SlideShare a Scribd company logo
VOCATIONAL TRAINING PROJECT WORK
PROJECT TITLE: SIPAT SUPER THERMAL POWER STATION
DURATION: FROM 21/06/2012 TO18/06/2012
DETAILS OF STUDENT:
NAME: KHAGESH KUMAR CHANDRA
ROLL NO: 3353710033
COLLEGE: SSITM, BHILAI
YEAR: 2012
PROJECT LOCATION:
NTPC LIMITED, SIPAT
DISTT: BILASPUR
CHHATTISGARH - 495555
ACKNOWLEDGEMENT
I am truly thankful to all the faculties/guides that imparted the
lectures on various subjects/topics and took us to the plants in
a guided study along with the detailed explaining about the
plant and the machinery.
I would also like to thank the Human resource department for
permitting and organizing the training program for us.
Signature
Date- 18/06/2012
Name- KHAGESH KUMAR CHANDRA
Roll no. - 3353710033
College- SSITM, BHILAI.
Branch- MECHANICAL
Year- 2012
CERTIFICATE
THIS IS TO CERTIFY THAT MR. KHAGESH KUMAR CHANDRA HAS
ATTENDED THE VOCATIONAL TRAINING PROGRAM FROM 18 may TO 21
June YEAR 2012 AND HAS PREPARED THE PROJECT REPORT.
HIS/HER CONDUCT HAS BEEN “GOOD” DURING THE RAINING
DURATION.
PROJECT GUIDED:
NAME
DESIGNATION
DEP/SECTION
DECLARATION
THE PROJECT WORK TITLED: SIPAT THERMAL POWER PROJECT
HAS BEEN CARRIED OUT AND THE REPORT PREPARED BY ME
DURING 21 may TO 18 June UNDER THESUPERVISION OF
GUIDES AT NTPC LTD/SIPAT SUPER THERMAL POWER PROJECT
AND ORGANISED BY EMPLOYEE DEVELOPMENT CENTER,
HUMAN RESOURCE DEPARTMENT.
THIS IS THE ORIGINAL WORK CARRIED OUT BY ME AND HAS
NEITHER BEEN TAKEN FROM ANY OTHER SOURCE NOR BEEN
SUBMITTED TO ANY INSTITUTE OR ORGANISATION AS A
FULFILMENT OF ANY OTHER CURRICULUM.
SIGNATURE
DATE: 18/06/2012
NAME: KHAGESH KUMAR CHANDRA
ROLL NO. : 3353710033
COLLEGE: SSITM, BHILAI
BRANCH: MECHANICAL
YEAR/SEM: 2ND
/4TH
PROJECT WORK
LOCATION: NTPC LTD, SIPAT
DURATION: FROM 21/06/2012 TO 18/06/2012
DISCIPLINE: MECHANICAL ENGINEERING
TOPICS COVERED:
1
.
Overview of power plant
2
.
Super critical technology
3
.
Power plant equipments
4
.
Boiler
5
.
Turbine and its maintenance
SIGNATURE
DATE: 18/06/2012
NAME: KHAGESH KUMAR CHANDRA:
ROLL NO. : 335371003
COLLEGE: SSITM, BHILAI
BRANCH: MECHANICAL
YEAR/SEM: 2ND
/4TH
INDEX
S.
No.
TOPIC
1. NTPC and its joint ventures
2. Super critical technology
3. Basic of power plant
4. Boiler
5. Turbine
6. Working of steam turbine
7. condenser
8. Turbine maintenance
9.
10.
11.
oUR vISION:
”tO bE tHE
wORLD’S
lARGEST aND
bEST pOWER
pRODUCER,
pOWERING
iNDIA’S
gROWTH.”
NTPC limited
A maharatan company.
Established in November 1975 for the nation’s
sustainable power development.
Core business is engineering, construction and
operation of power generating plant and
providing consultancy to power utilities.
Listed on BSE and government of India holds a
stake of 84.5%.
Total installed capacity of 34194 MW (as on 31
march 2011) with 15 coal based & 7 gas based
station and set to become 1, 28,000 MW
company by 2032.
Capacity under construction 14740 MW
(approx) & PPA for more than 66000 MW.
With a share of 17.75% of India’s installed
capacity. Generates about 27.4% of India’s total
generation.|~|
Ranked 138th
position in Fortune 500 in 2009.
NTPC Limited and Its Joint Ventures
NTPC hydro is formed to enter into hydel
power sector.
NTPC Electric Supply Company Ltd is formed to
enter into power distribution & rural
electrification.
NTPC Vidyut Vyapar Nigam Limited formed for
power trading.
Bhartiya Rail Bijlee Company Ltd formed to
construct & operate power plants for railways.
Three joint Venture Company with SAIL to
operate and maintain its captive power plants.
To sustain the generation NTPC Ltd is also
foraying in to coal mining.
JV with ALsthom Power Generation AG to take
up renovation and modernization of power
plants.|~|
Utility Power tech Ltd a JV with BSES to take up
construction, erection and supervision works in
power sector.
NTPC Tamilnadu Energy Company Ltd (JV).
Ratnagiri Gas & Power pvt ltd (JV).
Meja Urja Nigam pvt ltd (JV).
Aravali power company pvt ltd (JV).
NTPC-BHEL Power projects pvt ltd (JV).
SIPAT SUPER THERMAL POWER STATION
Sipat thermal power project is a cynosure of
power generation of India.
Situated in the vicinity of Bilaspur city.
Pioneer of adopting super critical technology in
India.
India’s first 765 KV transmissions.
Installed capacity 2890 MW
Stage 1-3*660 MW
Stage 2-2*500 MW
Water source – Hasdeo right bank canal
Coal linkage – Dipika mines, SECL.
WHY SUPER-CRITICAL TECHNOLOGY?
To reduce emission for each Kwh of electricity
generated: Superior Environmental.
1% rise in efficiency reduces the CO2 emission
by 2-3%.
The most economical way to enhance
efficiency.
To achieve fuel cost saving: Economical
Operating Flexibility.
Reduces the boiler size/MW.
To reduce start-up time.
Basics of a thermal Power Plant:
UNDERSTANDING SUB-SUPER CRITICAL
TECNOLOGY:
Water when heated to sub critical temperature,
pressure increases until it starts boiling.
This temperature remains constant till all the
water converted to steam.
When all liquid converted to steam than again
temperature starts rising.
Sub critical boiler typically has a mean (boiler
drum) to separate steam and water.
The mass of this boiler drum, which limits the
rate at which the sub critical boiler responds to
the load changes.
Too great a firing rate will result in high thermal
stresses in the boiler drum.
UNDERSTANDING SUPER CRITICAL
TECHNOLOGY:
When Water is heated at constant pressure
above the critical pressure, its temperature will
never be constant.
No distinction between the liquid and gas, the
mass density of the two phases remain same.
No stage where the water exists as two phases
and requires separation: No Drum.
The actual location of the transition from liquid
to steam in a once through super critical boiler
is free to move with different condition: Sliding
Pressure Operation.
BOILER DEFINITION:
Steam Boiler are defined as ‘Any closed vessel
exceeding 22.75 liters in capacity which is used
expressively for generating steam under
pressure and includes any mounting or other
fitting attaches to such vessel, which is wholly,
or partly under pressure when the steam is
shut off.
BOILER SPECIFICATIONS:
Controlled Circulation with Rifle Tubing, Dry
Bottom, Radiant Reheat, Single Drum, and Top
Supported, Balanced Draft Furnace. (BHEL)
Tilting, Tangential type firing.
Steam Generating Cap. Of 1675 T/Hr at 172 ksc
& 540o
c.
Furnace volume 16424 m3
.
Depth = 15.8m
Width = 19.2m
Efficiency = 84.4%
Sucks flue gas and Throws out via Chimney.
Creates Negative Pr. in Ducts & Furnace.
Maintain Furnace draft.
Double Suction & Single Discharge Radial Fan.
Arrangement of Main Boiler
Economizer (3 stage)
Boiler drum
Down comers & BCW pumps
Water wall & SCWs
LTSH
Divisional panel
Final SH
Reheater
Safety valves
Burner and igniters
BAHs
Economizer
Boiler economizers are feed-water heater in
which the heat from waste gases is
recovered to raise the temperature of feed-
water supplied to the boiler.
6o
c raise in feed water temperature, by
economizers corresponds to 1% saving in
fuel consumption.
220 C reduction in flue gas temperature
increases boiler efficiency by 1%.
Location and Arrangement:
Ahead of air-heater in 2nd
pass below LTSH
Following the primary super-heater
Counter-flow arrangement
Horizontal placement (facilitate draining)
Supported to prevent sagging, undue
deflection and expansion.
Stop valve and non-return valves
incorporated to ensure recirculation in
case of no feed-flow.
Ash hopper below as flue gas takes a
turn.
Boiler Arrangement:
Super heater Specifications:
LTSH Divisional
Panel
Platen Stage
No. of rubber 744 432 400
Outer Dia 44.5 44.5 54
Joining Butt Butt Butt
Max Steam
Temp
405K(H)
444K(P)
513K 553K
Max Gas
Temp
405(H)
469(P)
524K 629K
TURBINE AND ITS AUXILLARIES
Steam Turbines of following OEM’S are running
in NTPC
LMZ (Russia)
KWU, Siemens (Germany)
ABB-Alston (Germany)
GEC-Alston (UK)
SKODA, (chezkoslovakia)
MHI (Japan)
GE(USA)
ANSALDO(Italy)
TYPES OF TURBINE
IMPULSE TURBINE- In a stage of Impulse
turbine the pressure/enthalpy drop takes
place only in fixed blades and not in the
moving blades.
REACTION TURBINE- In a stage of Reaction
Turbine the Pressure/Enthalpy drop takes
place in both the fixed and moving blades.
WORKING OF STEAM TURBINE:
A steam turbine works on the principle of
conversion of high pressure & temperature
steam into high kinetic energy, thereby
giving torque to a moving rotor.
For above energy conversion there is a
requirement of converging/converging-
diverging sections.
Such above requirement is built up in the
space between two consecutive blades of
fixed of fixed and moving blades rows.
THURST BALANCING
Thurst bearing.
IP/LP double flow(axial thurst-nullified)
Balancing disc.
TURBINE LUBE OIL SYSTEM
MOP: when turbine speed is>2840 rpm,
MOP will take over
Turbine lube oil is supplied by MOP pr. Is
2.6 ksc.
MOPS also supply---1.governing oil 2.make
up to seal oil system 3.barring gear oil
4.oil for LP bypass.
AOP1: When turbine trips, AOP1 will come
into service if speed<2840rpm or header
pr<4.8ksc
AOP2: will come into service if pr<4.5 ksc or
AOP1 trips
EOP: if pr< 1.1 ksc, in case of total AC failure
JOP: cut in-510 rpm. Barring gear v/v-cut in
210 rpm, cut out 240 rpm.
Condenser (it is a heat exchanger)
Specification: 76mm of hg vacuum (-0.9 ksc
gauge pr) is maintained in condenser.
For maintaining vacuum we need:
CW flow (provided by CW p/p, CW flow
3000 m3
/hour)
Air evacuation system(ejectors & turbine
sealing system)
Reduce steam loading (load, any v/v to
condenser passing).
Dirty tube.
STEAM TURBINE
Generator rated speed 3000 rpm
Generator manufacturer Electrosila
No. of bleedings 8
Length of the turbine 36.362m
No. of stages
HPT 17
IPT 11x2
LPT1 5x2
LPT2 5x2
Total 59
TURBINE MAINTAINNACE
Steam Turbine Blading
Steam turbines produce power by converting
the energy in steam provided from a boiler
or heat recovery steam generator (HRSG)
into rotational energy as the steam passes
through a turbine Stage. A turbine stage
normally consists of a row of stationary
blading and a row of rotating Blading. The
purpose of the stationary blading is to direct
the flow of the passing steam to the Rotating
blading at the proper angle and velocity for
the highest efficiency and extraction of
Power. The purpose of the rotating blading is
to convert the directed mass flow and steam
Velocity into rotational speed and torque.
Stationary blading may be referred to as
nozzles, Vanes, stators, partitions, and
stationary blading while rotating blades may
be referred to as Buckets, blades, and
rotating blading. A turbine may have a single
row or stage of stationary and rotating
blading or may have multiple rows or stages
of blading.|~|
Why to go to location
regularly?
ALL PARAMETERS ARE NOT AVAILABLE IN UCB
PERSONAL RELATIONSHIP WITH EQUIPMENTS
PHYSICAL STATUS IS NOT KNOWN
TO IDENTIFY ABNORMAL BEHAVIOR
INSTRUMENTATION STATUS
LEAKAGES
Turbine
Main Turbine
HP
IP
LP
Turbine driven BFP
Points to check for
Abnormal sound
Vibration
Expansions
Leakages (Oil, Steam, Water)
Oil flows
Pressures and Temperatures
--------------|~|---------------

