SlideShare a Scribd company logo
1 of 4
Download to read offline
Page 1 of 4
RESUME
Of
GOUTAM KUMAR MONDAL
Department of Civil Engineering
Khulna University of Engineering & Technology
Contact: +88-01719480296
E-mail: gkmce07@gmail.com
CARRIER OBJECTIVES:
I would like to have an opportunity to be employed in that position where I can engage
myself to implement my educational knowledge and technical skills which would be co-
operative to maximize the output of the relevant organization and thus to stand up myself as a
successful man as well as an enthusiastic, energetic and innovative Engineer.
WORK EXPERIENCE:
1. From 1st
November, 2012 to 31th December, 2012 I have worked as Trainee Engineer
at PEAL (The Pipe Line Engineers Associates Ltd.)
Road no :28,house no :56,Gulshan-1,Dhaka.
2. From 1st
January, 2013 to 31th may, 2014 I have worked as Upazila Coordinator
(Engineer) for ER-2013 project at a well reputed NGO. Uttaran.
Shyamnagar, Satkhira.
3. From 1st
June , 2013 till now I am working as site Engineer (Civil ) at Center for
Engineering studies &Design Ltd (CESD).
Multinational Company (Egypt).
Navana Tower, Flat 16/B, Gulshan-
1,Dhaka. Head office: Cairo, Egypt.
Branch office: Dubai, UAE.
Consultant of Orascom Telecom Ltd. (Bangla Link).
JOB RESPONSIBILITY:
Job responsibilities (FOR JOB-1):
 All Responsible for site management
 Overall supervision of the project
 Layout checking of the project.
 Quality control of the materials
 To estimate the cost of overall project works.
 Drawing studies of the project.
 To prepare the contractor bill.
 To prepare the project schedule and work according to the schedule.
Page 2 of 4
 To prepare the monthly materials budget and contractor fund budget.
 To maintain the liaison between the land owner, clients, company and between the
labors, contractors and the company.
Job responsibilities (FOR JOB-2):
 Maintain close liaison with LGED and Wfp for the implementation EG activities.
 Assist LGED Upzila Engineer in preparation of schemes.
 Maintain day- to- day contact with LCS.
 Mobilize the workforce in the project area.
 Plan the -day-to-day work and inform the project participants (workers) of their daily
Minimum target utput and their daily entitlement.
 Facilitate the work to be done as per design and specification.
 Assist the LCS with the distribution cash of the workers according to work complete.
 Assist LGED in pre and post- work measurements and co-singing measurement
sheets.
 Submission of monthly/ quarterly report in the prescribed format to WFP and LGED.
 Implementation of the project activities including pre, post and environmental survey
field level Specially earth work in Road, embankment, Ground Raising, Canal and
Pond Excavation.
 Conduct technical and environmental survey (pre-survey, post- survey etc) as per
project requirement.
 Maintain attendances sheet and responsible for Labor Payment activities.
 Prepare bill & check the bills vouchers.
 Supoort for the Procurement of materials like requisition, quotation collection etc.
 Monitor the working progress & ensure the quality of project activities & inform
project Officer timely.
 Conduct Training sessions accordingly the project requirement.
 Coordination & networking with stake holders.
 Involve UDMC & other project implementation teams for implementation of the
project.
 Ensure visibility of the project.
 Perform any other duties assigned by the Management.
 Ensure the signing contact (Annex-) by LCS with proper understanding.
Job responsibilities (FOR JOB-2):
 Layout checking of different Greenfield and Semi Greenfield sites.
 Supervision of more than 1000 piling work by wash boring method.
