___________________________________________________________________________________________________________________________
Prashant Kumar Gajbhiye (Bridge Design Engineer)
Email: prashantcygajbhiye@gmail.com
____________________________________________________________________________________________________________________________
1 of 4
CURRICULUM VITAE
POSITION IN THE FIRM : Senior Design Engineer-Structures ( Bridges)
NAME OF FIRM : M/s. Ramboll India Pvt. Ltd., Gurgaon, India
NAME OF EXPERT : Prashant Kumar Gajbhiye
DATE OF BIRTH : 11th
July 1980
CITIZENSHIP : Indian
PASSPORT NO. : N2443805 Date of Expiry : 6th
Sept. 2025
EDUCATION : M.Tech. (Structural Engineering) from VJTI, Mumbai University, 2008
B.E. (Civil Engineering) from NIT, Raipur, 2006.
PROFESSIONAL MEMBERSHIP : Life Member of Indian Institution of Bridge Engineers (IIBE India).
SOFTWARE USED : MIDAS CIVIL, STAAD pro. 2008, AutoCAD 2014. Microsoft Word, Excel
LANGUAGES : Speaking Reading Writing
English Excellent Excellent Excellent
Hindi Excellent Excellent Excellent
Marathi Good Excellent Excellent
PERMANENT ADDRESS : Flat no. 403/B, Plot No. – 15/16, Goodwill Garden CHS, Sector – 8, Kharghar,
Navi Mumbai, India – 410210.
Cell No. +91-9987124082.
Email: prashantcygajbhiye@gmail.com
prashant_gajbhiye50@yahoo.com
TOTAL EXPERIENCE : 7 Years 9 Months.
KEY PERFORMANCE AREAS
 A hard working result oriented Civil & Structural Engineer with rich, versatile & insightful experience of more than 7
years in design & detailed engineering of civil/structural works.
 Expertise in design and detailed engineering for Bridges, Flyovers, ROBs, VUPs & PUPs/CUPs. Having good
knowledge with MORTH specification, IRC & IS, BS & Euro codes.
 Adept in people and team management.
 Ability to successfully manage multiple priorities and assignments to provide total leadership to value engineering.
 Adept in swiftly ramping up projects within deadlines, budgets and quality parameters..
 Proficient in using structural softwares.
___________________________________________________________________________________________________________________________
Prashant Kumar Gajbhiye (Bridge Design Engineer)
Email: prashantcygajbhiye@gmail.com
____________________________________________________________________________________________________________________________
2 of 4
KEY PROJECTS:
 Construction of Elevated Road over Barapulla Nallah starting from Sarai Kale Khan to Aurobindo Marg near INA
Market, New Delhi (Phase-II).
 Rehabilitation, Strengthening and Four Laning of Jammu to Udhampur section from Km 15.00 (Jammu Bypass) to
Km 67.00 of NH 1-A in the State of Jammu & Kashmir.
 Design & Construction Of Flyovers, Grade Separator Along With Allied Works Including Road Work On Spine
Road At Kudalwadi Junction, Pune.
 Construction of ROB at Milan Subway, including vehicular under pass alongwith development of road at
Santacruz, Mumbai.
EMPLOYMENT RECORD :
1) M/S Ramboll India Pvt. Ltd. (Gurgaon, India) March 2016 – Till date
Senior Design Engineer-Structures ( Bridges)
Job Responsibilities:
 Carrying out the design and review the work of Asst Engineer / Design engineers and CAD technicians in the team
and maintaining quality of deliverables.
 Overseeing and troubleshooting the work of bridge design, guide Assistant Engineers / Design Engineers in
carrying out the design and preparation of the drawings.
 Coordination with the design team for project planning/preparation of schedule/WBS and delivering projects to
time and budget.
 Should take initiatives to develop design ability of the Assistant Engineers / Design engineers and improve the
quality of delivery of the team as whole.
 Mentoring and supervising Asst. Engineers/ Design Engineers and provide inputs to HoD/Technical manager for
the continued development of the staff in the team
2) M/S Intercontinental Consultants and Technocrats Pvt. Ltd. New Delhi, India) June 2015 – Feb 2016
Deputy General Manager (Bridges)
Job Responsibilities:
 Lead the team of engineers for design & project implementation.
 Develop innovative, constructible and most economical scheme/proposal for DPR as per codal standards.
 Design & release drawings for DPR considering quality, time & budget for projects like river Bridges, Flyovers,
ROBs, VUPs & PUPs/CUPs.
 Conducting inventory and condition survey of the existing structures.
 Regular monitoring of design activities to maintain close adherence to designs and drawings submitted to clients
for approval.
