ACKNOWLEDGEMENT
The project bears imprints of many people. I take this opportunity to
express my gratitude to all those people who have been instrumental
in the successful completion of this project.
I would like to show my greatest appreciation to Mr. K.D.N.Singh
(HOD Turbine).I can’t say thank you enough for their tremendous
support and help. I feel motivated and encouraged every time I attend
their meeting. Without their encouragement and guidance this project
would not have materialized.
I would like to convey my special Thanks and gratitude to Mr.Sudip
Banerjee –Officer HR, for his consistent support and guidance during
the three weeks of vocational training. .
The guidance and support received from all the TG team members of
Lanco Infratech Ltd., including Mr. Milind Bhajan & Mr. Vinit
Pradhan was vital for the success of the project. I am thankful for
their constant support and help.
PROJECT ON TURBINE DECK Page 2
PROJECT ON TURBINE DECK Page 3
INTRODUCTION
LANCO Power Ltd (LPL) is setting up 2x660 MW Coal based power
project near Pathadi - Saragbundia villages on the Champa - Korba State
Highway in Chhattisgarh, India. The commissioning schedule of 36 months
for Unit III and 40 Months for Unit IV categorizes these as fast track
projects.
Upon attaining the required statutory clearances for Unit 3, the
implementation of the project with supercritical technology started from 1
January 2010 as the zero date. Letter of Acceptance for the supply of coal
has been obtained for the third unit and Long Term Coal linkage has been
obtained for fourth unit. Power Finance Corporation, the lead lender for
the project has already appraised the project and the project is well poised
to achieve financial closure shortly.
The ultimate capacity of the LANCO Power Plant after completion of
Phase IV would be around 1920 MW. |~|
Contact
CORPORATE OFFICE
LANCO Power Ltd
Plot No. 397, Phase-III,
Udyog Vihar, Gurgaon - 122016
Haryana - India.
Tel : +91-124 - 4741000/01/02/03
Fax : +91-124 - 4741024
Email: lapl@lancogroup.com
PROJECT OFFICE
LANCO Thermal Power
Station
Village-Pathadi,P.O-Tilkeja
Dist.- Korba
Chhattisgarh-495 674, India
Tel : 07759 279238,279123
Fax : 07759 279370
email : lapl@lancogroup.com
MISSION
Development of society through entrepreneurship.
VISION
Most admired integrated infrastructure enterprise.
INDEX
Content
1. Setup of Turbine Deck
2. Strength Checking UT Machine
3. Setup of Condenser Foundation
4. Centre Line Marking
5. Blue Matching of Foundation Plates
PROJECT ON TURBINE DECK Page 4
What we learn in our vocational training
During our vocational training at Lanco we are with the Turbine team. We learn the
following things
1. Setup of Turbine Deck
2. Strength Checking UT
3. Setup of Condenser Foundation
4. Centre Line Marking
5. Blue Matching of Foundation Plates
Setup of Turbine Deck
Turbine deck consists of three floors
1. Ground Floor- In this floor mainly, only the condenser is present.
2. First Floor or Massine Floor-- In this floor, turbine & generators are present.
3. Second Floor or Operating Floor- - In this floor, operating machines are
placed.
Strength checking by UT Machine
In ultrasonic testing machine(UT), very short ultrasonic pulse-waves with center
frequencies ranging from 0.1-15 MHz and occasionally up to 50 MHz are launched
into materials to detect internal flaws or to characterize materials. The technique is
also commonly used to determine the thickness of the test object.
PROJECT ON TURBINE DECK Page 5
Ultrasonic testing is often performed on steel and other metals and alloys, though it
can also be used on concrete, wood and composites. It is a form of non-destructive
testing used in many industries.
It is done to check the strength of the foundation. It can show the air bubbles
between the concrete through waves. It is measure done to prevent the foundation
from being collapsed.|~|
Fig of foundation in which strength checking is done.
Fig 1- before checking fig. 2- during checking (no air bubble) fig. 3- during checking (air bubble present)
The concretes of the foundations are marked per square feet by a special paste and
are connected to the equipment which is connected to a computer monitor.
PROJECT ON TURBINE DECK Page 6
Continuous waves are seen through the monitor & if the air bubble is present then
there is a gap in the waves. It took about 10 days to check a unit turbine of power
plant.
How it works
In ultrasonic testing, an ultrasound transducer connected to a diagnostic machine is
passed over the object being inspected. The transducer is typically separated from
the test object by a couplant (such as oil) or by water, as in immersion testing.
There are two methods of receiving the ultrasound waveform, reflection and
attenuation. In reflection (or pulse-echo) mode, the transducer performs both the
sending and the receiving of the pulsed waves as the "sound" is reflected back to the
device. Reflected ultrasound comes from an interface, such as the back wall of the
object or from an imperfection within the object. The diagnostic machine displays
these results in the form of a signal with an amplitude representing the intensity of the
reflection and the distance, representing the arrival time of the reflection. In
attenuation (or through-transmission) mode, a transmitter sends ultrasound through
one surface, and a separate receiver detects the amount that has reached it on
another surface after traveling through the medium. Imperfections or other conditions
in the space between the transmitter and receiver reduce the amount of sound
transmitted, thus revealing their presence. Using the couplant increases the
efficiency of the process by reducing the losses in the ultrasonic wave energy due to
separation between the surfaces.
Setup of Condenser Foundation
PROJECT ON TURBINE DECK Page 7
Centre Line Marking
It is done to check the alignment of the foundations. If all the pedestals will not be in
same alignment i.e. not proper balanced and coaxial then it will result with decrease
in efficiency and even it may collapse. We have seen it on pedestals of condenser.
Blue Matching
PROJECT ON TURBINE DECK Page 8
Pedestals
of
condenser
foundation
s
It is done for finishing of the condenser plates. A standard specimen is available
which helps to finish the surfaces of the condenser plates. The work piece is firstly
polished with a special liquid called as blue liquid. Later the standard specimen is
rubbed over the colored portion. After rubbing, standard specimen is removed & the
work piece is examined whether it is fit or not. If not then the surface is finished by
grinding.|~|
PROJECT ON TURBINE DECK Page 9
It is done for finishing of the condenser plates. A standard specimen is available
which helps to finish the surfaces of the condenser plates. The work piece is firstly
polished with a special liquid called as blue liquid. Later the standard specimen is
rubbed over the colored portion. After rubbing, standard specimen is removed & the
work piece is examined whether it is fit or not. If not then the surface is finished by
grinding.|~|
PROJECT ON TURBINE DECK Page 9

