SlideShare a Scribd company logo
PROCESS FOR DOMESTIC WASTE TREATMENT
THREE VERSIONS OF TRANSFORMATION.
1 ° ELECTRIC ENERGY & FERTILIZER
2 ° 100% DEDICATED ELECTRIC POWER
3 ° POWER PLUS RENEWABLE RDF FUELS
MANDATORY ENVIRONMENTAL PARAMETERS
- Quantity of waste to be treated (waste characterization)
- Presence of towns and villages within 40 km
- Presence of several areas of quarry
- Extraction of lime or limestone
- Existence of an organized collection
COMPARISON OF CURRENT TECHNIQUES
- Incineration via plasma arc (cost and maintenance)
- Biogas (performance, cost and maintenance, inertia)
- A more technical approach without generating pollution
- Our technology is centered around generating producer synthesis gas
- Recovering 90% in the treatment of waste pollution is simplified, without
process reactivity 3 hours (without inertia) smokeless, odorless and
sanitized.
- All non-recyclable waste is approximately 10% (mostly inorganic ash with
recoverable metals and REEs)
THE CONTEXT OF OUR PROJECT
the waste treatment to date
TREATMENT & PROCESSING TO DATE
- Consulting Work
- Recycling improvements for urban centers
- Sourcing appropriate equipment (trucks, bins ...)
- Assembly of on-site manual screening systems
- Capacity development for new urban collection points
THE CONTEXT OF OUR PROJECT
- Organization of national collection and treatment
- Identify and deploy collection systems used
- Waste treated in landfill (another type to validate)
- Develop enhanced recycling and recovery
Diversified view of waste streams
Review of containers currently in use
Updating of the service trucks
Transportation of waste to landfill
Mechanical methods of landfill
Screening and preparation of MSW
ACTUAL MAINSTREAM SITUATION
COMPACTION
Is not a sustainable solution
For the 21st century
CURRENT INCONVENIENCES
- Visual pollution, odor, impact on groundwater ...
- This new design improves comfort and regional
ecological health, economic and social prosperity.
TECHNICAL PROPOSAL
Easing of access to containers
Collection performed by a single operator
Manual and mechanical separation
Compacting recyclable materials
Production of fertilizer
Production of synthesis gas
Harvesting of landfill gas
Production of fuels and chemicals
Electricity generation
TECHNICAL EXPERTISE
- Annual capacity starting at 60,000 tons / year
working two shifts of eight hours
- 50% Organic Waste Composition
- Inorganic waste processing capacity.
- Direct employment 80 (factory 400 T / day in 2 x 8 H)
TYPICAL INTEGRATED BIOREFINERY
- Start-up capacity of 60 000 tons of unsorted waste per year gross
- Renewable fuels refining and power generation at 350 days per year
- No direct incineration of waste
- Autonomy energy (including renewable)
- Capable of processing unit 160 t / d requires 4 hectares of
land, a building area of 8,000 m², including storage, screening
processing, access and range of motion
- Including RDF operation will require additional 6 hectares of land.
FERTILIZER SOLUTION # 1:
TRANSFORMATION OF ENERGY IN
WET ORGANIC WASTE THROUGH
A.D. AND COMPOSTING
- Minimum electricity (surplus production capacity of 200 kW) from first
AD organic waste dome.
- Fertilizers (annual output 20,000 T per year or 160T / d)
95% to agriculture.
- Selection of materials (plastics, metals, ferrous and non-ferrous metals,
glass, PVC, PET ...) prior to organic processing.
- Optional additional opportunity to increase raw material
- Secondary site processes cellulosic feedstocks for solid and liquid fuels.
BENEFITS ASSOCIATED WITH
WASTE RECOVERY of ECO (FERTILIZER)
- Granules (ease of application) organic fertilizer.
- Stabilizes soil pH organo-calcium and anti-acid
- Content of heavy metals PPM 130 (European standard PPM 4000)
- 2 T = 1T containing urea fertilizer + 3% of fertilizer
(nitrogen, phosphorus, potassium)
- Less susceptible to runoff and infiltration
(bacterial microflora improved)
SOLUTION # 2:
DEDICATED ELECTRICITY GENERATION
- Energy production 5mW derived from syn-gas gen-sets
- 24 hours 350 days a year annual production of 42,000 MWh / year
- Sorting materials
(plastic, ferrous and non-ferrous metals, glass, PVC, PET ...)
- Optional additional opportunity to increase raw material
secondary site (plastics, greases, rubber, sludge ...)
OPTIONS
- Selective recovery of plastics (25 tons per day)
- PE, HDPE, PVC and PET ...
- Recovery of hospital waste
- Recovery of dried sludge and trap greases for fuels vs landfiling
- Harvesting available biogas for additional power generation
- Gas recovery for trucking operations
HOSPITAL WASTE TREATMENT
SOLUTIONS
- Capacity between 375 kg and
250 kg / 40 min
- The waste materials can be
normally processed
waste or CET
BENEFITS INCLUDED
- General study and details of the process parameter options
- Plans finalized according to local codes
- Supply, delivery, installation and commissioning of equipment within
the first month of contract signing
- Buildings and infrastructure attachment / construction
- Utilities (electricity, lighting ...)
- Training of personnel for operation and maintenance
- Room for intervention of process and sale for end products
- Provide handling equipment
(bucket loaders, backhoe clips ...)
- Customs Procedures
- Administrative Monitoring Project
- Project architecture or infrastructure
- Resource dedication
- Providing project land grants
CUSTOMERS ARE NOT OBLIGATED TO:
EIGHT YEARS PRACTICAL EXPERIENCE IN
FRENCH WTE &RDF PROJECTS
PRINCIPAL EQUIPMENT
- Screen Opener bags (no drilling)
- Split screen and cabin screening
- Various phase separation and baling
- Bio digester suited for wet garbage
- Onsite power generation and rCNG for city waste recovery
- Two cabins composting
- Utilities (electricity LV / HV, lighting, supervision ...
- Producer gas generation systems for liquid fuels production
TIMETABLE FOR IMPLEMENTATION
- Feasibility study: three months
- Job creation: ten months
- Reception provisionally: ten months
- Final acceptance: twelve months
- Execution of contracts and commercial
funding (from the signing of the partnership
PPP or public-private partnership with DSP State
guarantee for Africa and 10 years for the purchase
of fertilizer and energy)
ESTIMATED PROJECT INVESTMENT
Average cost of building the facilities
- Solution # 1: Energy Fertilizer between € 25 million and € 30 million
on a project basis, including various options.
- Solution # 2: Energy between € 30 million and € 37 million
on a project basis, including various options.
- Solution # 3: Renewable fuels from recoverable hydrocarbons and
cellulose between € 25 million and € 175 million
- Investors public, private or mixed
- In case of inability to finance
We have in-house finance available and we can invest subject to
obtaining guarantees for feedstocks and off-take agreements
- Example
A 10-year purchase agreement for fertilizer or energy, solid or liquid
fuels produced by the plant
Exclusive supply 400 tons of waste per day and 350 days / year.
INVESTING WORLDWIDE
OUR ENVIRONMENTAL STEWARDSHIP
- Project management for landfill waste reduction, waste recycling
- Construction Process for exothermal landfill gas recovery.
- Treatment of flue gas to European incinerators standardization
(can include waste gas recovery for algae growth}
- Treatment of metals and plastics
- Water treatment (network design, treatment)
EXAMPLE OF PROJECT FINANCING
- Norges bank available asset or lender leader
- Buyer Municipal Authority in partnership with Fernando HC Reis
- Warranty or condition of the central bank of Norway
- Amount of the loan (Mr Reis, principal) up to 100%
- Payback period of 10 years based on longterm investment plan
- Interest rate 4.5%
- After 10 years the possibility to restructure ownership of the plant
Presentation 60,000 tpy of msw   english (4)

