Vision
• To be the World’s leading power company,
energizing India’s growth.
Mission
• Provide reliable power and related solutions in an
economical, efficient, and environment friendly
manner, driven by innovation and agility.
Core Values: ICOMIT
• Integrity
• Customer Focus
• Organizational Pride
• Mutual Respect & Trust
• Innovation & Learning
• Total Quality & Safety
NTPC became a Maharatna company in May
2010, one of the only four companies to be
awarded this status.
NTPC was ranked 400th in the 2016, Forbes
Global 2000 ranking of the World’s biggest
companies.
Board of directors
 Shri. Gurudeep Singh - CMD
 Shri A.K.Jha - Director (Technical)
 Shri S. Roy - Director (HR),
 Shri A.K. Gupta - Director (Commercial)
 Shri S C Pandey - Director (Projects)
 Shri Kulamani Biswal - Director (Finance)
 Shri K K Sharma - Director (Operation)
 Shri Pradeep Kumar - Director ( JS & FA)
 Shri Anirudh kumar - JS (Thermal)
 Dr Gauri Trivedi - Independent Director.
 Shri. S. Chander - Independent Director.
 Shri Rajesh Jain - Independent Director.
Past CMD’s
 SHRI DV KAPUR Took over as 1st CMD on 19-03-1976
 SHRI A.K SHAH.
 SHRI M.L SHISHOO.
 SHRI PS BAMI.
 SHRI DR. RAJENDER SINGH.
 SHRI C.P JAIN.
 SHRI T.SHANKARLINGAM.
 SHRI R.S.SHARMA.
 SHRI Dr. ARUP ROY CHOUDHURY.
NTPC CaPaCiTy addiTioN
Present installed capacity (20.06.2017) 51635 MW
Capacity addition till 31.03.2017 50498 MW
Capacity addition during 2016-17 3845 MW
Capacity added during 2015-2016 2255 MW
Capacity added during 2014-15 1290 MW
Capacity added during 2013-14 1835 MW
Capacity added during 2012-13 4170 MW
Capacity added during 2011-12 2820 MW
Capacity added during 2010-11 2490 MW
Capacity added during 2009-10 1560 MW
• The total installed capacity of the company
is 51,635 MW (including JVs) with 20 coal based, 7 gas
based stations, 1 Hydro based station and 1 Wind
based station. 9 Joint Venture stations are coal based
and 11 Solar PV projects.
• NTPC has been operating its plants at high efficiency
levels. Although the company has 17.73% of the total
national capacity, it contributes 24.0% of total power
generation due to its focus on high efficiency.
(As on 20.06.2017) NO. OF
PLANTS
CAPACITY
(MW)
NTPC Owned
Coal 20 38,755
Gas/Liquid Fuel 7 4,017
Hydro 1 800
RE projects (Solar PV) 11 845
Hydro 1 2
Total 40 44,419
Owned By JVs/Subsidiaries
Coal & Gas 9 7,216
Total 49 51,635
REGION COAL GAS/Liquid
Fuel
Renewable TOTAL
Northern 9,515 2,344 35 11,894
Western 13,320 1,313 412 14,930
Southern 6,200 360 385 6,945
Eastern 9,720 - 10 9,845
Islands - - 5 5
Hydro - - - 800
JVs 5,249 1,967 - 7,216
Total 44,004 5,984 622 51,635
Regional Spread of Generating Facilities
Sr. No. COAL BASED (Owned by NTPC) STATE CAPACITY(MW)
1. Singrauli Uttar Pradesh 2,000
2. Korba Chhattisgarh 2,600
3. Ramagundam Telangana 2,600
4. Farakka West Bengal 2,100
5. Vindhyachal Madhya Pradesh 4,760
6. Rihand Uttar Pradesh 3,000
7. Kahalgaon Bihar 2,340
8. Dadri Uttar Pradesh 1,820
9. Talcher Kaniha Orissa 3,000
10. Feroze Gandhi, Unchahar Uttar Pradesh 1,550
11. Talcher Thermal Orissa 460
12. Simhadri Andhra Pradesh 2,000
13. Tanda Uttar Pradesh 440
14. Badarpur Delhi 705
15. Sipat Chhattisgarh 2,980
16. Mauda Maharashtra 2,320
17. Barh Bihar 1320
18. Bongaigaon Assam 500
19. Kudgi Karnataka 1600
20. Solapur Maharashtra 660
Total 38,755
Sr. No COAL BASED(Owned
by JVs/Subsidiaries)
STATE COMMISSIONED
CAPACITY
1. Durgapur West Bengal 120
2 Rourkela Orissa 120
3 Bhilai Chhattisgarh 574
4 Kanti Bihar 610
5 IGSTPP, Jhajjar Haryana 1500
6 Vallur Tamil Nadu 1500
7 Nabinagar-BRBCL Bihar 500
8 PUVNL(Patratu) Jharkhand 325
Total 5,249
Coal Based Joint Ventures/Subsidiaries
Sr. No. GAS BASED (Owned by NTPC) STATE COMMISSIONED
CAPACITY(MW)
1. Anta Rajasthan 419.33
2. Auraiya Uttar Pradesh 663.36
3. Kawas Gujarat 656.20
4. Dadri Uttar Pradesh 829.78
5. Jhanor-Gandhar Gujarat 657.39
6. Rajiv Gandhi CCPP Kayamkulam Kerala 359.58
7. Faridabad Haryana 431.59
Total 4,017.23
Sr. No. GAS BASED (Owned by
JVs/Subsidiaries)
STATE COMMISSIONED
CAPACITY
1. RGPPL Maharashtra 1967.08
Total 1,967.08
S.
No.
Hydro Based State Approved
capacity MW
Commissioned
capacity (MW)
1. Koldam (HEPP) Himachal
Pradesh
800 800
2. Tapovan Vishnugad Uttarakhand 520 -
3. Singrauli CW
Discharge (Small
Hydro)
Uttar Pradesh 8 -
4. Lata Tapovan Uttrakhand 171 -
5. Rammam West Bengal 120 -
Total 1,519 800
Hydro Based Power Projects
 NTPC has increased thrust on hydro development for a balanced portfolio for long
term sustainability.
 The first step in this direction was taken by initiating investment in Koldam Hydro
Electric Power Project located on Satluj river in Bilaspur district of Himachal
Pradesh. Other hydro project under construction is Tapovan Vishnugad.
 On all these projects construction activities are in full swing.
S. No. Project State/UT Capacity (MW)
1. Dadri Solar PV Uttar Pradesh 5
2. Port blair Solar PV Andaman & Nicobar Island 5
3. Ramagundam Solar
PV (Phase -I)
Telangana 10
4. Talcher Kaniha Solar
PV
Odisha 10
5. Faridabad Solar PV Haryana 5
6. Unchahar Solar PV Uttar Pradesh 10
7. Rajgarh Solar PV Madhya Pradesh 50
8. Singrauli Solar PV Uttar Pradesh 15
9. Ananthapuram
Solar PV
Andhra Pradesh 250
10. Bhadla-Solar Rajasthan 260
11. Mandsaur-Solar Madhya Pradesh 225
Total 845
Renewable eneRgy PRojects - SOLAR
Sr. No. Project State/UT Capacity (MW)
1. Rojmal Gujarat 2
Total 2
Wind Energy: Rojmal Wind Power Project (50 MW)
Renewable eneRgy PRojects - WIND
Geothermal Energy:
Tattapani Geothermal Project in
Chhattisgarh: MoU Signed with Govt.
of Chhattisgarh.
 Feasibility studies in association with
the Geological Survey of India are in
progress.
