SlideShare a Scribd company logo
PRE-COMMISSIONING &
TROUBLESHOOTING STEPS FOR
SITE ENGINEERS
1
Scope of Presentation:
• Commissioning of BTS CC card in Pre-swap
• Software Version up-gradation Methods
• Follow steps on Configuration Diagram in LMT
• Troubleshoot the alarms one-by-one
2
Commissioning of CC card
• First of all, confirm that you have required version of LMT(LMT_v12.13.43P02_GUL)
3
Commissioning of CC card
• After that you must apply setting to you laptop LAN IP like following.
4
Commissioning of CC card
• Now open “EOMS” file from LMT as mentioned below.
5
Commissioning of CC card
• EOMS will open a windows like below then select “Image and burn” and press “OK”
6
Commissioning of CC card
• It will ask for selection of RADIO MODE, select “MULTIMODE”
7
Commissioning of CC card
• Select PATCH Directory & Commissioning File then press “OK”
8
Commissioning of CC card
• After that LMT will start the process of image burning.
9
Commissioning of CC card
• It will take a while
10
Commissioning of CC card
Burning/MO file Succeeded
when it will be succeeded the display shows
11
12
Commissioning of CC card(2nd Method)
Select “Online Configuration” & press “Station”.
Fill the Station Name & Station IP field.
13
Commissioning of CC card (2nd Method)
Give User name “admin” and left password field blank. Then press OK to login.
14
Commissioning of CC card (2nd Method)
Go to “System” and select “Import”. After that select the MO file in xml format. Press OK.
Commissioning of CC Card
• After completed process & reset of CC board, you can login again in EOMS and
you can see the following window. It would show you the topology.
15
Expected Alarms in EFMS
• You can login to EFMS and you can see the alarms.
16
View the Topology and follow it
• Connect the boards & fiber cables according to the topology shown in LMT.
17
View the Topology and follow it
• Connect the boards & fiber cables according to the topology shown in LMT.
18
View the Topology and follow it
19
Confirming the Software Version
• Go to System and select Version Management to confirm the
Version
20
Confirming the Software Version
• Version must be 4.13.10.38P42. All versions must be in RUN condition. In case
of 3G site, UMTS package must also be available.
21
Confirming the Software Version
• In case software is not updated, just right click on Local window and add
the package files.
22
Confirming the Software Version
• In case software is not updated, just right click on Local window and add
the package files.
23
Confirming the Software Version
• It will take some time to upload.
24
Confirming the Software Version
• After that, right click on the package files on Local Window and select
“Download”. It will download the files.
25
Key Points for software downloading
• After commissioning, first confirm running the package version.
• Running package version must be 4.13.10.38P42
• If the running version is still old one we need to active the new one
again.
• In case, package files are corrupted or not active successfully, first
Delete the files by right click on it and then download again.
• If you download again without deleting it, it may cause capacity issue.
• In case, you don’t understand above points or you cannot resolve any
issue, contact concerned troubleshooting person on call.
26
Irrelative Alarms on Pre-Swap
• Antenna related alarms.(VSWR, Carrier uplink etc)
• SCTP alarm.
• Link broken between OMM and NE.
• SNTP time adjustment alarm.
• 1588 Clock source fault.
• The physical Ethernet link is broken.
27
Related Alarms in Pre-Swap
• Optical port receiving link failure(198098319)
• The RRU link is broken(198097605)
• Hardware type is different from the configuration(198092029)
• Device power down(198092295)
• Version package fault(198097567)
• Unavailable optical module(198098318)
• Software runs abnormally(198097604)
• Carrier downlink data problem(198098471)
• The board is not in position(198092072)
• Carrier uplink data is abnormal.(198093053)
• Disable PA(198098440)
• Initialization failure(198092070)
• The board is not configured(198092203)
• The board is powered off(198092057)
• Board communication link interrupted(198097060)
• Internal fault(198098467)
• Software loading is abnormal(198093056)
28
Alarms & Solution
29
Alarms & Solution
30
31
Alarms & Solution
32
Alarms & Solution
33
Alarms & Solution
34
Alarms & Solution
35
Alarms & Solution
36
Alarms & Solution
37
Alarms & Solution
Questions…
• In Live BTS, if GSM (2G) is down, UMTS (3G) will effect of not?
• In the worst scenario, if you have to edit the MO file on site, how you
will do it?
One More thing…
After pre-swap, the site engineer must feedback the snapshot of EFMS
to region management (Mr. Adeel and CC to us) as to confirm the pre-
swap is successful or not.
38
THANK YOU
39

