MS Project 2010 application for PMPs 
Instructor: Phạm Tuấn Anh MBA, PMP
Outline 
Initiating (0.5 day) 
Planning Essentials (2.5 days) 
Executing: Communication and Reports (2 days) 
M&C: Tracking and Analyzing (0.75 days) 
Closing Activities (0.25 days) 
All Rights Reserved © Professional Management Academy - 2013 2
Initiating 
Introduction 
PMP Process groups vs. MsP2010 
Enterprise Project Management 
Setting up MsP2010 environment 
All Rights Reserved © Professional Management Academy - 2013 3
Initiating 
Introduction 
Project management software? 
22 million 
250 thousand 
All Rights Reserved © Professional Management Academy - 2013 4
Initiating 
Introduction 
Top PM softwares 
Why MSP? 
All Rights Reserved © Professional Management Academy - 2013 5
Initiating 
PMP Process groups vs. MsP2010 
Effective application approach 
All Rights Reserved © Professional Management Academy - 2013 6
Initiating 
PMP Process groups vs. MsP2010 
Level of MS Project usage 
PM Stage MS Project 
usage level 
Comments 
Initiating Low May help develop high-level order of magnitude estimates for schedule, scope, and cost 
Planning High Helps define, integrate, and communicate scope, time, cost and resource plans. Some 
support for risk planning 
Executing Med-High Helps direct who does what when, in terms of execution. Provides the roadmap and 
clear path to the final deliverable or result 
M&C High Helps monitor and control change and measure the impact on scope, time, cost, and 
resources. Allows for effective variance analysis and decision-making for taking 
corrective action 
Closing Low-Med Useful for final variance analysis, lessons learned, developing future forecasting abilities, 
best practices, and benchmarking 
All Rights Reserved © Professional Management Academy - 2013 7
Initiating 
Enterprise Project Management 
What is EPM? 
How is EPM? 
• Demand Management 
• Portfolio Selection and 
Analytics 
• Resource Management 
• Schedule Management 
• Team Collaboration 
• Business Intelligence and 
Reporting 
All Rights Reserved © Professional Management Academy - 2013 8
Initiating 
Enterprise Project Management 
03 Professional functions 
• Team Planner View 
• Direct Project to SharePoint Synchronization 
• Inactive Tasks Function 
All Rights Reserved © Professional Management Academy - 2013 9
Initiating 
Enterprise Project Management 
Resource sharing without EPM? 
All Rights Reserved © Professional Management Academy - 2013 10
Initiating 
Setting up MsP2010 environment 
Default view 
• Gantt Chart 
• Timeline 
• Ribbon 
All Rights Reserved © Professional Management Academy - 2013 11
Initiating 
Setting up MsP2010 environment 
The Ribbon 
• Tabs 
• Groups 
• Quick Access Toolbar 
• Buttons 
• File & Backstage view 
All Rights Reserved © Professional Management Academy - 2013 12
Initiating 
Setting up MsP2010 environment 
Gantt Chart 
• Text area 
• Bar area 
• Auto Filter, Group, Sort 
• Add new column 
• Zoom 
All Rights Reserved © Professional Management Academy - 2013 13
Initiating 
Setting up MsP2010 environment 
Changing views 
• Task and Resource tabs 
• View tab 
• Quick view switching 
• Split screens 
All Rights Reserved © Professional Management Academy - 2013 14
Initiating 
Setting up MsP2010 environment 
Start creating new project 
• Using Project Template 
• Importing from MS Excel 
Key settings 
• Manual & Automatic Scheduling 
• Project Summary Task and Outline Number 
All Rights Reserved © Professional Management Academy - 2013 15
Initiating 
Setting up MsP2010 environment 
Scheduling approaches and Default Task Type 
• Duration Based Scheduling 
• Effort-Based Scheduling 
• The Relationship between Work and Duration 
Work = Duration × Units 
 Fix one component and enter the second variable 
 Project will calculate the third 
All Rights Reserved © Professional Management Academy - 2013 16
Initiating 
Setting up MsP2010 environment 
Scheduling approaches and 
Default Task Type 
All Rights Reserved © Professional Management Academy - 2013 17
Initiating 
Setting up MsP2010 environment 
Working with Calendars 
• Creating new calendar 
• Conversion factors: hours per day, hours per week, days per month 
Project start/end date 
• Configure start date 
• Display start/current in Gantt Chart 
All Rights Reserved © Professional Management Academy - 2013 18
Initiating 
Hands-on session 
Setting Up – Initializing a new Project 
Change the Working Time – Working With Calendars 
All Rights Reserved © Professional Management Academy - 2013 19
Planning Essential 
Create WBS and Task List 
Estimate Task Duration 
Setting Dependencies and Critical Path 
Assigning Resource and Estimate Cost 
Calculation Engine for Automatic Scheduling 
All Rights Reserved © Professional Management Academy - 2013 20
Planning 
Create WBS and Task List 
What is a WBS 
Creating vs. representation 
• Interim Deliverables 
• Milestones 
“A deliverable-oriented hierarchical decomposition of the 
work to be executed by the project team, to accomplish 
the project objectives and create the required deliverable” 
WBS item Description 
(0) Final deliverable Project summary task 
1 .0 Interim deliverable 1 Summary task, phase, or major piece 
1 .1 Task 1 Lowest level of detail in the structure 
1 .2 Task 2 
1 .3 Task n 
1 .4 Key milestone Deliverable achieved 
2 .0 Interim deliverable 2 
2 .1 Task 1 
…. 
All Rights Reserved © Professional Management Academy - 2013 21
Planning 
Create WBS and Task List 
WBS format 
• Outline structure 
• Network diagram 
• Tree structure 
All Rights Reserved © Professional Management Academy - 2013 22
Planning 
Create WBS and Task List 
WBS sizing 
• Compatible with organization’s reporting requirement 
• Level of detail do team members require 
• Enough detail to estimate resource, timeline 
• Lower-level elements fully describe the upper level 
• Allow effective management of project risks and drive key issues 
• Effective tracking of project scope, timeline, and budget 
All Rights Reserved © Professional Management Academy - 2013 23
Planning 
Create WBS and Task List 
Progressive Elaboration 
All Rights Reserved © Professional Management Academy - 2013 24
Planning 
Create WBS and Task List 
Tasks and Milestones 
• Last level detail in WBS 
• Summary task has item(s) indented under it 
• Finish task referred as milestone 
– Reporting 
– Gating 
– Decision making 
– Key handoff point 
– Benchmarking/tracking 
Assign a duration of zero to a task, it automatically 
changes to a milestone and is represented in the Gantt 
bar area by a diamond 
All Rights Reserved © Professional Management Academy - 2013 25
Planning 
Create WBS and Task List 
Tasks name column 
• Focus in task name 
• Enter WBS components first, later 
outline the detail 
• Quick access using Task/Insert 
group 
All Rights Reserved © Professional Management Academy - 2013 26
Planning 
Create WBS and Task List 
User-controlled Scheduling 
• Project is default to start with manual 
schedule option 
• Switching between two modes: 
– Task mode column 
– Task tab /Schedule group 
All Rights Reserved © Professional Management Academy - 2013 27
Planning 
Create WBS and Task List 
Outlining (Indenting & Outdenting) Tools 
• Summary task 
– Broad categories under which we 
can group tasks 
– Represents total work effort, cost, 
duration, start/finish date 
• Creating summary tasks 
– Task tab > Insert group > Summary 
– Indent sub tasks 
• Project enable to turn-off 
automatic roll-up calculation 
All Rights Reserved © Professional Management Academy - 2013 28
Planning 
Create WBS and Task List 
Collapse and Expand: Show Outline 
• WYSIWYG 
– Broad categories under which we can 
group tasks 
– Represents total work effort, cost, 
duration, start/finish date 
• Creating summary tasks 
– Indent sub tasks 
– Task tab > Insert group > Summary 
All Rights Reserved © Professional Management Academy - 2013 29
Planning 
Create WBS and Task List 
Setting Up – Initializing a new Project 
Change the Working Time – Working With Calendars 
All Rights Reserved © Professional Management Academy - 2013 30
Outline 
Executing: Communication and Reports (2 days) 
• Understanding Views 
• Using Tables and Custom Fields 
• Using Filter, Group and Sorts 
• Create Custom View, Formatting and Reporting 
• Master Schedule with Inserted Projects 
All Rights Reserved © Professional Management Academy - 2013 31
Outline 
M&C: Tracking and Analyzing (1 day) 
• Setting and Maintaining Baselines 
• Updating and Tracking Status 
• Variance Analysis and Corrective Action 
All Rights Reserved © Professional Management Academy - 2013 32