More Related Content

What's hot

Solid waste plant
Solid waste plantSolid waste plant
Solid waste plant
Manu Dixit
 
Techonology as the key to future. Adriana Orejas_Repsol
Techonology as the key to future. Adriana Orejas_RepsolTechonology as the key to future. Adriana Orejas_Repsol
Techonology as the key to future. Adriana Orejas_Repsol
Funseam - Fundación para la Sostenibilidad Energética y Ambiental
 
Waste to energy
Waste to energyWaste to energy
Waste to energy
HarithaMNair
 
Rmu710 b 1-conformite_environnementale_en
Rmu710 b 1-conformite_environnementale_enRmu710 b 1-conformite_environnementale_en
Rmu710 b 1-conformite_environnementale_en
e-genieclimatique
 
Ciclo Conferencias "Hacia una Economía Circular" Ladeja Godina Kosir
Ciclo Conferencias "Hacia una Economía Circular" Ladeja Godina KosirCiclo Conferencias "Hacia una Economía Circular" Ladeja Godina Kosir
Ciclo Conferencias "Hacia una Economía Circular" Ladeja Godina Kosir
Funseam - Fundación para la Sostenibilidad Energética y Ambiental
 
Bor bio kozomin eng
Bor bio kozomin engBor bio kozomin eng
Bor bio kozomin eng
PremyslK
 
Best practice projects and future challenges in biogas production - Frank Stumpf
Best practice projects and future challenges in biogas production - Frank StumpfBest practice projects and future challenges in biogas production - Frank Stumpf
Best practice projects and future challenges in biogas production - Frank Stumpf
EBAconference
 
Brochure gasification plant eng
Brochure gasification plant engBrochure gasification plant eng
Brochure gasification plant eng
Martina Andreoni
 
Added value biomass chains for energy and biobased products
Added value biomass chains for energy and biobased productsAdded value biomass chains for energy and biobased products
Added value biomass chains for energy and biobased products
Oleksandra Tryboi
 
Utilization of substrates from landscape conservation - Dipl.Ing. Sven Schick...
Utilization of substrates from landscape conservation - Dipl.Ing. Sven Schick...Utilization of substrates from landscape conservation - Dipl.Ing. Sven Schick...
Utilization of substrates from landscape conservation - Dipl.Ing. Sven Schick...
EBAconference
 
Briquetting 1
Briquetting 1Briquetting 1
Briquetting 1
Rajesh Chaudary A
 
Crimea Waste Management (Benehi)
Crimea Waste Management (Benehi)Crimea Waste Management (Benehi)
Crimea Waste Management (Benehi)
blackseaforum
 
7 guiyang sustainable development process by mr. wang baojian
7 guiyang sustainable development process by mr. wang baojian7 guiyang sustainable development process by mr. wang baojian
7 guiyang sustainable development process by mr. wang baojian
Global Infrastructure Basel Foundation
 
SLOPE 3rd workshop - presentation 4
SLOPE 3rd workshop - presentation 4SLOPE 3rd workshop - presentation 4
SLOPE 3rd workshop - presentation 4
SLOPE Project
 
3. roland streng
3. roland streng3. roland streng
3. roland streng
Plastindustrien
 
Prospects of sustainable feedstock production for advanced biofuels. Hans van...
Prospects of sustainable feedstock production for advanced biofuels. Hans van...Prospects of sustainable feedstock production for advanced biofuels. Hans van...
Prospects of sustainable feedstock production for advanced biofuels. Hans van...
Oleksandra Tryboi
 
Avi waste management solutions tripoli1
Avi waste management solutions   tripoli1Avi waste management solutions   tripoli1
Avi waste management solutions tripoli1
Howard Barmil
 

What's hot (17)

Solid waste plant
Solid waste plantSolid waste plant
Solid waste plant
 
Techonology as the key to future. Adriana Orejas_Repsol
Techonology as the key to future. Adriana Orejas_RepsolTechonology as the key to future. Adriana Orejas_Repsol
Techonology as the key to future. Adriana Orejas_Repsol
 
Waste to energy
Waste to energyWaste to energy
Waste to energy
 
Rmu710 b 1-conformite_environnementale_en
Rmu710 b 1-conformite_environnementale_enRmu710 b 1-conformite_environnementale_en
Rmu710 b 1-conformite_environnementale_en
 