More Related Content

Similar to Pre_Commissioning_steps_of_ZTE_SDR.pptx

UserGuide-DKAGPS-1_um_1v0.pdf
UserGuide-DKAGPS-1_um_1v0.pdfUserGuide-DKAGPS-1_um_1v0.pdf
UserGuide-DKAGPS-1_um_1v0.pdf
Mucussete Abudo
 
XLp Training V1.1.pdf
XLp Training  V1.1.pdfXLp Training  V1.1.pdf
XLp Training V1.1.pdf
nunelengineering
 
Why we didn't catch that
Why we didn't catch thatWhy we didn't catch that
Why we didn't catch thatgaoliang641
 
7106503678 td w8961-nd_qig
7106503678 td w8961-nd_qig7106503678 td w8961-nd_qig
7106503678 td w8961-nd_qig
Akibo Davies
 
Snet+Pro+Service+Software_SNET+Pro+2+Instructions.pdf
Snet+Pro+Service+Software_SNET+Pro+2+Instructions.pdfSnet+Pro+Service+Software_SNET+Pro+2+Instructions.pdf
Snet+Pro+Service+Software_SNET+Pro+2+Instructions.pdf
fjero
 
Asia 14-garcia-illera-dude-wtf-in-my-can
Asia 14-garcia-illera-dude-wtf-in-my-canAsia 14-garcia-illera-dude-wtf-in-my-can
Asia 14-garcia-illera-dude-wtf-in-my-can
injenerzntu
 
GTG SGT700 Control system Introduction.pptx
GTG SGT700 Control system Introduction.pptxGTG SGT700 Control system Introduction.pptx
GTG SGT700 Control system Introduction.pptx
06nikhil
 
BMW E60 CIPprogramming software update progcoding
BMW E60 CIPprogramming software update progcodingBMW E60 CIPprogramming software update progcoding
BMW E60 CIPprogramming software update progcoding
buyobdii
 
RISC-V 30907 summit 2020 joint picocom_mentor
RISC-V 30907 summit 2020 joint picocom_mentorRISC-V 30907 summit 2020 joint picocom_mentor
RISC-V 30907 summit 2020 joint picocom_mentor
RISC-V International
 
Digital video recorder
Digital video recorderDigital video recorder
Digital video recorder
VIKAS CHAUHAN
 
Procedure install cn510 step by step
Procedure install cn510 step by stepProcedure install cn510 step by step
Procedure install cn510 step by step
Ahmed Hussien Ali Gomaa Bebars
 
manual for WIM card programming
manual for WIM card programmingmanual for WIM card programming
manual for WIM card programmingGuriqbal Singh
 
시크 SICK Lector63x 2D DPM스캐너 고정식바코드스캐너 산업용바코드리더 이미지스캐너 매뉴얼
시크 SICK Lector63x 2D DPM스캐너 고정식바코드스캐너 산업용바코드리더 이미지스캐너 매뉴얼시크 SICK Lector63x 2D DPM스캐너 고정식바코드스캐너 산업용바코드리더 이미지스캐너 매뉴얼
시크 SICK Lector63x 2D DPM스캐너 고정식바코드스캐너 산업용바코드리더 이미지스캐너 매뉴얼
HION IT
 
Wcdma bts-alarm-descriptions
Wcdma bts-alarm-descriptionsWcdma bts-alarm-descriptions
Wcdma bts-alarm-descriptions
Mahmoud Abd Elrahman
 
Final exam chapters 11 16
Final exam chapters 11 16Final exam chapters 11 16
Final exam chapters 11 16Icostyle
 
Bluetooth quick start_guide / Controlanything India
Bluetooth quick start_guide / Controlanything IndiaBluetooth quick start_guide / Controlanything India
Bluetooth quick start_guide / Controlanything India
Dcube Tech Ventures
 
Network Management Card User Manual-en.pdf
Network Management Card User Manual-en.pdfNetwork Management Card User Manual-en.pdf
Network Management Card User Manual-en.pdf
LuongVanLoi1
 