More Related Content

What's hot

Product Management Training - MS Project Training
Product Management Training - MS Project TrainingProduct Management Training - MS Project Training
Product Management Training - MS Project Trainingguest2739cfb
 
Ms Project Workshop
Ms Project WorkshopMs Project Workshop
Ms Project WorkshopEder Alves
 
Ms project 2016 overview
Ms project 2016 overviewMs project 2016 overview
Ms project 2016 overviewMaher Almohamad
 
sMs project tutorial_iit
sMs project tutorial_iitsMs project tutorial_iit
sMs project tutorial_iitKushal Patel
 
MS Project Svcs Productivity
MS Project Svcs ProductivityMS Project Svcs Productivity
MS Project Svcs Productivityedmahler
 
Ms Project 2007(Basic)
Ms Project 2007(Basic)Ms Project 2007(Basic)
Ms Project 2007(Basic)Dinesh Singh
 
How to Create S Curve by MS Project 2013
How to Create S Curve by MS Project 2013How to Create S Curve by MS Project 2013
How to Create S Curve by MS Project 2013Ong-Art Sanpinit
 
MS Project Integration: Tips, Tricks and What's New for You
MS Project Integration: Tips, Tricks and What's New for YouMS Project Integration: Tips, Tricks and What's New for You
MS Project Integration: Tips, Tricks and What's New for YouCA Technologies
 
Ms project training ppt
Ms project training pptMs project training ppt
Ms project training pptglobalp7
 
Master MSProject 2010
Master MSProject 2010Master MSProject 2010
Master MSProject 2010Amr Miqdadi
 
Ms project presentation
Ms project presentationMs project presentation
Ms project presentationKhem Singh
 
Microsoft Project 2013 Quickstart
Microsoft Project 2013 QuickstartMicrosoft Project 2013 Quickstart
Microsoft Project 2013 Quickstartcomatsg
 