More Related Content

Similar to Lanco amarkantak power ltd korba mechanical vocational training report 2 haxxo24 i~i

NDT Method.pdf
NDT Method.pdfNDT Method.pdf
NDT Method.pdfHrkHrk1
 
Ultrasonic testing
Ultrasonic testingUltrasonic testing
Ultrasonic testingShahzad Baig
 
Internship presentation at Fabrimax Engg Pvt Ltd
Internship presentation at Fabrimax Engg Pvt LtdInternship presentation at Fabrimax Engg Pvt Ltd
Internship presentation at Fabrimax Engg Pvt Ltdabhishekgawande
 
A Complete Guide on Directional Boring
A Complete Guide on Directional BoringA Complete Guide on Directional Boring
A Complete Guide on Directional BoringWe-Bore-It
 
Lucknow metro rail project internship report
Lucknow metro rail project internship report Lucknow metro rail project internship report
Lucknow metro rail project internship report Aditya Pratap Singh
 
Quality control department in karachi shipyard pakistan
Quality control department in karachi shipyard pakistanQuality control department in karachi shipyard pakistan
Quality control department in karachi shipyard pakistanKamil Ashraf
 
IRJET- Structural Audit and Rehabilitation of Building
IRJET-  	  Structural Audit and Rehabilitation of BuildingIRJET-  	  Structural Audit and Rehabilitation of Building
IRJET- Structural Audit and Rehabilitation of BuildingIRJET Journal
 
IRJET- Structural Audit and Rehabilitation of Building
IRJET- Structural Audit and Rehabilitation of BuildingIRJET- Structural Audit and Rehabilitation of Building
IRJET- Structural Audit and Rehabilitation of BuildingIRJET Journal
 
NDT & Welding Inspection.pdf
NDT & Welding Inspection.pdfNDT & Welding Inspection.pdf
NDT & Welding Inspection.pdfserajahmad52
 
Testing & Engineering Services Company Limited Trinidad and Tobago
Testing & Engineering Services Company Limited Trinidad and TobagoTesting & Engineering Services Company Limited Trinidad and Tobago
Testing & Engineering Services Company Limited Trinidad and Tobagocompsoltt
 
IRJET- Wall Cleaning Machine
IRJET- Wall Cleaning MachineIRJET- Wall Cleaning Machine
IRJET- Wall Cleaning MachineIRJET Journal
 
ndt grp8..pptx
ndt grp8..pptxndt grp8..pptx
ndt grp8..pptxhemal_2911
 
Experimental Validation on ASTM A516 Grade 70 Carbon Steel by Non-Destructive...
Experimental Validation on ASTM A516 Grade 70 Carbon Steel by Non-Destructive...Experimental Validation on ASTM A516 Grade 70 Carbon Steel by Non-Destructive...
Experimental Validation on ASTM A516 Grade 70 Carbon Steel by Non-Destructive...IJMTST Journal
 