Template 8
Template 8Template 8
Template 8Icostyle
 
Template 3
Template 3Template 3
Template 3Icostyle
 
Lightspeed ii-manual-2012-jan
Lightspeed ii-manual-2012-janLightspeed ii-manual-2012-jan
Lightspeed ii-manual-2012-jan
Alan Spicer Marine Telecom
 

Similar to Pre_Commissioning_steps_of_ZTE_SDR.pptx (20)

UserGuide-DKAGPS-1_um_1v0.pdf
UserGuide-DKAGPS-1_um_1v0.pdfUserGuide-DKAGPS-1_um_1v0.pdf
UserGuide-DKAGPS-1_um_1v0.pdf
 
XLp Training V1.1.pdf
XLp Training  V1.1.pdfXLp Training  V1.1.pdf
XLp Training V1.1.pdf
 
Why we didn't catch that
Why we didn't catch thatWhy we didn't catch that
Why we didn't catch that
 
7106503678 td w8961-nd_qig
7106503678 td w8961-nd_qig7106503678 td w8961-nd_qig
7106503678 td w8961-nd_qig
 
Snet+Pro+Service+Software_SNET+Pro+2+Instructions.pdf
Snet+Pro+Service+Software_SNET+Pro+2+Instructions.pdfSnet+Pro+Service+Software_SNET+Pro+2+Instructions.pdf
Snet+Pro+Service+Software_SNET+Pro+2+Instructions.pdf
 
Asia 14-garcia-illera-dude-wtf-in-my-can
Asia 14-garcia-illera-dude-wtf-in-my-canAsia 14-garcia-illera-dude-wtf-in-my-can
Asia 14-garcia-illera-dude-wtf-in-my-can
 
GTG SGT700 Control system Introduction.pptx
GTG SGT700 Control system Introduction.pptxGTG SGT700 Control system Introduction.pptx
GTG SGT700 Control system Introduction.pptx
 
BMW E60 CIPprogramming software update progcoding
BMW E60 CIPprogramming software update progcodingBMW E60 CIPprogramming software update progcoding
BMW E60 CIPprogramming software update progcoding
 
RISC-V 30907 summit 2020 joint picocom_mentor
RISC-V 30907 summit 2020 joint picocom_mentorRISC-V 30907 summit 2020 joint picocom_mentor
RISC-V 30907 summit 2020 joint picocom_mentor
 
Digital video recorder
Digital video recorderDigital video recorder
Digital video recorder
 
Procedure install cn510 step by step
Procedure install cn510 step by stepProcedure install cn510 step by step
Procedure install cn510 step by step
 
manual for WIM card programming
manual for WIM card programmingmanual for WIM card programming
manual for WIM card programming
 
시크 SICK Lector63x 2D DPM스캐너 고정식바코드스캐너 산업용바코드리더 이미지스캐너 매뉴얼
시크 SICK Lector63x 2D DPM스캐너 고정식바코드스캐너 산업용바코드리더 이미지스캐너 매뉴얼시크 SICK Lector63x 2D DPM스캐너 고정식바코드스캐너 산업용바코드리더 이미지스캐너 매뉴얼
시크 SICK Lector63x 2D DPM스캐너 고정식바코드스캐너 산업용바코드리더 이미지스캐너 매뉴얼
 
Wcdma bts-alarm-descriptions
Wcdma bts-alarm-descriptionsWcdma bts-alarm-descriptions
Wcdma bts-alarm-descriptions
 
Final exam chapters 11 16
Final exam chapters 11 16Final exam chapters 11 16
Final exam chapters 11 16
 
Bluetooth quick start_guide / Controlanything India
Bluetooth quick start_guide / Controlanything IndiaBluetooth quick start_guide / Controlanything India
Bluetooth quick start_guide / Controlanything India
 
Network Management Card User Manual-en.pdf
Network Management Card User Manual-en.pdfNetwork Management Card User Manual-en.pdf
Network Management Card User Manual-en.pdf
 
Template 8
Template 8Template 8
Template 8
 
Template 3
Template 3Template 3
Template 3
 
Lightspeed ii-manual-2012-jan
Lightspeed ii-manual-2012-janLightspeed ii-manual-2012-jan
Lightspeed ii-manual-2012-jan
 

