ESTIMATION OF POWER GENERATED BY STEAM TURBINE at 36 mw
INLET EXT-1 EXT-2 Process EXT-3 EXT-4 Exhaust Return Cond. Feed water
FLOW ENTHALPY FLOW ENTHALPY FLOW ENTHALPY FLOW ENTHALPY FLOW ENTHALPY FLOW ENTHALPY FLOW ENTHALPY FLOW ENTHALPY FLOW ENTHALPY
TPH Kcal/Kg TPH Kcal/Kg TPH Kcal/Kg TPH Kcal/Kg TPH Kcal/Kg TPH Kcal/Kg TPH Kcal/Kg TPH Kcal/Kg TPH Kcal/Kg
172.06 826.4 16.949 763.9 13.039 707.5 47.601 705.5 14.542 668 7.007 613.8 73.126 550.5 30 80.2 164.2 247
INLET POWER EXT-1 POWER EXT-2 POWER EXT to Process EXT-3 POWER EXT-4 POWER Exhaust Power EXHAUST POWER
KW KW KW KW KW KW KW DM Makeup
511885.38 1.23 1.80 6.69 2.68 1.73 23.46 FLOW ENTHALPY
Stage 1 + 26 Stage Power: 1-7 Stage Power: 7 - 15 Stage Power: 15 - 19 Stage Power: 19 - 23Stage Power:23 - 26
12.504 10.172 4.119 5.037 5.367
TURBINE OUTPUT POWER 37.6 MW 79.929 80.133 -0.204 37.201
37.60
TPH Kcal/Kg
GEAR BOX
EFFICIENCY
99.9 20 32.3
GENERATOR
EFFICIENCY
98
1848.8TURBINE OUTPUT POWER
36.8
MW
.
11273 10172.39581-3555.778058 94.471
65.58139535 94471 77.589
1112 39.5
3731604.5 2759.651222
4339.075 0.84
45.93023256 2318.107027
2755.813953

More Related Content

Similar to Power generation

Indian scenario of super critical power plants issues and challenges by ntpc...
Indian scenario of super critical power plants  issues and challenges by ntpc...Indian scenario of super critical power plants  issues and challenges by ntpc...
Indian scenario of super critical power plants issues and challenges by ntpc...
Ajay Singhal
 
Thermal Power plant familarisation & its Auxillaries
Thermal Power plant familarisation & its AuxillariesThermal Power plant familarisation & its Auxillaries
Thermal Power plant familarisation & its Auxillaries
Vaibhav Paydelwar
 
2005 ASME Power Conference Analysis of Turbine Cycle Performance Losses Using...
2005 ASME Power Conference Analysis of Turbine Cycle Performance Losses Using...2005 ASME Power Conference Analysis of Turbine Cycle Performance Losses Using...
2005 ASME Power Conference Analysis of Turbine Cycle Performance Losses Using...Komandur Sunder Raj, P.E.
 
SURATGARH SUPER THERMAL POWER STATION
SURATGARH  SUPER  THERMAL POWER    STATION SURATGARH  SUPER  THERMAL POWER    STATION
SURATGARH SUPER THERMAL POWER STATION Sagar Sharma
 
Pintu raj
Pintu rajPintu raj
Pintu raj
ritchaubey
 
Hvac pumps 120 series pumps
Hvac pumps 120 series pumpsHvac pumps 120 series pumps
Hvac pumps 120 series pumps
Callaghan Pump and Controls, Inc.
 
GAS POWER CYCLES PRESENTATION FOR STUDENT UNIVERSITY
GAS POWER CYCLES PRESENTATION FOR STUDENT UNIVERSITYGAS POWER CYCLES PRESENTATION FOR STUDENT UNIVERSITY
GAS POWER CYCLES PRESENTATION FOR STUDENT UNIVERSITY
ssuser5a6db81
 
Dev
DevDev
Presentation on Jamshoro power company limited (jpcl)
Presentation on Jamshoro power company limited (jpcl)Presentation on Jamshoro power company limited (jpcl)
Presentation on Jamshoro power company limited (jpcl)
Muhammad Azhar Arain
 
Rte 1 en
Rte 1 enRte 1 en
Rte 1 en
Oliverh Kalprit
 
THERMAL POWER PLANT (COAL TO POWER)
THERMAL POWER PLANT (COAL TO POWER)THERMAL POWER PLANT (COAL TO POWER)
THERMAL POWER PLANT (COAL TO POWER)
Baibhav Saha
 
