Purpose
The purpose of testing showers and reporting is to perform minor maintenance while on site and to
eliminate the possible causes of a potential shower leak. This provides accurate data to Infraworks
Plumbing to enable the correct maintenance work to be raised. It is also used to minimise the
inconvenience to tenants for multiple trips that are unnecessary, as all minor maintenance will be
conducted on the first, and perhaps the only visit.
Testing Procedure
1. Conduct a complete visual inspection of the shower area and the surrounds for any indications
of a possible shower leak, prior to conducting any testing or maintenance. This would include
noting any damp patches to walls outside the shower in adjoining rooms, adjoining cupboards,
water stains to floor coverings at bathroom or ensuite entries, including carpet, (pull the edge of
the carpet back and look underneath) water stains to walls/ceilings/cornices directly below the
shower, swollen or water damaged architraves, doorjambs and skirtings in and around the
shower are. Record any findings on the report form in your the Assignar App Shower Leak Test
Report Form.
2. Ask the tenant why they feel the shower is leaking. Have they noticed any damp patches or
water not associated with normal shower use? Ask when they noted the water leak and where
Test Shower Leaks for Plumbers
STANDARD OPERATING PROCEDURE
2 | P a g e
Form Number: PO 119
Issue date: 3/05/2019
Issue 1.0
specifically. Be aware that tenants may not be technical minded and may be giving an un-
informed opinion. Record any findings on the report form on your the Assignar App Shower Leak
Test Report Form.
3. Pull back the tap wall flanges and see if there are any indications of leaks or water dripping back
into the wall cavity. Silicone seal the gap the gap between the tap bodies and the tiles/wall
sheets if this has not already been done. AFTER all tap maintenance has been completed and
ensure the area is thoroughly dry before applying silicone. Tool off the silicone to ensure a water
tight finish. Record any findings on your the Assignar App Shower Leak Test Report Form.
4. Remove tap spindles and replace any tap washers. Check the “O” rings to the spindles and
replace “O” rings. Check the ceramic disc condition (if used) and replace the spindles if damaged.
Record any findings on the Assignar Report form. If it is a mixer tap check it thoroughly for any
leaks. Record any findings on your Assignar App Shower Leak Test Report Form.
5. Remove the shower rose and connect a pressure gauge and open the taps. Close off the taps
and observe and note the pressure reading and note if it drops after 10 minutes. Record any
findings on the Assignar App Shower Leak Test Report Form.
6. If the shower is a Hobless Shower
a. Conduct a flood test to the shower by blocking the floor waste and filling the shower to
no more than 5mm depth of the perimeter of the shower screen (this is so we don’t
flood over the waterproofing angle underneath the shower screen if present). A small
amount of indicator dye may be used to aid the detection of leaks if there is any doubt
as to the source of leakage (This may be helpful to confirm that the source of water
found OUTSIDE of the recess has come from INSIDE of the recess)
b. Check if any water shows in the ensuite or bathroom doorway or anywhere else outside
of the screened shower.
c. Pull back carpet at the doorway and check
d. Record any findings on the Assignar App Shower Leak Test Report Form.
7. If the shower is a Hobbed Shower
Stage 1.
The following flood test should be conducted for a minimum of 30 minutes or ceased on signs of
leakage.
STANDARD OPERATING PROCEDURE
3 | P a g e
Form Number: PO 119
Issue date: 3/05/2019
Issue 1.0
a. Fill the shower to depth of 30mm below the top of the hob to test the basin
waterproofing flood height. Flood test will be conducted for a minimum of 30 minutes or
ceased signs of leakage. Record any findings on the Assignar App Shower Leak Test
Report Form. If there is any doubt as to the source of the leakage, a small amount of
indicator dye may be used to aid the detection of leaks. This may be helpful to confirm
that the source of water found OUTSIDE of the recess has come from INSIDE of the
recess.
b. Check if any water shows in the ensuite or bathroom doorway or anywhere else outside
of the screened shower.
c. Pull back carpet at the doorway and check for any signs of leakage.
d. Record any findings on the Assignar App Shower Leak Test Report Form.
e. Proceed to Stage 2 if nothing shows at Stage 1
Stage 2
The following flood test should be conducted for a minimum of 30 minutes or ceased on signs of
leakage.
If there are any other signs of water damage and no leaks occur within 30 minutes it may be
necessary to hold the test for 60 minutes, If the membrane is suspect it should show within this
period.
a. Fill the shower to the top of the tile without running across the top of the hob to test the tile
grout and tile trim (A small amount of indicator dye may used to aid in the detection of
leaks, if there is any doubt as to the source of the leakage .e.g. Fluorescein . This may be
helpful to confirm that the source of water found OUTSIDE of the recess has come from
INSIDE of the recess)
b. Check for any water that shows at the ensuite or bathroom doorway, or any where else
outside the screened shower. Pull back the carpet at the doorway and check for leakage.
c. Where test was conducted and no findings have been found, or if there are indications of a
membrane leak and all other issues have been checked and resolved the test may need to
be conducted for longer. In this instance contact a technical specialist
d. Record any findings on the Assignar App Shower Leak Test Report Form.
STANDARD OPERATING PROCEDURE
4 | P a g e
Form Number: PO 119
Issue date: 3/05/2019
Issue 1.0
8. All Showers
a. Close over the shower door and spray the water around the shower recess to see if the
leak may be from a faulty silicone seal of the shower screen.
b. Wipe up all excess water and dry the area thoroughly and reseal the silicone where
faulty. This may need to be done the next day when it has dried out, otherwise dry the
area thoroughly with a heat gun before apply silicone.
c. Record any findings on the Assignar App Shower Leak Test Report Form.
9. Two Storey Showers
a. Listen for dripping sounds between the floor and ceiling if it is a bathroom upstairs, It
nay indicate a leak in the waste plumbing between the floors from a faulty trap seal or
broken/unglued waste pipe joint.
b. Cut a small hole in the plasterboard ceiling to inspect and replacing with a PVC snap vent
(maximum size 300 x 300mm)
c. Repair any leaking pipes found
d. Record any findings on the Assignar App Shower Leak Test Report Form.
STANDARD OPERATING PROCEDURE
5 | P a g e
Form Number: PO 119
Issue date: 3/05/2019
Issue 1.0
10. What if nothing shows? Look wider than the shower
⇒ Is there a vanity nearby that could causing the issue?
⇒ Is there a leaky bath from taps or wastes? Is it an island bath – and a silicone seal
failure?
⇒ Is there a toilet nearby that could be causing the issue?
⇒ Is there a bath nearby that could be causing the issue?
⇒ Is it a 2-storey property with a sewer vent in the wall – Flashing issue?
⇒ Is there some other cause that could be in an adjoining room? E.g. Back to back
bathrooms, leaking pipe in the wall, air conditioning condensation leak
⇒ Call the Technical Specialist at Infraworks

