National Rurban Mission
MINISTRY OF RURAL DEVELOPMENT
INTEGRATED CLUSTER ACTION PLANs
Uttarakhand – 02 Clusters
Name of Cluster Name of Block Name of District Cluster Population (2011)
Bhagtanpur Abidpur Bahadrabad Haridwar 45,614
Athoorwala Doiwala Dehradun 44,905
State Government of Uttarakhand
&
CSIR – Central Building Research Institute
Selection of Cluster
S. No. Name of District Population (Census 2011)
1 Almora 622,506
2 Bageshwar 259,898
3 Chamoli 391,605
4 Champawat 259,648
5 Dehradun 1,696,694
6 Haridwar 1,890,422
7 Nainital 954,605
8 Pauri Garhwal 687,271
9 Pithoragarh 483,439
10 Rudraprayag 242,285
11 Tehri Garhwal 618,931
12 Udham Singh Nagar 1,648,902
13 Uttarkashi 330,086
13 Non – Tribal Districts, Uttarakhand
S. No. Category Cluster Name Block District
1. Plain Bhagtanpur Abidpur Bahadrabad Haridwar
2. Plain Athoorwala Doiwala Dehradun
Empanelment of CSIR-CBRI as STSA
Empanelment of CSIR – CBRI Roorkee as the State Technical Support Agencies under
the National Rurban Mission’ by Ministry of Rural Development
Planning area notification
Planning area notification by the State Government of Uttarakhand
of Clusters Bhagtanpur Abidpur (Haridwar) and Athoorwala (Dehradun)
Preparation of ICAP – Methodology
5
Bhagtanpur Abidpur cluster
Sno. Name of GP Households
(nos)
1 Atmalpur Bangla 1768
2 Ruhalki Kishanpur 664
3 Alipur Ibrahimpur 785
4 Bhagtanpur Abidpur 4178
5 Bahadar Pur Jatt 1600
6 Ajitpur 425
7 Noorpur Panjanhedi 864
Total Households 10284
Athoorwala cluster
S No Name of GP Households
(nos)
1 Athoorwala 2172
2 Mazrigrant 2228
3 Bhaniawala 936
4 Jollygrant 2088
5 RanipokhariMoja 396
6 Ranipokhari Grant 1080
7 Rainapur Grant 324
8 Kanharwala 1126
Total Households 10350
▪ Household surveys of both clusters with 100% sampling size for Cluster & Component profiling.
Survey conducted by Uttarakhand government based on questionnaires prepared by CSIR- CBRI.
▪ Digitalization of administrative boundaries of all GPs by CSIR-CBRI using GPS technology on sites
and geo-referencing the same with Sajra maps and Land record officers (Patwaris).
▪ Preparation of Land use maps of every GP by CSIR-CBRI for the built-up areas and spatial
composition by extensive site visits to both clusters.
▪ Periodic meetings chaired by the Additional Secretary Shri. Yugal Kishore Pant & CDOs; with the
concerned division heads, BDOs, Pradhans, stakeholders and the CSIR-CBRI team.
Investment & CGF summary
6
Name of Cluster
Total
Investment
Estimated
30% of
Investment
Estimated
CGF Projected by
State
Funds Mobilized
through
Convergence/
Funds
1
Bhagtanpur
Abidpur
106.72 32.02 34.17 72.55
2 Athoorwala 104.06 31.22 31.19 72.87
Total
(Crores)
210.78 63.24 65.36 145.42
(In Crores)
Bhagtanpur Abidpur Cluster (Plain)
Block: Bahadrabad
District: Haridwar
Cluster Overview
No. of Gram Panchayats in cluster 07
Population of the cluster (HH survey, 2016) 54214
Decadal growth in population (2001 – 2011) 28.5%
Name of Block Head Quarters Bahadrabad
Name of the BDO Ms. Anita Panwar
Bhagtanpur Abidpur cluster
The Bhagtanpur Abidpur cluster
region is under the master plan of
Haridwar. It is located within the
administrative boundary of
Bahadrabad block. The declared
cluster is situated geographically
between the towns of Haridwar
and Roorkee, access to which is via
the National Highway 58 and the
Bahadrabad bypass.
Administrative structure of cluster Bhagtanpur Abidpur cluster
District
Haridwar
GP 1
Atmalpur
Bangla
GP 2
Ruhalki
Kishanpur
GP 3
Alipur
Ibrahimpur
Alipur
GP 4
Bhagtanpur
Abidpur
Ambuwala
Ibrahimpur
Jhabri
Ikkar khurd
Ikkar kalan
Sukhrasa
Dandi (1&2)
Pathri
GP 5
Bahadar Pur
Jatt
GP 6
Ajitpur
Ajitpur
Athmal
Ajitpur
Mustakam
Sirsali
GP 7
Noorpur
Panjhedi
Kishanpur
Missarpur
Mustakam
Noorpur
Panjhedi
Missarpur
Athmal
Block
Bahadrabad
Vision & SWOT Analysis
“Developing Bhagtanpur Abidpur cluster as an agri based core
and providing all basic amenities with clean environment”
STRENGTHS WEAKNESS
OPPORTUNITIES THREATS
Bhagtanpur
Abidpur
Cluster
• Soil & Climatic Factors
• Availability of vacant land parcels.
• Connectivity to the National Highway
• Close to SIDCUL, BHEL, Patanjali,
Great White, Anchor as important non-
agricultural employment source.
• Insignificant home based skills in cluster.
• Lack of basic physical infrastructure like
street lights, drains etc.
• Lack of piped water connection in villages.
• No solid and liquid waste management
• Non functional Common Service Centers.
• Weak agro-processing infrastructure
• Decreasing level of ground water.
• Increasing shift from Farm to non-farm
workforce.
• Contamination of agricultural fields due
to disposal of solid wastes.
• Scope for agro-processing units.
• Scope for vocational training.
• Potential of industrial employment and self
employment.
• Opportunities of skill training/capacity
building for placement linked employment.
Bhagtanpur Abidpur cluster
Cluster at Glance Bhagtanpur Abidpur cluster
Deficiency Analysis
0% 20% 40% 60% 80% 100%
LPG Gas connections
Street Lights
Village drains
Solid & Liquid waste…
Sanitation
Piped water
0%
20%
40%
60%
80%
100%
Education PHC Sub Centre School for
diabled
Veterinary
care
0%
20%
40%
60%
80%
100%
Skill
Development
Agro service
center
Deficiency Existing
0%
20%
40%
60%
80%
100%
Digital
Literacy
CSCs
Basic Amenities Digital Amenities
Economic AmenitiesSocial Amenities
Bhagtanpur Abidpur cluster
Investment & CGF summary
Funding strategy 2016-17 2017-18 2018-19 Total
A
Total Investment
Required 41.155 39.959 25.607 106.72
B
CGF capped as per
norms
14.614 11.115 8.44 34.17
C
Resources through
Convergence
26.541 28.844 17.167 72.55
Bhagtanpur Abidpur cluster(In Crores)
Investment Phasing
Name of the component Total Investment
required
2016-17 2017-18 2018-19
1 Skill development training 11.00 0 7.56 3.44
2 Agri-services & processing 1.87 0 1.87 0
3 Digital amenities & literacy/CSCs .185 0 0.12 0.065
4 24 x 7 Piped water supply 20.224 0 10.224 10.0o
5 Sanitation 4.785 4.785 0 0
6 Solid& Liquid Waste Management 2.464 2.464 0 0
7 Access to village streets with drains 21.00 21.00 0 0
8 Village street lights 6.031 4.056 1.975 0
9 Health 6.86 0 4.5 2.36
10 Upgradation of schools 1.10 0 0.75 0.35
11 Inter village road connectivity 21.542 0 12.20 9.342
12 Public transport .10 0 .05 .05
13 LPG gas connection .71 0 .71 0
14 Minor Irrigation 8.85 8.85 0 0
Grand Total 106.721 41.155 39.959 25.607
Bhagtanpur Abidpur cluster(In Crores)
Component Details
15
Name of the component Investment Share Sub Components
1 Skill development training 11.0
10.56 Training of 7039 persons for food packaging,
Agriculture, Mechanics, Mobile & Electrical Repairing,
Computers, Handicrafts.
0.44
2
Agricultural services and
processing
1.87
1.25 Construction of 01 Agro service centre.
Construction of 02 Agro processing units.
Upgradation of existing Agro processing units.
Construction of Agri Waste based Compost pits.
0.62
3 Digital Amenities/ CSCs 0.185
0.185 6229 persons to be made digitally literate.
05 Citizen Service Centers to be made functional.
Facilitate Internet Banking in all 07 CSCs.
-
4 24 x 7 Piped water supply 20.224
09.704 Construction and provision of piped water supply in
Bhagtanpur Abidpur GP.10.52
5 Sanitation 4.785
4.785 Construction of 3987 IHH Latrines.
Public Toilets in Bhagtanpur Abidpur, Bahadar Pur Jatt
and Alipur Ibrahimpur GPs.
-
6
Solid & Liquid waste
management
2.464
1.35 Construction of Solid waste dumping pits with linings.