L&T Inplant training at chennai metro report
L&T Inplant training at chennai metro reportL&T Inplant training at chennai metro report
L&T Inplant training at chennai metro reporthemanth kumar
 
IRJET- Case Study of RCC Structure with the Help of Non Destructive Testing
IRJET-  	  Case Study of RCC Structure with the Help of Non Destructive TestingIRJET-  	  Case Study of RCC Structure with the Help of Non Destructive Testing
IRJET- Case Study of RCC Structure with the Help of Non Destructive TestingIRJET Journal
 

Similar to Lanco amarkantak power ltd korba mechanical vocational training report 2 haxxo24 i~i (20)

NDT Method.pdf
NDT Method.pdfNDT Method.pdf
NDT Method.pdf
 
Ultrasonic testing
Ultrasonic testingUltrasonic testing
Ultrasonic testing
 
Internship presentation at Fabrimax Engg Pvt Ltd
Internship presentation at Fabrimax Engg Pvt LtdInternship presentation at Fabrimax Engg Pvt Ltd
Internship presentation at Fabrimax Engg Pvt Ltd
 
A Complete Guide on Directional Boring
A Complete Guide on Directional BoringA Complete Guide on Directional Boring
A Complete Guide on Directional Boring
 
Lucknow metro rail project internship report
Lucknow metro rail project internship report Lucknow metro rail project internship report
Lucknow metro rail project internship report
 
Report on practical training NTPC BARH
Report on practical training NTPC BARHReport on practical training NTPC BARH
Report on practical training NTPC BARH
 
Quality control department in karachi shipyard pakistan
Quality control department in karachi shipyard pakistanQuality control department in karachi shipyard pakistan
Quality control department in karachi shipyard pakistan
 
IRJET- Structural Audit and Rehabilitation of Building
IRJET-  	  Structural Audit and Rehabilitation of BuildingIRJET-  	  Structural Audit and Rehabilitation of Building
IRJET- Structural Audit and Rehabilitation of Building
 
IRJET- Structural Audit and Rehabilitation of Building
IRJET- Structural Audit and Rehabilitation of BuildingIRJET- Structural Audit and Rehabilitation of Building
IRJET- Structural Audit and Rehabilitation of Building
 
NDT & Welding Inspection.pdf
NDT & Welding Inspection.pdfNDT & Welding Inspection.pdf
NDT & Welding Inspection.pdf
 
Testing & Engineering Services Company Limited Trinidad and Tobago
Testing & Engineering Services Company Limited Trinidad and TobagoTesting & Engineering Services Company Limited Trinidad and Tobago
Testing & Engineering Services Company Limited Trinidad and Tobago
 
Importance of ndt
Importance of ndtImportance of ndt
Importance of ndt
 
IRJET- Wall Cleaning Machine
IRJET- Wall Cleaning MachineIRJET- Wall Cleaning Machine
IRJET- Wall Cleaning Machine
 
Intro to ndt
Intro to ndtIntro to ndt
Intro to ndt
 
Intro to ndt
Intro to ndtIntro to ndt
Intro to ndt
 
Ndt course
Ndt courseNdt course
Ndt course
 
ndt grp8..pptx
ndt grp8..pptxndt grp8..pptx
ndt grp8..pptx
 
Experimental Validation on ASTM A516 Grade 70 Carbon Steel by Non-Destructive...
Experimental Validation on ASTM A516 Grade 70 Carbon Steel by Non-Destructive...Experimental Validation on ASTM A516 Grade 70 Carbon Steel by Non-Destructive...
Experimental Validation on ASTM A516 Grade 70 Carbon Steel by Non-Destructive...
 
L&T Inplant training at chennai metro report
L&T Inplant training at chennai metro reportL&T Inplant training at chennai metro report
L&T Inplant training at chennai metro report
 
IRJET- Case Study of RCC Structure with the Help of Non Destructive Testing
IRJET-  	  Case Study of RCC Structure with the Help of Non Destructive TestingIRJET-  	  Case Study of RCC Structure with the Help of Non Destructive Testing
IRJET- Case Study of RCC Structure with the Help of Non Destructive Testing
 

More from haxxo24

Wagon project report mechanical vocational training presentation haxxo24 i~i
Wagon project report mechanical vocational training presentation haxxo24 i~iWagon project report mechanical vocational training presentation haxxo24 i~i
Wagon project report mechanical vocational training presentation haxxo24 i~ihaxxo24
 
South east central railway (secr) bilaspur mechanical vocational training rep...
South east central railway (secr) bilaspur mechanical vocational training rep...South east central railway (secr) bilaspur mechanical vocational training rep...
South east central railway (secr) bilaspur mechanical vocational training rep...haxxo24
 
