Project 1
2010- Rupse Khola Small Hydropower Project (4 MW)
Project
High Head Small Run-of- River type Hydropower Project with installed Capacity of 4 MW
Client
Research and Development Group (P). Ltd.
Personal Input to the Project
Review and detail hydrological study of the project
Preliminary Layout Planning of the project and optimization of layout
Hydraulic design of different components
Structural Design of various components
Preliminary drafting of Engineering Design drawings of different designed components of project
Assistance in preparation of final documents and drawings
Technical Features
Installed Capacity of 4 MW with Annual Energy Generation 22.07 GWhr
Turbine Discharge of 1 m3/s with gross head 489.7 m
About 1500 m long headrace conveyance system and 1120 m long penstock pipe
2 numbers of Pelton turbine
Environmental Restriction
to discharge the water back to natural course of river just upstream of famous Rupse
circuit
Hydraulic/Hydropower Engineer Portfolio
River type Hydropower Project with installed Capacity of 4 MW
Preliminary drafting of Engineering Design drawings of different designed components of project
Rupse fall in Annapurna trekking
Famous Rupse fall
Sunil Basnet Hydraulic/Hydropower Engineer
Layout of Headwork's Area (
Hydraulic/Hydropower Engineer Portfolio
Layout of Headwork's Area (Rupse Khola SHP)
Sunil Basnet Hydraulic/Hydropower Engineer
Forebay Tank (Rupse Khola SHP)
Hydraulic/Hydropower Engineer Portfolio
SHP)
Layout of Powerhouse Area (
Sunil Basnet Hydraulic/Hydropower Engineer
Layout of Powerhouse Area (Rupse Khola SHP)
Hydraulic/Hydropower Engineer Portfolio
Sunil Basnet Hydraulic/Hydropower Engineer
Project 2
2010- Deumai Storage Project (30 MW)
Project
Medium Head Storage type Peaking Purposed Hydropower
Client
Himal Dolakha Hydropower Company
Personal Input to the Project
• Preliminary Layout Planning of the project and optimization of layout
• Hydraulic design of different components• Hydraulic design of different components
• Reservoir Simulation along with fixation of optimum rule curve
• Preliminary drafting of Engineering Design drawings of different designed components of project
• Assistance in preparation of final documents and drawings
Technical Features
• Installed Capacity of 30 MW with Peaking of 6 hours a day Annual Energy Generation 141.24
• Rated Turbine Discharge of 14.42 m3/s with gross head 245.73 m
• About 4.4 Km long headrace tunnel and 456 m long penstock pipe
• 2 numbers of Horizontal Francis turbine
Hydraulic/Hydropower Engineer Portfolio
Peaking Purposed Hydropower Project with installed Capacity of 30 MW
Preliminary Layout Planning of the project and optimization of layout
Reservoir Simulation along with fixation of optimum rule curve
Preliminary drafting of Engineering Design drawings of different designed components of project
Assistance in preparation of final documents and drawings
Installed Capacity of 30 MW with Peaking of 6 hours a day Annual Energy Generation 141.24 GWhr
/s with gross head 245.73 m
About 4.4 Km long headrace tunnel and 456 m long penstock pipe
Sunil Basnet Hydraulic/Hydropower EngineerHydraulic/Hydropower Engineer Portfolio
Sunil Basnet Hydraulic/Hydropower Engineer
5.00
6.00
7.00
8.00
9.00
TurbineDischargeeachunit(m3/s)
Reservoir Regulation Curve Deumai
0.00
1.00
2.00
3.00
4.00
JAN
FEB
MAR
APR
MAY
JUN
TurbineDischarge
Regulation Curve Non Peaking Hour
Hydraulic/Hydropower Engineer Portfolio
Deumai Storage HEP 30 MW
JUL
AUG
SEP
OCT
NOV
DEC
Regulation Curve Peaking Hour
20.00
25.00
30.00
35.00
GernrationPower(MW)
Energy Generation Curve Deumai Storage Project (30 MW)
Sunil Basnet Hydraulic/Hydropower Engineer
0.00
5.00
10.00
15.00
JAN
FEB
MAR
APR
MAY
JUN
GernrationPower(MW)
Non Peaking Hour
Energy Generation Curve Deumai Storage Project (30 MW)
Hydraulic/Hydropower Engineer Portfolio
JUL
AUG
SEP
OCT
NOV