More Related Content

Similar to PO 119 SOP Testing Shower Leaks for Plumbers

Kohler Water Tile Cleaning Instructions
Kohler Water Tile Cleaning Instructions Kohler Water Tile Cleaning Instructions
Kohler Water Tile Cleaning Instructions
Living180University
 
S3 SANITARY PIPE WORK ASSIGNMENT
S3 SANITARY PIPE WORK ASSIGNMENTS3 SANITARY PIPE WORK ASSIGNMENT
S3 SANITARY PIPE WORK ASSIGNMENT
no suhaila
 
5 traps & sovent
5 traps & sovent5 traps & sovent
5 traps & sovent
Van Heina
 
L 44 leakge management
L 44 leakge managementL 44 leakge management
L 44 leakge management
Dr. shrikant jahagirdar
 
Environmental engineering PPT
Environmental engineering PPTEnvironmental engineering PPT
Environmental engineering PPT
Kavin Raval
 
mud filtration
mud filtrationmud filtration
mud filtration
Muhammad Faisal
 
How To Fix A Leaky Faucet
How To Fix A Leaky FaucetHow To Fix A Leaky Faucet
How To Fix A Leaky Faucet
Plumbing 911
 
Pro‐Ox Iron Filter 1650 with Chlorine Side Tank Installation and Start Up Guide
Pro‐Ox Iron Filter 1650 with Chlorine Side Tank Installation and Start Up GuidePro‐Ox Iron Filter 1650 with Chlorine Side Tank Installation and Start Up Guide
Pro‐Ox Iron Filter 1650 with Chlorine Side Tank Installation and Start Up Guide
Clean Water Systems
 
Leakages from toilets
Leakages from toiletsLeakages from toilets
Leakages from toilets
sandapraveenkumar
 
Maintenance of sewer
Maintenance of sewerMaintenance of sewer
Maintenance of sewer
dhara dattani
 
Septic Systems for Homeowners
Septic Systems for HomeownersSeptic Systems for Homeowners
Septic Systems for Homeowners
Amanda Myers
 