 Communicate with various departments of the Company to help the completion of work within the time schedule.
 Train and guide new entrants/Junior Engineers.
 Overall control and management of Design Team.
 Review and study of tender documents, Preparation of Pre-bid queries, Site visit and Validation of data provided
with the tender, Preparation of Compliance Statement and design concept and methodology for design and
construction including representative drawings i.e. Layouts, ESPs / Yard Plans, Bridge drawing, construction
depot drawings as relevant.
Name of the Projects:
1) Consulting Services for Detailed Project Report cum Transaction Advisory Services for Karnataka State Highway
Improvement Project-III (KSHIP-III) – Group II.
2) DFCCIL - Package 301. Design, Civil, Structure & Track Works, Pilkhani – Sahnewal Station (Approximately
175 route Km Of single line).
___________________________________________________________________________________________________________________________
Prashant Kumar Gajbhiye (Bridge Design Engineer)
Email: prashantcygajbhiye@gmail.com
____________________________________________________________________________________________________________________________
3 of 4
3) M/S Tangent Technical Solutions (Mumbai, India) Qct 2011 – June 2015
Senior Structural Design Engineer
Job Responsibilities:
 Preparation of detailed design and GADs and Reinforcement drawings for Bridges, Flyovers and Viaducts in the
stretch under scope. Design & drawings of open and pile foundation, RCC substructure, Balanced cantilever Box
type superstructure, Prestressed Box continuous superstructure, RCC solid slab, Prestressed voided slab and
Pretension I-Girders as superstructure. Meeting with the client on various issues and getting approval of the
drawings from the Proof Consultant.
 Preparing Detailed BOQ and cost Estimates for Roads and Bridges projects.
 Detailed backup for Estimates and Quantity.
 Meeting with the client on various issues and getting approval of the designs and drawings from the Proof
Consultant.
 Frequent visits to the projects site to provide support & adequate information to site in the form of drawings,
construction notes and methodology.
 Obtain approval from clients/proof consultants for design, methodology, erection scheme and drawings.
Name of the Projects:
1) Development of Firozabad (Village Gurha) to Etawah (Village Moonj) Km 53+500 to Km 115+500 Access
Controlled 6 Lane Expressway (Green Field) Project in the State of Uttar Pradesh on EPC Basis, Package – II.
2) Construction of Elevated Road over Barapulla Nallah starting from Sarai Kale Khan to Aurobindo Marg near INA
Market, New Delhi (Phase-II)
3) Design & Construction Of Flyovers, Grade Separator Along With Allied Works Including Road Work On Spine
Road At Kudalwadi Junction, Pune.
4) Rehabilitation, Strengthening and Four Laning of Jammu to Udhampur section from Km 15.00 (Jammu
Bypass) to Km 67.00 of NH 1-A in the State of Jammu & Kashmir.
4) M/S Technogem Consultants Pvt. Ltd. (Mumbai, India) Feb 2009 – Oct 2011
Structural Design Engineer
Job Responsibilities:
 Preparation of detailed GADs and Reinforcement drawings for ROB. Design & drawings of pile foundation, RCC
substructure, PSC I-Girder with RCC deck slab and RCC solid slab as superstructure, box culverts. Meeting with the
client and Railway officials on various issues and getting approval of the drawings from the Proof Consultant and
Railway.
 Proof checking of PSC I-Girders, RCC deck slab, substructure and pile foundations Pot-PTFE Bearings and getting
approval from the Railway.
 Structure inventory on the stretch, preparation of drawings of existing and proposed structures. Preparing BOQ for
feasibility report, PPR and DPR. Hydraulic Design, Structural Design & drawings for 10 major bridges and 52 minor
bridges.
 Calculation of Quantities of project by studying structural drawings and using IS codes, IRC manuals and Standards.
 Preparing Detailed BOQ and cost Estimates for Roads and Bridges projects.
Name of the Projects:
1) Proof Checking Of Design for The Proposed ROBs in lieu of L.C. 17 Between Gandevi – Chikhli Road Station At Km.
11/12-1311 on NH-8 Near Alipore Village & L.C. No. S7-A on NH-S Near Udhwada Quarry I Sleeper Factory at Km.
353.050.
2) Construction of ROB at Milan Subway, including vehicular under pass alongwith development of road at Santacruz,
Mumbai.
3) Construction of Katol Bypass & approaches for Katol ROB on BOT basis.
4) Development Of Pedestrian Skywalk Bridge At Vasai Road (W) Phase – I) At Mumbai.
