SlideShare a Scribd company logo
U r b a n D e v e l o p m e n t & H o u s i n g D e p a r t m e n t
Workshop on Solid Waste
Management in Ganga Towns
UD&HD, Govt. of Bihar
9th January, 2019
Dr. Rajesh Kumar Prajapati
Sr. Environmental Planner, SPMG Bihar
U r b a n D e v e l o p m e n t & H o u s i n g D e p a r t m e n t
General Introduction
 The river Ganga is the longest river in India, and one of the most
sacred rivers for the Indians.
 It is considered a central part of Indian tradition, life and culture.
 It is also the third largest river across the globe by discharge.
 The river Ganga is a 2,525 km trans-boundary river of Asia that
rises in the western Himalayas and flows through India and
Bangladesh.
 In Bihar the river Ganga travels a length of 445 KM from Chausa
(Buxar) to Manihari (Katihar).
Cont…
U r b a n D e v e l o p m e n t & H o u s i n g D e p a r t m e n t
General Introduction
 At the entry point the average discharge of the river is 400
cumecs where as it increases up to 1600 cumecs when it leaves
Bihar.
 This shows that in Bihar large number of tributaries having high
discharge enriches the flow of river Ganga.
 The main tributaries of the river Ganga in Bihar are Sone,
Ghaghara, Gandak, Punpun, Burhi Gandak, Koshi and
Mahanada.
U r b a n D e v e l o p m e n t & H o u s i n g D e p a r t m e n t
Town wise Action plan for Sewerage projects for
abatement of Pollution in Ganga River
 There are 23 towns situated on main stem of River Ganga in Bihar
state which have been considered for sewerage projects under
Namami Gange Programme .
 Out of 23 towns (Main Stem of River Ganga) 16 towns sewerage
projects such as Buxer, Patna, Barh, Mokama, Sultanganj,
Naugachhiya, Bhagalpur, Munger, Begusarai, Hajipur, Sonepur,
Chhapra, Khagaria, Fatuha, Bakhtiyarpur and Maner have been
approved by NMCG.
 Total approved Cost for sewerage infrastructure is Rs-
5040.63Cr.(GOI)/5397.77Cr. (GOB).
Cont…
U r b a n D e v e l o p m e n t & H o u s i n g D e p a r t m e n t
Town wise Action plan for Sewerage projects for
abatement of Pollution in Ganga River
 The total no’s of approved DPR is 26, out of which 11 DPRs have
been approved for Patna town itself.
 Patna
 Pahari STP (60MLD)  Pahari Sewerage
Network Zone IV-A
 Pahari Sewerage
Network Zone V
 Beur Sewerage Network  Beur STP (43MLD)  Karmalichak STP
(37MLD)
 Karmalichak Sewerage
Network
 Saidpur STP & Adjoining
Network (60MLD)
 Saidpur Sewerage
Network
 Digha Sewerage
(100MLD)
 Kankarbagh Sewerage
(50MLD)
Cont…
U r b a n D e v e l o p m e n t & H o u s i n g D e p a r t m e n t
Town wise Action plan for Sewerage projects for
abatement of Pollution in Ganga River
 In these approved projects, 13 Project are ongoing :-Patna 9
projects (200MLD), Sultanganj (10MLD), Barh (11MLD),
Naugachhiya (9MLD), Buxar (16MLD-NOC for termination of
contract awaited)
 Beur, Saidpur, Pahari, Karmalichak Project will be completed by
Dec. 2020 &. Digha & Kankarbagh by Dec 2021
Cont…
U r b a n D e v e l o p m e n t & H o u s i n g D e p a r t m e n t
 7 have been tendered
 Target of completion for tendered projects is Dec 2020.
 For 5 projects, tender to be floated
 Target of completion for to be tender projects is Dec 2020.
 Munger (30MLD)  Fathua (7MLD)  Bakhtiyarpur (10MLD)
 Khagaria (4.5MLD)  Maner (6.5MLD)
Town wise Action plan for Sewerage projects for
abatement of Pollution in Ganga River
 Patna (Digha :100MLD and
Kankarbagh 50MLD)
 Begusarai (17MLD)  Mokama (8MLD)
 Sonepur (3.5MLD)  Bhagalpur (65MLD)  Hajipur (22MLD)
 Chhapra (32MLD)
Cont…
U r b a n D e v e l o p m e n t & H o u s i n g D e p a r t m e n t
 Out of which 8 projects have been proposed:
 DPRs have been prepared and submitted to NMCG for approval
 Proposed target to completion of the project is Dec. 2020.
 After completion of the sewerage projects Solid Waste flowing though
drains/Nala Will be mechanically screened at the entry point of the
STP
 Danapur (8MLD)  Barahiya (5.4MLD)  Kahalgaon (8MLD)
 Dighwara (5.4MLD)  Manihari (4.7MLD)  Teghra (3.5MLD)
 Jamalpur (4.7MLD)  Patna (Phulwarisarif-
13MLD)
Town wise Action plan for Sewerage projects for
abatement of Pollution in Ganga River
Cont…
U r b a n D e v e l o p m e n t & H o u s i n g D e p a r t m e n t
 From the above details it is clear that Sewerage projects (Network and STP) for
Buxer, Patna, Hajipur, Begusarai and Munger and other towns I&D with STP
projects have been proposed.
 In towns where STP with Network have been proposed, after completion of project
no sewage/ Solid Waste will flow through drains/Nala.
 In other towns after completion of I&D STP Projects, nalas will be taped and no
sewage / solid waste will be allowed to enter in the river Ganga without treatment.
 In STP there is provision of mechanically/manually operated screens at the entry
point of STP from which solid wastes will be screened .
 In this regard premier institute like IIT Patna, NIT Patna, BIT Meshra (Patna) & MIT
Muzaffarpur have been requested to deliver technological assistance.
Town wise Action plan for Sewerage projects for
abatement of Pollution in Ganga River
U r b a n D e v e l o p m e n t & H o u s i n g D e p a r t m e n t
Ganga Town Solid Waste Management Project Status and Action Plan
Cont…
Sl.No.
Name of
Towns
Population
Total
Projects
Waste
Generation
(TPD)
Wards with
D2D
collection
Status and Action Plan
1 Patna 2085203 19908.67 900 75/75
 SWM DPR has been prepared and submitted to
Govt. of India through UD & HD, Govt. of Bihar
letter no. 03/SBM-20-12/2015/2730 for
Collection and Transpiration, Garbage transfer
Station, which has been approved from Govt. of
India and received amount Rs. 34.50 Cr.
 Waste to energy project to be commissioned
soon.
2 Bhagalpur 435381 3862.36 234 51/51
 SWM DPR has been prepared and Submitted to
Govt. of India through UD & HD, Govt. of Bihar
letter no. 03/SBM-20-12/2015/2730 dated
19.11.2018 after approval execution shall be
started
3 Munger 213301 1953.69 45 45/45
 Partially waste processing through India Tobacco
Company Limited (ITC), SWM DPR has been
prepared and Submitted to Govt. of India
through UD & HD, Govt. of Bihar letter no.
03/SBM-20-12/2015/2730 dated 19.11.2018
after approval execution shall be started
4 Chhapra 263058 1937.50 45 45/44
 SWM DPRs have been prepared and Submitted
to Govt. of India through UD & HD, Govt. of Bihar
letter no. 03/SBM-20-12/2015/2730 dated
19.11.2018 after approval execution shall be
started
5 Begusarai 360211 3142.57 45 45/15
6 Hajipur 191994 1363.70 39 39/39
7 Mokama 75883 583.27 28 28/28
8 Bakhtiyarpur 62266 509.55 27 27/27
9 Buxar 143790 1130.16 34 34/34
10 Danapur 237158 1877.76 40 40/40
U r b a n D e v e l o p m e n t & H o u s i n g D e p a r t m e n t
Sl. No Name of Towns Population
Total
Projects
Waste
Generation
(TPD)
Wards with
D2D collection
Status and Action Plan
11 Barh 79911 643.73 27 27/27
 Partially waste processing through Shree
Shakti Industrial Agency SWM DPRs have
been prepared and Submitted to Govt. of
India through UD & HD, Govt. of Bihar
letter no. 03/SBM-20-12/2015/2730
dated 19.11.2018 after approval
execution shall be started
12 Fatuha 66249 483.42 27 27/27
 SWM DPRs have been prepared and
Submitted to Govt. of India through UD &
HD, Govt. of Bihar letter no. 03/SBM-20-
12/2015/2730 dated 19.11.2018 after
approval execution shall be started
13 Khagariya 64228 496.50 26 26/23
14 Jamalpur 136637 1094.86 36 36/25
15 Sultanganj 68760 535.71 25 25/25
16 Teghra 73104 527.23 25 25/00
17 Maner 52081 400.17 19 19/17
18 Barahiya 56047 431.07 24 24/24
19 Manihari 34618 274.47 15 15/13
20 Sonepur 49057 389.17 21 21/21
21 Naugachhiya 63790 479.31 19 19/15
22 Kahalgaon 43810 365.39 17 17/16
23 Dighwara 41265 299.97 18 18/15
Total 4897802 42735.22 2009
Ganga Town Solid Waste Management Project Status and Action Plan
U r b a n D e v e l o p m e n t & H o u s i n g D e p a r t m e n t
Thank You

