SlideShare a Scribd company logo
1 of 5
DHIRAJ KUMAR SHRESTHA
Land surveyor,
Mob: +971508671459, 0525931122
@: seedenggo11@gmail.com
Objective
To excel my knowledge in the survey industry by contributing my skills and ability to
enhance my professional skills to complete the task given to facilitates the growth of
the company.
Skillsand Abilities
 Familiarity with the land survey equipment’s like Total station, DGPS, VRS,
RTK, Digital level
 Learnt to be organized in all the activities to complete the given role in right
time
 Enthusiastic to work, quick learner and willingness to learn new things.
 Understanding of As build survey, settlement survey, geodetic survey,
verticality survey topographic and utility survey
 Conversant with MS Office tools, Photoshop
Education
 Land survey : Land Management Training Centre Dhulikhel, kavre, Nepal
 I .Com : Kathmandu Campus Kalimati, Nepal
 Shree Tribhuwon Higher Secondary School Gaushala Nepal
Softwareexpertise
Auto CAD (2007 &2D & 3D,2010 2D) ,Eagle Point, TBC( Trimble Geo Office), Lecia
geo Office, Liscad 9 ,Topcon link,
Instrumental abilities
 GPS( DGPS, RTK, VRS)- Trimble, Leica, Spectra
 Total station- Trimble , Leica , Nikon, sokkia ,Topcon,,gowing,pentax
 Digital Level- Trimble dini , Lecia DNA 03
 Auto lev l- Leica , Nikon, sokkia ,Topcon,,gowing,pentax
Professional experience history of work
Senior Land surveyor at capital surveys, Abu Dhabi, UAE Nov 2015 to June
2016
 Geodetic survey for establishment of bench mark, and precise digital leveling
for the bench mark around ICAD2, Zone crops Abu Dhabi
 Ground monitoring for Ester project , Sol data
 Topographic survey of Roads & Parking Development Al-Ain (UAE) project
with DORSCH (Consultant).
 Layout plan of Buildings & Plats & sewerage & Drains. Earth Worketc.
 Settlement survey & geodetic survey for pipe line At Oil & Gas Refinery
(GASCO) Abu Dhabi Project.
 As Built survey of Al-Ain Air Port & Different Schools in Abu Dhabi.
 Topographic survey of Abu Dhabi City Area with Siemens
 Checked the verticality for the cooling tower in habshan 5, Abu Dhabi
 Topographic survey of Roads & Parking Development Ajman al Nuaimia
(UAE) project with
 Topographic survey of Ras al kamahi Area with Mina al Arab property
 Topographic survey of Reef villas Abu Dhabi City Area with KEO
 Topographic survey of ADNOC SCHOOL Abu DhabiArea with KEO
 Checked the verticality topographic maps and pump station of kalba area with
halcor
 Topographic survey of Roads Development of Dubai area with aecom
 Topographic survey of Dubai a2k area with Dmaca
Senior Surveyor, Seed Engineering Consultant & Survey Company Pvt.Ltd
Nepal October 2011 to July 2015
 Preparation Topographic Survey Contours(Roads,
Hydroelectric,irragition,river trading, tunnel, aliment,ropeway,railway etc)
 Traversing survey establishment of bench mark fixed the controls points
 Preparation and submission of topographical maps, drawings and reports.
 Roads construction survey works (traversing check center line data fixing on
site ,O G L, NGL, level traversing and cross section quantity using in total
station and auto level
 Layout plan of Buildings & Plats & sewerage & Drains. &Earth Work
&Supervision.
 Preparation of drawings & cross sections of Roads & External Services
 Monitor work progress. Ensure they deliver work as schedule.
 All Structure work Bridge, Culverts, Drains, Asphalt, tunnel work etc.
 Stakeout work for whole project(intake, tunnel alignment desanding, fore bay,
powerhouse, construction camp area,penstock alignment, traversing, access
road, etc)
 EARTH WORK in mountainous area Development Works.
 WATER SUPPLY System on both sides of ROW on Roads/ streets.
Senior Surveyor,Engen Consultancy Pvt.Ltd Nepal
October 2010 to October 2011(Khani Khola Hydroelectric Project 25 MW)
 Preparation Topographic Survey
 Traversing survey establishment of bench mark
 Stakeout work for whole project area (intake, tunnel alignment, desanding,
fore bay, powerhouse, construction camp area,penstock alignment, access
road, ropeway etc.)
 Fixing and cutting of steel same like drawings.
 Supervised the Frame Structure Concrete and Shuttering(intake, tunnel, fore
bay, powerhouse, ropeway)
 Construction of Frame Structure whole project over Supervision

