The document discusses investing in solar energy projects in Vietnam. It outlines the potential for solar energy in Vietnam, noting the country receives 1400-3000 hours of sunshine per year. It summarizes the government's policies supporting renewable energy, including targets for solar power capacity of 850MW by 2020 and 12,000MW by 2030. It also provides recommendations for foreign investors, suggesting public-private partnerships and negotiating favorable power purchase agreements with the national utility, EVN.
Enterprise Information Management | EIM | Ulrich Kampffmeyer | PROJECT CONSULT Unternehmensberatung GmbH | Contents: 1) EIM ~ All information must be treated equal | 2) EIM ~ A self-fulfilling prophecy | 3) EIM ~ Definition still in progress | 4) From ECM to EIM ~ A functional model | 5) EIM ~ A platform and an ecosystem | 6) What’s up with EIM? | Definition: "EIM Enterprise Information Management is the comprehensive management and utilization of all information of an enterprise irrespective of location, user, author, source, application, platform, use case, format, medium, and time.
To cover this scope EIM supports, uses and unifies functional components like Social Business, Enterprise Search, Business Process Management, Data Warehousing, Business Intelligence, Automated Classification, BigData, Knowledge Management, Cloud, Mobile and Information Lifecycle Management, which surround Enterprise Content Management as the core of EIM."
Enterprise Information Management | EIM | Ulrich Kampffmeyer | PROJECT CONSULT Unternehmensberatung GmbH | Contents: 1) EIM ~ All information must be treated equal | 2) EIM ~ A self-fulfilling prophecy | 3) EIM ~ Definition still in progress | 4) From ECM to EIM ~ A functional model | 5) EIM ~ A platform and an ecosystem | 6) What’s up with EIM? | Definition: "EIM Enterprise Information Management is the comprehensive management and utilization of all information of an enterprise irrespective of location, user, author, source, application, platform, use case, format, medium, and time.
To cover this scope EIM supports, uses and unifies functional components like Social Business, Enterprise Search, Business Process Management, Data Warehousing, Business Intelligence, Automated Classification, BigData, Knowledge Management, Cloud, Mobile and Information Lifecycle Management, which surround Enterprise Content Management as the core of EIM."
The Next Tsunami AI Blockchain IOT and Our Swarm Evolutionary SingularityDinis Guarda
The Next Tsunami AI Blockchain IOT and Our Swarm Evolutionary Singularity. AI is going to change everything? Wrong! AI changed already everything! But… Did we forgot our human swarm intelligence evolutionary nature?
Human, tech, evolution – individual – business - identity?
In this complex ecosystem, what is our human singularity?
What is creativity in a digitalised, blockchain, nano technology - IoT AI evolutionary swarm world? The Internet of Everything needs a Trust Protocol: A Ledger of Everything.
Blockchain tech is the open, distributed, global platform that fundamentally changes what we can digitally, how we do it, and who can participate. A world wide ledger smart contract based tech powered by AI.
The Be-All, End-All List of Small Business Tax DeductionsWagepoint
Read the full article with even more details at https://blog.wagepoint.com/h/i/289427271-the-comprehensive-list-of-small-business-tax-deductions/185037
Buyers no longer use voicemails and emails from strangers to learn about products. This information is online, whenever buyers are interested. This SlideShare presentation show sellers how to connect in a meaningful way by starting conversations around the buyer’s plans, goals and challenges.
This presentation is one class in HubSpot Academy's free sales training course. You can enroll here: http://certification.hubspot.com/inbound-sales-certification
Class 1: Email Marketing Certification course: Email Marketing and Your BusinessHubSpot
*From HubSpot Academy*
Over the past few decades, people have radically changed the way they live, work and buy. This class will give you an overview of an adaptive, inbound approach to sending emails that provide value and drive growth for your business. It will also teach you about the four big themes of a modern email marketing program: segmentation, personalization, mobile, and optimization.
Why People Block Ads (And What It Means for Marketers and Advertisers) [New R...HubSpot
HubSpot Research shares new data on why people use ad blockers and what marketers and advertisers need to do to keep people from blocking out ads completely. Hint: it's stop using interruptive and annoying ads.