More Related Content

What's hot

Kakinada Smart City MP Presentation
Kakinada Smart City MP PresentationKakinada Smart City MP Presentation
Kakinada Smart City MP Presentation
Harish Lunani
 
GVMPDBI
GVMPDBIGVMPDBI
BEST REAL ESTATE COMPANY IN PATNA
BEST REAL ESTATE COMPANY IN PATNABEST REAL ESTATE COMPANY IN PATNA
BEST REAL ESTATE COMPANY IN PATNA
Saakaar constructions
 
SOLID WASTE COLLECTION AND DISPOSAL MANAGEMENT IN NARAYANGANJ CITY CORPORATION
SOLID WASTE COLLECTION AND DISPOSAL MANAGEMENT IN NARAYANGANJ CITY CORPORATIONSOLID WASTE COLLECTION AND DISPOSAL MANAGEMENT IN NARAYANGANJ CITY CORPORATION
SOLID WASTE COLLECTION AND DISPOSAL MANAGEMENT IN NARAYANGANJ CITY CORPORATION
Md. Jisan Ahmed
 
BHADA (BHUJ AREA DEVELOPMENT AUTHORITY)
BHADA (BHUJ AREA DEVELOPMENT AUTHORITY)BHADA (BHUJ AREA DEVELOPMENT AUTHORITY)
BHADA (BHUJ AREA DEVELOPMENT AUTHORITY)
MIRAL SONI
 
Gandhinagar town planning and master plan study
Gandhinagar town planning and master plan studyGandhinagar town planning and master plan study
Gandhinagar town planning and master plan study
Anoushka Tyagi
 
Gandhinagar Smart City
Gandhinagar Smart CityGandhinagar Smart City
Gandhinagar Smart City
Jishnu Gohel
 
Challanges of water for present and future generations of kathmandu valley ne...
Challanges of water for present and future generations of kathmandu valley ne...Challanges of water for present and future generations of kathmandu valley ne...
Challanges of water for present and future generations of kathmandu valley ne...
Bhim Upadhyaya
 
Development Initiatives taken in Jhajjar District, Haryana.
Development Initiatives taken in Jhajjar District, Haryana.Development Initiatives taken in Jhajjar District, Haryana.
Development Initiatives taken in Jhajjar District, Haryana.
NITI Aayog
 
3.5.1 master plan
3.5.1 master plan3.5.1 master plan
3.5.1 master plan
Sachin PatiL
 
Solid Waste Management master plan for NCC
Solid Waste Management master plan for NCCSolid Waste Management master plan for NCC
Solid Waste Management master plan for NCC
MdJisanAhmed
 
ULAANBAATAR MONGOLIA PROJECT AND COOPERATION DEPARTMENT 91003310
ULAANBAATAR MONGOLIA PROJECT AND COOPERATION DEPARTMENT 91003310ULAANBAATAR MONGOLIA PROJECT AND COOPERATION DEPARTMENT 91003310
ULAANBAATAR MONGOLIA PROJECT AND COOPERATION DEPARTMENT 91003310
Bayar Tsend
 