Surveyor ,R.K Survey Company pvt.ltd Nepal,
September 2004 to July 2010
 Responsible for conducting, Plane Table, Geodetic Control Points Survey,
Topographical Survey, Transmission Line Survey, GPS Survey, Road
Survey, Leveling survey, Cadastral survey and survey related job etc. Auto
Carto Consult
 Preparation of topographical maps and design drawings for detailed and
feasibility study of the following projects
- Feasibility study of San Khola and Dingla – Manawa Small
Hydropower Projects,Bhojpur district;
- Detailed study of Upper Sabha Small Hydropower Project (5 MW),
Sankhuwasabha district;
- Detailed study of Yaksuwa Small Hydropower Project,
Sankhuwasabha district;
- Detailed study of Sabha Khola “A” Small Hydropower Project (5
MW), Sankhuwasabha district;
- Detailed study of Lankhuwa Khola Small Hydropower Project (1
MW), Sankhuwasabha district;
- Detailed survey of Bajura Roads Project (Track Road – 31 km total
length), Bajura district;
- Feasibility study of Upper Khoranga Small Hydropower Project,
Sankhuwasabha district;
- Feasibility study for high transmission line of Upper Tamakhosi
Hydroelectric Project (456 MW), Dolakha district;
- Detailed study of Badigad “A” and Nisi Khola Small Hydropower
Project (5 MW and 2 MW), Baglung and Gulmi districts;
- Feasibility study of Upper Marsyangdi – 1 Hydroelectric Project
(100 MW), Manang and Lamjung district;
- Feasibility study of Sabha Khola Hydropower Project (23 MW),
Sankhuwasabha district;
- Detailed study of Upper Myardi Khola Small Hydropower Project
(4.9 MW), Lamjung district;
- Detailed study of Jiri Khola Small Hydropower Project (2.2 MW),
Dolakha district;
- Feasibility study of Mai Khola – B Hydropower Project (3 MW),
Ilam district;
- Feasibility and detailed study of Tungun – Thosne and Khani Khola
Small Hydropower Project (6.3 MW), Lalitpur district;
- Detailed study of Lower Rudi Khola Small Hydropower Project (3.4
MW), Kaski district ;
- Detailed study of Rudi Khola “A” Small Hydropower Project (5.9
MW), Kaski district;
- Feasibility Survey of North South Fast Track Road Project from
Kathmandu-Nijgadh-Pathlaiya (97km) and Budine-Hetauda (16km)
it using Total Station & Preparation of Topography Map. The
project undertaken by the ITECO Nepal (P) Ltd. ; (November 2007 -
March 2008)
 Detail Survey of from Satbaj to Jhulaghat, Satbajh to Gokuleshwor, Phidim
to Taplejung, Surkhet to Kalikot using Total Station and preparation of
Topography Maps under RSDP (March 2007 – November 2007);
 Detail Survey of 220 kV Transmission Line of Upper Seti (Damauli)
Storage Hydroelectric Project. Total Length 38.415 Km. Preparations of
Topography Maps And Profile of Upper Seti (Damauli) Storage
Hydroelectric Project. The project undertaken by the Masina Continental
 Detailed survey of Melamchi Water Supply Project
Communication Skills
Nepali,English,Hindi,Malayu
Personal details
 Date of Birth: 10/07/2040 (BS) 18 October 1983 (AD)
 Gender : Male
 Marital Status: Married
 Country of Origin : Nepal
 Present Nationality: Nepali
 Passport No : 08738322
 Permanent Address- Gaushala Bazar-2 ,Mahottari Nepal
 Temporary Address-,UAE
CERTIFICATION
I, the undersigned certify that to the best of my knowledge and belief, this bio-data correctly
describes my qualifications and my experience. I understand that any willful misstatement
described herein may lead to my disqualification or dismissal, if employed.
Dhiraj kumar shrestha

