Manajemen Proyek
Pertemuan 7
memahami proses perencanaan proyek
khususnya pada area pengetahuan
manajemen kualitas proyek (Project Quality
Management)
Grup Proses
3
Inisialisasi Perencanaan Eksekusi Penutupan
Variable
Tingkat
Interaksi
Awal Variable Waktu Akhir
Monitor dan
Kontrol
9 Area Pengetahuan
4
Quality Management
• Manajemen kualitas meliputi proses dalam
menentukan kebijakan kualitas dan prosedur
• Untuk memastikan project dapat memenuhi
kebutuhan yang telah disepakati
Quality Management
• Kurangnya perhatian terhadap kualitas = lebih
banyak mengulang pekerjaan atau banyaknya
cacat produk yang dihasilkan
• Dampaknya : waktu bertambah, biaya
bertambah
• Jadi kualitas harus direncanakan daripada
sibuk menangani masalah dikemudian hari
Ex : Build a new car Project
Ex : Build a new car Project
Ex : Build a new car Project
Intisari PM (PG vs KA)
Close
Procurement
s
Administer Procurements
Conduct Procurements
Plan Procurement
9. Project Procurement
Management
Monitor and Control Risks
Plan Risk Management, Identify Risks
Perform Qualitative Risk Analysis
Perform Quantitative Risk Analysis
Plan Risk Responses
8. Project Risk
Management
Report Performance
Distribution Information
Manage Stakeholder Expectations
Plan Communications
Identify Stakeholder
7. Project
Communication Mgm
Acquire Project Team
Develop Project Team
Manage Project Team
Develop Human Resource Plan
6. Project Human
Resource Management
Perform Quality Control
Perform Quality Assurance
Plan Quality
5. Project Quality Mgm
Control Costs
Estimate Cost
Determine Budget
4. Project Cost
Management
Schedule Control
Defince Activities
Sequence Activities
Estimate Activity Resources
Estimate aDurations
Develop Schedule
3. Project Time
Management
Scope Verification
Scope Control
Collect Requirement
Define Scope
Create WBS
2. Project Scope
Management
Close Project
or Phase
Monitor and control Project
work
Integrated Change Control
Direct and Manage Project Execution
Develop Project Management Plan
Develop Project Charter
1. Project Integration
Management
5.
Penutupa
n
4. Monitor & Kontrol
3. Eksekusi
2. Perencanaan
1. Inisialisasi
PG/KA
1. Plan Quality
Plan Quality
Proses mengidentifikasikan kebutuhan kualitas
dan/atau standard proyek atau produk
Dan mendokumentasikan bagaimana proyek
menunjukan kepatuhan terhadap
kesepakatan
Plan Quality
Mengukur kualitas produk sesuai dengan produk
apa yang akan dihasilkan
Contoh :
Mengukur kualitas proyek untuk membangun
reaktor nuklir berbeda dengan proyek
membangun SIA
Plan Quality
• Kualitas vs Grade (Level)
• Presisi vs Akurasi
Plan Quality
Inputs
Tools
&
Techniques
Outputs
Scope baseline
Stakeholder register
Cost performance
baseline
Schedule baseline
Risk register
Enterprise
environmental factors
Organizational process
assets
Cost-benefit analysis
Cost of quality
Control charts
Benchmarking
Design of experiment
Statistical sampling
Flowcharting
Propietary quality mgm
methodologies
Add quality planning
tools
Quality management
plan
Quality metrics
Quality checklists
Project improvement
plan
Project document
updates
Kesimpulan
Project Quality Management khususnya pada
tahap perencanaan proyek :
• Plan Quality
16
Lain -lain
Struktur Organisasi Proyek
– Fungsional
– Matriks
– Projectized
17
Fungsional
18
Matriks
19
Projectized
Terimakasih

More Related Content

Similar to pertemuan 7 - Quality Mangement for Planning Process_compressed_compressed.pdf

Project Management
Project ManagementProject Management
Project Management
guest4408ddc
 
File 3 removed 4 slides 1
File 3 removed 4 slides 1File 3 removed 4 slides 1
File 3 removed 4 slides 1
test prod1
 
File 3 extra four slides 1
File 3 extra four slides 1File 3 extra four slides 1
File 3 extra four slides 1
test prod1
 
File 3 extra slide 2
File 3 extra slide 2File 3 extra slide 2
File 3 extra slide 2
test prod1
 
122 Part 1 - GuideFigure 4-15. Close Project or Phase Dat.docx
122 Part 1 - GuideFigure 4-15. Close Project or Phase Dat.docx122 Part 1 - GuideFigure 4-15. Close Project or Phase Dat.docx
122 Part 1 - GuideFigure 4-15. Close Project or Phase Dat.docx
RAJU852744
 
