Paul Arseneau has over 30 years of experience as a General Superintendent and General Foreman on construction projects in Atlantic Canada. His resume lists numerous projects he has managed involving concrete work, civil works, mechanical and electrical systems for industrial facilities, infrastructure projects, and commercial and institutional buildings. Project values range from hundreds of thousands to tens of millions of dollars. Notable past clients include various government agencies, hospitals, universities, and forestry product manufacturers.
Flatlick Sewer Rehabilitation Project Phase 1 and 2Fairfax County
The Flatlick Sewer Rehabilitation Project included rehabilitation of approximately 2,500 linear feet of existing 24-inch diameter pipe and 650 linear feet of existing 15-inch diameter pipe using the Cured in Place Pipe (CIPP) lining method. The lining was cured using UV Light. In addition, 11 manholes were rehabilitated throughout the Flatlick Branch stream valley in Chantilly, Virginia. This project was substantially complete on January 4, 2021.
Flatlick Sewer Rehabilitation Project Phase 1 and 2Fairfax County
The Flatlick Sewer Rehabilitation Project included rehabilitation of approximately 2,500 linear feet of existing 24-inch diameter pipe and 650 linear feet of existing 15-inch diameter pipe using the Cured in Place Pipe (CIPP) lining method. The lining was cured using UV Light. In addition, 11 manholes were rehabilitated throughout the Flatlick Branch stream valley in Chantilly, Virginia. This project was substantially complete on January 4, 2021.
Replacement of 625 LF of 8" diameter sanitary sewer force main located in the Waynewood Community in Alexandria, Virginia. The new force main alignment relocated the force main from areas between residential houses and in back yards to the right of way. The project also included a waterline relocation to accommodate the new force main, two new manholes, 30 feet of sanitary gravity sewer line, new pump station driveway, and site restoration. This project was substantially complete on May 12, 2021.
Oak Marr Pump Station Rehabilitation – Construction ProjectFairfax County
Neighborhood was built in the 1980s, and the sewer infrastructure has been in operation since.
Aged pump station equipment – pumps, valves, fans, concrete, etc.
This aging equipment has the potential of causing:
Sanitary Sewer Overflows (SSO)
Sewer back-ups into homes
Environmental damages
Maintenance problems
Backlick Run Gravity Sewer Abandonment Project June 2020Fairfax County
This is a 4,000 linear foot section of gravity sewer that was taken out of service. The pipe had deteriorated and was prone to collapse. The area was restored and site improvements were completed.
High Ridge Lakevale Estates Langley Oaks and Weid Pump Stations ProjectFairfax County
The work under this project included provision for the replacement of all pumping, piping, valves, generator, electrical, and mechanical equipment at each pump station. Each pump station also included structural and architectural repairs for the buildings as well as the installation of a security system. Miscellaneous site and civil modifications were also completed. This project was substantially complete on May 27, 2021.
The four pump stations (PS) included, Lakevale PS (10209 Kenbrooke Ct, Vienna), High Ridge PS (3890 Fairfax Ridge Rd, Fairfax), Weid PS (8418A Holly Leaf Drive, McLean), and Langley Oaks PS (6526 Heather Brook Ct, McLean)
Accotink Creek at Wakefield Park Stream Restoration ProjectFairfax County
Accotink Creek at Wakefield Park Stream Restoration project was substantially completed on November 23, 2021. This project consists of restoring, enhancing, and stabilizing of approximately 4,900 linear feet of stream channel through the installation of four Newbury Riffles within the main channel of Accotink Creek and one Newbury Riffle within a side channel to provide aquatic benefits, grade control, improve water quality and prevent further erosion.
Resolving Project Boundary Challenges to Streamline FERC Hydropower Dam Relic...Black & Veatch
The Ozark Beach Hydroelectric Project, owned and operated by The Empire District Electric Company, is a FERC-licensed, 16 MW run-of-river project located on the White River in south central Missouri. As part of project relicensing, EDEC revised the project boundary to exclude land that is no longer required for project operation to streamline the process and save on administrative costs.
Community Meeting - Indian Run Gravity Sewer Replacement Construction ProjectFairfax County
2019 study evaluated several alternatives for replacement
Selected alternative would:
Eliminate the exposed sewer/stream crossing
Maintain level of sewer services to the community
Provide future access ease to Fairfax County’s wastewater operator
Improve system’s reliability in the area
Reduce future risk of sanitary sewer overflows
Reduce risk to public health and the environment
Replacement of 625 LF of 8" diameter sanitary sewer force main located in the Waynewood Community in Alexandria, Virginia. The new force main alignment relocated the force main from areas between residential houses and in back yards to the right of way. The project also included a waterline relocation to accommodate the new force main, two new manholes, 30 feet of sanitary gravity sewer line, new pump station driveway, and site restoration. This project was substantially complete on May 12, 2021.