5) Central Park, Kharghar, Navi Mumbai
6) Construction of ROB on Mumbai-Thane-Ahmednagar-Nanded-Bhokar M.S.H.-2 near Bafna Chowk at km.320/200 in
___________________________________________________________________________________________________________________________
Prashant Kumar Gajbhiye (Bridge Design Engineer)
Email: prashantcygajbhiye@gmail.com
____________________________________________________________________________________________________________________________
4 of 4
Nanded City.
7) Proposed bridges across various creeks in Amroli and Kosad area of Surat city.
8) Consultancy services for preparation of detailed project report for rehabilitation & upgrading to 2 lane with paved
shoulders configuration of Dhamtari – Jagdalpur section on NH-43 in state of Chhatisgarh.
9) Rehabilitaion and upgrading to 2 lane with paved shoulder configuration of the heritage route Ahmedabad – Dandi
National Highway No. – 228 in the state of Gujrat, section Ahmedabad-Mahisagar river (package no. DPR/Dl6/01).
10) Constructing major bridge on godavari river at chas village km. 27/200 on savalivihir bharvas road tal . Kopargaon dist.
Ahmednagar.
11) Proposed rob at Maltekdi, Nanded.
12) Design engineering, drawing & construction of Road Over Bridge (ROB) for proposed B.G.Rly siding at Khaperkheda.
5) M/S . Pranav Construction Systems Pvt. Ltd., (Mumbai, India) July 2008 – Feb 2009
Design Engineer
Job Responsibilities:
The job profile consists of design and checking of temporary steel structures to provide formwork and staging system for
heavy civil engineering structures. This consists of design of steel column, beams with different cross sections, steel plates,
design of steel connections, i.e., welded and bolted connections using Indian and international codes. The job also consists
of preparing full detailed drawing.
Awards & Honors : “Kundan Award” by Intercontinental Consultants and Technocrats Pvt. Ltd. on 1st January 2016 for
performing excellent work in project; Rehabilitation, Strengthening and Four Laning of Jammu to Udhampur section from
Km 15.00 (Jammu Bypass) to Km 67.00 of NH 1-A in the State of Jammu & Kashmir
CERTIFICATION : :
I, the undersigned, certify to the best of my knowledge and belief that, this CV correctly describes my qualifications and
experience
I understand that any willful misstatement described herein may lead to my disqualification or dismissal, if engaged.
Date : (Prashant Kumar Gajbhiye)

Prashant - CV simple format

  • 1.
    ___________________________________________________________________________________________________________________________ Prashant Kumar Gajbhiye(Bridge Design Engineer) Email: prashantcygajbhiye@gmail.com ____________________________________________________________________________________________________________________________ 1 of 4 CURRICULUM VITAE POSITION IN THE FIRM : Senior Design Engineer-Structures ( Bridges) NAME OF FIRM : M/s. Ramboll India Pvt. Ltd., Gurgaon, India NAME OF EXPERT : Prashant Kumar Gajbhiye DATE OF BIRTH : 11th July 1980 CITIZENSHIP : Indian PASSPORT NO. : N2443805 Date of Expiry : 6th Sept. 2025 EDUCATION : M.Tech. (Structural Engineering) from VJTI, Mumbai University, 2008 B.E. (Civil Engineering) from NIT, Raipur, 2006. PROFESSIONAL MEMBERSHIP : Life Member of Indian Institution of Bridge Engineers (IIBE India). SOFTWARE USED : MIDAS CIVIL, STAAD pro. 2008, AutoCAD 2014. Microsoft Word, Excel LANGUAGES : Speaking Reading Writing English Excellent Excellent Excellent Hindi Excellent Excellent Excellent Marathi Good Excellent Excellent PERMANENT ADDRESS : Flat no. 403/B, Plot No. – 15/16, Goodwill Garden CHS, Sector – 8, Kharghar, Navi Mumbai, India – 410210. Cell No. +91-9987124082. Email: prashantcygajbhiye@gmail.com prashant_gajbhiye50@yahoo.com TOTAL EXPERIENCE : 7 Years 9 Months. KEY PERFORMANCE AREAS  A hard working result oriented Civil & Structural Engineer with rich, versatile & insightful experience of more than 7 years in design & detailed engineering of civil/structural works.  Expertise in design and detailed engineering for Bridges, Flyovers, ROBs, VUPs & PUPs/CUPs. Having good knowledge with MORTH specification, IRC & IS, BS & Euro codes.  Adept in people and team management.  Ability to successfully manage multiple priorities and assignments to provide total leadership to value engineering.  Adept in swiftly ramping up projects within deadlines, budgets and quality parameters..  Proficient in using structural softwares.