South east central railway (secr) bilaspur mechanical vocational training rep...
South east central railway (secr) bilaspur mechanical vocational training rep...South east central railway (secr) bilaspur mechanical vocational training rep...
South east central railway (secr) bilaspur mechanical vocational training rep...haxxo24
 
South east central railway (secr) bilaspur mechanical vocational training pre...
South east central railway (secr) bilaspur mechanical vocational training pre...South east central railway (secr) bilaspur mechanical vocational training pre...
South east central railway (secr) bilaspur mechanical vocational training pre...haxxo24
 
Ntpc (national thermal power corporation) sipat mechanical vocational trainin...
Ntpc (national thermal power corporation) sipat mechanical vocational trainin...Ntpc (national thermal power corporation) sipat mechanical vocational trainin...
Ntpc (national thermal power corporation) sipat mechanical vocational trainin...haxxo24
 
Ntpc (national thermal power corporation) sipat mechanical vocational trainin...
Ntpc (national thermal power corporation) sipat mechanical vocational trainin...Ntpc (national thermal power corporation) sipat mechanical vocational trainin...
Ntpc (national thermal power corporation) sipat mechanical vocational trainin...haxxo24
 
Ntpc (national thermal power corporation) sipat mechanical vocational trainin...
Ntpc (national thermal power corporation) sipat mechanical vocational trainin...Ntpc (national thermal power corporation) sipat mechanical vocational trainin...
Ntpc (national thermal power corporation) sipat mechanical vocational trainin...haxxo24
 
Ntpc (national thermal power corporation) sipat mechanical vocational trainin...
Ntpc (national thermal power corporation) sipat mechanical vocational trainin...Ntpc (national thermal power corporation) sipat mechanical vocational trainin...
Ntpc (national thermal power corporation) sipat mechanical vocational trainin...haxxo24
 
Ntpc (national thermal power corporation) sipat boiler haxxo24 i~i
Ntpc (national thermal power corporation) sipat boiler haxxo24 i~iNtpc (national thermal power corporation) sipat boiler haxxo24 i~i
Ntpc (national thermal power corporation) sipat boiler haxxo24 i~ihaxxo24
 
Lanco amarkantak power ltd korba mechanical vocational training report 1 haxx...
Lanco amarkantak power ltd korba mechanical vocational training report 1 haxx...Lanco amarkantak power ltd korba mechanical vocational training report 1 haxx...
Lanco amarkantak power ltd korba mechanical vocational training report 1 haxx...haxxo24
 
Indian railways mechanical vocational training report 2 haxxo24 i~i
Indian railways mechanical vocational training report 2 haxxo24 i~iIndian railways mechanical vocational training report 2 haxxo24 i~i
Indian railways mechanical vocational training report 2 haxxo24 i~ihaxxo24
 
Indian railways mechanical vocational training report 1 haxxo24 i~i
Indian railways mechanical vocational training report 1 haxxo24 i~iIndian railways mechanical vocational training report 1 haxxo24 i~i
Indian railways mechanical vocational training report 1 haxxo24 i~ihaxxo24
 
Cseb (chhattisgarh state electricity board) korba mechanical vocational train...
Cseb (chhattisgarh state electricity board) korba mechanical vocational train...Cseb (chhattisgarh state electricity board) korba mechanical vocational train...
Cseb (chhattisgarh state electricity board) korba mechanical vocational train...haxxo24
 
Cseb (chhattisgarh state electricity board) korba east vocational training pr...
Cseb (chhattisgarh state electricity board) korba east vocational training pr...Cseb (chhattisgarh state electricity board) korba east vocational training pr...
Cseb (chhattisgarh state electricity board) korba east vocational training pr...haxxo24
 
Bharat aluminium company ltd. (balco) mechanical vocational training report h...
Bharat aluminium company ltd. (balco) mechanical vocational training report h...Bharat aluminium company ltd. (balco) mechanical vocational training report h...
Bharat aluminium company ltd. (balco) mechanical vocational training report h...haxxo24
 

More from haxxo24 (15)

Wagon project report mechanical vocational training presentation haxxo24 i~i
Wagon project report mechanical vocational training presentation haxxo24 i~iWagon project report mechanical vocational training presentation haxxo24 i~i
Wagon project report mechanical vocational training presentation haxxo24 i~i
 
South east central railway (secr) bilaspur mechanical vocational training rep...
South east central railway (secr) bilaspur mechanical vocational training rep...South east central railway (secr) bilaspur mechanical vocational training rep...
South east central railway (secr) bilaspur mechanical vocational training rep...
 