Oak Marr Pump Station Rehabilitation – Construction ProjectFairfax County
Neighborhood was built in the 1980s, and the sewer infrastructure has been in operation since.
Aged pump station equipment – pumps, valves, fans, concrete, etc.
This aging equipment has the potential of causing:
Sanitary Sewer Overflows (SSO)
Sewer back-ups into homes
Environmental damages
Maintenance problems
Backlick Run Gravity Sewer Abandonment Project June 2020Fairfax County
This is a 4,000 linear foot section of gravity sewer that was taken out of service. The pipe had deteriorated and was prone to collapse. The area was restored and site improvements were completed.
High Ridge Lakevale Estates Langley Oaks and Weid Pump Stations ProjectFairfax County
The work under this project included provision for the replacement of all pumping, piping, valves, generator, electrical, and mechanical equipment at each pump station. Each pump station also included structural and architectural repairs for the buildings as well as the installation of a security system. Miscellaneous site and civil modifications were also completed. This project was substantially complete on May 27, 2021.
The four pump stations (PS) included, Lakevale PS (10209 Kenbrooke Ct, Vienna), High Ridge PS (3890 Fairfax Ridge Rd, Fairfax), Weid PS (8418A Holly Leaf Drive, McLean), and Langley Oaks PS (6526 Heather Brook Ct, McLean)
Accotink Creek at Wakefield Park Stream Restoration ProjectFairfax County
Accotink Creek at Wakefield Park Stream Restoration project was substantially completed on November 23, 2021. This project consists of restoring, enhancing, and stabilizing of approximately 4,900 linear feet of stream channel through the installation of four Newbury Riffles within the main channel of Accotink Creek and one Newbury Riffle within a side channel to provide aquatic benefits, grade control, improve water quality and prevent further erosion.
Resolving Project Boundary Challenges to Streamline FERC Hydropower Dam Relic...Black & Veatch
The Ozark Beach Hydroelectric Project, owned and operated by The Empire District Electric Company, is a FERC-licensed, 16 MW run-of-river project located on the White River in south central Missouri. As part of project relicensing, EDEC revised the project boundary to exclude land that is no longer required for project operation to streamline the process and save on administrative costs.
Community Meeting - Indian Run Gravity Sewer Replacement Construction ProjectFairfax County
2019 study evaluated several alternatives for replacement
Selected alternative would:
Eliminate the exposed sewer/stream crossing
Maintain level of sewer services to the community
Provide future access ease to Fairfax County’s wastewater operator
Improve system’s reliability in the area
Reduce future risk of sanitary sewer overflows
Reduce risk to public health and the environment
CM&B has assembled a team of the most highly skilled and dedicated construction professionals in the industry. Those experienced individuals are still part of CM&B today, joined by a new generation of talent with the same energy and enthusiasm to lead the company into the future. In addition to the longevity of our people, CM&B has built solid and long-standing relationships with clients, subcontractors, architects and other business partners: a testament to our core values and business philosophy. The breadth of experience gained through this team’s approach shows a range of projects with varying degrees of complexity and unique requirements. No matter the challenge, CM&B understands our clients’ needs and builds on our vast experience to deliver the highest quality construction experience for every client.
Rehabilitation of Three Equalization Basins and Ancillary Facilities Fairfax County
This project included construction and rehabilitation of three equalization basins and ancillary facilities located at the Noman M. Cole, Jr. Pollution Control Plant. The basins temporarily store overflow wastewater resulting from heavy storm events that exceed the plant’s treatment capacity. Work included construction of a new concrete liner system for Equalization Basin QQ1, rehabilitation of existing pump stations and addition of a new underdrain pump station and stormwater pump station. Construction of a new flood protection system and addition of a new check dam and sluice gate in Hogge Run for emergency spill protection. The new liner system for QQ1 includes a concrete slab with an HDPE membrane liner constructed over a pipe underdrain collection system.
Evermay Sec. 7b Underground Detention Facility Replacement ProjectFairfax County
The project replaced the failed underground gravel detention facility with a new detention system. Improvements were also made to the existing storm drainage system. This project provides a reduction of 1.6 pounds of total phosphorous, 18.6 pounds of total nitrogen and 1,246 pounds of sediment per year.
1. PERSONAL RESUME
PAUL ARSENEAU, G.S.C.