3 Proven Sales Email Templates Used by Successful CompaniesHubSpot
76% of emails never get opened. That makes life for salespeople very difficult. So we've partnered up with Breakthrough Email to bring you email templates that are proven to engage prospects and close more deals. Start using them today and grow your revenue.
The lack of visible female role models is pervasive in the tech industry, particularly on Wikipedia, where just under 17% of Wikipedia biographies were on women. That's why HubSpot wrote fourteen Wikipedia entries for remarkable women in tech to help inspire young women to reach positions at the highest levels of STEM.
PDF, audio, and voiceover are now available on designintechreport.wordpress.com
Today’s most beloved technology products and services balance design and engineering in a way that perfectly blends form and function. Businesses started by designers have created billions of dollars of value, are raising billions in capital, and VC firms increasingly see the importance of design. The third annual Design in Tech Report examines how design trends are revolutionizing the entrepreneurial and corporate ecosystems in tech. This report covers related M&A activity, new patterns in creativity × business, and the rise of computational design.
Options analysis for private sector investment into Vietnam’s transmission ne...OECD Environment
OECD-IEA: Unlocking transmission grid finance and investment for the clean energy transition in emerging markets and developing economies, 17 January 2024, Virtual meeting
VIETNAM — Anwalt in Vietnam Dr. Oliver Massmann Corporate Sustainability Due ...Dr. Oliver Massmann
VIETNAM — Anwalt in Vietnam Dr. Oliver Massmann Corporate Sustainability Due Diligence Directive (CSDDD oder das EU-Lieferkettengesetz): Umfassende Analyse und Ausblick auf die Auswirkungen auf Unternehmen in Vietnam
Corporate Sustainability Due Diligence Directive (CSDDD or the EU Supply Chai...Dr. Oliver Massmann
Corporate Sustainability Due Diligence Directive (CSDDD or the EU Supply Chain Law): A Comprehensive Analysis and Review of its Implications on Vietnam-based Companies
Legal Alert - Vietnam - First draft Decree on mechanisms and policies to enco...Dr. Oliver Massmann
Legal Alert - Vietnam - First draft Decree on mechanisms and policies to encourage the development of rooftop solar power systems for self-consumption purpose
Corporate Sustainability Due Diligence Directive (CSDDD or the EU Supply Chai...Dr. Oliver Massmann
Corporate Sustainability Due Diligence Directive (CSDDD or the EU Supply Chain Law): A Comprehensive Analysis and Review of its Implications on Vietnam-based Companies
Anwalt in Vietnam Dr. Oliver Massmann Corporate Sustainability Due Diligence ...Dr. Oliver Massmann
Anwalt in Vietnam Dr. Oliver Massmann Corporate Sustainability Due Diligence Directive (CSDDD oder das EU-Lieferkettengesetz): Umfassende Analyse und Ausblick auf die Auswirkungen auf Unternehmen in Vietnam
Corporate Sustainability Due Diligence Directive (CSDDD or the EU Supply Chai...Dr. Oliver Massmann
Corporate Sustainability Due Diligence Directive (CSDDD or the EU Supply Chain Law): A Comprehensive Analysis and Review of its Implications on Vietnam-based Companies
2. www.duanemorris.com
AGENDA
• POTENTIAL OF SOLAR ENERGY INDUSTRY
IN VIETNAM
• GOVERNMENT’S POLICIES ON RENEWABLE
(SOLAR) ENERGY
• MARKET ACCESS FOR FOREIGN INVESTORS
• RECOMMENDATIONS
*
3. www.duanemorris.com
Energy Sector Background
• Electricity demand is expected
to increase by up to 14.2 pct.
annually for the 2011-2015
period, 11.4 pct. for the 2016-
2020 period and 7 times to
800 billion Kwh in 2030
• Electricity consumption is
projected to increase from
85,932 gigawatt hours (GWh)
in 2010 to 251,763 GWh in
2020
*
4. www.duanemorris.com
POTENTIAL OF SOLAR ENERGY INDUSTRY
IN VIETNAM
• Total number of sunshine hours up to 1400 – 3000
hours/year
• Potential: 4-6 kWh/m2
• Current use: 5 MW
• Solar energy can be used for water boiling, power
production and other purposes, as e.g. drying, cooking
etc.