More Related Content

What's hot

Project synopsis for East West Gas Pipeline and Effective GIS Implementation
Project synopsis for East West Gas Pipeline and Effective GIS ImplementationProject synopsis for East West Gas Pipeline and Effective GIS Implementation
Project synopsis for East West Gas Pipeline and Effective GIS ImplementationSoumik Chakraborty
 
Lagatree professional background - jan-2020
Lagatree professional background - jan-2020Lagatree professional background - jan-2020
Lagatree professional background - jan-2020Bruce Lagatree
 
Gis saaf-project
Gis saaf-projectGis saaf-project
Gis saaf-projectSalah Bakry
 
SPATIO-TEMPORAL URBAN CHANGE DETECTION, ANALYSIS AND PREDICTION OF KATHMANDU ...
SPATIO-TEMPORAL URBAN CHANGE DETECTION, ANALYSIS AND PREDICTION OF KATHMANDU ...SPATIO-TEMPORAL URBAN CHANGE DETECTION, ANALYSIS AND PREDICTION OF KATHMANDU ...
SPATIO-TEMPORAL URBAN CHANGE DETECTION, ANALYSIS AND PREDICTION OF KATHMANDU ...Kamal Shahi
 
Geological mapping 27.04.18 updated (only mapping)
Geological mapping   27.04.18 updated (only mapping)Geological mapping   27.04.18 updated (only mapping)
Geological mapping 27.04.18 updated (only mapping)hosting guests
 
Subsurface utility engineering by Advance Scanning Services
Subsurface utility engineering  by Advance Scanning ServicesSubsurface utility engineering  by Advance Scanning Services
Subsurface utility engineering by Advance Scanning ServicesAdvanceScanningServices
 

What's hot (20)

Resume sougata
Resume sougataResume sougata
Resume sougata
 
Frankovitch Resume-July 2015
Frankovitch Resume-July 2015Frankovitch Resume-July 2015
Frankovitch Resume-July 2015
 
Józsa e.
Józsa e.Józsa e.
Józsa e.
 
Project synopsis for East West Gas Pipeline and Effective GIS Implementation
Project synopsis for East West Gas Pipeline and Effective GIS ImplementationProject synopsis for East West Gas Pipeline and Effective GIS Implementation
Project synopsis for East West Gas Pipeline and Effective GIS Implementation
 
Lagatree professional background - jan-2020
Lagatree professional background - jan-2020Lagatree professional background - jan-2020
Lagatree professional background - jan-2020
 
GIS KS RESUME
GIS KS RESUMEGIS KS RESUME
GIS KS RESUME
 
Gis saaf-project
Gis saaf-projectGis saaf-project
Gis saaf-project
 
Bagheri Dec 2016
Bagheri Dec 2016Bagheri Dec 2016
Bagheri Dec 2016
 
Portfolio_Gis_others
Portfolio_Gis_othersPortfolio_Gis_others
Portfolio_Gis_others
 
CKLaverty_CV
CKLaverty_CVCKLaverty_CV
CKLaverty_CV
 
SPATIO-TEMPORAL URBAN CHANGE DETECTION, ANALYSIS AND PREDICTION OF KATHMANDU ...
SPATIO-TEMPORAL URBAN CHANGE DETECTION, ANALYSIS AND PREDICTION OF KATHMANDU ...SPATIO-TEMPORAL URBAN CHANGE DETECTION, ANALYSIS AND PREDICTION OF KATHMANDU ...
SPATIO-TEMPORAL URBAN CHANGE DETECTION, ANALYSIS AND PREDICTION OF KATHMANDU ...
 
Geological mapping 27.04.18 updated (only mapping)
Geological mapping   27.04.18 updated (only mapping)Geological mapping   27.04.18 updated (only mapping)
Geological mapping 27.04.18 updated (only mapping)
 
CV WAQAR.
CV WAQAR.CV WAQAR.
CV WAQAR.
 
