1
Education
St. Edmunds College, Ipswich
Queensland Certificate of Education (QCE)
University of Southern Queensland, Toowoomba
SVY1500 – Spatial Science for Engineers
Associate Degree in Spatial Science – ADSS (Incomplete)
Brisbane Institute of TAFE
Diploma in Surveying (Cert IV)
Technical Proficiency
• 12D Model / 12D Field
• Leica TPS 1200 / Viva TS15
• Trimble GPS
• Topcon Machine Control
• Trimble Machine Control
• Topcon 3D Office
• Trimble Business Centre – HCE
• Paveset
• Microsoft Office
Skills
Surveying has given me a sound understanding of the
engineering and construction industry and all
applications and processes involved. Professionalism,
working proficiently, promptly and to specific
standards is my utmost priority whether it part of a
survey team, alone, in the office, out in the field or
engaging with clients.
Experience
2007 – 2008
Abigroup – Southern Regional Water Pipeline
CAD Technician
Data Processor
Surveyors Assistant
Originally employed as a CAD and Data Processing
Officer for Abigroup on the Southern Regional Water
Pipeline, I soon took on the role of a Surveyors
Assistant to primarily assist staff and contract
Surveyors in various surveying tasks in the construction
of the 128Km pipeline.
After six months I began to undertake both supervised
and unsupervised surveys using GPS equipment for the
setout of the pipeline alignment, excavations and
recording conformance observations.
Setouts
• Clear Limits
• Pipeline Alignment
• Public and Private Roads
• Building Grids
• Reservoirs, Balance Tanks and
Associated Infrastructure
• Retaining Walls
• Drainage Culverts, Pits
• Footpaths
• Road Furniture
As-built / Conformance
• Pipe, Valves, Pits
• Pump Houses
• Culverts
• Roads
• Drainage
Machine Control
• Trimble
• Topcon
2
2008 – 2009
Leighton’s Contractors – Northern Missing Link Rail
Surveyors.Assistant
Survey Technician
Primarily employed to assist staff and contract
Surveyors to undertake various surveying tasks in the
construction of the 70Km rail formation. I undertook
both supervised and unsupervised surveying tasks
using both GPS equipment and robotic instruments.
My role was primarily as an instrument technician
setting out for the earthworks formation and drainage
culverts on the alignment. I was introduced to Trimble
GPS and total stations, namely the Trimble R6 GPS and
S6 total station with the TSC2 field controller. I was also
responsible for machine calibrations and maintaining
GPS machines.
Setouts
• Clear Limits
• Fencing
• Cut / Fill Extents
• Batters, Earth Drains
As-built / Conformance
• Strip Surface
• Fencing
• Culverts
• Earthworks
• Drainage
Machine Control
• Trimble
2009 – 2009
Abigroup Contractors – Northern Bus-way
Surveyors.Aissistant
Survey Technician
Primarily employed to assist staff surveyors to
undertake various surveying tasks in the construction
of 2km of elevated carriage way. I undertook both
supervised and unsupervised surveying tasks using
both GPS equipment and robotic instruments.
I spent seven months in the close out period of the
project where I was able to adapt to new survey
procedures operating the Leica 1200 series total
station and the survey program Road Runner.
Setouts
• Deck Heights
• Pile / Pier Locations
• Parapets
• PUP Installation
As-built / Conformance
• Drainage
• Deck Pours
• Parapets
• Piers
• Paving
• Kerb
• Culverts
3
2009 – 2011
Abigroup – Ipswich Motorway Upgrade
Surveyors.Assistant
Survey Technician
Primarily employed to assist staff and contract
surveyors to undertake various surveying tasks in the
construction of the Ipswich Motorway. The job entailed
8Km of existing motorway lane widening, new bridges
and service roads. I undertook both supervised and
unsupervised surveying tasks using both GPS
equipment and robotic instruments.