 Construction and finalize pedestal (tower base), and pile cap.
 All R.C.C. work such as Basement, footing, short column, column, grade beam, slab
etc.
 All finishing work such as carpenter works, grill fitting, water supply and sanitary
works, tiles fitting and mosaic works, paint works, electrical fitting fixture,Brick
works, plaster works, glass brick fitting of the project.
 Provide safety security.
 Construction of Greenfield and Semi Greenfield sites as per design, assuring the
high quality work during the entire construction procedure.
 Performing PIT Test for cast in situ piles
Page 3 of 4
 Safety checking of RCC building.
 Job planning & preparing project schedule
 Estimating the construction materials
 Preparing and maintaining official documents such as daily progress report, weekly
progress report & monthly progress report
 Schmidt Hammer reading check.
 Using of Epoxy mortar to fix reinforcement bar with existing structure to increase
building height.
 Rectification work of RCC building.
 Checking BOQ of the contractors
 Designing of various projects.
 Plan and prepare construction schedules and milestones and monitor progress
against established schedule
 Prepare contracts and negotiate revisions, changes and additions to contractual
agreements with architects, consultants, clients, suppliers and subcontractors.
EDUCATIONAL INFORMATION:
Certificate/
Degree
Passing
Year
Name of
Institution
Board/
University
Discipline GPA/CGPA
B.Sc.
Engineering
2012
(June)
Khulna University
of Engineering &
Technology
Khulna
University of
Engineering
&
Technology
Civil
Engineering
3.11 (out of
4.00)
H.S.C. 2007
Daulatpur College
(Day-Night)
Jessore Science
5.00(out of
5.00)
S.S.C. 2004
United Secondary
School, Khazra
Jessore Science
4.44(out of
5.00)
COMPUTER SKILLS:
 Programming Language: FORTRAN.
 Operating Systems: Windows XP Professional, Windows 7 Ultimate.
 Application Package: MS Word, MS Excel, MS Power Point.
 Engineering Analytical Tools: Auto CAD , STAAD Pro., EVCS.
THECHNICAL TOUR:
 Technical tour to Dapdapia Bridge Construction Site, Barisal, Bangladesh.
 Technical tour to Saidabad Water Treatment Plant, Dhaka, Bangladesh.
 Technical tour to Hatirjheel Area Including Begunbari Khal Project, Dhaka,
Bangladesh.
Page 4 of 4
LANGUAGE PROFICIENCY:
Bengali : Excellent reading, writing and speaking in Bengali as native language.
English : Excellent reading, writing, and fluent speaking in English.
RESEARCH (UNDERGRADUATE THESIS):
TOPICS TITLE: “Study on Existing Drinking Water Sources at Asasuni Satkhira’’.
FIELD INTEREST IN:
 Environmental Engineering
 Structural Engineering
PERSONAL INFORMATION:
Father’s Name : Thakur Das Mondal.
Mother’s Name : Tarpona Rani Mondal.
Date and Place of Birth : 15th
December, 1989.Satkhira, Bangladesh.
Religion : Sonatan (Hindu).
Marital Status : Unmarried
Gender : Male
Nationality : Bangladeshi (By Birth)
Contact Address : SO: Thakur Das Mondal
Nabojibon Polytechnic Institute
Palashpol,Satkhira
Permanent Address : SO: Thakur Das Mondal
Village:Routara, Post:Khazra,
Thana:Asasuni, District: Satkhira(9400).
REFERENCES:
I, the undersigned certify that, according to my knowledge and belief, this Resume correctly
describes my qualifications and myself. I understand that any Willful misstatement described
herein may lead to my disqualification or dismissal, if employed.
Date: - -201
Signature
Dr. Kh. Mahbub Hassan
Associate Professor
Dept. of Civil Engineering
Khulna University of Engineering &
Technology.
Mobile: +8801714087302
E-mail:khmhassan@yahoo.com
Dr. Md. Saiful Islam
Professor
Dept. of Civil Engineering
Khulna University of Engineering &
Technology .
Mobile: +8801918868499
E-mail:saifulbitck@yahoo.com

