1. Ashok kumar Verma
E-Mail:ashokkumarverma149@gmail.com
Contact: +91-09430101139, 07043132773
Career Objective:
Seeking a challenging position and working as a Manager in a company where my analytical ability
and analyzing quest are used maximum for growth of the organization and that offers professional
growth and ample opportunity to learn and enrich competencies in carrier path.
Summary:
Having total 28 years of experience, currently working as Manager in Punj Loyd.
Educational Qualification— (Mechanical)—State Council for Engineering and Technical
Government College of West Bengal.
Software Skills—
Operating System, MS Office, Windows
Jobs And Responsibilities
Total looking after inspections of structural steel like Material Inspection, fabrication,
alignment and final SSSSinspection of Power house, Mill Bunker.
Preparing Monthly and weekly planning for Fabrication and Erection work of steel structure
as per priority of work sequence.
Managing and looking after activities related to fabrication and erection with Staff/Engineers.
Managing time to time records of raw material requirement of fabrication work.
Discussing with staff related to updated shop and scope drawings.
Looking after heavy erection work like erection of bunker structure (Approx 62 m height).
Maintaining monthly material reconciliation statement like RA bill of sub-contractors and
own organization RA bill to client.
Co-ordinating with Civil Clients, department, third party inspection to enhance the
productivity.
Discussing with staff to resolve some critical problems at site ,some time discuss with the
Designers to resolve the site issues.
Looking after monthly loading of sub-contractors for fabrication and erection work.
Certifying sub-contractor’ RA bills and maintains the control register for certified bills.
Preparing the SKETCH/DETAIL drawing from scope drawing in the absence of detail
drawing at site.
Attending weekly/monthly meeting with the Client.
2. Maintaining QA/QC and HSE Standard in the work site.
Work Experience—
Total Experience of 28 years in Fabrication and Erection of Structural Work in India& Onsite
(Dubai, Kuwait) with different Multi National Companies.
Project Details—
Project 1 Reliance IndustriesLimited Gujarat(Jamnagar)
Client: Reliance Industries Limited
Organization: Punj Lloyd Limited
Period: Jan-2014---Till date
Responsibility: Erection of cryogenic (liquid oxygen& liquid nitrogen) storage tank.
Project 2 2*270 MWThermal Power Plant
Client: GVK Power Limited
Organization: Punj Lloyd Limited
Period: March-2012---December 2013
Responsibility: Fabrication and Erection of 2* 250 Mill Bunker Building.
Project 3: Chabra Thermal Power Plant
Client: Rajasthan Rajya Vidyut Utpadan Nigam Limited
Organization: Punj Lloyd Limited
Period: April-2007---February 2012
Responsibility: Fabrication and Erection of 2* 250 MW Power house Building &Mill Bunker Build.
Project 4: 4*250,Jindal Power Plant,Raigarh,Chattisgarh
Client: Jindal Power Plant Limited
Organization: Punj Lloyd Limited
Period: January-2006---March 2007
Responsibility: Fabrication and Erection of 2* 250 MW Power house Building.
Project 5: 2*250,Guru Har Govind Thermal Power Project
Client: BHEL
Organization: UB Engineering
Period: April-2005---March 2006
Designation: Assistant Resident Engineer
Responsibility: Pre Assembly & Erection of 250 MW Boiler.
Project 6: Metro Rail NewDelhi
Client: IMCC
Organization: UB Engineering
Period: April-2002---March 2005
Designation: Senior Engineer
Responsibility: Fabrication& Erection.
Project 7: Erection ofCross Country Pipeline,Baroda,Gujarat
Client: Nirma Limited ,Baroda
Organization: UB Engineering
Period: April-2000---April 2002
Designation: Senior Engineer
Responsibility: Erection of Cross Country Pipeline
3. Project 8: Kuwait Cement Company(Onsite Shore)
Client: Kuwait Cement Company
Organization: UB Engineering
Period: April-1999---April 2000.
Designation: Senior Engineer
Responsibility: Fabrication and Erection of Row Mill Building.
Project 9: Reliance Petroleum Limited
Client: Reliance Petroleum Limited Gujarat
Organization: UB Engineering
Period: April-1998---April 1999
Designation: Senior Engineer
Responsibility: Pre-Assembly and Erection of Steel Structure.
Project 10: Sabiya Power Plant Kuwait(Onsite)
Client: Hyundai Engineering and Construction Company Limited
Organization: UB Engineering
Period: April-1996---April 1998
Designation: Senior Engineer
Responsibility: Pre-Assembly and Erection of 3*800 MW Main Turbine Building.
Project 11: Reliance Industries Limited Hazira Gujarat
Client: Reliance Industries Limited
Organization: UB Engineering
Period: April-1994---December 1995
Designation: Senior Engineer
Responsibility: Pre-Assembly and Erection of Pipe Rack Structures, Compressor House Building
d Erection of CS Tank.
Project 12: 2*500MWNational Thermal Power Corporation,Bengal
Client: Ansaldo
Organization: UB Engineering
Period: April-1989---April 1994
Designation: Assistant Engineer
Responsibility: Pre-Assembly and Erection of Boiler, Ducting, ESP.
Project 13: 2*500MWNational Thermal Power Corporation, Rihand Mirzapur
Client: Ansaldo
Organization: UB Engineering
Period: April-1986---December 1988
Designation: Junior Engineer
Responsibility: Pre-Assembly and Erection of Boiler, Ducting, ESP.
Personal Profile:
Name : Ashok Kumar Verma
Date of Birth : 21 January1958
Gender : Male
Marital Status : Married
Nationality : Indian
4. I hereby declare that the above information furnished is true to the best of my knowledge and belief.
Ashok Kumar Verma