p-chart, p-chart for SQC, p-chart for statistical quality control charts, p-chart for quality control, fraction - non-conformance chart, attribute quality control chart
2. Control Charts
Statistical Quality Control can be
implemented through control charts that
are used to monitor the output of the
process and indicate the presence of
problems requiring further action. Control
charts can be used to monitor processes
where output is measured as either
variables or attributes.
29/1/2018 Made By: Rakhee Chhibber
16. Analysis of P-chart
As the sample number 15 and 23 lie outside the
upper control limit of p-chart so we have to
eliminate them and calculate all the values again
and draw the chart again. Modified values are :-
9/1/2018 Made By: Rakhee Chhibber 16