OPERATIONAL PERFORMANCE OF COAL & GAS BASED NTPC STATIONS
Gross Generation (BU)
(COAL & GAS)
PLF (%)
(Coal Stations)
2016-17 250.03 78.60
2015-16 241.98 78.61
2014-15 241.139 80.23
2013-14 233.269 81.50
2012-13 232.00 83.08
2011-12 222.07 85.00
2010-11 220.54 88.29
2009-10 218.84 90.81
2008-09 206.94 91.14
2007-08 200.86 92.24
2006-07 188.67 89.43
2005-06 170.88 87.52
Future CapaCity additions (ntpC)
S. No. PROJECT STATE MW
1. Barh-I Bihar 1980
2. Singrauli CW Discharge (Small Hydro) Uttar Pradesh 8
3. Tapovan Vishnugud-Hydro Uttarakhand 520
4. Kudgi Karnataka 800
5. Solapur Maharashtra 660
6. Bongaigaon Assam 250
7. Lata Tapovan-Hydro Uttarakhand 171
8. Lara Chhattisgarh 1600
9. Gadarwara Madhya Pradesh 1600
10. Darlipali Odisha 1600
11. North Karanpura Jharkhand 1980
12. Rammam-Hydro West Bengal 120
13. Tanda-II Uttar Pradesh 1320
14. Khargone Madhya Pradesh 1320
15. Telangana Telangana 1600
16. Mandsor-Solar Madhya Pradesh 25
17. Rojmal-Wind Gujarat 48
Total 15,602
JV & Sub. Companies
1. Meja Uttar Pradesh 1320
2. Nabinagar-BRBCL Bihar 500
3. Nabinagar-BSEB Bihar 1980
4. Rourkela-NSPCL Odisha 250
5. Durgapur-NSPCL West Bengal 40
Total 4,090
Grand Total (NTPC + JV & Sub.
Companies)
19,692 MW
Turnaround Capability
• Acquisition of existing power plants serves both NTPC's own
commercial interests as well as the interest of the Indian
economy. NTPC has successfully turned around the
performance of four sub-optimally performing stations
(Badarpur, Unchahar, Talcher and Tanda) over the years.
Badarpur (705 MW)
• The expertise in R&M and performance turnaround
was developed and built up by NTPC with the
operational turnaround of Badarpur TPS through
scientifically engineered R&M initiatives. The PLF of
the power station improved from 31.94% at the time
of the takeover to 53.13% for the year 2014-15.
Unchahar (420 MW)
• The Feroze Gandhi Unchahar Power Station was
taken over by NTPC in 1992 by which the cash
strapped UP State Electricity Board was rescued by
the turnaround expertise of NTPC.
Talcher (460 MW)
• It is equivalent to a fairytale no less. Taken over in
June 1995, the table indicates the dramatic gains in
the performance of the power plant as a result of
NTPC’s expertise.
Tanda (440 MW)
• Tanda Thermal Power Station was taken over by
NTPC on the 15 January 2000.The PLF of the power
station improved from 21.59% at the time of the
takeover to 82.02% for the year 2014-15.
1
2200 MW (200MW X 11)
2019181716151413121110987654321End
In first decade (1975-1985) of NTPC's
existence, how much generating
capacity achieved by NTPC ?
2
NTPC HR Vision
2019181716151413121110987654321End
"To enable our people to be a
family of committed world class
professionals, making NTPC a
learning organization.“ Where will
you find this statement ?
3
0.54
2019181716151413121110987654321End
What is the MAN-MW ratio in FY-
2015-16 ?
4
2010
2019181716151413121110987654321End
In which year, NTPC has become
“Maharatna” Company ?
5
2032
2019181716151413121110987654321End
NTPC targeted to be a 130
GW company by ?
6
Electric Vehicles (EVs)
2019181716151413121110987654321End
NTPC has forayed into Charging
business and set up charging
stations at multiple locations for
what ?
7
250.3 BU
2019181716151413121110987654321End
NTPC Standalone generation
in BUs in FY-2016-17 ?
8
78.60 %
2019181716151413121110987654321End
What is the % of PLF of NTPC
Coal based thermal stations in
FY 2016-17 ?
9
13395 MW (Target is 11920 MW)
2019181716151413121110987654321End
How much capacity addition
done in 12th plan by NTPC ?
10
Bharatiya Rail Bijlee Company
Ltd
2019181716151413121110987654321End
Expand “BRBCL” – A subsidiary
company of NTPC ?
250 MW X 4 Units at
Nabi Nagar
11
Star PSU Award
From Business
Standard
2019181716151413121110987654321End
Which award was received by Shri
Gurdeep Singh , CMD by Finance
Minister , GOI Shri Arun Jaitely on
25.03.2017 ?
12
88MW at Anta, Rajasthan
2019181716151413121110987654321End
First unit gas based combined
cycle power plant started at
which place in India by NTPC ?
13
1992
2019181716151413121110987654321End
In which year, pursuant to legislation by
the Parliament of India, the transmission
systems owned by the company was
transferred to Power Grid Corporation
Limited ?
14
2007 – 08
(92.94%)
2019181716151413121110987654321End
In which year, NTPC is achieved
highest ever PLF from coal
based power stations ?
Financial Year PLF
2008-09 91.14%
2009-10 90.81 %
2010-11 88.29 %
2011-12 85.0 %
2012-13 83.08 %
2013-14 81.50 %
2014-15 80.23 %
2015-16 78.61 %
15
West Bengal
2019181716151413121110987654321End
“Rammam” – which is upcoming
Hydro power plant of capacity 120
MW is located in which state ?
Location:- Approx 150 Km from
Bagdogra / Siliguri Distt. Darjeeling.
The Darjeeling town is 50 km
form the project.
16
Adani-Mundra power station (4620 MW)
2019181716151413121110987654321End
With commissioning of 500 MW Unit # 13,
NTPC’s Vindhyachal STPS becomes the
largest thermal power station in India with
capacity of 4760 MW, leaving behind which
power station ?
17
Lucknow
2019181716151413121110987654321End
In which city, Northern Region
head quarter located ?
18
69.74 %
2019181716151413121110987654321End
What is present percentage
share holding by GOI in NTPC ?
Shareholders Shareholding
Promoters: Government of India 69.74 %
DIIs 16.33 %
FIIs 10.75 %
Individuals/HUFs 1.74 %
Body corporate & Insurance Co. 1.24 %
Others
0.20 %
Total 100.0%
19
Pakri Barwadih
2019181716151413121110987654321End
First Coal Rake Flagged off from
which NTPC's First Coal Block on
16.02.2017 by union minister of
finance Sri. Arun Jaitley ?
20
Dadri
2019181716151413121110987654321End
In which solar PV plant, NTPC
installed Robotic Dry Cleaning
System?
21
Punjab and Jammu and Kashmir
2019181716151413121110987654321End
NTPC is not set up any owned / JV
power plant (either coal, hydro or
solar) in which north states of India ?
North States-
1) Haryana – Faridabad & Jhajjar (Aravali Power).
2) Himachal Pradesh – Koldam. – Hydro.
3) Uttar Pradesh - Singrauli, Rihand, Dadri, Unchahar, Tanda, Meja,
Auriaya.
4) Uttarakhand - Loharinag Pala, Tapovan Vishnugad, Lata Tapovan.
5) Punjab – No.
6) Jammu and Kashmir – No.
7) Delhi – UT – Badarpur.