*
5. www.duanemorris.com
GOVERNMENT’S POLICIES ON RENEWABLE
(SOLAR) ENERGY
• Viet Nam currently does not have a full-fledged legal framework
on renewable energy, especially solar energy investment.
• Amended National Master Plan VII in Decision 48/QD-TTg
dated 18 March 2016
• Decision No. 2068/QD-TTg specifically on development plan for
renewable energy (biomass, wind, and solar energy) until 2030 and
with a vision to 2050
• Draft Decision on supporting regime for solar power projects is
now being re-amended by the General Directorate of Energy
(MOIT) after being considered by the new Prime Minister
*
6. www.duanemorris.com
Amended Power Master Plan VII on the development
of electricity in Vietnam
• Amended Master Plan VII focuses on energy security, energy efficiency, renewable
energy development and power market liberalization
• Objectives:
– To increase the aggregate output of imported and produced electricity to 235-245
billion kWh by 2020; 352 – 379 billion kWh by 2025 and 506 – 559 billion kWh by
2030
– To prioritize to develop renewable energy generation so that the proportion of
electricity generation of renewable energy will be increased from the present 3.5% of
the total electricity production to 7% in 2020 and 10% in 2030
– To promote the rural electrification program so that most of the rural households
will have access to the electricity by 2020
– To build flexible operation of electricity grid, high automation of the transmission to
distribution process, development of substations with no requirement for operating
personnel.
6
7. www.duanemorris.com
Amended Power Master Plan VII
• Strategies:
– Higher quality of electricity supply and more reasonable electricity price
– Diversification of domestic resources for power generation
– Developing new renewable power sources and updating technologies used in
existing plants
– Diversification of investment sources to overcome the lack of financial and technical
resources and also to improve economic efficiency
• Investment capital demand:
– Approximately USD 40 billion up to 2020: Two-thirds for power generation
development and one-third for power network development
– Approximately USD 108 billion for the period from 2021 to 2030: 74% for power
generation development and 26% for power network development
*
8. www.duanemorris.com
Amended Power Master Plan VII
• State to keep monopoly on transmission
• Prioritize development of renewable energy
• Renewable energy target rate at 7 pct. of total energy
output by 2020 and more than 10 pct. by 2030.
• Increase the solar power output to 850 MW by 2020,
4,000 MW in 2025 and 12,000 MW in 2030.
*
9. www.duanemorris.com
Vietnam’s electrical energy mix
• Vietnam policy emphasises the need to diversify the country’s
energy mix whilst maximising the use of local energy reserves
• Currently Vietnam is developing an energy mix sector with
the mainstay of coal fired power
*
12. www.duanemorris.com
DRAFT DECISION ON SUPPORTING REGIME
FOR SOLAR POWER PROJECTS
• EVN has to purchase electricity from on-grid solar energy projects at
VAT-excluded price of 15 US cents/kWh
• For on-grid rooftop solar projects, the rate will be 11.2 UScents/
kWh – Now being asked by the new Prime Minister to reduce
• The rate in VND will be adjusted according to the fluctuation in the
VND/USD exchange rate.
• Rooftop solar projects of less than 50kW will not have to connect to
the grid. For those of more than 50kW, connection to the grid is
required and an electricity operating permit must be obtained.
• Term of solar energy PPAs: 20 years (renewable)
*
13. www.duanemorris.com
ENERGY RETAIL PRICES
• Circular 12/2014/TT-BCT:
– 7-10% increase with MOIT approval
– More than 10% requires PM approval
– EVN can decide independently for less than 7%
increases?
• Energy retail prices are expected to increase Raise FiT
*
14. www.duanemorris.com
Market access and Forms of investment
• No foreign ownership restriction
• Investment forms:
ü A wholly-owned foreign enterprise
ü A joint venture company between a foreign investor and domestic investor
ü Investment pursuant to the BOT legal framework (which includes establishment
of a project entity in the form of a wholly-owned foreign enterprise by way of a
BOT contract with the MOIT which is implemented through a wholly-owned
foreign enterprise; or a joint venture company by way of a BOT contract with
the MOIT which is implemented through a joint venture with a Vietnamese
entity (usually including EVN, but it is also possible with a private domestic
IPP)
ü Through the purchase of shares in either an EVN subsidiary being or having
been equitized or a private IPP holding power assets. investment in the form of
establishment of a new company can be undertaken in one or more of the
following ways.*
15. www.duanemorris.com
BOT – BEST INVESTMENT FORM
• Government’s Decree No. 15/2015/ND-CP on Public-
Private Partnership: making projects more bankable
• Easier to negotiate more favorable electricity rates.