This job allowed me to work more independently and
take on more responsibility in the way of field work. I
was able to see, in depth, the process of upgrading
existing roads with use of traffic switches and road
closures.
Setouts
• Paving
• Bridges
• Structures – Stairs, Retaining Walls,
Disabled Ramps, Suspended Walkways
• Batters, Earth Drains
As-built / Conformance
• Strip Surface
• Fencing
• Culverts
• Pavements
• Structures
• Pavements
• Drainage
• Earthworks
Machine Control
• Trimble
• Topcon
2011 – 2013
Abigroup/Lend.Lease – Bruce Highway Upgrade
(Cardwell Range)
Instrument.Hand
Project Surveyor
Primarily employed to undertake surveying tasks
unassisted on the upgrade of the Bruce Highway at
Cardwell, North Queensland. The job consisted of 4Km
of complete re-alignment of the existing road.
The Cardwell Range Upgrade was the first job I had
worked independently. I was able to conduct surveys
for every part of the construction phase during the
project. This included my first bridge, which was a 60m
single span overpass from start to finish. I also worked
on other features such as reinforced earth batters
using soil nails, retaining walls with SMSE connections,
drill and blasting for rock removal and sub-strata
mapping.
Setouts
• Paving
• Bridges – Piles, Headstocks, Wing-
walls, Parapets, Super T’s
• Retaining Walls
• Guardrail
• Drill And Blast
• Kerb
• Concrete Batters
• Drainage
As-built / Conformance
• Bridges – Piles, Headstocks, Wing-
walls, Parapets
• Retaining Walls
• Earthworks
• Paving
• Road Furniture
• Kerb
• Drainage
Machine Control
• Topcon
• Trimble
4
2013 – 2015
Lend Lease – Dingo to Bluff Rail Duplication
Project Surveyor
Primarily employed to undertake surveying tasks
unassisted of the duplication of 25Km of electrified rail
between Dingo and Bluff, Central Queensland. I was
tasked with being the sole surveyor for three bridges
and then moved on to close out works for rail
formation and stanchion erection.
I was involved closely with every aspect of this job and
was the last surveyor on site to produce an electronic
as-built model for Aurizon.
Setouts
• Bridges – Piles, Headstocks, Nib Walls,
Core Holes, Wing-walls, Concrete
Beams
• Mast Foundations
• Culverts
• Earthworks
• Underground Services
As-built / Conformance
• Bridges – Piles, Headstocks, Nib Walls,
Core Holes, Wing-walls, Concrete
Beams
• Mast Foundations
• Culverts
• Earthworks
• Underground Services
• Existing Rail / Existing Rail Formation
• Access Tracks
Machine Control
• Trimble
• Topcon
2015 – 2015
Lend Lease – Bruce Highway Upgrade (Vantassels to
Cluden)
Project Surveyor
Primarily employed to undertake surveying tasks
unassisted on the 7Km upgrade of the Bruce Highway
from Vantassels to Cluden in Townsville, North
Queensland.
I was primarily employed tp provide survey for ITS and
drainage, however, I am involved in every other aspect
of the construction of the new road.
Setouts
• Culverts / Stormwater / End Structures
• Carriageway Extents
• Integrated Traffic Services
• Concrete Barriers
• Earthworks
• Kerb
As-built / Conformance
• Culverts / Stormwater / End Structures
• Paving
• Underground Services
• Concrete Barriers
• Earthworks
• Kerb
Machine Control
• Trimble
• Topcon
5
2015 – Present
Lend Lease – Bruce Highway Upgrade (Cooroy to
Curra)
Project Surveyor
Primarily employed to undertake surveying tasks
unassisted on the 7Km upgrade of the Bruce Highway
from Cooroy to Curra on the Sunshine Coast,
Queensland.
I am still currently working on this project and primarily
provide survey for all aspects involving the
construction of the road.