File 3 removed 1 word 1
File 3 removed 1 word 1File 3 removed 1 word 1
File 3 removed 1 word 1
test prod1
 
File 3 original copy 1
File 3 original copy 1File 3 original copy 1
File 3 original copy 1
test prod1
 
File 3 original
File 3 original File 3 original
File 3 original
test prod1
 

Similar to pertemuan 7 - Quality Mangement for Planning Process_compressed_compressed.pdf (20)

Project management
Project managementProject management
Project management
 
8.0 Project Quality Management Overview
8.0 Project Quality Management Overview8.0 Project Quality Management Overview
8.0 Project Quality Management Overview
 
8.3 Control Quality
8.3 Control Quality8.3 Control Quality
8.3 Control Quality
 
Project Management Cycle and MS Project 2013 By Subodh Kumar PMP
Project Management Cycle and  MS Project 2013  By Subodh Kumar PMPProject Management Cycle and  MS Project 2013  By Subodh Kumar PMP
Project Management Cycle and MS Project 2013 By Subodh Kumar PMP
 
PMBoK ed.5 brief overview
PMBoK ed.5 brief overviewPMBoK ed.5 brief overview
PMBoK ed.5 brief overview
 
Project Management
Project ManagementProject Management
Project Management
 
File 3 removed 4 slides 1
File 3 removed 4 slides 1File 3 removed 4 slides 1
File 3 removed 4 slides 1
 
Project Integration Management - PMP Preparation
Project Integration Management - PMP PreparationProject Integration Management - PMP Preparation
Project Integration Management - PMP Preparation
 
Nine Things-in-the-PMBoK
Nine Things-in-the-PMBoKNine Things-in-the-PMBoK
Nine Things-in-the-PMBoK
 
File 3 extra four slides 1
File 3 extra four slides 1File 3 extra four slides 1
File 3 extra four slides 1
 
File 3 extra slide 2
File 3 extra slide 2File 3 extra slide 2
File 3 extra slide 2
 
122 Part 1 - GuideFigure 4-15. Close Project or Phase Dat.docx
122 Part 1 - GuideFigure 4-15. Close Project or Phase Dat.docx122 Part 1 - GuideFigure 4-15. Close Project or Phase Dat.docx
122 Part 1 - GuideFigure 4-15. Close Project or Phase Dat.docx
 
PMP as per PMBOK 6
PMP as per PMBOK 6PMP as per PMBOK 6
PMP as per PMBOK 6
 
Project quality management - PMI PMBOK Knowledge Area
Project quality management - PMI PMBOK Knowledge AreaProject quality management - PMI PMBOK Knowledge Area
Project quality management - PMI PMBOK Knowledge Area
 
Pmp Certification
Pmp CertificationPmp Certification
Pmp Certification
 
File 3 removed 1 word 1
File 3 removed 1 word 1File 3 removed 1 word 1
File 3 removed 1 word 1
 
Project lifecycle
Project lifecycleProject lifecycle
Project lifecycle
 
Project Management Process and Its Phases
Project Management Process and Its PhasesProject Management Process and Its Phases
Project Management Process and Its Phases
 
File 3 original copy 1
File 3 original copy 1File 3 original copy 1
File 3 original copy 1
 
File 3 original
File 3 original File 3 original
File 3 original
 

Recently uploaded

Artificial intelligence presentation2-171219131633.pdf
Artificial intelligence presentation2-171219131633.pdfArtificial intelligence presentation2-171219131633.pdf
Artificial intelligence presentation2-171219131633.pdf
Kira Dess
 
01-vogelsanger-stanag-4178-ed-2-the-new-nato-standard-for-nitrocellulose-test...
01-vogelsanger-stanag-4178-ed-2-the-new-nato-standard-for-nitrocellulose-test...01-vogelsanger-stanag-4178-ed-2-the-new-nato-standard-for-nitrocellulose-test...
01-vogelsanger-stanag-4178-ed-2-the-new-nato-standard-for-nitrocellulose-test...
AshwaniAnuragi1
 
一比一原版(Griffith毕业证书)格里菲斯大学毕业证成绩单学位证书
一比一原版(Griffith毕业证书)格里菲斯大学毕业证成绩单学位证书一比一原版(Griffith毕业证书)格里菲斯大学毕业证成绩单学位证书
一比一原版(Griffith毕业证书)格里菲斯大学毕业证成绩单学位证书
c3384a92eb32
 