Ms project 2010 level 1&2
Ms project 2010 level 1&2 Ms project 2010 level 1&2
Ms project 2010 level 1&2 Rolf Kühnast
 
Lessons Learned - Schedule Updating And Maintenance Using Primavera™
Lessons Learned - Schedule Updating And Maintenance Using Primavera™Lessons Learned - Schedule Updating And Maintenance Using Primavera™
Lessons Learned - Schedule Updating And Maintenance Using Primavera™Charlie Jackson
 
Ms project management
Ms  project managementMs  project management
Ms project managementchinunki4
 

What's hot (20)

Product Management Training - MS Project Training
Product Management Training - MS Project TrainingProduct Management Training - MS Project Training
Product Management Training - MS Project Training
 
MS Project 2010 Training
MS Project 2010 TrainingMS Project 2010 Training
MS Project 2010 Training
 
Ms Project Workshop
Ms Project WorkshopMs Project Workshop
Ms Project Workshop
 
Ms project 2016 overview
Ms project 2016 overviewMs project 2016 overview
Ms project 2016 overview
 
sMs project tutorial_iit
sMs project tutorial_iitsMs project tutorial_iit
sMs project tutorial_iit
 
MS Project Svcs Productivity
MS Project Svcs ProductivityMS Project Svcs Productivity
MS Project Svcs Productivity
 
MS Project
MS ProjectMS Project
MS Project
 
Ms Project 2007(Basic)
Ms Project 2007(Basic)Ms Project 2007(Basic)
Ms Project 2007(Basic)
 
MS Project
MS Project MS Project
MS Project
 
How to Create S Curve by MS Project 2013
How to Create S Curve by MS Project 2013How to Create S Curve by MS Project 2013
How to Create S Curve by MS Project 2013
 
MS Project Integration: Tips, Tricks and What's New for You
MS Project Integration: Tips, Tricks and What's New for YouMS Project Integration: Tips, Tricks and What's New for You
MS Project Integration: Tips, Tricks and What's New for You
 
Ms project training ppt
Ms project training pptMs project training ppt
Ms project training ppt
 
Master MSProject 2010
Master MSProject 2010Master MSProject 2010
Master MSProject 2010
 
Microsoft Project 2013
Microsoft Project 2013Microsoft Project 2013
Microsoft Project 2013
 
Ms project presentation
Ms project presentationMs project presentation
Ms project presentation
 
Microsoft Project 2013 Quickstart
Microsoft Project 2013 QuickstartMicrosoft Project 2013 Quickstart
Microsoft Project 2013 Quickstart
 
Ms project 2010 level 1&2
Ms project 2010 level 1&2 Ms project 2010 level 1&2
Ms project 2010 level 1&2
 
Microsoft project 2010
Microsoft project 2010Microsoft project 2010
Microsoft project 2010
 
Lessons Learned - Schedule Updating And Maintenance Using Primavera™
Lessons Learned - Schedule Updating And Maintenance Using Primavera™Lessons Learned - Schedule Updating And Maintenance Using Primavera™
Lessons Learned - Schedule Updating And Maintenance Using Primavera™
 
Ms project management
Ms  project managementMs  project management
Ms project management
 

Viewers also liked

No REST For The Wicked: Take the JustAPIs T-Shirt Challenge!
No REST For The Wicked: Take the JustAPIs T-Shirt Challenge!No REST For The Wicked: Take the JustAPIs T-Shirt Challenge!
No REST For The Wicked: Take the JustAPIs T-Shirt Challenge!AnyPresence
 
Utusan Tuhan, Missi Langit & Bait Suci
Utusan Tuhan, Missi Langit & Bait SuciUtusan Tuhan, Missi Langit & Bait Suci
Utusan Tuhan, Missi Langit & Bait Suciיונה עזיאל
 
S2 GE Slides - Tourism (Part 1)
S2 GE Slides - Tourism (Part 1)S2 GE Slides - Tourism (Part 1)
S2 GE Slides - Tourism (Part 1)LEEENNA
 
S3 GE Mindmap - Tourism GW2 (RUDO)
S3 GE Mindmap - Tourism GW2 (RUDO)S3 GE Mindmap - Tourism GW2 (RUDO)
S3 GE Mindmap - Tourism GW2 (RUDO)LEEENNA
 
DNA fingerprinting
DNA fingerprintingDNA fingerprinting
DNA fingerprintingsantharooban
 
Hidup Islami Dengan Teknologi oleh Farid Ma'ruf
Hidup Islami Dengan Teknologi oleh Farid Ma'rufHidup Islami Dengan Teknologi oleh Farid Ma'ruf
Hidup Islami Dengan Teknologi oleh Farid Ma'rufSuryono .
 
Tadao Ando
Tadao AndoTadao Ando
Tadao AndoJayD480
 

Viewers also liked (12)

Prueva
PruevaPrueva
Prueva
 
No REST For The Wicked: Take the JustAPIs T-Shirt Challenge!
No REST For The Wicked: Take the JustAPIs T-Shirt Challenge!No REST For The Wicked: Take the JustAPIs T-Shirt Challenge!
No REST For The Wicked: Take the JustAPIs T-Shirt Challenge!
 