Sindh High Density Development Act, 2010 presentation by Roland deSouza
Sindh High Density Development Act, 2010 presentation by Roland deSouza Sindh High Density Development Act, 2010 presentation by Roland deSouza
Sindh High Density Development Act, 2010 presentation by Roland deSouza
TheExpressTribune
 
3.1 development control rules
3.1 development control rules3.1 development control rules
3.1 development control rules
Sachin PatiL
 
Development plan case study (nagpur & lasvegas)
Development plan  case study (nagpur & lasvegas)Development plan  case study (nagpur & lasvegas)
Development plan case study (nagpur & lasvegas)
ABHI PATEL
 
11.16-17.2015, PRESENTATION, City of Ulaanbaatar-2030, Bat-Uul Erdene
11.16-17.2015, PRESENTATION, City of Ulaanbaatar-2030, Bat-Uul Erdene11.16-17.2015, PRESENTATION, City of Ulaanbaatar-2030, Bat-Uul Erdene
11.16-17.2015, PRESENTATION, City of Ulaanbaatar-2030, Bat-Uul Erdene
The Business Council of Mongolia
 
Changing of land use in wall city
Changing of land use in wall cityChanging of land use in wall city
Changing of land use in wall city
MIRAL SONI
 

What's hot (17)

Kakinada Smart City MP Presentation
Kakinada Smart City MP PresentationKakinada Smart City MP Presentation
Kakinada Smart City MP Presentation
 
GVMPDBI
GVMPDBIGVMPDBI
GVMPDBI
 
BEST REAL ESTATE COMPANY IN PATNA
BEST REAL ESTATE COMPANY IN PATNABEST REAL ESTATE COMPANY IN PATNA
BEST REAL ESTATE COMPANY IN PATNA
 
SOLID WASTE COLLECTION AND DISPOSAL MANAGEMENT IN NARAYANGANJ CITY CORPORATION
SOLID WASTE COLLECTION AND DISPOSAL MANAGEMENT IN NARAYANGANJ CITY CORPORATIONSOLID WASTE COLLECTION AND DISPOSAL MANAGEMENT IN NARAYANGANJ CITY CORPORATION
SOLID WASTE COLLECTION AND DISPOSAL MANAGEMENT IN NARAYANGANJ CITY CORPORATION
 
BHADA (BHUJ AREA DEVELOPMENT AUTHORITY)
BHADA (BHUJ AREA DEVELOPMENT AUTHORITY)BHADA (BHUJ AREA DEVELOPMENT AUTHORITY)
BHADA (BHUJ AREA DEVELOPMENT AUTHORITY)
 
Gandhinagar town planning and master plan study
Gandhinagar town planning and master plan studyGandhinagar town planning and master plan study
Gandhinagar town planning and master plan study
 
Gandhinagar Smart City
Gandhinagar Smart CityGandhinagar Smart City
Gandhinagar Smart City
 
Challanges of water for present and future generations of kathmandu valley ne...
Challanges of water for present and future generations of kathmandu valley ne...Challanges of water for present and future generations of kathmandu valley ne...
Challanges of water for present and future generations of kathmandu valley ne...
 
Development Initiatives taken in Jhajjar District, Haryana.
Development Initiatives taken in Jhajjar District, Haryana.Development Initiatives taken in Jhajjar District, Haryana.
Development Initiatives taken in Jhajjar District, Haryana.
 
3.5.1 master plan
3.5.1 master plan3.5.1 master plan
3.5.1 master plan
 
Solid Waste Management master plan for NCC
Solid Waste Management master plan for NCCSolid Waste Management master plan for NCC
Solid Waste Management master plan for NCC
 
ULAANBAATAR MONGOLIA PROJECT AND COOPERATION DEPARTMENT 91003310
ULAANBAATAR MONGOLIA PROJECT AND COOPERATION DEPARTMENT 91003310ULAANBAATAR MONGOLIA PROJECT AND COOPERATION DEPARTMENT 91003310
ULAANBAATAR MONGOLIA PROJECT AND COOPERATION DEPARTMENT 91003310
 
Sindh High Density Development Act, 2010 presentation by Roland deSouza
Sindh High Density Development Act, 2010 presentation by Roland deSouza Sindh High Density Development Act, 2010 presentation by Roland deSouza
Sindh High Density Development Act, 2010 presentation by Roland deSouza
 
3.1 development control rules
3.1 development control rules3.1 development control rules
3.1 development control rules
 
Development plan case study (nagpur & lasvegas)
Development plan  case study (nagpur & lasvegas)Development plan  case study (nagpur & lasvegas)
Development plan case study (nagpur & lasvegas)
 
11.16-17.2015, PRESENTATION, City of Ulaanbaatar-2030, Bat-Uul Erdene
11.16-17.2015, PRESENTATION, City of Ulaanbaatar-2030, Bat-Uul Erdene11.16-17.2015, PRESENTATION, City of Ulaanbaatar-2030, Bat-Uul Erdene
11.16-17.2015, PRESENTATION, City of Ulaanbaatar-2030, Bat-Uul Erdene
 
Changing of land use in wall city
Changing of land use in wall cityChanging of land use in wall city
Changing of land use in wall city
 

Similar to PPT on Solid Waste Management in Ganga Towns

Sewage Management and Sanitation Practices for Nagpur, Maharashtra
Sewage Management and Sanitation Practices for Nagpur, MaharashtraSewage Management and Sanitation Practices for Nagpur, Maharashtra
Sewage Management and Sanitation Practices for Nagpur, Maharashtra
Prasad Thanthratey
 
GANGA ACTION PLAN
GANGA ACTION PLANGANGA ACTION PLAN
GANGA ACTION PLAN
deeksha sharma
 
Cleaning ganga
Cleaning gangaCleaning ganga
Cleaning ganga
stepupias
 
GANGA ACTION PLAN-slideshare
GANGA ACTION PLAN-slideshareGANGA ACTION PLAN-slideshare
GANGA ACTION PLAN-slideshare
SLIDE SHARE
 
