CHALLENGES FOR SUSTAINABLE
TRANSPORT SYSTEM
BRTS
Presented by:
Mr. Deepak Trivedi
General Manager, Ahmedabad Janmarg Limited,
Ahmedabad Municipal Corporation, Ahmedabad.
JANMARG TODAY
Proposed BRT
Corridor: 89 km
(Phase I & II)
Operational BRT
Corridor : 96 Km
(with connection of End
Nodes)
Period 15th August 2014 – 14th September 2014 15th January 2015 – 14th February 2015
Network Length 82 Km 96 Km (Connect with End Nodes)
Number of Stations 127 149 (Cabin - 16 )
Operations Timing 6:00 AM to 11:00 PM 6:00 AM to 11:00 PM
Peak Hours 8:00 AM – 11:00 AM ; 5:00 PM – 8:30 PM 8:00 AM – 11:00 AM ; 5:00 PM – 8:30 PM
Buses Operated 143 (Weekdays) , 135 (Sunday/Holiday) 209 (Weekdays) , 200 (Sunday/Holiday)
Average Daily Round Trips 896 1108
Average Daily Passenger 111899 121160
Average Daily Collection 1467698 1579272
Average Daily Kilometres
Scheduled: 38093
Operated (including dead):35161
Scheduled: 52290
Operated (including dead): 48560
Average Daily Passenger
Per kilometer: 3.18
Per bus: 782
Per trip:62
Per kilometer: 2.50
Per bus: 579
Per trip:55
Average Daily Income
Per passenger: Rs. 13.1
Per bus: Rs. 10269
Per trip: Rs. 820
Per passenger: Rs. 13.03
Per bus: Rs. 7545
Per trip: Rs. 713
JANMARG TODAY
Bus Rapid Transit is high-quality, customer-orientated transit that
delivers fast, comfortable and low-cost urban mobility.
:
• Segregated bus ways
• Rapid boarding and alighting
• Efficient fare collection
• Comfortable shelters and
stations
• Clean bus & modern
technologies
• Sophisticated marketing identity
• Excellence in customer service
WHAT IS BUS RAPID TRANSIT (BRT) SYSTEM?
BRT - A METRO EXPERIENCE ON ROAD THROUGH TECHNOLOGY
INNOVATIONS AT 1/20th THE COST
Centre of Excellence in Urban Transport, CEPT University, Ahmedabad
High Quality Transport at Affordable Costs
• Janmarg focused corridor utilization with economic viability.
• Janmarg has focused to keep atleast two routes on each corridor
to regulate cumulative frequency (i.e. corridor utilization) thus
keeping corridor busy.
• Busiest corridor in Janmarg has 48 buses per hour per direction
in peak hour.
1. Maintaining Corridor Exclusivity
• Creating a BRTS Identity
• An idle corridor creates a
negative image for MV Lane
users, hence maintaining
frequency is challenge.
• Currently Traffic
Management for BRTS
Junctions are handed over
to Traffic Police. While due
to over burden on
expanding services with
limited Human Resource
junction management has
been an issue.
2. Regulatory Challenges
• Janmarg is finding an Alternate mechanism for managing exclusivity
of BRTS corridor through BPMC Act – 208 & Penalty for violation
through BPMC Act – 393 applicable under municipal corporation.
• Indian society is fare sensitive.
• There is a market competition existing with
private services and informal transit
systems such as IPT which have low fares.
• Equivalent competitions is with 2-Wheelers
• Janmarg has developed Fare Regulatory
Mechanism, a formula approved by state
which allows annual updating of fare based
on WPI and Fuel price variation.
• Janmarg is also exploring strategic fare
such as adopting reduced fare for low
demand corridor
3. Fare Management
• BRTS is more about Operations
& Management than just
infrastructure development.
• Reducing Dead km have been
challenge and therefore Depot
locations are identified closer to
terminal points in different zones.