CV SUJINLAL
CV SUJINLALCV SUJINLAL
CV SUJINLAL
 
CV mona-rev 2
CV mona-rev 2CV mona-rev 2
CV mona-rev 2
 
Lawrance-Resume
Lawrance-ResumeLawrance-Resume
Lawrance-Resume
 
Subsurface utility engineering by Advance Scanning Services
Subsurface utility engineering  by Advance Scanning ServicesSubsurface utility engineering  by Advance Scanning Services
Subsurface utility engineering by Advance Scanning Services
 
Ramy's Resume
Ramy's ResumeRamy's Resume
Ramy's Resume
 
Linear scheduling LSM
Linear scheduling LSMLinear scheduling LSM
Linear scheduling LSM
 
John_Giblin
John_GiblinJohn_Giblin
John_Giblin
 

Similar to land surveyor dhiraj (20)

Narender_Geologist cum Shift Engg. Resume
Narender_Geologist cum Shift Engg. ResumeNarender_Geologist cum Shift Engg. Resume
Narender_Geologist cum Shift Engg. Resume
 
Resume dharmendra
Resume dharmendraResume dharmendra
Resume dharmendra
 
GOPAL
GOPALGOPAL
GOPAL
 
Naresh Cherukuri_CV_May-2016
Naresh Cherukuri_CV_May-2016Naresh Cherukuri_CV_May-2016
Naresh Cherukuri_CV_May-2016
 
cv Updated M.Anwar
cv Updated M.Anwarcv Updated M.Anwar
cv Updated M.Anwar
 
Ahmed's CV- May, 2015
Ahmed's CV- May, 2015Ahmed's CV- May, 2015
Ahmed's CV- May, 2015
 
Bio Data Sukdeb Samanta
Bio Data Sukdeb SamantaBio Data Sukdeb Samanta
Bio Data Sukdeb Samanta
 
Previous projects
Previous projectsPrevious projects
Previous projects
 
SURVEY CAMPING THEORY REPORT
SURVEY CAMPING THEORY REPORT SURVEY CAMPING THEORY REPORT
SURVEY CAMPING THEORY REPORT
 
CVMUSTAQEEMBURNEY
CVMUSTAQEEMBURNEYCVMUSTAQEEMBURNEY
CVMUSTAQEEMBURNEY
 
Madan Resume Updated
Madan Resume UpdatedMadan Resume Updated
Madan Resume Updated
 
CV AFZAAL AHMAD TARAR 1980 (1)
CV AFZAAL AHMAD TARAR 1980 (1)CV AFZAAL AHMAD TARAR 1980 (1)
CV AFZAAL AHMAD TARAR 1980 (1)
 
RESUME New
RESUME NewRESUME New
RESUME New
 
CV-Thowfeek
CV-ThowfeekCV-Thowfeek
CV-Thowfeek
 
gandham2910@yahoo.co.inCIVIL Site Manager
gandham2910@yahoo.co.inCIVIL Site Managergandham2910@yahoo.co.inCIVIL Site Manager
gandham2910@yahoo.co.inCIVIL Site Manager
 
Department of survey of pakistan
Department of survey of pakistanDepartment of survey of pakistan
Department of survey of pakistan
 
CV-SAJAN LAND SURVEYOR 15-07-15
CV-SAJAN LAND SURVEYOR 15-07-15CV-SAJAN LAND SURVEYOR 15-07-15
CV-SAJAN LAND SURVEYOR 15-07-15
 
CV-SAJAN LAND SURVEYOR 15-07-15
CV-SAJAN LAND SURVEYOR 15-07-15CV-SAJAN LAND SURVEYOR 15-07-15
CV-SAJAN LAND SURVEYOR 15-07-15
 