22
Dulanga Opencast – Odisha
Chhattibariatu opencast – Jharkhand
Karendari Mine block – Jharkhand
Talaipalli coal mine – Chhattisgarh
Pakri Barwadih coal mine - Jharkhand
2019181716151413121110987654321End
Specify at least three coal mining
projects allotted NTPC and which
are on pipeline?
Chandrabila and Kudanli Laburi – Odisha
Banai and Bhalmuda – Chhattisgarh
Mandakini- II and Banhardih - Jharkhand
23
Hindustan Urvarak and Rasayan Ltd (HURL)
2019181716151413121110987654321End
Which joint venture started by NTPC
and Coal India Limited to revival of
Gorakhpur Fertilizers' Plant ?
24
Badla, District Bilaspur, Himachal Pradesh
2019181716151413121110987654321End
Govt. of Himachal Pradesh, NTPC Ltd. &
NHPC signed an MoU for setting up
Hydro Engineering College at which
place of Himachal Pradesh ?
25
22
2019181716151413121110987654321End
How many joint venture
companies have been formed
so far by NTPC ?
1) NTPC-SAIL POWER COMPANY (PVT) LTD (NSPCL)
2) NTPC TAMILNADU ENERGY COMPANY LIMITED
3) ARAVALI POWER COMPANY PRIVATE LTD
4) MEJA URJA NIGAM PRIVATE LIMITED
5) RATNAGIRI GAS & POWER PVT. LIMITED
6) NABINAGAR POWER GENERATING CO. PVT. LTD.
7) NTPC GE POWER SERVICES PVT. LTD.
8) UTILITY POWER TECH LTD
9) NATIONAL HIGH POWER TEST LABORATORY PVT. LTD. (NHPTL)
10) NATIONAL POWER EXCHANGE LTD.(NPEX)
11) NTPC – SCCL GLOBAL VENTURES PRIVATE LTD
12) INTERNATIONAL COAL VENTURES PVT. LIMITED (ICVL)
13) NTPC-BHEL POWER PROJECTS PVT.LTD
14) BF NTPC ENERGY SYSTEM LIMITED.
15) NTPC-TELK
16) ENERGY EFFICIENCY SERVICES LTD. (EESL)
17) CIL-NTPC URJA PRIVATE LIMITED (CNUPL)
18) ANUSHAKTI VIDHYUT NIGAM LIMITED (ASHVINI)
19) PAN-ASIAN RENEWABLES PRIVATE LIMITED
20) TRINCOMALEE POWER COMPANY LIMITED
21) BANGLADESH-INDIA FRIENDSHIP POWER COMPANY PRIVATE LIMITED (BIFPCL)
22) HINDUSTAN URVARAK & RASAYAN LIMITED (HURL)
26
5
2019181716151413121110987654321End
NTPC is owning how many
subsidiary companies ?
1) NTPC Electric Supply Company Ltd. (NESCL)
2) NTPC Vidyut Vyapar Nigam Ltd. (NVVN)
3) Kanti Bijlee Utpadan Nigam Limited
4) Bharatiya Rail Bijlee Company Limited (BRBCL)
5) Patratu Vidyut Utpadan Nigam Limited (PVUNL)
27
2004
2019181716151413121110987654321End
In which year NTPC got listed on
BSE and NSE ?
28
2
2019181716151413121110987654321End
Arrange the following Project/Stations in
descending order of their installed
capacity?
Mouda, Kudgi, Simhadri and Sipat
1) Mouda, Simhadri, Sipat, Kudgi.
2) Sipat, Mouda, Simhadri, Kudgi.
3) Simhadri, Sipat, Kudgi, Mouda.
4) Sipat, Kudgi, Mouda, Simhadri.
2980 MW
2320 MW
2000 MW
1600 MW
29
4
2019181716151413121110987654321End
Which of the following pair of Project/
Station and the State in which it is
located is NOT CORRECT?
1) Tapovan Vishnugad – Uttarakhand
2) Kawas – Gujarat
3) Kanti – Bihar
4) Rourkela - Assam
30
3
2019181716151413121110987654321End
Which of the following is a NOT a
Coal Mining Project of NTPC ?
1) Chhattibariatu opencast – Jharkhand
2) Karendari Mine block – Jharkhand
3) Brinda and Sasai Coal Mine - Jharkhand
4) Talaipalli coal mine – Chhattisgarh
31
2
2019181716151413121110987654321End
Which of the following
Project/Station of NTPC is NOT a
Taken Over Project?
1) Badarpur
2) Bongaigaon
3) Unchahar
4) Tanda
32
3
2019181716151413121110987654321End
At which Project NTPC commissioned
its first Super Critical 800 MW unit ?
1) Solapur
2) Mouda
3) Kudgi
4) Lara
33
2
2019181716151413121110987654321End
How much capacity addition was
made by NTPC in the year 2016-17?
1) 3745 MW
2) 3845 MW
3) 3945 MW
4) 3645 MW
34
1
2019181716151413121110987654321End
What value does M stand for in our
Core Values ‘ I COMIT’ ?
1) Mutual respect & Trust.
2) Mutual responsibility & Team work.
3) Mutual understanding & Truth
4) Mutual benefit and Trust
35
3
2019181716151413121110987654321End
Which of the following on going power
projects is going to have supercritical
boiler technology of 800 MW ?
1) Barh – 1
2) Solapur
3) Gadarwara
4) Khargone
36
4
2019181716151413121110987654321End
Which of the following PSU is not a
“Maharatna” company ?
1) Steel Authority of India Limited (SAIL)
2) Bharat Heavy Electricals Ltd. ( BHEL)
3) Indian Oil Corporation Limited(IOCL)
4) Hindustan Petroleum Corporation Limited (HPCL)
List of Maharatna Companies
1) National Thermal Power Corporation
(NTPC)
2) Oil and Natural Gas Corporation (ONGC)
3) Steel Authority of India Limited (SAIL)
4) Bharat Heavy Electricals Ltd. ( BHEL)
5) Indian Oil Corporation Limited(IOCL)
6) Coal India Limited(CIL)
7) Gas Authority of India Limited(GAIL)
37
4
2019181716151413121110987654321End
Which of the following plants of NTPC
has the highest installed capacity of
power generation ?
1) Farakka
2) Singrauli
3) Mouda
4) Kahalgaon
1) Farakka - 2100
2) Singrauli - 2000
3) Mouda - 2320
4) Kahalgaon - 2340
38
2
2019181716151413121110987654321End
Arrange the following projects/stations in
ascending order of the year in which they
started production ?
1) Sipat, Simhadri, Unchahaar and Dadri
2) Unchahar, Dadri, Simhadri and Sipat
3) Dadri, Unchahar, Simhadri and Sipat.
4) Sipat, Simhadri, Dadri and Unchahar
Sipat, Simhadri, Dadri and Unchahar
Unchahar-1988, Dadri – 1991
Simhadri – 2002, Sipat - 2007
39
4
2019181716151413121110987654321End
What is Man : MW ratio maintained in FY
– 2015 ?
1) 0.40
2) 0.50
3) 0.45
4) 0.59
40
1
2019181716151413121110987654321End
Awarded Best Company to work for under the
Public Sector Category and Energy, Gas and Oil
Sector at the India’s Best Companies to Work
for 2016 by ?
1) Economic Times
2) Indian Express
3) India Today
4) Business Line
41
4
2019181716151413121110987654321End
NTPC has signed a MoU for take-over of
Chhabra Thermal Power Plant. Chhabra
TPP is in which state ?
1) Madhya Pradesh
2) Uttar Pradesh
3) Haryana
4) Rajasthan
42
2
2019181716151413121110987654321End
NTPC and NALCO, the Joint Venture
Company established to construct a 2400
MW coal based power project at
Gajmara, Dhenkanal in which state ?
