Ortec provides advanced 3D load building and dynamic route scheduling software designed to optimize shipping and transportation planning integrated with SAP® ERP. This software enhances logistics efficiency by offering decision-ready proposals for material flow and logistics cost reduction, along with tools for simulating complex business processes. Key features include carton, pallet, load space optimization, and automated route planning, all aimed at maximizing resource utilization and improving customer satisfaction.