Provision for waste disposal infrastructure.
Compactor/ transport vehicle (Hyva machine)
Construction of Recharge pits/ trenches for treatment
of Grey water prior disposal to agricultural fields.
1.114
7
Access to village streets with
drains
21.00
7.50 Construction of approx. 52 kms length of concrete
drains in arterial and sub-arterial roads.13.50
Under Convergence
Under CGF
(In Crores)
Component Details
16
Name of the component Investment Share Sub Components
8 Street lights 6.031
4.056
Installation of 2800 street lights.
1.975
9 Health 6.86
6.86 Construction of 01 Primary Health Centre.
Construction of 04 Sub Centres.
Construction of 02 Veterinary centre, each in Bhagtanpur Abidpur
and Bahadar Pur Jatt.
-
10 Upgradation of schools 1.10
1.10 Upgradation to intermediate school in Bhagtanpur Abidpur GP.
Construction of 04 additional classrooms.
Construction of computer labs facility in 03 Secondary schools.
Provision for amenities like drinking water and toilets.
-
11
Inter village road
connectivity
21.542
15.542 Widening and strengthening of the inter-village roads.
Repair of roads & causeway damaged due to heavy rains (4 kms).
Repair of causeway in Ibrahimpur & Ikkar Khurd (1 km).
Repair of damaged bridge in Bahadrabad-Sukhrasa road (4.5 kms).
6.0
12 Public Transport 0.10
0.10 Provision of 10 E-Rickshaws to beneficiaries in Bhagtanpur Abidpur
and Bahadar Pur Jatt GPs as para-transit modes.
Provision for permits/ licenses by the Regional Transport Office.
-
13 LPG gas connection 0.71
0.71
Facilitation of 02 Retail outlets by the District Supply Office.
-
14 Minor Irrigation 8.85
8.85
Repair/ construction of 29.5 kms of canal in the cluster.
-
Grand Total (In Crores) 106.721
72.55
34.17
(In Crores)
Under Convergence
Under CGF
Convergence Strategy
Components Name of the Scheme to be converged Amount
proposed to be
mobilised
CGF
Skill development training
related to economic
activities
DeendayalUpadhayaGraminKaushalyaYojana (DDUGKY),
Entrepreneurship Development Programme (EDP),
Rural Self Employment Training Institutes (RSETIs)
10.56 0.44
Agri-services & processing RashtriyaKrishiVikasYojana,
Sub-Mission on Agricultural Mechanization,
National Food Security Mission
1.25 0.62
Digital amenities & CSCs National Digital Literacy Mission (NDLM) 0.185 0
24 x 7 Piped water supply National Rural Drinking Water Programs (NRDWP) 9.704 10.52
Sanitation Swachh Bharat Mission - Gramin 4.785 0
SWM & LWM Swachh Bharat Mission - Gramin 1.35 1.114
streets with drains 14th Finance Commission, MGNREGA 7.50 13.50
Village street lights 14th Finance Commission
Ministry of New and Renewable Energy (MNRE)
4.056 1.975
Health District plan 6.86 0
Upgradation of schools Rashtriya Madhyamik Shiksha Abhiyan (RMSA) 1.10 0
Inter village roads State fund / SRMD 15.542 6.00
Public transport Innovation - 10 E-rickshaws @1 lakh/vehicle 0.10 0
L.P.G gas connection BPL Beneficiaries 0.71 0
Minor Irrigation Pradhan Mantri Krishi Sinchai Yojna (PMKSY) 8.85 0
Grand Total (in Crores) 72.552 34.17
Bhagtanpur Abidpur cluster(In Crores)
Implementation Strategy
18
Name of the component Implementing Agency Name
1 Skill Development & training District Industry Center, Roorkee
2 Agri-services and processing Department of Agriculture, Haridwar
3 Water supply PeyJal Nigam, Haridwar
4 Sanitation Swajal Nigam, Haridwar
5 Solid & Liquid waste management S & LWM department, Haridwar
6 Village streets and drains Rural Works Department, Haridwar
7 Village street lights UREDA
8 Health CMO, Haridwar / Animal Husbandry, Haridwar
9 Education Education department, Haridwar
10 Inter village road connectivity Public Works Department, Haridwar
11 Public Transport Regional transport Office, Haridwar
12 Irrigation Minor Irrigation department, Haridwar
Bhagtanpur Abidpur cluster
Digitalization of GP boundaries and Landuse mapping
19
Bhagtanpur Abidpur cluster
GP: Atmalpur Bangla
Digitalization of GP boundaries and Landuse mapping
20
Bhagtanpur Abidpur cluster
GP: Ruhalki Kishanpur
Digitalization of GP boundaries and Landuse mapping
21
Bhagtanpur Abidpur cluster
GP: Alipur Ibrahimpur
Digitalization of GP boundaries and Landuse mapping
22
Bhagtanpur Abidpur cluster
GP: Bhagtanpur Abidpur
Digitalization of GP boundaries and Landuse mapping
23
Bhagtanpur Abidpur cluster
GP: Bhagtanpur Abidpur
Village Ambuwala
Village Ibrahimpur
Village Jhabri
Digitalization of GP boundaries and Landuse mapping
24
Bhagtanpur Abidpur cluster
GP: Bhagtanpur Abidpur
Village Ikkar Khurd Village Ikkar Kalan
Digitalization of GP boundaries and Landuse mapping
25
Bhagtanpur Abidpur cluster
GP: Bhagtanpur Abidpur
Village Dandi I
Village Sukhrasa
Village Dandi II
Digitalization of GP boundaries and Landuse mapping
26
Bhagtanpur Abidpur cluster
GP: Bahadar Pur Jatt
Digitalization of GP boundaries and Landuse mapping
27
Bhagtanpur Abidpur cluster
GP: Ajitpur
Digitalization of GP boundaries and Landuse mapping
28
Bhagtanpur Abidpur cluster
GP: Noorpur Panjanhedi
Cluster level Proceedings Bhagtanpur Abidpur cluster
NRuM workshop – 03.08.2016 Deficiency & need assessment – 07.09.2016
Investment & Convergence – 04.10.2016
Gram Sabha Resolutions Bhagtanpur Abidpur cluster
Atmalpur Bangla – 20.06.2016
Gram Sabha Resolutions Bhagtanpur Abidpur cluster
Alipur Ibrahimpur – 08.07.2016
Ruhalki Kishanpur – 20.06.2016 Bhagtanpur Abidpur – 27.07.2016
Gram Sabha Resolutions Bhagtanpur Abidpur cluster
Bahadar Pur Jatt – 01.06.2016 Noorpur Panjanhedi – 18.06.2016
Ajitpur – 21.06.2016
Athoorwala Cluster(Plain)
Block: Doiwala
District: Dehradun
No. of Gram Panchayats in the cluster 08
Population of the cluster (HH survey, 2016) 45808
Decadal growth in the population 5.01%
Name of Block Head Quarters Doiwala
Name of the BDO Mr. D.S. Mehra
Athoorwala clusterCluster Overview
The Athoorwala cluster region is under
the master plan of Dehradun. It is
located within the administrative
boundary of Doiwala block. The declared
cluster is situated geographically
between the towns of Dehradun and
Rishikesh, access to which is via the
Dehradun-Haridwar Highway and
Dehradun-Rishikesh Highway.
Administrative structure of cluster Athoorwala cluster
District
Dehradun
GP 1 : Athoorwala
GP 2 : Mazri Grant
GP 3 : Bhaniawala
GP 4 : Jolly Grant
GP 5 : Ranipokhari Moja
GP 6 : Ranipokhari Grant
GP 7 : Rainapur Grant
GP 8 : Kanharwala
Block
Doiwala
Strengths:
Availability of vacant land parcels.
High literacy rate (especially among women).
Strong regional connectivity (via road, rail and
air).
Medical facilities.
Well established MSME clusters.
Weaknesses:
Lack of infrastructure like street lights, drains.
Scarcity of portable water in certain villages.
Shortage of solid and liquid waste collection and
management.
Poor drains and sewerage systems.
Lack of training institutes.
Opportunities:
Scope for Organic farming and Horticulture
Food processing units
Potential of industrial and self-employment.
Opportunities of skill training/capacity building
for placement linked employment.
Threats:
Unplanned development and construction.
Decreasing level of ground water.
Unavailability of fund on time.
Decreasing dependence on agriculture based
economy.
Athoorwala
“Developing the cluster as hub of agriculture and
Horticulture with all basic amenities and livelihood opportunities.”
Vision & SWOT Analysis Athoorwala cluster
0% 20% 40% 60% 80% 100%
LPG Gas connections
Street Lights
Village drains
Solid & Liquid waste…
Sanitation
Piped water
0%
20%
40%
60%
80%
100%