1) Madhya Pradesh
2) Odisha
3) Haryana
4) Jharkhand
43
4
2019181716151413121110987654321End
Piyush Goyal is the Minister of State
with Independent Charge for ?
1) Power and Coal.
2) Power, Coal and New Renewable energy.
3) Power, Coal, Energy and Mines.
4) Power, coal, New and Renewable energy and Mines.
44
1982
2019181716151413121110987654321End
In which year, Power
Management Institute, Delhi, a
center for education was
established by NTPC ?
45
Simhadri Project
2019181716151413121110987654321End
NTPC received the International Project
Management Award, for which project at
the International Project Management
Association World Congress. NTPC became
the only Asian Company to receive this
award ?
46
2007
2019181716151413121110987654321End
In which year, 765 KV
switchyard transmission system
energized at Sipat, the largest in
the country ?
47
Energy Efficiency Services Limited
2019181716151413121110987654321End
Which Joint Venture Company formed
amongst NTPC Limited, PFC, PGCIL and REC
to carry on and promote the business of
Energy Efficiency and climate change
including manufacture and supply of energy
efficiency services and products ?
48
Innovation & Learning
2019181716151413121110987654321End
In NTPC core values ICOMIT, what
is descriptive given letter ‘2nd ‘I’ ?
I - Integrity
C - Customer Focus
O - Organisational Pride
M - Mutual Respect & Trust
I - Innovation & Learning
T - Total Quality & Safety
49
2007 - 08
2019181716151413121110987654321End
In which financial year, NTPC
generation crossed “200 BU” ?
Financial Year Generation (BU)
2008-09 206.94
2009-10 218.84
2010-11 220.54
2011-12 222.07
2012-13 232.00
2013-14 233.269
2014-15 241.139
2015-16 241.98
50
JBVNL (Jarkhand Bijli Vitran Nigam
Limited
2019181716151413121110987654321End
“Patratu Vidyut Utpadan Nigam
Limited” (PVUNL) has been
incorporated in 2015 as a subsidiary
of NTPC and with which other
company ?
51
Trincomalee Power Company Limited
2019181716151413121110987654321End
What is the JV was incorporated on
26.09.2011 with the Ceylon Electricity
Board, Sri Lanka ?
52
NTPC Environment Policy
2019181716151413121110987654321End
“Going Higher on Generation,
lowering Green House Gas
Intensity” – The statement is
appeared on which policy of NTPC ?
53
NTPC Dadri
2019181716151413121110987654321End
Solar Thermal Cooking System (STCS)
an innovative low carbon, all weather
cooking solution has been installed on
October 21, 2015 for first time at which
NTPC station ?
54
Vaishali Power Generating Company
Limited
2019181716151413121110987654321End
“Kanti Bijlee Utpadan Nigam
Limited”, the subsidiary of NTPC
formerly known by what name ?
55
NTPC Energy Technology Research
Alliance
2019181716151413121110987654321End
What is the full form of NETRA?
56
Bhadla – Wind energy
2019181716151413121110987654321End
Which of the following locations
is incorrectly related to NTPC ?
1)Kanti – Thermal Energy
2)Jhanor – Gandhar – Gas Energy
3)Rammam – Hydro
4)Bhadla – Wind Energy
57
DRIVEN BY INNOVATION AND AGILITY
2019181716151413121110987654321End
NTPC Mission is “PROVIDE RELIABLE POWER
AND RELATED SOLUTIONS IN AN ECONOMICAL,
EFFICIENT AND ENVIRONMENT FRIENDLY
MANNER,…………………………… complete ?
58
4 – Exceeded in 2002
2019181716151413121110987654321End
Which of the following pairs important
milestones / events of NTPC and the
year of its occurrence is in correct ?
1) Maharatna Status – 2010.
2) Navaratna Status – 1997.
3) Changed its name from National Thermal Power
Corporation Ltd. to NTPC Ltd - 2005.
4) 20000MW Installed capacity crossed – 2001.
59
NPCIL
2019181716151413121110987654321End
'Anushakti Vidhyut Nigam Ltd'
(Company) incorporated between NTPC
and which other company ?
60
Jharkhand
2019181716151413121110987654321End
From the below, in which state NTPC
not owned coal based thermal station ?
1)Jharkhand
2)Madhya Pradesh
3)Chhattisgarh
4)Bihar
S. No. State Name NTPC/JV Plant
01 Andhra Pradesh Simhadri, Ananthpuram (solar)
02 Arunachal Pradesh No
03 Assam Bongaigaon
04 Bihar Kahalgaon, Barh, Kanti (JV), Nabinagar (JV)
05 Chattishgarh Korba, Sipat, Bhilai (JV)
06 Goa No
07 Gujarat Kawas, Jhanor – Ghandhar, Rojmal (wind)
08 Haryana Jhajjar (JV), Faridabad
09 Himachal Pradesh Koldam
10 Jammu and Kashmir No
11 Jharkhand Patratu (JV)
12 Karnataka Kudgi
13 Kerala Kayamkulam
14 Madhya Pradesh Vindhyachal, Rajgarh, Mandasaur
15 Maharastra Mauda, Sholapur, RGPPL (JV)
16 Manipur No
17 Meghalaya No
18 Mizoram No
19 Nagaland No
20 Odisha Talcher Kaniha, Talcher Thermal, Rourkela (JV)
S. No. State Name NTPC/JV Plant
21 Punjab No
22 Rajasthan Anta, Bhadla
23 Sikkim No
24 Tamilnadu Vallur
25 Telangana Ramagundam, Telangana
26 Tripura No
27 Uttara Pradesh Singrauli, Rihand, Dadri, Unchahaar, Tanda,
Auriaya
28 Uttarakhand Tapovan Vishnughad, Lata Tapovan
29 West Bengal Farakka, Durgapur (JV), Rammam
Union Territories
01 Andaman & Nicobar Islands Portblair
02 Chandigarh No
03 Dadra and Nagar Haveli No
04 Daman and Diu No
05 Delhi Badarpur
06 Lakshadweep No
07 Puducherry No
61
A) 3 – 4 – 2 - 1
B) 1 – 2 – 3 - 4
C) 4 – 3 – 2 - 1
D) 4 – 2 – 1 - 3
2019181716151413121110987654321End
Arrange the following Hydro stations in
descending order as per their capacity ?
1) Rammam,
2) Lata Tapovan,
3) Koldam
4) Tapovan Vishughad
(A)
(800-520-171-120MW)
62
2019181716151413121110987654321End
From the following, find incorrect
matching ?
1) Tanda - Uttarpradesh,
2) Barh - Bihar,
3) Durgapur – West Bengal
4) Kawas - Rajasthan
4
63
2019181716151413121110987654321End
Arrange the following gas stations in
descending order as per the capacity ?
1) Dadri,
2) Auriaya,
3) Anta
4) Kawas
C
(829.78 – 663.36 –
656.20 – 419.33MW)
A) 3 – 4 – 2 - 1
B) 1 – 2 – 3 - 4
C) 1 – 2 – 4 - 3
D) 4 – 2 – 1 - 3
64
2019181716151413121110987654321End
How much was the total
generation of NTPC Group in FY-
2017 ?
276 BU
65
2019181716151413121110987654321End
How much was the solar
capacity added in FY-2017
510 MW
All the Best

Ntpc information

  • 2.
    Vision • To bethe World’s leading power company, energizing India’s growth. Mission • Provide reliable power and related solutions in an economical, efficient, and environment friendly manner, driven by innovation and agility.