Most common source of humidifier leaks
Most common source of humidifier leaksMost common source of humidifier leaks
Most common source of humidifier leaks
21 Handshake
 
Microplate washer
Microplate washerMicroplate washer
Microplate washer
Asanka Lakmal Morawaka
 
Home improvement
Home improvementHome improvement
Home improvementfoamheart88
 
Plumbing presentation
Plumbing presentationPlumbing presentation
Plumbing presentation
Christine Gabasa
 
Operation maintenance EcoVault
Operation maintenance EcoVaultOperation maintenance EcoVault
Operation maintenance EcoVault
EcoSenseINT
 
FINAL The Owens Lake Turnout Facility End Cap Study
FINAL The Owens Lake Turnout Facility End Cap StudyFINAL The Owens Lake Turnout Facility End Cap Study
FINAL The Owens Lake Turnout Facility End Cap StudyKook Dean
 

Similar to PO 119 SOP Testing Shower Leaks for Plumbers (20)

Kohler Water Tile Cleaning Instructions
Kohler Water Tile Cleaning Instructions Kohler Water Tile Cleaning Instructions
Kohler Water Tile Cleaning Instructions
 
S3 SANITARY PIPE WORK ASSIGNMENT
S3 SANITARY PIPE WORK ASSIGNMENTS3 SANITARY PIPE WORK ASSIGNMENT
S3 SANITARY PIPE WORK ASSIGNMENT
 
5 traps & sovent
5 traps & sovent5 traps & sovent
5 traps & sovent
 
I hydro 7500-film test
I hydro 7500-film test I hydro 7500-film test
I hydro 7500-film test
 
L 44 leakge management
L 44 leakge managementL 44 leakge management
L 44 leakge management
 
Environmental engineering PPT
Environmental engineering PPTEnvironmental engineering PPT
Environmental engineering PPT
 
mud filtration
mud filtrationmud filtration
mud filtration
 
How To Fix A Leaky Faucet
How To Fix A Leaky FaucetHow To Fix A Leaky Faucet
How To Fix A Leaky Faucet
 
Pro‐Ox Iron Filter 1650 with Chlorine Side Tank Installation and Start Up Guide
Pro‐Ox Iron Filter 1650 with Chlorine Side Tank Installation and Start Up GuidePro‐Ox Iron Filter 1650 with Chlorine Side Tank Installation and Start Up Guide
Pro‐Ox Iron Filter 1650 with Chlorine Side Tank Installation and Start Up Guide
 
Leakages from toilets
Leakages from toiletsLeakages from toilets
Leakages from toilets
 
Maintenance of sewer
Maintenance of sewerMaintenance of sewer
Maintenance of sewer
 
Septic Systems for Homeowners
Septic Systems for HomeownersSeptic Systems for Homeowners
Septic Systems for Homeowners
 
Most common source of humidifier leaks
Most common source of humidifier leaksMost common source of humidifier leaks
Most common source of humidifier leaks
 
Microplate washer
Microplate washerMicroplate washer
Microplate washer
 
Home improvement
Home improvementHome improvement
Home improvement
 
Plumbing presentation
Plumbing presentationPlumbing presentation
Plumbing presentation
 
Operation maintenance EcoVault
Operation maintenance EcoVaultOperation maintenance EcoVault
Operation maintenance EcoVault
 
Hydraulicdesignofsewer
HydraulicdesignofsewerHydraulicdesignofsewer
Hydraulicdesignofsewer
 
Sample Instruction Manual
Sample Instruction ManualSample Instruction Manual
Sample Instruction Manual
 
FINAL The Owens Lake Turnout Facility End Cap Study
FINAL The Owens Lake Turnout Facility End Cap StudyFINAL The Owens Lake Turnout Facility End Cap Study
FINAL The Owens Lake Turnout Facility End Cap Study
 

More from Garry Pepper

September 2019 amendments flyer
September 2019 amendments flyerSeptember 2019 amendments flyer
September 2019 amendments flyer
Garry Pepper
 
Safe tracks 2019 08-network rules amendments
Safe tracks 2019 08-network rules amendmentsSafe tracks 2019 08-network rules amendments
Safe tracks 2019 08-network rules amendments
Garry Pepper
 
Laha memo
Laha memoLaha memo
Laha memo
Garry Pepper
 
Infraworks social media policy v1.0
Infraworks social media policy v1.0Infraworks social media policy v1.0
Infraworks social media policy v1.0
Garry Pepper
 
Safe notice 2019 003
Safe notice 2019 003Safe notice 2019 003
Safe notice 2019 003
Garry Pepper
 
