Ocular Systems| Networking & Network Security IEEE Project Topics




Final Year Projects
Advanced Java Project Topics
http://blog.ocularsystems.in/blog

info@ocularsystems.in
Behind Ayush Health Club,
Navjyot Mahila Society, Tambe Nagar,
MIDC-Baramati, Pune, 413 133
Our Branches: Baramati, Pune, Solapur, Ahmed Nagar
Contact No: 09970186685/ 07385043047




http://blog.ocularsystems.in/blog                                   Page 1
Ocular Systems| Networking & Network Security IEEE Project Topics


Ocular Systems Provides IEEE 2011 Projects For all Final Year Students. We do assist the
students with Technical Guidance for both the categories.
        Category 1 : Students with new project ideas.
        Category 2 : Students selecting from our list.
When you register for a project we ensure that the project is implemented to your fullest
satisfaction and you have a thorough understanding of every aspect of the project.

OCULAR SYSTEMS PROVIDES YOU THE LATEST IEEE 2011- IEEE2012
PROJECTSPROJECTS FOR FOLLOWING DEPARTMENT STUDENTS

B.E, B.TECH, M.TECH, M.E, DIPLOMA, MS, BSC, MSC, BCA, MCA, MBA, BBA, PHD,
NS-2, GLOMOSIM, MATLAB, JAVA, .NET,
B.E ( CSE, IT)
B.TECH(CSE, IT)
M.TECH(COMPUTER SCIENCE, SOFTWARE ENGINEERING)
M.E(COMPUTER SCIENCE, SOFTWARE, ENGINEERING)

DIPLOMA (CSE, IT)

We also have training and project, R & D division to serve the students and make them job
oriented professionals




IEEE TRANSACTION ON NETWORKING

http://blog.ocularsystems.in/blog                                                      Page 2
Ocular Systems| Networking & Network Security IEEE Project Topics


A Distributed Algorithm for Find All Best Swap Edges of a Minimum-Diameter   2011 / 2012
Spanning Tree.
A Novel Approach for Failure Localization in All-Optical Mesh                2011 / 2012
Networks
A Simple Model for Chunk-Scheduling Strategies in P2P                        2011 / 2012
Streaming
A Unified Approach to Optimizing Performance in Networks Serving             2011 / 2012
Heterogeneous Flows
Active Queue Management for Flow Fairness and Stable Queue                   2011 / 2012
Length
Adaptive Fault-Tolerant Qos Control Algorithms for Maximizing                2011 / 2012
system Lifetime of Query-Based Wireless Sensor Networks.
Adjacent Link Failure Localization With Monitoring Trails in                 2011 / 2012
All-Optical Mesh Networks
An Adaptive Network Coded Retransmission Scheme for                          2011 / 2012
Single-HopWireless Multicast Broadcast Services
An efficient two-factor user authentication framework for                    2011 / 2012
wireless sensor networks
An Optimal Algorithm for Relay Node Assignment in Cooperative Ad             2011 / 2012
Hoc Networks
Analyzing the Resilience-Complexity Tradeoff of Network Coding               2011 / 2012
in Dynamic P2P Networks.
Approaching Throughput-Optimality in Distributed CSMA Scheduling             2011 / 2012
Algorithms With Collisions
Architecture and Abstractions for Environment and Traffic-Aware              2011 / 2012
System-Level Coordination of Wireless Networks
Attribute-Based Access Control with Efficient Revocation in Data             2011 / 2012
Outsourcing Systems
AUTONOMOUS NETWORK RECONFIGURATION SYSTEM TO PRESERVE                        2011 / 2012
NETWORK
PERFORMANCE.
BRICK: A Novel Exact Active Statistics Counter Architecture                  2011 / 2012
Buffer Sizing for 802.11 Based Networks                                      2011 / 2012
BYPASS FLOW-SPLITTING FORWARDING IN FISH NETWORKS.                           2011 / 2012
Capacity of Large-Scale CSMA Wireless Networks                               2011 / 2012
Coloring Spatial Point Processes With Applications to Peer                   2011 / 2012
Discovery in Large Wireless Networks
Component-Based Localization in Sparse Wireless Networks                     2011 / 2012
Continuous Neighbor Discovery in Asynchronous Sensor                         2011 / 2012
Networks
Cross Layer Jamming Detection and Mitigation in Wireless                     2011 / 2012
Broadcast Networks
Crosstalk Preventing Scheduling in Single and Two Stage AWG                  2011 / 2012
Based Cell Switches

http://blog.ocularsystems.in/blog                                                 Page 3
Ocular Systems| Networking & Network Security IEEE Project Topics