DEC
Non Peaking Hour Peaking Hour
440.00
450.00
460.00
470.00
ReservoirElevation(m.a.s.l)
Reservoir Operating Elevation Regulation
Sunil Basnet Hydraulic/Hydropower Engineer
410.00
420.00
430.00
440.00
JAN
FEB
MAR
APR
MAY
JUN
ReservoirElevation(m.a.s.l)
Regulation Curve Deumai Storage HEP 30 MW
Hydraulic/Hydropower Engineer Portfolio
JUL
AUG
SEP
OCT
NOV
DEC
Sunil Basnet Hydraulic/Hydropower Engineer
Project 3
2011- Upper Puwa Khola HP (3.0 MW) ,Ilam
Project
Medium Head Run-off type Hydropower Project with installed Capacity of 3.0 MW
Client
Joshi Hydropower Company Pvt. Ltd.
Personal Input to the Project
• Optimization of project layout and individual structures
• Detailed Hydraulic Design of different components of the project
• Calculation of individual headloss at each hydraulic component hence the overall cumulative
system
• Calculation of individual headloss at each hydraulic component hence the overall cumulative
system
• Structural Analysis of Cut and cover headrace conduit
• Drafting of Engineering drawings of different designed components of project
Technical Features
• Installed Capacity of 3 MW with Annual Energy Generation 18.07 GWhr
• Turbine Discharge of 2.37 m3/s combined from two streams with gross head 162.39 m
• About 3745 m long headrace conveyance system including both stream and 355 m long penstock pipe
• 2 numbers of Francis turbine
• Diverted Discharge from two streams mixed in common forebay and conveyed thereafter through penstock
pipe to common Powerhouse
Hydraulic/Hydropower Engineer Portfolio
at each hydraulic component hence the overall cumulative headloss in theat each hydraulic component hence the overall cumulative headloss in the
/s combined from two streams with gross head 162.39 m
About 3745 m long headrace conveyance system including both stream and 355 m long penstock pipe
and conveyed thereafter through penstock
Sunil Basnet Hydraulic/Hydropower Engineer
Drawings CommonDrawings CommonDrawings CommonDrawings Common ForebayForebayForebayForebay along with photograph during constructionalong with photograph during constructionalong with photograph during constructionalong with photograph during construction
Hydraulic/Hydropower Engineer Portfolio
along with photograph during constructionalong with photograph during constructionalong with photograph during constructionalong with photograph during construction
Sunil Basnet Hydraulic/Hydropower Engineer
Drawings Settling Basin (UpperDrawings Settling Basin (UpperDrawings Settling Basin (UpperDrawings Settling Basin (Upper PuwaPuwaPuwaPuwa SHP) with photograph during constructionSHP) with photograph during constructionSHP) with photograph during constructionSHP) with photograph during construction
Hydraulic/Hydropower Engineer Portfolio
SHP) with photograph during constructionSHP) with photograph during constructionSHP) with photograph during constructionSHP) with photograph during construction
Sunil Basnet Hydraulic/Hydropower Engineer
Structural Design Spreadsheet of Box canal (with provision of Vehicle movement on top)Structural Design Spreadsheet of Box canal (with provision of Vehicle movement on top)Structural Design Spreadsheet of Box canal (with provision of Vehicle movement on top)Structural Design Spreadsheet of Box canal (with provision of Vehicle movement on top)
Hydraulic/Hydropower Engineer Portfolio
Structural Design Spreadsheet of Box canal (with provision of Vehicle movement on top)Structural Design Spreadsheet of Box canal (with provision of Vehicle movement on top)Structural Design Spreadsheet of Box canal (with provision of Vehicle movement on top)Structural Design Spreadsheet of Box canal (with provision of Vehicle movement on top)
Structural Detailing of Designed BoStructural Detailing of Designed BoStructural Detailing of Designed BoStructural Detailing of Designed Bo
Portfolio (Sunil Basnet )

