SlideShare a Scribd company logo
Cycle network
proposal to the city of Aveiro, Portugal
Master in Regional and Urban Planning
Mobility Planning 2016/2017
Professors: Frederico de Sá and José Carlos Mota
Students: David Havran, Giulio Suffritti, Giacomo Zanardi, José Otávio Braga, Lucas de Macedo and
Vanessa Passos
OBJECTIVES
General
Design a cycling network proposal for the urban core of Aveiro and its immediate
connections to promote mixed land use and make the bicycle a means of transport of
displacement.
Specifics
Create cycling connections of Aveiro and its nearby parishes;
Create a connected and safe cycle path network;
Attract people to the daily cycling use (using UBike, for example);
Improve the cycling culture.
METHODOLOGY
1. Area of analysis and influence radius;
2. Map the existing cycle paths;
3. Identify the desire lines and main attractive/traffic generator points;
4. Identify the typology and measure the dimensions of the streets & check streets maximum speed, their traffic
volume and analysis the stress level;
5. Identify possible connections and draw the network proposal connecting the point and the routes;
6. Decide the backbone structural route in the network as the best way to connect the interesting points;
7. Create an Ecological Cycling Network;
8. Evaluate the suitable typology - shared street, cycle lane or cycleway for each street;
9. Propose and design new preliminary street arranges to show viability;
10. Develop a plan with different phases for cycling network implementation.
1. Existent Cycling Network
Total length of
existing cycle routes:
5,2 km
2. Main Characteristics
2. Main Characteristics
Urbana Estruturante Autoestrada
40 45 -
50 60 - 90 110 - 120
50 70 - 90 120
3. Cycling Network Proposal
Length of proposed
Cycling Network:
46,9 km
Just in the Urban
Core:
34 km
4. Ecological Cycling Network
To take
advantage of the
environmental
characteristics of
Ria and other
landscapes, we
propose the
cyclepaths
marked as green.
They are
cyclepaths close
to points that will
incentivize its use
and potentialities,
such as:
tourism, sport and
ecologic
education.
5. Network proposal and influence radius (5km)
The circle indicates
the radius of 5km
from University of
Aveiro. With the
network and its
connections, is it
possible to bring
people safely from
nearby parishes
and even other
municipalities like
Ílhavo.
6. Rules/criteria for implementing network
I. Implement safer design solutions in the streets, especially in the intersections (e.g.
Bike box);
II. Streets with not so much traffic and small speed limits should receive shared
solutions and/or 30 km/h zone;
III. Improve segregation level according to speed limits and stress level for cyclists.
IV. Make sure that cars won’t be able to pass 50km/h in the area comprehended by
the cycle network, with design and monitoring solutions;
V. Take off public street parking if necessary to implement cyclepaths;
VI. Always avoid to take space from pedestrians. If it’s shared with pedestrians, make
sure that it has enough space for it to be safe.
Solutions researched and adopted
Cyclelane
Leisure Cycle Lane
Cycleway
Shared Street
(Sharrow)
Bikebox
Coexist
7. Viability Analysis
7. Viability Analysis
8. New Streets Sections CYCLEWAYS
Avenida da Força Aérea Portuguesa Rua Borges
8. New Streets Sections CYCLEWAYS
Avenida da UniversidadeRua Eng. Oudinot
8. New Streets Sections CYCLEWAYS
Avenida Dr. Sá Carneiro Rua de Viseu
8. New Streets Sections CYCLE LANE
Avenida 25 de abril Rua do McDonald'sAvenida do Oita
8. New Streets Sections CYCLE LANE
Cais de São Roque Estrada de São Bernardo - N335
8. New Streets Sections CYCLE LANE
Avenida de Araújo e Silva
Avenida 5 de outubro
8. New Streets Sections SHARED STREET
Avenida Artur Ravara Rua de Liberdade
8. New Streets Sections SHARED STREET
Rua de São Sebastião Rua do Gravito
8. New Streets Sections SHARED STREET
Rua Direita (tunnel entrance) Rua de São Martinho
8. New Streets Sections SHARED STREET
Rua Magalhães Serrão Rua dos Santos Martires
8. New Streets Sections SHARED STREET
Rua do Batalhão de Caçadores
8. New Streets Sections COEXSITENCE
Rua do Clube dos Galitos
(após paragem de autocarro)
Rua do Clube dos Galitos
8. New Streets Sections COEXSITENCE
Rua dos Combatentes da Grande Guerra
(Rua Direita)
9. Typologies of Cycling Network Proposal
Total length:
46,9km
- Cycleways:
22,9km
- Cyclelanes:
12,8 km
- Shared Streets:
5,9 km
- Coexistence:
5,3 km
10. Implementation Phases for Network Proposal
The proposal
foresees a network
that prioritizes, in a
first moment the
integration
between existing
cycling
infrastructure, and
then extends to
routes that
connect to other
parts of Aveiro
and external
connections.
CONCLUSIONS
Aveiro has good topography and many streets in the urban core without much
traffic volume. In this way, it is possible to create a good, comfortable and
connected cycling network that will take advantage of the desire lines,
interesting points and environmental landscapes without the necessity of
spending a lot of money, being it achievable to the medium term of 2025 or
sooner.
Besides, it is also possible to make connections with nearby parishes and other
municipalities, as it has already been noticed the will to be connected between
all them.
THE PROJECT EXPERIENCE
The present work had as an advantage the cultural diversity and interdisciplinarity
of the group elements. Proposing a cycling network for the city of Aveiro allowed
us different approaches and dynamics in the way we perceive the city.
As well, we were awakened for being closer and more interested in bike-usage as
a way to get around.
The greatest challenge faced is the short space of time to reach an even greater
degree of detail, since, from the time available, it leaves us glad and satisfied with
the result and learnings obtained, letting us comfortable to participate in public
policies for bike commutes.
SEE THE VIDEO OF OUR WORK.
https://www.youtube.com/watch?v=tG8h9j312vc
BIBLIOGRAPHY
CICLAVEIRO. Para uma Mobilidade Ciclável e Sustentável em Aveiro (2016);
INSTITUTO DA MOBILIDADE E DOS TRANSPORTES TERRESTRES. Rede Ciclável, Princípios de Planeamento e
Desenho (2011);
INSTITUTO DA MOBILIDADE E DOS TRANSPORTES TERRESTRES. Rede Viária, Princípios de Planeamento e Desenho
(2011);
PLANO MUNICIPAL DE MOBILIDADE DE AVEIRO. Relatório de Caracterização e Diagnóstico (2012);
SÁ, FREDERICO. A infraestrutura como referencial para o ordenamento do território (2015);
UBIKE. Manual de Normas (2015);
WAY2GO. Plano Municipal de Mobilidade de Aveiro (2012);
WORLD RESOURCES INSTITUTE - O Desenho de Cidades Seguras (2016).
THANK YOU!
OBRIGADO!
Hvala!
Grazie!
Dziękuję!
Děkuji!
ďakujem!
Sağol!