Utusan Tuhan, Missi Langit & Bait Suci
Utusan Tuhan, Missi Langit & Bait SuciUtusan Tuhan, Missi Langit & Bait Suci
Utusan Tuhan, Missi Langit & Bait Suci
 
S2 GE Slides - Tourism (Part 1)
S2 GE Slides - Tourism (Part 1)S2 GE Slides - Tourism (Part 1)
S2 GE Slides - Tourism (Part 1)
 
S3 GE Mindmap - Tourism GW2 (RUDO)
S3 GE Mindmap - Tourism GW2 (RUDO)S3 GE Mindmap - Tourism GW2 (RUDO)
S3 GE Mindmap - Tourism GW2 (RUDO)
 
Body language tips
Body language tipsBody language tips
Body language tips
 
DNA fingerprinting
DNA fingerprintingDNA fingerprinting
DNA fingerprinting
 
Hidup Islami Dengan Teknologi oleh Farid Ma'ruf
Hidup Islami Dengan Teknologi oleh Farid Ma'rufHidup Islami Dengan Teknologi oleh Farid Ma'ruf
Hidup Islami Dengan Teknologi oleh Farid Ma'ruf
 
Tadao Ando
Tadao AndoTadao Ando
Tadao Ando
 
Materi : syahadat sempurna oleh Felix Siau
Materi : syahadat sempurna oleh Felix SiauMateri : syahadat sempurna oleh Felix Siau
Materi : syahadat sempurna oleh Felix Siau
 
Cerpen Munsyi
Cerpen MunsyiCerpen Munsyi
Cerpen Munsyi
 
Liliencainicelamontalvo
LiliencainicelamontalvoLiliencainicelamontalvo
Liliencainicelamontalvo
 

Similar to Ms Project 2010 Application For PMP

Lesson 1 PMT Project Life Cycle (Microsoft Project Management)
Lesson 1 PMT Project Life Cycle (Microsoft Project Management)Lesson 1 PMT Project Life Cycle (Microsoft Project Management)
Lesson 1 PMT Project Life Cycle (Microsoft Project Management)amirasghar6
 
Initialization microsoft project 2010
Initialization microsoft project  2010Initialization microsoft project  2010
Initialization microsoft project 2010Wipro
 
Primavara
PrimavaraPrimavara
Primavaradanabl
 
Pmp project management professional free sample
Pmp project management professional free samplePmp project management professional free sample
Pmp project management professional free sampleNada Sallam
 
PM Training Slides
PM Training SlidesPM Training Slides
PM Training SlidesAhmed303
 
Project management part 1
Project management part 1Project management part 1
Project management part 1hkbhadraa
 
Integrating Agile and Traditional Projects in the Enterprise
Integrating Agile and Traditional Projects in the EnterpriseIntegrating Agile and Traditional Projects in the Enterprise
Integrating Agile and Traditional Projects in the EnterpriseTechWell
 
MIS485 Capstone Project in MIS 2MGT 400 - Project M
MIS485 Capstone Project in MIS 2MGT 400 - Project MMIS485 Capstone Project in MIS 2MGT 400 - Project M
MIS485 Capstone Project in MIS 2MGT 400 - Project MIlonaThornburg83
 
Lean planning with Oracle Primavera Cloud
Lean planning  with Oracle Primavera CloudLean planning  with Oracle Primavera Cloud
Lean planning with Oracle Primavera CloudPRMYAZILIM
 
PMP Training Project Time Management Part 1
PMP Training Project Time Management Part 1PMP Training Project Time Management Part 1
PMP Training Project Time Management Part 1Skillogic Solutions
 
Motorola Advaced Project Portfolio Management
Motorola Advaced Project Portfolio ManagementMotorola Advaced Project Portfolio Management
Motorola Advaced Project Portfolio ManagementAras
 
Project Management Cycle and MS Project 2013 By Subodh Kumar PMP
Project Management Cycle and  MS Project 2013  By Subodh Kumar PMPProject Management Cycle and  MS Project 2013  By Subodh Kumar PMP
Project Management Cycle and MS Project 2013 By Subodh Kumar PMPSubodh Kumar
 
Project management part 3
Project management part 3Project management part 3
Project management part 3hkbhadraa
 
What's New in Microsoft Project 2013
What's New in Microsoft Project 2013 What's New in Microsoft Project 2013
What's New in Microsoft Project 2013 UMT
 
MPUG Webinar: Setting up a project schedule without a PPM solution
MPUG Webinar: Setting up a project schedule without a PPM solutionMPUG Webinar: Setting up a project schedule without a PPM solution
MPUG Webinar: Setting up a project schedule without a PPM solutionRaphael Santos
 
eCIO PPT Roles for a SAP and Systems Integration Project
eCIO PPT Roles for a SAP and Systems Integration ProjecteCIO PPT Roles for a SAP and Systems Integration Project
eCIO PPT Roles for a SAP and Systems Integration ProjectDavid Niles
 
Workshop microsoft office MS Project.pptx
Workshop microsoft office MS Project.pptxWorkshop microsoft office MS Project.pptx
Workshop microsoft office MS Project.pptxHelenCandy2
 

Similar to Ms Project 2010 Application For PMP (20)

PMO and Project Server 2013 main features
PMO and Project Server 2013 main features PMO and Project Server 2013 main features
PMO and Project Server 2013 main features
 