More Related Content

What's hot

Steam turbines and its associated systems(ntpc ramagundam)
Steam turbines and its associated systems(ntpc ramagundam)Steam turbines and its associated systems(ntpc ramagundam)
Steam turbines and its associated systems(ntpc ramagundam)abdul mohammad
 
SUA presentation of the Power Generation Station Project
SUA presentation of the Power Generation Station ProjectSUA presentation of the Power Generation Station Project
SUA presentation of the Power Generation Station ProjectCity of Stillwater
 
Leaside & Laird Construction Liaison Committee - November 2017
Leaside & Laird Construction Liaison Committee - November 2017Leaside & Laird Construction Liaison Committee - November 2017
Leaside & Laird Construction Liaison Committee - November 2017Crosstown TO
 
CV - Rakesh Arya Jan'16
CV - Rakesh Arya Jan'16CV - Rakesh Arya Jan'16
CV - Rakesh Arya Jan'16Rakesh Arya
 
RDS as at 160527
RDS as at 160527RDS as at 160527
RDS as at 160527Rob Smith
 
DEVELOPMENT OF MICRO HYDRO-ELECTRIC PROJECT
DEVELOPMENT OF MICRO HYDRO-ELECTRIC PROJECTDEVELOPMENT OF MICRO HYDRO-ELECTRIC PROJECT
DEVELOPMENT OF MICRO HYDRO-ELECTRIC PROJECTVaisakh Shanmughan
 
Eglinton - Mount Pleasant Construction Liaison Committee Meeting - June 2017
Eglinton - Mount Pleasant Construction Liaison Committee Meeting - June 2017Eglinton - Mount Pleasant Construction Liaison Committee Meeting - June 2017
Eglinton - Mount Pleasant Construction Liaison Committee Meeting - June 2017Crosstown TO
 

What's hot (9)

Steam turbines and its associated systems(ntpc ramagundam)
Steam turbines and its associated systems(ntpc ramagundam)Steam turbines and its associated systems(ntpc ramagundam)
Steam turbines and its associated systems(ntpc ramagundam)
 
SUA presentation of the Power Generation Station Project
SUA presentation of the Power Generation Station ProjectSUA presentation of the Power Generation Station Project
SUA presentation of the Power Generation Station Project
 
Leaside & Laird Construction Liaison Committee - November 2017
Leaside & Laird Construction Liaison Committee - November 2017Leaside & Laird Construction Liaison Committee - November 2017
Leaside & Laird Construction Liaison Committee - November 2017
 
CV - Rakesh Arya Jan'16
CV - Rakesh Arya Jan'16CV - Rakesh Arya Jan'16
CV - Rakesh Arya Jan'16
 
Anil Pachpande-CV2016
Anil Pachpande-CV2016Anil Pachpande-CV2016
Anil Pachpande-CV2016
 
RDS as at 160527
RDS as at 160527RDS as at 160527
RDS as at 160527
 
DEVELOPMENT OF MICRO HYDRO-ELECTRIC PROJECT
DEVELOPMENT OF MICRO HYDRO-ELECTRIC PROJECTDEVELOPMENT OF MICRO HYDRO-ELECTRIC PROJECT
DEVELOPMENT OF MICRO HYDRO-ELECTRIC PROJECT
 
Eglinton - Mount Pleasant Construction Liaison Committee Meeting - June 2017
Eglinton - Mount Pleasant Construction Liaison Committee Meeting - June 2017Eglinton - Mount Pleasant Construction Liaison Committee Meeting - June 2017
Eglinton - Mount Pleasant Construction Liaison Committee Meeting - June 2017
 
WQ-2
WQ-2WQ-2
WQ-2
 

Viewers also liked

Power point, proyecto del cipa
Power point, proyecto del cipaPower point, proyecto del cipa
Power point, proyecto del cipaluzvillar
 
Jerri Ann Long-updated resume'
Jerri Ann Long-updated resume'Jerri Ann Long-updated resume'
Jerri Ann Long-updated resume'Jerri Long
 
Ai1617 ac-tp2-gn-a1
Ai1617 ac-tp2-gn-a1Ai1617 ac-tp2-gn-a1
Ai1617 ac-tp2-gn-a1André Dias
 
Diseño material educativo digital Jose y paola
Diseño material educativo digital Jose y paolaDiseño material educativo digital Jose y paola
Diseño material educativo digital Jose y paolaPäoLithä Briceno
 
What I learned about fish at NFI '17
What I learned about fish at NFI '17What I learned about fish at NFI '17
What I learned about fish at NFI '17Peter Handy
 