More Related Content

What's hot

thermal power station
thermal power stationthermal power station
thermal power station
Hari Ohm Singh
 
Harsh ntpc
Harsh ntpcHarsh ntpc
SUMMER Training report AT NTPC FOR INSTRUMENTATION (kbunl)
SUMMER Training report AT NTPC FOR INSTRUMENTATION (kbunl)SUMMER Training report AT NTPC FOR INSTRUMENTATION (kbunl)
SUMMER Training report AT NTPC FOR INSTRUMENTATION (kbunl)
guru nanak institute of technology
 
Steam turbines and its associated systems(ntpc ramagundam)
Steam turbines and its associated systems(ntpc ramagundam)Steam turbines and its associated systems(ntpc ramagundam)
Steam turbines and its associated systems(ntpc ramagundam)
abdul mohammad
 
Kalisindh Super Thermal Power Plant,Jhalawar,Rajasthan ,Report
 Kalisindh Super  Thermal Power Plant,Jhalawar,Rajasthan ,Report Kalisindh Super  Thermal Power Plant,Jhalawar,Rajasthan ,Report
Kalisindh Super Thermal Power Plant,Jhalawar,Rajasthan ,Report
MAHENDRA MEENA
 
Ntpc dadri thermal power plant & switchyard
Ntpc dadri thermal power plant & switchyardNtpc dadri thermal power plant & switchyard
Ntpc dadri thermal power plant & switchyard
I.E.T. lucknow
 
NTPC Project KORBA(SUPER THEMAL POWER PLANT)
NTPC Project KORBA(SUPER THEMAL POWER PLANT)NTPC Project KORBA(SUPER THEMAL POWER PLANT)
NTPC Project KORBA(SUPER THEMAL POWER PLANT)
Rajan Kumar Choudhary
 
Inplant training report
Inplant training reportInplant training report
Inplant training report
applesam8
 
Ntpc badarpur summer training
Ntpc badarpur summer trainingNtpc badarpur summer training
Ntpc badarpur summer training
Anubhav Ghosh
 
Thermal power plant term project
Thermal power plant term projectThermal power plant term project
Thermal power plant term project
Engr Mohammad Asim Khan
 
Summer Training Report on thermal power plant
Summer Training Report on thermal power plantSummer Training Report on thermal power plant
Summer Training Report on thermal power plant
MohdAreebQureshi
 