  • 3.
    Core Values: ICOMIT •Integrity • Customer Focus • Organizational Pride • Mutual Respect & Trust • Innovation & Learning • Total Quality & Safety NTPC became a Maharatna company in May 2010, one of the only four companies to be awarded this status. NTPC was ranked 400th in the 2016, Forbes Global 2000 ranking of the World’s biggest companies.
  • 4.
    Board of directors Shri. Gurudeep Singh - CMD  Shri A.K.Jha - Director (Technical)  Shri S. Roy - Director (HR),  Shri A.K. Gupta - Director (Commercial)  Shri S C Pandey - Director (Projects)  Shri Kulamani Biswal - Director (Finance)  Shri K K Sharma - Director (Operation)  Shri Pradeep Kumar - Director ( JS & FA)  Shri Anirudh kumar - JS (Thermal)  Dr Gauri Trivedi - Independent Director.  Shri. S. Chander - Independent Director.  Shri Rajesh Jain - Independent Director.
  • 5.
    Past CMD’s  SHRIDV KAPUR Took over as 1st CMD on 19-03-1976  SHRI A.K SHAH.  SHRI M.L SHISHOO.  SHRI PS BAMI.  SHRI DR. RAJENDER SINGH.  SHRI C.P JAIN.  SHRI T.SHANKARLINGAM.  SHRI R.S.SHARMA.  SHRI Dr. ARUP ROY CHOUDHURY.
  • 6.
    NTPC CaPaCiTy addiTioN Presentinstalled capacity (20.06.2017) 51635 MW Capacity addition till 31.03.2017 50498 MW Capacity addition during 2016-17 3845 MW Capacity added during 2015-2016 2255 MW Capacity added during 2014-15 1290 MW Capacity added during 2013-14 1835 MW Capacity added during 2012-13 4170 MW Capacity added during 2011-12 2820 MW Capacity added during 2010-11 2490 MW Capacity added during 2009-10 1560 MW
  • 7.
    • The totalinstalled capacity of the company is 51,635 MW (including JVs) with 20 coal based, 7 gas based stations, 1 Hydro based station and 1 Wind based station. 9 Joint Venture stations are coal based and 11 Solar PV projects. • NTPC has been operating its plants at high efficiency levels. Although the company has 17.73% of the total national capacity, it contributes 24.0% of total power generation due to its focus on high efficiency.
  • 9.
    (As on 20.06.2017)NO. OF PLANTS CAPACITY (MW) NTPC Owned Coal 20 38,755 Gas/Liquid Fuel 7 4,017 Hydro 1 800 RE projects (Solar PV) 11 845 Hydro 1 2 Total 40 44,419 Owned By JVs/Subsidiaries Coal & Gas 9 7,216 Total 49 51,635
  • 10.
    REGION COAL GAS/Liquid Fuel RenewableTOTAL Northern 9,515 2,344 35 11,894 Western 13,320 1,313 412 14,930 Southern 6,200 360 385 6,945 Eastern 9,720 - 10 9,845 Islands - - 5 5 Hydro - - - 800 JVs 5,249 1,967 - 7,216 Total 44,004 5,984 622 51,635 Regional Spread of Generating Facilities
  • 11.
    Sr. No. COALBASED (Owned by NTPC) STATE CAPACITY(MW) 1. Singrauli Uttar Pradesh 2,000 2. Korba Chhattisgarh 2,600 3. Ramagundam Telangana 2,600 4. Farakka West Bengal 2,100 5. Vindhyachal Madhya Pradesh 4,760 6. Rihand Uttar Pradesh 3,000 7. Kahalgaon Bihar 2,340 8. Dadri Uttar Pradesh 1,820 9. Talcher Kaniha Orissa 3,000 10. Feroze Gandhi, Unchahar Uttar Pradesh 1,550 11. Talcher Thermal Orissa 460 12. Simhadri Andhra Pradesh 2,000 13. Tanda Uttar Pradesh 440 14. Badarpur Delhi 705 15. Sipat Chhattisgarh 2,980 16. Mauda Maharashtra 2,320 17. Barh Bihar 1320 18. Bongaigaon Assam 500 19. Kudgi Karnataka 1600 20. Solapur Maharashtra 660 Total 38,755
  • 12.
    Sr. No COALBASED(Owned by JVs/Subsidiaries) STATE COMMISSIONED CAPACITY 1. Durgapur West Bengal 120 2 Rourkela Orissa 120 3 Bhilai Chhattisgarh 574 4 Kanti Bihar 610 5 IGSTPP, Jhajjar Haryana 1500 6 Vallur Tamil Nadu 1500 7 Nabinagar-BRBCL Bihar 500 8 PUVNL(Patratu) Jharkhand 325 Total 5,249 Coal Based Joint Ventures/Subsidiaries
  • 13.
    Sr. No. GASBASED (Owned by NTPC) STATE COMMISSIONED CAPACITY(MW) 1. Anta Rajasthan 419.33 2. Auraiya Uttar Pradesh 663.36 3. Kawas Gujarat 656.20 4. Dadri Uttar Pradesh 829.78 5. Jhanor-Gandhar Gujarat 657.39 6. Rajiv Gandhi CCPP Kayamkulam Kerala 359.58 7. Faridabad Haryana 431.59 Total 4,017.23 Sr. No. GAS BASED (Owned by JVs/Subsidiaries) STATE COMMISSIONED CAPACITY 1. RGPPL Maharashtra 1967.08 Total 1,967.08
  • 14.
    S. No. Hydro Based StateApproved capacity MW Commissioned capacity (MW) 1. Koldam (HEPP) Himachal Pradesh 800 800 2. Tapovan Vishnugad Uttarakhand 520 - 3. Singrauli CW Discharge (Small Hydro) Uttar Pradesh 8 - 4. Lata Tapovan Uttrakhand 171 - 5. Rammam West Bengal 120 - Total 1,519 800 Hydro Based Power Projects  NTPC has increased thrust on hydro development for a balanced portfolio for long term sustainability.  The first step in this direction was taken by initiating investment in Koldam Hydro Electric Power Project located on Satluj river in Bilaspur district of Himachal Pradesh. Other hydro project under construction is Tapovan Vishnugad.  On all these projects construction activities are in full swing.
  • 15.
    S. No. ProjectState/UT Capacity (MW) 1. Dadri Solar PV Uttar Pradesh 5 2. Port blair Solar PV Andaman & Nicobar Island 5 3. Ramagundam Solar PV (Phase -I) Telangana 10 4. Talcher Kaniha Solar PV Odisha 10 5. Faridabad Solar PV Haryana 5 6. Unchahar Solar PV Uttar Pradesh 10 7. Rajgarh Solar PV Madhya Pradesh 50 8. Singrauli Solar PV Uttar Pradesh 15 9. Ananthapuram Solar PV Andhra Pradesh 250 10. Bhadla-Solar Rajasthan 260 11. Mandsaur-Solar Madhya Pradesh 225 Total 845 Renewable eneRgy PRojects - SOLAR
  • 16.
    Sr. No. ProjectState/UT Capacity (MW) 1. Rojmal Gujarat 2 Total 2 Wind Energy: Rojmal Wind Power Project (50 MW) Renewable eneRgy PRojects - WIND
  • 17.
    Geothermal Energy: Tattapani GeothermalProject in Chhattisgarh: MoU Signed with Govt. of Chhattisgarh.  Feasibility studies in association with the Geological Survey of India are in progress.
  • 18.