Setouts
• Bridges
• Paving
• Culverts / Stormwater / End Structures
• Carriageway Extents
• Integrated Traffic Services
• Concrete Barriers
• Earthworks
• Kerb
As-built / Conformance
• Bridges
• Culverts / Stormwater / End Structures
• Paving
• Underground Services
• Concrete Barriers
• Earthworks
• Kerb
Machine Control
• Topcon
• Trimble

Jaimin Hooper - Resume

  • 1.
    1 Education St. Edmunds College,Ipswich Queensland Certificate of Education (QCE) University of Southern Queensland, Toowoomba SVY1500 – Spatial Science for Engineers Associate Degree in Spatial Science – ADSS (Incomplete) Brisbane Institute of TAFE Diploma in Surveying (Cert IV) Technical Proficiency • 12D Model / 12D Field • Leica TPS 1200 / Viva TS15 • Trimble GPS • Topcon Machine Control • Trimble Machine Control • Topcon 3D Office • Trimble Business Centre – HCE • Paveset • Microsoft Office Skills Surveying has given me a sound understanding of the engineering and construction industry and all applications and processes involved. Professionalism, working proficiently, promptly and to specific standards is my utmost priority whether it part of a survey team, alone, in the office, out in the field or engaging with clients. Experience 2007 – 2008 Abigroup – Southern Regional Water Pipeline CAD Technician Data Processor Surveyors Assistant Originally employed as a CAD and Data Processing Officer for Abigroup on the Southern Regional Water Pipeline, I soon took on the role of a Surveyors Assistant to primarily assist staff and contract Surveyors in various surveying tasks in the construction of the 128Km pipeline. After six months I began to undertake both supervised and unsupervised surveys using GPS equipment for the setout of the pipeline alignment, excavations and recording conformance observations. Setouts • Clear Limits • Pipeline Alignment • Public and Private Roads • Building Grids • Reservoirs, Balance Tanks and Associated Infrastructure • Retaining Walls • Drainage Culverts, Pits • Footpaths • Road Furniture As-built / Conformance • Pipe, Valves, Pits • Pump Houses • Culverts • Roads • Drainage Machine Control • Trimble • Topcon
  • 2.
    2 2008 – 2009 Leighton’sContractors – Northern Missing Link Rail Surveyors.Assistant Survey Technician Primarily employed to assist staff and contract Surveyors to undertake various surveying tasks in the construction of the 70Km rail formation. I undertook both supervised and unsupervised surveying tasks using both GPS equipment and robotic instruments. My role was primarily as an instrument technician setting out for the earthworks formation and drainage culverts on the alignment. I was introduced to Trimble GPS and total stations, namely the Trimble R6 GPS and S6 total station with the TSC2 field controller. I was also responsible for machine calibrations and maintaining GPS machines. Setouts • Clear Limits • Fencing • Cut / Fill Extents • Batters, Earth Drains As-built / Conformance • Strip Surface • Fencing • Culverts • Earthworks • Drainage Machine Control • Trimble 2009 – 2009 Abigroup Contractors – Northern Bus-way Surveyors.Aissistant Survey Technician Primarily employed to assist staff surveyors to undertake various surveying tasks in the construction of 2km of elevated carriage way. I undertook both supervised and unsupervised surveying tasks using both GPS equipment and robotic instruments. I spent seven months in the close out period of the project where I was able to adapt to new survey procedures operating the Leica 1200 series total station and the survey program Road Runner. Setouts • Deck Heights • Pile / Pier Locations • Parapets • PUP Installation As-built / Conformance • Drainage • Deck Pours • Parapets • Piers • Paving • Kerb • Culverts
  • 3.