Presentation1 kalisindh jhalawar
Presentation1 kalisindh jhalawarPresentation1 kalisindh jhalawar
Presentation1 kalisindh jhalawar
MAHENDRA MEENA
 
Kalisindh thermal power project jhalawar (keshav)
Kalisindh thermal power project jhalawar (keshav)Kalisindh thermal power project jhalawar (keshav)
Kalisindh thermal power project jhalawar (keshav)
Keshav Meena
 
H.T.P.S., Korba West
H.T.P.S., Korba WestH.T.P.S., Korba West
H.T.P.S., Korba West
Akash Rathore
 
Sagar mehta summer training thermal power station full report
Sagar mehta summer training thermal power station full reportSagar mehta summer training thermal power station full report
Sagar mehta summer training thermal power station full report
Sagar Mehta
 
Training report on thermal power plant
Training report on thermal power plantTraining report on thermal power plant
Training report on thermal power plant
lovely professional university
 
Project report of kota super thermal power plant
Project report of kota super thermal power plantProject report of kota super thermal power plant
Project report of kota super thermal power plant
Hîmãńshu Mêęńä
 
6 weeks summer Training report on thermal power plant in DCPP
6 weeks summer Training report on thermal power plant in DCPP6 weeks summer Training report on thermal power plant in DCPP
6 weeks summer Training report on thermal power plant in DCPP
Amit Bansal
 
Steam thermal power plant(panki)
Steam thermal power plant(panki)Steam thermal power plant(panki)
Steam thermal power plant(panki)
Ranjeet Kumar
 
Summer training report at uttpar pradesh rajay viduat utpadan nigam ...
Summer training report at uttpar pradesh rajay viduat utpadan          nigam ...Summer training report at uttpar pradesh rajay viduat utpadan          nigam ...
Summer training report at uttpar pradesh rajay viduat utpadan nigam ...
Navin Pathak
 

What's hot (20)

thermal power station
thermal power stationthermal power station
thermal power station
 
Harsh ntpc
Harsh ntpcHarsh ntpc
Harsh ntpc
 
SUMMER Training report AT NTPC FOR INSTRUMENTATION (kbunl)
SUMMER Training report AT NTPC FOR INSTRUMENTATION (kbunl)SUMMER Training report AT NTPC FOR INSTRUMENTATION (kbunl)
SUMMER Training report AT NTPC FOR INSTRUMENTATION (kbunl)
 
Steam turbines and its associated systems(ntpc ramagundam)
Steam turbines and its associated systems(ntpc ramagundam)Steam turbines and its associated systems(ntpc ramagundam)
Steam turbines and its associated systems(ntpc ramagundam)
 
Kalisindh Super Thermal Power Plant,Jhalawar,Rajasthan ,Report
 Kalisindh Super  Thermal Power Plant,Jhalawar,Rajasthan ,Report Kalisindh Super  Thermal Power Plant,Jhalawar,Rajasthan ,Report
Kalisindh Super Thermal Power Plant,Jhalawar,Rajasthan ,Report
 
Ntpc dadri thermal power plant & switchyard
Ntpc dadri thermal power plant & switchyardNtpc dadri thermal power plant & switchyard
Ntpc dadri thermal power plant & switchyard
 
NTPC Project KORBA(SUPER THEMAL POWER PLANT)
NTPC Project KORBA(SUPER THEMAL POWER PLANT)NTPC Project KORBA(SUPER THEMAL POWER PLANT)
NTPC Project KORBA(SUPER THEMAL POWER PLANT)
 
Inplant training report
Inplant training reportInplant training report
Inplant training report
 
Ntpc badarpur summer training
Ntpc badarpur summer trainingNtpc badarpur summer training
Ntpc badarpur summer training
 
Thermal power plant term project
Thermal power plant term projectThermal power plant term project
Thermal power plant term project
 
Summer Training Report on thermal power plant
Summer Training Report on thermal power plantSummer Training Report on thermal power plant
Summer Training Report on thermal power plant
 
Presentation1 kalisindh jhalawar
Presentation1 kalisindh jhalawarPresentation1 kalisindh jhalawar
Presentation1 kalisindh jhalawar
 
Kalisindh thermal power project jhalawar (keshav)
Kalisindh thermal power project jhalawar (keshav)Kalisindh thermal power project jhalawar (keshav)
Kalisindh thermal power project jhalawar (keshav)
 
H.T.P.S., Korba West
H.T.P.S., Korba WestH.T.P.S., Korba West
H.T.P.S., Korba West
 
Sagar mehta summer training thermal power station full report
Sagar mehta summer training thermal power station full reportSagar mehta summer training thermal power station full report
Sagar mehta summer training thermal power station full report
 
Training report on thermal power plant
Training report on thermal power plantTraining report on thermal power plant
Training report on thermal power plant
 
Project report of kota super thermal power plant
Project report of kota super thermal power plantProject report of kota super thermal power plant
Project report of kota super thermal power plant
 
6 weeks summer Training report on thermal power plant in DCPP
6 weeks summer Training report on thermal power plant in DCPP6 weeks summer Training report on thermal power plant in DCPP
6 weeks summer Training report on thermal power plant in DCPP
 
Steam thermal power plant(panki)
Steam thermal power plant(panki)Steam thermal power plant(panki)
Steam thermal power plant(panki)
 
Summer training report at uttpar pradesh rajay viduat utpadan nigam ...
Summer training report at uttpar pradesh rajay viduat utpadan          nigam ...Summer training report at uttpar pradesh rajay viduat utpadan          nigam ...
Summer training report at uttpar pradesh rajay viduat utpadan nigam ...
 

Viewers also liked

Power Plant Training Certificates
Power Plant Training CertificatesPower Plant Training Certificates
Power Plant Training Certificates
atavane
 
Summer Training at Indira Gandhi Super Thermal Power Project (IGSTPP)
Summer Training at Indira Gandhi Super Thermal Power Project (IGSTPP)Summer Training at Indira Gandhi Super Thermal Power Project (IGSTPP)
Summer Training at Indira Gandhi Super Thermal Power Project (IGSTPP)
Nadeem Khilji
 
Final reprt at ntpc vindhyanagar , singrauli
Final  reprt at ntpc vindhyanagar , singrauliFinal  reprt at ntpc vindhyanagar , singrauli
Final reprt at ntpc vindhyanagar , singrauli
Devanshu Yadav
 
South east central railway (secr) bilaspur mechanical vocational training rep...
South east central railway (secr) bilaspur mechanical vocational training rep...South east central railway (secr) bilaspur mechanical vocational training rep...
South east central railway (secr) bilaspur mechanical vocational training rep...
haxxo24
 
Seminar report on supercritical thenology
Seminar report on supercritical thenologySeminar report on supercritical thenology
Seminar report on supercritical thenology
nirgudebhau111
 
Ntpc (national thermal power corporation) sipat mechanical vocational trainin...
Ntpc (national thermal power corporation) sipat mechanical vocational trainin...Ntpc (national thermal power corporation) sipat mechanical vocational trainin...
Ntpc (national thermal power corporation) sipat mechanical vocational trainin...
haxxo24
 
Ntpc (national thermal power corporation) sipat mechanical vocational trainin...
Ntpc (national thermal power corporation) sipat mechanical vocational trainin...Ntpc (national thermal power corporation) sipat mechanical vocational trainin...
Ntpc (national thermal power corporation) sipat mechanical vocational trainin...
haxxo24
 
660 mw supercritical boiler
660 mw supercritical boiler660 mw supercritical boiler
660 mw supercritical boiler
Ashvani Shukla
 
super critical power plant
super critical power plantsuper critical power plant
super critical power plant
sridurga88
 
New final bsnl training report
New final bsnl training report New final bsnl training report
New final bsnl training report
manish katara
 