Education PHC Sub Centre
0%
20%
40%
60%
80%
100%
Skill
Development
Agro service
center
Deficiency Existing
0%
20%
40%
60%
80%
100%
Digital
Literacy
CSCs
Basic Amenities Digital Amenities
Economic AmenitiesSocial Amenities
Deficiency Analysis Athoorwala cluster
Funding Strategy 2016-17 2017-18 2018-19 Total
A
Total Investment
Required
36.255 37.505 30.3 104.06
B
CGF capped as per norms
above
13.21 10.975 7.0 31.185
C
Resources through
Convergence
23.045 26.53 23.3 72.875
Investment & CGF summary Athoorwala cluster(In Crores)
Investment Phasing
Name of the component
Total Investment
required
2016-17 2017-18 2018-19
1
Skill development training 2.00 0 1.00 1.00
2 Agri-services & processing .35 0 .35 0
3 Digital amenities & literacy/CSCs 0.035 0 0.035 0
4 24 x 7 Piped water supply 36.97 16.37 10.6 10
5 Sanitation 0 0 0 0
6
Solid & Liquid Waste Management 3.14 2.00 1.14 0
7 Access to streets with drains 18.00 9.0 5.0 4.0
8 Village street lights 2.06 1.06 1.0
9 Health 1.30 0.7 0.3 0.3
10 Upgradation of schools 1.765 1.765 0 0
11 Inter village road connectivity 15.36 5.36 5.0 5.0
12 Public transport 0 0 0 0
13 LPG gas connection 0 0 0 0
14 Horticulture 3.08 0 3.08 0
15 Minor Irrigation 20.00 0 10 10
Grand Total 104.06 36.255 37.505 30.3
Athoorwala cluster(In Crores)
Component Details
40
Name of the component Investment Share Sub Components
1 Skill development training 2.00
1.40 Training of 6590 persons by 05 skill development programs in
each GP for various trades of MSME to promote self as well as
waged employment.
0.6
2
Agricultural services and
processing
0.35
0.35 Construction of 01 Agro service centre.
Construction of 04 Agro processing units.
Construction of Agri Waste based Compost pits.
-
3 Digital Amenities/ CSCs 0.035
- 2436 persons to be made digitally literate.
07 Citizen Service Centers to be made functional.
Facilitate Internet Banking in all 08 CSCs.
0.035
4 24 x 7 Piped water supply 36.97
18.37 Construction of 06 tube wells, each in Kanharwala,
Ranipokhari Grant, Mazri Grant, Bhaniawala, Jolly Grant and
Athoorwala.
Construction of 08 OHT tanks, one in each GP.
Construction of 122 kms length of pipeline.
18.6
5 Sanitation 0
0 Satisfactory sanitation condition in the cluster.
Construction of 2532 IHH toilets under process.0
6
Solid & Liquid waste
management
3.14
1.61 Construction of Solid waste dumping pits with linings.
Management of waste collection and provision for disposal
infrastructure in Mazri Grant, Bhaniawala, Jolly Grant,
Ranipokhari Moja, Ranipokhari Grant and Rainapur Grant.
Compactor/ transport vehicle (Hyva machine)
Construction of Recharge pits/ trenches for treatment of
Grey water prior disposal to agricultural fields.
1.53
7
Access to village streets
with drains
18.00
12.60 Construction of approx. 108 kms length of concrete drains in
arterial and sub-arterial roads for all GPS except Athoorwala.5.4
(In Crores)
Under Convergence
Under CGF
Component Details
41
Name of the component Investment Share Sub Components
8 Street lights 2.06
1.38
Installation of 1880 street lights.
0.68
9 Health 1.30
1.30 Construction of 01 Primary Health Centre in Ranipokhari Grant.
Construction of 02 Sub Centres, each in Athoorwala and
Rainapur Grant.-
10 Upgradation of schools 1.765
1.765 Construction of new school building in Rainapur Grant (GHSS
Ghamandpur).
Provision for science stream in Ranipokhari Grant.
Construction of dining hall for 05 secondary schools.
Computer facility in secondary schools.
Drinking water facility in GGHSS Ghamandpur .
-
11
Inter village road
connectivity
15.36
11.02 Renewal of inter-village roads of all GPs.
Widening and strengthening of inter-village roads.4.34
12 Public Transport 0
- Provision for permits/ licenses in Rainapur Grant by the Regional
Transport Office.-
13 Horticulture 3.08
3.08 Construction of Vermi Compost units, Grading & Packing house.
Construction of Green houses, plant health clinics.-
14 Irrigation 20.0
20.0
Repair/ construction of kms of canal in the cluster.
-
Grand Total (In Crores) 106.721
72.875
31.185
(In Crores)
Under Convergence
Under CGF
Convergence Strategy
Components Name of the Scheme to be converged Amount to be
mobilised
CGF
Skill development training Deendayal Upadhaya Gramin Kaushalya Yojana /
Entrepreneurship Development Programme /
Rural Self Employment Training Institutes
1.40 0.6
Agri-services & processing Rashtriya Krishi Vikas Yojana / Sub-Mission on Agricultural
Mechanization / National Food Security Mission
0.35 0
Digital amenities & CSCs National Digital Literacy Mission 0 0.035
24 x 7 Piped water supply National Rural Drinking Water Programs / GP schemes 18.37 18.6
Sanitation Swatch Bharat Mission Gramin 0 0
SWM & LWM Swatch Bharat Mission Gramin 1.61 1.53
Streets access to drains 14th Finance Commission, MGNREGA 12.60 5.4
Village street lights Ministry of New and Renewable Energy 1.38 0.68
Health District Plan 1.30 0
Upgradation of schools Rashtriya Madhyamik Shiksha Abhiyan (RMSA) 1.765 0
Road connectivity State fund / PMGSY 11.02 4.34
Public transport Beneficiary 0 0
L.P.G gas connection Beneficiary 0 0
Horticulture District Plan,
Horticulture Mission for North East and Himalayan states
3.08 0
Minor Irrigation Pradhan Mantri Krishi Sinchai Yojna 20.00 0
Grand Total (in Crores) 72.875 31.185
Athoorwala cluster(In Crores)
Implementation Strategy
43
Name of the component Implementing Agency Name
1 Skill Development & training District Industry Center, Dehradun
2 Agri-services and processing Department of Agriculture, Dehradun
3 Water supply PeyJal Nigam, Dehradun
4 Sanitation Swajal Nigam, Dehradun / Rural Development
5 Solid & Liquid waste management S & LWM department, Dehradun
6 Village streets and drains Rural Works Department, Dehradun
7 Village street lights UREDA
8
Health CMO, Dehradun /
Animal Husbandry, Dehradun
9 Education Education department, Dehradun
10 Inter village road connectivity Public Works Department, Dehradun
11 Public Transport Regional transport Office, Dehradun
12 Horticulture Horticulture department, Dehradun
13 Irrigation Minor Irrigation department, Dehradun
Athoorwala cluster
Digitalization of GP boundaries and Landuse mapping
44
Athoorwala cluster
GP: Athoorwala
Digitalization of GP boundaries and Landuse mapping
45
Athoorwala cluster
GP: Mazri Grant
Digitalization of GP boundaries and Landuse mapping
46
Athoorwala cluster
GP: Bhaniawala
Digitalization of GP boundaries and Landuse mapping
47
Athoorwala cluster
GP: Jolly Grant
Digitalization of GP boundaries and Landuse mapping
48
Athoorwala cluster
GP: Ranipokhari Moja
Digitalization of GP boundaries and Landuse mapping
49
Athoorwala cluster
GP: Ranipokhari Grant
Digitalization of GP boundaries and Landuse mapping
50
Athoorwala cluster
GP: Rainapur Grant
Digitalization of GP boundaries and Landuse mapping
51
Athoorwala cluster
GP: Kanharwala
Funding strategies & ICAP review – 28.11.2016
Stakeholder consultation Athoorwala cluster
NRuM workshop – 08.08.2016 Deficiency & need assessment – 30.09.2016
Investment & Convergence – 12.11.2016
Gram Sabha Resolutions Athoorwala cluster
Mazri Grant – 21.09.2016Athoorwala – 05.10.2016
Gram Sabha Resolutions Athoorwala cluster
Jolly Grant – 24.09.2016
Bhaniawala – 22.09.2016 Ranipokhari Moja – 14.09.2016
Gram Sabha Resolutions Athoorwala cluster
Rainapur Grant – 28.09.2016
Ranipokhari Grant – 04.10.2016 Kanharwala – 22.09.2016
State Government of Uttarakhand
&
CSIR – Central Building Research Institute
THANK YOU

