1. DHIRAJ KUMAR SHRESTHA
Land surveyor,
Mob: +971508671459, 0525931122
@: seedenggo11@gmail.com
Objective
To excel my knowledge in the survey industry by contributing my skills and ability to
enhance my professional skills to complete the task given to facilitates the growth of
the company.
Skillsand Abilities
Familiarity with the land survey equipment’s like Total station, DGPS, VRS,
RTK, Digital level
Learnt to be organized in all the activities to complete the given role in right
time
Enthusiastic to work, quick learner and willingness to learn new things.
Understanding of As build survey, settlement survey, geodetic survey,
verticality survey topographic and utility survey
Conversant with MS Office tools, Photoshop
Education
Land survey : Land Management Training Centre Dhulikhel, kavre, Nepal
I .Com : Kathmandu Campus Kalimati, Nepal
Shree Tribhuwon Higher Secondary School Gaushala Nepal
Softwareexpertise
Auto CAD (2007 &2D & 3D,2010 2D) ,Eagle Point, TBC( Trimble Geo Office), Lecia
geo Office, Liscad 9 ,Topcon link,
2. Instrumental abilities
GPS( DGPS, RTK, VRS)- Trimble, Leica, Spectra
Total station- Trimble , Leica , Nikon, sokkia ,Topcon,,gowing,pentax
Digital Level- Trimble dini , Lecia DNA 03
Auto lev l- Leica , Nikon, sokkia ,Topcon,,gowing,pentax
Professional experience history of work
Senior Land surveyor at capital surveys, Abu Dhabi, UAE Nov 2015 to June
2016
Geodetic survey for establishment of bench mark, and precise digital leveling
for the bench mark around ICAD2, Zone crops Abu Dhabi
Ground monitoring for Ester project , Sol data
Topographic survey of Roads & Parking Development Al-Ain (UAE) project
with DORSCH (Consultant).
Layout plan of Buildings & Plats & sewerage & Drains. Earth Worketc.
Settlement survey & geodetic survey for pipe line At Oil & Gas Refinery
(GASCO) Abu Dhabi Project.
As Built survey of Al-Ain Air Port & Different Schools in Abu Dhabi.
Topographic survey of Abu Dhabi City Area with Siemens
Checked the verticality for the cooling tower in habshan 5, Abu Dhabi
Topographic survey of Roads & Parking Development Ajman al Nuaimia
(UAE) project with
Topographic survey of Ras al kamahi Area with Mina al Arab property
Topographic survey of Reef villas Abu Dhabi City Area with KEO
Topographic survey of ADNOC SCHOOL Abu DhabiArea with KEO
Checked the verticality topographic maps and pump station of kalba area with
halcor
Topographic survey of Roads Development of Dubai area with aecom
Topographic survey of Dubai a2k area with Dmaca
Senior Surveyor, Seed Engineering Consultant & Survey Company Pvt.Ltd
Nepal October 2011 to July 2015
Preparation Topographic Survey Contours(Roads,
Hydroelectric,irragition,river trading, tunnel, aliment,ropeway,railway etc)
Traversing survey establishment of bench mark fixed the controls points
Preparation and submission of topographical maps, drawings and reports.
3. Roads construction survey works (traversing check center line data fixing on
site ,O G L, NGL, level traversing and cross section quantity using in total
station and auto level
Layout plan of Buildings & Plats & sewerage & Drains. &Earth Work
&Supervision.
Preparation of drawings & cross sections of Roads & External Services
Monitor work progress. Ensure they deliver work as schedule.
All Structure work Bridge, Culverts, Drains, Asphalt, tunnel work etc.
Stakeout work for whole project(intake, tunnel alignment desanding, fore bay,
powerhouse, construction camp area,penstock alignment, traversing, access
road, etc)
EARTH WORK in mountainous area Development Works.
WATER SUPPLY System on both sides of ROW on Roads/ streets.
Senior Surveyor,Engen Consultancy Pvt.Ltd Nepal
October 2010 to October 2011(Khani Khola Hydroelectric Project 25 MW)
Preparation Topographic Survey
Traversing survey establishment of bench mark
Stakeout work for whole project area (intake, tunnel alignment, desanding,
fore bay, powerhouse, construction camp area,penstock alignment, access
road, ropeway etc.)
