YOUR SUCCESS OUR PASSION!
CostOS Estimating
Product Overview
CostOS Estimating
Discover Powerful Estimating!
Get Visibility of your Options
Value Engineer
Perform Constructability Analysis
Collaborate
Produce Integrated Estimates!
Contractors: Get More Work!
Consultants: Provide Unique Services!
Owners: Achieve Maximum ROI for your Projects!
Real Estate
Fabricators
Telecoms
AEC &
Infrastructure
EPC’s Other
Oil & Gas
Energy
Renewables
Mining
Owners
Consultants
Contractors
SECTOR ESTIMATING SOLUTION
Compliant with Several
International Standards
Enterprise &
Fully Scalable
Intelligent Parametric
Assemblies
Integrated with
Core Processes
Core BIM and Modern
Technologies
Why CostOS…
Key Process – Estimating with CostOS
ENGINEERING – DESIGN
BIM, GIS, Drawings, Concepts
PRECONSTRUCTION
Estimating with CostOS
Become a Learning
Organisation !
Easily Integrate With Core
Processes and Other Systems
CONSTRUCTION
Cost Control, Planning, Accounting
Off the Self Integrations– Transfer Knowledge
Integrations
Upon Request
Also Available!
We work hand in hand with our
customers to deliver the
integrations they may need
PDF
DWG DXF
Revit Bentley P6 Synchro
Tekla
MS
Project
BIM
IFC
Plan
ning
2D
Enterprise – Centralise your Knowledge
Neutral Wave  Enter your text here
Commercial
Database at the
Backend!
- Oracle 11g
- Microsoft SQL
- MySQL
- Business Intelligence and
Analytics
Connect Multiple Users, Departments & Offices
Enterprise – Work on the Same Estimates
Neutral Wave  Enter your text here
Discover
Role Based
Estimating!
Work real time on the same
Estimates
Collaborate, Learn and Improve
Manage your Estimates as they are being built
From Concept to Final BID
FINAL COST
+100%
-50%
Feasibility Study Design Bid Execute
+50%
-30%
-10%
+30%
-20%
-3%
+20%
Driver: Cost Estimating
+10%
Driver: Cost Control
ACCURACY
Concept
Lessons
Learned
Nomitech CostOS
Database Structure – Hierarchical
SMART PARAMETRIC ASSEMBLIES
RESOURCES / COMPOSITES
BOQ ITEMS / ESTIMATE ITEMS
Top Down &
Bottom Up Estimating
All Estimate
Classes in One
Solution!
International Applicability – Rates Build Up
Combine all
Methods of
Building Up
Rates !
Some times the Estimate / BOQ
Items are not well defined and
you may need to consolidate
several Items to price them.
CostOS gives you the flexibility
to follow all methods of building
up Rates, even assigning
Assemblies to price them!
Activity Based
Resource Based
US/Canada
Manage Items as Activities
British & Rest of World
Build Constants at Resource level
International Knowledge – Online Access
Conceptual Oil & Gas. Available Only in CostOS!
RICS : Unique Implementation at Resource Level. International Applicability!
Cost Data, Assemblies, Location Factors, BIM Enabled. Make most of it!
Ideal & Accurate for EPCs. Includes Manhours and Links to Cost Data Online!
Eos High Voltage Transmission Lines.
Setting the Standards for the Future – RICS
I was very impressed with CostOS the first time I
saw it and the more I have seen the more
impressed I have become. It is a truly innovative
cost estimating interface to BIM, which will
integrate cost (the so called 5th dimension) to a
project BIM. We are therefore delighted that the
BCIS resource cost database will be available to
work with CostOS. This initiative is part of our
endeavour to make all our price and cost data
available in BIM friendly format
Joe Martin, Executive Director ,BCIS, RICS
Nomitech Today is
Involved in Several
Initiatives that
Will Define
Modern Estimating
For Construction
EPC and Oil & Gas
Projects in the
Years to Come!
YOUR SUCCESS OUR PASSION!
Selected Quick Examples
CostOS Estimating
Screenshot Examples
Buildings Oil & Gas
Click to Select Sector :
YOUR SUCCESS OUR PASSION!
CostOS - Construction Examples
Product Overview
Concepts – Develop Estimates on Map
Real Estate and
Early Phase
Assessments for
Owners!
Get High Level Costs and define
The scope of your Projects
TIP:
Contractors: Define your
construction site estimate the
Mobilization Costs
Class 5 Conceptual Estimating
Concepts – Combine Sketches & Questionnaires
Model Your
Experience and
Pass it to
Your Team!
Import Conceptual BIM models
and Produce High Level
Estimates
Class 4 Factored Estimating or Rule of Thumb
Parametric Estimating – Optimise Project Scopes
Assess Several
Options and
Optimise the Scope
of your Projects!
Purchase Parametric Models
from our Online Store or
Develop Your Own Ones!
Class 3 Parametric Assemblies
Knowldgebases– Drag & Drop to Build your Estimates
Assess Several
Options and
Optimise the Scope
of your Projects!