Ciclo Conferencias "Hacia una Economía Circular" Ladeja Godina Kosir
Ciclo Conferencias "Hacia una Economía Circular" Ladeja Godina KosirCiclo Conferencias "Hacia una Economía Circular" Ladeja Godina Kosir
Ciclo Conferencias "Hacia una Economía Circular" Ladeja Godina Kosir
 
Bor bio kozomin eng
Bor bio kozomin engBor bio kozomin eng
Bor bio kozomin eng
 
Best practice projects and future challenges in biogas production - Frank Stumpf
Best practice projects and future challenges in biogas production - Frank StumpfBest practice projects and future challenges in biogas production - Frank Stumpf
Best practice projects and future challenges in biogas production - Frank Stumpf
 
Brochure gasification plant eng
Brochure gasification plant engBrochure gasification plant eng
Brochure gasification plant eng
 
Added value biomass chains for energy and biobased products
Added value biomass chains for energy and biobased productsAdded value biomass chains for energy and biobased products
Added value biomass chains for energy and biobased products
 
Utilization of substrates from landscape conservation - Dipl.Ing. Sven Schick...
Utilization of substrates from landscape conservation - Dipl.Ing. Sven Schick...Utilization of substrates from landscape conservation - Dipl.Ing. Sven Schick...
Utilization of substrates from landscape conservation - Dipl.Ing. Sven Schick...
 
Briquetting 1
Briquetting 1Briquetting 1
Briquetting 1
 
Crimea Waste Management (Benehi)
Crimea Waste Management (Benehi)Crimea Waste Management (Benehi)
Crimea Waste Management (Benehi)
 
7 guiyang sustainable development process by mr. wang baojian
7 guiyang sustainable development process by mr. wang baojian7 guiyang sustainable development process by mr. wang baojian
7 guiyang sustainable development process by mr. wang baojian
 
SLOPE 3rd workshop - presentation 4
SLOPE 3rd workshop - presentation 4SLOPE 3rd workshop - presentation 4
SLOPE 3rd workshop - presentation 4
 
3. roland streng
3. roland streng3. roland streng
3. roland streng
 
Prospects of sustainable feedstock production for advanced biofuels. Hans van...
Prospects of sustainable feedstock production for advanced biofuels. Hans van...Prospects of sustainable feedstock production for advanced biofuels. Hans van...
Prospects of sustainable feedstock production for advanced biofuels. Hans van...
 
Avi waste management solutions tripoli1
Avi waste management solutions   tripoli1Avi waste management solutions   tripoli1
Avi waste management solutions tripoli1
 

Viewers also liked

9 Tips to Visually Make Your Facebook Content Rock
9 Tips to Visually Make Your Facebook Content Rock9 Tips to Visually Make Your Facebook Content Rock
9 Tips to Visually Make Your Facebook Content Rock
Celeste Kirby-Brown
 
Municipal solid waste to power
Municipal solid waste to powerMunicipal solid waste to power
Municipal solid waste to power
Atef Gresat
 
Stix cms general overview_2012
Stix cms general overview_2012Stix cms general overview_2012
Stix cms general overview_2012
John Mirabitas
 
Plutselig død unge idrettsutøvere akutt med 16102013
Plutselig død unge idrettsutøvere akutt med 16102013Plutselig død unge idrettsutøvere akutt med 16102013
Plutselig død unge idrettsutøvere akutt med 16102013Jon Lyder
 
Urbis Project - La presentazione 2013
Urbis Project - La presentazione 2013Urbis Project - La presentazione 2013
Urbis Project - La presentazione 2013
Gianluca Copparoni
 
Gaphic design trends 2014 Kuala Lumpur Malaysia iconnect360
Gaphic design trends 2014 Kuala Lumpur Malaysia iconnect360Gaphic design trends 2014 Kuala Lumpur Malaysia iconnect360
Gaphic design trends 2014 Kuala Lumpur Malaysia iconnect360
Celeste Kirby-Brown
 
Presentation
PresentationPresentation
Presentation
Atef Gresat
 
Viral Marketing: The OMFG Factor in Content Creation in Kuala Lumpur
Viral Marketing: The OMFG Factor in Content Creation in Kuala LumpurViral Marketing: The OMFG Factor in Content Creation in Kuala Lumpur
Viral Marketing: The OMFG Factor in Content Creation in Kuala Lumpur
Celeste Kirby-Brown
 
Usaid innovation question
Usaid innovation questionUsaid innovation question
Usaid innovation question
Atef Gresat
 
iconnect360 software user interface redesign
iconnect360 software user interface redesigniconnect360 software user interface redesign
iconnect360 software user interface redesign
Celeste Kirby-Brown
 
Awo biorefinery pto pilot
Awo biorefinery pto pilotAwo biorefinery pto pilot
Awo biorefinery pto pilot
Atef Gresat
 
Flat Design Trends 2014 Kuala Lumpur Malaysia
Flat Design Trends 2014 Kuala Lumpur Malaysia Flat Design Trends 2014 Kuala Lumpur Malaysia
Flat Design Trends 2014 Kuala Lumpur Malaysia
Celeste Kirby-Brown
 
Alter nrg presentation to springtec nov 2010
Alter nrg presentation to springtec nov 2010Alter nrg presentation to springtec nov 2010
Alter nrg presentation to springtec nov 2010
Atef Gresat
 
T&I Consultancy - General pPresentation
T&I Consultancy - General pPresentationT&I Consultancy - General pPresentation
T&I Consultancy - General pPresentation
Leyla Abdullayeva
 
Tema y letra asignada
Tema y letra asignadaTema y letra asignada
Tema y letra asignada
wuendy lorena ajanel Poncio
 

Viewers also liked (15)

9 Tips to Visually Make Your Facebook Content Rock
9 Tips to Visually Make Your Facebook Content Rock9 Tips to Visually Make Your Facebook Content Rock
9 Tips to Visually Make Your Facebook Content Rock
 
Municipal solid waste to power
Municipal solid waste to powerMunicipal solid waste to power
Municipal solid waste to power
 
Stix cms general overview_2012
Stix cms general overview_2012Stix cms general overview_2012
Stix cms general overview_2012
 
Plutselig død unge idrettsutøvere akutt med 16102013
Plutselig død unge idrettsutøvere akutt med 16102013Plutselig død unge idrettsutøvere akutt med 16102013
Plutselig død unge idrettsutøvere akutt med 16102013
 