More Related Content

What's hot

What's hot (20)

Updated Resume (1)
Updated Resume (1)Updated Resume (1)
Updated Resume (1)
 
Hitendra resume (civil engineer)
Hitendra resume (civil engineer)Hitendra resume (civil engineer)
Hitendra resume (civil engineer)
 
Resume HNP Updated
Resume HNP UpdatedResume HNP Updated
Resume HNP Updated
 
CIVIL SUPERVISOR-CV-abdul shukoor
CIVIL SUPERVISOR-CV-abdul shukoorCIVIL SUPERVISOR-CV-abdul shukoor
CIVIL SUPERVISOR-CV-abdul shukoor
 
Abdul wali cv 29.03.2018
Abdul wali cv 29.03.2018Abdul wali cv 29.03.2018
Abdul wali cv 29.03.2018
 
Nawab civil supervisor cv
Nawab civil supervisor cvNawab civil supervisor cv
Nawab civil supervisor cv
 
Satish (Planning engineer)
Satish (Planning engineer)Satish (Planning engineer)
Satish (Planning engineer)
 
Pandiarajan CV 2015.1
Pandiarajan CV 2015.1Pandiarajan CV 2015.1
Pandiarajan CV 2015.1
 
prashant resume latest
prashant resume latestprashant resume latest
prashant resume latest
 
CV -Sachin Madhukar Chitnis -( Civil Roads, Utility,infra,metro rail ,)
CV  -Sachin Madhukar Chitnis  -( Civil Roads, Utility,infra,metro rail ,)CV  -Sachin Madhukar Chitnis  -( Civil Roads, Utility,infra,metro rail ,)
CV -Sachin Madhukar Chitnis -( Civil Roads, Utility,infra,metro rail ,)
 
Karthikeyan CIVIL Engg Resume (1)
Karthikeyan CIVIL Engg Resume (1)Karthikeyan CIVIL Engg Resume (1)
Karthikeyan CIVIL Engg Resume (1)
 
Civil Engineer
Civil EngineerCivil Engineer
Civil Engineer
 
2 btech civil engineer resume
2 btech civil engineer resume2 btech civil engineer resume
2 btech civil engineer resume
 
Karan Singh-CV
Karan Singh-CVKaran Singh-CV
Karan Singh-CV
 
Resume Pad
Resume PadResume Pad
Resume Pad
 
Er. Anand Resume
Er. Anand ResumeEr. Anand Resume
Er. Anand Resume
 
Ranjith mechanical engineer cv
Ranjith mechanical engineer  cvRanjith mechanical engineer  cv
Ranjith mechanical engineer cv
 
Anand kishor's resume
Anand kishor's resumeAnand kishor's resume
Anand kishor's resume
 
Mohammadhossein gholampoor-CV
Mohammadhossein gholampoor-CVMohammadhossein gholampoor-CV
Mohammadhossein gholampoor-CV
 
Sravan resume
Sravan resume Sravan resume
Sravan resume
 

Viewers also liked

Treball joel dinos
Treball joel dinosTreball joel dinos
Treball joel dinosturbolains
 
Ideaaworks profile 2015 pdf
Ideaaworks profile 2015 pdfIdeaaworks profile 2015 pdf
Ideaaworks profile 2015 pdfanjan bhaumik
 
The gettysburg address
The gettysburg addressThe gettysburg address
The gettysburg addresstritondboyle
 
Performance of the Built Environment - John Hooper
Performance of the Built Environment - John HooperPerformance of the Built Environment - John Hooper
Performance of the Built Environment - John HooperEERI
 
The US Resiliency Council Principles of Formation - Evan Reis
The US Resiliency Council Principles of Formation - Evan ReisThe US Resiliency Council Principles of Formation - Evan Reis
The US Resiliency Council Principles of Formation - Evan ReisEERI
 
Healthcare 1960s to 1970s
Healthcare 1960s to 1970sHealthcare 1960s to 1970s
Healthcare 1960s to 1970sSarah Maurer
 
Po parallelepipedo blog
Po parallelepipedo blogPo parallelepipedo blog
Po parallelepipedo blogproftecologia
 
Front page of assignment
Front page of assignmentFront page of assignment
Front page of assignmentWINNERbd.it
 
Front page format summer project
Front page format   summer projectFront page format   summer project
Front page format summer projectNithin Varghese
 
Todd foundation aigm presentation lightening the load
Todd foundation aigm presentation   lightening the loadTodd foundation aigm presentation   lightening the load
Todd foundation aigm presentation lightening the loadKatefnz
 

Viewers also liked (20)