Impact lab - Technology & Impact Design solutions for mission driven organiza...
Impact lab - Technology & Impact Design solutions for mission driven organiza...Impact lab - Technology & Impact Design solutions for mission driven organiza...
Impact lab - Technology & Impact Design solutions for mission driven organiza...SoPact
 
Poner fin a la violencia en las escuelas
Poner fin a la violencia en las escuelasPoner fin a la violencia en las escuelas
Poner fin a la violencia en las escuelasEsperanza Sosa Meza
 

Viewers also liked (9)

Power point, proyecto del cipa
Power point, proyecto del cipaPower point, proyecto del cipa
Power point, proyecto del cipa
 
Jerri Ann Long-updated resume'
Jerri Ann Long-updated resume'Jerri Ann Long-updated resume'
Jerri Ann Long-updated resume'
 
Ai1617 ac-tp2-gn-a1
Ai1617 ac-tp2-gn-a1Ai1617 ac-tp2-gn-a1
Ai1617 ac-tp2-gn-a1
 
Diseño material educativo digital Jose y paola
Diseño material educativo digital Jose y paolaDiseño material educativo digital Jose y paola
Diseño material educativo digital Jose y paola
 
Monarch Company Profile
Monarch Company ProfileMonarch Company Profile
Monarch Company Profile
 
What I learned about fish at NFI '17
What I learned about fish at NFI '17What I learned about fish at NFI '17
What I learned about fish at NFI '17
 
Impact lab - Technology & Impact Design solutions for mission driven organiza...
Impact lab - Technology & Impact Design solutions for mission driven organiza...Impact lab - Technology & Impact Design solutions for mission driven organiza...
Impact lab - Technology & Impact Design solutions for mission driven organiza...
 
merged_document_3
merged_document_3merged_document_3
merged_document_3
 
Poner fin a la violencia en las escuelas
Poner fin a la violencia en las escuelasPoner fin a la violencia en las escuelas
Poner fin a la violencia en las escuelas
 

Similar to Portfolio (Sunil Basnet )

Prime consulting group brochure
Prime consulting group brochurePrime consulting group brochure
Prime consulting group brochureMANOJ PATNE
 
Khoirul Amal Mohd Hanafiah Piping Engineering Aug 2016
Khoirul Amal Mohd Hanafiah Piping Engineering Aug 2016Khoirul Amal Mohd Hanafiah Piping Engineering Aug 2016
Khoirul Amal Mohd Hanafiah Piping Engineering Aug 2016Khoirul A'mal Mohd Hanafiah
 
Prime Consulting Group Profile
Prime Consulting Group ProfilePrime Consulting Group Profile
Prime Consulting Group ProfileMANOJ PATNE
 
Overview of Technology Development _ S_ F _Vhora
Overview of Technology Development _ S_ F _VhoraOverview of Technology Development _ S_ F _Vhora
Overview of Technology Development _ S_ F _VhoraProSIM R & D Pvt. Ltd.
 
Husin Asran_Nov'16
Husin Asran_Nov'16Husin Asran_Nov'16
Husin Asran_Nov'16Husin Asran
 
Isb engineering specialist
Isb engineering specialistIsb engineering specialist
Isb engineering specialistisbengineering
 
Charles Zhang CV(2016)
Charles Zhang CV(2016)Charles Zhang CV(2016)
Charles Zhang CV(2016)Charles Zhang
 
CV - Andrew Tan 25May2015
CV - Andrew Tan 25May2015CV - Andrew Tan 25May2015
CV - Andrew Tan 25May2015Andrew Tan
 
Modelling Analysis and Design of Self Anchored Suspension Bridge
Modelling Analysis and Design of Self Anchored Suspension BridgeModelling Analysis and Design of Self Anchored Suspension Bridge
Modelling Analysis and Design of Self Anchored Suspension BridgeRohit Grandhi, EIT
 
CV Engr. Sikandar Khan
CV Engr. Sikandar KhanCV Engr. Sikandar Khan
CV Engr. Sikandar Khansikandar Khan
 
Ehsan Asghar - Hydromechanical Engineer
Ehsan Asghar - Hydromechanical EngineerEhsan Asghar - Hydromechanical Engineer
Ehsan Asghar - Hydromechanical EngineerEHSAN ASGHAR, RE
 
Planning analysis design the overhead circular water tank in seerapalayam pan...
Planning analysis design the overhead circular water tank in seerapalayam pan...Planning analysis design the overhead circular water tank in seerapalayam pan...
Planning analysis design the overhead circular water tank in seerapalayam pan...Subash thangaraj
 