Rural road development_of_india_based_on PMGSY.
Rural road development_of_india_based_on PMGSY.Rural road development_of_india_based_on PMGSY.
Rural road development_of_india_based_on PMGSY.
CHAND PASHA KHAN
 
Ganga Rejuvenate Project - 2016
Ganga Rejuvenate Project - 2016Ganga Rejuvenate Project - 2016
Ganga Rejuvenate Project - 2016
H Janardan Prabhu
 
Ganga river cleaning schemes
Ganga  river cleaning schemesGanga  river cleaning schemes
Ganga river cleaning schemes
Arvind kumar
 
aparc_Broucher_100516_pro
aparc_Broucher_100516_proaparc_Broucher_100516_pro
aparc_Broucher_100516_pro
Ajay Agrawal
 
PLANNING AND DESIGN OF SEWERS USING ADVANCED TECHNIQUES FOR PROPOSED SEWERA...
PLANNING AND DESIGN OF SEWERS  USING ADVANCED TECHNIQUES  FOR PROPOSED SEWERA...PLANNING AND DESIGN OF SEWERS  USING ADVANCED TECHNIQUES  FOR PROPOSED SEWERA...
PLANNING AND DESIGN OF SEWERS USING ADVANCED TECHNIQUES FOR PROPOSED SEWERA...
Rajnish Bajaj
 
Proceedings of GRBMP Consultation Workshop
Proceedings of GRBMP Consultation WorkshopProceedings of GRBMP Consultation Workshop
Proceedings of GRBMP Consultation Workshop
FRANK Water
 
25. NECS 2016 _ Connecting NE through IWT_ Mr.Alok Ranjan
25. NECS 2016 _ Connecting NE through IWT_ Mr.Alok Ranjan25. NECS 2016 _ Connecting NE through IWT_ Mr.Alok Ranjan
25. NECS 2016 _ Connecting NE through IWT_ Mr.Alok Ranjan
FICCINorthEast
 
DESIGN OF MULTI-VILLAGE WATER SUPPLY SYSTEM
DESIGN OF MULTI-VILLAGE WATER SUPPLY SYSTEMDESIGN OF MULTI-VILLAGE WATER SUPPLY SYSTEM
DESIGN OF MULTI-VILLAGE WATER SUPPLY SYSTEM
IRJET Journal
 
CCC_Waste_Report Presentation_v5_Mahmoud.pptx
CCC_Waste_Report Presentation_v5_Mahmoud.pptxCCC_Waste_Report Presentation_v5_Mahmoud.pptx
CCC_Waste_Report Presentation_v5_Mahmoud.pptx
MajorTushar
 
Canal Network of UPID.ppt
Canal Network of UPID.pptCanal Network of UPID.ppt
Canal Network of UPID.ppt
ssuser7fd1e3
 
Critical Issues Plaguing Bangalore: B.PAC’s letter to the Karnataka CM
Critical Issues Plaguing Bangalore: B.PAC’s letter to the Karnataka CMCritical Issues Plaguing Bangalore: B.PAC’s letter to the Karnataka CM
Critical Issues Plaguing Bangalore: B.PAC’s letter to the Karnataka CM
Kiran Shaw
 
RIVER INTERLINKING (BY CANAL AND TUNNELS)
RIVER INTERLINKING (BY CANAL AND TUNNELS)RIVER INTERLINKING (BY CANAL AND TUNNELS)
RIVER INTERLINKING (BY CANAL AND TUNNELS)
IRJET Journal
 
Is the PMC a seat of bad governance? The Devnadi case study
Is the PMC a seat of bad governance? The Devnadi case studyIs the PMC a seat of bad governance? The Devnadi case study
Is the PMC a seat of bad governance? The Devnadi case study
Anupam Saraph
 
Ppt.puri 2014
Ppt.puri 2014Ppt.puri 2014
Ppt.puri 2014
santy12832
 
Line Deptt. Convergence Meeting_21-04-23.ppt
Line Deptt. Convergence Meeting_21-04-23.pptLine Deptt. Convergence Meeting_21-04-23.ppt
Line Deptt. Convergence Meeting_21-04-23.ppt
bhadratanusenapati1
 
Ganga pollution
Ganga pollutionGanga pollution
Ganga pollution
Vasundhara Singh Gautam
 

Similar to PPT on Solid Waste Management in Ganga Towns (20)

Sewage Management and Sanitation Practices for Nagpur, Maharashtra
Sewage Management and Sanitation Practices for Nagpur, MaharashtraSewage Management and Sanitation Practices for Nagpur, Maharashtra
Sewage Management and Sanitation Practices for Nagpur, Maharashtra
 
GANGA ACTION PLAN
GANGA ACTION PLANGANGA ACTION PLAN
GANGA ACTION PLAN
 
Cleaning ganga
Cleaning gangaCleaning ganga
Cleaning ganga
 
GANGA ACTION PLAN-slideshare
GANGA ACTION PLAN-slideshareGANGA ACTION PLAN-slideshare
GANGA ACTION PLAN-slideshare
 
Rural road development_of_india_based_on PMGSY.
Rural road development_of_india_based_on PMGSY.Rural road development_of_india_based_on PMGSY.
Rural road development_of_india_based_on PMGSY.
 
Ganga Rejuvenate Project - 2016
Ganga Rejuvenate Project - 2016Ganga Rejuvenate Project - 2016
Ganga Rejuvenate Project - 2016
 
Ganga river cleaning schemes
Ganga  river cleaning schemesGanga  river cleaning schemes
Ganga river cleaning schemes
 
aparc_Broucher_100516_pro
aparc_Broucher_100516_proaparc_Broucher_100516_pro
aparc_Broucher_100516_pro
 
PLANNING AND DESIGN OF SEWERS USING ADVANCED TECHNIQUES FOR PROPOSED SEWERA...
PLANNING AND DESIGN OF SEWERS  USING ADVANCED TECHNIQUES  FOR PROPOSED SEWERA...PLANNING AND DESIGN OF SEWERS  USING ADVANCED TECHNIQUES  FOR PROPOSED SEWERA...
PLANNING AND DESIGN OF SEWERS USING ADVANCED TECHNIQUES FOR PROPOSED SEWERA...
 