Recently uploaded

road safety engineering r s e unit 3.pdf
road safety engineering  r s e unit 3.pdfroad safety engineering  r s e unit 3.pdf
road safety engineering r s e unit 3.pdf
VENKATESHvenky89705
 
6th International Conference on Machine Learning & Applications (CMLA 2024)
6th International Conference on Machine Learning & Applications (CMLA 2024)6th International Conference on Machine Learning & Applications (CMLA 2024)
6th International Conference on Machine Learning & Applications (CMLA 2024)
ClaraZara1
 
Fundamentals of Electric Drives and its applications.pptx
Fundamentals of Electric Drives and its applications.pptxFundamentals of Electric Drives and its applications.pptx
Fundamentals of Electric Drives and its applications.pptx
manasideore6
 
MCQ Soil mechanics questions (Soil shear strength).pdf
MCQ Soil mechanics questions (Soil shear strength).pdfMCQ Soil mechanics questions (Soil shear strength).pdf
MCQ Soil mechanics questions (Soil shear strength).pdf
Osamah Alsalih
 
Student information management system project report ii.pdf
Student information management system project report ii.pdfStudent information management system project report ii.pdf
Student information management system project report ii.pdf
Kamal Acharya
 
Building Electrical System Design & Installation
Building Electrical System Design & InstallationBuilding Electrical System Design & Installation
Building Electrical System Design & Installation
symbo111
 
Understanding Inductive Bias in Machine Learning
Understanding Inductive Bias in Machine LearningUnderstanding Inductive Bias in Machine Learning
Understanding Inductive Bias in Machine Learning
SUTEJAS
 
Final project report on grocery store management system..pdf
Final project report on grocery store management system..pdfFinal project report on grocery store management system..pdf
Final project report on grocery store management system..pdf
Kamal Acharya
 
Railway Signalling Principles Edition 3.pdf
Railway Signalling Principles Edition 3.pdfRailway Signalling Principles Edition 3.pdf
Railway Signalling Principles Edition 3.pdf
TeeVichai
 
Hierarchical Digital Twin of a Naval Power System
Hierarchical Digital Twin of a Naval Power SystemHierarchical Digital Twin of a Naval Power System
Hierarchical Digital Twin of a Naval Power System
Kerry Sado
 
Cosmetic shop management system project report.pdf
Cosmetic shop management system project report.pdfCosmetic shop management system project report.pdf
Cosmetic shop management system project report.pdf
Kamal Acharya
 
Technical Drawings introduction to drawing of prisms
Technical Drawings introduction to drawing of prismsTechnical Drawings introduction to drawing of prisms
Technical Drawings introduction to drawing of prisms
heavyhaig
 
Water billing management system project report.pdf
Water billing management system project report.pdfWater billing management system project report.pdf
Water billing management system project report.pdf
Kamal Acharya
 
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
thanhdowork
 
PPT on GRP pipes manufacturing and testing
PPT on GRP pipes manufacturing and testingPPT on GRP pipes manufacturing and testing
PPT on GRP pipes manufacturing and testing
anoopmanoharan2
 
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&BDesign and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
Sreedhar Chowdam
 
Immunizing Image Classifiers Against Localized Adversary Attacks
Immunizing Image Classifiers Against Localized Adversary AttacksImmunizing Image Classifiers Against Localized Adversary Attacks
Immunizing Image Classifiers Against Localized Adversary Attacks
gerogepatton
 
Recycled Concrete Aggregate in Construction Part III
Recycled Concrete Aggregate in Construction Part IIIRecycled Concrete Aggregate in Construction Part III
Recycled Concrete Aggregate in Construction Part III
Aditya Rajan Patra
 
CW RADAR, FMCW RADAR, FMCW ALTIMETER, AND THEIR PARAMETERS
CW RADAR, FMCW RADAR, FMCW ALTIMETER, AND THEIR PARAMETERSCW RADAR, FMCW RADAR, FMCW ALTIMETER, AND THEIR PARAMETERS
CW RADAR, FMCW RADAR, FMCW ALTIMETER, AND THEIR PARAMETERS
veerababupersonal22
 