  • 2.
    ___________________________________________________________________________________________________________________________ Prashant Kumar Gajbhiye(Bridge Design Engineer) Email: prashantcygajbhiye@gmail.com ____________________________________________________________________________________________________________________________ 2 of 4 KEY PROJECTS:  Construction of Elevated Road over Barapulla Nallah starting from Sarai Kale Khan to Aurobindo Marg near INA Market, New Delhi (Phase-II).  Rehabilitation, Strengthening and Four Laning of Jammu to Udhampur section from Km 15.00 (Jammu Bypass) to Km 67.00 of NH 1-A in the State of Jammu & Kashmir.  Design & Construction Of Flyovers, Grade Separator Along With Allied Works Including Road Work On Spine Road At Kudalwadi Junction, Pune.  Construction of ROB at Milan Subway, including vehicular under pass alongwith development of road at Santacruz, Mumbai. EMPLOYMENT RECORD : 1) M/S Ramboll India Pvt. Ltd. (Gurgaon, India) March 2016 – Till date Senior Design Engineer-Structures ( Bridges) Job Responsibilities:  Carrying out the design and review the work of Asst Engineer / Design engineers and CAD technicians in the team and maintaining quality of deliverables.  Overseeing and troubleshooting the work of bridge design, guide Assistant Engineers / Design Engineers in carrying out the design and preparation of the drawings.  Coordination with the design team for project planning/preparation of schedule/WBS and delivering projects to time and budget.  Should take initiatives to develop design ability of the Assistant Engineers / Design engineers and improve the quality of delivery of the team as whole.  Mentoring and supervising Asst. Engineers/ Design Engineers and provide inputs to HoD/Technical manager for the continued development of the staff in the team 2) M/S Intercontinental Consultants and Technocrats Pvt. Ltd. New Delhi, India) June 2015 – Feb 2016 Deputy General Manager (Bridges) Job Responsibilities:  Lead the team of engineers for design & project implementation.  Develop innovative, constructible and most economical scheme/proposal for DPR as per codal standards.  Design & release drawings for DPR considering quality, time & budget for projects like river Bridges, Flyovers, ROBs, VUPs & PUPs/CUPs.  Conducting inventory and condition survey of the existing structures.  Regular monitoring of design activities to maintain close adherence to designs and drawings submitted to clients for approval.  Communicate with various departments of the Company to help the completion of work within the time schedule.  Train and guide new entrants/Junior Engineers.  Overall control and management of Design Team.  Review and study of tender documents, Preparation of Pre-bid queries, Site visit and Validation of data provided with the tender, Preparation of Compliance Statement and design concept and methodology for design and construction including representative drawings i.e. Layouts, ESPs / Yard Plans, Bridge drawing, construction depot drawings as relevant. Name of the Projects: 1) Consulting Services for Detailed Project Report cum Transaction Advisory Services for Karnataka State Highway Improvement Project-III (KSHIP-III) – Group II. 2) DFCCIL - Package 301. Design, Civil, Structure & Track Works, Pilkhani – Sahnewal Station (Approximately 175 route Km Of single line).
  • 3.
    ___________________________________________________________________________________________________________________________ Prashant Kumar Gajbhiye(Bridge Design Engineer) Email: prashantcygajbhiye@gmail.com ____________________________________________________________________________________________________________________________ 3 of 4 3) M/S Tangent Technical Solutions (Mumbai, India) Qct 2011 – June 2015 Senior Structural Design Engineer Job Responsibilities:  Preparation of detailed design and GADs and Reinforcement drawings for Bridges, Flyovers and Viaducts in the stretch under scope. Design & drawings of open and pile foundation, RCC substructure, Balanced cantilever Box type superstructure, Prestressed Box continuous superstructure, RCC solid slab, Prestressed voided slab and Pretension I-Girders as superstructure. Meeting with the client on various issues and getting approval of the drawings from the Proof Consultant.  Preparing Detailed BOQ and cost Estimates for Roads and Bridges projects.  Detailed backup for Estimates and Quantity.  Meeting with the client on various issues and getting approval of the designs and drawings from the Proof Consultant.  Frequent visits to the projects site to provide support & adequate information to site in the form of drawings, construction notes and methodology.  