Subscribe to one or more
knowledgebases and start
building estimates easily!
Class 3 Use Commercial Data to build Estimates
BID Preparation – Use BIM for Takeoffs
Perform Quantity
Takeoffs on BIM!
CostOS was one of the two
systems globally to prove that
BIM – IFC is ready for Takeoff!
(Ecobuild, Washingdon 2010)
Class 2 Forced Tenders with not full information
BID Preparation – Use 2D Drawings for Takeoffs
Perform Quantity
Takeoffs on 2D!
CostOS 2D module for takeoffs
on drawings:
- PDF
- DWG
- DXF
- DGN
- JPEG
Class 2 Forced Tenders with not full information
BID Preparation – WIN more Work!
Estimate in away
That your
Competitors Could
Never Do!
CostOS’s strong engine let’s you
focus on important things,
explore constructability options,
manage your RFQs and price at
a fraction of time that
competitor Estimating Systems
would need!
Everything is Carefully Designed
to enable you Win More Work!
Class 1 Final BIDs and Rate Build Up
YOUR SUCCESS OUR PASSION!
CostOS - Oil & Gas Examples
Product Overview
Develop Concepts – Define the Scope of your Projects
Conceptual
Estimates!
Get Early Phase Figures that are
critical on making Decisions
Class 5 Conceptual Estimates
Equipment List – Size your Equipment and Get Estimates
Develop your own
Models that Do
Equipment Sizing,
Buy Ready Made
Models from our
Knowledgebase
Or Let Us Develop
Models Based on
Your Standards
Ready Made NODOC models can
manage several Classes of
Estimates.
Open the revisions of the models
once you have a more defined
Scope, feed them with more
Information and get more
accurate Estimates!
Class 4 to 2: The more Info the better Accuracy
GIS & 3D – Modern Technologies at your Fingertips
Combine your
Cost Models with
GIS, 3D Models or
2D drawings and
Get Better
Accuracy!
CostOS Provides you with Edge
Technology that which will
Help you Deliver Estimates
Faster and with Better Accuracy
Class 3-2: FEED ESTIMATES
Knowledgebases– Search and Drag & Drop
Subscribe to
Knowledgebases
For Oil & Gas,
Search
Drag & Drop to
Build your
Estimates
Class 3-2: FEED ESTIMATES
Subscribe to one or more
knowledgebases and start
building estimates easily!
Contact Us– Set A Meeting with our Team Today!
Access our Local
Reseller Network
Online at:
www.nomitech.eu

Nomitech: CostOs Estimating Product Overview

  • 1.
    YOUR SUCCESS OURPASSION! CostOS Estimating Product Overview
  • 2.
    CostOS Estimating Discover PowerfulEstimating! Get Visibility of your Options Value Engineer Perform Constructability Analysis Collaborate Produce Integrated Estimates! Contractors: Get More Work! Consultants: Provide Unique Services! Owners: Achieve Maximum ROI for your Projects!
  • 3.
    Real Estate Fabricators Telecoms AEC & Infrastructure EPC’sOther Oil & Gas Energy Renewables Mining Owners Consultants Contractors SECTOR ESTIMATING SOLUTION
  • 4.
    Compliant with Several InternationalStandards Enterprise & Fully Scalable Intelligent Parametric Assemblies Integrated with Core Processes Core BIM and Modern Technologies Why CostOS…
  • 5.
    Key Process –Estimating with CostOS ENGINEERING – DESIGN BIM, GIS, Drawings, Concepts PRECONSTRUCTION Estimating with CostOS Become a Learning Organisation ! Easily Integrate With Core Processes and Other Systems CONSTRUCTION Cost Control, Planning, Accounting
  • 6.
    Off the SelfIntegrations– Transfer Knowledge Integrations Upon Request Also Available! We work hand in hand with our customers to deliver the integrations they may need PDF DWG DXF Revit Bentley P6 Synchro Tekla MS Project BIM IFC Plan ning 2D
  • 7.
    Enterprise – Centraliseyour Knowledge Neutral Wave  Enter your text here Commercial Database at the Backend! - Oracle 11g - Microsoft SQL - MySQL - Business Intelligence and Analytics Connect Multiple Users, Departments & Offices
  • 8.
    Enterprise – Workon the Same Estimates Neutral Wave  Enter your text here Discover Role Based Estimating! Work real time on the same Estimates Collaborate, Learn and Improve Manage your Estimates as they are being built
  • 9.
    From Concept toFinal BID FINAL COST +100% -50% Feasibility Study Design Bid Execute +50% -30% -10% +30% -20% -3% +20% Driver: Cost Estimating +10% Driver: Cost Control ACCURACY Concept Lessons Learned Nomitech CostOS
  • 10.
    Database Structure –Hierarchical SMART PARAMETRIC ASSEMBLIES RESOURCES / COMPOSITES BOQ ITEMS / ESTIMATE ITEMS Top Down & Bottom Up Estimating All Estimate Classes in One Solution!