Documento
DocumentoDocumento
Documento
 
Treball joel dinos
Treball joel dinosTreball joel dinos
Treball joel dinos
 
Developing a Culture
Developing a CultureDeveloping a Culture
Developing a Culture
 
Gbi Vanessa Beltran
Gbi   Vanessa BeltranGbi   Vanessa Beltran
Gbi Vanessa Beltran
 
Ideaaworks profile 2015 pdf
Ideaaworks profile 2015 pdfIdeaaworks profile 2015 pdf
Ideaaworks profile 2015 pdf
 
The gettysburg address
The gettysburg addressThe gettysburg address
The gettysburg address
 
Performance of the Built Environment - John Hooper
Performance of the Built Environment - John HooperPerformance of the Built Environment - John Hooper
Performance of the Built Environment - John Hooper
 
The US Resiliency Council Principles of Formation - Evan Reis
The US Resiliency Council Principles of Formation - Evan ReisThe US Resiliency Council Principles of Formation - Evan Reis
The US Resiliency Council Principles of Formation - Evan Reis
 
Healthcare 1960s to 1970s
Healthcare 1960s to 1970sHealthcare 1960s to 1970s
Healthcare 1960s to 1970s
 
Sii
SiiSii
Sii
 
C.g. 02
C.g. 02C.g. 02
C.g. 02
 
Po parallelepipedo blog
Po parallelepipedo blogPo parallelepipedo blog
Po parallelepipedo blog
 
UGST 1000 Spirituality Presentation
UGST 1000 Spirituality PresentationUGST 1000 Spirituality Presentation
UGST 1000 Spirituality Presentation
 
Study and Memory Skills
Study and Memory SkillsStudy and Memory Skills
Study and Memory Skills
 
Cover page of an Assignment
Cover page of an Assignment Cover page of an Assignment
Cover page of an Assignment
 
Cover page
Cover pageCover page
Cover page
 
Assignment resume
Assignment resumeAssignment resume
Assignment resume
 
Front page of assignment
Front page of assignmentFront page of assignment
Front page of assignment
 
Front page format summer project
Front page format   summer projectFront page format   summer project
Front page format summer project
 
Todd foundation aigm presentation lightening the load
Todd foundation aigm presentation   lightening the loadTodd foundation aigm presentation   lightening the load
Todd foundation aigm presentation lightening the load
 

Similar to Goutam-update (20)

CV of KRM QA & QC 1
CV of KRM QA & QC 1CV of KRM QA & QC 1
CV of KRM QA & QC 1
 
CV sultan(Q)
CV sultan(Q)CV sultan(Q)
CV sultan(Q)
 
Curriculam vitae deepak
Curriculam vitae deepakCurriculam vitae deepak
Curriculam vitae deepak
 
PROFESSIONAL EXPERIENCE
PROFESSIONAL EXPERIENCEPROFESSIONAL EXPERIENCE
PROFESSIONAL EXPERIENCE
 
John Okusolubo Resume 2015
John Okusolubo Resume 2015John Okusolubo Resume 2015
John Okusolubo Resume 2015
 
Aromal_CV.PDF
Aromal_CV.PDFAromal_CV.PDF
Aromal_CV.PDF
 
CV of JERSON ODUCAYEN_naukri
CV of JERSON ODUCAYEN_naukriCV of JERSON ODUCAYEN_naukri
CV of JERSON ODUCAYEN_naukri
 
Resume of Rebeka Sultana
Resume of Rebeka SultanaResume of Rebeka Sultana
Resume of Rebeka Sultana
 
Raja kumar Resume (Senior Civil Engineer)
Raja kumar Resume (Senior Civil Engineer)Raja kumar Resume (Senior Civil Engineer)
Raja kumar Resume (Senior Civil Engineer)
 
Civil Engineer
Civil EngineerCivil Engineer
Civil Engineer
 
Civil Engineer
Civil EngineerCivil Engineer
Civil Engineer
 
BASEEM
BASEEMBASEEM
BASEEM
 
---Ajinkya-- Resume
---Ajinkya-- Resume---Ajinkya-- Resume
---Ajinkya-- Resume
 
Cv henry oppong
Cv henry oppongCv henry oppong
Cv henry oppong
 
Resume_Zahir_Ibrahim
Resume_Zahir_IbrahimResume_Zahir_Ibrahim
Resume_Zahir_Ibrahim
 