More Related Content

Similar to National Rurban Mission and Uttarakhand

Hassan-Geo Water 21 July'15 Blore(sec)
Hassan-Geo Water 21 July'15 Blore(sec)Hassan-Geo Water 21 July'15 Blore(sec)
Hassan-Geo Water 21 July'15 Blore(sec)Ajitadev Pandit
 
1. CM Review Meeting-ATP-20-10-2022.pptx
1. CM Review Meeting-ATP-20-10-2022.pptx1. CM Review Meeting-ATP-20-10-2022.pptx
1. CM Review Meeting-ATP-20-10-2022.pptxEEMINandyal
 
Delineation of a region ncr - alok tripathi,krishna dutt
Delineation of a region ncr - alok tripathi,krishna duttDelineation of a region ncr - alok tripathi,krishna dutt
Delineation of a region ncr - alok tripathi,krishna duttkrishnadutt1819
 
Smart Water and Wastewater Management For Smart Cities - Mr. Anjum Parwez
Smart Water and Wastewater Management For Smart Cities - Mr. Anjum ParwezSmart Water and Wastewater Management For Smart Cities - Mr. Anjum Parwez
Smart Water and Wastewater Management For Smart Cities - Mr. Anjum ParwezIPPAI
 
Indian power sector 2017
Indian power sector 2017Indian power sector 2017
Indian power sector 2017rini ravi
 
GREATER HYDERABAD MUNICIPAL CORPORATION (1).pptx
GREATER HYDERABAD MUNICIPAL CORPORATION (1).pptxGREATER HYDERABAD MUNICIPAL CORPORATION (1).pptx
GREATER HYDERABAD MUNICIPAL CORPORATION (1).pptxcircle28ghmc
 
Sabawon presentation final
Sabawon presentation finalSabawon presentation final
Sabawon presentation finalHazratKhan11
 
2.1 IUKWC Workshop Freshwater EO - Pawan Kumar Labhasetwar - Jun17
2.1 IUKWC Workshop Freshwater EO - Pawan Kumar Labhasetwar - Jun172.1 IUKWC Workshop Freshwater EO - Pawan Kumar Labhasetwar - Jun17
2.1 IUKWC Workshop Freshwater EO - Pawan Kumar Labhasetwar - Jun17India UK Water Centre (IUKWC)
 
Baran- district profile
Baran- district profileBaran- district profile
Baran- district profilenaveenjain2002
 
karnataka state budget 2012-13 Presented by Bharat R S
 karnataka state budget 2012-13 Presented by Bharat R S karnataka state budget 2012-13 Presented by Bharat R S
karnataka state budget 2012-13 Presented by Bharat R SBharat Yashu
 
Evaluation of flagship rural development programe in Theni District
Evaluation of flagship rural development programe in Theni DistrictEvaluation of flagship rural development programe in Theni District
Evaluation of flagship rural development programe in Theni DistrictRamdass T
 

Similar to National Rurban Mission and Uttarakhand (20)

Hassan-Geo Water 21 July'15 Blore(sec)
Hassan-Geo Water 21 July'15 Blore(sec)Hassan-Geo Water 21 July'15 Blore(sec)
Hassan-Geo Water 21 July'15 Blore(sec)
 
1. CM Review Meeting-ATP-20-10-2022.pptx
1. CM Review Meeting-ATP-20-10-2022.pptx1. CM Review Meeting-ATP-20-10-2022.pptx
1. CM Review Meeting-ATP-20-10-2022.pptx
 
Bidar District Profile
Bidar District ProfileBidar District Profile
Bidar District Profile
 
Delineation of a region ncr - alok tripathi,krishna dutt
Delineation of a region ncr - alok tripathi,krishna duttDelineation of a region ncr - alok tripathi,krishna dutt
Delineation of a region ncr - alok tripathi,krishna dutt
 
Smart Water and Wastewater Management For Smart Cities - Mr. Anjum Parwez
Smart Water and Wastewater Management For Smart Cities - Mr. Anjum ParwezSmart Water and Wastewater Management For Smart Cities - Mr. Anjum Parwez
Smart Water and Wastewater Management For Smart Cities - Mr. Anjum Parwez
 
M.U.R.P. work
M.U.R.P. workM.U.R.P. work
M.U.R.P. work
 
Indian power sector 2017
Indian power sector 2017Indian power sector 2017
Indian power sector 2017
 
Gadag District profile
Gadag District profileGadag District profile
Gadag District profile
 
Dharwad District profile
Dharwad District profileDharwad District profile
Dharwad District profile
 
GREATER HYDERABAD MUNICIPAL CORPORATION (1).pptx
GREATER HYDERABAD MUNICIPAL CORPORATION (1).pptxGREATER HYDERABAD MUNICIPAL CORPORATION (1).pptx
GREATER HYDERABAD MUNICIPAL CORPORATION (1).pptx
 
Rids
RidsRids
Rids
 
Sabawon presentation final
Sabawon presentation finalSabawon presentation final
Sabawon presentation final
 
2.1 IUKWC Workshop Freshwater EO - Pawan Kumar Labhasetwar - Jun17
2.1 IUKWC Workshop Freshwater EO - Pawan Kumar Labhasetwar - Jun172.1 IUKWC Workshop Freshwater EO - Pawan Kumar Labhasetwar - Jun17
2.1 IUKWC Workshop Freshwater EO - Pawan Kumar Labhasetwar - Jun17
 
Chikballapur District profile
Chikballapur District profileChikballapur District profile
Chikballapur District profile
 
Bagalkote District profile
Bagalkote District profileBagalkote District profile
Bagalkote District profile
 
Baran- district profile
Baran- district profileBaran- district profile
Baran- district profile
 
karnataka state budget 2012-13 Presented by Bharat R S
 karnataka state budget 2012-13 Presented by Bharat R S karnataka state budget 2012-13 Presented by Bharat R S
karnataka state budget 2012-13 Presented by Bharat R S
 
Koppal District profile
Koppal District profileKoppal District profile
Koppal District profile
 
Davanagere District profile
Davanagere District profileDavanagere District profile
Davanagere District profile
 
Evaluation of flagship rural development programe in Theni District
Evaluation of flagship rural development programe in Theni DistrictEvaluation of flagship rural development programe in Theni District
Evaluation of flagship rural development programe in Theni District
 

Recently uploaded

2024: The FAR, Federal Acquisition Regulations - Part 29
2024: The FAR, Federal Acquisition Regulations - Part 292024: The FAR, Federal Acquisition Regulations - Part 29
2024: The FAR, Federal Acquisition Regulations - Part 29JSchaus & Associates
 
Artificial Intelligence in Philippine Local Governance: Challenges and Opport...
Artificial Intelligence in Philippine Local Governance: Challenges and Opport...Artificial Intelligence in Philippine Local Governance: Challenges and Opport...
Artificial Intelligence in Philippine Local Governance: Challenges and Opport...CedZabala
 
VIP High Class Call Girls Amravati Anushka 8250192130 Independent Escort Serv...
VIP High Class Call Girls Amravati Anushka 8250192130 Independent Escort Serv...VIP High Class Call Girls Amravati Anushka 8250192130 Independent Escort Serv...
VIP High Class Call Girls Amravati Anushka 8250192130 Independent Escort Serv...Suhani Kapoor
 
##9711199012 Call Girls Delhi Rs-5000 UpTo 10 K Hauz Khas Whats Up Number
##9711199012 Call Girls Delhi Rs-5000 UpTo 10 K Hauz Khas  Whats Up Number##9711199012 Call Girls Delhi Rs-5000 UpTo 10 K Hauz Khas  Whats Up Number
##9711199012 Call Girls Delhi Rs-5000 UpTo 10 K Hauz Khas Whats Up NumberMs Riya
 
Lucknow 💋 Russian Call Girls Lucknow ₹7.5k Pick Up & Drop With Cash Payment 8...
Lucknow 💋 Russian Call Girls Lucknow ₹7.5k Pick Up & Drop With Cash Payment 8...Lucknow 💋 Russian Call Girls Lucknow ₹7.5k Pick Up & Drop With Cash Payment 8...
Lucknow 💋 Russian Call Girls Lucknow ₹7.5k Pick Up & Drop With Cash Payment 8...anilsa9823
 
(SHINA) Call Girls Khed ( 7001035870 ) HI-Fi Pune Escorts Service
(SHINA) Call Girls Khed ( 7001035870 ) HI-Fi Pune Escorts Service(SHINA) Call Girls Khed ( 7001035870 ) HI-Fi Pune Escorts Service
(SHINA) Call Girls Khed ( 7001035870 ) HI-Fi Pune Escorts Serviceranjana rawat
 
Fair Trash Reduction - West Hartford, CT
Fair Trash Reduction - West Hartford, CTFair Trash Reduction - West Hartford, CT
Fair Trash Reduction - West Hartford, CTaccounts329278
 
(TARA) Call Girls Chakan ( 7001035870 ) HI-Fi Pune Escorts Service
(TARA) Call Girls Chakan ( 7001035870 ) HI-Fi Pune Escorts Service(TARA) Call Girls Chakan ( 7001035870 ) HI-Fi Pune Escorts Service
(TARA) Call Girls Chakan ( 7001035870 ) HI-Fi Pune Escorts Serviceranjana rawat
 