DfMAy 2024 - key insights and contributions
DfMAy 2024 - key insights and contributionsDfMAy 2024 - key insights and contributions
DfMAy 2024 - key insights and contributions
gestioneergodomus
 

Recently uploaded (20)

road safety engineering r s e unit 3.pdf
road safety engineering  r s e unit 3.pdfroad safety engineering  r s e unit 3.pdf
road safety engineering r s e unit 3.pdf
 
6th International Conference on Machine Learning & Applications (CMLA 2024)
6th International Conference on Machine Learning & Applications (CMLA 2024)6th International Conference on Machine Learning & Applications (CMLA 2024)
6th International Conference on Machine Learning & Applications (CMLA 2024)
 
Fundamentals of Electric Drives and its applications.pptx
Fundamentals of Electric Drives and its applications.pptxFundamentals of Electric Drives and its applications.pptx
Fundamentals of Electric Drives and its applications.pptx
 
MCQ Soil mechanics questions (Soil shear strength).pdf
MCQ Soil mechanics questions (Soil shear strength).pdfMCQ Soil mechanics questions (Soil shear strength).pdf
MCQ Soil mechanics questions (Soil shear strength).pdf
 
Student information management system project report ii.pdf
Student information management system project report ii.pdfStudent information management system project report ii.pdf
Student information management system project report ii.pdf
 
Building Electrical System Design & Installation
Building Electrical System Design & InstallationBuilding Electrical System Design & Installation
Building Electrical System Design & Installation
 
Understanding Inductive Bias in Machine Learning
Understanding Inductive Bias in Machine LearningUnderstanding Inductive Bias in Machine Learning
Understanding Inductive Bias in Machine Learning
 
Final project report on grocery store management system..pdf
Final project report on grocery store management system..pdfFinal project report on grocery store management system..pdf
Final project report on grocery store management system..pdf
 
Railway Signalling Principles Edition 3.pdf
Railway Signalling Principles Edition 3.pdfRailway Signalling Principles Edition 3.pdf
Railway Signalling Principles Edition 3.pdf
 
Hierarchical Digital Twin of a Naval Power System
Hierarchical Digital Twin of a Naval Power SystemHierarchical Digital Twin of a Naval Power System
Hierarchical Digital Twin of a Naval Power System
 
Cosmetic shop management system project report.pdf
Cosmetic shop management system project report.pdfCosmetic shop management system project report.pdf
Cosmetic shop management system project report.pdf
 
Technical Drawings introduction to drawing of prisms
Technical Drawings introduction to drawing of prismsTechnical Drawings introduction to drawing of prisms
Technical Drawings introduction to drawing of prisms
 
Water billing management system project report.pdf
Water billing management system project report.pdfWater billing management system project report.pdf
Water billing management system project report.pdf
 
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
 
PPT on GRP pipes manufacturing and testing
PPT on GRP pipes manufacturing and testingPPT on GRP pipes manufacturing and testing
PPT on GRP pipes manufacturing and testing
 
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&BDesign and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
 
Immunizing Image Classifiers Against Localized Adversary Attacks
Immunizing Image Classifiers Against Localized Adversary AttacksImmunizing Image Classifiers Against Localized Adversary Attacks
Immunizing Image Classifiers Against Localized Adversary Attacks
 
Recycled Concrete Aggregate in Construction Part III
Recycled Concrete Aggregate in Construction Part IIIRecycled Concrete Aggregate in Construction Part III
Recycled Concrete Aggregate in Construction Part III
 
CW RADAR, FMCW RADAR, FMCW ALTIMETER, AND THEIR PARAMETERS
CW RADAR, FMCW RADAR, FMCW ALTIMETER, AND THEIR PARAMETERSCW RADAR, FMCW RADAR, FMCW ALTIMETER, AND THEIR PARAMETERS
CW RADAR, FMCW RADAR, FMCW ALTIMETER, AND THEIR PARAMETERS
 
DfMAy 2024 - key insights and contributions
DfMAy 2024 - key insights and contributionsDfMAy 2024 - key insights and contributions
DfMAy 2024 - key insights and contributions
 