CV-Atif_Ashraf-4
CV-Atif_Ashraf-4CV-Atif_Ashraf-4
CV-Atif_Ashraf-4
 
Rusume of Engr. Pasha
Rusume of Engr. PashaRusume of Engr. Pasha
Rusume of Engr. Pasha
 
Narender_Geologist cum Shift Engg. Resume
Narender_Geologist cum Shift Engg. ResumeNarender_Geologist cum Shift Engg. Resume
Narender_Geologist cum Shift Engg. Resume
 
Khan.CV
Khan.CVKhan.CV
Khan.CV
 
Mewan Resume
Mewan ResumeMewan Resume
Mewan Resume
 

Goutam-update

  • 1. Page 1 of 4 RESUME Of GOUTAM KUMAR MONDAL Department of Civil Engineering Khulna University of Engineering & Technology Contact: +88-01719480296 E-mail: gkmce07@gmail.com CARRIER OBJECTIVES: I would like to have an opportunity to be employed in that position where I can engage myself to implement my educational knowledge and technical skills which would be co- operative to maximize the output of the relevant organization and thus to stand up myself as a successful man as well as an enthusiastic, energetic and innovative Engineer. WORK EXPERIENCE: 1. From 1st November, 2012 to 31th December, 2012 I have worked as Trainee Engineer at PEAL (The Pipe Line Engineers Associates Ltd.) Road no :28,house no :56,Gulshan-1,Dhaka. 2. From 1st January, 2013 to 31th may, 2014 I have worked as Upazila Coordinator (Engineer) for ER-2013 project at a well reputed NGO. Uttaran. Shyamnagar, Satkhira. 3. From 1st June , 2013 till now I am working as site Engineer (Civil ) at Center for Engineering studies &Design Ltd (CESD). Multinational Company (Egypt). Navana Tower, Flat 16/B, Gulshan- 1,Dhaka. Head office: Cairo, Egypt. Branch office: Dubai, UAE. Consultant of Orascom Telecom Ltd. (Bangla Link). JOB RESPONSIBILITY: Job responsibilities (FOR JOB-1):  All Responsible for site management  Overall supervision of the project  Layout checking of the project.  Quality control of the materials  To estimate the cost of overall project works.  Drawing studies of the project.  To prepare the contractor bill.  To prepare the project schedule and work according to the schedule.
  • 2. Page 2 of 4  To prepare the monthly materials budget and contractor fund budget.  To maintain the liaison between the land owner, clients, company and between the labors, contractors and the company. Job responsibilities (FOR JOB-2):  Maintain close liaison with LGED and Wfp for the implementation EG activities.  Assist LGED Upzila Engineer in preparation of schemes.  Maintain day- to- day contact with LCS.  Mobilize the workforce in the project area.  Plan the -day-to-day work and inform the project participants (workers) of their daily Minimum target utput and their daily entitlement.  Facilitate the work to be done as per design and specification.  Assist the LCS with the distribution cash of the workers according to work complete.  Assist LGED in pre and post- work measurements and co-singing measurement sheets.  Submission of monthly/ quarterly report in the prescribed format to WFP and LGED.  Implementation of the project activities including pre, post and environmental survey field level Specially earth work in Road, embankment, Ground Raising, Canal and Pond Excavation.  Conduct technical and environmental survey (pre-survey, post- survey etc) as per project requirement.  Maintain attendances sheet and responsible for Labor Payment activities.  Prepare bill & check the bills vouchers.  Supoort for the Procurement of materials like requisition, quotation collection etc.  Monitor the working progress & ensure the quality of project activities & inform project Officer timely.  Conduct Training sessions accordingly the project requirement.  Coordination & networking with stake holders.  Involve UDMC & other project implementation teams for implementation of the project.  Ensure visibility of the project.  Perform any other duties assigned by the Management.  