More Related Content

What's hot

Edinburgh Harbour Forth Ports Planning Application
Edinburgh Harbour Forth Ports Planning ApplicationEdinburgh Harbour Forth Ports Planning Application
Edinburgh Harbour Forth Ports Planning Application
Greener Leith
 
State of Biking Todd Waelterman
State of Biking Todd WaeltermanState of Biking Todd Waelterman
State of Biking Todd Waelterman
Trailnet
 
THE OLD HARBOUR OF LÜBECK
THE OLD HARBOUR OF LÜBECKTHE OLD HARBOUR OF LÜBECK
THE OLD HARBOUR OF LÜBECKOuerghi16
 
Woodward Corridor Neighborhood Bicycle Network - 2016 TAP Award
Woodward Corridor Neighborhood Bicycle Network - 2016 TAP AwardWoodward Corridor Neighborhood Bicycle Network - 2016 TAP Award
Woodward Corridor Neighborhood Bicycle Network - 2016 TAP Award
Justin Lyons
 
Miss Event Plan Confed Pkwy Bridge
Miss Event Plan Confed Pkwy BridgeMiss Event Plan Confed Pkwy Bridge
Miss Event Plan Confed Pkwy BridgeElizabeth Hendricks
 
Keep a 50m Pool in Coventry
Keep a 50m Pool in CoventryKeep a 50m Pool in Coventry
Keep a 50m Pool in Coventry
John Smith
 
AITPM Conference Presentation - phil gray
AITPM Conference Presentation - phil grayAITPM Conference Presentation - phil gray
AITPM Conference Presentation - phil gray
JumpingJaq
 
Aecom - Streets for people workshop
Aecom - Streets for people workshop Aecom - Streets for people workshop
Aecom - Streets for people workshop
JumpingJaq
 
Tony harvey developing the socio economic potential of waterway corridors
Tony harvey developing the socio economic potential of waterway corridorsTony harvey developing the socio economic potential of waterway corridors
Tony harvey developing the socio economic potential of waterway corridorssouthtippcoco
 

What's hot (9)

Edinburgh Harbour Forth Ports Planning Application
Edinburgh Harbour Forth Ports Planning ApplicationEdinburgh Harbour Forth Ports Planning Application
Edinburgh Harbour Forth Ports Planning Application
 
State of Biking Todd Waelterman
State of Biking Todd WaeltermanState of Biking Todd Waelterman
State of Biking Todd Waelterman
 
THE OLD HARBOUR OF LÜBECK
THE OLD HARBOUR OF LÜBECKTHE OLD HARBOUR OF LÜBECK
THE OLD HARBOUR OF LÜBECK
 
Woodward Corridor Neighborhood Bicycle Network - 2016 TAP Award
Woodward Corridor Neighborhood Bicycle Network - 2016 TAP AwardWoodward Corridor Neighborhood Bicycle Network - 2016 TAP Award
Woodward Corridor Neighborhood Bicycle Network - 2016 TAP Award
 