Urbis Project - La presentazione 2013
Urbis Project - La presentazione 2013Urbis Project - La presentazione 2013
Urbis Project - La presentazione 2013
 
Gaphic design trends 2014 Kuala Lumpur Malaysia iconnect360
Gaphic design trends 2014 Kuala Lumpur Malaysia iconnect360Gaphic design trends 2014 Kuala Lumpur Malaysia iconnect360
Gaphic design trends 2014 Kuala Lumpur Malaysia iconnect360
 
Presentation
PresentationPresentation
Presentation
 
Viral Marketing: The OMFG Factor in Content Creation in Kuala Lumpur
Viral Marketing: The OMFG Factor in Content Creation in Kuala LumpurViral Marketing: The OMFG Factor in Content Creation in Kuala Lumpur
Viral Marketing: The OMFG Factor in Content Creation in Kuala Lumpur
 
Usaid innovation question
Usaid innovation questionUsaid innovation question
Usaid innovation question
 
iconnect360 software user interface redesign
iconnect360 software user interface redesigniconnect360 software user interface redesign
iconnect360 software user interface redesign
 
Awo biorefinery pto pilot
Awo biorefinery pto pilotAwo biorefinery pto pilot
Awo biorefinery pto pilot
 
Flat Design Trends 2014 Kuala Lumpur Malaysia
Flat Design Trends 2014 Kuala Lumpur Malaysia Flat Design Trends 2014 Kuala Lumpur Malaysia
Flat Design Trends 2014 Kuala Lumpur Malaysia
 
Alter nrg presentation to springtec nov 2010
Alter nrg presentation to springtec nov 2010Alter nrg presentation to springtec nov 2010
Alter nrg presentation to springtec nov 2010
 
T&I Consultancy - General pPresentation
T&I Consultancy - General pPresentationT&I Consultancy - General pPresentation
T&I Consultancy - General pPresentation
 
Tema y letra asignada
Tema y letra asignadaTema y letra asignada
Tema y letra asignada
 

Similar to Presentation 60,000 tpy of msw english (4)

Integrated green technologies for msw (mam ver.)
Integrated green technologies for msw (mam ver.)Integrated green technologies for msw (mam ver.)
Integrated green technologies for msw (mam ver.)
mamdouh sabour
 
Saudi Waste (Recycling, Energy, Composte, Water) Solution
Saudi Waste (Recycling, Energy, Composte, Water) SolutionSaudi Waste (Recycling, Energy, Composte, Water) Solution
Saudi Waste (Recycling, Energy, Composte, Water) Solution
Paul Dooley paul@firstaff.ie
 
Waste water treatment and sewage slugde management in Veneto: the role of int...
Waste water treatment and sewage slugde management in Veneto: the role of int...Waste water treatment and sewage slugde management in Veneto: the role of int...
Waste water treatment and sewage slugde management in Veneto: the role of int...
francesco loro
 
Saudi waste (recycling, energy, composte, water) solution
Saudi waste (recycling, energy, composte, water) solutionSaudi waste (recycling, energy, composte, water) solution
Saudi waste (recycling, energy, composte, water) solution
Brandon Dooley
 
Municipal Solid Waste - Industrial Waste to energy
Municipal Solid Waste - Industrial Waste to energyMunicipal Solid Waste - Industrial Waste to energy
Municipal Solid Waste - Industrial Waste to energy
Manoj Kumar Sharma
 
Gasification Technology General v48
Gasification Technology General v48Gasification Technology General v48
Gasification Technology General v48
Greene Waste to Energy SL
 
integrated green Technologies for MSW
integrated green Technologies for MSWintegrated green Technologies for MSW
integrated green Technologies for MSW
Mamdouh Abdel-Sabour
 
Sludge2Energy: Energy self-sustaining sewage sludge utilisation process
Sludge2Energy: Energy self-sustaining sewage sludge utilisation processSludge2Energy: Energy self-sustaining sewage sludge utilisation process
Sludge2Energy: Energy self-sustaining sewage sludge utilisation process
A.T.E. Private Limited
 
Renewable Gas for the large industry sector - The road to Ireland's low carbo...
Renewable Gas for the large industry sector - The road to Ireland's low carbo...Renewable Gas for the large industry sector - The road to Ireland's low carbo...
Renewable Gas for the large industry sector - The road to Ireland's low carbo...
Linda O'Brien
 
IRJET - Biogas & Electricity Generation from the Biodegradable Solid Waste
IRJET -  	  Biogas & Electricity Generation from the Biodegradable Solid WasteIRJET -  	  Biogas & Electricity Generation from the Biodegradable Solid Waste
IRJET - Biogas & Electricity Generation from the Biodegradable Solid Waste
IRJET Journal
 
Supply Chain Opportunities in the Bioenergy Sector Workshop - Hilary Kinney
Supply Chain Opportunities in the Bioenergy Sector Workshop  - Hilary KinneySupply Chain Opportunities in the Bioenergy Sector Workshop  - Hilary Kinney
Supply Chain Opportunities in the Bioenergy Sector Workshop - Hilary Kinney
Invest Northern Ireland
 
Incineration Process for Solid Waste Management and Effective Utilization of ...
Incineration Process for Solid Waste Management and Effective Utilization of ...Incineration Process for Solid Waste Management and Effective Utilization of ...
Incineration Process for Solid Waste Management and Effective Utilization of ...
IRJET Journal
 
Path-dependency and path-making in the energy system in the Spanish Tile Sector.
Path-dependency and path-making in the energy system in the Spanish Tile Sector.Path-dependency and path-making in the energy system in the Spanish Tile Sector.
Path-dependency and path-making in the energy system in the Spanish Tile Sector.
Daniel Gabadón-Estevan
 
Natural Capitalism
Natural CapitalismNatural Capitalism
Natural Capitalism
NUS SDE
 
Recycling Plastic
Recycling PlasticRecycling Plastic
Recycling Plastic
City of Farmington, Mi
 