Ensure the signing contact (Annex-) by LCS with proper understanding. Job responsibilities (FOR JOB-2):  Layout checking of different Greenfield and Semi Greenfield sites.  Supervision of more than 1000 piling work by wash boring method.  Construction and finalize pedestal (tower base), and pile cap.  All R.C.C. work such as Basement, footing, short column, column, grade beam, slab etc.  All finishing work such as carpenter works, grill fitting, water supply and sanitary works, tiles fitting and mosaic works, paint works, electrical fitting fixture,Brick works, plaster works, glass brick fitting of the project.  Provide safety security.  Construction of Greenfield and Semi Greenfield sites as per design, assuring the high quality work during the entire construction procedure.  Performing PIT Test for cast in situ piles
  • 3. Page 3 of 4  Safety checking of RCC building.  Job planning & preparing project schedule  Estimating the construction materials  Preparing and maintaining official documents such as daily progress report, weekly progress report & monthly progress report  Schmidt Hammer reading check.  Using of Epoxy mortar to fix reinforcement bar with existing structure to increase building height.  Rectification work of RCC building.  Checking BOQ of the contractors  Designing of various projects.  Plan and prepare construction schedules and milestones and monitor progress against established schedule  Prepare contracts and negotiate revisions, changes and additions to contractual agreements with architects, consultants, clients, suppliers and subcontractors. EDUCATIONAL INFORMATION: Certificate/ Degree Passing Year Name of Institution Board/ University Discipline GPA/CGPA B.Sc. Engineering 2012 (June) Khulna University of Engineering & Technology Khulna University of Engineering & Technology Civil Engineering 3.11 (out of 4.00) H.S.C. 2007 Daulatpur College (Day-Night) Jessore Science 5.00(out of 5.00) S.S.C. 2004 United Secondary School, Khazra Jessore Science 4.44(out of 5.00) COMPUTER SKILLS:  Programming Language: FORTRAN.  Operating Systems: Windows XP Professional, Windows 7 Ultimate.  Application Package: MS Word, MS Excel, MS Power Point.  Engineering Analytical Tools: Auto CAD , STAAD Pro., EVCS. THECHNICAL TOUR:  Technical tour to Dapdapia Bridge Construction Site, Barisal, Bangladesh.  Technical tour to Saidabad Water Treatment Plant, Dhaka, Bangladesh.  Technical tour to Hatirjheel Area Including Begunbari Khal Project, Dhaka, Bangladesh.
  • 4. Page 4 of 4 LANGUAGE PROFICIENCY: Bengali : Excellent reading, writing and speaking in Bengali as native language. English : Excellent reading, writing, and fluent speaking in English. RESEARCH (UNDERGRADUATE THESIS): TOPICS TITLE: “Study on Existing Drinking Water Sources at Asasuni Satkhira’’. FIELD INTEREST IN:  Environmental Engineering  Structural Engineering PERSONAL INFORMATION: Father’s Name : Thakur Das Mondal. Mother’s Name : Tarpona Rani Mondal. Date and Place of Birth : 15th December, 1989.Satkhira, Bangladesh. Religion : Sonatan (Hindu). Marital Status : Unmarried Gender : Male Nationality : Bangladeshi (By Birth) Contact Address : SO: Thakur Das Mondal Nabojibon Polytechnic Institute Palashpol,Satkhira Permanent Address : SO: Thakur Das Mondal Village:Routara, Post:Khazra, Thana:Asasuni, District: Satkhira(9400). REFERENCES: I, the undersigned certify that, according to my knowledge and belief, this Resume correctly describes my qualifications and myself. I understand that any Willful misstatement described herein may lead to my disqualification or dismissal, if employed. Date: - -201 Signature Dr. Kh. Mahbub Hassan Associate Professor Dept. of Civil Engineering Khulna University of Engineering & Technology. Mobile: +8801714087302 E-mail:khmhassan@yahoo.com Dr. Md. Saiful Islam Professor Dept. of Civil Engineering Khulna University of Engineering & Technology . Mobile: +8801918868499 E-mail:saifulbitck@yahoo.com