Still rationalizing dead km with
limitations for land availability in
urban context is a challenge.
4. Bus Operations
• Janmarg has flexible scheduling depending of weekday, festivals
(like navratri) and seasons.
• Janmarg has also abided all operations under labour laws
Zund
al
IIT
A
E
C
Sola
Bahgwat
Lal
Darwaj
a
Gita
Man
dir
Soni
ni
Chali
Odhav
Ring
road
Odhav
GIDC
Naroda
Gam
Hatkesw
ar
Jasoda
nagar
Vasana
Janmarg Routes
• Though it is difficult to satisfy expectations individual commuters
(received through regular user feedback) though Janmarg has
responded to suggestion from society to deliver the best practice.
• Janmarg has continuously achieved a rating of 8.7 to 9.2 out of
10 in all monthly surveys.
• To avoid fair leakages, Janmarg has a policy for staff rotation on
BRTS stations
5. Operation Monitoring
• Janmarg has kept a
closer look on
regular service levels
through monthly
surveys.
• Smart Management through ITMS has
resolved many regulatory issues for
Janmarg.
• Janmarg uses PIS, AVLS, Afc, O&M and
Scheduling through IT management.
• While IT industry is continuously
developing it is a challenge to maintain
skill resources and deliver diverse task as
single system
• Hardware have 9yr lifecycle while
Software have perpetual life.
Continuously changing its compatibility
and continuity.
6. ITMS
• For delivering the desired services
regular maintenance is equally
important.
• Regular maintenance of IT-hardware
and Civil works are monitored
weekly directly by Janmarg.
• Janmarg deliver all its services
through contracts, hence contract
management monitoring has been
key strength of Janmarg for
achieving service levels.
7. Maintenance Issues
Rutting in Pavement
IT Hardware
• The Roadway infrastructure is
designed with a concept of
COMPLETE STREET. Utilising
RoW for Mobility.
• The utilization of roadway edges
has limited the designed capacity
for MV lane.
8. Managing Road Edge
• Parking and Encroachments has
reduced upon MV lane capacity.
• Enforcement of corridor
utilization is with corporation and
efforts are being made on same.
Footpath & Curbing
• Lack of Technical Human Resource both expertise as well as
experienced
• With AFC and ATC adding new dimensions in decision
making
• Skill requirements are modifying with regular up-gradation of
IT and its utility in PT Services
• Need for extensive Training and Development Programme in
field of Transport Operation and Management
• Janmarg is enrolling in events like leaders program by SUTP
and other technical capacity building programme
• Also Janmarg gives advisory support to other organizations
and sharing experience.
9. Capacity Building
Need of Cultural Change
• Companies to Take Ownership
• Not to depend on Subsidies
• Address Market Competition
• Identify Non-fare box revenue resources
• Achieve Sustainability in Operation-Management
10. Companies to Act like Companies
• Maintaining Identity of System
• Multimodal integration (physical, fare, institutional)
• Janmarg exploring opportunities for AMTS-BRTS
integration (pilot started with sharing 35CNG buses with
right side door to 5-AMTS routes)
• Last Mile Connectivity (Feeder services) – Janmarg
exploring impacts of extended routes to 6-locations
(AMTS terminals) within a km from corridor.
• Development of UMTA
• Exploring TOD is in process with AUDA announcing
higher FSI along BRTS corridor.
GOING BEYOND BRTS
Thank You

