I am engineer Fathi, senior electrical engineer with experience in the fields of electrical installation, Building infrastructure ,consultancy,designing, execution of shop drawings(low current/low voltage systems), Testing & Commissioning and O&M beside tenders study and projects estimation.
I am engineer Fathi, senior electrical engineer with experience in the fields of electrical installation, Building infrastructure ,consultancy,designing, execution of shop drawings(low current/low voltage systems), Testing & Commissioning and O&M beside tenders study and projects estimation.
The Lumiere Group - College Planning - Education Strategy The Lumiere Group
At The Lumiere Group we work with many types of clients, in this slide we discuss our services for our student, parent, individual clients for College Planning, Career Planning, and more.
9+ Years of Experience as 7+ years in Electrical Design and Site Engineer for MEP projects as well as 2 years worked as an Assistant Electrical Engineer in 220KV substation.
1. Page 1 of 3
NIZAR MADDAH
Current Address: Kingdom of Saudi Arabia – Jeddah.
MOBILE:+966507503065
Nationality: Lebanese.
Date of Birth: 21/02/1971.
Marital Status: Married.
E-mail: nizar31m@hotmail.com
ACADEMIC EDUCATION:
Electrical Engineer 1996.
KEY EXPERIENCE:
Eighteen (19) years working in the construction field in Electro-Mechanical Projects,
(Management and Supervision Projects - Development and Renovation Projects -
Implementation Projects ) in, Load Center, Commercial, Residential, Industrial, Militarily
and Healthcare buildings.
EMPLOYMENT HISTORY
From October 2012 Up to date (KSA - Jeddah)
Employer: INMA UTILITIES CO.
Job Title: Senior Electrical Engineer.
Project: Jeddah Airport (Electromechanical Load Center).
Main Contractor: Saudi Benladen Group.
Consultant: Dar Al-Handasah
Responsibilities / Duties:
Review shop drawing and execute the different electrical systems such as :
MV/LV network (MV,LV Substation– MV Switchgear – MV,LV cables – Transformer “Dry,
Oil”- Diesel Generator - ATS - Bus Way system - Lightning/Grounding/Earthing system –
Lighting – Power - External Network, etc…)
Low current system ( BMS system ).
Manage quantity takeoff from the drawings.
Follow up the electrical materials (request & delivery).
Follow up the shop drawings with technical office.
Prepare project execution strategy, ensure the implementation of quality control standards.
Inspect and supervise the installation of equipment, materials and electrical systems.
Receive Main contractor request for inspection and identify those aspects for inspections.
Coordinate between all services to provide best possible solutions.
Manage a team while having a crucial role in the MEP decisions on the project.
Setup the testing and commissioning procedures for different electrical systems.
Ensure safety during work at site.
From March 2008 to August 2012 (KSA - Jeddah)
Employer: ADVANCED VISION CO.
2. Resume of Nizar Maddah (Continued)
Page 2 of 3
Job Title: Electromechanical Package Manager
Project: King Abdullah University of Science & Technology (KAUST).
Main Contractor: Saudi Benladen Group.
Consultant: Aramco.
Responsibilities / Duties:
Review shop drawing and execute the different electrical/mechanical systems such as :
LV network (DB’s - Cables - Lightning/grounding system – Raceway - Lighting – Power
etc…)
(AHU – FCU – Fan – Chilled water system – plumbing system - drainage network -
firefighting system etc…).
Low current system ( BMS system ).
Manage quantity takeoff from the drawings.
Prepare daily reports.
Manpower control, daily reports and monthly reports.
Follow up the electromechanical materials (request & delivery).
Prepare project execution strategy, ensure the implementation of quality control standards .
Prepare MEP method of statement according to tender specifications.
Inspect and supervise the installation of equipment, materials and electrical systems.
Receive subcontractor’s request for inspection and identify those aspects for inspections.
Coordinate between all services to provide best possible solutions.
Prepare variation order and claims.
Prepare electrical monthly invoices and review subcontractor's invoice
Manage a team while having a crucial role in the MEP decisions on the project.
Setup the testing and commissioning procedures for different electrical systems.
Ensure safety during work at site.
From November 2002 to February 2008 (KSA-Jeddah/Riyadh)
Employer: SETRAA Advanced CO.
Job Title: Project Manager.
Main Contractor: Saudi Oger CO.
Consultant: Rashid Engineering
Projects:
Renovation and development of KFSH King Faysal Specialist Hospital (Jeddah) (Low
Current Work)
MBA. Villas. Prince Meshal Bin Abdullah (Riyadh) (Low Current Work)
King Palace in Obhur (Jeddah) (Low Current Work)
Officer Bldg (Mekkah) (Low Voltage & Low Current Work)
Prince Abdulaziz Ben Fahed Villas. (Jeddah) (Low Voltage & Low Current Work)
Responsibilities / Duties:
Management & Execution of Low Voltage & Low Current Work such as (MV/LV
Substations, Cables, Raceway, Panel Boards, Light & Small power System, CCTV, TV,
Telephone, Fire Alarm, Public Address, Data, Intercom, Nurse Call system, etc…).
Setup the testing and commissioning procedures for different systems.
From January 1998 to October 2002 (Lebanon)
Employer: Albonian International CO.
Job Title: Site Engineer.
Project: Official Bank of Lebanon (Beirut) (Low Voltage & Low Current Work)
3. Resume of Nizar Maddah (Continued)
Page 3 of 3
Project: Crown Plaza Hotel (Beirut) (Low Voltage & Low Current Work)
Project: Rose Centre (Brummana) (Low Voltage & Low Current Work)
Responsibilities / Duties:
Execution of Low Voltage & Low Current Work such as (LV Substations, Cables, Raceway,
Panel Boards, Light & Small power System, CCTV, TV, Telephone, Fire Alarm, Data,
Intercom, etc…).
Preparing bill of materials Qty.
Preparing Materials Submittals.
Preparing Shop Drawings Submittals.
Review drawings to ensure compliance with contract technical specifications.
Coordination with other trades to avoid any conflicts.
Prepare daily progress report.
Follow up the work progress.
Prepare As-built drawings
Setup the testing and commissioning procedures for different electrical systems.
From January 1997 to November 1997 (Lebanon)
Employer: Debbas CO.
Job Title: Site Engineer.
Project: ESCKWA Building (Beirut) (Low Voltage & Low Current Work)
Responsibilities / Duties:
Execution of Low Voltage & Low Current Work such as (LV Substations, Cables,
Raceway, Panel Boards, Light & Small power System, CCTV, TV, Telephone, Fire Alarm,
Data, Intercom, etc…).
Preparing bill of materials Qty.
Review drawings to ensure compliance with contract technical specifications.
Coordination with other trades to avoid any conflicts.
Prepare daily progress report.
Follow up the work progress
Prepare As-built drawings.
Setup the testing and commissioning procedures for different electrical systems.
Language:
English
French
Arabic
COMPUTER SKILLS:
Microsoft Office package.
AutoCAD.
Internet.