Obtain approval from clients/proof consultants for design, methodology, erection scheme and drawings. Name of the Projects: 1) Development of Firozabad (Village Gurha) to Etawah (Village Moonj) Km 53+500 to Km 115+500 Access Controlled 6 Lane Expressway (Green Field) Project in the State of Uttar Pradesh on EPC Basis, Package – II. 2) Construction of Elevated Road over Barapulla Nallah starting from Sarai Kale Khan to Aurobindo Marg near INA Market, New Delhi (Phase-II) 3) Design & Construction Of Flyovers, Grade Separator Along With Allied Works Including Road Work On Spine Road At Kudalwadi Junction, Pune. 4) Rehabilitation, Strengthening and Four Laning of Jammu to Udhampur section from Km 15.00 (Jammu Bypass) to Km 67.00 of NH 1-A in the State of Jammu & Kashmir. 4) M/S Technogem Consultants Pvt. Ltd. (Mumbai, India) Feb 2009 – Oct 2011 Structural Design Engineer Job Responsibilities:  Preparation of detailed GADs and Reinforcement drawings for ROB. Design & drawings of pile foundation, RCC substructure, PSC I-Girder with RCC deck slab and RCC solid slab as superstructure, box culverts. Meeting with the client and Railway officials on various issues and getting approval of the drawings from the Proof Consultant and Railway.  Proof checking of PSC I-Girders, RCC deck slab, substructure and pile foundations Pot-PTFE Bearings and getting approval from the Railway.  Structure inventory on the stretch, preparation of drawings of existing and proposed structures. Preparing BOQ for feasibility report, PPR and DPR. Hydraulic Design, Structural Design & drawings for 10 major bridges and 52 minor bridges.  Calculation of Quantities of project by studying structural drawings and using IS codes, IRC manuals and Standards.  Preparing Detailed BOQ and cost Estimates for Roads and Bridges projects. Name of the Projects: 1) Proof Checking Of Design for The Proposed ROBs in lieu of L.C. 17 Between Gandevi – Chikhli Road Station At Km. 11/12-1311 on NH-8 Near Alipore Village & L.C. No. S7-A on NH-S Near Udhwada Quarry I Sleeper Factory at Km. 353.050. 2) Construction of ROB at Milan Subway, including vehicular under pass alongwith development of road at Santacruz, Mumbai. 3) Construction of Katol Bypass & approaches for Katol ROB on BOT basis. 4) Development Of Pedestrian Skywalk Bridge At Vasai Road (W) Phase – I) At Mumbai. 5) Central Park, Kharghar, Navi Mumbai 6) Construction of ROB on Mumbai-Thane-Ahmednagar-Nanded-Bhokar M.S.H.-2 near Bafna Chowk at km.320/200 in
  • 4.
    ___________________________________________________________________________________________________________________________ Prashant Kumar Gajbhiye(Bridge Design Engineer) Email: prashantcygajbhiye@gmail.com ____________________________________________________________________________________________________________________________ 4 of 4 Nanded City. 7) Proposed bridges across various creeks in Amroli and Kosad area of Surat city. 8) Consultancy services for preparation of detailed project report for rehabilitation & upgrading to 2 lane with paved shoulders configuration of Dhamtari – Jagdalpur section on NH-43 in state of Chhatisgarh. 9) Rehabilitaion and upgrading to 2 lane with paved shoulder configuration of the heritage route Ahmedabad – Dandi National Highway No. – 228 in the state of Gujrat, section Ahmedabad-Mahisagar river (package no. DPR/Dl6/01). 10) Constructing major bridge on godavari river at chas village km. 27/200 on savalivihir bharvas road tal . Kopargaon dist. Ahmednagar. 11) Proposed rob at Maltekdi, Nanded. 12) Design engineering, drawing & construction of Road Over Bridge (ROB) for proposed B.G.Rly siding at Khaperkheda. 5) M/S . Pranav Construction Systems Pvt. Ltd., (Mumbai, India) July 2008 – Feb 2009 Design Engineer Job Responsibilities: The job profile consists of design and checking of temporary steel structures to provide formwork and staging system for heavy civil engineering structures. This consists of design of steel column, beams with different cross sections, steel plates, design of steel connections, i.e., welded and bolted connections using Indian and international codes. The job also consists of preparing full detailed drawing. Awards & Honors : “Kundan Award” by Intercontinental Consultants and Technocrats Pvt. Ltd. on 1st January 2016 for performing excellent work in project; Rehabilitation, Strengthening and Four Laning of Jammu to Udhampur section from Km 15.00 (Jammu Bypass) to Km 67.00 of NH 1-A in the State of Jammu & Kashmir CERTIFICATION : : I, the undersigned, certify to the best of my knowledge and belief that, this CV correctly describes my qualifications and experience I understand that any willful misstatement described herein may lead to my disqualification or dismissal, if engaged. Date : (Prashant Kumar Gajbhiye)