Fixing and cutting of steel same like drawings.
Supervised the Frame Structure Concrete and Shuttering(intake, tunnel, fore
bay, powerhouse, ropeway)
Construction of Frame Structure whole project over Supervision
Surveyor ,R.K Survey Company pvt.ltd Nepal,
September 2004 to July 2010
Responsible for conducting, Plane Table, Geodetic Control Points Survey,
Topographical Survey, Transmission Line Survey, GPS Survey, Road
Survey, Leveling survey, Cadastral survey and survey related job etc. Auto
Carto Consult
Preparation of topographical maps and design drawings for detailed and
feasibility study of the following projects
- Feasibility study of San Khola and Dingla – Manawa Small
Hydropower Projects,Bhojpur district;
- Detailed study of Upper Sabha Small Hydropower Project (5 MW),
Sankhuwasabha district;
4. - Detailed study of Yaksuwa Small Hydropower Project,
Sankhuwasabha district;
- Detailed study of Sabha Khola “A” Small Hydropower Project (5
MW), Sankhuwasabha district;
- Detailed study of Lankhuwa Khola Small Hydropower Project (1
MW), Sankhuwasabha district;
- Detailed survey of Bajura Roads Project (Track Road – 31 km total
length), Bajura district;
- Feasibility study of Upper Khoranga Small Hydropower Project,
Sankhuwasabha district;
- Feasibility study for high transmission line of Upper Tamakhosi
Hydroelectric Project (456 MW), Dolakha district;
- Detailed study of Badigad “A” and Nisi Khola Small Hydropower
Project (5 MW and 2 MW), Baglung and Gulmi districts;
- Feasibility study of Upper Marsyangdi – 1 Hydroelectric Project
(100 MW), Manang and Lamjung district;
- Feasibility study of Sabha Khola Hydropower Project (23 MW),
Sankhuwasabha district;
- Detailed study of Upper Myardi Khola Small Hydropower Project
(4.9 MW), Lamjung district;
- Detailed study of Jiri Khola Small Hydropower Project (2.2 MW),
Dolakha district;
- Feasibility study of Mai Khola – B Hydropower Project (3 MW),
Ilam district;
- Feasibility and detailed study of Tungun – Thosne and Khani Khola
Small Hydropower Project (6.3 MW), Lalitpur district;
- Detailed study of Lower Rudi Khola Small Hydropower Project (3.4
MW), Kaski district ;
- Detailed study of Rudi Khola “A” Small Hydropower Project (5.9
MW), Kaski district;
- Feasibility Survey of North South Fast Track Road Project from
Kathmandu-Nijgadh-Pathlaiya (97km) and Budine-Hetauda (16km)
it using Total Station & Preparation of Topography Map. The
project undertaken by the ITECO Nepal (P) Ltd. ; (November 2007 -
March 2008)
Detail Survey of from Satbaj to Jhulaghat, Satbajh to Gokuleshwor, Phidim
to Taplejung, Surkhet to Kalikot using Total Station and preparation of
Topography Maps under RSDP (March 2007 – November 2007);
Detail Survey of 220 kV Transmission Line of Upper Seti (Damauli)
Storage Hydroelectric Project. Total Length 38.415 Km. Preparations of
Topography Maps And Profile of Upper Seti (Damauli) Storage
Hydroelectric Project. The project undertaken by the Masina Continental
Detailed survey of Melamchi Water Supply Project
5. Communication Skills
Nepali,English,Hindi,Malayu
Personal details
Date of Birth: 10/07/2040 (BS) 18 October 1983 (AD)
Gender : Male
Marital Status: Married
Country of Origin : Nepal
Present Nationality: Nepali
Passport No : 08738322
Permanent Address- Gaushala Bazar-2 ,Mahottari Nepal
Temporary Address-,UAE
CERTIFICATION
I, the undersigned certify that to the best of my knowledge and belief, this bio-data correctly
describes my qualifications and my experience. I understand that any willful misstatement
described herein may lead to my disqualification or dismissal, if employed.
Dhiraj kumar shrestha