South east central railway (secr) bilaspur mechanical vocational training rep...
South east central railway (secr) bilaspur mechanical vocational training rep...South east central railway (secr) bilaspur mechanical vocational training rep...
South east central railway (secr) bilaspur mechanical vocational training rep...
 
South east central railway (secr) bilaspur mechanical vocational training pre...
South east central railway (secr) bilaspur mechanical vocational training pre...South east central railway (secr) bilaspur mechanical vocational training pre...
South east central railway (secr) bilaspur mechanical vocational training pre...
 
Ntpc (national thermal power corporation) sipat mechanical vocational trainin...
Ntpc (national thermal power corporation) sipat mechanical vocational trainin...Ntpc (national thermal power corporation) sipat mechanical vocational trainin...
Ntpc (national thermal power corporation) sipat mechanical vocational trainin...
 
Ntpc (national thermal power corporation) sipat mechanical vocational trainin...
Ntpc (national thermal power corporation) sipat mechanical vocational trainin...Ntpc (national thermal power corporation) sipat mechanical vocational trainin...
Ntpc (national thermal power corporation) sipat mechanical vocational trainin...
 
Ntpc (national thermal power corporation) sipat mechanical vocational trainin...
Ntpc (national thermal power corporation) sipat mechanical vocational trainin...Ntpc (national thermal power corporation) sipat mechanical vocational trainin...
Ntpc (national thermal power corporation) sipat mechanical vocational trainin...
 
Ntpc (national thermal power corporation) sipat mechanical vocational trainin...
Ntpc (national thermal power corporation) sipat mechanical vocational trainin...Ntpc (national thermal power corporation) sipat mechanical vocational trainin...
Ntpc (national thermal power corporation) sipat mechanical vocational trainin...
 
Ntpc (national thermal power corporation) sipat boiler haxxo24 i~i
Ntpc (national thermal power corporation) sipat boiler haxxo24 i~iNtpc (national thermal power corporation) sipat boiler haxxo24 i~i
Ntpc (national thermal power corporation) sipat boiler haxxo24 i~i
 
Lanco amarkantak power ltd korba mechanical vocational training report 1 haxx...
Lanco amarkantak power ltd korba mechanical vocational training report 1 haxx...Lanco amarkantak power ltd korba mechanical vocational training report 1 haxx...
Lanco amarkantak power ltd korba mechanical vocational training report 1 haxx...
 
Indian railways mechanical vocational training report 2 haxxo24 i~i
Indian railways mechanical vocational training report 2 haxxo24 i~iIndian railways mechanical vocational training report 2 haxxo24 i~i
Indian railways mechanical vocational training report 2 haxxo24 i~i
 
Indian railways mechanical vocational training report 1 haxxo24 i~i
Indian railways mechanical vocational training report 1 haxxo24 i~iIndian railways mechanical vocational training report 1 haxxo24 i~i
Indian railways mechanical vocational training report 1 haxxo24 i~i
 
Cseb (chhattisgarh state electricity board) korba mechanical vocational train...
Cseb (chhattisgarh state electricity board) korba mechanical vocational train...Cseb (chhattisgarh state electricity board) korba mechanical vocational train...
Cseb (chhattisgarh state electricity board) korba mechanical vocational train...
 
Cseb (chhattisgarh state electricity board) korba east vocational training pr...
Cseb (chhattisgarh state electricity board) korba east vocational training pr...Cseb (chhattisgarh state electricity board) korba east vocational training pr...
Cseb (chhattisgarh state electricity board) korba east vocational training pr...
 
Bharat aluminium company ltd. (balco) mechanical vocational training report h...
Bharat aluminium company ltd. (balco) mechanical vocational training report h...Bharat aluminium company ltd. (balco) mechanical vocational training report h...
Bharat aluminium company ltd. (balco) mechanical vocational training report h...
 

Recently uploaded

call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️
call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️
call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️9953056974 Low Rate Call Girls In Saket, Delhi NCR
 
Call Girls in Dwarka Mor Delhi Contact Us 9654467111
Call Girls in Dwarka Mor Delhi Contact Us 9654467111Call Girls in Dwarka Mor Delhi Contact Us 9654467111
Call Girls in Dwarka Mor Delhi Contact Us 9654467111Sapana Sha
 
The basics of sentences session 2pptx copy.pptx
The basics of sentences session 2pptx copy.pptxThe basics of sentences session 2pptx copy.pptx
The basics of sentences session 2pptx copy.pptxheathfieldcps1
 
URLs and Routing in the Odoo 17 Website App
URLs and Routing in the Odoo 17 Website AppURLs and Routing in the Odoo 17 Website App
URLs and Routing in the Odoo 17 Website AppCeline George
 
