Koldam HEPP, Himachal Pradesh
2019181716151413121110987654321End
Name the first Hydro Power Project
taken over by NTPC.
Location: Bilaspur District, Himachal Pradesh
Capacity: 800 MW
Commissioned: 2008
It is a run-of-river scheme utilizing water from Satluj River.