Proceedings of GRBMP Consultation Workshop
Proceedings of GRBMP Consultation WorkshopProceedings of GRBMP Consultation Workshop
Proceedings of GRBMP Consultation Workshop
 
25. NECS 2016 _ Connecting NE through IWT_ Mr.Alok Ranjan
25. NECS 2016 _ Connecting NE through IWT_ Mr.Alok Ranjan25. NECS 2016 _ Connecting NE through IWT_ Mr.Alok Ranjan
25. NECS 2016 _ Connecting NE through IWT_ Mr.Alok Ranjan
 
DESIGN OF MULTI-VILLAGE WATER SUPPLY SYSTEM
DESIGN OF MULTI-VILLAGE WATER SUPPLY SYSTEMDESIGN OF MULTI-VILLAGE WATER SUPPLY SYSTEM
DESIGN OF MULTI-VILLAGE WATER SUPPLY SYSTEM
 
CCC_Waste_Report Presentation_v5_Mahmoud.pptx
CCC_Waste_Report Presentation_v5_Mahmoud.pptxCCC_Waste_Report Presentation_v5_Mahmoud.pptx
CCC_Waste_Report Presentation_v5_Mahmoud.pptx
 
Canal Network of UPID.ppt
Canal Network of UPID.pptCanal Network of UPID.ppt
Canal Network of UPID.ppt
 
Critical Issues Plaguing Bangalore: B.PAC’s letter to the Karnataka CM
Critical Issues Plaguing Bangalore: B.PAC’s letter to the Karnataka CMCritical Issues Plaguing Bangalore: B.PAC’s letter to the Karnataka CM
Critical Issues Plaguing Bangalore: B.PAC’s letter to the Karnataka CM
 
RIVER INTERLINKING (BY CANAL AND TUNNELS)
RIVER INTERLINKING (BY CANAL AND TUNNELS)RIVER INTERLINKING (BY CANAL AND TUNNELS)
RIVER INTERLINKING (BY CANAL AND TUNNELS)
 
Is the PMC a seat of bad governance? The Devnadi case study
Is the PMC a seat of bad governance? The Devnadi case studyIs the PMC a seat of bad governance? The Devnadi case study
Is the PMC a seat of bad governance? The Devnadi case study
 
Ppt.puri 2014
Ppt.puri 2014Ppt.puri 2014
Ppt.puri 2014
 
Line Deptt. Convergence Meeting_21-04-23.ppt
Line Deptt. Convergence Meeting_21-04-23.pptLine Deptt. Convergence Meeting_21-04-23.ppt
Line Deptt. Convergence Meeting_21-04-23.ppt
 
Ganga pollution
Ganga pollutionGanga pollution
Ganga pollution
 

Recently uploaded

原版制作(Newcastle毕业证书)纽卡斯尔大学毕业证在读证明一模一样
原版制作(Newcastle毕业证书)纽卡斯尔大学毕业证在读证明一模一样原版制作(Newcastle毕业证书)纽卡斯尔大学毕业证在读证明一模一样
原版制作(Newcastle毕业证书)纽卡斯尔大学毕业证在读证明一模一样
p2npnqp
 
在线办理(lboro毕业证书)拉夫堡大学毕业证学历证书一模一样
在线办理(lboro毕业证书)拉夫堡大学毕业证学历证书一模一样在线办理(lboro毕业证书)拉夫堡大学毕业证学历证书一模一样
在线办理(lboro毕业证书)拉夫堡大学毕业证学历证书一模一样
pjq9n1lk
 
BASIC CONCEPT OF ENVIRONMENT AND DIFFERENT CONSTITUTENET OF ENVIRONMENT
BASIC CONCEPT OF ENVIRONMENT AND DIFFERENT CONSTITUTENET OF ENVIRONMENTBASIC CONCEPT OF ENVIRONMENT AND DIFFERENT CONSTITUTENET OF ENVIRONMENT
BASIC CONCEPT OF ENVIRONMENT AND DIFFERENT CONSTITUTENET OF ENVIRONMENT
AmitKumar619042
 
PACKAGING OF FROZEN FOODS ( food technology)
PACKAGING OF FROZEN FOODS  ( food technology)PACKAGING OF FROZEN FOODS  ( food technology)
PACKAGING OF FROZEN FOODS ( food technology)
Addu25809
 
Improving the viability of probiotics by encapsulation methods for developmen...
Improving the viability of probiotics by encapsulation methods for developmen...Improving the viability of probiotics by encapsulation methods for developmen...
Improving the viability of probiotics by encapsulation methods for developmen...
Open Access Research Paper
 
Evolving Lifecycles with High Resolution Site Characterization (HRSC) and 3-D...
Evolving Lifecycles with High Resolution Site Characterization (HRSC) and 3-D...Evolving Lifecycles with High Resolution Site Characterization (HRSC) and 3-D...
Evolving Lifecycles with High Resolution Site Characterization (HRSC) and 3-D...
Joshua Orris
 
Environment Conservation Rules 2023 (ECR)-2023.pptx
Environment Conservation Rules 2023 (ECR)-2023.pptxEnvironment Conservation Rules 2023 (ECR)-2023.pptx
Environment Conservation Rules 2023 (ECR)-2023.pptx
neilsencassidy
 
按照学校原版(UAL文凭证书)伦敦艺术大学毕业证快速办理
按照学校原版(UAL文凭证书)伦敦艺术大学毕业证快速办理按照学校原版(UAL文凭证书)伦敦艺术大学毕业证快速办理
按照学校原版(UAL文凭证书)伦敦艺术大学毕业证快速办理
xeexm
 
一比一原版西澳大学毕业证学历证书如何办理
一比一原版西澳大学毕业证学历证书如何办理一比一原版西澳大学毕业证学历证书如何办理
一比一原版西澳大学毕业证学历证书如何办理
yxfus
 
快速办理(Calabria毕业证书)卡拉布里亚大学毕业证在读证明一模一样
快速办理(Calabria毕业证书)卡拉布里亚大学毕业证在读证明一模一样快速办理(Calabria毕业证书)卡拉布里亚大学毕业证在读证明一模一样
快速办理(Calabria毕业证书)卡拉布里亚大学毕业证在读证明一模一样
astuz
 