Miss Event Plan Confed Pkwy Bridge
Miss Event Plan Confed Pkwy BridgeMiss Event Plan Confed Pkwy Bridge
Miss Event Plan Confed Pkwy Bridge
 
Keep a 50m Pool in Coventry
Keep a 50m Pool in CoventryKeep a 50m Pool in Coventry
Keep a 50m Pool in Coventry
 
AITPM Conference Presentation - phil gray
AITPM Conference Presentation - phil grayAITPM Conference Presentation - phil gray
AITPM Conference Presentation - phil gray
 
Aecom - Streets for people workshop
Aecom - Streets for people workshop Aecom - Streets for people workshop
Aecom - Streets for people workshop
 
Tony harvey developing the socio economic potential of waterway corridors
Tony harvey developing the socio economic potential of waterway corridorsTony harvey developing the socio economic potential of waterway corridors
Tony harvey developing the socio economic potential of waterway corridors
 

Similar to PM - Proposta de Rede Cicloviária para Aveiro (Cycling Network Proposal)

2014 03-13 Planning and Designing for Cyclists
2014 03-13 Planning and Designing for Cyclists2014 03-13 Planning and Designing for Cyclists
2014 03-13 Planning and Designing for Cyclists
Cycling Scotland
 
Fort William Feb 2012
Fort William Feb 2012Fort William Feb 2012
Fort William Feb 2012
Cycling Scotland
 
MCM Cycle Demonstration - Glasgow (Mar 12)
MCM Cycle Demonstration - Glasgow (Mar 12)MCM Cycle Demonstration - Glasgow (Mar 12)
MCM Cycle Demonstration - Glasgow (Mar 12)
Cycling Scotland
 
Highway and railway geometric design-Revised.pptx
Highway and railway geometric design-Revised.pptxHighway and railway geometric design-Revised.pptx
Highway and railway geometric design-Revised.pptx
kiranmaqsood5
 
Creating cycling infrastructure for all ages by Will Haynes
Creating cycling infrastructure for all ages by Will HaynesCreating cycling infrastructure for all ages by Will Haynes
Creating cycling infrastructure for all ages by Will Haynes
Sustrans
 
Presentation for the UNECE Group of Experts on Cycling Infrastructure Module ...
Presentation for the UNECE Group of Experts on Cycling Infrastructure Module ...Presentation for the UNECE Group of Experts on Cycling Infrastructure Module ...
Presentation for the UNECE Group of Experts on Cycling Infrastructure Module ...
Joris Van Damme
 
Connect PB Summary Report
Connect PB Summary ReportConnect PB Summary Report
Connect PB Summary ReportCrowdbrite
 
Connect pb Summary Dec 2014
Connect pb Summary Dec 2014Connect pb Summary Dec 2014
Connect pb Summary Dec 2014
Darin Dinsmore
 
Final report ThinkBike Chicago 2010
Final report ThinkBike Chicago 2010Final report ThinkBike Chicago 2010
Final report ThinkBike Chicago 2010NLandUSA
 
Complete streetsintro ar.leela immadisetty_alumni(auce architecture)
Complete streetsintro ar.leela immadisetty_alumni(auce architecture)Complete streetsintro ar.leela immadisetty_alumni(auce architecture)
Complete streetsintro ar.leela immadisetty_alumni(auce architecture)
A.U Architecture Alumni Association
 
Mcm demo glasgow - august 11
Mcm demo   glasgow - august 11Mcm demo   glasgow - august 11
Mcm demo glasgow - august 11
Cycling Scotland
 
ConnectPB Crowdbrite Summary
ConnectPB Crowdbrite Summary ConnectPB Crowdbrite Summary
ConnectPB Crowdbrite Summary
Crowdbrite
 
THE RELATIONSHIP BETWEEN UNIVERSITY, LOCAL AUTHORITIES, ADVOCAY AND BICYCLE I...
THE RELATIONSHIP BETWEEN UNIVERSITY, LOCAL AUTHORITIES, ADVOCAY AND BICYCLE I...THE RELATIONSHIP BETWEEN UNIVERSITY, LOCAL AUTHORITIES, ADVOCAY AND BICYCLE I...
THE RELATIONSHIP BETWEEN UNIVERSITY, LOCAL AUTHORITIES, ADVOCAY AND BICYCLE I...
José Carlos Mota
 
2 cip infuse-ottawa-bennett
2 cip infuse-ottawa-bennett2 cip infuse-ottawa-bennett
2 cip infuse-ottawa-bennett
UrbanSystemsCanada
 
2014 03-04 maintenance devon way
2014 03-04 maintenance devon way2014 03-04 maintenance devon way
2014 03-04 maintenance devon way
Cycling Scotland
 