Thermal Power Plant - Manual
Thermal Power Plant - ManualThermal Power Plant - Manual
Thermal Power Plant - Manual
Sheel Shah
 
BSNL Industrial Training ppt 2014.
BSNL Industrial Training ppt 2014.BSNL Industrial Training ppt 2014.
BSNL Industrial Training ppt 2014.
Shubham Singh
 
report on thermal power plant
report on thermal power plantreport on thermal power plant
report on thermal power plant
sagar20jain
 
Super critical boiler
Super critical boilerSuper critical boiler
Super critical boiler
SHIVAJI CHOUDHURY
 
Ntpc (national thermal power corporation) sipat boiler haxxo24 i~i
Ntpc (national thermal power corporation) sipat boiler haxxo24 i~iNtpc (national thermal power corporation) sipat boiler haxxo24 i~i
Ntpc (national thermal power corporation) sipat boiler haxxo24 i~i
haxxo24
 

Viewers also liked (15)

Power Plant Training Certificates
Power Plant Training CertificatesPower Plant Training Certificates
Power Plant Training Certificates
 
Summer Training at Indira Gandhi Super Thermal Power Project (IGSTPP)
Summer Training at Indira Gandhi Super Thermal Power Project (IGSTPP)Summer Training at Indira Gandhi Super Thermal Power Project (IGSTPP)
Summer Training at Indira Gandhi Super Thermal Power Project (IGSTPP)
 
Final reprt at ntpc vindhyanagar , singrauli
Final  reprt at ntpc vindhyanagar , singrauliFinal  reprt at ntpc vindhyanagar , singrauli
Final reprt at ntpc vindhyanagar , singrauli
 
South east central railway (secr) bilaspur mechanical vocational training rep...
South east central railway (secr) bilaspur mechanical vocational training rep...South east central railway (secr) bilaspur mechanical vocational training rep...
South east central railway (secr) bilaspur mechanical vocational training rep...
 
Seminar report on supercritical thenology
Seminar report on supercritical thenologySeminar report on supercritical thenology
Seminar report on supercritical thenology
 
Ntpc (national thermal power corporation) sipat mechanical vocational trainin...
Ntpc (national thermal power corporation) sipat mechanical vocational trainin...Ntpc (national thermal power corporation) sipat mechanical vocational trainin...
Ntpc (national thermal power corporation) sipat mechanical vocational trainin...
 
Ntpc (national thermal power corporation) sipat mechanical vocational trainin...
Ntpc (national thermal power corporation) sipat mechanical vocational trainin...Ntpc (national thermal power corporation) sipat mechanical vocational trainin...
Ntpc (national thermal power corporation) sipat mechanical vocational trainin...
 
660 mw supercritical boiler
660 mw supercritical boiler660 mw supercritical boiler
660 mw supercritical boiler
 
super critical power plant
super critical power plantsuper critical power plant
super critical power plant
 
New final bsnl training report
New final bsnl training report New final bsnl training report
New final bsnl training report
 
Thermal Power Plant - Manual
Thermal Power Plant - ManualThermal Power Plant - Manual
Thermal Power Plant - Manual
 
BSNL Industrial Training ppt 2014.
BSNL Industrial Training ppt 2014.BSNL Industrial Training ppt 2014.
BSNL Industrial Training ppt 2014.
 
report on thermal power plant
report on thermal power plantreport on thermal power plant
report on thermal power plant
 
Super critical boiler
Super critical boilerSuper critical boiler
Super critical boiler
 
Ntpc (national thermal power corporation) sipat boiler haxxo24 i~i
Ntpc (national thermal power corporation) sipat boiler haxxo24 i~iNtpc (national thermal power corporation) sipat boiler haxxo24 i~i
Ntpc (national thermal power corporation) sipat boiler haxxo24 i~i
 

Similar to Ntpc (national thermal power corporation) sipat mechanical vocational training report 3 haxxo24 i~i

ntpc unchahar
ntpc unchaharntpc unchahar
ntpc unchahar
Aditya Narain
 
Lovely Amit
Lovely AmitLovely Amit
Lovely Amit
Amit Kumar
 
Tarun Project Report On NTPC Kanti
Tarun  Project Report On NTPC KantiTarun  Project Report On NTPC Kanti
Tarun Project Report On NTPC Kanti
Tarun Kumar
 
ntpc
ntpcntpc
Anil thermal power plant
Anil thermal power plantAnil thermal power plant
Anil thermal power plant
ANIL SHARMA
 
Ntpc dadri
Ntpc dadriNtpc dadri
Ntpc dadri
Ishant Gautam.
 
Ntpc report harsh
Ntpc report  harshNtpc report  harsh
INTRODUCTION project apurv (1)
INTRODUCTION project apurv (1)INTRODUCTION project apurv (1)
INTRODUCTION project apurv (1)
apurv rathore
 
Attachment.doc
Attachment.docAttachment.doc
Attachment.doc
CHANDAN JAISWAL
 
Kota tharmal plant new.pdf
Kota tharmal plant new.pdfKota tharmal plant new.pdf
Kota tharmal plant new.pdf
RahulLodha11
 
BPSCL Vocational Training report
BPSCL Vocational Training report BPSCL Vocational Training report
BPSCL Vocational Training report
Rahul Raj
 
Presentation on Kota super Thermal Power Station
Presentation on Kota super Thermal Power StationPresentation on Kota super Thermal Power Station
Presentation on Kota super Thermal Power Station
pukhraj palariya
 
KTPS
KTPSKTPS
thermal-plant-report-mechatronics.pdf
thermal-plant-report-mechatronics.pdfthermal-plant-report-mechatronics.pdf
thermal-plant-report-mechatronics.pdf
FarzanMehmood
 
NTPC Singrauli
NTPC SingrauliNTPC Singrauli
NTPC Singrauli
Vinay Vishwakarma
 
CESC PROJECT
CESC PROJECTCESC PROJECT
CESC PROJECT
AYAN MONDAL
 
Training reporton ka tpp by naval kishor
Training reporton ka tpp by naval kishorTraining reporton ka tpp by naval kishor
Training reporton ka tpp by naval kishor
NAVAL KISHOR
 
bhel haridwr training ppt k-10655
bhel haridwr training ppt k-10655bhel haridwr training ppt k-10655
bhel haridwr training ppt k-10655
Hariom Rathore
 
Vocational training report
Vocational training reportVocational training report
Vocational training report
ATUL RAJ
 
internship report of Kepco
internship report of Kepcointernship report of Kepco

Similar to Ntpc (national thermal power corporation) sipat mechanical vocational training report 3 haxxo24 i~i (20)

ntpc unchahar
ntpc unchaharntpc unchahar
ntpc unchahar
 
Lovely Amit
Lovely AmitLovely Amit
Lovely Amit
 
Tarun Project Report On NTPC Kanti
Tarun  Project Report On NTPC KantiTarun  Project Report On NTPC Kanti
Tarun Project Report On NTPC Kanti
 
ntpc
ntpcntpc
ntpc
 
Anil thermal power plant
Anil thermal power plantAnil thermal power plant
Anil thermal power plant
 
Ntpc dadri
Ntpc dadriNtpc dadri
Ntpc dadri
 
Ntpc report harsh
Ntpc report  harshNtpc report  harsh
Ntpc report harsh
 
INTRODUCTION project apurv (1)
INTRODUCTION project apurv (1)INTRODUCTION project apurv (1)
INTRODUCTION project apurv (1)
 
Attachment.doc
Attachment.docAttachment.doc
Attachment.doc
 
Kota tharmal plant new.pdf
Kota tharmal plant new.pdfKota tharmal plant new.pdf
Kota tharmal plant new.pdf
 
BPSCL Vocational Training report
BPSCL Vocational Training report BPSCL Vocational Training report
BPSCL Vocational Training report
 