Harry Holland CV Update Water Infrastructure & Pipelines August 2015
Harry Holland CV Update Water Infrastructure & Pipelines August 2015Harry Holland CV Update Water Infrastructure & Pipelines August 2015
Harry Holland CV Update Water Infrastructure & Pipelines August 2015Harry Holland
 
Harry Holland CV Update Water Infrastructure & Pipelines August 2015
Harry Holland CV Update Water Infrastructure & Pipelines August 2015Harry Holland CV Update Water Infrastructure & Pipelines August 2015
Harry Holland CV Update Water Infrastructure & Pipelines August 2015Harry Holland
 

Similar to Portfolio (Sunil Basnet ) (20)

Prime consulting group brochure
Prime consulting group brochurePrime consulting group brochure
Prime consulting group brochure
 
Khoirul Amal Mohd Hanafiah Piping Engineering Aug 2016
Khoirul Amal Mohd Hanafiah Piping Engineering Aug 2016Khoirul Amal Mohd Hanafiah Piping Engineering Aug 2016
Khoirul Amal Mohd Hanafiah Piping Engineering Aug 2016
 
Prime Consulting Group Profile
Prime Consulting Group ProfilePrime Consulting Group Profile
Prime Consulting Group Profile
 
My Cv 05-2014
My Cv 05-2014My Cv 05-2014
My Cv 05-2014
 
Overview of Technology Development _ S_ F _Vhora
Overview of Technology Development _ S_ F _VhoraOverview of Technology Development _ S_ F _Vhora
Overview of Technology Development _ S_ F _Vhora
 
Husin Asran_Nov'16
Husin Asran_Nov'16Husin Asran_Nov'16
Husin Asran_Nov'16
 
Isb engineering specialist
Isb engineering specialistIsb engineering specialist
Isb engineering specialist
 
Charles Zhang CV(2016)
Charles Zhang CV(2016)Charles Zhang CV(2016)
Charles Zhang CV(2016)
 
Vijayakanth CV_ 27 Oct 15
Vijayakanth CV_ 27 Oct 15Vijayakanth CV_ 27 Oct 15
Vijayakanth CV_ 27 Oct 15
 
CV - Andrew Tan 25May2015
CV - Andrew Tan 25May2015CV - Andrew Tan 25May2015
CV - Andrew Tan 25May2015
 
Modelling Analysis and Design of Self Anchored Suspension Bridge
Modelling Analysis and Design of Self Anchored Suspension BridgeModelling Analysis and Design of Self Anchored Suspension Bridge
Modelling Analysis and Design of Self Anchored Suspension Bridge
 
CV Engr. Sikandar Khan
CV Engr. Sikandar KhanCV Engr. Sikandar Khan
CV Engr. Sikandar Khan
 
Ehsan Asghar - Hydromechanical Engineer
Ehsan Asghar - Hydromechanical EngineerEhsan Asghar - Hydromechanical Engineer
Ehsan Asghar - Hydromechanical Engineer
 
CV - AGK LinkedIn
CV - AGK LinkedInCV - AGK LinkedIn
CV - AGK LinkedIn
 
Planning analysis design the overhead circular water tank in seerapalayam pan...
Planning analysis design the overhead circular water tank in seerapalayam pan...Planning analysis design the overhead circular water tank in seerapalayam pan...
Planning analysis design the overhead circular water tank in seerapalayam pan...
 
Harry Holland CV Update Water Infrastructure & Pipelines August 2015
Harry Holland CV Update Water Infrastructure & Pipelines August 2015Harry Holland CV Update Water Infrastructure & Pipelines August 2015
Harry Holland CV Update Water Infrastructure & Pipelines August 2015
 
Harry Holland CV Update Water Infrastructure & Pipelines August 2015
Harry Holland CV Update Water Infrastructure & Pipelines August 2015Harry Holland CV Update Water Infrastructure & Pipelines August 2015
Harry Holland CV Update Water Infrastructure & Pipelines August 2015
 
Saeed Ahmad Infrastucture Engineer Utilities
Saeed Ahmad Infrastucture Engineer UtilitiesSaeed Ahmad Infrastucture Engineer Utilities
Saeed Ahmad Infrastucture Engineer Utilities
 