一比一原版(NEU毕业证书)东北大学毕业证成绩单原件一模一样
一比一原版(NEU毕业证书)东北大学毕业证成绩单原件一模一样一比一原版(NEU毕业证书)东北大学毕业证成绩单原件一模一样
一比一原版(NEU毕业证书)东北大学毕业证成绩单原件一模一样
A
 
21P35A0312 Internship eccccccReport.docx
21P35A0312 Internship eccccccReport.docx21P35A0312 Internship eccccccReport.docx
21P35A0312 Internship eccccccReport.docx
rahulmanepalli02
 

Recently uploaded (20)

Involute of a circle,Square, pentagon,HexagonInvolute_Engineering Drawing.pdf
Involute of a circle,Square, pentagon,HexagonInvolute_Engineering Drawing.pdfInvolute of a circle,Square, pentagon,HexagonInvolute_Engineering Drawing.pdf
Involute of a circle,Square, pentagon,HexagonInvolute_Engineering Drawing.pdf
 
handbook on reinforce concrete and detailing
handbook on reinforce concrete and detailinghandbook on reinforce concrete and detailing
handbook on reinforce concrete and detailing
 
Artificial intelligence presentation2-171219131633.pdf
Artificial intelligence presentation2-171219131633.pdfArtificial intelligence presentation2-171219131633.pdf
Artificial intelligence presentation2-171219131633.pdf
 
01-vogelsanger-stanag-4178-ed-2-the-new-nato-standard-for-nitrocellulose-test...
01-vogelsanger-stanag-4178-ed-2-the-new-nato-standard-for-nitrocellulose-test...01-vogelsanger-stanag-4178-ed-2-the-new-nato-standard-for-nitrocellulose-test...
01-vogelsanger-stanag-4178-ed-2-the-new-nato-standard-for-nitrocellulose-test...
 
Fuzzy logic method-based stress detector with blood pressure and body tempera...
Fuzzy logic method-based stress detector with blood pressure and body tempera...Fuzzy logic method-based stress detector with blood pressure and body tempera...
Fuzzy logic method-based stress detector with blood pressure and body tempera...
 
8th International Conference on Soft Computing, Mathematics and Control (SMC ...
8th International Conference on Soft Computing, Mathematics and Control (SMC ...8th International Conference on Soft Computing, Mathematics and Control (SMC ...
8th International Conference on Soft Computing, Mathematics and Control (SMC ...
 
一比一原版(Griffith毕业证书)格里菲斯大学毕业证成绩单学位证书
一比一原版(Griffith毕业证书)格里菲斯大学毕业证成绩单学位证书一比一原版(Griffith毕业证书)格里菲斯大学毕业证成绩单学位证书
一比一原版(Griffith毕业证书)格里菲斯大学毕业证成绩单学位证书
 
engineering chemistry power point presentation
engineering chemistry  power point presentationengineering chemistry  power point presentation
engineering chemistry power point presentation
 
Presentation on Slab, Beam, Column, and Foundation/Footing
Presentation on Slab,  Beam, Column, and Foundation/FootingPresentation on Slab,  Beam, Column, and Foundation/Footing
Presentation on Slab, Beam, Column, and Foundation/Footing
 
Basics of Relay for Engineering Students
Basics of Relay for Engineering StudentsBasics of Relay for Engineering Students
Basics of Relay for Engineering Students
 
Autodesk Construction Cloud (Autodesk Build).pptx
Autodesk Construction Cloud (Autodesk Build).pptxAutodesk Construction Cloud (Autodesk Build).pptx
Autodesk Construction Cloud (Autodesk Build).pptx
 
一比一原版(NEU毕业证书)东北大学毕业证成绩单原件一模一样
一比一原版(NEU毕业证书)东北大学毕业证成绩单原件一模一样一比一原版(NEU毕业证书)东北大学毕业证成绩单原件一模一样
一比一原版(NEU毕业证书)东北大学毕业证成绩单原件一模一样
 
Theory of Time 2024 (Universal Theory for Everything)
Theory of Time 2024 (Universal Theory for Everything)Theory of Time 2024 (Universal Theory for Everything)
Theory of Time 2024 (Universal Theory for Everything)
 
Databricks Generative AI FoundationCertified.pdf
Databricks Generative AI FoundationCertified.pdfDatabricks Generative AI FoundationCertified.pdf
Databricks Generative AI FoundationCertified.pdf
 
Diploma Engineering Drawing Qp-2024 Ece .pdf
Diploma Engineering Drawing Qp-2024 Ece .pdfDiploma Engineering Drawing Qp-2024 Ece .pdf
Diploma Engineering Drawing Qp-2024 Ece .pdf
 
analog-vs-digital-communication (concept of analog and digital).pptx
analog-vs-digital-communication (concept of analog and digital).pptxanalog-vs-digital-communication (concept of analog and digital).pptx
analog-vs-digital-communication (concept of analog and digital).pptx
 