Kota super thermal power station ppt, rtu
Kota super thermal power station ppt, rtuKota super thermal power station ppt, rtu
Kota super thermal power station ppt, rtu
Raghav Chittora
 
Sor
SorSor
ppt on kstps 2016
ppt on kstps 2016ppt on kstps 2016
ppt on kstps 2016
Apoorva Sharma
 
Ae32626632
Ae32626632Ae32626632
Ae32626632IJMER
 
Presentation on Kota super Thermal Power Station
Presentation on Kota super Thermal Power StationPresentation on Kota super Thermal Power Station
Presentation on Kota super Thermal Power Station
pukhraj palariya
 
Bjs green belt ppt
Bjs green belt pptBjs green belt ppt
Bjs green belt ppt
Dr. Bikram Jit Singh
 
SUMMER Training report AT NTPC FOR INSTRUMENTATION (kbunl)
SUMMER Training report AT NTPC FOR INSTRUMENTATION (kbunl)SUMMER Training report AT NTPC FOR INSTRUMENTATION (kbunl)
SUMMER Training report AT NTPC FOR INSTRUMENTATION (kbunl)
guru nanak institute of technology
 
2007 PROJECT DOCUMENT ON EXERGY
2007  PROJECT DOCUMENT ON EXERGY 2007  PROJECT DOCUMENT ON EXERGY
2007 PROJECT DOCUMENT ON EXERGY Alekhya Madisetty
 

Similar to Power generation (20)

Indian scenario of super critical power plants issues and challenges by ntpc...
Indian scenario of super critical power plants  issues and challenges by ntpc...Indian scenario of super critical power plants  issues and challenges by ntpc...
Indian scenario of super critical power plants issues and challenges by ntpc...
 
Thermal Power plant familarisation & its Auxillaries
Thermal Power plant familarisation & its AuxillariesThermal Power plant familarisation & its Auxillaries
Thermal Power plant familarisation & its Auxillaries
 
2005 ASME Power Conference Analysis of Turbine Cycle Performance Losses Using...
2005 ASME Power Conference Analysis of Turbine Cycle Performance Losses Using...2005 ASME Power Conference Analysis of Turbine Cycle Performance Losses Using...
2005 ASME Power Conference Analysis of Turbine Cycle Performance Losses Using...
 
SURATGARH SUPER THERMAL POWER STATION
SURATGARH  SUPER  THERMAL POWER    STATION SURATGARH  SUPER  THERMAL POWER    STATION
SURATGARH SUPER THERMAL POWER STATION
 
Pintu raj
Pintu rajPintu raj
Pintu raj
 
Hvac pumps 120 series pumps
Hvac pumps 120 series pumpsHvac pumps 120 series pumps
Hvac pumps 120 series pumps
 
GAS POWER CYCLES PRESENTATION FOR STUDENT UNIVERSITY
GAS POWER CYCLES PRESENTATION FOR STUDENT UNIVERSITYGAS POWER CYCLES PRESENTATION FOR STUDENT UNIVERSITY
GAS POWER CYCLES PRESENTATION FOR STUDENT UNIVERSITY
 
Dev
DevDev
Dev
 
Presentation on Jamshoro power company limited (jpcl)
Presentation on Jamshoro power company limited (jpcl)Presentation on Jamshoro power company limited (jpcl)
Presentation on Jamshoro power company limited (jpcl)
 
Rte 1 en
Rte 1 enRte 1 en
Rte 1 en
 
THERMAL POWER PLANT (COAL TO POWER)
THERMAL POWER PLANT (COAL TO POWER)THERMAL POWER PLANT (COAL TO POWER)
THERMAL POWER PLANT (COAL TO POWER)
 
CESC PROJECT
CESC PROJECTCESC PROJECT
CESC PROJECT
 
Kota super thermal power station ppt, rtu
Kota super thermal power station ppt, rtuKota super thermal power station ppt, rtu
Kota super thermal power station ppt, rtu
 
Sor
SorSor
Sor
 
ppt on kstps 2016
ppt on kstps 2016ppt on kstps 2016
ppt on kstps 2016
 
Ae32626632
Ae32626632Ae32626632
Ae32626632
 
Presentation on Kota super Thermal Power Station
Presentation on Kota super Thermal Power StationPresentation on Kota super Thermal Power Station
Presentation on Kota super Thermal Power Station
 