  • 11.
    International Applicability –Rates Build Up Combine all Methods of Building Up Rates ! Some times the Estimate / BOQ Items are not well defined and you may need to consolidate several Items to price them. CostOS gives you the flexibility to follow all methods of building up Rates, even assigning Assemblies to price them! Activity Based Resource Based US/Canada Manage Items as Activities British & Rest of World Build Constants at Resource level
  • 12.
    International Knowledge –Online Access Conceptual Oil & Gas. Available Only in CostOS! RICS : Unique Implementation at Resource Level. International Applicability! Cost Data, Assemblies, Location Factors, BIM Enabled. Make most of it! Ideal & Accurate for EPCs. Includes Manhours and Links to Cost Data Online! Eos High Voltage Transmission Lines.
  • 13.
    Setting the Standardsfor the Future – RICS I was very impressed with CostOS the first time I saw it and the more I have seen the more impressed I have become. It is a truly innovative cost estimating interface to BIM, which will integrate cost (the so called 5th dimension) to a project BIM. We are therefore delighted that the BCIS resource cost database will be available to work with CostOS. This initiative is part of our endeavour to make all our price and cost data available in BIM friendly format Joe Martin, Executive Director ,BCIS, RICS Nomitech Today is Involved in Several Initiatives that Will Define Modern Estimating For Construction EPC and Oil & Gas Projects in the Years to Come!
  • 14.
    YOUR SUCCESS OURPASSION! Selected Quick Examples CostOS Estimating Screenshot Examples Buildings Oil & Gas Click to Select Sector :
  • 15.
    YOUR SUCCESS OURPASSION! CostOS - Construction Examples Product Overview
  • 16.
    Concepts – DevelopEstimates on Map Real Estate and Early Phase Assessments for Owners! Get High Level Costs and define The scope of your Projects TIP: Contractors: Define your construction site estimate the Mobilization Costs Class 5 Conceptual Estimating
  • 17.
    Concepts – CombineSketches & Questionnaires Model Your Experience and Pass it to Your Team! Import Conceptual BIM models and Produce High Level Estimates Class 4 Factored Estimating or Rule of Thumb
  • 18.
    Parametric Estimating –Optimise Project Scopes Assess Several Options and Optimise the Scope of your Projects! Purchase Parametric Models from our Online Store or Develop Your Own Ones! Class 3 Parametric Assemblies
  • 19.
    Knowldgebases– Drag &Drop to Build your Estimates Assess Several Options and Optimise the Scope of your Projects! Subscribe to one or more knowledgebases and start building estimates easily! Class 3 Use Commercial Data to build Estimates
  • 20.
    BID Preparation –Use BIM for Takeoffs Perform Quantity Takeoffs on BIM! CostOS was one of the two systems globally to prove that BIM – IFC is ready for Takeoff! (Ecobuild, Washingdon 2010) Class 2 Forced Tenders with not full information
  • 21.
    BID Preparation –Use 2D Drawings for Takeoffs Perform Quantity Takeoffs on 2D! CostOS 2D module for takeoffs on drawings: - PDF - DWG - DXF - DGN - JPEG Class 2 Forced Tenders with not full information
  • 22.
    BID Preparation –WIN more Work! Estimate in away That your Competitors Could Never Do! CostOS’s strong engine let’s you focus on important things, explore constructability options, manage your RFQs and price at a fraction of time that competitor Estimating Systems would need! Everything is Carefully Designed to enable you Win More Work! Class 1 Final BIDs and Rate Build Up
  • 23.
    YOUR SUCCESS OURPASSION! CostOS - Oil & Gas Examples Product Overview
  • 24.
    Develop Concepts –Define the Scope of your Projects Conceptual Estimates! Get Early Phase Figures that are critical on making Decisions Class 5 Conceptual Estimates
  • 25.
    Equipment List –Size your Equipment and Get Estimates Develop your own Models that Do Equipment Sizing, Buy Ready Made Models from our Knowledgebase Or Let Us Develop Models Based on Your Standards Ready Made NODOC models can manage several Classes of Estimates. Open the revisions of the models once you have a more defined Scope, feed them with more Information and get more accurate Estimates! Class 4 to 2: The more Info the better Accuracy
  • 26.
    GIS & 3D– Modern Technologies at your Fingertips Combine your Cost Models with GIS, 3D Models or 2D drawings and Get Better Accuracy! CostOS Provides you with Edge Technology that which will Help you Deliver Estimates Faster and with Better Accuracy Class 3-2: FEED ESTIMATES
  • 27.
    Knowledgebases– Search andDrag & Drop Subscribe to Knowledgebases For Oil & Gas, Search Drag & Drop to Build your Estimates Class 3-2: FEED ESTIMATES Subscribe to one or more knowledgebases and start building estimates easily!
  • 28.
    Contact Us– SetA Meeting with our Team Today! Access our Local Reseller Network Online at: www.nomitech.eu