Compositi e economia circolare – aggiornamenti attività europee e Tavolo di l...
Compositi e economia circolare – aggiornamenti attività europee e Tavolo di l...Compositi e economia circolare – aggiornamenti attività europee e Tavolo di l...
Compositi e economia circolare – aggiornamenti attività europee e Tavolo di l...
Compositi
 
Balkanika Energy Presentation
Balkanika Energy PresentationBalkanika Energy Presentation
Balkanika Energy Presentation
abozhkovbalkanikaenergy
 
Separate technical-ppt web
Separate technical-ppt webSeparate technical-ppt web
Separate technical-ppt web
VMPRESS Technologies
 
Waste 2 Fuel Technology
Waste 2 Fuel TechnologyWaste 2 Fuel Technology
Waste 2 Fuel Technology
Dax de Premonville
 
Energy recovery from municipal solid waste (WASTE-TO-ENERGY)
Energy recovery from municipal solid waste (WASTE-TO-ENERGY)Energy recovery from municipal solid waste (WASTE-TO-ENERGY)
Energy recovery from municipal solid waste (WASTE-TO-ENERGY)
Mahmoud Izzat Mahmoud
 

Similar to Presentation 60,000 tpy of msw english (4) (20)

Integrated green technologies for msw (mam ver.)
Integrated green technologies for msw (mam ver.)Integrated green technologies for msw (mam ver.)
Integrated green technologies for msw (mam ver.)
 
Saudi Waste (Recycling, Energy, Composte, Water) Solution
Saudi Waste (Recycling, Energy, Composte, Water) SolutionSaudi Waste (Recycling, Energy, Composte, Water) Solution
Saudi Waste (Recycling, Energy, Composte, Water) Solution
 
Waste water treatment and sewage slugde management in Veneto: the role of int...
Waste water treatment and sewage slugde management in Veneto: the role of int...Waste water treatment and sewage slugde management in Veneto: the role of int...
Waste water treatment and sewage slugde management in Veneto: the role of int...
 
Saudi waste (recycling, energy, composte, water) solution
Saudi waste (recycling, energy, composte, water) solutionSaudi waste (recycling, energy, composte, water) solution
Saudi waste (recycling, energy, composte, water) solution
 
Municipal Solid Waste - Industrial Waste to energy
Municipal Solid Waste - Industrial Waste to energyMunicipal Solid Waste - Industrial Waste to energy
Municipal Solid Waste - Industrial Waste to energy
 
Gasification Technology General v48
Gasification Technology General v48Gasification Technology General v48
Gasification Technology General v48
 
integrated green Technologies for MSW
integrated green Technologies for MSWintegrated green Technologies for MSW
integrated green Technologies for MSW
 
Sludge2Energy: Energy self-sustaining sewage sludge utilisation process
Sludge2Energy: Energy self-sustaining sewage sludge utilisation processSludge2Energy: Energy self-sustaining sewage sludge utilisation process
Sludge2Energy: Energy self-sustaining sewage sludge utilisation process
 
Renewable Gas for the large industry sector - The road to Ireland's low carbo...
Renewable Gas for the large industry sector - The road to Ireland's low carbo...Renewable Gas for the large industry sector - The road to Ireland's low carbo...
Renewable Gas for the large industry sector - The road to Ireland's low carbo...
 
IRJET - Biogas & Electricity Generation from the Biodegradable Solid Waste
IRJET -  	  Biogas & Electricity Generation from the Biodegradable Solid WasteIRJET -  	  Biogas & Electricity Generation from the Biodegradable Solid Waste
IRJET - Biogas & Electricity Generation from the Biodegradable Solid Waste
 
Supply Chain Opportunities in the Bioenergy Sector Workshop - Hilary Kinney
Supply Chain Opportunities in the Bioenergy Sector Workshop  - Hilary KinneySupply Chain Opportunities in the Bioenergy Sector Workshop  - Hilary Kinney
Supply Chain Opportunities in the Bioenergy Sector Workshop - Hilary Kinney
 
Incineration Process for Solid Waste Management and Effective Utilization of ...
Incineration Process for Solid Waste Management and Effective Utilization of ...Incineration Process for Solid Waste Management and Effective Utilization of ...
Incineration Process for Solid Waste Management and Effective Utilization of ...
 
Path-dependency and path-making in the energy system in the Spanish Tile Sector.
Path-dependency and path-making in the energy system in the Spanish Tile Sector.Path-dependency and path-making in the energy system in the Spanish Tile Sector.
Path-dependency and path-making in the energy system in the Spanish Tile Sector.
 
Natural Capitalism
Natural CapitalismNatural Capitalism
Natural Capitalism
 
Recycling Plastic
Recycling PlasticRecycling Plastic
Recycling Plastic
 
Compositi e economia circolare – aggiornamenti attività europee e Tavolo di l...
Compositi e economia circolare – aggiornamenti attività europee e Tavolo di l...Compositi e economia circolare – aggiornamenti attività europee e Tavolo di l...
Compositi e economia circolare – aggiornamenti attività europee e Tavolo di l...
 
Balkanika Energy Presentation
Balkanika Energy PresentationBalkanika Energy Presentation
Balkanika Energy Presentation
 
Separate technical-ppt web
Separate technical-ppt webSeparate technical-ppt web
Separate technical-ppt web
 
Waste 2 Fuel Technology
Waste 2 Fuel TechnologyWaste 2 Fuel Technology
Waste 2 Fuel Technology
 
Energy recovery from municipal solid waste (WASTE-TO-ENERGY)
Energy recovery from municipal solid waste (WASTE-TO-ENERGY)Energy recovery from municipal solid waste (WASTE-TO-ENERGY)
Energy recovery from municipal solid waste (WASTE-TO-ENERGY)
 

Recently uploaded

Properties Railway Sleepers and Test.pptx
Properties Railway Sleepers and Test.pptxProperties Railway Sleepers and Test.pptx
Properties Railway Sleepers and Test.pptx
MDSABBIROJJAMANPAYEL
 
ITSM Integration with MuleSoft.pptx
ITSM  Integration with MuleSoft.pptxITSM  Integration with MuleSoft.pptx
ITSM Integration with MuleSoft.pptx
VANDANAMOHANGOUDA
 