• Easier to obtain more government guarantees, especially
in terms of EVN’s obligations to purchase all electricity
from the project.
• More fiscal and financial incentives.
• Precedent large-scaled BOT power projects in Vietnam:
Phu My, Vung Ang, Mong Duong 2
*
16. www.duanemorris.com
INVESTMENT INCENTIVES
• Subject to the decision of the local People’s Committee where the project
is located
• Land: exemption of land rental within 3 years from the operation date of the
project, etc.
• CIT 10%
– 15 years for new enterprises investing in power plant projects
– tax exemptions within 4 years and tax reduction by 50% in the next 9 years.
• Import duty exemption
– on goods imported to create fixed assets of the projects; components, materials and
semi-finished products which are not available at home for the project’s operation.
• Investment capital
– investors could apply for a loan of up to 70% of the total investment capital of their
project with a term of maximum 12 years.
– investors could also enjoy export credit incentives in the form of a loan of up to
85% of the export/ import contract value or L/C value also with a term of
maximum 12 years.*
17. www.duanemorris.com
Project planning
• Investors has to obtain prior agreement of EVN on power purchase prior to
licensing procedure.
• Commitment of banks or credit institutions on financing the project must be
obtained prior to issuance of Investment Registration Certificate .
• In-principle approval of the local People’s Committee is required prior to
issuance of Investment Registration Certificate depending on the project size
• A solar power plant must obtain a power generation permit from the competent
State authorities in order to conduct power generation operations in Vietnam
• Term of the permit: maximum 20 years for large power plants with particularly
important meaning on economy, society, national defense and security as per
the list approved by the Prime Minister; and 10 years for other power plants
projects.
• The permit cannot be renewed but the investor may apply for a new one within
60 days prior to the expiry date of the current permit.
*
18. www.duanemorris.com
Project licensing
• Step 1: The investor obtains approval from the competent authority [e.g., Prime
Minister, MOIT] approving the solar power plant as part of the power
development master plan (if required).
• Step 2: The investor obtains in-principle approval from the competent People’s
Committee (or other competent authorities subject to the details of the project)
approving the solar power plant project, land demand / location, environment,
construction plan, other terms of the project.
• Step 3: Application for issuance of the Investment Registration Certificate and
the Enterprise Registration Certificate
• Step 4: Preparation of construction / operations of the solar power plant (for
example, acquiring land area, site clearance, preparation, land investigation,
conducting environmental assessment)
• Step 5: The project company to obtain necessary permits (e.g. electricity
generating permit) and relevant agreements (e.g. PPA) for its and the power
plant’s operation.
• Step 6: Construction of solar power plant and operation
*
19. www.duanemorris.com
RECOMMENDATIONS FOR INVESTORS
• Difficult time but opportunities await.
• Public private partnerships (e.g. - BOT) should be the first option.
• Due care on negotiations of the PPA and grid connection agreement with EVN
• Electricity selling in off-grid areas can be a good choice
• Sound financing structure, good business model and great legal assistance are keys
to success.
• Accurate prediction of where the market is heading to, in the context of Vietnam’s
critical power shortage, should be considered.
• More pressure on the government to adequately address key issues on tariff
increase, demonopolization of the power market and government guarantee.
• Vietnam’s market is extremely in need of financing and EPC capability. There are
rooms for cost-effective and high quality EPC contractors and resourceful lenders.
• In many cases, you can “test the water” with a small power plant project.
*
20. www.duanemorris.com
DUANE MORRIS VIETNAM LLC
Thank you very much!
HANOI OFFICE HO CHI MINH CITY OFFICE
Pacific Place, Unit V1307/08, 13th Floor, Suite 1503/04, Saigon Tower
83B Ly Thuong Kiet, Hoan Kiem District 29 Le Duan Street, District 1
Hanoi, Vietnam Ho Chi Minh City, Vietnam
Tel.: +84 4 39462200 Tel.: +84 8 3824 0240
Fax: +84 4 3946 1311 Fax: +84 8 3824 0241
Contact email: