1. NARENDER
(Engineering Geologist)
Mobile : +91- 9811779772 (DL), +91- 8892510357 (KA)
E-Mail : nkjajoria86@gmail.com
Offer my services to explore my abilities to the best of my knowledge and experience in the pioneering environment,
where I can contribute in the development of the organization as well as I can upgrade my career path with a good
exposure and seeking assignments in Construction Project Operations, Site Management, Quality control and
Maintenance with a reputed organization.
Location Preference: Anywhere in India & Abroad.
Work Experience
• Since September 2015
Drillcon Infrastructures Pvt. Ltd. as an Engineering Geologist cum Shift Engineer, Posted in Bangalore
Metro Rail Project “North Ramp to Majestic North Shaft, Phase - I” Bangalore City, Karnataka.
Client: Bangalore Metro Rail Corporation Limited (BMRCL)
Tunneling Mode: Mechanized Tunneling by Earth Pressure Balance (EPB) TBM
Responsibilities as a Geologist:
Day to day monitoring of Ground Settlement Markers, Building Settlement Markers etc.
Real time monitoring for the building using Crack meters above the tunnel alignment.
Dynamic Probing Test to find out Cavities and the Underground information.
Worked with Tunnel design team and the civil works team on ground improvements works (Such as
Surface Grouting along the Tunnel alignment).
Calculating Face Pressure for EPB TBM either Ring wise or Chainage wise.
Calculating Thrust Pressure for EPB TBM for penetrate the applied face support pressure.
Face Mapping & Photo Mapping under Compressed Air up to 1.4 bar, (10 TBM Cutter Head / Tunnel
face Interventions under belt till November 2015).
Providing Geological information about the underground to Tunnel team and Design team.
Conducting various tests for soil or rocks such as Slump Test etc.
Responsibilities as a Shift Engineer:
Preparation of daily progress reports about all the TBM advance works including all mechanical,
electrical, civil works along with the general surface works.
Stock controls of all the materials used for the TBM works in daily routine.
Distribution and management of manpower for different works either inside the tunnel or at the
surface.
Monitoring all the activities carried out on the shifts.
• May 2014 – August 2015
P & R Infraprojects limited, Chandigarh, as a Geologist. Posted in Leh - Ladakh, Jammu & Kashmir, Leh –
Kargil road, Biama, Hanu (9 MW) & Dah (9 MW) Small Hydroelectric Power Projects.
Client: J & K State Power Development Corporation
PMC: WAPCOS
Responsibilities:
Surface Mapping and preparation of Geological Section from surface and subsurface data.
Bore Hole Logging & monitoring Preparation of Geological Reports of working site.
Page | 1
2. Rock fall protection guidelines on unstable slopes and undergrounds excavation.
Geological Face logging, 3D- logging of Drifts, Tunnels & Caverns.
Rock Mass classification (RMR & ‘Q’ System).
Observation & suggestion in rock support system (Fore poling, Rib erection, Rock bolting
& Rock anchoring, wire mesh & Shotcrete, Grouting).
Deformation Monitoring in tunnels using MPBX, SPBX, Load Cell, Tape Extensometer etc.
Tunnel profiling with Total Station (Surveying Instrument) and Tunnel excavation quantity estimation.
Civil construction quantity estimation of Dam site works including Billing work.
• November 2013 to April 2014
Worked as a Geologist cum Resistivity Data Processor and Interpreter in Global Hydrogeological Solutions
(GHS), Vikas Puri, New Delhi.
Responsibilities:
Vertical Electrical Sounding (VES) data acquisition, processing and interpretation.
Preparation of Proposals for DST Projects, document verifications, report formation for DST
(Department of Science & Technology) projects in Baddi, Jhajjar and Dholera.
Projects Handled:
Ground water assessment, pollution status and Aquifer management plan for Baddi Industrial Complex,
Solan district, Himachal Pradesh.
Groundwater System Analysis, Sustainable Development Plan and Pilot Project on In-situ Purification
(ISP) Technology for Water Supply, Jhajjar District, Haryana.
Report formation for the geophysical survey carried out in Dholera, Gujarat, for the project of DMIC
(Delhi – Mumbai Industrial Corridor).
• May 2013 – November 2013
Worked on the Contract basis as a Resistivity Data Processor and Interpreter in Rail India Technical and
Economic Services Limited (RITES), Gurgaon.
Client: WAPCOS
Responsibilities:
Vertical Electrical Sounding (VES) data acquisition, processing and interpretation both manually and
using the Resistivity Processing and Interpretation Software IX-1D, 2-D, and 3-D modeling of Aquifer
using Rockworks.
• August 2007 – August 2008
Worked as a Draughtsman (Geology) in Energy Infratech Pvt. Limited (EIPL), Gurgaon.
Responsibilities:
Preparation of Hydro geological drawings including digitization of the Toposheets, 3D geological logs,
face logs, borehole logs, foundation mapping and Regional Geological maps etc.
Preparation of Civil/Geological plans and sections for various Civil Structures, e.g., Power House, Dam,
Diversion Tunnel, Head Race Tunnel, Tail Race Tunnel, Cable Tunnel, for the following projects:
a) Teesta - III H.E. Power Project, Sikkim (1,200 MW).
b) Malana - II H.E. Power Project, Himachal Pradesh (100 MW).
c) Demwe H.E. Power Project, Arunachal Pradesh (1200 & 1800 MW).
Industrial & Institutional Trainings
Feb. 2013 - May 2013 (4 months): Rail India Technical and Economic Services Limited (RITES), Gurgaon,
Haryana “Aquifer Mapping by using geophysical techniques”.
June 2012 (3 weeks): National Hydro-electric Power Corporation Limited (NHPC), Kullu, Himachal Pradesh,
“Parbati-II and Parbati-III Hydro-electric Power Project”.
Page | 2
3. Jan 2012 (3 weeks): National Geophysical Research Institute (NGRI), Hyderabad, Andhra Pradesh, “Fundamental of
geophysics, study of ground water properties and overview on gas hydrates”.
June 2011 (2 weeks): Oil India Limited (OIL), Duliajan, Assam, “Visits of oil rigs and bore log studies”.
Academic Profile
2008 – 2013: M.Tech Applied Geology (five year integrated course) from Department of Geology, Kurukshetra
University Kurukshetra, and secured 75.92 % marks.
2005 – 2007: Draughtsman (Civil) Certificate Course from Industrial Training Institute (ITI), Pusa, Patel Nagar,
New Delhi, and secured 84.28% marks.
2004: 12th
from C.B.S.E., New Delhi, and secured 65 % marks.
2002: 10th
from C.B.S.E., New Delhi, and secured 76.6 % marks.
Academic Trainings and Projects
Title: Lithological & Geological Structure identification and small scale geological mapping in Narnaul, Haryana
Title: Preparation of Report on working procedure in an open pit limestone mine in Kashlok mine, Shimla, H.P
Achievements & Extra Curricular Activities
Dec 2011: Delivered seminar on Introduction to Remote Sensing (M.Tech, VIIth
semester).
Dec 2012: Delivered seminar on Earthquake Hazards and its study (M.Tech, IXth
semester).
IT Skills
Operating Systems: Windows XP / 2000 / 98 & Windows 7, 8, 10.
Other Application Software: Expertise working in AutoCAD (2D, 3D) & Rockworks (2D, 3D Aquifer modeling),
Surfer 9 (Contour formation, Cutting / Excavation quantity estimations etc.), IX-1D
(Resistivity Layer Processing & Interpretation Software), MS Office (MS-Word, MS-
Excel, MS-Power Point), Photoshop, Page Maker, Corel Draw, Google Earth.
Strengths
• Fast learner, smart worker, optimistic attitude, creative, intense desire to learn new technologies.
• Leadership Quality with frequent environmental adaptability.
• Clean and Clear Workability and precise Functionality, Time Punctuality.
Personal Details
Father's Name : Sh. Mool Chand
Date of Birth : 29th
Dec, 1986
Nationality : Indian
Sex : Male
Marital Status : Single
Passport Details : K 6085075, Issued on 11/07/2012, Expiry Dt. 10/07/2022
Language Known : English and Hindi
Address : Correspondence: WZ-39, Roop Vihar, Nawada, Uttam Nagar, New Delhi – 110059.
Permanent: Plot No. 8, Vipin Garden, Dwarka Mod, Metro Pillar No. 800, Near SBI, Main
Najafgarh Road, New Delhi – 110059.
Declaration
I, hereby, acknowledge that all the details given above are true and correct to the best of my knowledge and belief and