Decomposing Workload Bursts for Efficient Storage Resource          2011 / 2012
Management
Delay Analysis and Optimality of Scheduling Policies for            2011 / 2012
Multihop Wireless Networks
Delay-Optimal Opportunistic Scheduling and Approximations: The      2011 / 2012
Log Rule
Differential Encoding of DFAs for Fast Regular Expression           2011 / 2012
Matching
DISTRIBUTED FAULT-TOLERANT QUALITY OF WIRELESS NETWORKS.            2011 / 2012
Effect of Link-Level Feedback and Retransmissions on the            2011 / 2012
Performance of Cooperative Networking.
Effective Delay-Controlled Load Distribution over Multipath         2011 / 2012
Networks.
Efficient Multipath Communication for Time-Critical Applications    2011 / 2012
in Underwater Acoustic Sensor Networks
Energy Efficient Opportunistic Routing in Wireless Sensor           2011 / 2012
Networks.
Energy Efficient Protocol for Cooperative Networks                  2011 / 2012
Energy-Efficient Localized Routing in Random Multihop Wireless      2011 / 2012
Networks
Energy-Efficient Protocol for Cooperative Networks                  2011 / 2012
Exploring Second Life                                               2011 / 2012
Fast Simulation of Service Availability in Mesh Networks With       2011 / 2012
Dynamic Path Restoration
Flexible Robust Group Key Agreement.                                2011 / 2012
Forward Correction and Fountain Codes in Delay-Tolerant Networks    2011 / 2012
Generalized Probabilistic Flooding in Unstructured Peer-to-Peer     2011 / 2012
Networks
Impact of File Arrivals and Departures on Buffer Sizing in Core     2011 / 2012
Routers
IMPACT OF FILE ARRIVALS AND DEPARTURES ON BUFFER SIZING IN          2011 / 2012
CORE
ROUTERS.
Improved Bounds on the Throughput Efficiency of Greedy Maximal      2011 / 2012
Scheduling in Wireless Networks
Jamming-Aware Traffic Allocation for Multiple-Path Routing Using    2011 / 2012
Portfolio Selection
Licklider Transmission Protocol (LTP)-Based DTN for Cislunar        2011 / 2012
Communications
Lifetime and Coverage Guarantees Through Distributed                2011 / 2012
Coordinate-Free Sensor Activation
Live Streaming With Receiver Based Peer-Division Multiplexing       2011 / 2012
Load balance with Imperfect Information in Structured               2011 / 2012
Peer-to-Peer Systems.

http://blog.ocularsystems.in/blog                                        Page 4
Ocular Systems| Networking & Network Security IEEE Project Topics


Local Restoration With Multiple Spanning Trees in Metro Ethernet    2011 / 2012
Networks
LOCAL RESTORATION WITH MULTIPLE SPANNING TREES IN METRO             2011 / 2012
ETHERNET
NETWORKS.
LOOSY NETWORK FLOW OPTIMIZATION RECOVERY PROBLEM USING              2011 / 2012
PORTFOLIO
SELECTION.
Maelstrom: Transparent Error Correction for Communication           2011 / 2012
Between Data Centers
Maximizing the Number of Broadcast Operations in Random             2011 / 2012
Geometric Ad Hoc Wireless Networks.
Measuring Multipath Routing in the Internet                         2011 / 2012
MESH NETWORK MODEL WITH A GENERAL DYNAMIC PATH                      2011 / 2012
RESTORATION.
Metadata Distribution and Consistency Techniques for Large-Scale    2011 / 2012
Cluster File Systems.
Mobile Sampling of Sensor Field Data Using Controlled Broadcast     2011 / 2012
Model-Based Identification of Dominant Congested Links              2011 / 2012
Monitoring The Impact OfP2P Users On A Broadband Operator’s         2011 / 2012
Network Over time.
NEIGHBOR DISCOVERY DURING SENSOR NETWORK INITIALIZATION             2011 / 2012
AND
CONTINUOUS NEIGHBOR DISCOVERY.
Network Coding Multicast Networks With QoS Guarantees               2011 / 2012
Node Reclamation and Replacement for long-lived Sensor Networks.    2011 / 2012
On Combining Shortest-Path and Back-Pressure Routing Over           2011 / 2012
Multihop Wireless Networks
On Cooperative Settlement Between Content, Transit, and Eyeball     2011 / 2012
Internet Service Providers
On the Complexity of the Regenerator Placement Problem in           2011 / 2012
Optical Networks
On the Dimensioning of WDM Optical Networks With                    2011 / 2012
Impairment-Aware Regeneration
On the Levy-Walk Nature of Human Mobility                           2011 / 2012
On the Market Power of Network Coding in P2P Content                2011 / 2012
Distribution Systems.
On the Price of Security in Large-Scale Wireless Ad Hoc Networks    2011 / 2012
On the Robustness of Bit Torrent Swarms to Greedy Peers.            2011 / 2012
Opportunity Cost Analysis for Dynamic Wavelength Routed Mesh        2011 / 2012
Networks
Optimal Anycast Technique for Delay-Sensitive Energy-Constrained    2011 / 2012
Asynchronous Sensor Networks
Optimal Scheduling for Fair Resource Allocation in Ad Hoc           2011 / 2012