Pre_Commissioning_steps_of_ZTE_SDR.pptx

  • 2. Scope of Presentation: • Commissioning of BTS CC card in Pre-swap • Software Version up-gradation Methods • Follow steps on Configuration Diagram in LMT • Troubleshoot the alarms one-by-one 2
  • 3. Commissioning of CC card • First of all, confirm that you have required version of LMT(LMT_v12.13.43P02_GUL) 3
  • 4. Commissioning of CC card • After that you must apply setting to you laptop LAN IP like following. 4
  • 5. Commissioning of CC card • Now open “EOMS” file from LMT as mentioned below. 5
  • 6. Commissioning of CC card • EOMS will open a windows like below then select “Image and burn” and press “OK” 6
  • 7. Commissioning of CC card • It will ask for selection of RADIO MODE, select “MULTIMODE” 7
  • 8. Commissioning of CC card • Select PATCH Directory & Commissioning File then press “OK” 8
  • 9. Commissioning of CC card • After that LMT will start the process of image burning. 9
  • 10. Commissioning of CC card • It will take a while 10
  • 11. Commissioning of CC card Burning/MO file Succeeded when it will be succeeded the display shows 11
  • 12. 12 Commissioning of CC card(2nd Method) Select “Online Configuration” & press “Station”. Fill the Station Name & Station IP field.
  • 13. 13 Commissioning of CC card (2nd Method) Give User name “admin” and left password field blank. Then press OK to login.
  • 14. 14 Commissioning of CC card (2nd Method) Go to “System” and select “Import”. After that select the MO file in xml format. Press OK.
  • 15. Commissioning of CC Card • After completed process & reset of CC board, you can login again in EOMS and you can see the following window. It would show you the topology. 15
  • 16. Expected Alarms in EFMS • You can login to EFMS and you can see the alarms. 16
  • 17. View the Topology and follow it • Connect the boards & fiber cables according to the topology shown in LMT. 17
  • 18. View the Topology and follow it • Connect the boards & fiber cables according to the topology shown in LMT. 18
  • 19. View the Topology and follow it 19
  • 20. Confirming the Software Version • Go to System and select Version Management to confirm the Version 20
  • 21. Confirming the Software Version • Version must be 4.13.10.38P42. All versions must be in RUN condition. In case of 3G site, UMTS package must also be available. 21
  • 22. Confirming the Software Version • In case software is not updated, just right click on Local window and add the package files. 22
  • 23. Confirming the Software Version • In case software is not updated, just right click on Local window and add the package files. 23
  • 24. Confirming the Software Version • It will take some time to upload. 24
  • 25. Confirming the Software Version • After that, right click on the package files on Local Window and select “Download”. It will download the files. 25
  • 26. Key Points for software downloading • After commissioning, first confirm running the package version. • Running package version must be 4.13.10.38P42 • If the running version is still old one we need to active the new one again. • In case, package files are corrupted or not active successfully, first Delete the files by right click on it and then download again. • If you download again without deleting it, it may cause capacity issue. • In case, you don’t understand above points or you cannot resolve any issue, contact concerned troubleshooting person on call. 26
  • 27. Irrelative Alarms on Pre-Swap • Antenna related alarms.(VSWR, Carrier uplink etc) • SCTP alarm. • Link broken between OMM and NE. • SNTP time adjustment alarm. • 1588 Clock source fault. • The physical Ethernet link is broken. 27
  • 28. Related Alarms in Pre-Swap • Optical port receiving link failure(198098319) • The RRU link is broken(198097605) • Hardware type is different from the configuration(198092029) • Device power down(198092295) • Version package fault(198097567) • Unavailable optical module(198098318) • Software runs abnormally(198097604) • Carrier downlink data problem(198098471) • The board is not in position(198092072) • Carrier uplink data is abnormal.(198093053) • Disable PA(198098440) • Initialization failure(198092070) • The board is not configured(198092203) • The board is powered off(198092057) • Board communication link interrupted(198097060) • Internal fault(198098467) • Software loading is abnormal(198093056) 28
  • 38. Questions… • In Live BTS, if GSM (2G) is down, UMTS (3G) will effect of not? • In the worst scenario, if you have to edit the MO file on site, how you will do it? One More thing… After pre-swap, the site engineer must feedback the snapshot of EFMS to region management (Mr. Adeel and CC to us) as to confirm the pre- swap is successful or not. 38