Regional Snapshot Atlanta Aging Trends 2024
Regional Snapshot Atlanta Aging Trends 2024Regional Snapshot Atlanta Aging Trends 2024
Regional Snapshot Atlanta Aging Trends 2024ARCResearch
 
(NEHA) Bhosari Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(NEHA) Bhosari Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts(NEHA) Bhosari Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(NEHA) Bhosari Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escortsranjana rawat
 
VIP High Profile Call Girls Gorakhpur Aarushi 8250192130 Independent Escort S...
VIP High Profile Call Girls Gorakhpur Aarushi 8250192130 Independent Escort S...VIP High Profile Call Girls Gorakhpur Aarushi 8250192130 Independent Escort S...
VIP High Profile Call Girls Gorakhpur Aarushi 8250192130 Independent Escort S...Suhani Kapoor
 
VIP Call Girls Service Bikaner Aishwarya 8250192130 Independent Escort Servic...
VIP Call Girls Service Bikaner Aishwarya 8250192130 Independent Escort Servic...VIP Call Girls Service Bikaner Aishwarya 8250192130 Independent Escort Servic...
VIP Call Girls Service Bikaner Aishwarya 8250192130 Independent Escort Servic...Suhani Kapoor
 
CBO’s Recent Appeals for New Research on Health-Related Topics
CBO’s Recent Appeals for New Research on Health-Related TopicsCBO’s Recent Appeals for New Research on Health-Related Topics
CBO’s Recent Appeals for New Research on Health-Related TopicsCongressional Budget Office
 
Expressive clarity oral presentation.pptx
Expressive clarity oral presentation.pptxExpressive clarity oral presentation.pptx
Expressive clarity oral presentation.pptxtsionhagos36
 
Cunningham Road Call Girls Bangalore WhatsApp 8250192130 High Profile Service
Cunningham Road Call Girls Bangalore WhatsApp 8250192130 High Profile ServiceCunningham Road Call Girls Bangalore WhatsApp 8250192130 High Profile Service
Cunningham Road Call Girls Bangalore WhatsApp 8250192130 High Profile ServiceHigh Profile Call Girls
 
DNV publication: China Energy Transition Outlook 2024
DNV publication: China Energy Transition Outlook 2024DNV publication: China Energy Transition Outlook 2024
DNV publication: China Energy Transition Outlook 2024Energy for One World
 
(PRIYA) Call Girls Rajgurunagar ( 7001035870 ) HI-Fi Pune Escorts Service
(PRIYA) Call Girls Rajgurunagar ( 7001035870 ) HI-Fi Pune Escorts Service(PRIYA) Call Girls Rajgurunagar ( 7001035870 ) HI-Fi Pune Escorts Service
(PRIYA) Call Girls Rajgurunagar ( 7001035870 ) HI-Fi Pune Escorts Serviceranjana rawat
 
PPT Item # 4 - 231 Encino Ave (Significance Only)
PPT Item # 4 - 231 Encino Ave (Significance Only)PPT Item # 4 - 231 Encino Ave (Significance Only)
PPT Item # 4 - 231 Encino Ave (Significance Only)ahcitycouncil
 

Recently uploaded (20)

2024: The FAR, Federal Acquisition Regulations - Part 29
2024: The FAR, Federal Acquisition Regulations - Part 292024: The FAR, Federal Acquisition Regulations - Part 29
2024: The FAR, Federal Acquisition Regulations - Part 29
 
Artificial Intelligence in Philippine Local Governance: Challenges and Opport...
Artificial Intelligence in Philippine Local Governance: Challenges and Opport...Artificial Intelligence in Philippine Local Governance: Challenges and Opport...
Artificial Intelligence in Philippine Local Governance: Challenges and Opport...
 
Rohini Sector 37 Call Girls Delhi 9999965857 @Sabina Saikh No Advance
Rohini Sector 37 Call Girls Delhi 9999965857 @Sabina Saikh No AdvanceRohini Sector 37 Call Girls Delhi 9999965857 @Sabina Saikh No Advance
Rohini Sector 37 Call Girls Delhi 9999965857 @Sabina Saikh No Advance
 
VIP High Class Call Girls Amravati Anushka 8250192130 Independent Escort Serv...
VIP High Class Call Girls Amravati Anushka 8250192130 Independent Escort Serv...VIP High Class Call Girls Amravati Anushka 8250192130 Independent Escort Serv...
VIP High Class Call Girls Amravati Anushka 8250192130 Independent Escort Serv...
 
##9711199012 Call Girls Delhi Rs-5000 UpTo 10 K Hauz Khas Whats Up Number
##9711199012 Call Girls Delhi Rs-5000 UpTo 10 K Hauz Khas  Whats Up Number##9711199012 Call Girls Delhi Rs-5000 UpTo 10 K Hauz Khas  Whats Up Number
##9711199012 Call Girls Delhi Rs-5000 UpTo 10 K Hauz Khas Whats Up Number
 
Lucknow 💋 Russian Call Girls Lucknow ₹7.5k Pick Up & Drop With Cash Payment 8...
Lucknow 💋 Russian Call Girls Lucknow ₹7.5k Pick Up & Drop With Cash Payment 8...Lucknow 💋 Russian Call Girls Lucknow ₹7.5k Pick Up & Drop With Cash Payment 8...
Lucknow 💋 Russian Call Girls Lucknow ₹7.5k Pick Up & Drop With Cash Payment 8...
 
(SHINA) Call Girls Khed ( 7001035870 ) HI-Fi Pune Escorts Service
(SHINA) Call Girls Khed ( 7001035870 ) HI-Fi Pune Escorts Service(SHINA) Call Girls Khed ( 7001035870 ) HI-Fi Pune Escorts Service
(SHINA) Call Girls Khed ( 7001035870 ) HI-Fi Pune Escorts Service
 
How to Save a Place: 12 Tips To Research & Know the Threat
How to Save a Place: 12 Tips To Research & Know the ThreatHow to Save a Place: 12 Tips To Research & Know the Threat
How to Save a Place: 12 Tips To Research & Know the Threat
 
Fair Trash Reduction - West Hartford, CT
Fair Trash Reduction - West Hartford, CTFair Trash Reduction - West Hartford, CT
Fair Trash Reduction - West Hartford, CT
 
(TARA) Call Girls Chakan ( 7001035870 ) HI-Fi Pune Escorts Service
(TARA) Call Girls Chakan ( 7001035870 ) HI-Fi Pune Escorts Service(TARA) Call Girls Chakan ( 7001035870 ) HI-Fi Pune Escorts Service
(TARA) Call Girls Chakan ( 7001035870 ) HI-Fi Pune Escorts Service
 
Regional Snapshot Atlanta Aging Trends 2024
Regional Snapshot Atlanta Aging Trends 2024Regional Snapshot Atlanta Aging Trends 2024
Regional Snapshot Atlanta Aging Trends 2024
 
(NEHA) Bhosari Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(NEHA) Bhosari Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts(NEHA) Bhosari Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(NEHA) Bhosari Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
 
VIP High Profile Call Girls Gorakhpur Aarushi 8250192130 Independent Escort S...
VIP High Profile Call Girls Gorakhpur Aarushi 8250192130 Independent Escort S...VIP High Profile Call Girls Gorakhpur Aarushi 8250192130 Independent Escort S...
VIP High Profile Call Girls Gorakhpur Aarushi 8250192130 Independent Escort S...
 
VIP Call Girls Service Bikaner Aishwarya 8250192130 Independent Escort Servic...
VIP Call Girls Service Bikaner Aishwarya 8250192130 Independent Escort Servic...VIP Call Girls Service Bikaner Aishwarya 8250192130 Independent Escort Servic...
VIP Call Girls Service Bikaner Aishwarya 8250192130 Independent Escort Servic...
 