    OPERATIONAL PERFORMANCE OFCOAL & GAS BASED NTPC STATIONS Gross Generation (BU) (COAL & GAS) PLF (%) (Coal Stations) 2016-17 250.03 78.60 2015-16 241.98 78.61 2014-15 241.139 80.23 2013-14 233.269 81.50 2012-13 232.00 83.08 2011-12 222.07 85.00 2010-11 220.54 88.29 2009-10 218.84 90.81 2008-09 206.94 91.14 2007-08 200.86 92.24 2006-07 188.67 89.43 2005-06 170.88 87.52
  • 19.
    Future CapaCity additions(ntpC) S. No. PROJECT STATE MW 1. Barh-I Bihar 1980 2. Singrauli CW Discharge (Small Hydro) Uttar Pradesh 8 3. Tapovan Vishnugud-Hydro Uttarakhand 520 4. Kudgi Karnataka 800 5. Solapur Maharashtra 660 6. Bongaigaon Assam 250 7. Lata Tapovan-Hydro Uttarakhand 171 8. Lara Chhattisgarh 1600 9. Gadarwara Madhya Pradesh 1600 10. Darlipali Odisha 1600 11. North Karanpura Jharkhand 1980 12. Rammam-Hydro West Bengal 120 13. Tanda-II Uttar Pradesh 1320 14. Khargone Madhya Pradesh 1320 15. Telangana Telangana 1600 16. Mandsor-Solar Madhya Pradesh 25 17. Rojmal-Wind Gujarat 48 Total 15,602
  • 20.
    JV & Sub.Companies 1. Meja Uttar Pradesh 1320 2. Nabinagar-BRBCL Bihar 500 3. Nabinagar-BSEB Bihar 1980 4. Rourkela-NSPCL Odisha 250 5. Durgapur-NSPCL West Bengal 40 Total 4,090 Grand Total (NTPC + JV & Sub. Companies) 19,692 MW
  • 21.
    Turnaround Capability • Acquisitionof existing power plants serves both NTPC's own commercial interests as well as the interest of the Indian economy. NTPC has successfully turned around the performance of four sub-optimally performing stations (Badarpur, Unchahar, Talcher and Tanda) over the years. Badarpur (705 MW) • The expertise in R&M and performance turnaround was developed and built up by NTPC with the operational turnaround of Badarpur TPS through scientifically engineered R&M initiatives. The PLF of the power station improved from 31.94% at the time of the takeover to 53.13% for the year 2014-15.
  • 22.
    Unchahar (420 MW) •The Feroze Gandhi Unchahar Power Station was taken over by NTPC in 1992 by which the cash strapped UP State Electricity Board was rescued by the turnaround expertise of NTPC. Talcher (460 MW) • It is equivalent to a fairytale no less. Taken over in June 1995, the table indicates the dramatic gains in the performance of the power plant as a result of NTPC’s expertise. Tanda (440 MW) • Tanda Thermal Power Station was taken over by NTPC on the 15 January 2000.The PLF of the power station improved from 21.59% at the time of the takeover to 82.02% for the year 2014-15.
  • 23.
    1 2200 MW (200MWX 11) 2019181716151413121110987654321End In first decade (1975-1985) of NTPC's existence, how much generating capacity achieved by NTPC ?
  • 24.
    2 NTPC HR Vision 2019181716151413121110987654321End "Toenable our people to be a family of committed world class professionals, making NTPC a learning organization.“ Where will you find this statement ?
  • 25.
  • 26.
    4 2010 2019181716151413121110987654321End In which year,NTPC has become “Maharatna” Company ?
  • 27.
  • 28.
    6 Electric Vehicles (EVs) 2019181716151413121110987654321End NTPChas forayed into Charging business and set up charging stations at multiple locations for what ?
  • 29.
  • 30.
    8 78.60 % 2019181716151413121110987654321End What isthe % of PLF of NTPC Coal based thermal stations in FY 2016-17 ?
  • 31.
    9 13395 MW (Targetis 11920 MW) 2019181716151413121110987654321End How much capacity addition done in 12th plan by NTPC ?
  • 32.
    10 Bharatiya Rail BijleeCompany Ltd 2019181716151413121110987654321End Expand “BRBCL” – A subsidiary company of NTPC ? 250 MW X 4 Units at Nabi Nagar
  • 33.
    11 Star PSU Award FromBusiness Standard 2019181716151413121110987654321End Which award was received by Shri Gurdeep Singh , CMD by Finance Minister , GOI Shri Arun Jaitely on 25.03.2017 ?
  • 34.
    12 88MW at Anta,Rajasthan 2019181716151413121110987654321End First unit gas based combined cycle power plant started at which place in India by NTPC ?
  • 35.
    13 1992 2019181716151413121110987654321End In which year,pursuant to legislation by the Parliament of India, the transmission systems owned by the company was transferred to Power Grid Corporation Limited ?
  • 36.
    14 2007 – 08 (92.94%) 2019181716151413121110987654321End Inwhich year, NTPC is achieved highest ever PLF from coal based power stations ? Financial Year PLF 2008-09 91.14% 2009-10 90.81 % 2010-11 88.29 % 2011-12 85.0 % 2012-13 83.08 % 2013-14 81.50 % 2014-15 80.23 % 2015-16 78.61 %
  • 37.
    15 West Bengal 2019181716151413121110987654321End “Rammam” –which is upcoming Hydro power plant of capacity 120 MW is located in which state ? Location:- Approx 150 Km from Bagdogra / Siliguri Distt. Darjeeling. The Darjeeling town is 50 km form the project.
  • 38.
    16 Adani-Mundra power station(4620 MW) 2019181716151413121110987654321End With commissioning of 500 MW Unit # 13, NTPC’s Vindhyachal STPS becomes the largest thermal power station in India with capacity of 4760 MW, leaving behind which power station ?
  • 39.
  • 40.
    18 69.74 % 2019181716151413121110987654321End What ispresent percentage share holding by GOI in NTPC ? Shareholders Shareholding Promoters: Government of India 69.74 % DIIs 16.33 % FIIs 10.75 % Individuals/HUFs 1.74 % Body corporate & Insurance Co. 1.24 % Others 0.20 % Total 100.0%
  • 41.
    19 Pakri Barwadih 2019181716151413121110987654321End First CoalRake Flagged off from which NTPC's First Coal Block on 16.02.2017 by union minister of finance Sri. Arun Jaitley ?
  • 42.
    20 Dadri 2019181716151413121110987654321End In which solarPV plant, NTPC installed Robotic Dry Cleaning System?
  • 43.
    21 Punjab and Jammuand Kashmir 2019181716151413121110987654321End NTPC is not set up any owned / JV power plant (either coal, hydro or solar) in which north states of India ? North States- 1) Haryana – Faridabad & Jhajjar (Aravali Power). 2) Himachal Pradesh – Koldam. – Hydro. 3) Uttar Pradesh - Singrauli, Rihand, Dadri, Unchahar, Tanda, Meja, Auriaya. 4) Uttarakhand - Loharinag Pala, Tapovan Vishnugad, Lata Tapovan. 5) Punjab – No. 6) Jammu and Kashmir – No. 7) Delhi – UT – Badarpur.
  • 44.
    22 Dulanga Opencast –Odisha Chhattibariatu opencast – Jharkhand Karendari Mine block – Jharkhand Talaipalli coal mine – Chhattisgarh Pakri Barwadih coal mine - Jharkhand 2019181716151413121110987654321End Specify at least three coal mining projects allotted NTPC and which are on pipeline? Chandrabila and Kudanli Laburi – Odisha Banai and Bhalmuda – Chhattisgarh Mandakini- II and Banhardih - Jharkhand
  • 45.