Presentation on Kota super Thermal Power Station
Presentation on Kota super Thermal Power StationPresentation on Kota super Thermal Power Station
Presentation on Kota super Thermal Power Station
 
KTPS
KTPSKTPS
KTPS
 
thermal-plant-report-mechatronics.pdf
thermal-plant-report-mechatronics.pdfthermal-plant-report-mechatronics.pdf
thermal-plant-report-mechatronics.pdf
 
NTPC Singrauli
NTPC SingrauliNTPC Singrauli
NTPC Singrauli
 
CESC PROJECT
CESC PROJECTCESC PROJECT
CESC PROJECT
 
Training reporton ka tpp by naval kishor
Training reporton ka tpp by naval kishorTraining reporton ka tpp by naval kishor
Training reporton ka tpp by naval kishor
 
bhel haridwr training ppt k-10655
bhel haridwr training ppt k-10655bhel haridwr training ppt k-10655
bhel haridwr training ppt k-10655
 
Vocational training report
Vocational training reportVocational training report
Vocational training report
 
internship report of Kepco
internship report of Kepcointernship report of Kepco
internship report of Kepco
 

More from haxxo24

Wagon project report mechanical vocational training presentation haxxo24 i~i
Wagon project report mechanical vocational training presentation haxxo24 i~iWagon project report mechanical vocational training presentation haxxo24 i~i
Wagon project report mechanical vocational training presentation haxxo24 i~i
haxxo24
 
South east central railway (secr) bilaspur mechanical vocational training rep...
South east central railway (secr) bilaspur mechanical vocational training rep...South east central railway (secr) bilaspur mechanical vocational training rep...
South east central railway (secr) bilaspur mechanical vocational training rep...
haxxo24
 
South east central railway (secr) bilaspur mechanical vocational training pre...
South east central railway (secr) bilaspur mechanical vocational training pre...South east central railway (secr) bilaspur mechanical vocational training pre...
South east central railway (secr) bilaspur mechanical vocational training pre...
haxxo24
 
Lanco amarkantak power ltd korba mechanical vocational training report 2 haxx...
Lanco amarkantak power ltd korba mechanical vocational training report 2 haxx...Lanco amarkantak power ltd korba mechanical vocational training report 2 haxx...
Lanco amarkantak power ltd korba mechanical vocational training report 2 haxx...
haxxo24
 
Lanco amarkantak power ltd korba mechanical vocational training report 1 haxx...
Lanco amarkantak power ltd korba mechanical vocational training report 1 haxx...Lanco amarkantak power ltd korba mechanical vocational training report 1 haxx...
Lanco amarkantak power ltd korba mechanical vocational training report 1 haxx...
haxxo24
 
Indian railways mechanical vocational training report 2 haxxo24 i~i
Indian railways mechanical vocational training report 2 haxxo24 i~iIndian railways mechanical vocational training report 2 haxxo24 i~i
Indian railways mechanical vocational training report 2 haxxo24 i~i
haxxo24
 
Indian railways mechanical vocational training report 1 haxxo24 i~i
Indian railways mechanical vocational training report 1 haxxo24 i~iIndian railways mechanical vocational training report 1 haxxo24 i~i
Indian railways mechanical vocational training report 1 haxxo24 i~i
haxxo24
 
Cseb (chhattisgarh state electricity board) korba mechanical vocational train...
Cseb (chhattisgarh state electricity board) korba mechanical vocational train...Cseb (chhattisgarh state electricity board) korba mechanical vocational train...
Cseb (chhattisgarh state electricity board) korba mechanical vocational train...
haxxo24
 
Cseb (chhattisgarh state electricity board) korba east vocational training pr...
Cseb (chhattisgarh state electricity board) korba east vocational training pr...Cseb (chhattisgarh state electricity board) korba east vocational training pr...
Cseb (chhattisgarh state electricity board) korba east vocational training pr...
haxxo24
 
Bharat aluminium company ltd. (balco) mechanical vocational training report h...
Bharat aluminium company ltd. (balco) mechanical vocational training report h...Bharat aluminium company ltd. (balco) mechanical vocational training report h...
Bharat aluminium company ltd. (balco) mechanical vocational training report h...
haxxo24
 

More from haxxo24 (10)

Wagon project report mechanical vocational training presentation haxxo24 i~i
Wagon project report mechanical vocational training presentation haxxo24 i~iWagon project report mechanical vocational training presentation haxxo24 i~i
Wagon project report mechanical vocational training presentation haxxo24 i~i
 
South east central railway (secr) bilaspur mechanical vocational training rep...
South east central railway (secr) bilaspur mechanical vocational training rep...South east central railway (secr) bilaspur mechanical vocational training rep...
South east central railway (secr) bilaspur mechanical vocational training rep...
 
South east central railway (secr) bilaspur mechanical vocational training pre...
South east central railway (secr) bilaspur mechanical vocational training pre...South east central railway (secr) bilaspur mechanical vocational training pre...
South east central railway (secr) bilaspur mechanical vocational training pre...
 
Lanco amarkantak power ltd korba mechanical vocational training report 2 haxx...
Lanco amarkantak power ltd korba mechanical vocational training report 2 haxx...Lanco amarkantak power ltd korba mechanical vocational training report 2 haxx...
Lanco amarkantak power ltd korba mechanical vocational training report 2 haxx...
 
Lanco amarkantak power ltd korba mechanical vocational training report 1 haxx...
Lanco amarkantak power ltd korba mechanical vocational training report 1 haxx...Lanco amarkantak power ltd korba mechanical vocational training report 1 haxx...
Lanco amarkantak power ltd korba mechanical vocational training report 1 haxx...
 
Indian railways mechanical vocational training report 2 haxxo24 i~i
Indian railways mechanical vocational training report 2 haxxo24 i~iIndian railways mechanical vocational training report 2 haxxo24 i~i
Indian railways mechanical vocational training report 2 haxxo24 i~i
 
Indian railways mechanical vocational training report 1 haxxo24 i~i
Indian railways mechanical vocational training report 1 haxxo24 i~iIndian railways mechanical vocational training report 1 haxxo24 i~i
Indian railways mechanical vocational training report 1 haxxo24 i~i
 
Cseb (chhattisgarh state electricity board) korba mechanical vocational train...
Cseb (chhattisgarh state electricity board) korba mechanical vocational train...Cseb (chhattisgarh state electricity board) korba mechanical vocational train...
Cseb (chhattisgarh state electricity board) korba mechanical vocational train...
 
Cseb (chhattisgarh state electricity board) korba east vocational training pr...
Cseb (chhattisgarh state electricity board) korba east vocational training pr...Cseb (chhattisgarh state electricity board) korba east vocational training pr...
Cseb (chhattisgarh state electricity board) korba east vocational training pr...
 
Bharat aluminium company ltd. (balco) mechanical vocational training report h...
Bharat aluminium company ltd. (balco) mechanical vocational training report h...Bharat aluminium company ltd. (balco) mechanical vocational training report h...
Bharat aluminium company ltd. (balco) mechanical vocational training report h...
 

