB4
 
Scottish Government Guardbridge Geothermal Feasibility Report - March 2016
Scottish Government Guardbridge Geothermal Feasibility Report - March 2016Scottish Government Guardbridge Geothermal Feasibility Report - March 2016
Scottish Government Guardbridge Geothermal Feasibility Report - March 2016
 
Curtin University Department of Petroleum Engineering .docx
Curtin University Department of Petroleum Engineering  .docxCurtin University Department of Petroleum Engineering  .docx
Curtin University Department of Petroleum Engineering .docx
 
subsurface[1].pptx
subsurface[1].pptxsubsurface[1].pptx
subsurface[1].pptx
 
16 Aug-2013 - Ary van der Lely - A stratigraphic model of the MIA
16 Aug-2013 - Ary van der Lely - A stratigraphic model of the MIA16 Aug-2013 - Ary van der Lely - A stratigraphic model of the MIA
16 Aug-2013 - Ary van der Lely - A stratigraphic model of the MIA
 
Factors affecting def and asr in the concrete dam at vrané nad vltavou
Factors affecting def and asr in the concrete dam at vrané nad vltavouFactors affecting def and asr in the concrete dam at vrané nad vltavou
Factors affecting def and asr in the concrete dam at vrané nad vltavou
 
The Role of Geotechnical Site Investigations of Lekki Toll Road Infrastructur...
The Role of Geotechnical Site Investigations of Lekki Toll Road Infrastructur...The Role of Geotechnical Site Investigations of Lekki Toll Road Infrastructur...
The Role of Geotechnical Site Investigations of Lekki Toll Road Infrastructur...
 
TGS GPS- Barents Sea Post Well Analysis 2014
TGS GPS- Barents Sea Post Well Analysis 2014TGS GPS- Barents Sea Post Well Analysis 2014
TGS GPS- Barents Sea Post Well Analysis 2014
 
putnam engineering geophysics 2007
putnam engineering geophysics 2007putnam engineering geophysics 2007
putnam engineering geophysics 2007
 

Recently uploaded

ALCOHOL PRODUCTION- Beer Brewing Process.pdf
ALCOHOL PRODUCTION- Beer Brewing Process.pdfALCOHOL PRODUCTION- Beer Brewing Process.pdf
ALCOHOL PRODUCTION- Beer Brewing Process.pdf
Madan Karki
 
Complex plane, Modulus, Argument, Graphical representation of a complex numbe...
Complex plane, Modulus, Argument, Graphical representation of a complex numbe...Complex plane, Modulus, Argument, Graphical representation of a complex numbe...
Complex plane, Modulus, Argument, Graphical representation of a complex numbe...
MohammadAliNayeem
 

Recently uploaded (20)

Lab Manual Arduino UNO Microcontrollar.docx
Lab Manual Arduino UNO Microcontrollar.docxLab Manual Arduino UNO Microcontrollar.docx
Lab Manual Arduino UNO Microcontrollar.docx
 
Fabrication Of Automatic Star Delta Starter Using Relay And GSM Module By Utk...
Fabrication Of Automatic Star Delta Starter Using Relay And GSM Module By Utk...Fabrication Of Automatic Star Delta Starter Using Relay And GSM Module By Utk...
Fabrication Of Automatic Star Delta Starter Using Relay And GSM Module By Utk...
 
5G and 6G refer to generations of mobile network technology, each representin...
5G and 6G refer to generations of mobile network technology, each representin...5G and 6G refer to generations of mobile network technology, each representin...
5G and 6G refer to generations of mobile network technology, each representin...
 
Theory for How to calculation capacitor bank
Theory for How to calculation capacitor bankTheory for How to calculation capacitor bank
Theory for How to calculation capacitor bank
 
EMPLOYEE MANAGEMENT SYSTEM FINAL presentation
EMPLOYEE MANAGEMENT SYSTEM FINAL presentationEMPLOYEE MANAGEMENT SYSTEM FINAL presentation
EMPLOYEE MANAGEMENT SYSTEM FINAL presentation
 
Software Engineering - Modelling Concepts + Class Modelling + Building the An...
Software Engineering - Modelling Concepts + Class Modelling + Building the An...Software Engineering - Modelling Concepts + Class Modelling + Building the An...
Software Engineering - Modelling Concepts + Class Modelling + Building the An...
 
ChatGPT Prompt Engineering for project managers.pdf
ChatGPT Prompt Engineering for project managers.pdfChatGPT Prompt Engineering for project managers.pdf
ChatGPT Prompt Engineering for project managers.pdf
 
Research Methodolgy & Intellectual Property Rights Series 1
Research Methodolgy & Intellectual Property Rights Series 1Research Methodolgy & Intellectual Property Rights Series 1
Research Methodolgy & Intellectual Property Rights Series 1
 
Lesson no16 application of Induction Generator in Wind.ppsx
Lesson no16 application of Induction Generator in Wind.ppsxLesson no16 application of Induction Generator in Wind.ppsx
Lesson no16 application of Induction Generator in Wind.ppsx
 
"United Nations Park" Site Visit Report.
"United Nations Park" Site  Visit Report."United Nations Park" Site  Visit Report.
"United Nations Park" Site Visit Report.
 