一比一原版(uofo毕业证书)美国俄勒冈大学毕业证如何办理
一比一原版(uofo毕业证书)美国俄勒冈大学毕业证如何办理一比一原版(uofo毕业证书)美国俄勒冈大学毕业证如何办理
一比一原版(uofo毕业证书)美国俄勒冈大学毕业证如何办理
upoux
 
22CYT12-Unit-V-E Waste and its Management.ppt
22CYT12-Unit-V-E Waste and its Management.ppt22CYT12-Unit-V-E Waste and its Management.ppt
22CYT12-Unit-V-E Waste and its Management.ppt
KrishnaveniKrishnara1
 
4. Mosca vol I -Fisica-Tipler-5ta-Edicion-Vol-1.pdf
4. Mosca vol I -Fisica-Tipler-5ta-Edicion-Vol-1.pdf4. Mosca vol I -Fisica-Tipler-5ta-Edicion-Vol-1.pdf
4. Mosca vol I -Fisica-Tipler-5ta-Edicion-Vol-1.pdf
Gino153088
 
Generative AI Use cases applications solutions and implementation.pdf
Generative AI Use cases applications solutions and implementation.pdfGenerative AI Use cases applications solutions and implementation.pdf
Generative AI Use cases applications solutions and implementation.pdf
mahaffeycheryld
 
Computational Engineering IITH Presentation
Computational Engineering IITH PresentationComputational Engineering IITH Presentation
Computational Engineering IITH Presentation
co23btech11018
 
2008 BUILDING CONSTRUCTION Illustrated - Ching Chapter 02 The Building.pdf
2008 BUILDING CONSTRUCTION Illustrated - Ching Chapter 02 The Building.pdf2008 BUILDING CONSTRUCTION Illustrated - Ching Chapter 02 The Building.pdf
2008 BUILDING CONSTRUCTION Illustrated - Ching Chapter 02 The Building.pdf
Yasser Mahgoub
 
132/33KV substation case study Presentation
132/33KV substation case study Presentation132/33KV substation case study Presentation
132/33KV substation case study Presentation
kandramariana6
 
SCALING OF MOS CIRCUITS m .pptx
SCALING OF MOS CIRCUITS m                 .pptxSCALING OF MOS CIRCUITS m                 .pptx
SCALING OF MOS CIRCUITS m .pptx
harshapolam10
 
Electric vehicle and photovoltaic advanced roles in enhancing the financial p...
Electric vehicle and photovoltaic advanced roles in enhancing the financial p...Electric vehicle and photovoltaic advanced roles in enhancing the financial p...
Electric vehicle and photovoltaic advanced roles in enhancing the financial p...
IJECEIAES
 
Curve Fitting in Numerical Methods Regression
Curve Fitting in Numerical Methods RegressionCurve Fitting in Numerical Methods Regression
Curve Fitting in Numerical Methods Regression
Nada Hikmah
 
一比一原版(osu毕业证书)美国俄勒冈州立大学毕业证如何办理
一比一原版(osu毕业证书)美国俄勒冈州立大学毕业证如何办理一比一原版(osu毕业证书)美国俄勒冈州立大学毕业证如何办理
一比一原版(osu毕业证书)美国俄勒冈州立大学毕业证如何办理
upoux
 
morris_worm_intro_and_source_code_analysis_.pdf
morris_worm_intro_and_source_code_analysis_.pdfmorris_worm_intro_and_source_code_analysis_.pdf
morris_worm_intro_and_source_code_analysis_.pdf
ycwu0509
 
Redefining brain tumor segmentation: a cutting-edge convolutional neural netw...
Redefining brain tumor segmentation: a cutting-edge convolutional neural netw...Redefining brain tumor segmentation: a cutting-edge convolutional neural netw...
Redefining brain tumor segmentation: a cutting-edge convolutional neural netw...
IJECEIAES
 
Advanced control scheme of doubly fed induction generator for wind turbine us...
Advanced control scheme of doubly fed induction generator for wind turbine us...Advanced control scheme of doubly fed induction generator for wind turbine us...
Advanced control scheme of doubly fed induction generator for wind turbine us...
IJECEIAES
 
CompEx~Manual~1210 (2).pdf COMPEX GAS AND VAPOURS
CompEx~Manual~1210 (2).pdf COMPEX GAS AND VAPOURSCompEx~Manual~1210 (2).pdf COMPEX GAS AND VAPOURS
CompEx~Manual~1210 (2).pdf COMPEX GAS AND VAPOURS
RamonNovais6
 
Digital Twins Computer Networking Paper Presentation.pptx
Digital Twins Computer Networking Paper Presentation.pptxDigital Twins Computer Networking Paper Presentation.pptx
Digital Twins Computer Networking Paper Presentation.pptx
aryanpankaj78
 
Applications of artificial Intelligence in Mechanical Engineering.pdf
Applications of artificial Intelligence in Mechanical Engineering.pdfApplications of artificial Intelligence in Mechanical Engineering.pdf
Applications of artificial Intelligence in Mechanical Engineering.pdf
Atif Razi
 
原版制作(Humboldt毕业证书)柏林大学毕业证学位证一模一样
原版制作(Humboldt毕业证书)柏林大学毕业证学位证一模一样原版制作(Humboldt毕业证书)柏林大学毕业证学位证一模一样
原版制作(Humboldt毕业证书)柏林大学毕业证学位证一模一样
ydzowc
 

Recently uploaded (20)

Properties Railway Sleepers and Test.pptx
Properties Railway Sleepers and Test.pptxProperties Railway Sleepers and Test.pptx
Properties Railway Sleepers and Test.pptx
 
ITSM Integration with MuleSoft.pptx
ITSM  Integration with MuleSoft.pptxITSM  Integration with MuleSoft.pptx
ITSM Integration with MuleSoft.pptx
 
一比一原版(uofo毕业证书)美国俄勒冈大学毕业证如何办理
一比一原版(uofo毕业证书)美国俄勒冈大学毕业证如何办理一比一原版(uofo毕业证书)美国俄勒冈大学毕业证如何办理
一比一原版(uofo毕业证书)美国俄勒冈大学毕业证如何办理
 