Optimizing Post Remediation Groundwater Performance with Enhanced Microbiolog...
Optimizing Post Remediation Groundwater Performance with Enhanced Microbiolog...Optimizing Post Remediation Groundwater Performance with Enhanced Microbiolog...
Optimizing Post Remediation Groundwater Performance with Enhanced Microbiolog...
Joshua Orris
 
Biomimicry in agriculture: Nature-Inspired Solutions for a Greener Future
Biomimicry in agriculture: Nature-Inspired Solutions for a Greener FutureBiomimicry in agriculture: Nature-Inspired Solutions for a Greener Future
Biomimicry in agriculture: Nature-Inspired Solutions for a Greener Future
Dr. P.B.Dharmasena
 
Kinetic studies on malachite green dye adsorption from aqueous solutions by A...
Kinetic studies on malachite green dye adsorption from aqueous solutions by A...Kinetic studies on malachite green dye adsorption from aqueous solutions by A...
Kinetic studies on malachite green dye adsorption from aqueous solutions by A...
Open Access Research Paper
 
world-environment-day-2024-240601103559-14f4c0b4.pptx
world-environment-day-2024-240601103559-14f4c0b4.pptxworld-environment-day-2024-240601103559-14f4c0b4.pptx
world-environment-day-2024-240601103559-14f4c0b4.pptx
mfasna35
 
REPORT-PRESENTATION BY CHIEF SECRETARY, ANDAMAN NICOBAR ADMINISTRATION IN OA ...
REPORT-PRESENTATION BY CHIEF SECRETARY, ANDAMAN NICOBAR ADMINISTRATION IN OA ...REPORT-PRESENTATION BY CHIEF SECRETARY, ANDAMAN NICOBAR ADMINISTRATION IN OA ...
REPORT-PRESENTATION BY CHIEF SECRETARY, ANDAMAN NICOBAR ADMINISTRATION IN OA ...
pareeksulkash
 
学校原版(unuk学位证书)英国牛津布鲁克斯大学毕业证硕士文凭原版一模一样
学校原版(unuk学位证书)英国牛津布鲁克斯大学毕业证硕士文凭原版一模一样学校原版(unuk学位证书)英国牛津布鲁克斯大学毕业证硕士文凭原版一模一样
学校原版(unuk学位证书)英国牛津布鲁克斯大学毕业证硕士文凭原版一模一样
ehfyqtu
 
Lessons from operationalizing integrated landscape approaches
Lessons from operationalizing integrated landscape approachesLessons from operationalizing integrated landscape approaches
Lessons from operationalizing integrated landscape approaches
CIFOR-ICRAF
 
原版制作(Manitoba毕业证书)曼尼托巴大学毕业证学位证一模一样
原版制作(Manitoba毕业证书)曼尼托巴大学毕业证学位证一模一样原版制作(Manitoba毕业证书)曼尼托巴大学毕业证学位证一模一样
原版制作(Manitoba毕业证书)曼尼托巴大学毕业证学位证一模一样
mvrpcz6
 

Recently uploaded (18)

原版制作(Newcastle毕业证书)纽卡斯尔大学毕业证在读证明一模一样
原版制作(Newcastle毕业证书)纽卡斯尔大学毕业证在读证明一模一样原版制作(Newcastle毕业证书)纽卡斯尔大学毕业证在读证明一模一样
原版制作(Newcastle毕业证书)纽卡斯尔大学毕业证在读证明一模一样
 
在线办理(lboro毕业证书)拉夫堡大学毕业证学历证书一模一样
在线办理(lboro毕业证书)拉夫堡大学毕业证学历证书一模一样在线办理(lboro毕业证书)拉夫堡大学毕业证学历证书一模一样
在线办理(lboro毕业证书)拉夫堡大学毕业证学历证书一模一样
 
BASIC CONCEPT OF ENVIRONMENT AND DIFFERENT CONSTITUTENET OF ENVIRONMENT
BASIC CONCEPT OF ENVIRONMENT AND DIFFERENT CONSTITUTENET OF ENVIRONMENTBASIC CONCEPT OF ENVIRONMENT AND DIFFERENT CONSTITUTENET OF ENVIRONMENT
BASIC CONCEPT OF ENVIRONMENT AND DIFFERENT CONSTITUTENET OF ENVIRONMENT
 
PACKAGING OF FROZEN FOODS ( food technology)
PACKAGING OF FROZEN FOODS  ( food technology)PACKAGING OF FROZEN FOODS  ( food technology)
PACKAGING OF FROZEN FOODS ( food technology)
 
Improving the viability of probiotics by encapsulation methods for developmen...
Improving the viability of probiotics by encapsulation methods for developmen...Improving the viability of probiotics by encapsulation methods for developmen...
Improving the viability of probiotics by encapsulation methods for developmen...
 
Evolving Lifecycles with High Resolution Site Characterization (HRSC) and 3-D...
Evolving Lifecycles with High Resolution Site Characterization (HRSC) and 3-D...Evolving Lifecycles with High Resolution Site Characterization (HRSC) and 3-D...
Evolving Lifecycles with High Resolution Site Characterization (HRSC) and 3-D...
 
Environment Conservation Rules 2023 (ECR)-2023.pptx
Environment Conservation Rules 2023 (ECR)-2023.pptxEnvironment Conservation Rules 2023 (ECR)-2023.pptx
Environment Conservation Rules 2023 (ECR)-2023.pptx
 
按照学校原版(UAL文凭证书)伦敦艺术大学毕业证快速办理
按照学校原版(UAL文凭证书)伦敦艺术大学毕业证快速办理按照学校原版(UAL文凭证书)伦敦艺术大学毕业证快速办理
按照学校原版(UAL文凭证书)伦敦艺术大学毕业证快速办理
 
一比一原版西澳大学毕业证学历证书如何办理
一比一原版西澳大学毕业证学历证书如何办理一比一原版西澳大学毕业证学历证书如何办理
一比一原版西澳大学毕业证学历证书如何办理
 
快速办理(Calabria毕业证书)卡拉布里亚大学毕业证在读证明一模一样
快速办理(Calabria毕业证书)卡拉布里亚大学毕业证在读证明一模一样快速办理(Calabria毕业证书)卡拉布里亚大学毕业证在读证明一模一样
快速办理(Calabria毕业证书)卡拉布里亚大学毕业证在读证明一模一样
 
Optimizing Post Remediation Groundwater Performance with Enhanced Microbiolog...
Optimizing Post Remediation Groundwater Performance with Enhanced Microbiolog...Optimizing Post Remediation Groundwater Performance with Enhanced Microbiolog...
Optimizing Post Remediation Groundwater Performance with Enhanced Microbiolog...
 