Recently uploaded

Liberal Approach to the Study of Indian Politics.pdf
Liberal Approach to the Study of Indian Politics.pdfLiberal Approach to the Study of Indian Politics.pdf
Liberal Approach to the Study of Indian Politics.pdf
WaniBasim
 
BÀI TẬP BỔ TRỢ TIẾNG ANH 8 CẢ NĂM - GLOBAL SUCCESS - NĂM HỌC 2023-2024 (CÓ FI...
BÀI TẬP BỔ TRỢ TIẾNG ANH 8 CẢ NĂM - GLOBAL SUCCESS - NĂM HỌC 2023-2024 (CÓ FI...BÀI TẬP BỔ TRỢ TIẾNG ANH 8 CẢ NĂM - GLOBAL SUCCESS - NĂM HỌC 2023-2024 (CÓ FI...
BÀI TẬP BỔ TRỢ TIẾNG ANH 8 CẢ NĂM - GLOBAL SUCCESS - NĂM HỌC 2023-2024 (CÓ FI...
Nguyen Thanh Tu Collection
 
CACJapan - GROUP Presentation 1- Wk 4.pdf
CACJapan - GROUP Presentation 1- Wk 4.pdfCACJapan - GROUP Presentation 1- Wk 4.pdf
CACJapan - GROUP Presentation 1- Wk 4.pdf
camakaiclarkmusic
 
Exploiting Artificial Intelligence for Empowering Researchers and Faculty, In...
Exploiting Artificial Intelligence for Empowering Researchers and Faculty, In...Exploiting Artificial Intelligence for Empowering Researchers and Faculty, In...
Exploiting Artificial Intelligence for Empowering Researchers and Faculty, In...
Dr. Vinod Kumar Kanvaria
 
Types of Herbal Cosmetics its standardization.
Types of Herbal Cosmetics its standardization.Types of Herbal Cosmetics its standardization.
Types of Herbal Cosmetics its standardization.
Ashokrao Mane college of Pharmacy Peth-Vadgaon
 
The basics of sentences session 6pptx.pptx
The basics of sentences session 6pptx.pptxThe basics of sentences session 6pptx.pptx
The basics of sentences session 6pptx.pptx
heathfieldcps1
 
A Strategic Approach: GenAI in Education
A Strategic Approach: GenAI in EducationA Strategic Approach: GenAI in Education
A Strategic Approach: GenAI in Education
Peter Windle
 
Digital Artifact 1 - 10VCD Environments Unit
Digital Artifact 1 - 10VCD Environments UnitDigital Artifact 1 - 10VCD Environments Unit
Digital Artifact 1 - 10VCD Environments Unit
chanes7
 
How to Build a Module in Odoo 17 Using the Scaffold Method
How to Build a Module in Odoo 17 Using the Scaffold MethodHow to Build a Module in Odoo 17 Using the Scaffold Method
How to Build a Module in Odoo 17 Using the Scaffold Method
Celine George
 
World environment day ppt For 5 June 2024
World environment day ppt For 5 June 2024World environment day ppt For 5 June 2024
World environment day ppt For 5 June 2024
ak6969907
 
C1 Rubenstein AP HuG xxxxxxxxxxxxxx.pptx
C1 Rubenstein AP HuG xxxxxxxxxxxxxx.pptxC1 Rubenstein AP HuG xxxxxxxxxxxxxx.pptx
C1 Rubenstein AP HuG xxxxxxxxxxxxxx.pptx
mulvey2
 
RPMS TEMPLATE FOR SCHOOL YEAR 2023-2024 FOR TEACHER 1 TO TEACHER 3
RPMS TEMPLATE FOR SCHOOL YEAR 2023-2024 FOR TEACHER 1 TO TEACHER 3RPMS TEMPLATE FOR SCHOOL YEAR 2023-2024 FOR TEACHER 1 TO TEACHER 3
RPMS TEMPLATE FOR SCHOOL YEAR 2023-2024 FOR TEACHER 1 TO TEACHER 3
IreneSebastianRueco1
 
writing about opinions about Australia the movie
writing about opinions about Australia the moviewriting about opinions about Australia the movie
writing about opinions about Australia the movie
Nicholas Montgomery
 
Film vocab for eal 3 students: Australia the movie
Film vocab for eal 3 students: Australia the movieFilm vocab for eal 3 students: Australia the movie
Film vocab for eal 3 students: Australia the movie
Nicholas Montgomery
 
The Diamonds of 2023-2024 in the IGRA collection
The Diamonds of 2023-2024 in the IGRA collectionThe Diamonds of 2023-2024 in the IGRA collection
The Diamonds of 2023-2024 in the IGRA collection
Israel Genealogy Research Association
 
How to Add Chatter in the odoo 17 ERP Module
How to Add Chatter in the odoo 17 ERP ModuleHow to Add Chatter in the odoo 17 ERP Module
How to Add Chatter in the odoo 17 ERP Module
Celine George
 
Smart-Money for SMC traders good time and ICT
Smart-Money for SMC traders good time and ICTSmart-Money for SMC traders good time and ICT
Smart-Money for SMC traders good time and ICT
simonomuemu
 
Executive Directors Chat Leveraging AI for Diversity, Equity, and Inclusion
Executive Directors Chat  Leveraging AI for Diversity, Equity, and InclusionExecutive Directors Chat  Leveraging AI for Diversity, Equity, and Inclusion
Executive Directors Chat Leveraging AI for Diversity, Equity, and Inclusion
TechSoup
 
Lapbook sobre os Regimes Totalitários.pdf
Lapbook sobre os Regimes Totalitários.pdfLapbook sobre os Regimes Totalitários.pdf
Lapbook sobre os Regimes Totalitários.pdf
Jean Carlos Nunes Paixão
 
S1-Introduction-Biopesticides in ICM.pptx
S1-Introduction-Biopesticides in ICM.pptxS1-Introduction-Biopesticides in ICM.pptx
S1-Introduction-Biopesticides in ICM.pptx
tarandeep35
 

Recently uploaded (20)

Liberal Approach to the Study of Indian Politics.pdf
Liberal Approach to the Study of Indian Politics.pdfLiberal Approach to the Study of Indian Politics.pdf
Liberal Approach to the Study of Indian Politics.pdf
 
BÀI TẬP BỔ TRỢ TIẾNG ANH 8 CẢ NĂM - GLOBAL SUCCESS - NĂM HỌC 2023-2024 (CÓ FI...
BÀI TẬP BỔ TRỢ TIẾNG ANH 8 CẢ NĂM - GLOBAL SUCCESS - NĂM HỌC 2023-2024 (CÓ FI...BÀI TẬP BỔ TRỢ TIẾNG ANH 8 CẢ NĂM - GLOBAL SUCCESS - NĂM HỌC 2023-2024 (CÓ FI...
BÀI TẬP BỔ TRỢ TIẾNG ANH 8 CẢ NĂM - GLOBAL SUCCESS - NĂM HỌC 2023-2024 (CÓ FI...
 
CACJapan - GROUP Presentation 1- Wk 4.pdf
CACJapan - GROUP Presentation 1- Wk 4.pdfCACJapan - GROUP Presentation 1- Wk 4.pdf
CACJapan - GROUP Presentation 1- Wk 4.pdf
 
Exploiting Artificial Intelligence for Empowering Researchers and Faculty, In...
Exploiting Artificial Intelligence for Empowering Researchers and Faculty, In...Exploiting Artificial Intelligence for Empowering Researchers and Faculty, In...
Exploiting Artificial Intelligence for Empowering Researchers and Faculty, In...
 
Types of Herbal Cosmetics its standardization.
Types of Herbal Cosmetics its standardization.Types of Herbal Cosmetics its standardization.
Types of Herbal Cosmetics its standardization.
 