http://blog.ocularsystems.in/blog                                        Page 5
Ocular Systems| Networking & Network Security IEEE Project Topics


Networks With Elastic and Inelastic Traffic.
Optimizing Resource Conflicts in Workflow Management systems.   2011 / 2012
Parametric Methods for Anomaly Detection in Aggregate Traffic   2011 / 2012
PARAMETRIC METHODS FOR ANOMALY DETECTION IN AGGREGATE           2011 / 2012
TRAFFIC
AND RAPID DETECTION OF REAL DENIAL-OF -SERVICE ATTACKS.
Pareto Boundary of Utility Sets for Multiuser Wireless Systems  2011 / 2012
Peering Equilibrium Multipath Routing: A Game Theory Framework  2011 / 2012
for Internet Peering Settlements
Practical Computation of Optimal Schedules in Multihop Wireless 2011 / 2012
Networks
Practical Routing in a Cyclic MobiSpace                         2011 / 2012
Predictable high performance Computing using Feedback and       2011 / 2012
admission control.
Predictable High-Performance Computing Using Feedback Control   2011 / 2012
and Admission Control.
Predictive Resource Management of Multiple Monitoring           2011 / 2012
Applications
Primary User Activity Modeling Using First-Difference Filter    2011 / 2012
Clustering and Correlation in Cognitive Radio Networks
ProgME: Towards Programmable Network Measurement                2011 / 2012
Reliability for Networked Storage Nodes                         2011 / 2012
Risk-Aware Provisioning for Optical WDM Mesh Networks           2011 / 2012
Robust Network Codes for Unicast Connections: A Case Study      2011 / 2012
ROC Resilient Online Coverage for Surveillance Applications     2011 / 2012
Rumor RidingL:Anonymizing Unstructured Peer-to-Peer Systems.    2011 / 2012
Scalable and Cost-Effective Interconnection of Data-Center      2011 / 2012
Servers Using Dual Server Ports
SCHEDULABILITY ANALYSIS FOR HARD NETWORK LIFETIME               2011 / 2012
WIRELESS
SENSOR NETWORKS WITH HIGH ENERGY FIRST CLUSTERING.
Scheduling Algorithms for Multicarrier Wireless Data Systems    2011 / 2012
SECURE HIGH-THROUGHPUT MULTICAST ROUTING IN WIRELESS MESH 2011 / 2012
NETWORKS.
Self Reconfigurable Wireless Mesh Networks                      2011 / 2012
Selfish Overlay Network Creation and Maintenance.               2011 / 2012
Self-Reconfigurable Wireless Mesh Networks.                     2011 / 2012
Site-Based Partitioning And Repartitioning Techniques For       2011 / 2012
Parallel Page Rank Computation.
SPAF – Stateless FSA-Based Packet Filters                       2011 / 2012
Stability-Optimal Grouping Strategy of Peer-to-Peer Systems.    2011 / 2012
Star Block Design in Two-Level Survivable Optical Networks      2011 / 2012
Stochastic Model and Connectivity Dynamics for VANETs in        2011 / 2012

http://blog.ocularsystems.in/blog                                     Page 6
Ocular Systems| Networking & Network Security IEEE Project Topics