Enzyme, Pharmaceutical Aids, Miscellaneous Last Part of Chapter no 5th.pdf
Enzyme, Pharmaceutical Aids, Miscellaneous Last Part of Chapter no 5th.pdfEnzyme, Pharmaceutical Aids, Miscellaneous Last Part of Chapter no 5th.pdf
Enzyme, Pharmaceutical Aids, Miscellaneous Last Part of Chapter no 5th.pdfSumit Tiwari
 
Class 11 Legal Studies Ch-1 Concept of State .pdf
Class 11 Legal Studies Ch-1 Concept of State .pdfClass 11 Legal Studies Ch-1 Concept of State .pdf
Class 11 Legal Studies Ch-1 Concept of State .pdfakmcokerachita
 
Introduction to ArtificiaI Intelligence in Higher Education
Introduction to ArtificiaI Intelligence in Higher EducationIntroduction to ArtificiaI Intelligence in Higher Education
Introduction to ArtificiaI Intelligence in Higher Educationpboyjonauth
 
Incoming and Outgoing Shipments in 1 STEP Using Odoo 17
Incoming and Outgoing Shipments in 1 STEP Using Odoo 17Incoming and Outgoing Shipments in 1 STEP Using Odoo 17
Incoming and Outgoing Shipments in 1 STEP Using Odoo 17Celine George
 
18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf
18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf
18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdfssuser54595a
 
How to Configure Email Server in Odoo 17
How to Configure Email Server in Odoo 17How to Configure Email Server in Odoo 17
How to Configure Email Server in Odoo 17Celine George
 
microwave assisted reaction. General introduction
microwave assisted reaction. General introductionmicrowave assisted reaction. General introduction
microwave assisted reaction. General introductionMaksud Ahmed
 
Accessible design: Minimum effort, maximum impact
Accessible design: Minimum effort, maximum impactAccessible design: Minimum effort, maximum impact
Accessible design: Minimum effort, maximum impactdawncurless
 
BASLIQ CURRENT LOOKBOOK LOOKBOOK(1) (1).pdf
BASLIQ CURRENT LOOKBOOK  LOOKBOOK(1) (1).pdfBASLIQ CURRENT LOOKBOOK  LOOKBOOK(1) (1).pdf
BASLIQ CURRENT LOOKBOOK LOOKBOOK(1) (1).pdfSoniaTolstoy
 
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...EduSkills OECD
 
mini mental status format.docx
mini    mental       status     format.docxmini    mental       status     format.docx
mini mental status format.docxPoojaSen20
 
ECONOMIC CONTEXT - LONG FORM TV DRAMA - PPT
ECONOMIC CONTEXT - LONG FORM TV DRAMA - PPTECONOMIC CONTEXT - LONG FORM TV DRAMA - PPT
ECONOMIC CONTEXT - LONG FORM TV DRAMA - PPTiammrhaywood
 
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptxSOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptxiammrhaywood
 

Recently uploaded (20)

call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️
call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️
call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️
 
Call Girls in Dwarka Mor Delhi Contact Us 9654467111
Call Girls in Dwarka Mor Delhi Contact Us 9654467111Call Girls in Dwarka Mor Delhi Contact Us 9654467111
Call Girls in Dwarka Mor Delhi Contact Us 9654467111
 
The basics of sentences session 2pptx copy.pptx
The basics of sentences session 2pptx copy.pptxThe basics of sentences session 2pptx copy.pptx
The basics of sentences session 2pptx copy.pptx
 
Código Creativo y Arte de Software | Unidad 1
Código Creativo y Arte de Software | Unidad 1Código Creativo y Arte de Software | Unidad 1
Código Creativo y Arte de Software | Unidad 1
 
URLs and Routing in the Odoo 17 Website App
URLs and Routing in the Odoo 17 Website AppURLs and Routing in the Odoo 17 Website App
URLs and Routing in the Odoo 17 Website App
 
Enzyme, Pharmaceutical Aids, Miscellaneous Last Part of Chapter no 5th.pdf
Enzyme, Pharmaceutical Aids, Miscellaneous Last Part of Chapter no 5th.pdfEnzyme, Pharmaceutical Aids, Miscellaneous Last Part of Chapter no 5th.pdf
Enzyme, Pharmaceutical Aids, Miscellaneous Last Part of Chapter no 5th.pdf
 
Class 11 Legal Studies Ch-1 Concept of State .pdf
Class 11 Legal Studies Ch-1 Concept of State .pdfClass 11 Legal Studies Ch-1 Concept of State .pdf
Class 11 Legal Studies Ch-1 Concept of State .pdf
 
Introduction to ArtificiaI Intelligence in Higher Education
Introduction to ArtificiaI Intelligence in Higher EducationIntroduction to ArtificiaI Intelligence in Higher Education
Introduction to ArtificiaI Intelligence in Higher Education
 