    23 Hindustan Urvarak andRasayan Ltd (HURL) 2019181716151413121110987654321End Which joint venture started by NTPC and Coal India Limited to revival of Gorakhpur Fertilizers' Plant ?
  • 46.
    24 Badla, District Bilaspur,Himachal Pradesh 2019181716151413121110987654321End Govt. of Himachal Pradesh, NTPC Ltd. & NHPC signed an MoU for setting up Hydro Engineering College at which place of Himachal Pradesh ?
  • 47.
    25 22 2019181716151413121110987654321End How many jointventure companies have been formed so far by NTPC ?
  • 48.
    1) NTPC-SAIL POWERCOMPANY (PVT) LTD (NSPCL) 2) NTPC TAMILNADU ENERGY COMPANY LIMITED 3) ARAVALI POWER COMPANY PRIVATE LTD 4) MEJA URJA NIGAM PRIVATE LIMITED 5) RATNAGIRI GAS & POWER PVT. LIMITED 6) NABINAGAR POWER GENERATING CO. PVT. LTD. 7) NTPC GE POWER SERVICES PVT. LTD. 8) UTILITY POWER TECH LTD 9) NATIONAL HIGH POWER TEST LABORATORY PVT. LTD. (NHPTL) 10) NATIONAL POWER EXCHANGE LTD.(NPEX) 11) NTPC – SCCL GLOBAL VENTURES PRIVATE LTD 12) INTERNATIONAL COAL VENTURES PVT. LIMITED (ICVL) 13) NTPC-BHEL POWER PROJECTS PVT.LTD 14) BF NTPC ENERGY SYSTEM LIMITED. 15) NTPC-TELK 16) ENERGY EFFICIENCY SERVICES LTD. (EESL) 17) CIL-NTPC URJA PRIVATE LIMITED (CNUPL) 18) ANUSHAKTI VIDHYUT NIGAM LIMITED (ASHVINI) 19) PAN-ASIAN RENEWABLES PRIVATE LIMITED 20) TRINCOMALEE POWER COMPANY LIMITED 21) BANGLADESH-INDIA FRIENDSHIP POWER COMPANY PRIVATE LIMITED (BIFPCL) 22) HINDUSTAN URVARAK & RASAYAN LIMITED (HURL)
  • 49.
    26 5 2019181716151413121110987654321End NTPC is owninghow many subsidiary companies ? 1) NTPC Electric Supply Company Ltd. (NESCL) 2) NTPC Vidyut Vyapar Nigam Ltd. (NVVN) 3) Kanti Bijlee Utpadan Nigam Limited 4) Bharatiya Rail Bijlee Company Limited (BRBCL) 5) Patratu Vidyut Utpadan Nigam Limited (PVUNL)
  • 50.
  • 51.
    28 2 2019181716151413121110987654321End Arrange the followingProject/Stations in descending order of their installed capacity? Mouda, Kudgi, Simhadri and Sipat 1) Mouda, Simhadri, Sipat, Kudgi. 2) Sipat, Mouda, Simhadri, Kudgi. 3) Simhadri, Sipat, Kudgi, Mouda. 4) Sipat, Kudgi, Mouda, Simhadri. 2980 MW 2320 MW 2000 MW 1600 MW
  • 52.
    29 4 2019181716151413121110987654321End Which of thefollowing pair of Project/ Station and the State in which it is located is NOT CORRECT? 1) Tapovan Vishnugad – Uttarakhand 2) Kawas – Gujarat 3) Kanti – Bihar 4) Rourkela - Assam
  • 53.
    30 3 2019181716151413121110987654321End Which of thefollowing is a NOT a Coal Mining Project of NTPC ? 1) Chhattibariatu opencast – Jharkhand 2) Karendari Mine block – Jharkhand 3) Brinda and Sasai Coal Mine - Jharkhand 4) Talaipalli coal mine – Chhattisgarh
  • 54.
    31 2 2019181716151413121110987654321End Which of thefollowing Project/Station of NTPC is NOT a Taken Over Project? 1) Badarpur 2) Bongaigaon 3) Unchahar 4) Tanda
  • 55.
    32 3 2019181716151413121110987654321End At which ProjectNTPC commissioned its first Super Critical 800 MW unit ? 1) Solapur 2) Mouda 3) Kudgi 4) Lara
  • 56.
    33 2 2019181716151413121110987654321End How much capacityaddition was made by NTPC in the year 2016-17? 1) 3745 MW 2) 3845 MW 3) 3945 MW 4) 3645 MW
  • 57.
    34 1 2019181716151413121110987654321End What value doesM stand for in our Core Values ‘ I COMIT’ ? 1) Mutual respect & Trust. 2) Mutual responsibility & Team work. 3) Mutual understanding & Truth 4) Mutual benefit and Trust
  • 58.
    35 3 2019181716151413121110987654321End Which of thefollowing on going power projects is going to have supercritical boiler technology of 800 MW ? 1) Barh – 1 2) Solapur 3) Gadarwara 4) Khargone
  • 59.
    36 4 2019181716151413121110987654321End Which of thefollowing PSU is not a “Maharatna” company ? 1) Steel Authority of India Limited (SAIL) 2) Bharat Heavy Electricals Ltd. ( BHEL) 3) Indian Oil Corporation Limited(IOCL) 4) Hindustan Petroleum Corporation Limited (HPCL)
  • 60.
    List of MaharatnaCompanies 1) National Thermal Power Corporation (NTPC) 2) Oil and Natural Gas Corporation (ONGC) 3) Steel Authority of India Limited (SAIL) 4) Bharat Heavy Electricals Ltd. ( BHEL) 5) Indian Oil Corporation Limited(IOCL) 6) Coal India Limited(CIL) 7) Gas Authority of India Limited(GAIL)
  • 61.
    37 4 2019181716151413121110987654321End Which of thefollowing plants of NTPC has the highest installed capacity of power generation ? 1) Farakka 2) Singrauli 3) Mouda 4) Kahalgaon 1) Farakka - 2100 2) Singrauli - 2000 3) Mouda - 2320 4) Kahalgaon - 2340
  • 62.
    38 2 2019181716151413121110987654321End Arrange the followingprojects/stations in ascending order of the year in which they started production ? 1) Sipat, Simhadri, Unchahaar and Dadri 2) Unchahar, Dadri, Simhadri and Sipat 3) Dadri, Unchahar, Simhadri and Sipat. 4) Sipat, Simhadri, Dadri and Unchahar Sipat, Simhadri, Dadri and Unchahar Unchahar-1988, Dadri – 1991 Simhadri – 2002, Sipat - 2007
  • 63.
    39 4 2019181716151413121110987654321End What is Man: MW ratio maintained in FY – 2015 ? 1) 0.40 2) 0.50 3) 0.45 4) 0.59
  • 64.
    40 1 2019181716151413121110987654321End Awarded Best Companyto work for under the Public Sector Category and Energy, Gas and Oil Sector at the India’s Best Companies to Work for 2016 by ? 1) Economic Times 2) Indian Express 3) India Today 4) Business Line
  • 65.
    41 4 2019181716151413121110987654321End NTPC has signeda MoU for take-over of Chhabra Thermal Power Plant. Chhabra TPP is in which state ? 1) Madhya Pradesh 2) Uttar Pradesh 3) Haryana 4) Rajasthan
  • 66.
    42 2 2019181716151413121110987654321End NTPC and NALCO,the Joint Venture Company established to construct a 2400 MW coal based power project at Gajmara, Dhenkanal in which state ? 1) Madhya Pradesh 2) Odisha 3) Haryana 4) Jharkhand
  • 67.