Artc safety alert no. 112
Artc safety alert no. 112Artc safety alert no. 112
Artc safety alert no. 112
Garry Pepper
 
Safe notice permanent 009
Safe notice permanent 009Safe notice permanent 009
Safe notice permanent 009
Garry Pepper
 
Changes to css script for toa
Changes to css script for toaChanges to css script for toa
Changes to css script for toa
Garry Pepper
 
Safe tracks july 07
Safe tracks july 07Safe tracks july 07
Safe tracks july 07
Garry Pepper
 
S afe notice 193 194 204
S afe notice 193 194 204S afe notice 193 194 204
S afe notice 193 194 204
Garry Pepper
 
Plumbers sydney water work completions memo
Plumbers sydney water work completions memoPlumbers sydney water work completions memo
Plumbers sydney water work completions memo
Garry Pepper
 
Lessons learnt electrical incident penrith wrp july 2019
Lessons learnt electrical incident penrith wrp july 2019Lessons learnt electrical incident penrith wrp july 2019
Lessons learnt electrical incident penrith wrp july 2019
Garry Pepper
 
Alert riw transition from pegasus to mta
Alert riw transition from pegasus to mtaAlert riw transition from pegasus to mta
Alert riw transition from pegasus to mta
Garry Pepper
 
Safe notice 192 191
Safe notice 192 191Safe notice 192 191
Safe notice 192 191
Garry Pepper
 
Safe notice telegram 1027
Safe notice telegram 1027Safe notice telegram 1027
Safe notice telegram 1027
Garry Pepper
 
Infraworks induction presentaion v4.0
Infraworks induction presentaion v4.0Infraworks induction presentaion v4.0
Infraworks induction presentaion v4.0
Garry Pepper
 
Safe notice 178 189 206
Safe notice 178 189 206Safe notice 178 189 206
Safe notice 178 189 206
Garry Pepper
 
Safe notice permanent 008 2019
Safe notice permanent 008 2019Safe notice permanent 008 2019
Safe notice permanent 008 2019
Garry Pepper
 
Reminder to vote EA
Reminder to vote EAReminder to vote EA
Reminder to vote EA
Garry Pepper
 
Safe notice 160 231 176 175
Safe notice 160 231 176 175Safe notice 160 231 176 175
Safe notice 160 231 176 175
Garry Pepper
 

More from Garry Pepper (20)

September 2019 amendments flyer
September 2019 amendments flyerSeptember 2019 amendments flyer
September 2019 amendments flyer
 
Safe tracks 2019 08-network rules amendments
Safe tracks 2019 08-network rules amendmentsSafe tracks 2019 08-network rules amendments
Safe tracks 2019 08-network rules amendments
 
Laha memo
Laha memoLaha memo
Laha memo
 
Infraworks social media policy v1.0
Infraworks social media policy v1.0Infraworks social media policy v1.0
Infraworks social media policy v1.0
 
Safe notice 2019 003
Safe notice 2019 003Safe notice 2019 003
Safe notice 2019 003
 
Artc safety alert no. 112
Artc safety alert no. 112Artc safety alert no. 112
Artc safety alert no. 112
 
Safe notice permanent 009
Safe notice permanent 009Safe notice permanent 009
Safe notice permanent 009
 
Changes to css script for toa
Changes to css script for toaChanges to css script for toa
Changes to css script for toa
 
Safe tracks july 07
Safe tracks july 07Safe tracks july 07
Safe tracks july 07
 
S afe notice 193 194 204
S afe notice 193 194 204S afe notice 193 194 204
S afe notice 193 194 204
 
Plumbers sydney water work completions memo
Plumbers sydney water work completions memoPlumbers sydney water work completions memo
Plumbers sydney water work completions memo
 
Lessons learnt electrical incident penrith wrp july 2019
Lessons learnt electrical incident penrith wrp july 2019Lessons learnt electrical incident penrith wrp july 2019
Lessons learnt electrical incident penrith wrp july 2019
 
Alert riw transition from pegasus to mta
Alert riw transition from pegasus to mtaAlert riw transition from pegasus to mta
Alert riw transition from pegasus to mta
 
Safe notice 192 191
Safe notice 192 191Safe notice 192 191
Safe notice 192 191
 
Safe notice telegram 1027
Safe notice telegram 1027Safe notice telegram 1027
Safe notice telegram 1027
 
Infraworks induction presentaion v4.0
Infraworks induction presentaion v4.0Infraworks induction presentaion v4.0
Infraworks induction presentaion v4.0
 