Seismic Hazard Assessment Software in Python by Prof. Dr. Costas Sachpazis
Seismic Hazard Assessment Software in Python by Prof. Dr. Costas SachpazisSeismic Hazard Assessment Software in Python by Prof. Dr. Costas Sachpazis
Seismic Hazard Assessment Software in Python by Prof. Dr. Costas Sachpazis
 
Piping and instrumentation diagram p.pdf
Piping and instrumentation diagram p.pdfPiping and instrumentation diagram p.pdf
Piping and instrumentation diagram p.pdf
 
ALCOHOL PRODUCTION- Beer Brewing Process.pdf
ALCOHOL PRODUCTION- Beer Brewing Process.pdfALCOHOL PRODUCTION- Beer Brewing Process.pdf
ALCOHOL PRODUCTION- Beer Brewing Process.pdf
 
Diploma Engineering Drawing Qp-2024 Ece .pdf
Diploma Engineering Drawing Qp-2024 Ece .pdfDiploma Engineering Drawing Qp-2024 Ece .pdf
Diploma Engineering Drawing Qp-2024 Ece .pdf
 
SLIDESHARE PPT-DECISION MAKING METHODS.pptx
SLIDESHARE PPT-DECISION MAKING METHODS.pptxSLIDESHARE PPT-DECISION MAKING METHODS.pptx
SLIDESHARE PPT-DECISION MAKING METHODS.pptx
 
RM&IPR M5 notes.pdfResearch Methodolgy & Intellectual Property Rights Series 5
RM&IPR M5 notes.pdfResearch Methodolgy & Intellectual Property Rights Series 5RM&IPR M5 notes.pdfResearch Methodolgy & Intellectual Property Rights Series 5
RM&IPR M5 notes.pdfResearch Methodolgy & Intellectual Property Rights Series 5
 
Linux Systems Programming: Semaphores, Shared Memory, and Message Queues
Linux Systems Programming: Semaphores, Shared Memory, and Message QueuesLinux Systems Programming: Semaphores, Shared Memory, and Message Queues
Linux Systems Programming: Semaphores, Shared Memory, and Message Queues
 
15-Minute City: A Completely New Horizon
15-Minute City: A Completely New Horizon15-Minute City: A Completely New Horizon
15-Minute City: A Completely New Horizon
 
Complex plane, Modulus, Argument, Graphical representation of a complex numbe...
Complex plane, Modulus, Argument, Graphical representation of a complex numbe...Complex plane, Modulus, Argument, Graphical representation of a complex numbe...
Complex plane, Modulus, Argument, Graphical representation of a complex numbe...
 
Introduction to Heat Exchangers: Principle, Types and Applications
Introduction to Heat Exchangers: Principle, Types and ApplicationsIntroduction to Heat Exchangers: Principle, Types and Applications
Introduction to Heat Exchangers: Principle, Types and Applications
 

Presentation draft related to design.pptx

  • 1. DISCUSSION ON BRIDGE DESIGN REVIEW AMIT KUMAR VARMA
  • 3. HYDROLOGICAL AND GEOTECHNICAL HYDROLOGICAL 1) DISCHARGE (THUMB RULE, CATCHMENT VERIFICATION) AND INCREMENT AS PER CATCHMENT AREA. 2) CONSTRICTED LINEAR WATERWAY. 3) FREEBOARD: CONSIDERED IN THE NEW HY DROLOGICAL GUIDELINE 4) MEAN PARTICLE SIZE (FROM GEOTECHNICAL REPORT). GEOTECHNICAL 1) MEAN PARTICLE SIZE (EITHER CALCULATED AS IRC 5:2015 OR D50 OR GEOTECHNICAL ER. JUDGEMENT WITH VALID REASON). 2) BEARING CAPACITY (WITH CONSIDERATION OF SCOUR LEVEL) 3) LIQUEFACTION OR ARTESIAN 4) LAB REPORTS
  • 5. HORIZONTAL PILE CAPACITY/DEFLECTION 1) SOIL MODULUS OR SOIL STIFFNESS, KH (TABLE 3 IS 2911) BASED ON SPT VALUE. AND STIFFNESS FACTOR, T (SAND/NORMALLY LOADED CLAYS) = (EL/KH)1/5 2) PILE LENGTH IN SCOUR ZONE, L1. AND THEN L1/T AND THEN LF/T AS PER FIGURE 4 OF IS 2911. 3) DEPTH OF FIXITY, LF
  • 6. HORIZONTAL PILE CAPACITY/DEFLECTION 10) CONFINEMENT REBAR LENGTH = 3 TIMES THE DIAMETER OF PILE 4) FIXED HEAD PILE: STATIC HORIZONTAL LOAD CAPACITY = 12EIY/(L1+LF)3 ; WHERE Y IS THE PERMISSIBLE DEFLECTION = 1% OF PILE DIA. 5) LENGTH OF EQUIVALENT CANTILEVER = L1+LF 6) HORIZONTAL LOAD ON PILE = TOTAL HORIZONTAL LOAD/NOS. OF PILE 7) FIXED END MOMENT IN PILE = H*(L1+LF)/2 8) PERMANENT STEEL LINER AS PER CODE. 9) CURTAILMENT OF REBAR IN PILE: DEPTH OF FIXITY (OR LENGTH OF EQUIVALENT CANTILEVER) + DEVELOPMENT LENGTH (X 1 OR X 2)
  • 9. REBAR DETAILING: CONFINEMENT REBAR (PIER): MIN. : 16MM DIA. REBAR @ 100 C/C AT BOTTOM AND 16MM @ 150 C/C AT OTHER PLACE PILE: 10-12MM @ 80-100MM C/C BEARING STOPPER: 18% OF VERTICAL LOAD SHOULD BE CONSIDERED. 20-25MM DIA. REBAR @ 100-150 MM C/C
  • 11. PIER CURTAILMENT OF REBAR: CHAPTER: 17 OF IRC 112 WHERE LONGITUDINAL REINFORCEMENT IS CURTAILED POTENTIAL OF FORMATION OF HINGE SHALL BE AVOIDED JUST BEYOND THE POINT OF CURTAILMENT. NOT MORE THAN 1/3 OF LONGITUDINAL REINFORCEMENT AVAILABLE AT THE SECTION SHALL BE CURTAILED.