Conf Cycling Leisure And Tourism Aveiro Vf
Conf Cycling Leisure And Tourism  Aveiro VfConf Cycling Leisure And Tourism  Aveiro Vf
Conf Cycling Leisure And Tourism Aveiro VfJose Carlos Mota
 
Conf Cycling Leisure And Tourism Aveiro
Conf Cycling Leisure And Tourism  AveiroConf Cycling Leisure And Tourism  Aveiro
Conf Cycling Leisure And Tourism AveiroJose Carlos Mota
 
Oct. 19 Complete Streets Open House Boards
Oct. 19 Complete Streets Open House BoardsOct. 19 Complete Streets Open House Boards
Oct. 19 Complete Streets Open House Boards
CityofBoulder
 
Portfolio - Bicycle and Soft Mobility Technological Platform - University of ...
Portfolio - Bicycle and Soft Mobility Technological Platform - University of ...Portfolio - Bicycle and Soft Mobility Technological Platform - University of ...
Portfolio - Bicycle and Soft Mobility Technological Platform - University of ...
Plataforma Tecnológica da Bicicleta e Mobilidade Suave
 

Similar to PM - Proposta de Rede Cicloviária para Aveiro (Cycling Network Proposal) (20)

2014 03-13 Planning and Designing for Cyclists
2014 03-13 Planning and Designing for Cyclists2014 03-13 Planning and Designing for Cyclists
2014 03-13 Planning and Designing for Cyclists
 
MCM Devon Way - Oct 2010
MCM Devon Way - Oct 2010MCM Devon Way - Oct 2010
MCM Devon Way - Oct 2010
 
Fort William Feb 2012
Fort William Feb 2012Fort William Feb 2012
Fort William Feb 2012
 
MCM Cycle Demonstration - Glasgow (Mar 12)
MCM Cycle Demonstration - Glasgow (Mar 12)MCM Cycle Demonstration - Glasgow (Mar 12)
MCM Cycle Demonstration - Glasgow (Mar 12)
 
Highway and railway geometric design-Revised.pptx
Highway and railway geometric design-Revised.pptxHighway and railway geometric design-Revised.pptx
Highway and railway geometric design-Revised.pptx
 
Creating cycling infrastructure for all ages by Will Haynes
Creating cycling infrastructure for all ages by Will HaynesCreating cycling infrastructure for all ages by Will Haynes
Creating cycling infrastructure for all ages by Will Haynes
 
Presentation for the UNECE Group of Experts on Cycling Infrastructure Module ...
Presentation for the UNECE Group of Experts on Cycling Infrastructure Module ...Presentation for the UNECE Group of Experts on Cycling Infrastructure Module ...
Presentation for the UNECE Group of Experts on Cycling Infrastructure Module ...
 
Connect PB Summary Report
Connect PB Summary ReportConnect PB Summary Report
Connect PB Summary Report
 
Connect pb Summary Dec 2014
Connect pb Summary Dec 2014Connect pb Summary Dec 2014
Connect pb Summary Dec 2014
 
Final report ThinkBike Chicago 2010
Final report ThinkBike Chicago 2010Final report ThinkBike Chicago 2010
Final report ThinkBike Chicago 2010
 
Complete streetsintro ar.leela immadisetty_alumni(auce architecture)
Complete streetsintro ar.leela immadisetty_alumni(auce architecture)Complete streetsintro ar.leela immadisetty_alumni(auce architecture)
Complete streetsintro ar.leela immadisetty_alumni(auce architecture)
 
Mcm demo glasgow - august 11
Mcm demo   glasgow - august 11Mcm demo   glasgow - august 11
Mcm demo glasgow - august 11
 
ConnectPB Crowdbrite Summary
ConnectPB Crowdbrite Summary ConnectPB Crowdbrite Summary
ConnectPB Crowdbrite Summary
 
THE RELATIONSHIP BETWEEN UNIVERSITY, LOCAL AUTHORITIES, ADVOCAY AND BICYCLE I...
THE RELATIONSHIP BETWEEN UNIVERSITY, LOCAL AUTHORITIES, ADVOCAY AND BICYCLE I...THE RELATIONSHIP BETWEEN UNIVERSITY, LOCAL AUTHORITIES, ADVOCAY AND BICYCLE I...
THE RELATIONSHIP BETWEEN UNIVERSITY, LOCAL AUTHORITIES, ADVOCAY AND BICYCLE I...
 