Signalized Road Systems
Supporting Scalable and Adaptive Metadata Management in Ultra       2011 / 2012
large-Scale File Systems
Survivable Multipath Provisioning With Differential Delay           2011 / 2012
Constraint in Telecom Mesh Networks
SWARM: The Power of Structure in Community Wireless Mesh            2011 / 2012
Networks
Symmetric Key Approaches to Securing BGP—A Little Bit Trust Is      2011 / 2012
Enough
THE ERROR RATE AND ENERGY SAVING PROTOCOL FOR COOPERTIVE            2011 / 2012
SENSOR
NETWORK.
The Limit of Information Propagation Speed in Large-Scale           2011 / 2012
Multihop Wireless Networks
The small world of file sharing                                     2011 / 2012
THROUGHPUT-COMPETITIVE ADVANCE RESERVATION WITH                     2011 / 2012
BHOUNDED PATH
DISPERSION TO ACHIEVE NEAR-OPTIMAL PERFORMANCE.
TOFU Semi Truthful Online Frequency Allocation Mechanism for        2011 / 2012
Wireless Networks
Topological Transformation Approaches to TCAM-Based Packet          2011 / 2012
Classification
Toward Efficient and Simplified Distributed Data Intensive          2011 / 2012
Computing
Towards Realizable, Low-Cost Broadcast Systems for Dynamic          2011 / 2012
Environments
Towards Systematic Design of Enterprise Networks                    2011 / 2012
Traffic-Aware Dynamic Routing to Alleviate Congestion in            2011 / 2012
Wireless Sensor Networks
Traffic-Oblivious Routing in the Hose Model                         2011 / 2012
TRANSIENT ANALYSIS OF IEEE 802.15.4 SENSOR NETWORKS.                2011 / 2012
Using Link Gradients to Predict the Impact of Network Latency on    2011 / 2012
Multitier Applications
Valuable Detours: Least-Cost Anypath Routing                        2011 / 2012
Yet Another Simple Solution for the Concurrent Programming          2011 / 2012
Control Problem.