Introduction-to- Metrology and Quality.pptx
Introduction-to- Metrology and Quality.pptxIntroduction-to- Metrology and Quality.pptx
Introduction-to- Metrology and Quality.pptx
 
21P35A0312 Internship eccccccReport.docx
21P35A0312 Internship eccccccReport.docx21P35A0312 Internship eccccccReport.docx
21P35A0312 Internship eccccccReport.docx
 
Filters for Electromagnetic Compatibility Applications
Filters for Electromagnetic Compatibility ApplicationsFilters for Electromagnetic Compatibility Applications
Filters for Electromagnetic Compatibility Applications
 
Circuit Breakers for Engineering Students
Circuit Breakers for Engineering StudentsCircuit Breakers for Engineering Students
Circuit Breakers for Engineering Students
 

pertemuan 7 - Quality Mangement for Planning Process_compressed_compressed.pdf

  • 2. Pertemuan 7 memahami proses perencanaan proyek khususnya pada area pengetahuan manajemen kualitas proyek (Project Quality Management)
  • 3. Grup Proses 3 Inisialisasi Perencanaan Eksekusi Penutupan Variable Tingkat Interaksi Awal Variable Waktu Akhir Monitor dan Kontrol
  • 5. Quality Management • Manajemen kualitas meliputi proses dalam menentukan kebijakan kualitas dan prosedur • Untuk memastikan project dapat memenuhi kebutuhan yang telah disepakati
  • 6. Quality Management • Kurangnya perhatian terhadap kualitas = lebih banyak mengulang pekerjaan atau banyaknya cacat produk yang dihasilkan • Dampaknya : waktu bertambah, biaya bertambah • Jadi kualitas harus direncanakan daripada sibuk menangani masalah dikemudian hari
  • 7. Ex : Build a new car Project
  • 8. Ex : Build a new car Project
  • 9. Ex : Build a new car Project
  • 10. Intisari PM (PG vs KA) Close Procurement s Administer Procurements Conduct Procurements Plan Procurement 9. Project Procurement Management Monitor and Control Risks Plan Risk Management, Identify Risks Perform Qualitative Risk Analysis Perform Quantitative Risk Analysis Plan Risk Responses 8. Project Risk Management Report Performance Distribution Information Manage Stakeholder Expectations Plan Communications Identify Stakeholder 7. Project Communication Mgm Acquire Project Team Develop Project Team Manage Project Team Develop Human Resource Plan 6. Project Human Resource Management Perform Quality Control Perform Quality Assurance Plan Quality 5. Project Quality Mgm Control Costs Estimate Cost Determine Budget 4. Project Cost Management Schedule Control Defince Activities Sequence Activities Estimate Activity Resources Estimate aDurations Develop Schedule 3. Project Time Management Scope Verification Scope Control Collect Requirement Define Scope Create WBS 2. Project Scope Management Close Project or Phase Monitor and control Project work Integrated Change Control Direct and Manage Project Execution Develop Project Management Plan Develop Project Charter 1. Project Integration Management 5. Penutupa n 4. Monitor & Kontrol 3. Eksekusi 2. Perencanaan 1. Inisialisasi PG/KA 1. Plan Quality
  • 11. Plan Quality Proses mengidentifikasikan kebutuhan kualitas dan/atau standard proyek atau produk Dan mendokumentasikan bagaimana proyek menunjukan kepatuhan terhadap kesepakatan
  • 12. Plan Quality Mengukur kualitas produk sesuai dengan produk apa yang akan dihasilkan Contoh : Mengukur kualitas proyek untuk membangun reaktor nuklir berbeda dengan proyek membangun SIA
  • 13. Plan Quality • Kualitas vs Grade (Level) • Presisi vs Akurasi
  • 14. Plan Quality Inputs Tools & Techniques Outputs Scope baseline Stakeholder register Cost performance baseline Schedule baseline Risk register Enterprise environmental factors Organizational process assets Cost-benefit analysis Cost of quality Control charts Benchmarking Design of experiment Statistical sampling Flowcharting Propietary quality mgm methodologies Add quality planning tools Quality management plan Quality metrics Quality checklists Project improvement plan Project document updates
  • 15. Kesimpulan Project Quality Management khususnya pada tahap perencanaan proyek : • Plan Quality
  • 16. 16 Lain -lain Struktur Organisasi Proyek – Fungsional – Matriks – Projectized