Biomimicry in agriculture: Nature-Inspired Solutions for a Greener Future
Biomimicry in agriculture: Nature-Inspired Solutions for a Greener FutureBiomimicry in agriculture: Nature-Inspired Solutions for a Greener Future
Biomimicry in agriculture: Nature-Inspired Solutions for a Greener Future
 
Kinetic studies on malachite green dye adsorption from aqueous solutions by A...
Kinetic studies on malachite green dye adsorption from aqueous solutions by A...Kinetic studies on malachite green dye adsorption from aqueous solutions by A...
Kinetic studies on malachite green dye adsorption from aqueous solutions by A...
 
world-environment-day-2024-240601103559-14f4c0b4.pptx
world-environment-day-2024-240601103559-14f4c0b4.pptxworld-environment-day-2024-240601103559-14f4c0b4.pptx
world-environment-day-2024-240601103559-14f4c0b4.pptx
 
REPORT-PRESENTATION BY CHIEF SECRETARY, ANDAMAN NICOBAR ADMINISTRATION IN OA ...
REPORT-PRESENTATION BY CHIEF SECRETARY, ANDAMAN NICOBAR ADMINISTRATION IN OA ...REPORT-PRESENTATION BY CHIEF SECRETARY, ANDAMAN NICOBAR ADMINISTRATION IN OA ...
REPORT-PRESENTATION BY CHIEF SECRETARY, ANDAMAN NICOBAR ADMINISTRATION IN OA ...
 
学校原版(unuk学位证书)英国牛津布鲁克斯大学毕业证硕士文凭原版一模一样
学校原版(unuk学位证书)英国牛津布鲁克斯大学毕业证硕士文凭原版一模一样学校原版(unuk学位证书)英国牛津布鲁克斯大学毕业证硕士文凭原版一模一样
学校原版(unuk学位证书)英国牛津布鲁克斯大学毕业证硕士文凭原版一模一样
 
Lessons from operationalizing integrated landscape approaches
Lessons from operationalizing integrated landscape approachesLessons from operationalizing integrated landscape approaches
Lessons from operationalizing integrated landscape approaches
 
原版制作(Manitoba毕业证书)曼尼托巴大学毕业证学位证一模一样
原版制作(Manitoba毕业证书)曼尼托巴大学毕业证学位证一模一样原版制作(Manitoba毕业证书)曼尼托巴大学毕业证学位证一模一样
原版制作(Manitoba毕业证书)曼尼托巴大学毕业证学位证一模一样
 

