1. T A M A R A L . N I T S C H
OBJECTIVE
Seeking a position with an organization that will utilize my experience in the
nuclear industry.
SUMMARY OF QUALIFICATIONS
I have twenty-seven years of experience in the nuclear industry. My
assignments have included: Training, Modifications, Design Engineering,
Human Resources , Quality Control, Outage and On-Line Integrated Plant
Scheduling.
EXPERIENCE
1988-Present Wolf Creek Nuclear Operating Corp. Burlington, KS
2007-Present Wolf Creek Nuclear Operating Corp. Burlington, KS
Scheduler III, Integrated Plant Scheduling, Daily
Develop work week schedules and issue the site wide work schedule
(Plan of the Day) and a progress report on a daily basis, utilizing
Primavera 6 scheduling software tool.
Issue the scope review, scope review output, scope validation, scope
freeze, schedule freeze, and Rev. 0 schedules according to the weekly
production schedule.
Create fragnets for Technical Specification Equipment Outages.
Qualified Procedure writer for my work group.
Compile and create the IPS Daily department performance indicators on
a weekly basis and provide the data to INPO on a monthly basis.
Manage the daily surveillance templates to ensure surveillances are
performed in the correct work week.
2003-2007 Wolf Creek Nuclear Operating Corp. Burlington, KS
Scheduler II, Integrated Plant Scheduling, Daily
Develop work week schedules and issue the site wide work schedule
(Plan of the Day) and a progress report on a daily basis.
Issue the pre-planning scope, planning scope, scope draft, scope list,
preliminary, approved and Rev. 0 schedules according to the weekly
production schedule.
Create fragnets for Technical Specification Equipment Outages.
Qualified Procedure writer for my work group.
Compile and create the IPS Daily department performance indicators on
a weekly basis.
Manage the daily surveillance templates to ensure surveillances are
2. performed in the correct work week.
Involved in the design and testing of the Access database used to track
schedule adherence.
2000-2003 Wolf Creek Nuclear Operating Corp. Burlington, KS
Scheduler I, Integrated Plant Scheduling, Outage
Access database admistrator for various Acess databases in the
department.
Created and issued various outage reports (Level II, Critical Path
graphs).
Created access database to track outage critique items.
Responsible for tracking outage milestones and updating the milestone
chart.
1998-2000 Wolf Creek Nuclear Operating Corp. Burlington, KS
Human Resources Representative
Developed queries in Oracle for retrieving data to be utilized in
spreadsheets or Crystal reports.
Designed and built interfaces to retrieve MAPPER data for transfer to
user friendly PC based systems such as Microsoft Excel or Access.
Qualified Procedure writer
1991-1988 Wolf Creek Nuclear Operating Corp. Burlington, KS
Secretary, Facilities and Modifications and Design Engineering
Provided clerical support to the work groups. Performance
Improvement logkeeper, timesheet coordinator.
EDUCATION
1995-2001 Friends University Wichita, KS
Bachelor of Science, Computer Information Systems
Associate Degree, 1997, Friends University
Graduate, Yates Center High School, 1986
ADDITIONAL PROFESSIONAL ACTIVITIES
Member of the Emergency Planning Organization for 18 years.
Received a Presidential Award from the CEO in 2010 for my teamwork
on the AP-928 revision 3 implentation.
Attended Primavera 6 Client Training in 2013.
2
3. Was a core member of the Primavera 6 team to install P-6 at the site in
December of 2013.
Supported various outage positions throughout the years. Worked for
the Head Area Maintenance (HAM) Team supporting the Refueling,
Split Pin Replacement, Reactor Coolant Pump Teams. Worked in the
tool rooms at the site and for the Quality Control Department.
Employees Association Board Member in 2000-2001.
Member of the Site Safety Committee in 1999.
Attended and successfully completed Plant Systems Training (PWR)
for the Turbine Building.
Successfully completed Microsoft Suite computer courses that were
offered at Wolf Creek Nuclear Operating Corporation.
Attended Microsoft Project class.
Attended Artemis Project View Scheduling Software Training.
REFERENCES
Will provide references upon your request.
3