22CYT12-Unit-V-E Waste and its Management.ppt
22CYT12-Unit-V-E Waste and its Management.ppt22CYT12-Unit-V-E Waste and its Management.ppt
22CYT12-Unit-V-E Waste and its Management.ppt
 
4. Mosca vol I -Fisica-Tipler-5ta-Edicion-Vol-1.pdf
4. Mosca vol I -Fisica-Tipler-5ta-Edicion-Vol-1.pdf4. Mosca vol I -Fisica-Tipler-5ta-Edicion-Vol-1.pdf
4. Mosca vol I -Fisica-Tipler-5ta-Edicion-Vol-1.pdf
 
Generative AI Use cases applications solutions and implementation.pdf
Generative AI Use cases applications solutions and implementation.pdfGenerative AI Use cases applications solutions and implementation.pdf
Generative AI Use cases applications solutions and implementation.pdf
 
Computational Engineering IITH Presentation
Computational Engineering IITH PresentationComputational Engineering IITH Presentation
Computational Engineering IITH Presentation
 
2008 BUILDING CONSTRUCTION Illustrated - Ching Chapter 02 The Building.pdf
2008 BUILDING CONSTRUCTION Illustrated - Ching Chapter 02 The Building.pdf2008 BUILDING CONSTRUCTION Illustrated - Ching Chapter 02 The Building.pdf
2008 BUILDING CONSTRUCTION Illustrated - Ching Chapter 02 The Building.pdf
 
132/33KV substation case study Presentation
132/33KV substation case study Presentation132/33KV substation case study Presentation
132/33KV substation case study Presentation
 
SCALING OF MOS CIRCUITS m .pptx
SCALING OF MOS CIRCUITS m                 .pptxSCALING OF MOS CIRCUITS m                 .pptx
SCALING OF MOS CIRCUITS m .pptx
 
Electric vehicle and photovoltaic advanced roles in enhancing the financial p...
Electric vehicle and photovoltaic advanced roles in enhancing the financial p...Electric vehicle and photovoltaic advanced roles in enhancing the financial p...
Electric vehicle and photovoltaic advanced roles in enhancing the financial p...
 
Curve Fitting in Numerical Methods Regression
Curve Fitting in Numerical Methods RegressionCurve Fitting in Numerical Methods Regression
Curve Fitting in Numerical Methods Regression
 
一比一原版(osu毕业证书)美国俄勒冈州立大学毕业证如何办理
一比一原版(osu毕业证书)美国俄勒冈州立大学毕业证如何办理一比一原版(osu毕业证书)美国俄勒冈州立大学毕业证如何办理
一比一原版(osu毕业证书)美国俄勒冈州立大学毕业证如何办理
 
morris_worm_intro_and_source_code_analysis_.pdf
morris_worm_intro_and_source_code_analysis_.pdfmorris_worm_intro_and_source_code_analysis_.pdf
morris_worm_intro_and_source_code_analysis_.pdf
 
Redefining brain tumor segmentation: a cutting-edge convolutional neural netw...
Redefining brain tumor segmentation: a cutting-edge convolutional neural netw...Redefining brain tumor segmentation: a cutting-edge convolutional neural netw...
Redefining brain tumor segmentation: a cutting-edge convolutional neural netw...
 
Advanced control scheme of doubly fed induction generator for wind turbine us...
Advanced control scheme of doubly fed induction generator for wind turbine us...Advanced control scheme of doubly fed induction generator for wind turbine us...
Advanced control scheme of doubly fed induction generator for wind turbine us...
 
CompEx~Manual~1210 (2).pdf COMPEX GAS AND VAPOURS
CompEx~Manual~1210 (2).pdf COMPEX GAS AND VAPOURSCompEx~Manual~1210 (2).pdf COMPEX GAS AND VAPOURS
CompEx~Manual~1210 (2).pdf COMPEX GAS AND VAPOURS
 
Digital Twins Computer Networking Paper Presentation.pptx
Digital Twins Computer Networking Paper Presentation.pptxDigital Twins Computer Networking Paper Presentation.pptx
Digital Twins Computer Networking Paper Presentation.pptx
 
Applications of artificial Intelligence in Mechanical Engineering.pdf
Applications of artificial Intelligence in Mechanical Engineering.pdfApplications of artificial Intelligence in Mechanical Engineering.pdf
Applications of artificial Intelligence in Mechanical Engineering.pdf
 
原版制作(Humboldt毕业证书)柏林大学毕业证学位证一模一样
原版制作(Humboldt毕业证书)柏林大学毕业证学位证一模一样原版制作(Humboldt毕业证书)柏林大学毕业证学位证一模一样
原版制作(Humboldt毕业证书)柏林大学毕业证学位证一模一样
 

Presentation 60,000 tpy of msw english (4)