PPT on Solid Waste Management in Ganga Towns

  • 1. U r b a n D e v e l o p m e n t & H o u s i n g D e p a r t m e n t Workshop on Solid Waste Management in Ganga Towns UD&HD, Govt. of Bihar 9th January, 2019 Dr. Rajesh Kumar Prajapati Sr. Environmental Planner, SPMG Bihar
  • 2. U r b a n D e v e l o p m e n t & H o u s i n g D e p a r t m e n t General Introduction  The river Ganga is the longest river in India, and one of the most sacred rivers for the Indians.  It is considered a central part of Indian tradition, life and culture.  It is also the third largest river across the globe by discharge.  The river Ganga is a 2,525 km trans-boundary river of Asia that rises in the western Himalayas and flows through India and Bangladesh.  In Bihar the river Ganga travels a length of 445 KM from Chausa (Buxar) to Manihari (Katihar). Cont…
  • 3. U r b a n D e v e l o p m e n t & H o u s i n g D e p a r t m e n t General Introduction  At the entry point the average discharge of the river is 400 cumecs where as it increases up to 1600 cumecs when it leaves Bihar.  This shows that in Bihar large number of tributaries having high discharge enriches the flow of river Ganga.  The main tributaries of the river Ganga in Bihar are Sone, Ghaghara, Gandak, Punpun, Burhi Gandak, Koshi and Mahanada.
  • 4. U r b a n D e v e l o p m e n t & H o u s i n g D e p a r t m e n t Town wise Action plan for Sewerage projects for abatement of Pollution in Ganga River  There are 23 towns situated on main stem of River Ganga in Bihar state which have been considered for sewerage projects under Namami Gange Programme .  Out of 23 towns (Main Stem of River Ganga) 16 towns sewerage projects such as Buxer, Patna, Barh, Mokama, Sultanganj, Naugachhiya, Bhagalpur, Munger, Begusarai, Hajipur, Sonepur, Chhapra, Khagaria, Fatuha, Bakhtiyarpur and Maner have been approved by NMCG.  Total approved Cost for sewerage infrastructure is Rs- 5040.63Cr.(GOI)/5397.77Cr. (GOB). Cont…
  • 5. U r b a n D e v e l o p m e n t & H o u s i n g D e p a r t m e n t Town wise Action plan for Sewerage projects for abatement of Pollution in Ganga River  The total no’s of approved DPR is 26, out of which 11 DPRs have been approved for Patna town itself.  Patna  Pahari STP (60MLD)  Pahari Sewerage Network Zone IV-A  Pahari Sewerage Network Zone V  Beur Sewerage Network  Beur STP (43MLD)  Karmalichak STP (37MLD)  Karmalichak Sewerage Network  Saidpur STP & Adjoining Network (60MLD)  Saidpur Sewerage Network  Digha Sewerage (100MLD)  Kankarbagh Sewerage (50MLD) Cont…
  • 6. U r b a n D e v e l o p m e n t & H o u s i n g D e p a r t m e n t Town wise Action plan for Sewerage projects for abatement of Pollution in Ganga River  In these approved projects, 13 Project are ongoing :-Patna 9 projects (200MLD), Sultanganj (10MLD), Barh (11MLD), Naugachhiya (9MLD), Buxar (16MLD-NOC for termination of contract awaited)  Beur, Saidpur, Pahari, Karmalichak Project will be completed by Dec. 2020 &. Digha & Kankarbagh by Dec 2021 Cont…
  • 7. U r b a n D e v e l o p m e n t & H o u s i n g D e p a r t m e n t  7 have been tendered  Target of completion for tendered projects is Dec 2020.  For 5 projects, tender to be floated  Target of completion for to be tender projects is Dec 2020.  Munger (30MLD)  Fathua (7MLD)  Bakhtiyarpur (10MLD)  Khagaria (4.5MLD)  Maner (6.5MLD) Town wise Action plan for Sewerage projects for abatement of Pollution in Ganga River  Patna (Digha :100MLD and Kankarbagh 50MLD)  Begusarai (17MLD)  Mokama (8MLD)  Sonepur (3.5MLD)  Bhagalpur (65MLD)  Hajipur (22MLD)  Chhapra (32MLD) Cont…
  • 8. U r b a n D e v e l o p m e n t & H o u s i n g D e p a r t m e n t  Out of which 8 projects have been proposed:  DPRs have been prepared and submitted to NMCG for approval  Proposed target to completion of the project is Dec. 2020.  After completion of the sewerage projects Solid Waste flowing though drains/Nala Will be mechanically screened at the entry point of the STP  Danapur (8MLD)  Barahiya (5.4MLD)  Kahalgaon (8MLD)  Dighwara (5.4MLD)  Manihari (4.7MLD)  Teghra (3.5MLD)  Jamalpur (4.7MLD)  Patna (Phulwarisarif- 13MLD) Town wise Action plan for Sewerage projects for abatement of Pollution in Ganga River Cont…
  • 9. U r b a n D e v e l o p m e n t & H o u s i n g D e p a r t m e n t  From the above details it is clear that Sewerage projects (Network and STP) for Buxer, Patna, Hajipur, Begusarai and Munger and other towns I&D with STP projects have been proposed.  In towns where STP with Network have been proposed, after completion of project no sewage/ Solid Waste will flow through drains/Nala.  In other towns after completion of I&D STP Projects, nalas will be taped and no sewage / solid waste will be allowed to enter in the river Ganga without treatment.  In STP there is provision of mechanically/manually operated screens at the entry point of STP from which solid wastes will be screened .  In this regard premier institute like IIT Patna, NIT Patna, BIT Meshra (Patna) & MIT Muzaffarpur have been requested to deliver technological assistance. Town wise Action plan for Sewerage projects for abatement of Pollution in Ganga River
  • 10. U r b a n D e v e l o p m e n t & H o u s i n g D e p a r t m e n t Ganga Town Solid Waste Management Project Status and Action Plan Cont… Sl.No. Name of Towns Population Total Projects Waste Generation (TPD) Wards with D2D collection Status and Action Plan 1 Patna 2085203 19908.67 900 75/75  SWM DPR has been prepared and submitted to Govt. of India through UD & HD, Govt. of Bihar letter no. 03/SBM-20-12/2015/2730 for Collection and Transpiration, Garbage transfer Station, which has been approved from Govt. of India and received amount Rs. 34.50 Cr.  Waste to energy project to be commissioned soon. 2 Bhagalpur 435381 3862.36 234 51/51  SWM DPR has been prepared and Submitted to Govt. of India through UD & HD, Govt. of Bihar letter no. 03/SBM-20-12/2015/2730 dated 19.11.2018 after approval execution shall be started 3 Munger 213301 1953.69 45 45/45  Partially waste processing through India Tobacco Company Limited (ITC), SWM DPR has been prepared and Submitted to Govt. of India through UD & HD, Govt. of Bihar letter no. 03/SBM-20-12/2015/2730 dated 19.11.2018 after approval execution shall be started 4 Chhapra 263058 1937.50 45 45/44  SWM DPRs have been prepared and Submitted to Govt. of India through UD & HD, Govt. of Bihar letter no. 03/SBM-20-12/2015/2730 dated 19.11.2018 after approval execution shall be started 5 Begusarai 360211 3142.57 45 45/15 6 Hajipur 191994 1363.70 39 39/39 7 Mokama 75883 583.27 28 28/28 8 Bakhtiyarpur 62266 509.55 27 27/27 9 Buxar 143790 1130.16 34 34/34 10 Danapur 237158 1877.76 40 40/40
  • 11. U r b a n D e v e l o p m e n t & H o u s i n g D e p a r t m e n t Sl. No Name of Towns Population Total Projects Waste Generation (TPD) Wards with D2D collection Status and Action Plan 11 Barh 79911 643.73 27 27/27  Partially waste processing through Shree Shakti Industrial Agency SWM DPRs have been prepared and Submitted to Govt. of India through UD & HD, Govt. of Bihar letter no. 03/SBM-20-12/2015/2730 dated 19.11.2018 after approval execution shall be started 12 Fatuha 66249 483.42 27 27/27  SWM DPRs have been prepared and Submitted to Govt. of India through UD & HD, Govt. of Bihar letter no. 03/SBM-20- 12/2015/2730 dated 19.11.2018 after approval execution shall be started 13 Khagariya 64228 496.50 26 26/23 14 Jamalpur 136637 1094.86 36 36/25 15 Sultanganj 68760 535.71 25 25/25 16 Teghra 73104 527.23 25 25/00 17 Maner 52081 400.17 19 19/17 18 Barahiya 56047 431.07 24 24/24 19 Manihari 34618 274.47 15 15/13 20 Sonepur 49057 389.17 21 21/21 21 Naugachhiya 63790 479.31 19 19/15 22 Kahalgaon 43810 365.39 17 17/16 23 Dighwara 41265 299.97 18 18/15 Total 4897802 42735.22 2009 Ganga Town Solid Waste Management Project Status and Action Plan
  • 12. U r b a n D e v e l o p m e n t & H o u s i n g D e p a r t m e n t Thank You