http://blog.ocularsystems.in/blog                                        Page 7

Networking ieee-project-topics-ocularsystems.in

  • 1.
    Ocular Systems| Networking& Network Security IEEE Project Topics Final Year Projects Advanced Java Project Topics http://blog.ocularsystems.in/blog info@ocularsystems.in Behind Ayush Health Club, Navjyot Mahila Society, Tambe Nagar, MIDC-Baramati, Pune, 413 133 Our Branches: Baramati, Pune, Solapur, Ahmed Nagar Contact No: 09970186685/ 07385043047 http://blog.ocularsystems.in/blog Page 1
  • 2.
    Ocular Systems| Networking& Network Security IEEE Project Topics Ocular Systems Provides IEEE 2011 Projects For all Final Year Students. We do assist the students with Technical Guidance for both the categories. Category 1 : Students with new project ideas. Category 2 : Students selecting from our list. When you register for a project we ensure that the project is implemented to your fullest satisfaction and you have a thorough understanding of every aspect of the project. OCULAR SYSTEMS PROVIDES YOU THE LATEST IEEE 2011- IEEE2012 PROJECTSPROJECTS FOR FOLLOWING DEPARTMENT STUDENTS B.E, B.TECH, M.TECH, M.E, DIPLOMA, MS, BSC, MSC, BCA, MCA, MBA, BBA, PHD, NS-2, GLOMOSIM, MATLAB, JAVA, .NET, B.E ( CSE, IT) B.TECH(CSE, IT) M.TECH(COMPUTER SCIENCE, SOFTWARE ENGINEERING) M.E(COMPUTER SCIENCE, SOFTWARE, ENGINEERING) DIPLOMA (CSE, IT) We also have training and project, R & D division to serve the students and make them job oriented professionals IEEE TRANSACTION ON NETWORKING http://blog.ocularsystems.in/blog Page 2
  • 3.
    Ocular Systems| Networking& Network Security IEEE Project Topics A Distributed Algorithm for Find All Best Swap Edges of a Minimum-Diameter 2011 / 2012 Spanning Tree. A Novel Approach for Failure Localization in All-Optical Mesh 2011 / 2012 Networks A Simple Model for Chunk-Scheduling Strategies in P2P 2011 / 2012 Streaming A Unified Approach to Optimizing Performance in Networks Serving 2011 / 2012 Heterogeneous Flows Active Queue Management for Flow Fairness and Stable Queue 2011 / 2012 Length Adaptive Fault-Tolerant Qos Control Algorithms for Maximizing 2011 / 2012 system Lifetime of Query-Based Wireless Sensor Networks. Adjacent Link Failure Localization With Monitoring Trails in 2011 / 2012 All-Optical Mesh Networks An Adaptive Network Coded Retransmission Scheme for 2011 / 2012 Single-HopWireless Multicast Broadcast Services An efficient two-factor user authentication framework for 2011 / 2012 wireless sensor networks An Optimal Algorithm for Relay Node Assignment in Cooperative Ad 2011 / 2012 Hoc Networks Analyzing the Resilience-Complexity Tradeoff of Network Coding 2011 / 2012 in Dynamic P2P Networks. Approaching Throughput-Optimality in Distributed CSMA Scheduling 2011 / 2012 Algorithms With Collisions Architecture and Abstractions for Environment and Traffic-Aware 2011 / 2012 System-Level Coordination of Wireless Networks Attribute-Based Access Control with Efficient Revocation in Data 2011 / 2012 Outsourcing Systems AUTONOMOUS NETWORK RECONFIGURATION SYSTEM TO PRESERVE 2011 / 2012 NETWORK PERFORMANCE. BRICK: A Novel Exact Active Statistics Counter Architecture 2011 / 2012 Buffer Sizing for 802.11 Based Networks 2011 / 2012 BYPASS FLOW-SPLITTING FORWARDING IN FISH NETWORKS. 2011 / 2012 Capacity of Large-Scale CSMA Wireless Networks 2011 / 2012 Coloring Spatial Point Processes With Applications to Peer 2011 / 2012 Discovery in Large Wireless Networks Component-Based Localization in Sparse Wireless Networks 2011 / 2012 Continuous Neighbor Discovery in Asynchronous Sensor 2011 / 2012 Networks Cross Layer Jamming Detection and Mitigation in Wireless 2011 / 2012 Broadcast Networks Crosstalk Preventing Scheduling in Single and Two Stage AWG 2011 / 2012 Based Cell Switches http://blog.ocularsystems.in/blog Page 3
  • 4.