Bjs green belt ppt
Bjs green belt pptBjs green belt ppt
Bjs green belt ppt
 
SUMMER Training report AT NTPC FOR INSTRUMENTATION (kbunl)
SUMMER Training report AT NTPC FOR INSTRUMENTATION (kbunl)SUMMER Training report AT NTPC FOR INSTRUMENTATION (kbunl)
SUMMER Training report AT NTPC FOR INSTRUMENTATION (kbunl)
 
2007 PROJECT DOCUMENT ON EXERGY
2007  PROJECT DOCUMENT ON EXERGY 2007  PROJECT DOCUMENT ON EXERGY
2007 PROJECT DOCUMENT ON EXERGY
 

Recently uploaded

Immunizing Image Classifiers Against Localized Adversary Attacks
Immunizing Image Classifiers Against Localized Adversary AttacksImmunizing Image Classifiers Against Localized Adversary Attacks
Immunizing Image Classifiers Against Localized Adversary Attacks
gerogepatton
 
Water Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation and Control Monthly - May 2024.pdfWater Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation & Control
 
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
bakpo1
 
Technical Drawings introduction to drawing of prisms
Technical Drawings introduction to drawing of prismsTechnical Drawings introduction to drawing of prisms
Technical Drawings introduction to drawing of prisms
heavyhaig
 
DfMAy 2024 - key insights and contributions
DfMAy 2024 - key insights and contributionsDfMAy 2024 - key insights and contributions
DfMAy 2024 - key insights and contributions
gestioneergodomus
 
Gen AI Study Jams _ For the GDSC Leads in India.pdf
Gen AI Study Jams _ For the GDSC Leads in India.pdfGen AI Study Jams _ For the GDSC Leads in India.pdf
Gen AI Study Jams _ For the GDSC Leads in India.pdf
gdsczhcet
 
Railway Signalling Principles Edition 3.pdf
Railway Signalling Principles Edition 3.pdfRailway Signalling Principles Edition 3.pdf
Railway Signalling Principles Edition 3.pdf
TeeVichai
 
Nuclear Power Economics and Structuring 2024
Nuclear Power Economics and Structuring 2024Nuclear Power Economics and Structuring 2024
Nuclear Power Economics and Structuring 2024
Massimo Talia
 
Building Electrical System Design & Installation
Building Electrical System Design & InstallationBuilding Electrical System Design & Installation
Building Electrical System Design & Installation
symbo111
 
PPT on GRP pipes manufacturing and testing
PPT on GRP pipes manufacturing and testingPPT on GRP pipes manufacturing and testing
PPT on GRP pipes manufacturing and testing
anoopmanoharan2
 
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdfTop 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Teleport Manpower Consultant
 
Basic Industrial Engineering terms for apparel
Basic Industrial Engineering terms for apparelBasic Industrial Engineering terms for apparel
Basic Industrial Engineering terms for apparel
top1002
 
weather web application report.pdf
weather web application report.pdfweather web application report.pdf
weather web application report.pdf
Pratik Pawar
 
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
obonagu
 
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Dr.Costas Sachpazis
 
Tutorial for 16S rRNA Gene Analysis with QIIME2.pdf
Tutorial for 16S rRNA Gene Analysis with QIIME2.pdfTutorial for 16S rRNA Gene Analysis with QIIME2.pdf
Tutorial for 16S rRNA Gene Analysis with QIIME2.pdf
aqil azizi
 
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdfHybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
fxintegritypublishin
 
Student information management system project report ii.pdf
Student information management system project report ii.pdfStudent information management system project report ii.pdf
Student information management system project report ii.pdf
Kamal Acharya
 
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
MdTanvirMahtab2
 
Understanding Inductive Bias in Machine Learning
Understanding Inductive Bias in Machine LearningUnderstanding Inductive Bias in Machine Learning
Understanding Inductive Bias in Machine Learning
SUTEJAS
 

Recently uploaded (20)

Immunizing Image Classifiers Against Localized Adversary Attacks
Immunizing Image Classifiers Against Localized Adversary AttacksImmunizing Image Classifiers Against Localized Adversary Attacks
Immunizing Image Classifiers Against Localized Adversary Attacks
 
Water Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation and Control Monthly - May 2024.pdfWater Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation and Control Monthly - May 2024.pdf
 