Incoming and Outgoing Shipments in 1 STEP Using Odoo 17
Incoming and Outgoing Shipments in 1 STEP Using Odoo 17Incoming and Outgoing Shipments in 1 STEP Using Odoo 17
Incoming and Outgoing Shipments in 1 STEP Using Odoo 17
 
18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf
18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf
18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf
 
How to Configure Email Server in Odoo 17
How to Configure Email Server in Odoo 17How to Configure Email Server in Odoo 17
How to Configure Email Server in Odoo 17
 
Model Call Girl in Bikash Puri Delhi reach out to us at 🔝9953056974🔝
Model Call Girl in Bikash Puri  Delhi reach out to us at 🔝9953056974🔝Model Call Girl in Bikash Puri  Delhi reach out to us at 🔝9953056974🔝
Model Call Girl in Bikash Puri Delhi reach out to us at 🔝9953056974🔝
 
Model Call Girl in Tilak Nagar Delhi reach out to us at 🔝9953056974🔝
Model Call Girl in Tilak Nagar Delhi reach out to us at 🔝9953056974🔝Model Call Girl in Tilak Nagar Delhi reach out to us at 🔝9953056974🔝
Model Call Girl in Tilak Nagar Delhi reach out to us at 🔝9953056974🔝
 
microwave assisted reaction. General introduction
microwave assisted reaction. General introductionmicrowave assisted reaction. General introduction
microwave assisted reaction. General introduction
 
Accessible design: Minimum effort, maximum impact
Accessible design: Minimum effort, maximum impactAccessible design: Minimum effort, maximum impact
Accessible design: Minimum effort, maximum impact
 
BASLIQ CURRENT LOOKBOOK LOOKBOOK(1) (1).pdf
BASLIQ CURRENT LOOKBOOK  LOOKBOOK(1) (1).pdfBASLIQ CURRENT LOOKBOOK  LOOKBOOK(1) (1).pdf
BASLIQ CURRENT LOOKBOOK LOOKBOOK(1) (1).pdf
 
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
 
mini mental status format.docx
mini    mental       status     format.docxmini    mental       status     format.docx
mini mental status format.docx
 
ECONOMIC CONTEXT - LONG FORM TV DRAMA - PPT
ECONOMIC CONTEXT - LONG FORM TV DRAMA - PPTECONOMIC CONTEXT - LONG FORM TV DRAMA - PPT
ECONOMIC CONTEXT - LONG FORM TV DRAMA - PPT
 
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptxSOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
 

Lanco amarkantak power ltd korba mechanical vocational training report 2 haxxo24 i~i