    3 2009 – 2011 Abigroup– Ipswich Motorway Upgrade Surveyors.Assistant Survey Technician Primarily employed to assist staff and contract surveyors to undertake various surveying tasks in the construction of the Ipswich Motorway. The job entailed 8Km of existing motorway lane widening, new bridges and service roads. I undertook both supervised and unsupervised surveying tasks using both GPS equipment and robotic instruments. This job allowed me to work more independently and take on more responsibility in the way of field work. I was able to see, in depth, the process of upgrading existing roads with use of traffic switches and road closures. Setouts • Paving • Bridges • Structures – Stairs, Retaining Walls, Disabled Ramps, Suspended Walkways • Batters, Earth Drains As-built / Conformance • Strip Surface • Fencing • Culverts • Pavements • Structures • Pavements • Drainage • Earthworks Machine Control • Trimble • Topcon 2011 – 2013 Abigroup/Lend.Lease – Bruce Highway Upgrade (Cardwell Range) Instrument.Hand Project Surveyor Primarily employed to undertake surveying tasks unassisted on the upgrade of the Bruce Highway at Cardwell, North Queensland. The job consisted of 4Km of complete re-alignment of the existing road. The Cardwell Range Upgrade was the first job I had worked independently. I was able to conduct surveys for every part of the construction phase during the project. This included my first bridge, which was a 60m single span overpass from start to finish. I also worked on other features such as reinforced earth batters using soil nails, retaining walls with SMSE connections, drill and blasting for rock removal and sub-strata mapping. Setouts • Paving • Bridges – Piles, Headstocks, Wing- walls, Parapets, Super T’s • Retaining Walls • Guardrail • Drill And Blast • Kerb • Concrete Batters • Drainage As-built / Conformance • Bridges – Piles, Headstocks, Wing- walls, Parapets • Retaining Walls • Earthworks • Paving • Road Furniture • Kerb • Drainage Machine Control • Topcon • Trimble
  • 4.
    4 2013 – 2015 LendLease – Dingo to Bluff Rail Duplication Project Surveyor Primarily employed to undertake surveying tasks unassisted of the duplication of 25Km of electrified rail between Dingo and Bluff, Central Queensland. I was tasked with being the sole surveyor for three bridges and then moved on to close out works for rail formation and stanchion erection. I was involved closely with every aspect of this job and was the last surveyor on site to produce an electronic as-built model for Aurizon. Setouts • Bridges – Piles, Headstocks, Nib Walls, Core Holes, Wing-walls, Concrete Beams • Mast Foundations • Culverts • Earthworks • Underground Services As-built / Conformance • Bridges – Piles, Headstocks, Nib Walls, Core Holes, Wing-walls, Concrete Beams • Mast Foundations • Culverts • Earthworks • Underground Services • Existing Rail / Existing Rail Formation • Access Tracks Machine Control • Trimble • Topcon 2015 – 2015 Lend Lease – Bruce Highway Upgrade (Vantassels to Cluden) Project Surveyor Primarily employed to undertake surveying tasks unassisted on the 7Km upgrade of the Bruce Highway from Vantassels to Cluden in Townsville, North Queensland. I was primarily employed tp provide survey for ITS and drainage, however, I am involved in every other aspect of the construction of the new road. Setouts • Culverts / Stormwater / End Structures • Carriageway Extents • Integrated Traffic Services • Concrete Barriers • Earthworks • Kerb As-built / Conformance • Culverts / Stormwater / End Structures • Paving • Underground Services • Concrete Barriers • Earthworks • Kerb Machine Control • Trimble • Topcon
  • 5.
    5 2015 – Present LendLease – Bruce Highway Upgrade (Cooroy to Curra) Project Surveyor Primarily employed to undertake surveying tasks unassisted on the 7Km upgrade of the Bruce Highway from Cooroy to Curra on the Sunshine Coast, Queensland. I am still currently working on this project and primarily provide survey for all aspects involving the construction of the road. Setouts • Bridges • Paving • Culverts / Stormwater / End Structures • Carriageway Extents • Integrated Traffic Services • Concrete Barriers • Earthworks • Kerb As-built / Conformance • Bridges • Culverts / Stormwater / End Structures • Paving • Underground Services • Concrete Barriers • Earthworks • Kerb Machine Control • Topcon • Trimble