  • 1. PROCESS FOR DOMESTIC WASTE TREATMENT THREE VERSIONS OF TRANSFORMATION. 1 ° ELECTRIC ENERGY & FERTILIZER 2 ° 100% DEDICATED ELECTRIC POWER 3 ° POWER PLUS RENEWABLE RDF FUELS
  • 2. MANDATORY ENVIRONMENTAL PARAMETERS - Quantity of waste to be treated (waste characterization) - Presence of towns and villages within 40 km - Presence of several areas of quarry - Extraction of lime or limestone - Existence of an organized collection
  • 3. COMPARISON OF CURRENT TECHNIQUES - Incineration via plasma arc (cost and maintenance) - Biogas (performance, cost and maintenance, inertia) - A more technical approach without generating pollution - Our technology is centered around generating producer synthesis gas - Recovering 90% in the treatment of waste pollution is simplified, without process reactivity 3 hours (without inertia) smokeless, odorless and sanitized. - All non-recyclable waste is approximately 10% (mostly inorganic ash with recoverable metals and REEs)
  • 4. THE CONTEXT OF OUR PROJECT the waste treatment to date
  • 5. TREATMENT & PROCESSING TO DATE - Consulting Work - Recycling improvements for urban centers - Sourcing appropriate equipment (trucks, bins ...) - Assembly of on-site manual screening systems - Capacity development for new urban collection points
  • 6. THE CONTEXT OF OUR PROJECT - Organization of national collection and treatment - Identify and deploy collection systems used - Waste treated in landfill (another type to validate) - Develop enhanced recycling and recovery
  • 7. Diversified view of waste streams Review of containers currently in use Updating of the service trucks Transportation of waste to landfill Mechanical methods of landfill Screening and preparation of MSW ACTUAL MAINSTREAM SITUATION
  • 8. COMPACTION Is not a sustainable solution For the 21st century
  • 9. CURRENT INCONVENIENCES - Visual pollution, odor, impact on groundwater ... - This new design improves comfort and regional ecological health, economic and social prosperity.
  • 11. Easing of access to containers Collection performed by a single operator Manual and mechanical separation Compacting recyclable materials Production of fertilizer Production of synthesis gas Harvesting of landfill gas Production of fuels and chemicals Electricity generation TECHNICAL EXPERTISE
  • 12. - Annual capacity starting at 60,000 tons / year working two shifts of eight hours - 50% Organic Waste Composition - Inorganic waste processing capacity. - Direct employment 80 (factory 400 T / day in 2 x 8 H)
  • 13. TYPICAL INTEGRATED BIOREFINERY - Start-up capacity of 60 000 tons of unsorted waste per year gross - Renewable fuels refining and power generation at 350 days per year - No direct incineration of waste - Autonomy energy (including renewable) - Capable of processing unit 160 t / d requires 4 hectares of land, a building area of 8,000 m², including storage, screening processing, access and range of motion - Including RDF operation will require additional 6 hectares of land.
  • 14. FERTILIZER SOLUTION # 1: TRANSFORMATION OF ENERGY IN WET ORGANIC WASTE THROUGH A.D. AND COMPOSTING - Minimum electricity (surplus production capacity of 200 kW) from first AD organic waste dome. - Fertilizers (annual output 20,000 T per year or 160T / d) 95% to agriculture. - Selection of materials (plastics, metals, ferrous and non-ferrous metals, glass, PVC, PET ...) prior to organic processing. - Optional additional opportunity to increase raw material - Secondary site processes cellulosic feedstocks for solid and liquid fuels.
  • 15. BENEFITS ASSOCIATED WITH WASTE RECOVERY of ECO (FERTILIZER) - Granules (ease of application) organic fertilizer. - Stabilizes soil pH organo-calcium and anti-acid - Content of heavy metals PPM 130 (European standard PPM 4000) - 2 T = 1T containing urea fertilizer + 3% of fertilizer (nitrogen, phosphorus, potassium) - Less susceptible to runoff and infiltration (bacterial microflora improved)
  • 16. SOLUTION # 2: DEDICATED ELECTRICITY GENERATION - Energy production 5mW derived from syn-gas gen-sets - 24 hours 350 days a year annual production of 42,000 MWh / year - Sorting materials (plastic, ferrous and non-ferrous metals, glass, PVC, PET ...) - Optional additional opportunity to increase raw material secondary site (plastics, greases, rubber, sludge ...)
  • 17. OPTIONS - Selective recovery of plastics (25 tons per day) - PE, HDPE, PVC and PET ... - Recovery of hospital waste - Recovery of dried sludge and trap greases for fuels vs landfiling - Harvesting available biogas for additional power generation - Gas recovery for trucking operations
  • 18. HOSPITAL WASTE TREATMENT SOLUTIONS - Capacity between 375 kg and 250 kg / 40 min - The waste materials can be normally processed waste or CET
  • 19. BENEFITS INCLUDED - General study and details of the process parameter options - Plans finalized according to local codes - Supply, delivery, installation and commissioning of equipment within the first month of contract signing - Buildings and infrastructure attachment / construction - Utilities (electricity, lighting ...) - Training of personnel for operation and maintenance - Room for intervention of process and sale for end products
  • 20. - Provide handling equipment (bucket loaders, backhoe clips ...) - Customs Procedures - Administrative Monitoring Project - Project architecture or infrastructure - Resource dedication - Providing project land grants CUSTOMERS ARE NOT OBLIGATED TO:
  • 21. EIGHT YEARS PRACTICAL EXPERIENCE IN FRENCH WTE &RDF PROJECTS
  • 22. PRINCIPAL EQUIPMENT - Screen Opener bags (no drilling) - Split screen and cabin screening - Various phase separation and baling - Bio digester suited for wet garbage - Onsite power generation and rCNG for city waste recovery - Two cabins composting - Utilities (electricity LV / HV, lighting, supervision ... - Producer gas generation systems for liquid fuels production
  • 23. TIMETABLE FOR IMPLEMENTATION - Feasibility study: three months - Job creation: ten months - Reception provisionally: ten months - Final acceptance: twelve months - Execution of contracts and commercial funding (from the signing of the partnership PPP or public-private partnership with DSP State guarantee for Africa and 10 years for the purchase of fertilizer and energy)
  • 24. ESTIMATED PROJECT INVESTMENT Average cost of building the facilities - Solution # 1: Energy Fertilizer between € 25 million and € 30 million on a project basis, including various options. - Solution # 2: Energy between € 30 million and € 37 million on a project basis, including various options. - Solution # 3: Renewable fuels from recoverable hydrocarbons and cellulose between € 25 million and € 175 million
  • 25. - Investors public, private or mixed - In case of inability to finance We have in-house finance available and we can invest subject to obtaining guarantees for feedstocks and off-take agreements - Example A 10-year purchase agreement for fertilizer or energy, solid or liquid fuels produced by the plant Exclusive supply 400 tons of waste per day and 350 days / year. INVESTING WORLDWIDE
  • 26. OUR ENVIRONMENTAL STEWARDSHIP - Project management for landfill waste reduction, waste recycling - Construction Process for exothermal landfill gas recovery. - Treatment of flue gas to European incinerators standardization (can include waste gas recovery for algae growth} - Treatment of metals and plastics - Water treatment (network design, treatment)
  • 27. EXAMPLE OF PROJECT FINANCING - Norges bank available asset or lender leader - Buyer Municipal Authority in partnership with Fernando HC Reis - Warranty or condition of the central bank of Norway - Amount of the loan (Mr Reis, principal) up to 100% - Payback period of 10 years based on longterm investment plan - Interest rate 4.5% - After 10 years the possibility to restructure ownership of the plant