CURRICULUM VITAE
CURRICULUM VITAECURRICULUM VITAE
CURRICULUM VITAE
 
Resume140515
Resume140515Resume140515
Resume140515
 

Portfolio (Sunil Basnet )

  • 1. Engineering Design Portfolio Sunil BasnetSunil Basnet Hydraulic/Hydropower Engineer Research and Development Group Pvt. Ltd. Kathmandu, Nepal Engineering Design Portfolio Hydraulic/Hydropower Engineer Research and Development Group Pvt. Ltd.
  • 2. Sunil Basnet Hydraulic/Hydropower Engineer Project 1 2010- Rupse Khola Small Hydropower Project (4 MW) Project High Head Small Run-of- River type Hydropower Project with installed Capacity of 4 MW Client Research and Development Group (P). Ltd. Personal Input to the Project Review and detail hydrological study of the project Preliminary Layout Planning of the project and optimization of layout Hydraulic design of different components Structural Design of various components Preliminary drafting of Engineering Design drawings of different designed components of project Assistance in preparation of final documents and drawings Technical Features Installed Capacity of 4 MW with Annual Energy Generation 22.07 GWhr Turbine Discharge of 1 m3/s with gross head 489.7 m About 1500 m long headrace conveyance system and 1120 m long penstock pipe 2 numbers of Pelton turbine Environmental Restriction to discharge the water back to natural course of river just upstream of famous Rupse circuit Hydraulic/Hydropower Engineer Portfolio River type Hydropower Project with installed Capacity of 4 MW Preliminary drafting of Engineering Design drawings of different designed components of project Rupse fall in Annapurna trekking Famous Rupse fall
  • 3. Sunil Basnet Hydraulic/Hydropower Engineer Layout of Headwork's Area ( Hydraulic/Hydropower Engineer Portfolio Layout of Headwork's Area (Rupse Khola SHP)
  • 4. Sunil Basnet Hydraulic/Hydropower Engineer Forebay Tank (Rupse Khola SHP) Hydraulic/Hydropower Engineer Portfolio SHP)
  • 5. Layout of Powerhouse Area ( Sunil Basnet Hydraulic/Hydropower Engineer Layout of Powerhouse Area (Rupse Khola SHP) Hydraulic/Hydropower Engineer Portfolio
  • 6. Sunil Basnet Hydraulic/Hydropower Engineer Project 2 2010- Deumai Storage Project (30 MW) Project Medium Head Storage type Peaking Purposed Hydropower Client Himal Dolakha Hydropower Company Personal Input to the Project • Preliminary Layout Planning of the project and optimization of layout • Hydraulic design of different components• Hydraulic design of different components • Reservoir Simulation along with fixation of optimum rule curve • Preliminary drafting of Engineering Design drawings of different designed components of project • Assistance in preparation of final documents and drawings Technical Features • Installed Capacity of 30 MW with Peaking of 6 hours a day Annual Energy Generation 141.24 • Rated Turbine Discharge of 14.42 m3/s with gross head 245.73 m • About 4.4 Km long headrace tunnel and 456 m long penstock pipe • 2 numbers of Horizontal Francis turbine Hydraulic/Hydropower Engineer Portfolio Peaking Purposed Hydropower Project with installed Capacity of 30 MW Preliminary Layout Planning of the project and optimization of layout Reservoir Simulation along with fixation of optimum rule curve Preliminary drafting of Engineering Design drawings of different designed components of project Assistance in preparation of final documents and drawings Installed Capacity of 30 MW with Peaking of 6 hours a day Annual Energy Generation 141.24 GWhr /s with gross head 245.73 m About 4.4 Km long headrace tunnel and 456 m long penstock pipe
  • 7. Sunil Basnet Hydraulic/Hydropower EngineerHydraulic/Hydropower Engineer Portfolio
  • 8. Sunil Basnet Hydraulic/Hydropower Engineer 5.00 6.00 7.00 8.00 9.00 TurbineDischargeeachunit(m3/s) Reservoir Regulation Curve Deumai 0.00 1.00 2.00 3.00 4.00 JAN FEB MAR APR MAY JUN TurbineDischarge Regulation Curve Non Peaking Hour Hydraulic/Hydropower Engineer Portfolio Deumai Storage HEP 30 MW JUL AUG SEP OCT NOV DEC Regulation Curve Peaking Hour