2 cip infuse-ottawa-bennett
2 cip infuse-ottawa-bennett2 cip infuse-ottawa-bennett
2 cip infuse-ottawa-bennett
 
2014 03-04 maintenance devon way
2014 03-04 maintenance devon way2014 03-04 maintenance devon way
2014 03-04 maintenance devon way
 
Conf Cycling Leisure And Tourism Aveiro Vf
Conf Cycling Leisure And Tourism  Aveiro VfConf Cycling Leisure And Tourism  Aveiro Vf
Conf Cycling Leisure And Tourism Aveiro Vf
 
Conf Cycling Leisure And Tourism Aveiro
Conf Cycling Leisure And Tourism  AveiroConf Cycling Leisure And Tourism  Aveiro
Conf Cycling Leisure And Tourism Aveiro
 
Oct. 19 Complete Streets Open House Boards
Oct. 19 Complete Streets Open House BoardsOct. 19 Complete Streets Open House Boards
Oct. 19 Complete Streets Open House Boards
 
Portfolio - Bicycle and Soft Mobility Technological Platform - University of ...
Portfolio - Bicycle and Soft Mobility Technological Platform - University of ...Portfolio - Bicycle and Soft Mobility Technological Platform - University of ...
Portfolio - Bicycle and Soft Mobility Technological Platform - University of ...
 

Recently uploaded

Donate to charity during this holiday season
Donate to charity during this holiday seasonDonate to charity during this holiday season
Donate to charity during this holiday season
SERUDS INDIA
 
Preliminary findings _OECD field visits to ten regions in the TSI EU mining r...
Preliminary findings _OECD field visits to ten regions in the TSI EU mining r...Preliminary findings _OECD field visits to ten regions in the TSI EU mining r...
Preliminary findings _OECD field visits to ten regions in the TSI EU mining r...
OECDregions
 
CBO’s Outlook for U.S. Fertility Rates: 2024 to 2054
CBO’s Outlook for U.S. Fertility Rates: 2024 to 2054CBO’s Outlook for U.S. Fertility Rates: 2024 to 2054
CBO’s Outlook for U.S. Fertility Rates: 2024 to 2054
Congressional Budget Office
 
A proposed request for information on LIHTC
A proposed request for information on LIHTCA proposed request for information on LIHTC
A proposed request for information on LIHTC
Roger Valdez
 
如何办理(uoit毕业证书)加拿大安大略理工大学毕业证文凭证书录取通知原版一模一样
如何办理(uoit毕业证书)加拿大安大略理工大学毕业证文凭证书录取通知原版一模一样如何办理(uoit毕业证书)加拿大安大略理工大学毕业证文凭证书录取通知原版一模一样
如何办理(uoit毕业证书)加拿大安大略理工大学毕业证文凭证书录取通知原版一模一样
850fcj96
 
Uniform Guidance 3.0 - The New 2 CFR 200
Uniform Guidance 3.0 - The New 2 CFR 200Uniform Guidance 3.0 - The New 2 CFR 200
Uniform Guidance 3.0 - The New 2 CFR 200
GrantManagementInsti
 
Get Government Grants and Assistance Program
Get Government Grants and Assistance ProgramGet Government Grants and Assistance Program
Get Government Grants and Assistance Program
Get Government Grants
 
Transit-Oriented Development Study Working Group Meeting
Transit-Oriented Development Study Working Group MeetingTransit-Oriented Development Study Working Group Meeting
Transit-Oriented Development Study Working Group Meeting
Cuyahoga County Planning Commission
 
State crafting: Changes and challenges for managing the public finances
State crafting: Changes and challenges for managing the public financesState crafting: Changes and challenges for managing the public finances
State crafting: Changes and challenges for managing the public finances
ResolutionFoundation
 
2017 Omnibus Rules on Appointments and Other Human Resource Actions, As Amended
2017 Omnibus Rules on Appointments and Other Human Resource Actions, As Amended2017 Omnibus Rules on Appointments and Other Human Resource Actions, As Amended
2017 Omnibus Rules on Appointments and Other Human Resource Actions, As Amended
johnmarimigallon
 
PNRR MADRID GREENTECH FOR BROWN NETWORKS NETWORKS MUR_MUSA_TEBALDI.pdf
PNRR MADRID GREENTECH FOR BROWN NETWORKS NETWORKS MUR_MUSA_TEBALDI.pdfPNRR MADRID GREENTECH FOR BROWN NETWORKS NETWORKS MUR_MUSA_TEBALDI.pdf
PNRR MADRID GREENTECH FOR BROWN NETWORKS NETWORKS MUR_MUSA_TEBALDI.pdf
ClaudioTebaldi2
 
Invitation Letter for an alumni association
Invitation Letter for an alumni associationInvitation Letter for an alumni association
Invitation Letter for an alumni association
elmerdalida001
 
kupon sample qurban masjid indonesia terbaru.pptx
kupon sample qurban masjid indonesia terbaru.pptxkupon sample qurban masjid indonesia terbaru.pptx
kupon sample qurban masjid indonesia terbaru.pptx
viderakai
 
Opinions on EVs: Metro Atlanta Speaks 2023
Opinions on EVs: Metro Atlanta Speaks 2023Opinions on EVs: Metro Atlanta Speaks 2023
Opinions on EVs: Metro Atlanta Speaks 2023
ARCResearch
 