The basics of sentences session 6pptx.pptx
The basics of sentences session 6pptx.pptxThe basics of sentences session 6pptx.pptx
The basics of sentences session 6pptx.pptx
 
A Strategic Approach: GenAI in Education
A Strategic Approach: GenAI in EducationA Strategic Approach: GenAI in Education
A Strategic Approach: GenAI in Education
 
Digital Artifact 1 - 10VCD Environments Unit
Digital Artifact 1 - 10VCD Environments UnitDigital Artifact 1 - 10VCD Environments Unit
Digital Artifact 1 - 10VCD Environments Unit
 
How to Build a Module in Odoo 17 Using the Scaffold Method
How to Build a Module in Odoo 17 Using the Scaffold MethodHow to Build a Module in Odoo 17 Using the Scaffold Method
How to Build a Module in Odoo 17 Using the Scaffold Method
 
World environment day ppt For 5 June 2024
World environment day ppt For 5 June 2024World environment day ppt For 5 June 2024
World environment day ppt For 5 June 2024
 
C1 Rubenstein AP HuG xxxxxxxxxxxxxx.pptx
C1 Rubenstein AP HuG xxxxxxxxxxxxxx.pptxC1 Rubenstein AP HuG xxxxxxxxxxxxxx.pptx
C1 Rubenstein AP HuG xxxxxxxxxxxxxx.pptx
 
RPMS TEMPLATE FOR SCHOOL YEAR 2023-2024 FOR TEACHER 1 TO TEACHER 3
RPMS TEMPLATE FOR SCHOOL YEAR 2023-2024 FOR TEACHER 1 TO TEACHER 3RPMS TEMPLATE FOR SCHOOL YEAR 2023-2024 FOR TEACHER 1 TO TEACHER 3
RPMS TEMPLATE FOR SCHOOL YEAR 2023-2024 FOR TEACHER 1 TO TEACHER 3
 
writing about opinions about Australia the movie
writing about opinions about Australia the moviewriting about opinions about Australia the movie
writing about opinions about Australia the movie
 
Film vocab for eal 3 students: Australia the movie
Film vocab for eal 3 students: Australia the movieFilm vocab for eal 3 students: Australia the movie
Film vocab for eal 3 students: Australia the movie
 
The Diamonds of 2023-2024 in the IGRA collection
The Diamonds of 2023-2024 in the IGRA collectionThe Diamonds of 2023-2024 in the IGRA collection
The Diamonds of 2023-2024 in the IGRA collection
 
How to Add Chatter in the odoo 17 ERP Module
How to Add Chatter in the odoo 17 ERP ModuleHow to Add Chatter in the odoo 17 ERP Module
How to Add Chatter in the odoo 17 ERP Module
 
Smart-Money for SMC traders good time and ICT
Smart-Money for SMC traders good time and ICTSmart-Money for SMC traders good time and ICT
Smart-Money for SMC traders good time and ICT
 
Executive Directors Chat Leveraging AI for Diversity, Equity, and Inclusion
Executive Directors Chat  Leveraging AI for Diversity, Equity, and InclusionExecutive Directors Chat  Leveraging AI for Diversity, Equity, and Inclusion
Executive Directors Chat Leveraging AI for Diversity, Equity, and Inclusion
 
Lapbook sobre os Regimes Totalitários.pdf
Lapbook sobre os Regimes Totalitários.pdfLapbook sobre os Regimes Totalitários.pdf
Lapbook sobre os Regimes Totalitários.pdf
 
S1-Introduction-Biopesticides in ICM.pptx
S1-Introduction-Biopesticides in ICM.pptxS1-Introduction-Biopesticides in ICM.pptx
S1-Introduction-Biopesticides in ICM.pptx
 

Ntpc (national thermal power corporation) sipat mechanical vocational training report 3 haxxo24 i~i