  • 9. 20.00 25.00 30.00 35.00 GernrationPower(MW) Energy Generation Curve Deumai Storage Project (30 MW) Sunil Basnet Hydraulic/Hydropower Engineer 0.00 5.00 10.00 15.00 JAN FEB MAR APR MAY JUN GernrationPower(MW) Non Peaking Hour Energy Generation Curve Deumai Storage Project (30 MW) Hydraulic/Hydropower Engineer Portfolio JUL AUG SEP OCT NOV DEC Non Peaking Hour Peaking Hour
  • 10. 440.00 450.00 460.00 470.00 ReservoirElevation(m.a.s.l) Reservoir Operating Elevation Regulation Sunil Basnet Hydraulic/Hydropower Engineer 410.00 420.00 430.00 440.00 JAN FEB MAR APR MAY JUN ReservoirElevation(m.a.s.l) Regulation Curve Deumai Storage HEP 30 MW Hydraulic/Hydropower Engineer Portfolio JUL AUG SEP OCT NOV DEC
  • 11. Sunil Basnet Hydraulic/Hydropower Engineer Project 3 2011- Upper Puwa Khola HP (3.0 MW) ,Ilam Project Medium Head Run-off type Hydropower Project with installed Capacity of 3.0 MW Client Joshi Hydropower Company Pvt. Ltd. Personal Input to the Project • Optimization of project layout and individual structures • Detailed Hydraulic Design of different components of the project • Calculation of individual headloss at each hydraulic component hence the overall cumulative system • Calculation of individual headloss at each hydraulic component hence the overall cumulative system • Structural Analysis of Cut and cover headrace conduit • Drafting of Engineering drawings of different designed components of project Technical Features • Installed Capacity of 3 MW with Annual Energy Generation 18.07 GWhr • Turbine Discharge of 2.37 m3/s combined from two streams with gross head 162.39 m • About 3745 m long headrace conveyance system including both stream and 355 m long penstock pipe • 2 numbers of Francis turbine • Diverted Discharge from two streams mixed in common forebay and conveyed thereafter through penstock pipe to common Powerhouse Hydraulic/Hydropower Engineer Portfolio at each hydraulic component hence the overall cumulative headloss in theat each hydraulic component hence the overall cumulative headloss in the /s combined from two streams with gross head 162.39 m About 3745 m long headrace conveyance system including both stream and 355 m long penstock pipe and conveyed thereafter through penstock
  • 12. Sunil Basnet Hydraulic/Hydropower Engineer Drawings CommonDrawings CommonDrawings CommonDrawings Common ForebayForebayForebayForebay along with photograph during constructionalong with photograph during constructionalong with photograph during constructionalong with photograph during construction Hydraulic/Hydropower Engineer Portfolio along with photograph during constructionalong with photograph during constructionalong with photograph during constructionalong with photograph during construction
  • 13. Sunil Basnet Hydraulic/Hydropower Engineer Drawings Settling Basin (UpperDrawings Settling Basin (UpperDrawings Settling Basin (UpperDrawings Settling Basin (Upper PuwaPuwaPuwaPuwa SHP) with photograph during constructionSHP) with photograph during constructionSHP) with photograph during constructionSHP) with photograph during construction Hydraulic/Hydropower Engineer Portfolio SHP) with photograph during constructionSHP) with photograph during constructionSHP) with photograph during constructionSHP) with photograph during construction
  • 14. Sunil Basnet Hydraulic/Hydropower Engineer Structural Design Spreadsheet of Box canal (with provision of Vehicle movement on top)Structural Design Spreadsheet of Box canal (with provision of Vehicle movement on top)Structural Design Spreadsheet of Box canal (with provision of Vehicle movement on top)Structural Design Spreadsheet of Box canal (with provision of Vehicle movement on top) Hydraulic/Hydropower Engineer Portfolio Structural Design Spreadsheet of Box canal (with provision of Vehicle movement on top)Structural Design Spreadsheet of Box canal (with provision of Vehicle movement on top)Structural Design Spreadsheet of Box canal (with provision of Vehicle movement on top)Structural Design Spreadsheet of Box canal (with provision of Vehicle movement on top) Structural Detailing of Designed BoStructural Detailing of Designed BoStructural Detailing of Designed BoStructural Detailing of Designed Bo