PMO and project server 2013
PMO and project server 2013PMO and project server 2013
PMO and project server 2013
 
Lesson 1 PMT Project Life Cycle (Microsoft Project Management)
Lesson 1 PMT Project Life Cycle (Microsoft Project Management)Lesson 1 PMT Project Life Cycle (Microsoft Project Management)
Lesson 1 PMT Project Life Cycle (Microsoft Project Management)
 
Initialization microsoft project 2010
Initialization microsoft project  2010Initialization microsoft project  2010
Initialization microsoft project 2010
 
Primavara
PrimavaraPrimavara
Primavara
 
Pmp project management professional free sample
Pmp project management professional free samplePmp project management professional free sample
Pmp project management professional free sample
 
PM Training Slides
PM Training SlidesPM Training Slides
PM Training Slides
 
Microsoft Project.pptx
Microsoft Project.pptxMicrosoft Project.pptx
Microsoft Project.pptx
 
Project management part 1
Project management part 1Project management part 1
Project management part 1
 
Integrating Agile and Traditional Projects in the Enterprise
Integrating Agile and Traditional Projects in the EnterpriseIntegrating Agile and Traditional Projects in the Enterprise
Integrating Agile and Traditional Projects in the Enterprise
 
MIS485 Capstone Project in MIS 2MGT 400 - Project M
MIS485 Capstone Project in MIS 2MGT 400 - Project MMIS485 Capstone Project in MIS 2MGT 400 - Project M
MIS485 Capstone Project in MIS 2MGT 400 - Project M
 
Lean planning with Oracle Primavera Cloud
Lean planning  with Oracle Primavera CloudLean planning  with Oracle Primavera Cloud
Lean planning with Oracle Primavera Cloud
 
PMP Training Project Time Management Part 1
PMP Training Project Time Management Part 1PMP Training Project Time Management Part 1
PMP Training Project Time Management Part 1
 
Motorola Advaced Project Portfolio Management
Motorola Advaced Project Portfolio ManagementMotorola Advaced Project Portfolio Management
Motorola Advaced Project Portfolio Management
 
Project Management Cycle and MS Project 2013 By Subodh Kumar PMP
Project Management Cycle and  MS Project 2013  By Subodh Kumar PMPProject Management Cycle and  MS Project 2013  By Subodh Kumar PMP
Project Management Cycle and MS Project 2013 By Subodh Kumar PMP
 
Project management part 3
Project management part 3Project management part 3
Project management part 3
 
What's New in Microsoft Project 2013
What's New in Microsoft Project 2013 What's New in Microsoft Project 2013
What's New in Microsoft Project 2013
 
MPUG Webinar: Setting up a project schedule without a PPM solution
MPUG Webinar: Setting up a project schedule without a PPM solutionMPUG Webinar: Setting up a project schedule without a PPM solution
MPUG Webinar: Setting up a project schedule without a PPM solution
 
eCIO PPT Roles for a SAP and Systems Integration Project
eCIO PPT Roles for a SAP and Systems Integration ProjecteCIO PPT Roles for a SAP and Systems Integration Project
eCIO PPT Roles for a SAP and Systems Integration Project
 
Workshop microsoft office MS Project.pptx
Workshop microsoft office MS Project.pptxWorkshop microsoft office MS Project.pptx
Workshop microsoft office MS Project.pptx
 

Recently uploaded

New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024
New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024
New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024BookNet Canada
 
APIForce Zurich 5 April Automation LPDG
APIForce Zurich 5 April  Automation LPDGAPIForce Zurich 5 April  Automation LPDG
APIForce Zurich 5 April Automation LPDGMarianaLemus7
 
Developer Data Modeling Mistakes: From Postgres to NoSQL
Developer Data Modeling Mistakes: From Postgres to NoSQLDeveloper Data Modeling Mistakes: From Postgres to NoSQL
Developer Data Modeling Mistakes: From Postgres to NoSQLScyllaDB
 
"Debugging python applications inside k8s environment", Andrii Soldatenko
"Debugging python applications inside k8s environment", Andrii Soldatenko"Debugging python applications inside k8s environment", Andrii Soldatenko
"Debugging python applications inside k8s environment", Andrii SoldatenkoFwdays
 
Install Stable Diffusion in windows machine
Install Stable Diffusion in windows machineInstall Stable Diffusion in windows machine
Install Stable Diffusion in windows machinePadma Pradeep
 
Human Factors of XR: Using Human Factors to Design XR Systems
Human Factors of XR: Using Human Factors to Design XR SystemsHuman Factors of XR: Using Human Factors to Design XR Systems
Human Factors of XR: Using Human Factors to Design XR SystemsMark Billinghurst
 
Beyond Boundaries: Leveraging No-Code Solutions for Industry Innovation
Beyond Boundaries: Leveraging No-Code Solutions for Industry InnovationBeyond Boundaries: Leveraging No-Code Solutions for Industry Innovation
Beyond Boundaries: Leveraging No-Code Solutions for Industry InnovationSafe Software
 
SAP Build Work Zone - Overview L2-L3.pptx
SAP Build Work Zone - Overview L2-L3.pptxSAP Build Work Zone - Overview L2-L3.pptx
SAP Build Work Zone - Overview L2-L3.pptxNavinnSomaal
 