Employment Record / Project Summary
Opron Maritimes Construction Ltd.Maricon Construction Management Ltd.
General Superintendent
Reporting directly to the Project Manager, responsible for all on site activities, subcontractor coordination,
workforce and scheduling.
Grand Manan Nursing Home
PCS AMEC Americas
PICADILLY MINE, PENOBSQUIS, NEW BRUNSWICK
Contract CP-14:
Elevated Slabs - 22 Concentrator Building Elevated Slabs complete with curbs, floor drains and 2.3 M
miscellaneous Anchor Bolts.
Contract CP-81: Salt Shed Civil Works 412 K
PUBLIC WORKS AND GOVERNMENT SERVICES CANADA 17.0 M
ST. ANDREWS, NEW BRUNSWICK
Construction of a New Wet Lab Building for PWGSC at the Dept. of Fisheries & Oceans,
St. Andrew’s Biological Station. Work includes dismantling of existing buildings, new additions to
existing buildings and a new emergency generator. The Main Wet Lab Building consisted
of a 30,000 sq ft, primarily concrete, structure to house fisheries experiments, including
all building systems and all necessary laboratory process systems.
UNIVERSITY OF NEW BRUNSWICK - SAINT JOHN & 1.0 M
SAINT JOHN REGIONAL HOSPITAL
SAINT JOHN, NEW BRUNSWICK
Construction of an underground Steam Tunnel from the Saint John Regional Hospital
to the University of New Brunswick. The purpose of this tunnel was for the Hospital to
transfer their excess steam to the University to use to heat their facility. Work included
mass excavation, tunnel construction, waterproofing, electrical and mechanical systems.
PUBLIC WORKS AND GOVERNMENT SERVICES CANADA 5.1 M
BATHURST, NEW BRUNSWICK
Nicholas Denys Building - Modernization of a multi floor government office building. This
was a multi phase project which was carried out without interruption to employee services
at the building. Work included demolition, architectural, electrical, mechanical, and the
coordination and moving of office employees in conjunction with construction work.
CHARLOTTETOWN AREA DEVELOPMENT CORPORATION 1.2 M
CHARLOTTETOWN, PEI
Construction of a new 5 level parking garage structure including all civil work, structural
work (excluding precast structure), architectural, mechanical and electrical.
SAINT JOHN CUSTOMER & CUSTODY TRANSFER STATIONS 500 K
2. SAINT JOHN, NEW BRUNSWICK
Associated civil work including excavation/backfill, sitework and foundations.
3. Employment Record / Project Summary Paul Arseneau
IWK HEALTH CENTRE 1.26 M
HALIFAX, NOVA SCOTIA
Work comprised of the creation of a Heliport on the roof, Level 8, of the IWK Health Centre. The
work involved extending two of the existing service elevators up a level to serve the Heliport, the
supply and installation of the helideck, a connecting lobby and vestibule from the apron of
the helideck to the new elevator location and the associated mechanical and electrical systems
FRASER PAPERS INC.
EDMUNDSTON, NEW BRUNSWICK
MgO Recovery Boiler Precipitator, two contracts:
1 - Foundation Work 300 K
2 - General Civil Work 750 K
MCCAIN FOODS USA, INC.
EASTON, MAINE USA
Pipeline Installation: Construction of a 6 mile waterline to a new Waste Water Treatment Plant. 3.0 M
Responsible for workforce supervision, coordination, quality control and safety.
New Waste Water Treatment Plant: Construction of concrete aerobic and anaerobic chambers, 9.0 M
concrete clarifier and various support buildings. Underground piping, HDPE liners and
subdrain systems completed this work. Responsible for onsite workforce, subcontractor
coordination, quality control, safety and scheduling.
DEPARTMENT OF SUPPLY AND SERVICES 1.7 M
BATHURST, NEW BRUNSWICK
New Boiler Room Addition at the hospital. All architectural, mechanical and electrical
systems form part of the scope.
BRUNSWICK MINES
BATHURST, NEW BRUNSWICK
AG Mill foundations and concrete. Massive concrete foundations, structural and elevated 660 K
slabs for the new mill equipment.
AG Mill architectural finishes, overhead and mandoors for the new mill. 90 K
FUNDY REGION SOLID WASTE COMMISSION
CRANE MOUNTAIN LANDFILL
SAINT JOHN, NEW BRUNSWICK
Sitework Phase III: Construction of roads, material handling area and paving for the new 560 K
landfill.
Ancillary Buildings and Scales: Construction of 3 buildings, scale and foundation, 710 K
reinforced earth precast retaining wall. Architectural, electrical and mechanical work.