More Related Content

What's hot

BRTS Delhi transportation
BRTS Delhi transportation BRTS Delhi transportation
BRTS Delhi transportation
Tanzil Faraz
 
Bus Rapid Transit System (BRTS) - Case Studies in Indian Scenario
Bus Rapid Transit System (BRTS) - Case Studies in Indian Scenario Bus Rapid Transit System (BRTS) - Case Studies in Indian Scenario
Bus Rapid Transit System (BRTS) - Case Studies in Indian Scenario
Apparao Gandi
 
CONNECTKaro 2015 - Session 2 - Smart City Smart Mobility
CONNECTKaro 2015 - Session 2 - Smart City Smart MobilityCONNECTKaro 2015 - Session 2 - Smart City Smart Mobility
CONNECTKaro 2015 - Session 2 - Smart City Smart Mobility
WRI Ross Center for Sustainable Cities
 
World Class Bus Rapid Transit System (BRTS) for Bangalore
World Class Bus Rapid Transit System (BRTS) for BangaloreWorld Class Bus Rapid Transit System (BRTS) for Bangalore
World Class Bus Rapid Transit System (BRTS) for Bangalore
Kiran Shaw
 
BRTS
BRTSBRTS
Ahmedabad BRTS Overview
Ahmedabad BRTS OverviewAhmedabad BRTS Overview
Ahmedabad BRTS Overview
Nishit kadia
 
Surat BRTS - Abhijit Lokre
Surat BRTS - Abhijit LokreSurat BRTS - Abhijit Lokre
Surat BRTS - Abhijit Lokre
WRI Ross Center for Sustainable Cities
 
Effective learning from delhi brts –a case study of pune brts
Effective learning from delhi brts –a case study of pune brtsEffective learning from delhi brts –a case study of pune brts
Effective learning from delhi brts –a case study of pune brts
eSAT Journals
 
Webinar Session: "BRT in India – a way forward"
Webinar Session: "BRT in India – a way forward"Webinar Session: "BRT in India – a way forward"
Webinar Session: "BRT in India – a way forward"
BRTCoE
 
Sustainable urban travel- brts ahmedabad,brts pune,suburban railway mumbai
Sustainable urban travel- brts ahmedabad,brts pune,suburban railway mumbaiSustainable urban travel- brts ahmedabad,brts pune,suburban railway mumbai
Sustainable urban travel- brts ahmedabad,brts pune,suburban railway mumbai
Gargee Ghosh
 
BRT Chennai
BRT ChennaiBRT Chennai
BRT Chennai
edsley
 
Integrated multi modal transportation system
Integrated multi modal transportation system Integrated multi modal transportation system
Integrated multi modal transportation system
Aditya Gupta
 
BRT in China: A brief review
BRT in China: A brief reviewBRT in China: A brief review
BRT in China: A brief review
WRI Ross Center for Sustainable Cities
 
Metro vs. Bus
Metro vs. BusMetro vs. Bus
Metro vs. Bus
guest0591bc
 
Dubai - City of Emirates
Dubai - City of EmiratesDubai - City of Emirates
Dubai - City of Emirates
Jaspal Singh
 
Road Safety and Bus Rapid Transit
Road Safety and Bus Rapid TransitRoad Safety and Bus Rapid Transit
Road Safety and Bus Rapid Transit
WRI Ross Center for Sustainable Cities
 
BRT - EDSA (Bus Rapid Transit) System 2018
BRT - EDSA (Bus Rapid Transit) System 2018BRT - EDSA (Bus Rapid Transit) System 2018
BRT - EDSA (Bus Rapid Transit) System 2018
Eduardo C. Arrojado
 
Webinar: Bus rapid transit system: metro on surface or high performance bus s...
Webinar: Bus rapid transit system: metro on surface or high performance bus s...Webinar: Bus rapid transit system: metro on surface or high performance bus s...
Webinar: Bus rapid transit system: metro on surface or high performance bus s...
BRTCoE
 

What's hot (20)

BRTS Delhi transportation
BRTS Delhi transportation BRTS Delhi transportation
BRTS Delhi transportation
 
Bus Rapid Transit System (BRTS) - Case Studies in Indian Scenario
Bus Rapid Transit System (BRTS) - Case Studies in Indian Scenario Bus Rapid Transit System (BRTS) - Case Studies in Indian Scenario
Bus Rapid Transit System (BRTS) - Case Studies in Indian Scenario
 
CONNECTKaro 2015 - Session 2 - Smart City Smart Mobility
CONNECTKaro 2015 - Session 2 - Smart City Smart MobilityCONNECTKaro 2015 - Session 2 - Smart City Smart Mobility
CONNECTKaro 2015 - Session 2 - Smart City Smart Mobility
 
World Class Bus Rapid Transit System (BRTS) for Bangalore
World Class Bus Rapid Transit System (BRTS) for BangaloreWorld Class Bus Rapid Transit System (BRTS) for Bangalore
World Class Bus Rapid Transit System (BRTS) for Bangalore
 
BRTS
BRTSBRTS
BRTS
 
Ahmedabad BRTS Overview
Ahmedabad BRTS OverviewAhmedabad BRTS Overview
Ahmedabad BRTS Overview
 