Kotlin Multiplatform & Compose Multiplatform - Starter kit for pragmatics
Kotlin Multiplatform & Compose Multiplatform - Starter kit for pragmaticsKotlin Multiplatform & Compose Multiplatform - Starter kit for pragmatics
Kotlin Multiplatform & Compose Multiplatform - Starter kit for pragmaticscarlostorres15106
 
Automating Business Process via MuleSoft Composer | Bangalore MuleSoft Meetup...
Automating Business Process via MuleSoft Composer | Bangalore MuleSoft Meetup...Automating Business Process via MuleSoft Composer | Bangalore MuleSoft Meetup...
Automating Business Process via MuleSoft Composer | Bangalore MuleSoft Meetup...shyamraj55
 
Are Multi-Cloud and Serverless Good or Bad?
Are Multi-Cloud and Serverless Good or Bad?Are Multi-Cloud and Serverless Good or Bad?
Are Multi-Cloud and Serverless Good or Bad?Mattias Andersson
 
SQL Database Design For Developers at php[tek] 2024
SQL Database Design For Developers at php[tek] 2024SQL Database Design For Developers at php[tek] 2024
SQL Database Design For Developers at php[tek] 2024Scott Keck-Warren
 
Tech-Forward - Achieving Business Readiness For Copilot in Microsoft 365
Tech-Forward - Achieving Business Readiness For Copilot in Microsoft 365Tech-Forward - Achieving Business Readiness For Copilot in Microsoft 365
Tech-Forward - Achieving Business Readiness For Copilot in Microsoft 3652toLead Limited
 
Understanding the Laravel MVC Architecture
Understanding the Laravel MVC ArchitectureUnderstanding the Laravel MVC Architecture
Understanding the Laravel MVC ArchitecturePixlogix Infotech
 
Streamlining Python Development: A Guide to a Modern Project Setup
Streamlining Python Development: A Guide to a Modern Project SetupStreamlining Python Development: A Guide to a Modern Project Setup
Streamlining Python Development: A Guide to a Modern Project SetupFlorian Wilhelm
 
"ML in Production",Oleksandr Bagan
"ML in Production",Oleksandr Bagan"ML in Production",Oleksandr Bagan
"ML in Production",Oleksandr BaganFwdays
 
SIP trunking in Janus @ Kamailio World 2024
SIP trunking in Janus @ Kamailio World 2024SIP trunking in Janus @ Kamailio World 2024
SIP trunking in Janus @ Kamailio World 2024Lorenzo Miniero
 
Scanning the Internet for External Cloud Exposures via SSL Certs
Scanning the Internet for External Cloud Exposures via SSL CertsScanning the Internet for External Cloud Exposures via SSL Certs
Scanning the Internet for External Cloud Exposures via SSL CertsRizwan Syed
 
My INSURER PTE LTD - Insurtech Innovation Award 2024
My INSURER PTE LTD - Insurtech Innovation Award 2024My INSURER PTE LTD - Insurtech Innovation Award 2024
My INSURER PTE LTD - Insurtech Innovation Award 2024The Digital Insurer
 

Recently uploaded (20)

New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024
New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024
New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024
 
APIForce Zurich 5 April Automation LPDG
APIForce Zurich 5 April  Automation LPDGAPIForce Zurich 5 April  Automation LPDG
APIForce Zurich 5 April Automation LPDG
 
Developer Data Modeling Mistakes: From Postgres to NoSQL
Developer Data Modeling Mistakes: From Postgres to NoSQLDeveloper Data Modeling Mistakes: From Postgres to NoSQL
Developer Data Modeling Mistakes: From Postgres to NoSQL
 
"Debugging python applications inside k8s environment", Andrii Soldatenko
"Debugging python applications inside k8s environment", Andrii Soldatenko"Debugging python applications inside k8s environment", Andrii Soldatenko
"Debugging python applications inside k8s environment", Andrii Soldatenko
 
Install Stable Diffusion in windows machine
Install Stable Diffusion in windows machineInstall Stable Diffusion in windows machine
Install Stable Diffusion in windows machine
 
Human Factors of XR: Using Human Factors to Design XR Systems
Human Factors of XR: Using Human Factors to Design XR SystemsHuman Factors of XR: Using Human Factors to Design XR Systems
Human Factors of XR: Using Human Factors to Design XR Systems
 
Beyond Boundaries: Leveraging No-Code Solutions for Industry Innovation
Beyond Boundaries: Leveraging No-Code Solutions for Industry InnovationBeyond Boundaries: Leveraging No-Code Solutions for Industry Innovation
Beyond Boundaries: Leveraging No-Code Solutions for Industry Innovation
 
SAP Build Work Zone - Overview L2-L3.pptx
SAP Build Work Zone - Overview L2-L3.pptxSAP Build Work Zone - Overview L2-L3.pptx
SAP Build Work Zone - Overview L2-L3.pptx
 
Kotlin Multiplatform & Compose Multiplatform - Starter kit for pragmatics
Kotlin Multiplatform & Compose Multiplatform - Starter kit for pragmaticsKotlin Multiplatform & Compose Multiplatform - Starter kit for pragmatics
Kotlin Multiplatform & Compose Multiplatform - Starter kit for pragmatics
 
Automating Business Process via MuleSoft Composer | Bangalore MuleSoft Meetup...
Automating Business Process via MuleSoft Composer | Bangalore MuleSoft Meetup...Automating Business Process via MuleSoft Composer | Bangalore MuleSoft Meetup...
Automating Business Process via MuleSoft Composer | Bangalore MuleSoft Meetup...
 