  • 1. 26th May -26th Jun 2011 Under Guidance: Shri K.D.N. Singh Submitted by: Abhinav Sharma, Rohit Shrivastava, Vikas Pandey LANCO PROJECT CHHATTISGARH INDIA A Project Report on the Partial Fulfillment of Vocational Training on TURBINE & GENERATOR DECK
  • 2. ACKNOWLEDGEMENT The project bears imprints of many people. I take this opportunity to express my gratitude to all those people who have been instrumental in the successful completion of this project. I would like to show my greatest appreciation to Mr. K.D.N.Singh (HOD Turbine).I can’t say thank you enough for their tremendous support and help. I feel motivated and encouraged every time I attend their meeting. Without their encouragement and guidance this project would not have materialized. I would like to convey my special Thanks and gratitude to Mr.Sudip Banerjee –Officer HR, for his consistent support and guidance during the three weeks of vocational training. . The guidance and support received from all the TG team members of Lanco Infratech Ltd., including Mr. Milind Bhajan & Mr. Vinit Pradhan was vital for the success of the project. I am thankful for their constant support and help. PROJECT ON TURBINE DECK Page 2
  • 3. PROJECT ON TURBINE DECK Page 3 INTRODUCTION LANCO Power Ltd (LPL) is setting up 2x660 MW Coal based power project near Pathadi - Saragbundia villages on the Champa - Korba State Highway in Chhattisgarh, India. The commissioning schedule of 36 months for Unit III and 40 Months for Unit IV categorizes these as fast track projects. Upon attaining the required statutory clearances for Unit 3, the implementation of the project with supercritical technology started from 1 January 2010 as the zero date. Letter of Acceptance for the supply of coal has been obtained for the third unit and Long Term Coal linkage has been obtained for fourth unit. Power Finance Corporation, the lead lender for the project has already appraised the project and the project is well poised to achieve financial closure shortly. The ultimate capacity of the LANCO Power Plant after completion of Phase IV would be around 1920 MW. |~| Contact CORPORATE OFFICE LANCO Power Ltd Plot No. 397, Phase-III, Udyog Vihar, Gurgaon - 122016 Haryana - India. Tel : +91-124 - 4741000/01/02/03 Fax : +91-124 - 4741024 Email: lapl@lancogroup.com PROJECT OFFICE LANCO Thermal Power Station Village-Pathadi,P.O-Tilkeja Dist.- Korba Chhattisgarh-495 674, India Tel : 07759 279238,279123 Fax : 07759 279370 email : lapl@lancogroup.com MISSION Development of society through entrepreneurship. VISION Most admired integrated infrastructure enterprise.
  • 4. INDEX Content 1. Setup of Turbine Deck 2. Strength Checking UT Machine 3. Setup of Condenser Foundation 4. Centre Line Marking 5. Blue Matching of Foundation Plates PROJECT ON TURBINE DECK Page 4
  • 5. What we learn in our vocational training During our vocational training at Lanco we are with the Turbine team. We learn the following things 1. Setup of Turbine Deck 2. Strength Checking UT 3. Setup of Condenser Foundation 4. Centre Line Marking 5. Blue Matching of Foundation Plates Setup of Turbine Deck Turbine deck consists of three floors 1. Ground Floor- In this floor mainly, only the condenser is present. 2. First Floor or Massine Floor-- In this floor, turbine & generators are present. 3. Second Floor or Operating Floor- - In this floor, operating machines are placed. Strength checking by UT Machine In ultrasonic testing machine(UT), very short ultrasonic pulse-waves with center frequencies ranging from 0.1-15 MHz and occasionally up to 50 MHz are launched into materials to detect internal flaws or to characterize materials. The technique is also commonly used to determine the thickness of the test object. PROJECT ON TURBINE DECK Page 5
  • 6. Ultrasonic testing is often performed on steel and other metals and alloys, though it can also be used on concrete, wood and composites. It is a form of non-destructive testing used in many industries. It is done to check the strength of the foundation. It can show the air bubbles between the concrete through waves. It is measure done to prevent the foundation from being collapsed.|~| Fig of foundation in which strength checking is done. Fig 1- before checking fig. 2- during checking (no air bubble) fig. 3- during checking (air bubble present) The concretes of the foundations are marked per square feet by a special paste and are connected to the equipment which is connected to a computer monitor. PROJECT ON TURBINE DECK Page 6
  • 7. Continuous waves are seen through the monitor & if the air bubble is present then there is a gap in the waves. It took about 10 days to check a unit turbine of power plant. How it works In ultrasonic testing, an ultrasound transducer connected to a diagnostic machine is passed over the object being inspected. The transducer is typically separated from the test object by a couplant (such as oil) or by water, as in immersion testing. There are two methods of receiving the ultrasound waveform, reflection and attenuation. In reflection (or pulse-echo) mode, the transducer performs both the sending and the receiving of the pulsed waves as the "sound" is reflected back to the device. Reflected ultrasound comes from an interface, such as the back wall of the object or from an imperfection within the object. The diagnostic machine displays these results in the form of a signal with an amplitude representing the intensity of the reflection and the distance, representing the arrival time of the reflection. In attenuation (or through-transmission) mode, a transmitter sends ultrasound through one surface, and a separate receiver detects the amount that has reached it on another surface after traveling through the medium. Imperfections or other conditions in the space between the transmitter and receiver reduce the amount of sound transmitted, thus revealing their presence. Using the couplant increases the efficiency of the process by reducing the losses in the ultrasonic wave energy due to separation between the surfaces. Setup of Condenser Foundation PROJECT ON TURBINE DECK Page 7
  • 8. Centre Line Marking It is done to check the alignment of the foundations. If all the pedestals will not be in same alignment i.e. not proper balanced and coaxial then it will result with decrease in efficiency and even it may collapse. We have seen it on pedestals of condenser. Blue Matching PROJECT ON TURBINE DECK Page 8 Pedestals of condenser foundation s
  • 9. It is done for finishing of the condenser plates. A standard specimen is available which helps to finish the surfaces of the condenser plates. The work piece is firstly polished with a special liquid called as blue liquid. Later the standard specimen is rubbed over the colored portion. After rubbing, standard specimen is removed & the work piece is examined whether it is fit or not. If not then the surface is finished by grinding.|~| PROJECT ON TURBINE DECK Page 9
  • 10. It is done for finishing of the condenser plates. A standard specimen is available which helps to finish the surfaces of the condenser plates. The work piece is firstly polished with a special liquid called as blue liquid. Later the standard specimen is rubbed over the colored portion. After rubbing, standard specimen is removed & the work piece is examined whether it is fit or not. If not then the surface is finished by grinding.|~| PROJECT ON TURBINE DECK Page 9