    Ocular Systems| Networking& Network Security IEEE Project Topics Decomposing Workload Bursts for Efficient Storage Resource 2011 / 2012 Management Delay Analysis and Optimality of Scheduling Policies for 2011 / 2012 Multihop Wireless Networks Delay-Optimal Opportunistic Scheduling and Approximations: The 2011 / 2012 Log Rule Differential Encoding of DFAs for Fast Regular Expression 2011 / 2012 Matching DISTRIBUTED FAULT-TOLERANT QUALITY OF WIRELESS NETWORKS. 2011 / 2012 Effect of Link-Level Feedback and Retransmissions on the 2011 / 2012 Performance of Cooperative Networking. Effective Delay-Controlled Load Distribution over Multipath 2011 / 2012 Networks. Efficient Multipath Communication for Time-Critical Applications 2011 / 2012 in Underwater Acoustic Sensor Networks Energy Efficient Opportunistic Routing in Wireless Sensor 2011 / 2012 Networks. Energy Efficient Protocol for Cooperative Networks 2011 / 2012 Energy-Efficient Localized Routing in Random Multihop Wireless 2011 / 2012 Networks Energy-Efficient Protocol for Cooperative Networks 2011 / 2012 Exploring Second Life 2011 / 2012 Fast Simulation of Service Availability in Mesh Networks With 2011 / 2012 Dynamic Path Restoration Flexible Robust Group Key Agreement. 2011 / 2012 Forward Correction and Fountain Codes in Delay-Tolerant Networks 2011 / 2012 Generalized Probabilistic Flooding in Unstructured Peer-to-Peer 2011 / 2012 Networks Impact of File Arrivals and Departures on Buffer Sizing in Core 2011 / 2012 Routers IMPACT OF FILE ARRIVALS AND DEPARTURES ON BUFFER SIZING IN 2011 / 2012 CORE ROUTERS. Improved Bounds on the Throughput Efficiency of Greedy Maximal 2011 / 2012 Scheduling in Wireless Networks Jamming-Aware Traffic Allocation for Multiple-Path Routing Using 2011 / 2012 Portfolio Selection Licklider Transmission Protocol (LTP)-Based DTN for Cislunar 2011 / 2012 Communications Lifetime and Coverage Guarantees Through Distributed 2011 / 2012 Coordinate-Free Sensor Activation Live Streaming With Receiver Based Peer-Division Multiplexing 2011 / 2012 Load balance with Imperfect Information in Structured 2011 / 2012 Peer-to-Peer Systems. http://blog.ocularsystems.in/blog Page 4
  • 5.
    Ocular Systems| Networking& Network Security IEEE Project Topics Local Restoration With Multiple Spanning Trees in Metro Ethernet 2011 / 2012 Networks LOCAL RESTORATION WITH MULTIPLE SPANNING TREES IN METRO 2011 / 2012 ETHERNET NETWORKS. LOOSY NETWORK FLOW OPTIMIZATION RECOVERY PROBLEM USING 2011 / 2012 PORTFOLIO SELECTION. Maelstrom: Transparent Error Correction for Communication 2011 / 2012 Between Data Centers Maximizing the Number of Broadcast Operations in Random 2011 / 2012 Geometric Ad Hoc Wireless Networks. Measuring Multipath Routing in the Internet 2011 / 2012 MESH NETWORK MODEL WITH A GENERAL DYNAMIC PATH 2011 / 2012 RESTORATION. Metadata Distribution and Consistency Techniques for Large-Scale 2011 / 2012 Cluster File Systems. Mobile Sampling of Sensor Field Data Using Controlled Broadcast 2011 / 2012 Model-Based Identification of Dominant Congested Links 2011 / 2012 Monitoring The Impact OfP2P Users On A Broadband Operator’s 2011 / 2012 Network Over time. NEIGHBOR DISCOVERY DURING SENSOR NETWORK INITIALIZATION 2011 / 2012 AND CONTINUOUS NEIGHBOR DISCOVERY. Network Coding Multicast Networks With QoS Guarantees 2011 / 2012 Node Reclamation and Replacement for long-lived Sensor Networks. 2011 / 2012 On Combining Shortest-Path and Back-Pressure Routing Over 2011 / 2012 Multihop Wireless Networks On Cooperative Settlement Between Content, Transit, and Eyeball 2011 / 2012 Internet Service Providers On the Complexity of the Regenerator Placement Problem in 2011 / 2012 Optical Networks On the Dimensioning of WDM Optical Networks With 2011 / 2012 Impairment-Aware Regeneration On the Levy-Walk Nature of Human Mobility 2011 / 2012 On the Market Power of Network Coding in P2P Content 2011 / 2012 Distribution Systems. On the Price of Security in Large-Scale Wireless Ad Hoc Networks 2011 / 2012 On the Robustness of Bit Torrent Swarms to Greedy Peers. 2011 / 2012 Opportunity Cost Analysis for Dynamic Wavelength Routed Mesh 2011 / 2012 Networks Optimal Anycast Technique for Delay-Sensitive Energy-Constrained 2011 / 2012 Asynchronous Sensor Networks Optimal Scheduling for Fair Resource Allocation in Ad Hoc 2011 / 2012 http://blog.ocularsystems.in/blog Page 5
  • 6.