Are Multi-Cloud and Serverless Good or Bad?
Are Multi-Cloud and Serverless Good or Bad?Are Multi-Cloud and Serverless Good or Bad?
Are Multi-Cloud and Serverless Good or Bad?
 
SQL Database Design For Developers at php[tek] 2024
SQL Database Design For Developers at php[tek] 2024SQL Database Design For Developers at php[tek] 2024
SQL Database Design For Developers at php[tek] 2024
 
Tech-Forward - Achieving Business Readiness For Copilot in Microsoft 365
Tech-Forward - Achieving Business Readiness For Copilot in Microsoft 365Tech-Forward - Achieving Business Readiness For Copilot in Microsoft 365
Tech-Forward - Achieving Business Readiness For Copilot in Microsoft 365
 
Understanding the Laravel MVC Architecture
Understanding the Laravel MVC ArchitectureUnderstanding the Laravel MVC Architecture
Understanding the Laravel MVC Architecture
 
DMCC Future of Trade Web3 - Special Edition
DMCC Future of Trade Web3 - Special EditionDMCC Future of Trade Web3 - Special Edition
DMCC Future of Trade Web3 - Special Edition
 
Streamlining Python Development: A Guide to a Modern Project Setup
Streamlining Python Development: A Guide to a Modern Project SetupStreamlining Python Development: A Guide to a Modern Project Setup
Streamlining Python Development: A Guide to a Modern Project Setup
 
"ML in Production",Oleksandr Bagan
"ML in Production",Oleksandr Bagan"ML in Production",Oleksandr Bagan
"ML in Production",Oleksandr Bagan
 
SIP trunking in Janus @ Kamailio World 2024
SIP trunking in Janus @ Kamailio World 2024SIP trunking in Janus @ Kamailio World 2024
SIP trunking in Janus @ Kamailio World 2024
 
Scanning the Internet for External Cloud Exposures via SSL Certs
Scanning the Internet for External Cloud Exposures via SSL CertsScanning the Internet for External Cloud Exposures via SSL Certs
Scanning the Internet for External Cloud Exposures via SSL Certs
 
My INSURER PTE LTD - Insurtech Innovation Award 2024
My INSURER PTE LTD - Insurtech Innovation Award 2024My INSURER PTE LTD - Insurtech Innovation Award 2024
My INSURER PTE LTD - Insurtech Innovation Award 2024
 