Surat BRTS - Abhijit Lokre
Surat BRTS - Abhijit LokreSurat BRTS - Abhijit Lokre
Surat BRTS - Abhijit Lokre
 
Effective learning from delhi brts –a case study of pune brts
Effective learning from delhi brts –a case study of pune brtsEffective learning from delhi brts –a case study of pune brts
Effective learning from delhi brts –a case study of pune brts
 
IMPACT OF BRTS ON CITIES
IMPACT OF BRTS ON CITIESIMPACT OF BRTS ON CITIES
IMPACT OF BRTS ON CITIES
 
Webinar Session: "BRT in India – a way forward"
Webinar Session: "BRT in India – a way forward"Webinar Session: "BRT in India – a way forward"
Webinar Session: "BRT in India – a way forward"
 
Brt india
Brt indiaBrt india
Brt india
 
Sustainable urban travel- brts ahmedabad,brts pune,suburban railway mumbai
Sustainable urban travel- brts ahmedabad,brts pune,suburban railway mumbaiSustainable urban travel- brts ahmedabad,brts pune,suburban railway mumbai
Sustainable urban travel- brts ahmedabad,brts pune,suburban railway mumbai
 
BRT Chennai
BRT ChennaiBRT Chennai
BRT Chennai
 
Integrated multi modal transportation system
Integrated multi modal transportation system Integrated multi modal transportation system
Integrated multi modal transportation system
 
BRT in China: A brief review
BRT in China: A brief reviewBRT in China: A brief review
BRT in China: A brief review
 
Metro vs. Bus
Metro vs. BusMetro vs. Bus
Metro vs. Bus
 
Dubai - City of Emirates
Dubai - City of EmiratesDubai - City of Emirates
Dubai - City of Emirates
 
Road Safety and Bus Rapid Transit
Road Safety and Bus Rapid TransitRoad Safety and Bus Rapid Transit
Road Safety and Bus Rapid Transit
 
BRT - EDSA (Bus Rapid Transit) System 2018
BRT - EDSA (Bus Rapid Transit) System 2018BRT - EDSA (Bus Rapid Transit) System 2018
BRT - EDSA (Bus Rapid Transit) System 2018
 
Webinar: Bus rapid transit system: metro on surface or high performance bus s...
Webinar: Bus rapid transit system: metro on surface or high performance bus s...Webinar: Bus rapid transit system: metro on surface or high performance bus s...
Webinar: Bus rapid transit system: metro on surface or high performance bus s...
 

Similar to CONNECTKaro 2015 - Session 10A - BRT - Challenges for Sustainable Transport System

SEM 1 PRESENTATION
SEM 1 PRESENTATIONSEM 1 PRESENTATION
SEM 1 PRESENTATION
Shubhraneel Aich
 
180412_Nayi Disha_Delhi Govt_ITDP.pptx
180412_Nayi Disha_Delhi Govt_ITDP.pptx180412_Nayi Disha_Delhi Govt_ITDP.pptx
180412_Nayi Disha_Delhi Govt_ITDP.pptx
Miracle574616
 
Presentation2
Presentation2Presentation2
Presentation2Aman Haz
 
Battery Powered and Hybrid Drive Opportunities in Heavy Duty, Large Capacity,...
Battery Powered and Hybrid Drive Opportunities in Heavy Duty, Large Capacity,...Battery Powered and Hybrid Drive Opportunities in Heavy Duty, Large Capacity,...
Battery Powered and Hybrid Drive Opportunities in Heavy Duty, Large Capacity,...
Newton Montano
 
How to Design an On-Demand Transit Service
How to Design an On-Demand Transit ServiceHow to Design an On-Demand Transit Service
How to Design an On-Demand Transit Service
Gurjap Birring
 
Workshop Innovation in Africa - BRT Lessons from Dar es Salaam by Ronald Lwak...
Workshop Innovation in Africa - BRT Lessons from Dar es Salaam by Ronald Lwak...Workshop Innovation in Africa - BRT Lessons from Dar es Salaam by Ronald Lwak...
Workshop Innovation in Africa - BRT Lessons from Dar es Salaam by Ronald Lwak...
BRTCoE
 