    43 4 2019181716151413121110987654321End Piyush Goyal isthe Minister of State with Independent Charge for ? 1) Power and Coal. 2) Power, Coal and New Renewable energy. 3) Power, Coal, Energy and Mines. 4) Power, coal, New and Renewable energy and Mines.
  • 68.
    44 1982 2019181716151413121110987654321End In which year,Power Management Institute, Delhi, a center for education was established by NTPC ?
  • 69.
    45 Simhadri Project 2019181716151413121110987654321End NTPC receivedthe International Project Management Award, for which project at the International Project Management Association World Congress. NTPC became the only Asian Company to receive this award ?
  • 70.
    46 2007 2019181716151413121110987654321End In which year,765 KV switchyard transmission system energized at Sipat, the largest in the country ?
  • 71.
    47 Energy Efficiency ServicesLimited 2019181716151413121110987654321End Which Joint Venture Company formed amongst NTPC Limited, PFC, PGCIL and REC to carry on and promote the business of Energy Efficiency and climate change including manufacture and supply of energy efficiency services and products ?
  • 72.
    48 Innovation & Learning 2019181716151413121110987654321End InNTPC core values ICOMIT, what is descriptive given letter ‘2nd ‘I’ ? I - Integrity C - Customer Focus O - Organisational Pride M - Mutual Respect & Trust I - Innovation & Learning T - Total Quality & Safety
  • 73.
    49 2007 - 08 2019181716151413121110987654321End Inwhich financial year, NTPC generation crossed “200 BU” ? Financial Year Generation (BU) 2008-09 206.94 2009-10 218.84 2010-11 220.54 2011-12 222.07 2012-13 232.00 2013-14 233.269 2014-15 241.139 2015-16 241.98
  • 74.
    50 JBVNL (Jarkhand BijliVitran Nigam Limited 2019181716151413121110987654321End “Patratu Vidyut Utpadan Nigam Limited” (PVUNL) has been incorporated in 2015 as a subsidiary of NTPC and with which other company ?
  • 75.
    51 Trincomalee Power CompanyLimited 2019181716151413121110987654321End What is the JV was incorporated on 26.09.2011 with the Ceylon Electricity Board, Sri Lanka ?
  • 76.
    52 NTPC Environment Policy 2019181716151413121110987654321End “GoingHigher on Generation, lowering Green House Gas Intensity” – The statement is appeared on which policy of NTPC ?
  • 77.
    53 NTPC Dadri 2019181716151413121110987654321End Solar ThermalCooking System (STCS) an innovative low carbon, all weather cooking solution has been installed on October 21, 2015 for first time at which NTPC station ?
  • 78.
    54 Vaishali Power GeneratingCompany Limited 2019181716151413121110987654321End “Kanti Bijlee Utpadan Nigam Limited”, the subsidiary of NTPC formerly known by what name ?
  • 79.
    55 NTPC Energy TechnologyResearch Alliance 2019181716151413121110987654321End What is the full form of NETRA?
  • 80.
    56 Bhadla – Windenergy 2019181716151413121110987654321End Which of the following locations is incorrectly related to NTPC ? 1)Kanti – Thermal Energy 2)Jhanor – Gandhar – Gas Energy 3)Rammam – Hydro 4)Bhadla – Wind Energy
  • 81.
    57 DRIVEN BY INNOVATIONAND AGILITY 2019181716151413121110987654321End NTPC Mission is “PROVIDE RELIABLE POWER AND RELATED SOLUTIONS IN AN ECONOMICAL, EFFICIENT AND ENVIRONMENT FRIENDLY MANNER,…………………………… complete ?
  • 82.
    58 4 – Exceededin 2002 2019181716151413121110987654321End Which of the following pairs important milestones / events of NTPC and the year of its occurrence is in correct ? 1) Maharatna Status – 2010. 2) Navaratna Status – 1997. 3) Changed its name from National Thermal Power Corporation Ltd. to NTPC Ltd - 2005. 4) 20000MW Installed capacity crossed – 2001.
  • 83.
    59 NPCIL 2019181716151413121110987654321End 'Anushakti Vidhyut NigamLtd' (Company) incorporated between NTPC and which other company ?
  • 84.
    60 Jharkhand 2019181716151413121110987654321End From the below,in which state NTPC not owned coal based thermal station ? 1)Jharkhand 2)Madhya Pradesh 3)Chhattisgarh 4)Bihar
  • 85.
    S. No. StateName NTPC/JV Plant 01 Andhra Pradesh Simhadri, Ananthpuram (solar) 02 Arunachal Pradesh No 03 Assam Bongaigaon 04 Bihar Kahalgaon, Barh, Kanti (JV), Nabinagar (JV) 05 Chattishgarh Korba, Sipat, Bhilai (JV) 06 Goa No 07 Gujarat Kawas, Jhanor – Ghandhar, Rojmal (wind) 08 Haryana Jhajjar (JV), Faridabad 09 Himachal Pradesh Koldam 10 Jammu and Kashmir No 11 Jharkhand Patratu (JV) 12 Karnataka Kudgi 13 Kerala Kayamkulam 14 Madhya Pradesh Vindhyachal, Rajgarh, Mandasaur 15 Maharastra Mauda, Sholapur, RGPPL (JV) 16 Manipur No 17 Meghalaya No 18 Mizoram No 19 Nagaland No 20 Odisha Talcher Kaniha, Talcher Thermal, Rourkela (JV)
  • 86.
    S. No. StateName NTPC/JV Plant 21 Punjab No 22 Rajasthan Anta, Bhadla 23 Sikkim No 24 Tamilnadu Vallur 25 Telangana Ramagundam, Telangana 26 Tripura No 27 Uttara Pradesh Singrauli, Rihand, Dadri, Unchahaar, Tanda, Auriaya 28 Uttarakhand Tapovan Vishnughad, Lata Tapovan 29 West Bengal Farakka, Durgapur (JV), Rammam Union Territories 01 Andaman & Nicobar Islands Portblair 02 Chandigarh No 03 Dadra and Nagar Haveli No 04 Daman and Diu No 05 Delhi Badarpur 06 Lakshadweep No 07 Puducherry No
  • 87.
    61 A) 3 –4 – 2 - 1 B) 1 – 2 – 3 - 4 C) 4 – 3 – 2 - 1 D) 4 – 2 – 1 - 3 2019181716151413121110987654321End Arrange the following Hydro stations in descending order as per their capacity ? 1) Rammam, 2) Lata Tapovan, 3) Koldam 4) Tapovan Vishughad (A) (800-520-171-120MW)
  • 88.
    62 2019181716151413121110987654321End From the following,find incorrect matching ? 1) Tanda - Uttarpradesh, 2) Barh - Bihar, 3) Durgapur – West Bengal 4) Kawas - Rajasthan 4
  • 89.
    63 2019181716151413121110987654321End Arrange the followinggas stations in descending order as per the capacity ? 1) Dadri, 2) Auriaya, 3) Anta 4) Kawas C (829.78 – 663.36 – 656.20 – 419.33MW) A) 3 – 4 – 2 - 1 B) 1 – 2 – 3 - 4 C) 1 – 2 – 4 - 3 D) 4 – 2 – 1 - 3
  • 90.
    64 2019181716151413121110987654321End How much wasthe total generation of NTPC Group in FY- 2017 ? 276 BU
  • 91.
    65 2019181716151413121110987654321End How much wasthe solar capacity added in FY-2017 510 MW
  • 92.