CBO’s Recent Appeals for New Research on Health-Related Topics
CBO’s Recent Appeals for New Research on Health-Related TopicsCBO’s Recent Appeals for New Research on Health-Related Topics
CBO’s Recent Appeals for New Research on Health-Related Topics
 
Expressive clarity oral presentation.pptx
Expressive clarity oral presentation.pptxExpressive clarity oral presentation.pptx
Expressive clarity oral presentation.pptx
 
Cunningham Road Call Girls Bangalore WhatsApp 8250192130 High Profile Service
Cunningham Road Call Girls Bangalore WhatsApp 8250192130 High Profile ServiceCunningham Road Call Girls Bangalore WhatsApp 8250192130 High Profile Service
Cunningham Road Call Girls Bangalore WhatsApp 8250192130 High Profile Service
 
DNV publication: China Energy Transition Outlook 2024
DNV publication: China Energy Transition Outlook 2024DNV publication: China Energy Transition Outlook 2024
DNV publication: China Energy Transition Outlook 2024
 
(PRIYA) Call Girls Rajgurunagar ( 7001035870 ) HI-Fi Pune Escorts Service
(PRIYA) Call Girls Rajgurunagar ( 7001035870 ) HI-Fi Pune Escorts Service(PRIYA) Call Girls Rajgurunagar ( 7001035870 ) HI-Fi Pune Escorts Service
(PRIYA) Call Girls Rajgurunagar ( 7001035870 ) HI-Fi Pune Escorts Service
 
PPT Item # 4 - 231 Encino Ave (Significance Only)
PPT Item # 4 - 231 Encino Ave (Significance Only)PPT Item # 4 - 231 Encino Ave (Significance Only)
PPT Item # 4 - 231 Encino Ave (Significance Only)
 