    Ocular Systems| Networking& Network Security IEEE Project Topics Networks With Elastic and Inelastic Traffic. Optimizing Resource Conflicts in Workflow Management systems. 2011 / 2012 Parametric Methods for Anomaly Detection in Aggregate Traffic 2011 / 2012 PARAMETRIC METHODS FOR ANOMALY DETECTION IN AGGREGATE 2011 / 2012 TRAFFIC AND RAPID DETECTION OF REAL DENIAL-OF -SERVICE ATTACKS. Pareto Boundary of Utility Sets for Multiuser Wireless Systems 2011 / 2012 Peering Equilibrium Multipath Routing: A Game Theory Framework 2011 / 2012 for Internet Peering Settlements Practical Computation of Optimal Schedules in Multihop Wireless 2011 / 2012 Networks Practical Routing in a Cyclic MobiSpace 2011 / 2012 Predictable high performance Computing using Feedback and 2011 / 2012 admission control. Predictable High-Performance Computing Using Feedback Control 2011 / 2012 and Admission Control. Predictive Resource Management of Multiple Monitoring 2011 / 2012 Applications Primary User Activity Modeling Using First-Difference Filter 2011 / 2012 Clustering and Correlation in Cognitive Radio Networks ProgME: Towards Programmable Network Measurement 2011 / 2012 Reliability for Networked Storage Nodes 2011 / 2012 Risk-Aware Provisioning for Optical WDM Mesh Networks 2011 / 2012 Robust Network Codes for Unicast Connections: A Case Study 2011 / 2012 ROC Resilient Online Coverage for Surveillance Applications 2011 / 2012 Rumor RidingL:Anonymizing Unstructured Peer-to-Peer Systems. 2011 / 2012 Scalable and Cost-Effective Interconnection of Data-Center 2011 / 2012 Servers Using Dual Server Ports SCHEDULABILITY ANALYSIS FOR HARD NETWORK LIFETIME 2011 / 2012 WIRELESS SENSOR NETWORKS WITH HIGH ENERGY FIRST CLUSTERING. Scheduling Algorithms for Multicarrier Wireless Data Systems 2011 / 2012 SECURE HIGH-THROUGHPUT MULTICAST ROUTING IN WIRELESS MESH 2011 / 2012 NETWORKS. Self Reconfigurable Wireless Mesh Networks 2011 / 2012 Selfish Overlay Network Creation and Maintenance. 2011 / 2012 Self-Reconfigurable Wireless Mesh Networks. 2011 / 2012 Site-Based Partitioning And Repartitioning Techniques For 2011 / 2012 Parallel Page Rank Computation. SPAF – Stateless FSA-Based Packet Filters 2011 / 2012 Stability-Optimal Grouping Strategy of Peer-to-Peer Systems. 2011 / 2012 Star Block Design in Two-Level Survivable Optical Networks 2011 / 2012 Stochastic Model and Connectivity Dynamics for VANETs in 2011 / 2012 http://blog.ocularsystems.in/blog Page 6
  • 7.
    Ocular Systems| Networking& Network Security IEEE Project Topics Signalized Road Systems Supporting Scalable and Adaptive Metadata Management in Ultra 2011 / 2012 large-Scale File Systems Survivable Multipath Provisioning With Differential Delay 2011 / 2012 Constraint in Telecom Mesh Networks SWARM: The Power of Structure in Community Wireless Mesh 2011 / 2012 Networks Symmetric Key Approaches to Securing BGP—A Little Bit Trust Is 2011 / 2012 Enough THE ERROR RATE AND ENERGY SAVING PROTOCOL FOR COOPERTIVE 2011 / 2012 SENSOR NETWORK. The Limit of Information Propagation Speed in Large-Scale 2011 / 2012 Multihop Wireless Networks The small world of file sharing 2011 / 2012 THROUGHPUT-COMPETITIVE ADVANCE RESERVATION WITH 2011 / 2012 BHOUNDED PATH DISPERSION TO ACHIEVE NEAR-OPTIMAL PERFORMANCE. TOFU Semi Truthful Online Frequency Allocation Mechanism for 2011 / 2012 Wireless Networks Topological Transformation Approaches to TCAM-Based Packet 2011 / 2012 Classification Toward Efficient and Simplified Distributed Data Intensive 2011 / 2012 Computing Towards Realizable, Low-Cost Broadcast Systems for Dynamic 2011 / 2012 Environments Towards Systematic Design of Enterprise Networks 2011 / 2012 Traffic-Aware Dynamic Routing to Alleviate Congestion in 2011 / 2012 Wireless Sensor Networks Traffic-Oblivious Routing in the Hose Model 2011 / 2012 TRANSIENT ANALYSIS OF IEEE 802.15.4 SENSOR NETWORKS. 2011 / 2012 Using Link Gradients to Predict the Impact of Network Latency on 2011 / 2012 Multitier Applications Valuable Detours: Least-Cost Anypath Routing 2011 / 2012 Yet Another Simple Solution for the Concurrent Programming 2011 / 2012 Control Problem. http://blog.ocularsystems.in/blog Page 7