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
 
Technical Drawings introduction to drawing of prisms
Technical Drawings introduction to drawing of prismsTechnical Drawings introduction to drawing of prisms
Technical Drawings introduction to drawing of prisms
 
DfMAy 2024 - key insights and contributions
DfMAy 2024 - key insights and contributionsDfMAy 2024 - key insights and contributions
DfMAy 2024 - key insights and contributions
 
Gen AI Study Jams _ For the GDSC Leads in India.pdf
Gen AI Study Jams _ For the GDSC Leads in India.pdfGen AI Study Jams _ For the GDSC Leads in India.pdf
Gen AI Study Jams _ For the GDSC Leads in India.pdf
 
Railway Signalling Principles Edition 3.pdf
Railway Signalling Principles Edition 3.pdfRailway Signalling Principles Edition 3.pdf
Railway Signalling Principles Edition 3.pdf
 
Nuclear Power Economics and Structuring 2024
Nuclear Power Economics and Structuring 2024Nuclear Power Economics and Structuring 2024
Nuclear Power Economics and Structuring 2024
 
Building Electrical System Design & Installation
Building Electrical System Design & InstallationBuilding Electrical System Design & Installation
Building Electrical System Design & Installation
 
PPT on GRP pipes manufacturing and testing
PPT on GRP pipes manufacturing and testingPPT on GRP pipes manufacturing and testing
PPT on GRP pipes manufacturing and testing
 
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdfTop 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
 
Basic Industrial Engineering terms for apparel
Basic Industrial Engineering terms for apparelBasic Industrial Engineering terms for apparel
Basic Industrial Engineering terms for apparel
 
weather web application report.pdf
weather web application report.pdfweather web application report.pdf
weather web application report.pdf
 
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
 
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
 
Tutorial for 16S rRNA Gene Analysis with QIIME2.pdf
Tutorial for 16S rRNA Gene Analysis with QIIME2.pdfTutorial for 16S rRNA Gene Analysis with QIIME2.pdf
Tutorial for 16S rRNA Gene Analysis with QIIME2.pdf
 
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdfHybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
 
Student information management system project report ii.pdf
Student information management system project report ii.pdfStudent information management system project report ii.pdf
Student information management system project report ii.pdf
 
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
 
Understanding Inductive Bias in Machine Learning
Understanding Inductive Bias in Machine LearningUnderstanding Inductive Bias in Machine Learning
Understanding Inductive Bias in Machine Learning
 

Power generation

  • 1. ESTIMATION OF POWER GENERATED BY STEAM TURBINE at 36 mw INLET EXT-1 EXT-2 Process EXT-3 EXT-4 Exhaust Return Cond. Feed water FLOW ENTHALPY FLOW ENTHALPY FLOW ENTHALPY FLOW ENTHALPY FLOW ENTHALPY FLOW ENTHALPY FLOW ENTHALPY FLOW ENTHALPY FLOW ENTHALPY TPH Kcal/Kg TPH Kcal/Kg TPH Kcal/Kg TPH Kcal/Kg TPH Kcal/Kg TPH Kcal/Kg TPH Kcal/Kg TPH Kcal/Kg TPH Kcal/Kg 172.06 826.4 16.949 763.9 13.039 707.5 47.601 705.5 14.542 668 7.007 613.8 73.126 550.5 30 80.2 164.2 247 INLET POWER EXT-1 POWER EXT-2 POWER EXT to Process EXT-3 POWER EXT-4 POWER Exhaust Power EXHAUST POWER KW KW KW KW KW KW KW DM Makeup 511885.38 1.23 1.80 6.69 2.68 1.73 23.46 FLOW ENTHALPY Stage 1 + 26 Stage Power: 1-7 Stage Power: 7 - 15 Stage Power: 15 - 19 Stage Power: 19 - 23Stage Power:23 - 26 12.504 10.172 4.119 5.037 5.367 TURBINE OUTPUT POWER 37.6 MW 79.929 80.133 -0.204 37.201 37.60 TPH Kcal/Kg GEAR BOX EFFICIENCY 99.9 20 32.3 GENERATOR EFFICIENCY 98 1848.8TURBINE OUTPUT POWER 36.8 MW . 11273 10172.39581-3555.778058 94.471 65.58139535 94471 77.589 1112 39.5 3731604.5 2759.651222 4339.075 0.84 45.93023256 2318.107027 2755.813953