BRT in India
BRT in IndiaBRT in India
Revision of parking code for IRC
Revision of parking code for IRCRevision of parking code for IRC
Revision of parking code for IRCAkanksha Chopra
 
Use of IT in Data Collection and its Implications in Improving Service Operat...
Use of IT in Data Collection and its Implications in Improving Service Operat...Use of IT in Data Collection and its Implications in Improving Service Operat...
Use of IT in Data Collection and its Implications in Improving Service Operat...
WRI Ross Center for Sustainable Cities
 
Integrated Public Transport System - Bangalore
Integrated Public Transport System - BangaloreIntegrated Public Transport System - Bangalore
Integrated Public Transport System - BangaloreTehsin Kazi
 
Intelligent Transportation System
Intelligent Transportation SystemIntelligent Transportation System
Intelligent Transportation System
Himanshu Garg
 
ULTIMO-overviewV2.2.pptx
ULTIMO-overviewV2.2.pptxULTIMO-overviewV2.2.pptx
ULTIMO-overviewV2.2.pptx
DimitriKonstantas1
 
94f86e45 9650-4b3c-8899-11ee30369769-converted
94f86e45 9650-4b3c-8899-11ee30369769-converted94f86e45 9650-4b3c-8899-11ee30369769-converted
94f86e45 9650-4b3c-8899-11ee30369769-converted
PARASMONGIA2
 
PPP in public bus transport - Why and Models
PPP in public bus transport - Why and ModelsPPP in public bus transport - Why and Models
PPP in public bus transport - Why and Models
Jalpa Jain
 
Modern Roads
Modern RoadsModern Roads
Modern Roads
Siddharth Vaibhav
 
City Bus Service Modernisation "BusKaroPlus" - Anjum Parwez, IAS
City Bus Service Modernisation "BusKaroPlus" - Anjum Parwez, IASCity Bus Service Modernisation "BusKaroPlus" - Anjum Parwez, IAS
City Bus Service Modernisation "BusKaroPlus" - Anjum Parwez, IAS
WRI Ross Center for Sustainable Cities
 
Transport marketing
Transport marketingTransport marketing
Transport marketing
deepu2000
 
Proposed Transport Project by Millennium Challenge Corporation
Proposed Transport Project by Millennium Challenge CorporationProposed Transport Project by Millennium Challenge Corporation
Proposed Transport Project by Millennium Challenge Corporation
MillChalle
 
Operation management in METRO RAIL.pptx
Operation management in METRO RAIL.pptxOperation management in METRO RAIL.pptx
Operation management in METRO RAIL.pptx
maurya parkara
 

Similar to CONNECTKaro 2015 - Session 10A - BRT - Challenges for Sustainable Transport System (20)

SEM 1 PRESENTATION
SEM 1 PRESENTATIONSEM 1 PRESENTATION
SEM 1 PRESENTATION
 
180412_Nayi Disha_Delhi Govt_ITDP.pptx
180412_Nayi Disha_Delhi Govt_ITDP.pptx180412_Nayi Disha_Delhi Govt_ITDP.pptx
180412_Nayi Disha_Delhi Govt_ITDP.pptx
 
Presentation2
Presentation2Presentation2
Presentation2
 
Battery Powered and Hybrid Drive Opportunities in Heavy Duty, Large Capacity,...
Battery Powered and Hybrid Drive Opportunities in Heavy Duty, Large Capacity,...Battery Powered and Hybrid Drive Opportunities in Heavy Duty, Large Capacity,...
Battery Powered and Hybrid Drive Opportunities in Heavy Duty, Large Capacity,...
 
How to Design an On-Demand Transit Service
How to Design an On-Demand Transit ServiceHow to Design an On-Demand Transit Service
How to Design an On-Demand Transit Service
 
Workshop Innovation in Africa - BRT Lessons from Dar es Salaam by Ronald Lwak...
Workshop Innovation in Africa - BRT Lessons from Dar es Salaam by Ronald Lwak...Workshop Innovation in Africa - BRT Lessons from Dar es Salaam by Ronald Lwak...
Workshop Innovation in Africa - BRT Lessons from Dar es Salaam by Ronald Lwak...
 