2024: The FAR - Federal Acquisition Regulations, Part 38
2024: The FAR - Federal Acquisition Regulations, Part 382024: The FAR - Federal Acquisition Regulations, Part 38
2024: The FAR - Federal Acquisition Regulations, Part 38
JSchaus & Associates
 
快速制作(ocad毕业证书)加拿大安大略艺术设计学院毕业证本科学历雅思成绩单原版一模一样
快速制作(ocad毕业证书)加拿大安大略艺术设计学院毕业证本科学历雅思成绩单原版一模一样快速制作(ocad毕业证书)加拿大安大略艺术设计学院毕业证本科学历雅思成绩单原版一模一样
快速制作(ocad毕业证书)加拿大安大略艺术设计学院毕业证本科学历雅思成绩单原版一模一样
850fcj96
 
Monitoring Health for the SDGs - Global Health Statistics 2024 - WHO
Monitoring Health for the SDGs - Global Health Statistics 2024 - WHOMonitoring Health for the SDGs - Global Health Statistics 2024 - WHO
Monitoring Health for the SDGs - Global Health Statistics 2024 - WHO
Christina Parmionova
 
ZGB - The Role of Generative AI in Government transformation.pdf
ZGB - The Role of Generative AI in Government transformation.pdfZGB - The Role of Generative AI in Government transformation.pdf
ZGB - The Role of Generative AI in Government transformation.pdf
Saeed Al Dhaheri
 
2024: The FAR - Federal Acquisition Regulations, Part 39
2024: The FAR - Federal Acquisition Regulations, Part 392024: The FAR - Federal Acquisition Regulations, Part 39
2024: The FAR - Federal Acquisition Regulations, Part 39
JSchaus & Associates
 
2024: The FAR - Federal Acquisition Regulations, Part 37
2024: The FAR - Federal Acquisition Regulations, Part 372024: The FAR - Federal Acquisition Regulations, Part 37
2024: The FAR - Federal Acquisition Regulations, Part 37
JSchaus & Associates
 

Recently uploaded (20)

Donate to charity during this holiday season
Donate to charity during this holiday seasonDonate to charity during this holiday season
Donate to charity during this holiday season
 
Preliminary findings _OECD field visits to ten regions in the TSI EU mining r...
Preliminary findings _OECD field visits to ten regions in the TSI EU mining r...Preliminary findings _OECD field visits to ten regions in the TSI EU mining r...
Preliminary findings _OECD field visits to ten regions in the TSI EU mining r...
 
CBO’s Outlook for U.S. Fertility Rates: 2024 to 2054
CBO’s Outlook for U.S. Fertility Rates: 2024 to 2054CBO’s Outlook for U.S. Fertility Rates: 2024 to 2054
CBO’s Outlook for U.S. Fertility Rates: 2024 to 2054
 
A proposed request for information on LIHTC
A proposed request for information on LIHTCA proposed request for information on LIHTC
A proposed request for information on LIHTC
 
如何办理(uoit毕业证书)加拿大安大略理工大学毕业证文凭证书录取通知原版一模一样
如何办理(uoit毕业证书)加拿大安大略理工大学毕业证文凭证书录取通知原版一模一样如何办理(uoit毕业证书)加拿大安大略理工大学毕业证文凭证书录取通知原版一模一样
如何办理(uoit毕业证书)加拿大安大略理工大学毕业证文凭证书录取通知原版一模一样
 
Uniform Guidance 3.0 - The New 2 CFR 200
Uniform Guidance 3.0 - The New 2 CFR 200Uniform Guidance 3.0 - The New 2 CFR 200
Uniform Guidance 3.0 - The New 2 CFR 200
 
Get Government Grants and Assistance Program
Get Government Grants and Assistance ProgramGet Government Grants and Assistance Program
Get Government Grants and Assistance Program
 
Transit-Oriented Development Study Working Group Meeting
Transit-Oriented Development Study Working Group MeetingTransit-Oriented Development Study Working Group Meeting
Transit-Oriented Development Study Working Group Meeting
 
State crafting: Changes and challenges for managing the public finances
State crafting: Changes and challenges for managing the public financesState crafting: Changes and challenges for managing the public finances
State crafting: Changes and challenges for managing the public finances
 
2017 Omnibus Rules on Appointments and Other Human Resource Actions, As Amended
2017 Omnibus Rules on Appointments and Other Human Resource Actions, As Amended2017 Omnibus Rules on Appointments and Other Human Resource Actions, As Amended
2017 Omnibus Rules on Appointments and Other Human Resource Actions, As Amended
 