Ms Project 2010 Application For PMP

  • 1. MS Project 2010 application for PMPs Instructor: Phạm Tuấn Anh MBA, PMP
  • 2. Outline Initiating (0.5 day) Planning Essentials (2.5 days) Executing: Communication and Reports (2 days) M&C: Tracking and Analyzing (0.75 days) Closing Activities (0.25 days) All Rights Reserved © Professional Management Academy - 2013 2
  • 3. Initiating Introduction PMP Process groups vs. MsP2010 Enterprise Project Management Setting up MsP2010 environment All Rights Reserved © Professional Management Academy - 2013 3
  • 4. Initiating Introduction Project management software? 22 million 250 thousand All Rights Reserved © Professional Management Academy - 2013 4
  • 5. Initiating Introduction Top PM softwares Why MSP? All Rights Reserved © Professional Management Academy - 2013 5
  • 6. Initiating PMP Process groups vs. MsP2010 Effective application approach All Rights Reserved © Professional Management Academy - 2013 6
  • 7. Initiating PMP Process groups vs. MsP2010 Level of MS Project usage PM Stage MS Project usage level Comments Initiating Low May help develop high-level order of magnitude estimates for schedule, scope, and cost Planning High Helps define, integrate, and communicate scope, time, cost and resource plans. Some support for risk planning Executing Med-High Helps direct who does what when, in terms of execution. Provides the roadmap and clear path to the final deliverable or result M&C High Helps monitor and control change and measure the impact on scope, time, cost, and resources. Allows for effective variance analysis and decision-making for taking corrective action Closing Low-Med Useful for final variance analysis, lessons learned, developing future forecasting abilities, best practices, and benchmarking All Rights Reserved © Professional Management Academy - 2013 7
  • 8. Initiating Enterprise Project Management What is EPM? How is EPM? • Demand Management • Portfolio Selection and Analytics • Resource Management • Schedule Management • Team Collaboration • Business Intelligence and Reporting All Rights Reserved © Professional Management Academy - 2013 8
  • 9. Initiating Enterprise Project Management 03 Professional functions • Team Planner View • Direct Project to SharePoint Synchronization • Inactive Tasks Function All Rights Reserved © Professional Management Academy - 2013 9
  • 10. Initiating Enterprise Project Management Resource sharing without EPM? All Rights Reserved © Professional Management Academy - 2013 10
  • 11. Initiating Setting up MsP2010 environment Default view • Gantt Chart • Timeline • Ribbon All Rights Reserved © Professional Management Academy - 2013 11
  • 12. Initiating Setting up MsP2010 environment The Ribbon • Tabs • Groups • Quick Access Toolbar • Buttons • File & Backstage view All Rights Reserved © Professional Management Academy - 2013 12
  • 13. Initiating Setting up MsP2010 environment Gantt Chart • Text area • Bar area • Auto Filter, Group, Sort • Add new column • Zoom All Rights Reserved © Professional Management Academy - 2013 13
  • 14. Initiating Setting up MsP2010 environment Changing views • Task and Resource tabs • View tab • Quick view switching • Split screens All Rights Reserved © Professional Management Academy - 2013 14
  • 15. Initiating Setting up MsP2010 environment Start creating new project • Using Project Template • Importing from MS Excel Key settings • Manual & Automatic Scheduling • Project Summary Task and Outline Number All Rights Reserved © Professional Management Academy - 2013 15
  • 16. Initiating Setting up MsP2010 environment Scheduling approaches and Default Task Type • Duration Based Scheduling • Effort-Based Scheduling • The Relationship between Work and Duration Work = Duration × Units  Fix one component and enter the second variable  Project will calculate the third All Rights Reserved © Professional Management Academy - 2013 16
  • 17. Initiating Setting up MsP2010 environment Scheduling approaches and Default Task Type All Rights Reserved © Professional Management Academy - 2013 17
  • 18. Initiating Setting up MsP2010 environment Working with Calendars • Creating new calendar • Conversion factors: hours per day, hours per week, days per month Project start/end date • Configure start date • Display start/current in Gantt Chart All Rights Reserved © Professional Management Academy - 2013 18
  • 19. Initiating Hands-on session Setting Up – Initializing a new Project Change the Working Time – Working With Calendars All Rights Reserved © Professional Management Academy - 2013 19
  • 20. Planning Essential Create WBS and Task List Estimate Task Duration Setting Dependencies and Critical Path Assigning Resource and Estimate Cost Calculation Engine for Automatic Scheduling All Rights Reserved © Professional Management Academy - 2013 20
  • 21. Planning Create WBS and Task List What is a WBS Creating vs. representation • Interim Deliverables • Milestones “A deliverable-oriented hierarchical decomposition of the work to be executed by the project team, to accomplish the project objectives and create the required deliverable” WBS item Description (0) Final deliverable Project summary task 1 .0 Interim deliverable 1 Summary task, phase, or major piece 1 .1 Task 1 Lowest level of detail in the structure 1 .2 Task 2 1 .3 Task n 1 .4 Key milestone Deliverable achieved 2 .0 Interim deliverable 2 2 .1 Task 1 …. All Rights Reserved © Professional Management Academy - 2013 21
  • 22. Planning Create WBS and Task List WBS format • Outline structure • Network diagram • Tree structure All Rights Reserved © Professional Management Academy - 2013 22
  • 23. Planning Create WBS and Task List WBS sizing • Compatible with organization’s reporting requirement • Level of detail do team members require • Enough detail to estimate resource, timeline • Lower-level elements fully describe the upper level • Allow effective management of project risks and drive key issues • Effective tracking of project scope, timeline, and budget All Rights Reserved © Professional Management Academy - 2013 23
  • 24. Planning Create WBS and Task List Progressive Elaboration All Rights Reserved © Professional Management Academy - 2013 24
  • 25. Planning Create WBS and Task List Tasks and Milestones • Last level detail in WBS • Summary task has item(s) indented under it • Finish task referred as milestone – Reporting – Gating – Decision making – Key handoff point – Benchmarking/tracking Assign a duration of zero to a task, it automatically changes to a milestone and is represented in the Gantt bar area by a diamond All Rights Reserved © Professional Management Academy - 2013 25
  • 26. Planning Create WBS and Task List Tasks name column • Focus in task name • Enter WBS components first, later outline the detail • Quick access using Task/Insert group All Rights Reserved © Professional Management Academy - 2013 26
  • 27. Planning Create WBS and Task List User-controlled Scheduling • Project is default to start with manual schedule option • Switching between two modes: – Task mode column – Task tab /Schedule group All Rights Reserved © Professional Management Academy - 2013 27
  • 28. Planning Create WBS and Task List Outlining (Indenting & Outdenting) Tools • Summary task – Broad categories under which we can group tasks – Represents total work effort, cost, duration, start/finish date • Creating summary tasks – Task tab > Insert group > Summary – Indent sub tasks • Project enable to turn-off automatic roll-up calculation All Rights Reserved © Professional Management Academy - 2013 28
  • 29. Planning Create WBS and Task List Collapse and Expand: Show Outline • WYSIWYG – Broad categories under which we can group tasks – Represents total work effort, cost, duration, start/finish date • Creating summary tasks – Indent sub tasks – Task tab > Insert group > Summary All Rights Reserved © Professional Management Academy - 2013 29
  • 30. Planning Create WBS and Task List Setting Up – Initializing a new Project Change the Working Time – Working With Calendars All Rights Reserved © Professional Management Academy - 2013 30
  • 31. Outline Executing: Communication and Reports (2 days) • Understanding Views • Using Tables and Custom Fields • Using Filter, Group and Sorts • Create Custom View, Formatting and Reporting • Master Schedule with Inserted Projects All Rights Reserved © Professional Management Academy - 2013 31
  • 32. Outline M&C: Tracking and Analyzing (1 day) • Setting and Maintaining Baselines • Updating and Tracking Status • Variance Analysis and Corrective Action All Rights Reserved © Professional Management Academy - 2013 32