Safe notice 178 189 206
Safe notice 178 189 206Safe notice 178 189 206
Safe notice 178 189 206
 
Safe notice permanent 008 2019
Safe notice permanent 008 2019Safe notice permanent 008 2019
Safe notice permanent 008 2019
 
Reminder to vote EA
Reminder to vote EAReminder to vote EA
Reminder to vote EA
 
Safe notice 160 231 176 175
Safe notice 160 231 176 175Safe notice 160 231 176 175
Safe notice 160 231 176 175
 

Recently uploaded

Premium MEAN Stack Development Solutions for Modern Businesses
Premium MEAN Stack Development Solutions for Modern BusinessesPremium MEAN Stack Development Solutions for Modern Businesses
Premium MEAN Stack Development Solutions for Modern Businesses
SynapseIndia
 
20240425_ TJ Communications Credentials_compressed.pdf
20240425_ TJ Communications Credentials_compressed.pdf20240425_ TJ Communications Credentials_compressed.pdf
20240425_ TJ Communications Credentials_compressed.pdf
tjcomstrang
 
What are the main advantages of using HR recruiter services.pdf
What are the main advantages of using HR recruiter services.pdfWhat are the main advantages of using HR recruiter services.pdf
What are the main advantages of using HR recruiter services.pdf
HumanResourceDimensi1
 
Unveiling the Secrets How Does Generative AI Work.pdf
Unveiling the Secrets How Does Generative AI Work.pdfUnveiling the Secrets How Does Generative AI Work.pdf
Unveiling the Secrets How Does Generative AI Work.pdf
Sam H
 
The-McKinsey-7S-Framework. strategic management
The-McKinsey-7S-Framework. strategic managementThe-McKinsey-7S-Framework. strategic management
The-McKinsey-7S-Framework. strategic management
Bojamma2
 
Business Valuation Principles for Entrepreneurs
Business Valuation Principles for EntrepreneursBusiness Valuation Principles for Entrepreneurs
Business Valuation Principles for Entrepreneurs
Ben Wann
 
ModelingMarketingStrategiesMKS.CollumbiaUniversitypdf
ModelingMarketingStrategiesMKS.CollumbiaUniversitypdfModelingMarketingStrategiesMKS.CollumbiaUniversitypdf
ModelingMarketingStrategiesMKS.CollumbiaUniversitypdf
fisherameliaisabella
 
5 Things You Need To Know Before Hiring a Videographer
5 Things You Need To Know Before Hiring a Videographer5 Things You Need To Know Before Hiring a Videographer
5 Things You Need To Know Before Hiring a Videographer
ofm712785
 
VAT Registration Outlined In UAE: Benefits and Requirements
VAT Registration Outlined In UAE: Benefits and RequirementsVAT Registration Outlined In UAE: Benefits and Requirements
VAT Registration Outlined In UAE: Benefits and Requirements
uae taxgpt
 
一比一原版加拿大渥太华大学毕业证(uottawa毕业证书)如何办理
一比一原版加拿大渥太华大学毕业证(uottawa毕业证书)如何办理一比一原版加拿大渥太华大学毕业证(uottawa毕业证书)如何办理
一比一原版加拿大渥太华大学毕业证(uottawa毕业证书)如何办理
taqyed
 
What is the TDS Return Filing Due Date for FY 2024-25.pdf
What is the TDS Return Filing Due Date for FY 2024-25.pdfWhat is the TDS Return Filing Due Date for FY 2024-25.pdf
What is the TDS Return Filing Due Date for FY 2024-25.pdf
seoforlegalpillers
 
Project File Report BBA 6th semester.pdf
Project File Report BBA 6th semester.pdfProject File Report BBA 6th semester.pdf
Project File Report BBA 6th semester.pdf
RajPriye
 
Enterprise Excellence is Inclusive Excellence.pdf
Enterprise Excellence is Inclusive Excellence.pdfEnterprise Excellence is Inclusive Excellence.pdf
Enterprise Excellence is Inclusive Excellence.pdf
KaiNexus
 
ikea_woodgreen_petscharity_cat-alogue_digital.pdf
ikea_woodgreen_petscharity_cat-alogue_digital.pdfikea_woodgreen_petscharity_cat-alogue_digital.pdf
ikea_woodgreen_petscharity_cat-alogue_digital.pdf
agatadrynko
 