AdilCV-WB-F
AdilCV-WB-FAdilCV-WB-F
AdilCV-WB-F
 
murali_cv_updated
murali_cv_updatedmurali_cv_updated
murali_cv_updated
 

land surveyor dhiraj

  • 1. DHIRAJ KUMAR SHRESTHA Land surveyor, Mob: +971508671459, 0525931122 @: seedenggo11@gmail.com Objective To excel my knowledge in the survey industry by contributing my skills and ability to enhance my professional skills to complete the task given to facilitates the growth of the company. Skillsand Abilities  Familiarity with the land survey equipment’s like Total station, DGPS, VRS, RTK, Digital level  Learnt to be organized in all the activities to complete the given role in right time  Enthusiastic to work, quick learner and willingness to learn new things.  Understanding of As build survey, settlement survey, geodetic survey, verticality survey topographic and utility survey  Conversant with MS Office tools, Photoshop Education  Land survey : Land Management Training Centre Dhulikhel, kavre, Nepal  I .Com : Kathmandu Campus Kalimati, Nepal  Shree Tribhuwon Higher Secondary School Gaushala Nepal Softwareexpertise Auto CAD (2007 &2D & 3D,2010 2D) ,Eagle Point, TBC( Trimble Geo Office), Lecia geo Office, Liscad 9 ,Topcon link,
  • 2. Instrumental abilities  GPS( DGPS, RTK, VRS)- Trimble, Leica, Spectra  Total station- Trimble , Leica , Nikon, sokkia ,Topcon,,gowing,pentax  Digital Level- Trimble dini , Lecia DNA 03  Auto lev l- Leica , Nikon, sokkia ,Topcon,,gowing,pentax Professional experience history of work Senior Land surveyor at capital surveys, Abu Dhabi, UAE Nov 2015 to June 2016  Geodetic survey for establishment of bench mark, and precise digital leveling for the bench mark around ICAD2, Zone crops Abu Dhabi  Ground monitoring for Ester project , Sol data  Topographic survey of Roads & Parking Development Al-Ain (UAE) project with DORSCH (Consultant).  Layout plan of Buildings & Plats & sewerage & Drains. Earth Worketc.  Settlement survey & geodetic survey for pipe line At Oil & Gas Refinery (GASCO) Abu Dhabi Project.  As Built survey of Al-Ain Air Port & Different Schools in Abu Dhabi.  Topographic survey of Abu Dhabi City Area with Siemens  Checked the verticality for the cooling tower in habshan 5, Abu Dhabi  Topographic survey of Roads & Parking Development Ajman al Nuaimia (UAE) project with  Topographic survey of Ras al kamahi Area with Mina al Arab property  Topographic survey of Reef villas Abu Dhabi City Area with KEO  Topographic survey of ADNOC SCHOOL Abu DhabiArea with KEO  Checked the verticality topographic maps and pump station of kalba area with halcor  Topographic survey of Roads Development of Dubai area with aecom  Topographic survey of Dubai a2k area with Dmaca Senior Surveyor, Seed Engineering Consultant & Survey Company Pvt.Ltd Nepal October 2011 to July 2015  Preparation Topographic Survey Contours(Roads, Hydroelectric,irragition,river trading, tunnel, aliment,ropeway,railway etc)  Traversing survey establishment of bench mark fixed the controls points  Preparation and submission of topographical maps, drawings and reports.
  • 3.  Roads construction survey works (traversing check center line data fixing on site ,O G L, NGL, level traversing and cross section quantity using in total station and auto level  Layout plan of Buildings & Plats & sewerage & Drains. &Earth Work &Supervision.  Preparation of drawings & cross sections of Roads & External Services  Monitor work progress. Ensure they deliver work as schedule.  All Structure work Bridge, Culverts, Drains, Asphalt, tunnel work etc.  Stakeout work for whole project(intake, tunnel alignment desanding, fore bay, powerhouse, construction camp area,penstock alignment, traversing, access road, etc)  EARTH WORK in mountainous area Development Works.  