PNRR MADRID GREENTECH FOR BROWN NETWORKS NETWORKS MUR_MUSA_TEBALDI.pdf
PNRR MADRID GREENTECH FOR BROWN NETWORKS NETWORKS MUR_MUSA_TEBALDI.pdfPNRR MADRID GREENTECH FOR BROWN NETWORKS NETWORKS MUR_MUSA_TEBALDI.pdf
PNRR MADRID GREENTECH FOR BROWN NETWORKS NETWORKS MUR_MUSA_TEBALDI.pdf
 
Invitation Letter for an alumni association
Invitation Letter for an alumni associationInvitation Letter for an alumni association
Invitation Letter for an alumni association
 
kupon sample qurban masjid indonesia terbaru.pptx
kupon sample qurban masjid indonesia terbaru.pptxkupon sample qurban masjid indonesia terbaru.pptx
kupon sample qurban masjid indonesia terbaru.pptx
 
Opinions on EVs: Metro Atlanta Speaks 2023
Opinions on EVs: Metro Atlanta Speaks 2023Opinions on EVs: Metro Atlanta Speaks 2023
Opinions on EVs: Metro Atlanta Speaks 2023
 
2024: The FAR - Federal Acquisition Regulations, Part 38
2024: The FAR - Federal Acquisition Regulations, Part 382024: The FAR - Federal Acquisition Regulations, Part 38
2024: The FAR - Federal Acquisition Regulations, Part 38
 
快速制作(ocad毕业证书)加拿大安大略艺术设计学院毕业证本科学历雅思成绩单原版一模一样
快速制作(ocad毕业证书)加拿大安大略艺术设计学院毕业证本科学历雅思成绩单原版一模一样快速制作(ocad毕业证书)加拿大安大略艺术设计学院毕业证本科学历雅思成绩单原版一模一样
快速制作(ocad毕业证书)加拿大安大略艺术设计学院毕业证本科学历雅思成绩单原版一模一样
 
Monitoring Health for the SDGs - Global Health Statistics 2024 - WHO
Monitoring Health for the SDGs - Global Health Statistics 2024 - WHOMonitoring Health for the SDGs - Global Health Statistics 2024 - WHO
Monitoring Health for the SDGs - Global Health Statistics 2024 - WHO
 
ZGB - The Role of Generative AI in Government transformation.pdf
ZGB - The Role of Generative AI in Government transformation.pdfZGB - The Role of Generative AI in Government transformation.pdf
ZGB - The Role of Generative AI in Government transformation.pdf
 
2024: The FAR - Federal Acquisition Regulations, Part 39
2024: The FAR - Federal Acquisition Regulations, Part 392024: The FAR - Federal Acquisition Regulations, Part 39
2024: The FAR - Federal Acquisition Regulations, Part 39
 
2024: The FAR - Federal Acquisition Regulations, Part 37
2024: The FAR - Federal Acquisition Regulations, Part 372024: The FAR - Federal Acquisition Regulations, Part 37
2024: The FAR - Federal Acquisition Regulations, Part 37
 

PM - Proposta de Rede Cicloviária para Aveiro (Cycling Network Proposal)