Maksym Vyshnivetskyi: PMO Quality Management (UA)
Maksym Vyshnivetskyi: PMO Quality Management (UA)Maksym Vyshnivetskyi: PMO Quality Management (UA)
Maksym Vyshnivetskyi: PMO Quality Management (UA)
Lviv Startup Club
 
Improving profitability for small business
Improving profitability for small businessImproving profitability for small business
Improving profitability for small business
Ben Wann
 
Cracking the Workplace Discipline Code Main.pptx
Cracking the Workplace Discipline Code Main.pptxCracking the Workplace Discipline Code Main.pptx
Cracking the Workplace Discipline Code Main.pptx
Workforce Group
 
Attending a job Interview for B1 and B2 Englsih learners
Attending a job Interview for B1 and B2 Englsih learnersAttending a job Interview for B1 and B2 Englsih learners
Attending a job Interview for B1 and B2 Englsih learners
Erika906060
 
Search Disrupted Google’s Leaked Documents Rock the SEO World.pdf
Search Disrupted Google’s Leaked Documents Rock the SEO World.pdfSearch Disrupted Google’s Leaked Documents Rock the SEO World.pdf
Search Disrupted Google’s Leaked Documents Rock the SEO World.pdf
Arihant Webtech Pvt. Ltd
 
ikea_woodgreen_petscharity_dog-alogue_digital.pdf
ikea_woodgreen_petscharity_dog-alogue_digital.pdfikea_woodgreen_petscharity_dog-alogue_digital.pdf
ikea_woodgreen_petscharity_dog-alogue_digital.pdf
agatadrynko
 

Recently uploaded (20)

Premium MEAN Stack Development Solutions for Modern Businesses
Premium MEAN Stack Development Solutions for Modern BusinessesPremium MEAN Stack Development Solutions for Modern Businesses
Premium MEAN Stack Development Solutions for Modern Businesses
 
20240425_ TJ Communications Credentials_compressed.pdf
20240425_ TJ Communications Credentials_compressed.pdf20240425_ TJ Communications Credentials_compressed.pdf
20240425_ TJ Communications Credentials_compressed.pdf
 
What are the main advantages of using HR recruiter services.pdf
What are the main advantages of using HR recruiter services.pdfWhat are the main advantages of using HR recruiter services.pdf
What are the main advantages of using HR recruiter services.pdf
 
Unveiling the Secrets How Does Generative AI Work.pdf
Unveiling the Secrets How Does Generative AI Work.pdfUnveiling the Secrets How Does Generative AI Work.pdf
Unveiling the Secrets How Does Generative AI Work.pdf
 
The-McKinsey-7S-Framework. strategic management
The-McKinsey-7S-Framework. strategic managementThe-McKinsey-7S-Framework. strategic management
The-McKinsey-7S-Framework. strategic management
 
Business Valuation Principles for Entrepreneurs
Business Valuation Principles for EntrepreneursBusiness Valuation Principles for Entrepreneurs
Business Valuation Principles for Entrepreneurs
 
ModelingMarketingStrategiesMKS.CollumbiaUniversitypdf
ModelingMarketingStrategiesMKS.CollumbiaUniversitypdfModelingMarketingStrategiesMKS.CollumbiaUniversitypdf
ModelingMarketingStrategiesMKS.CollumbiaUniversitypdf
 
5 Things You Need To Know Before Hiring a Videographer
5 Things You Need To Know Before Hiring a Videographer5 Things You Need To Know Before Hiring a Videographer
5 Things You Need To Know Before Hiring a Videographer
 
VAT Registration Outlined In UAE: Benefits and Requirements
VAT Registration Outlined In UAE: Benefits and RequirementsVAT Registration Outlined In UAE: Benefits and Requirements
VAT Registration Outlined In UAE: Benefits and Requirements
 
一比一原版加拿大渥太华大学毕业证(uottawa毕业证书)如何办理
一比一原版加拿大渥太华大学毕业证(uottawa毕业证书)如何办理一比一原版加拿大渥太华大学毕业证(uottawa毕业证书)如何办理
一比一原版加拿大渥太华大学毕业证(uottawa毕业证书)如何办理
 
What is the TDS Return Filing Due Date for FY 2024-25.pdf
What is the TDS Return Filing Due Date for FY 2024-25.pdfWhat is the TDS Return Filing Due Date for FY 2024-25.pdf
What is the TDS Return Filing Due Date for FY 2024-25.pdf
 
Project File Report BBA 6th semester.pdf
Project File Report BBA 6th semester.pdfProject File Report BBA 6th semester.pdf
Project File Report BBA 6th semester.pdf
 