WATER SUPPLY System on both sides of ROW on Roads/ streets. Senior Surveyor,Engen Consultancy Pvt.Ltd Nepal October 2010 to October 2011(Khani Khola Hydroelectric Project 25 MW)  Preparation Topographic Survey  Traversing survey establishment of bench mark  Stakeout work for whole project area (intake, tunnel alignment, desanding, fore bay, powerhouse, construction camp area,penstock alignment, access road, ropeway etc.)  Fixing and cutting of steel same like drawings.  Supervised the Frame Structure Concrete and Shuttering(intake, tunnel, fore bay, powerhouse, ropeway)  Construction of Frame Structure whole project over Supervision  Surveyor ,R.K Survey Company pvt.ltd Nepal, September 2004 to July 2010  Responsible for conducting, Plane Table, Geodetic Control Points Survey, Topographical Survey, Transmission Line Survey, GPS Survey, Road Survey, Leveling survey, Cadastral survey and survey related job etc. Auto Carto Consult  Preparation of topographical maps and design drawings for detailed and feasibility study of the following projects - Feasibility study of San Khola and Dingla – Manawa Small Hydropower Projects,Bhojpur district; - Detailed study of Upper Sabha Small Hydropower Project (5 MW), Sankhuwasabha district;
  • 4. - Detailed study of Yaksuwa Small Hydropower Project, Sankhuwasabha district; - Detailed study of Sabha Khola “A” Small Hydropower Project (5 MW), Sankhuwasabha district; - Detailed study of Lankhuwa Khola Small Hydropower Project (1 MW), Sankhuwasabha district; - Detailed survey of Bajura Roads Project (Track Road – 31 km total length), Bajura district; - Feasibility study of Upper Khoranga Small Hydropower Project, Sankhuwasabha district; - Feasibility study for high transmission line of Upper Tamakhosi Hydroelectric Project (456 MW), Dolakha district; - Detailed study of Badigad “A” and Nisi Khola Small Hydropower Project (5 MW and 2 MW), Baglung and Gulmi districts; - Feasibility study of Upper Marsyangdi – 1 Hydroelectric Project (100 MW), Manang and Lamjung district; - Feasibility study of Sabha Khola Hydropower Project (23 MW), Sankhuwasabha district; - Detailed study of Upper Myardi Khola Small Hydropower Project (4.9 MW), Lamjung district; - Detailed study of Jiri Khola Small Hydropower Project (2.2 MW), Dolakha district; - Feasibility study of Mai Khola – B Hydropower Project (3 MW), Ilam district; - Feasibility and detailed study of Tungun – Thosne and Khani Khola Small Hydropower Project (6.3 MW), Lalitpur district; - Detailed study of Lower Rudi Khola Small Hydropower Project (3.4 MW), Kaski district ; - Detailed study of Rudi Khola “A” Small Hydropower Project (5.9 MW), Kaski district; - Feasibility Survey of North South Fast Track Road Project from Kathmandu-Nijgadh-Pathlaiya (97km) and Budine-Hetauda (16km) it using Total Station & Preparation of Topography Map. The project undertaken by the ITECO Nepal (P) Ltd. ; (November 2007 - March 2008)  Detail Survey of from Satbaj to Jhulaghat, Satbajh to Gokuleshwor, Phidim to Taplejung, Surkhet to Kalikot using Total Station and preparation of Topography Maps under RSDP (March 2007 – November 2007);  Detail Survey of 220 kV Transmission Line of Upper Seti (Damauli) Storage Hydroelectric Project. Total Length 38.415 Km. Preparations of Topography Maps And Profile of Upper Seti (Damauli) Storage Hydroelectric Project. The project undertaken by the Masina Continental  Detailed survey of Melamchi Water Supply Project
  • 5. Communication Skills Nepali,English,Hindi,Malayu Personal details  Date of Birth: 10/07/2040 (BS) 18 October 1983 (AD)  Gender : Male  Marital Status: Married  Country of Origin : Nepal  Present Nationality: Nepali  Passport No : 08738322  Permanent Address- Gaushala Bazar-2 ,Mahottari Nepal  Temporary Address-,UAE CERTIFICATION I, the undersigned certify that to the best of my knowledge and belief, this bio-data correctly describes my qualifications and my experience. I understand that any willful misstatement described herein may lead to my disqualification or dismissal, if employed. Dhiraj kumar shrestha