The procurement engineering process has 6 stages that take input design and engineering documents through to final equipment production. Stage 1 involves developing specifications and sending RFQs. Stage 2 reviews vendor data. Stage 3 certifies the data. Stage 4 develops final design drawings. Stage 5 does a final design review. Stage 6 produces operation manuals and handles installation, testing, and warranty work. The flowchart shows the roles and interactions of the procurement engineering team and vendors through the process from initial requirements to final delivery.