  • 1. Cycle network proposal to the city of Aveiro, Portugal Master in Regional and Urban Planning Mobility Planning 2016/2017 Professors: Frederico de Sá and José Carlos Mota Students: David Havran, Giulio Suffritti, Giacomo Zanardi, José Otávio Braga, Lucas de Macedo and Vanessa Passos
  • 2. OBJECTIVES General Design a cycling network proposal for the urban core of Aveiro and its immediate connections to promote mixed land use and make the bicycle a means of transport of displacement. Specifics Create cycling connections of Aveiro and its nearby parishes; Create a connected and safe cycle path network; Attract people to the daily cycling use (using UBike, for example); Improve the cycling culture.
  • 3. METHODOLOGY 1. Area of analysis and influence radius; 2. Map the existing cycle paths; 3. Identify the desire lines and main attractive/traffic generator points; 4. Identify the typology and measure the dimensions of the streets & check streets maximum speed, their traffic volume and analysis the stress level; 5. Identify possible connections and draw the network proposal connecting the point and the routes; 6. Decide the backbone structural route in the network as the best way to connect the interesting points; 7. Create an Ecological Cycling Network; 8. Evaluate the suitable typology - shared street, cycle lane or cycleway for each street; 9. Propose and design new preliminary street arranges to show viability; 10. Develop a plan with different phases for cycling network implementation.
  • 4. 1. Existent Cycling Network Total length of existing cycle routes: 5,2 km
  • 6. 2. Main Characteristics Urbana Estruturante Autoestrada 40 45 - 50 60 - 90 110 - 120 50 70 - 90 120
  • 7. 3. Cycling Network Proposal Length of proposed Cycling Network: 46,9 km Just in the Urban Core: 34 km
  • 8. 4. Ecological Cycling Network To take advantage of the environmental characteristics of Ria and other landscapes, we propose the cyclepaths marked as green. They are cyclepaths close to points that will incentivize its use and potentialities, such as: tourism, sport and ecologic education.
  • 9. 5. Network proposal and influence radius (5km) The circle indicates the radius of 5km from University of Aveiro. With the network and its connections, is it possible to bring people safely from nearby parishes and even other municipalities like Ílhavo.
  • 10. 6. Rules/criteria for implementing network I. Implement safer design solutions in the streets, especially in the intersections (e.g. Bike box); II. Streets with not so much traffic and small speed limits should receive shared solutions and/or 30 km/h zone; III. Improve segregation level according to speed limits and stress level for cyclists. IV. Make sure that cars won’t be able to pass 50km/h in the area comprehended by the cycle network, with design and monitoring solutions; V. Take off public street parking if necessary to implement cyclepaths; VI. Always avoid to take space from pedestrians. If it’s shared with pedestrians, make sure that it has enough space for it to be safe.
  • 11. Solutions researched and adopted Cyclelane Leisure Cycle Lane Cycleway Shared Street (Sharrow) Bikebox Coexist
  • 14. 8. New Streets Sections CYCLEWAYS Avenida da Força Aérea Portuguesa Rua Borges
  • 15. 8. New Streets Sections CYCLEWAYS Avenida da UniversidadeRua Eng. Oudinot
  • 16. 8. New Streets Sections CYCLEWAYS Avenida Dr. Sá Carneiro Rua de Viseu
  • 17. 8. New Streets Sections CYCLE LANE Avenida 25 de abril Rua do McDonald'sAvenida do Oita
  • 18. 8. New Streets Sections CYCLE LANE Cais de São Roque Estrada de São Bernardo - N335
  • 19. 8. New Streets Sections CYCLE LANE Avenida de Araújo e Silva Avenida 5 de outubro
  • 20. 8. New Streets Sections SHARED STREET Avenida Artur Ravara Rua de Liberdade
  • 21. 8. New Streets Sections SHARED STREET Rua de São Sebastião Rua do Gravito
  • 22. 8. New Streets Sections SHARED STREET Rua Direita (tunnel entrance) Rua de São Martinho
  • 23. 8. New Streets Sections SHARED STREET Rua Magalhães Serrão Rua dos Santos Martires
  • 24. 8. New Streets Sections SHARED STREET Rua do Batalhão de Caçadores
  • 25. 8. New Streets Sections COEXSITENCE Rua do Clube dos Galitos (após paragem de autocarro) Rua do Clube dos Galitos
  • 26. 8. New Streets Sections COEXSITENCE Rua dos Combatentes da Grande Guerra (Rua Direita)
  • 27. 9. Typologies of Cycling Network Proposal Total length: 46,9km - Cycleways: 22,9km - Cyclelanes: 12,8 km - Shared Streets: 5,9 km - Coexistence: 5,3 km
  • 28. 10. Implementation Phases for Network Proposal The proposal foresees a network that prioritizes, in a first moment the integration between existing cycling infrastructure, and then extends to routes that connect to other parts of Aveiro and external connections.
  • 29. CONCLUSIONS Aveiro has good topography and many streets in the urban core without much traffic volume. In this way, it is possible to create a good, comfortable and connected cycling network that will take advantage of the desire lines, interesting points and environmental landscapes without the necessity of spending a lot of money, being it achievable to the medium term of 2025 or sooner. Besides, it is also possible to make connections with nearby parishes and other municipalities, as it has already been noticed the will to be connected between all them.
  • 30. THE PROJECT EXPERIENCE The present work had as an advantage the cultural diversity and interdisciplinarity of the group elements. Proposing a cycling network for the city of Aveiro allowed us different approaches and dynamics in the way we perceive the city. As well, we were awakened for being closer and more interested in bike-usage as a way to get around. The greatest challenge faced is the short space of time to reach an even greater degree of detail, since, from the time available, it leaves us glad and satisfied with the result and learnings obtained, letting us comfortable to participate in public policies for bike commutes.
  • 31. SEE THE VIDEO OF OUR WORK. https://www.youtube.com/watch?v=tG8h9j312vc
  • 32. BIBLIOGRAPHY CICLAVEIRO. Para uma Mobilidade Ciclável e Sustentável em Aveiro (2016); INSTITUTO DA MOBILIDADE E DOS TRANSPORTES TERRESTRES. Rede Ciclável, Princípios de Planeamento e Desenho (2011); INSTITUTO DA MOBILIDADE E DOS TRANSPORTES TERRESTRES. Rede Viária, Princípios de Planeamento e Desenho (2011); PLANO MUNICIPAL DE MOBILIDADE DE AVEIRO. Relatório de Caracterização e Diagnóstico (2012); SÁ, FREDERICO. A infraestrutura como referencial para o ordenamento do território (2015); UBIKE. Manual de Normas (2015); WAY2GO. Plano Municipal de Mobilidade de Aveiro (2012); WORLD RESOURCES INSTITUTE - O Desenho de Cidades Seguras (2016).