  • 1. VOCATIONAL TRAINING PROJECT WORK PROJECT TITLE: SIPAT SUPER THERMAL POWER STATION DURATION: FROM 21/06/2012 TO18/06/2012 DETAILS OF STUDENT: NAME: KHAGESH KUMAR CHANDRA ROLL NO: 3353710033 COLLEGE: SSITM, BHILAI YEAR: 2012 PROJECT LOCATION: NTPC LIMITED, SIPAT DISTT: BILASPUR CHHATTISGARH - 495555
  • 2. ACKNOWLEDGEMENT I am truly thankful to all the faculties/guides that imparted the lectures on various subjects/topics and took us to the plants in a guided study along with the detailed explaining about the plant and the machinery. I would also like to thank the Human resource department for permitting and organizing the training program for us. Signature Date- 18/06/2012 Name- KHAGESH KUMAR CHANDRA Roll no. - 3353710033 College- SSITM, BHILAI. Branch- MECHANICAL Year- 2012
  • 3.
  • 4. CERTIFICATE THIS IS TO CERTIFY THAT MR. KHAGESH KUMAR CHANDRA HAS ATTENDED THE VOCATIONAL TRAINING PROGRAM FROM 18 may TO 21 June YEAR 2012 AND HAS PREPARED THE PROJECT REPORT. HIS/HER CONDUCT HAS BEEN “GOOD” DURING THE RAINING DURATION. PROJECT GUIDED: NAME DESIGNATION DEP/SECTION
  • 5. DECLARATION THE PROJECT WORK TITLED: SIPAT THERMAL POWER PROJECT HAS BEEN CARRIED OUT AND THE REPORT PREPARED BY ME DURING 21 may TO 18 June UNDER THESUPERVISION OF GUIDES AT NTPC LTD/SIPAT SUPER THERMAL POWER PROJECT AND ORGANISED BY EMPLOYEE DEVELOPMENT CENTER, HUMAN RESOURCE DEPARTMENT. THIS IS THE ORIGINAL WORK CARRIED OUT BY ME AND HAS NEITHER BEEN TAKEN FROM ANY OTHER SOURCE NOR BEEN SUBMITTED TO ANY INSTITUTE OR ORGANISATION AS A FULFILMENT OF ANY OTHER CURRICULUM. SIGNATURE DATE: 18/06/2012 NAME: KHAGESH KUMAR CHANDRA ROLL NO. : 3353710033 COLLEGE: SSITM, BHILAI BRANCH: MECHANICAL YEAR/SEM: 2ND /4TH
  • 6. PROJECT WORK LOCATION: NTPC LTD, SIPAT DURATION: FROM 21/06/2012 TO 18/06/2012 DISCIPLINE: MECHANICAL ENGINEERING TOPICS COVERED: 1 . Overview of power plant 2 . Super critical technology 3 . Power plant equipments 4 . Boiler 5 . Turbine and its maintenance SIGNATURE DATE: 18/06/2012
  • 7. NAME: KHAGESH KUMAR CHANDRA: ROLL NO. : 335371003 COLLEGE: SSITM, BHILAI BRANCH: MECHANICAL YEAR/SEM: 2ND /4TH INDEX S. No. TOPIC 1. NTPC and its joint ventures 2. Super critical technology 3. Basic of power plant 4. Boiler 5. Turbine 6. Working of steam turbine
  • 8. 7. condenser 8. Turbine maintenance 9. 10. 11. oUR vISION: ”tO bE tHE
  • 10. Established in November 1975 for the nation’s sustainable power development. Core business is engineering, construction and operation of power generating plant and providing consultancy to power utilities. Listed on BSE and government of India holds a stake of 84.5%. Total installed capacity of 34194 MW (as on 31 march 2011) with 15 coal based & 7 gas based station and set to become 1, 28,000 MW company by 2032. Capacity under construction 14740 MW (approx) & PPA for more than 66000 MW. With a share of 17.75% of India’s installed capacity. Generates about 27.4% of India’s total generation.|~| Ranked 138th position in Fortune 500 in 2009. NTPC Limited and Its Joint Ventures
  • 11. NTPC hydro is formed to enter into hydel power sector. NTPC Electric Supply Company Ltd is formed to enter into power distribution & rural electrification. NTPC Vidyut Vyapar Nigam Limited formed for power trading. Bhartiya Rail Bijlee Company Ltd formed to construct & operate power plants for railways. Three joint Venture Company with SAIL to operate and maintain its captive power plants. To sustain the generation NTPC Ltd is also foraying in to coal mining. JV with ALsthom Power Generation AG to take up renovation and modernization of power plants.|~| Utility Power tech Ltd a JV with BSES to take up construction, erection and supervision works in power sector.
  • 12. NTPC Tamilnadu Energy Company Ltd (JV). Ratnagiri Gas & Power pvt ltd (JV). Meja Urja Nigam pvt ltd (JV). Aravali power company pvt ltd (JV). NTPC-BHEL Power projects pvt ltd (JV). SIPAT SUPER THERMAL POWER STATION Sipat thermal power project is a cynosure of power generation of India. Situated in the vicinity of Bilaspur city. Pioneer of adopting super critical technology in India. India’s first 765 KV transmissions. Installed capacity 2890 MW Stage 1-3*660 MW Stage 2-2*500 MW Water source – Hasdeo right bank canal
  • 13. Coal linkage – Dipika mines, SECL. WHY SUPER-CRITICAL TECHNOLOGY? To reduce emission for each Kwh of electricity generated: Superior Environmental. 1% rise in efficiency reduces the CO2 emission by 2-3%. The most economical way to enhance efficiency. To achieve fuel cost saving: Economical Operating Flexibility. Reduces the boiler size/MW. To reduce start-up time.
  • 14. Basics of a thermal Power Plant:
  • 16. Water when heated to sub critical temperature, pressure increases until it starts boiling. This temperature remains constant till all the water converted to steam. When all liquid converted to steam than again temperature starts rising. Sub critical boiler typically has a mean (boiler drum) to separate steam and water. The mass of this boiler drum, which limits the rate at which the sub critical boiler responds to the load changes.
  • 17. Too great a firing rate will result in high thermal stresses in the boiler drum. UNDERSTANDING SUPER CRITICAL TECHNOLOGY: When Water is heated at constant pressure above the critical pressure, its temperature will never be constant. No distinction between the liquid and gas, the mass density of the two phases remain same. No stage where the water exists as two phases and requires separation: No Drum. The actual location of the transition from liquid to steam in a once through super critical boiler is free to move with different condition: Sliding Pressure Operation.
  • 18. BOILER DEFINITION: Steam Boiler are defined as ‘Any closed vessel exceeding 22.75 liters in capacity which is used expressively for generating steam under pressure and includes any mounting or other fitting attaches to such vessel, which is wholly, or partly under pressure when the steam is shut off. BOILER SPECIFICATIONS: Controlled Circulation with Rifle Tubing, Dry Bottom, Radiant Reheat, Single Drum, and Top Supported, Balanced Draft Furnace. (BHEL) Tilting, Tangential type firing. Steam Generating Cap. Of 1675 T/Hr at 172 ksc & 540o c. Furnace volume 16424 m3 . Depth = 15.8m
  • 19. Width = 19.2m Efficiency = 84.4% Sucks flue gas and Throws out via Chimney. Creates Negative Pr. in Ducts & Furnace. Maintain Furnace draft. Double Suction & Single Discharge Radial Fan. Arrangement of Main Boiler Economizer (3 stage) Boiler drum Down comers & BCW pumps Water wall & SCWs LTSH Divisional panel Final SH Reheater
  • 20. Safety valves Burner and igniters BAHs Economizer Boiler economizers are feed-water heater in which the heat from waste gases is recovered to raise the temperature of feed- water supplied to the boiler. 6o c raise in feed water temperature, by economizers corresponds to 1% saving in fuel consumption. 220 C reduction in flue gas temperature increases boiler efficiency by 1%. Location and Arrangement: Ahead of air-heater in 2nd pass below LTSH
  • 21. Following the primary super-heater Counter-flow arrangement Horizontal placement (facilitate draining) Supported to prevent sagging, undue deflection and expansion. Stop valve and non-return valves incorporated to ensure recirculation in case of no feed-flow. Ash hopper below as flue gas takes a turn. Boiler Arrangement:
  • 22. Super heater Specifications: LTSH Divisional Panel Platen Stage No. of rubber 744 432 400 Outer Dia 44.5 44.5 54 Joining Butt Butt Butt Max Steam Temp 405K(H) 444K(P) 513K 553K
  • 23. Max Gas Temp 405(H) 469(P) 524K 629K TURBINE AND ITS AUXILLARIES Steam Turbines of following OEM’S are running in NTPC LMZ (Russia) KWU, Siemens (Germany) ABB-Alston (Germany) GEC-Alston (UK) SKODA, (chezkoslovakia) MHI (Japan) GE(USA) ANSALDO(Italy)
  • 24. TYPES OF TURBINE IMPULSE TURBINE- In a stage of Impulse turbine the pressure/enthalpy drop takes place only in fixed blades and not in the moving blades. REACTION TURBINE- In a stage of Reaction Turbine the Pressure/Enthalpy drop takes place in both the fixed and moving blades. WORKING OF STEAM TURBINE: A steam turbine works on the principle of conversion of high pressure & temperature steam into high kinetic energy, thereby giving torque to a moving rotor. For above energy conversion there is a requirement of converging/converging-
  • 25. diverging sections. Such above requirement is built up in the space between two consecutive blades of fixed of fixed and moving blades rows. THURST BALANCING Thurst bearing. IP/LP double flow(axial thurst-nullified) Balancing disc. TURBINE LUBE OIL SYSTEM MOP: when turbine speed is>2840 rpm, MOP will take over Turbine lube oil is supplied by MOP pr. Is 2.6 ksc. MOPS also supply---1.governing oil 2.make up to seal oil system 3.barring gear oil 4.oil for LP bypass.
  • 26. AOP1: When turbine trips, AOP1 will come into service if speed<2840rpm or header pr<4.8ksc AOP2: will come into service if pr<4.5 ksc or AOP1 trips EOP: if pr< 1.1 ksc, in case of total AC failure JOP: cut in-510 rpm. Barring gear v/v-cut in 210 rpm, cut out 240 rpm. Condenser (it is a heat exchanger) Specification: 76mm of hg vacuum (-0.9 ksc gauge pr) is maintained in condenser.
  • 27. For maintaining vacuum we need: CW flow (provided by CW p/p, CW flow 3000 m3 /hour) Air evacuation system(ejectors & turbine sealing system) Reduce steam loading (load, any v/v to condenser passing). Dirty tube. STEAM TURBINE Generator rated speed 3000 rpm Generator manufacturer Electrosila No. of bleedings 8 Length of the turbine 36.362m No. of stages HPT 17 IPT 11x2
  • 28. LPT1 5x2 LPT2 5x2 Total 59 TURBINE MAINTAINNACE Steam Turbine Blading Steam turbines produce power by converting the energy in steam provided from a boiler or heat recovery steam generator (HRSG) into rotational energy as the steam passes through a turbine Stage. A turbine stage normally consists of a row of stationary blading and a row of rotating Blading. The purpose of the stationary blading is to direct the flow of the passing steam to the Rotating blading at the proper angle and velocity for the highest efficiency and extraction of Power. The purpose of the rotating blading is to convert the directed mass flow and steam Velocity into rotational speed and torque. Stationary blading may be referred to as
  • 29. nozzles, Vanes, stators, partitions, and stationary blading while rotating blades may be referred to as Buckets, blades, and rotating blading. A turbine may have a single row or stage of stationary and rotating blading or may have multiple rows or stages of blading.|~| Why to go to location regularly? ALL PARAMETERS ARE NOT AVAILABLE IN UCB
  • 30. PERSONAL RELATIONSHIP WITH EQUIPMENTS PHYSICAL STATUS IS NOT KNOWN TO IDENTIFY ABNORMAL BEHAVIOR INSTRUMENTATION STATUS LEAKAGES Turbine Main Turbine HP IP LP Turbine driven BFP Points to check for Abnormal sound Vibration Expansions
  • 31. Leakages (Oil, Steam, Water) Oil flows Pressures and Temperatures --------------|~|---------------