4. Employment Record / Project Summary Paul Arseneau
BELOIT CANADA LTD. 550 K
PORT HAWKESBURY, NOVA SCOTIA
Construction of a concrete truck dumper complete with embedded metals, hydraulic
pumphouse and electrical work.
ST. ANNE NACKAWIC PULP CO.
NACKAWIC, NEW BRUNSWICK
Concrete slabs, architectural finishes, electrical and mechanical for a new Conference 725 K
Training Center.
Interior slabs, architectural finishes, computer floor, mechanical and electrical for a new 700 K
Steam Plant Control Center.
AVENOR MARITIMES INC. (BOWATER MERSEY)
DALHOUSIE, NEW BRUNSWICK
Construction of a new TMP plant: contracts completed as superintendent, consisting mainly
of concrete work.
- 235 K Ash Bunker Extension
- 260 K Boiler #7 Electrostatic Precipitator
- 200 K Concrete Floors BPT-056
- 850 K Truck Dumper
FRASER PAPERS INC. 200 K
EDMUNDSTON, NEW BRUNSWICK
Concrete work associated with a reinforced concrete bunker and Ash Pond #1 and #2
Rebuild.
General Foreman (13 Years)
BOWATER MERSEY PAPER CO. LIMITED
LIVERPOOL, NOVA SCOTIA
Mill Effluent Treatment - Work consisted of mass excavation and construction of a clarifier tank.
Underground process piping, concrete pump station, tanks, truck bay, etc., were also included.
HOPITAL DE L’ENFANT JESUS INC.
CARAQUET, NEW BRUNSWICK
Addition and Renovation, Phase II - Caraquet Hospital. Building of a new hospital addition,
approximately 50,000 sq.ft., including all civil, electrical, mechanical and exterior architectural work.
Also, extensive renovation on existing first floor and boiler room.
5. Employment Record / Project Summary Paul Arseneau
BELLEDUNE GENERATING STATION
BELLEDUNE, NEW BRUNSWICK
FGD Building Superstructure
FGD Building Foundations
Breakwater Conveyor Foundations
Conveyor System and Crusher House Civil Works
Civil/Architectural for Coal Handling Facilities
Construction Site Offices
General Foreman for contracts noted above, including activities such as mass earth/rock
excavation, buried services, massive concrete work, grouting, surface preparation, masonry,
structural steel, architectural finishes, special coatings, mechanical and electrical work.
CONSOLIDATED BATHURST INC.
BATHURST, NEW BRUNSWICK
Chip Handling Project: Construction of New Poplar Reclaim Facilities. Work involved re-location
of underground services, construction of concrete, structural steel, mechanical, electrical and
architectural features.
CONSOLIDATED BATHURST INC.
BATHURST, NEW BRUNSWICK
Effluent Treatment Project: This work involved major excavation, concrete work, mechanical
and electrical for the construction of the Aeration, Reactor, Sludge and Conditioning Tank
including Gas Building, Mechanical and Service Building. Also involved underground services
relocation, demolition and modification of existing structure and cooling tower. Replacement
of mill main water line and major underground effluent and biogas lines.
BOWATER MERSEY, CTMP PROJECT, LUMMUS CANADA
LIVERPOOL, NOVA SCOTIA
Civil work for A-Frame Chip Storage Building and Warehouse including miscellaneous concrete
foundation for Debarker Drum and Hog Feeder Building.
CONSOLIDATED BATHURST INC.
BATHURST, NEW BRUNSWICK
#6 Paper Machine Project. Work involved relocation of site services, mechanical
and electrical, demolition of existing structure and construction of permanent parking lot.
CONSOLIDATED BATHURST INC.
BATHURST, NEW BRUNSWICK
Construction of new CTMP Bleach Plant, foundations, slabs, architectural finishes.
CONSOLIDATED BATHURST INC.
BATHURST, NEW BRUNSWICK
Recovery Boiler Project. Demolition of existing structure and construction of all foundations,
slabs, structural steel and architectural features. As well as electrical and mechanical systems
7. Employment Record / Project Summary Paul Arseneau
CONSOLIDATED BATHURST INC.
BATHURST, NEW BRUNSWICK
Civil work for new construction of CTMP Plant. Activities involved excavation, grading,
underground services, demolition and construction of plant.
____________________________________
Strait Crossing Inc. - Bayfield, New Brunswick
Employed by Strait Crossing Inc. to do concrete work to construct massive bridge segments.
Heath Steel Mines - Newcastle, New Brunswick
Employed by Heath Steel Mines to refurbish barker drum. Roso Steel