National Rurban Mission and Uttarakhand

  • 1. National Rurban Mission MINISTRY OF RURAL DEVELOPMENT INTEGRATED CLUSTER ACTION PLANs Uttarakhand – 02 Clusters Name of Cluster Name of Block Name of District Cluster Population (2011) Bhagtanpur Abidpur Bahadrabad Haridwar 45,614 Athoorwala Doiwala Dehradun 44,905 State Government of Uttarakhand & CSIR – Central Building Research Institute
  • 2. Selection of Cluster S. No. Name of District Population (Census 2011) 1 Almora 622,506 2 Bageshwar 259,898 3 Chamoli 391,605 4 Champawat 259,648 5 Dehradun 1,696,694 6 Haridwar 1,890,422 7 Nainital 954,605 8 Pauri Garhwal 687,271 9 Pithoragarh 483,439 10 Rudraprayag 242,285 11 Tehri Garhwal 618,931 12 Udham Singh Nagar 1,648,902 13 Uttarkashi 330,086 13 Non – Tribal Districts, Uttarakhand S. No. Category Cluster Name Block District 1. Plain Bhagtanpur Abidpur Bahadrabad Haridwar 2. Plain Athoorwala Doiwala Dehradun
  • 3. Empanelment of CSIR-CBRI as STSA Empanelment of CSIR – CBRI Roorkee as the State Technical Support Agencies under the National Rurban Mission’ by Ministry of Rural Development
  • 4. Planning area notification Planning area notification by the State Government of Uttarakhand of Clusters Bhagtanpur Abidpur (Haridwar) and Athoorwala (Dehradun)
  • 5. Preparation of ICAP – Methodology 5 Bhagtanpur Abidpur cluster Sno. Name of GP Households (nos) 1 Atmalpur Bangla 1768 2 Ruhalki Kishanpur 664 3 Alipur Ibrahimpur 785 4 Bhagtanpur Abidpur 4178 5 Bahadar Pur Jatt 1600 6 Ajitpur 425 7 Noorpur Panjanhedi 864 Total Households 10284 Athoorwala cluster S No Name of GP Households (nos) 1 Athoorwala 2172 2 Mazrigrant 2228 3 Bhaniawala 936 4 Jollygrant 2088 5 RanipokhariMoja 396 6 Ranipokhari Grant 1080 7 Rainapur Grant 324 8 Kanharwala 1126 Total Households 10350 ▪ Household surveys of both clusters with 100% sampling size for Cluster & Component profiling. Survey conducted by Uttarakhand government based on questionnaires prepared by CSIR- CBRI. ▪ Digitalization of administrative boundaries of all GPs by CSIR-CBRI using GPS technology on sites and geo-referencing the same with Sajra maps and Land record officers (Patwaris). ▪ Preparation of Land use maps of every GP by CSIR-CBRI for the built-up areas and spatial composition by extensive site visits to both clusters. ▪ Periodic meetings chaired by the Additional Secretary Shri. Yugal Kishore Pant & CDOs; with the concerned division heads, BDOs, Pradhans, stakeholders and the CSIR-CBRI team.
  • 6. Investment & CGF summary 6 Name of Cluster Total Investment Estimated 30% of Investment Estimated CGF Projected by State Funds Mobilized through Convergence/ Funds 1 Bhagtanpur Abidpur 106.72 32.02 34.17 72.55 2 Athoorwala 104.06 31.22 31.19 72.87 Total (Crores) 210.78 63.24 65.36 145.42 (In Crores)
  • 7. Bhagtanpur Abidpur Cluster (Plain) Block: Bahadrabad District: Haridwar
  • 8. Cluster Overview No. of Gram Panchayats in cluster 07 Population of the cluster (HH survey, 2016) 54214 Decadal growth in population (2001 – 2011) 28.5% Name of Block Head Quarters Bahadrabad Name of the BDO Ms. Anita Panwar Bhagtanpur Abidpur cluster The Bhagtanpur Abidpur cluster region is under the master plan of Haridwar. It is located within the administrative boundary of Bahadrabad block. The declared cluster is situated geographically between the towns of Haridwar and Roorkee, access to which is via the National Highway 58 and the Bahadrabad bypass.
  • 9. Administrative structure of cluster Bhagtanpur Abidpur cluster District Haridwar GP 1 Atmalpur Bangla GP 2 Ruhalki Kishanpur GP 3 Alipur Ibrahimpur Alipur GP 4 Bhagtanpur Abidpur Ambuwala Ibrahimpur Jhabri Ikkar khurd Ikkar kalan Sukhrasa Dandi (1&2) Pathri GP 5 Bahadar Pur Jatt GP 6 Ajitpur Ajitpur Athmal Ajitpur Mustakam Sirsali GP 7 Noorpur Panjhedi Kishanpur Missarpur Mustakam Noorpur Panjhedi Missarpur Athmal Block Bahadrabad
  • 10. Vision & SWOT Analysis “Developing Bhagtanpur Abidpur cluster as an agri based core and providing all basic amenities with clean environment” STRENGTHS WEAKNESS OPPORTUNITIES THREATS Bhagtanpur Abidpur Cluster • Soil & Climatic Factors • Availability of vacant land parcels. • Connectivity to the National Highway • Close to SIDCUL, BHEL, Patanjali, Great White, Anchor as important non- agricultural employment source. • Insignificant home based skills in cluster. • Lack of basic physical infrastructure like street lights, drains etc. • Lack of piped water connection in villages. • No solid and liquid waste management • Non functional Common Service Centers. • Weak agro-processing infrastructure • Decreasing level of ground water. • Increasing shift from Farm to non-farm workforce. • Contamination of agricultural fields due to disposal of solid wastes. • Scope for agro-processing units. • Scope for vocational training. • Potential of industrial employment and self employment. • Opportunities of skill training/capacity building for placement linked employment. Bhagtanpur Abidpur cluster
  • 11. Cluster at Glance Bhagtanpur Abidpur cluster
  • 12. Deficiency Analysis 0% 20% 40% 60% 80% 100% LPG Gas connections Street Lights Village drains Solid & Liquid waste… Sanitation Piped water 0% 20% 40% 60% 80% 100% Education PHC Sub Centre School for diabled Veterinary care 0% 20% 40% 60% 80% 100% Skill Development Agro service center Deficiency Existing 0% 20% 40% 60% 80% 100% Digital Literacy CSCs Basic Amenities Digital Amenities Economic AmenitiesSocial Amenities Bhagtanpur Abidpur cluster
  • 13. Investment & CGF summary Funding strategy 2016-17 2017-18 2018-19 Total A Total Investment Required 41.155 39.959 25.607 106.72 B CGF capped as per norms 14.614 11.115 8.44 34.17 C Resources through Convergence 26.541 28.844 17.167 72.55 Bhagtanpur Abidpur cluster(In Crores)
  • 14. Investment Phasing Name of the component Total Investment required 2016-17 2017-18 2018-19 1 Skill development training 11.00 0 7.56 3.44 2 Agri-services & processing 1.87 0 1.87 0 3 Digital amenities & literacy/CSCs .185 0 0.12 0.065 4 24 x 7 Piped water supply 20.224 0 10.224 10.0o 5 Sanitation 4.785 4.785 0 0 6 Solid& Liquid Waste Management 2.464 2.464 0 0 7 Access to village streets with drains 21.00 21.00 0 0 8 Village street lights 6.031 4.056 1.975 0 9 Health 6.86 0 4.5 2.36 10 Upgradation of schools 1.10 0 0.75 0.35 11 Inter village road connectivity 21.542 0 12.20 9.342 12 Public transport .10 0 .05 .05 13 LPG gas connection .71 0 .71 0 14 Minor Irrigation 8.85 8.85 0 0 Grand Total 106.721 41.155 39.959 25.607 Bhagtanpur Abidpur cluster(In Crores)
  • 15. Component Details 15 Name of the component Investment Share Sub Components 1 Skill development training 11.0 10.56 Training of 7039 persons for food packaging, Agriculture, Mechanics, Mobile & Electrical Repairing, Computers, Handicrafts. 0.44 2 Agricultural services and processing 1.87 1.25 Construction of 01 Agro service centre. Construction of 02 Agro processing units. Upgradation of existing Agro processing units. Construction of Agri Waste based Compost pits. 0.62 3 Digital Amenities/ CSCs 0.185 0.185 6229 persons to be made digitally literate. 05 Citizen Service Centers to be made functional. Facilitate Internet Banking in all 07 CSCs. - 4 24 x 7 Piped water supply 20.224 09.704 Construction and provision of piped water supply in Bhagtanpur Abidpur GP.10.52 5 Sanitation 4.785 4.785 Construction of 3987 IHH Latrines. Public Toilets in Bhagtanpur Abidpur, Bahadar Pur Jatt and Alipur Ibrahimpur GPs. - 6 Solid & Liquid waste management 2.464 1.35 Construction of Solid waste dumping pits with linings. Provision for waste disposal infrastructure. Compactor/ transport vehicle (Hyva machine) Construction of Recharge pits/ trenches for treatment of Grey water prior disposal to agricultural fields. 1.114 7 Access to village streets with drains 21.00 7.50 Construction of approx. 52 kms length of concrete drains in arterial and sub-arterial roads.13.50 Under Convergence Under CGF (In Crores)
  • 16. Component Details 16 Name of the component Investment Share Sub Components 8 Street lights 6.031 4.056 Installation of 2800 street lights. 1.975 9 Health 6.86 6.86 Construction of 01 Primary Health Centre. Construction of 04 Sub Centres. Construction of 02 Veterinary centre, each in Bhagtanpur Abidpur and Bahadar Pur Jatt. - 10 Upgradation of schools 1.10 1.10 Upgradation to intermediate school in Bhagtanpur Abidpur GP. Construction of 04 additional classrooms. Construction of computer labs facility in 03 Secondary schools. Provision for amenities like drinking water and toilets. - 11 Inter village road connectivity 21.542 15.542 Widening and strengthening of the inter-village roads. Repair of roads & causeway damaged due to heavy rains (4 kms). Repair of causeway in Ibrahimpur & Ikkar Khurd (1 km). Repair of damaged bridge in Bahadrabad-Sukhrasa road (4.5 kms). 6.0 12 Public Transport 0.10 0.10 Provision of 10 E-Rickshaws to beneficiaries in Bhagtanpur Abidpur and Bahadar Pur Jatt GPs as para-transit modes. Provision for permits/ licenses by the Regional Transport Office. - 13 LPG gas connection 0.71 0.71 Facilitation of 02 Retail outlets by the District Supply Office. - 14 Minor Irrigation 8.85 8.85 Repair/ construction of 29.5 kms of canal in the cluster. - Grand Total (In Crores) 106.721 72.55 34.17 (In Crores) Under Convergence Under CGF
  • 17. Convergence Strategy Components Name of the Scheme to be converged Amount proposed to be mobilised CGF Skill development training related to economic activities DeendayalUpadhayaGraminKaushalyaYojana (DDUGKY), Entrepreneurship Development Programme (EDP), Rural Self Employment Training Institutes (RSETIs) 10.56 0.44 Agri-services & processing RashtriyaKrishiVikasYojana, Sub-Mission on Agricultural Mechanization, National Food Security Mission 1.25 0.62 Digital amenities & CSCs National Digital Literacy Mission (NDLM) 0.185 0 24 x 7 Piped water supply National Rural Drinking Water Programs (NRDWP) 9.704 10.52 Sanitation Swachh Bharat Mission - Gramin 4.785 0 SWM & LWM Swachh Bharat Mission - Gramin 1.35 1.114 streets with drains 14th Finance Commission, MGNREGA 7.50 13.50 Village street lights 14th Finance Commission Ministry of New and Renewable Energy (MNRE) 4.056 1.975 Health District plan 6.86 0 Upgradation of schools Rashtriya Madhyamik Shiksha Abhiyan (RMSA) 1.10 0 Inter village roads State fund / SRMD 15.542 6.00 Public transport Innovation - 10 E-rickshaws @1 lakh/vehicle 0.10 0 L.P.G gas connection BPL Beneficiaries 0.71 0 Minor Irrigation Pradhan Mantri Krishi Sinchai Yojna (PMKSY) 8.85 0 Grand Total (in Crores) 72.552 34.17 Bhagtanpur Abidpur cluster(In Crores)
  • 18. Implementation Strategy 18 Name of the component Implementing Agency Name 1 Skill Development & training District Industry Center, Roorkee 2 Agri-services and processing Department of Agriculture, Haridwar 3 Water supply PeyJal Nigam, Haridwar 4 Sanitation Swajal Nigam, Haridwar 5 Solid & Liquid waste management S & LWM department, Haridwar 6 Village streets and drains Rural Works Department, Haridwar 7 Village street lights UREDA 8 Health CMO, Haridwar / Animal Husbandry, Haridwar 9 Education Education department, Haridwar 10 Inter village road connectivity Public Works Department, Haridwar 11 Public Transport Regional transport Office, Haridwar 12 Irrigation Minor Irrigation department, Haridwar Bhagtanpur Abidpur cluster
