Suivi de l’avancement d’un projet Agile/Scrum
1. Introduction
Scrum
Methodology
and Artefacts
Scrum
tracking
methods
Tools for
monitoring
and progress
Pratical :Jira
Conclusion
Summary
INSTITUT DE LA FRANCOPHONIE POUR L’INNOVATION
IFI - VNU
Exposé de Gestion de Projet§
¦
¤
¥
Suivi de l’avancement d’un projet Agile/Scrum
Rédigé par :
SONFACK S. Serge
COULIBALY Adama
Promotion :22
Année académique : 2017-2018
9 août 2018 1 / 20
6. Introduction
Scrum
Methodology
and Artefacts
Scrum
tracking
methods
Tools for
monitoring
and progress
Pratical :Jira
Conclusion
Summary
Burndown chart
The Scrum Burndown Chart is a visual measurement tool that
shows the completed work per day against the projected rate of
completion for the current project release. Its purpose is to
enable that the project is on the track to deliver the expected
solution within the desired schedule.
Figure – simple burndown chart
9 août 2018 6 / 20
7. Introduction
Scrum
Methodology
and Artefacts
Scrum
tracking
methods
Tools for
monitoring
and progress
Pratical :Jira
Conclusion
Summary
Backlog
A backlog is a list of features or technical tasks which the team
maintains and which, at a given moment, are known to be
necessary and sufficient to complete a project or a release.
(a) listed backlog (b) Organized backlog
Figure – backlog illustration
9 août 2018 7 / 20
9. Introduction
Scrum
Methodology
and Artefacts
Scrum
tracking
methods
Tools for
monitoring
and progress
Pratical :Jira
Conclusion
Summary
Impediment
anything that keeps the Team from getting work Done and
that slows Velocity. Impediments come in many forms : a sick
team member, a missing resource, lack of management support
or even a cold team room. If it’s blocking the team from doing
its work, it’s an Impediment.
Figure – impediment
9 août 2018 9 / 20
12. Introduction
Scrum
Methodology
and Artefacts
Scrum
tracking
methods
Tools for
monitoring
and progress
Pratical :Jira
Conclusion
Summary
Sprint Backlog
sprint or iterations, are timeboxed periods where a team
plans, builds, delivers, and reviews a set of small, valuable,
potentially shippable features.
The sprint backlog is a list of tasks identified by the Scrum
team to be completed during the Scrum sprint
Figure – sprint backlog
Spring Backlog Burndown
Spring Backlog Burn-down
9 août 2018 12 / 20
14. Introduction
Scrum
Methodology
and Artefacts
Scrum
tracking
methods
Tools for
monitoring
and progress
Pratical :Jira
Conclusion
Summary
Product Backlog Delta Report
Product Backlog Delta Report simply shows the changes to the
Product Backlog between sprints.Each story can be in different
states (not done, in progress, done). The Product Owner can
also reorder stories, remove stories, and add new stories, so it
will show the number of stories that have changed
9 août 2018 14 / 20
18. Introduction
Scrum
Methodology
and Artefacts
Scrum
tracking
methods
Tools for
monitoring
and progress
Pratical :Jira
Conclusion
Summary
Drawbacks
Paper board
Difficult to keep track (past state)
Limited in termes of manipulations(litle information can be
pasted)
Spreadsheet
Need extra knowledge on formulation manipulation
Need extra knowledge on graphics
Jira
Need to put in money
9 août 2018 18 / 20