Enterprise Excellence is Inclusive Excellence.pdf
Enterprise Excellence is Inclusive Excellence.pdfEnterprise Excellence is Inclusive Excellence.pdf
Enterprise Excellence is Inclusive Excellence.pdf
 
ikea_woodgreen_petscharity_cat-alogue_digital.pdf
ikea_woodgreen_petscharity_cat-alogue_digital.pdfikea_woodgreen_petscharity_cat-alogue_digital.pdf
ikea_woodgreen_petscharity_cat-alogue_digital.pdf
 
Maksym Vyshnivetskyi: PMO Quality Management (UA)
Maksym Vyshnivetskyi: PMO Quality Management (UA)Maksym Vyshnivetskyi: PMO Quality Management (UA)
Maksym Vyshnivetskyi: PMO Quality Management (UA)
 
Improving profitability for small business
Improving profitability for small businessImproving profitability for small business
Improving profitability for small business
 
Cracking the Workplace Discipline Code Main.pptx
Cracking the Workplace Discipline Code Main.pptxCracking the Workplace Discipline Code Main.pptx
Cracking the Workplace Discipline Code Main.pptx
 
Attending a job Interview for B1 and B2 Englsih learners
Attending a job Interview for B1 and B2 Englsih learnersAttending a job Interview for B1 and B2 Englsih learners
Attending a job Interview for B1 and B2 Englsih learners
 
Search Disrupted Google’s Leaked Documents Rock the SEO World.pdf
Search Disrupted Google’s Leaked Documents Rock the SEO World.pdfSearch Disrupted Google’s Leaked Documents Rock the SEO World.pdf
Search Disrupted Google’s Leaked Documents Rock the SEO World.pdf
 
ikea_woodgreen_petscharity_dog-alogue_digital.pdf
ikea_woodgreen_petscharity_dog-alogue_digital.pdfikea_woodgreen_petscharity_dog-alogue_digital.pdf
ikea_woodgreen_petscharity_dog-alogue_digital.pdf
 