  • 19. Digitalization of GP boundaries and Landuse mapping 19 Bhagtanpur Abidpur cluster GP: Atmalpur Bangla
  • 20. Digitalization of GP boundaries and Landuse mapping 20 Bhagtanpur Abidpur cluster GP: Ruhalki Kishanpur
  • 21. Digitalization of GP boundaries and Landuse mapping 21 Bhagtanpur Abidpur cluster GP: Alipur Ibrahimpur
  • 22. Digitalization of GP boundaries and Landuse mapping 22 Bhagtanpur Abidpur cluster GP: Bhagtanpur Abidpur
  • 23. Digitalization of GP boundaries and Landuse mapping 23 Bhagtanpur Abidpur cluster GP: Bhagtanpur Abidpur Village Ambuwala Village Ibrahimpur Village Jhabri
  • 24. Digitalization of GP boundaries and Landuse mapping 24 Bhagtanpur Abidpur cluster GP: Bhagtanpur Abidpur Village Ikkar Khurd Village Ikkar Kalan
  • 25. Digitalization of GP boundaries and Landuse mapping 25 Bhagtanpur Abidpur cluster GP: Bhagtanpur Abidpur Village Dandi I Village Sukhrasa Village Dandi II
  • 26. Digitalization of GP boundaries and Landuse mapping 26 Bhagtanpur Abidpur cluster GP: Bahadar Pur Jatt
  • 27. Digitalization of GP boundaries and Landuse mapping 27 Bhagtanpur Abidpur cluster GP: Ajitpur
  • 28. Digitalization of GP boundaries and Landuse mapping 28 Bhagtanpur Abidpur cluster GP: Noorpur Panjanhedi
  • 29. Cluster level Proceedings Bhagtanpur Abidpur cluster NRuM workshop – 03.08.2016 Deficiency & need assessment – 07.09.2016 Investment & Convergence – 04.10.2016
  • 30. Gram Sabha Resolutions Bhagtanpur Abidpur cluster Atmalpur Bangla – 20.06.2016
  • 31. Gram Sabha Resolutions Bhagtanpur Abidpur cluster Alipur Ibrahimpur – 08.07.2016 Ruhalki Kishanpur – 20.06.2016 Bhagtanpur Abidpur – 27.07.2016
  • 32. Gram Sabha Resolutions Bhagtanpur Abidpur cluster Bahadar Pur Jatt – 01.06.2016 Noorpur Panjanhedi – 18.06.2016 Ajitpur – 21.06.2016
  • 34. No. of Gram Panchayats in the cluster 08 Population of the cluster (HH survey, 2016) 45808 Decadal growth in the population 5.01% Name of Block Head Quarters Doiwala Name of the BDO Mr. D.S. Mehra Athoorwala clusterCluster Overview The Athoorwala cluster region is under the master plan of Dehradun. It is located within the administrative boundary of Doiwala block. The declared cluster is situated geographically between the towns of Dehradun and Rishikesh, access to which is via the Dehradun-Haridwar Highway and Dehradun-Rishikesh Highway.
  • 35. Administrative structure of cluster Athoorwala cluster District Dehradun GP 1 : Athoorwala GP 2 : Mazri Grant GP 3 : Bhaniawala GP 4 : Jolly Grant GP 5 : Ranipokhari Moja GP 6 : Ranipokhari Grant GP 7 : Rainapur Grant GP 8 : Kanharwala Block Doiwala
  • 36. Strengths: Availability of vacant land parcels. High literacy rate (especially among women). Strong regional connectivity (via road, rail and air). Medical facilities. Well established MSME clusters. Weaknesses: Lack of infrastructure like street lights, drains. Scarcity of portable water in certain villages. Shortage of solid and liquid waste collection and management. Poor drains and sewerage systems. Lack of training institutes. Opportunities: Scope for Organic farming and Horticulture Food processing units Potential of industrial and self-employment. Opportunities of skill training/capacity building for placement linked employment. Threats: Unplanned development and construction. Decreasing level of ground water. Unavailability of fund on time. Decreasing dependence on agriculture based economy. Athoorwala “Developing the cluster as hub of agriculture and Horticulture with all basic amenities and livelihood opportunities.” Vision & SWOT Analysis Athoorwala cluster
  • 37. 0% 20% 40% 60% 80% 100% LPG Gas connections Street Lights Village drains Solid & Liquid waste… Sanitation Piped water 0% 20% 40% 60% 80% 100% Education PHC Sub Centre 0% 20% 40% 60% 80% 100% Skill Development Agro service center Deficiency Existing 0% 20% 40% 60% 80% 100% Digital Literacy CSCs Basic Amenities Digital Amenities Economic AmenitiesSocial Amenities Deficiency Analysis Athoorwala cluster
  • 38. Funding Strategy 2016-17 2017-18 2018-19 Total A Total Investment Required 36.255 37.505 30.3 104.06 B CGF capped as per norms above 13.21 10.975 7.0 31.185 C Resources through Convergence 23.045 26.53 23.3 72.875 Investment & CGF summary Athoorwala cluster(In Crores)
  • 39. Investment Phasing Name of the component Total Investment required 2016-17 2017-18 2018-19 1 Skill development training 2.00 0 1.00 1.00 2 Agri-services & processing .35 0 .35 0 3 Digital amenities & literacy/CSCs 0.035 0 0.035 0 4 24 x 7 Piped water supply 36.97 16.37 10.6 10 5 Sanitation 0 0 0 0 6 Solid & Liquid Waste Management 3.14 2.00 1.14 0 7 Access to streets with drains 18.00 9.0 5.0 4.0 8 Village street lights 2.06 1.06 1.0 9 Health 1.30 0.7 0.3 0.3 10 Upgradation of schools 1.765 1.765 0 0 11 Inter village road connectivity 15.36 5.36 5.0 5.0 12 Public transport 0 0 0 0 13 LPG gas connection 0 0 0 0 14 Horticulture 3.08 0 3.08 0 15 Minor Irrigation 20.00 0 10 10 Grand Total 104.06 36.255 37.505 30.3 Athoorwala cluster(In Crores)
  • 40. Component Details 40 Name of the component Investment Share Sub Components 1 Skill development training 2.00 1.40 Training of 6590 persons by 05 skill development programs in each GP for various trades of MSME to promote self as well as waged employment. 0.6 2 Agricultural services and processing 0.35 0.35 Construction of 01 Agro service centre. Construction of 04 Agro processing units. Construction of Agri Waste based Compost pits. - 3 Digital Amenities/ CSCs 0.035 - 2436 persons to be made digitally literate. 07 Citizen Service Centers to be made functional. Facilitate Internet Banking in all 08 CSCs. 0.035 4 24 x 7 Piped water supply 36.97 18.37 Construction of 06 tube wells, each in Kanharwala, Ranipokhari Grant, Mazri Grant, Bhaniawala, Jolly Grant and Athoorwala. Construction of 08 OHT tanks, one in each GP. Construction of 122 kms length of pipeline. 18.6 5 Sanitation 0 0 Satisfactory sanitation condition in the cluster. Construction of 2532 IHH toilets under process.0 6 Solid & Liquid waste management 3.14 1.61 Construction of Solid waste dumping pits with linings. Management of waste collection and provision for disposal infrastructure in Mazri Grant, Bhaniawala, Jolly Grant, Ranipokhari Moja, Ranipokhari Grant and Rainapur Grant. Compactor/ transport vehicle (Hyva machine) Construction of Recharge pits/ trenches for treatment of Grey water prior disposal to agricultural fields. 1.53 7 Access to village streets with drains 18.00 12.60 Construction of approx. 108 kms length of concrete drains in arterial and sub-arterial roads for all GPS except Athoorwala.5.4 (In Crores) Under Convergence Under CGF
  • 41. Component Details 41 Name of the component Investment Share Sub Components 8 Street lights 2.06 1.38 Installation of 1880 street lights. 0.68 9 Health 1.30 1.30 Construction of 01 Primary Health Centre in Ranipokhari Grant. Construction of 02 Sub Centres, each in Athoorwala and Rainapur Grant.- 10 Upgradation of schools 1.765 1.765 Construction of new school building in Rainapur Grant (GHSS Ghamandpur). Provision for science stream in Ranipokhari Grant. Construction of dining hall for 05 secondary schools. Computer facility in secondary schools. Drinking water facility in GGHSS Ghamandpur . - 11 Inter village road connectivity 15.36 11.02 Renewal of inter-village roads of all GPs. Widening and strengthening of inter-village roads.4.34 12 Public Transport 0 - Provision for permits/ licenses in Rainapur Grant by the Regional Transport Office.- 13 Horticulture 3.08 3.08 Construction of Vermi Compost units, Grading & Packing house. Construction of Green houses, plant health clinics.- 14 Irrigation 20.0 20.0 Repair/ construction of kms of canal in the cluster. - Grand Total (In Crores) 106.721 72.875 31.185 (In Crores) Under Convergence Under CGF
  • 42. Convergence Strategy Components Name of the Scheme to be converged Amount to be mobilised CGF Skill development training Deendayal Upadhaya Gramin Kaushalya Yojana / Entrepreneurship Development Programme / Rural Self Employment Training Institutes 1.40 0.6 Agri-services & processing Rashtriya Krishi Vikas Yojana / Sub-Mission on Agricultural Mechanization / National Food Security Mission 0.35 0 Digital amenities & CSCs National Digital Literacy Mission 0 0.035 24 x 7 Piped water supply National Rural Drinking Water Programs / GP schemes 18.37 18.6 Sanitation Swatch Bharat Mission Gramin 0 0 SWM & LWM Swatch Bharat Mission Gramin 1.61 1.53 Streets access to drains 14th Finance Commission, MGNREGA 12.60 5.4 Village street lights Ministry of New and Renewable Energy 1.38 0.68 Health District Plan 1.30 0 Upgradation of schools Rashtriya Madhyamik Shiksha Abhiyan (RMSA) 1.765 0 Road connectivity State fund / PMGSY 11.02 4.34 Public transport Beneficiary 0 0 L.P.G gas connection Beneficiary 0 0 Horticulture District Plan, Horticulture Mission for North East and Himalayan states 3.08 0 Minor Irrigation Pradhan Mantri Krishi Sinchai Yojna 20.00 0 Grand Total (in Crores) 72.875 31.185 Athoorwala cluster(In Crores)
  • 43. Implementation Strategy 43 Name of the component Implementing Agency Name 1 Skill Development & training District Industry Center, Dehradun 2 Agri-services and processing Department of Agriculture, Dehradun 3 Water supply PeyJal Nigam, Dehradun 4 Sanitation Swajal Nigam, Dehradun / Rural Development 5 Solid & Liquid waste management S & LWM department, Dehradun 6 Village streets and drains Rural Works Department, Dehradun 7 Village street lights UREDA 8 Health CMO, Dehradun / Animal Husbandry, Dehradun 9 Education Education department, Dehradun 10 Inter village road connectivity Public Works Department, Dehradun 11 Public Transport Regional transport Office, Dehradun 12 Horticulture Horticulture department, Dehradun 13 Irrigation Minor Irrigation department, Dehradun Athoorwala cluster
  • 44. Digitalization of GP boundaries and Landuse mapping 44 Athoorwala cluster GP: Athoorwala
  • 45. Digitalization of GP boundaries and Landuse mapping 45 Athoorwala cluster GP: Mazri Grant
  • 46. Digitalization of GP boundaries and Landuse mapping 46 Athoorwala cluster GP: Bhaniawala
  • 47. Digitalization of GP boundaries and Landuse mapping 47 Athoorwala cluster GP: Jolly Grant
  • 48. Digitalization of GP boundaries and Landuse mapping 48 Athoorwala cluster GP: Ranipokhari Moja
  • 49. Digitalization of GP boundaries and Landuse mapping 49 Athoorwala cluster GP: Ranipokhari Grant
  • 50. Digitalization of GP boundaries and Landuse mapping 50 Athoorwala cluster GP: Rainapur Grant
  • 51. Digitalization of GP boundaries and Landuse mapping 51 Athoorwala cluster GP: Kanharwala
  • 52. Funding strategies & ICAP review – 28.11.2016 Stakeholder consultation Athoorwala cluster NRuM workshop – 08.08.2016 Deficiency & need assessment – 30.09.2016 Investment & Convergence – 12.11.2016
  • 53. Gram Sabha Resolutions Athoorwala cluster Mazri Grant – 21.09.2016Athoorwala – 05.10.2016
  • 54. Gram Sabha Resolutions Athoorwala cluster Jolly Grant – 24.09.2016 Bhaniawala – 22.09.2016 Ranipokhari Moja – 14.09.2016
  • 55. Gram Sabha Resolutions Athoorwala cluster Rainapur Grant – 28.09.2016 Ranipokhari Grant – 04.10.2016 Kanharwala – 22.09.2016
  • 56. State Government of Uttarakhand & CSIR – Central Building Research Institute THANK YOU