PO 119 SOP Testing Shower Leaks for Plumbers

  • 1. STANDARD OPERATING PROCEDURE 1 | P a g e Form Number: PO 119 Issue date: 3/05/2019 Issue 1.0 Purpose The purpose of testing showers and reporting is to perform minor maintenance while on site and to eliminate the possible causes of a potential shower leak. This provides accurate data to Infraworks Plumbing to enable the correct maintenance work to be raised. It is also used to minimise the inconvenience to tenants for multiple trips that are unnecessary, as all minor maintenance will be conducted on the first, and perhaps the only visit. Testing Procedure 1. Conduct a complete visual inspection of the shower area and the surrounds for any indications of a possible shower leak, prior to conducting any testing or maintenance. This would include noting any damp patches to walls outside the shower in adjoining rooms, adjoining cupboards, water stains to floor coverings at bathroom or ensuite entries, including carpet, (pull the edge of the carpet back and look underneath) water stains to walls/ceilings/cornices directly below the shower, swollen or water damaged architraves, doorjambs and skirtings in and around the shower are. Record any findings on the report form in your the Assignar App Shower Leak Test Report Form. 2. Ask the tenant why they feel the shower is leaking. Have they noticed any damp patches or water not associated with normal shower use? Ask when they noted the water leak and where Test Shower Leaks for Plumbers
  • 2. STANDARD OPERATING PROCEDURE 2 | P a g e Form Number: PO 119 Issue date: 3/05/2019 Issue 1.0 specifically. Be aware that tenants may not be technical minded and may be giving an un- informed opinion. Record any findings on the report form on your the Assignar App Shower Leak Test Report Form. 3. Pull back the tap wall flanges and see if there are any indications of leaks or water dripping back into the wall cavity. Silicone seal the gap the gap between the tap bodies and the tiles/wall sheets if this has not already been done. AFTER all tap maintenance has been completed and ensure the area is thoroughly dry before applying silicone. Tool off the silicone to ensure a water tight finish. Record any findings on your the Assignar App Shower Leak Test Report Form. 4. Remove tap spindles and replace any tap washers. Check the “O” rings to the spindles and replace “O” rings. Check the ceramic disc condition (if used) and replace the spindles if damaged. Record any findings on the Assignar Report form. If it is a mixer tap check it thoroughly for any leaks. Record any findings on your Assignar App Shower Leak Test Report Form. 5. Remove the shower rose and connect a pressure gauge and open the taps. Close off the taps and observe and note the pressure reading and note if it drops after 10 minutes. Record any findings on the Assignar App Shower Leak Test Report Form. 6. If the shower is a Hobless Shower a. Conduct a flood test to the shower by blocking the floor waste and filling the shower to no more than 5mm depth of the perimeter of the shower screen (this is so we don’t flood over the waterproofing angle underneath the shower screen if present). A small amount of indicator dye may be used to aid the detection of leaks if there is any doubt as to the source of leakage (This may be helpful to confirm that the source of water found OUTSIDE of the recess has come from INSIDE of the recess) b. Check if any water shows in the ensuite or bathroom doorway or anywhere else outside of the screened shower. c. Pull back carpet at the doorway and check d. Record any findings on the Assignar App Shower Leak Test Report Form. 7. If the shower is a Hobbed Shower Stage 1. The following flood test should be conducted for a minimum of 30 minutes or ceased on signs of leakage.
  • 3. STANDARD OPERATING PROCEDURE 3 | P a g e Form Number: PO 119 Issue date: 3/05/2019 Issue 1.0 a. Fill the shower to depth of 30mm below the top of the hob to test the basin waterproofing flood height. Flood test will be conducted for a minimum of 30 minutes or ceased signs of leakage. Record any findings on the Assignar App Shower Leak Test Report Form. If there is any doubt as to the source of the leakage, a small amount of indicator dye may be used to aid the detection of leaks. This may be helpful to confirm that the source of water found OUTSIDE of the recess has come from INSIDE of the recess. b. Check if any water shows in the ensuite or bathroom doorway or anywhere else outside of the screened shower. c. Pull back carpet at the doorway and check for any signs of leakage. d. Record any findings on the Assignar App Shower Leak Test Report Form. e. Proceed to Stage 2 if nothing shows at Stage 1 Stage 2 The following flood test should be conducted for a minimum of 30 minutes or ceased on signs of leakage. If there are any other signs of water damage and no leaks occur within 30 minutes it may be necessary to hold the test for 60 minutes, If the membrane is suspect it should show within this period. a. Fill the shower to the top of the tile without running across the top of the hob to test the tile grout and tile trim (A small amount of indicator dye may used to aid in the detection of leaks, if there is any doubt as to the source of the leakage .e.g. Fluorescein . This may be helpful to confirm that the source of water found OUTSIDE of the recess has come from INSIDE of the recess) b. Check for any water that shows at the ensuite or bathroom doorway, or any where else outside the screened shower. Pull back the carpet at the doorway and check for leakage. c. Where test was conducted and no findings have been found, or if there are indications of a membrane leak and all other issues have been checked and resolved the test may need to be conducted for longer. In this instance contact a technical specialist d. Record any findings on the Assignar App Shower Leak Test Report Form.
  • 4. STANDARD OPERATING PROCEDURE 4 | P a g e Form Number: PO 119 Issue date: 3/05/2019 Issue 1.0 8. All Showers a. Close over the shower door and spray the water around the shower recess to see if the leak may be from a faulty silicone seal of the shower screen. b. Wipe up all excess water and dry the area thoroughly and reseal the silicone where faulty. This may need to be done the next day when it has dried out, otherwise dry the area thoroughly with a heat gun before apply silicone. c. Record any findings on the Assignar App Shower Leak Test Report Form. 9. Two Storey Showers a. Listen for dripping sounds between the floor and ceiling if it is a bathroom upstairs, It nay indicate a leak in the waste plumbing between the floors from a faulty trap seal or broken/unglued waste pipe joint. b. Cut a small hole in the plasterboard ceiling to inspect and replacing with a PVC snap vent (maximum size 300 x 300mm) c. Repair any leaking pipes found d. Record any findings on the Assignar App Shower Leak Test Report Form.
  • 5. STANDARD OPERATING PROCEDURE 5 | P a g e Form Number: PO 119 Issue date: 3/05/2019 Issue 1.0 10. What if nothing shows? Look wider than the shower ⇒ Is there a vanity nearby that could causing the issue? ⇒ Is there a leaky bath from taps or wastes? Is it an island bath – and a silicone seal failure? ⇒ Is there a toilet nearby that could be causing the issue? ⇒ Is there a bath nearby that could be causing the issue? ⇒ Is it a 2-storey property with a sewer vent in the wall – Flashing issue? ⇒ Is there some other cause that could be in an adjoining room? E.g. Back to back bathrooms, leaking pipe in the wall, air conditioning condensation leak ⇒ Call the Technical Specialist at Infraworks