BRT in India
BRT in IndiaBRT in India
BRT in India
 
Revision of parking code for IRC
Revision of parking code for IRCRevision of parking code for IRC
Revision of parking code for IRC
 
Use of IT in Data Collection and its Implications in Improving Service Operat...
Use of IT in Data Collection and its Implications in Improving Service Operat...Use of IT in Data Collection and its Implications in Improving Service Operat...
Use of IT in Data Collection and its Implications in Improving Service Operat...
 
Integrated Public Transport System - Bangalore
Integrated Public Transport System - BangaloreIntegrated Public Transport System - Bangalore
Integrated Public Transport System - Bangalore
 
Intelligent Transportation System
Intelligent Transportation SystemIntelligent Transportation System
Intelligent Transportation System
 
RTPI 2013 David Hytch
RTPI 2013 David HytchRTPI 2013 David Hytch
RTPI 2013 David Hytch
 
ULTIMO-overviewV2.2.pptx
ULTIMO-overviewV2.2.pptxULTIMO-overviewV2.2.pptx
ULTIMO-overviewV2.2.pptx
 
94f86e45 9650-4b3c-8899-11ee30369769-converted
94f86e45 9650-4b3c-8899-11ee30369769-converted94f86e45 9650-4b3c-8899-11ee30369769-converted
94f86e45 9650-4b3c-8899-11ee30369769-converted
 
PPP in public bus transport - Why and Models
PPP in public bus transport - Why and ModelsPPP in public bus transport - Why and Models
PPP in public bus transport - Why and Models
 
Modern Roads
Modern RoadsModern Roads
Modern Roads
 
City Bus Service Modernisation "BusKaroPlus" - Anjum Parwez, IAS
City Bus Service Modernisation "BusKaroPlus" - Anjum Parwez, IASCity Bus Service Modernisation "BusKaroPlus" - Anjum Parwez, IAS
City Bus Service Modernisation "BusKaroPlus" - Anjum Parwez, IAS
 
Transport marketing
Transport marketingTransport marketing
Transport marketing
 
Proposed Transport Project by Millennium Challenge Corporation
Proposed Transport Project by Millennium Challenge CorporationProposed Transport Project by Millennium Challenge Corporation
Proposed Transport Project by Millennium Challenge Corporation
 
Operation management in METRO RAIL.pptx
Operation management in METRO RAIL.pptxOperation management in METRO RAIL.pptx
Operation management in METRO RAIL.pptx
 

More from WRI Ross Center for Sustainable Cities

Restoration of Urban Blue Acres_Case of Rajokari Village
Restoration of Urban Blue Acres_Case of Rajokari VillageRestoration of Urban Blue Acres_Case of Rajokari Village
Restoration of Urban Blue Acres_Case of Rajokari Village
WRI Ross Center for Sustainable Cities
 
Restoration of Urban Blue Acres_Nualgi Pyco-remediation of sewage and lakes
Restoration of Urban Blue Acres_Nualgi Pyco-remediation of sewage and lakesRestoration of Urban Blue Acres_Nualgi Pyco-remediation of sewage and lakes
Restoration of Urban Blue Acres_Nualgi Pyco-remediation of sewage and lakes
WRI Ross Center for Sustainable Cities
 
Restoration of Urban Blue Acres_Green Water Revoln. Pune
Restoration of Urban Blue Acres_Green Water Revoln. PuneRestoration of Urban Blue Acres_Green Water Revoln. Pune
Restoration of Urban Blue Acres_Green Water Revoln. Pune
WRI Ross Center for Sustainable Cities
 
Restoration of Urban Blue Acres_Biostarts Ventures
Restoration of Urban Blue Acres_Biostarts VenturesRestoration of Urban Blue Acres_Biostarts Ventures
Restoration of Urban Blue Acres_Biostarts Ventures
WRI Ross Center for Sustainable Cities
 
Restoration of Urban Blue Acres_Biome Water for Cities
Restoration of Urban Blue Acres_Biome Water for CitiesRestoration of Urban Blue Acres_Biome Water for Cities
Restoration of Urban Blue Acres_Biome Water for Cities
WRI Ross Center for Sustainable Cities
 
Restoration of Urban Blue Acres_Relevance of Global Outlook to HYD
Restoration of Urban Blue Acres_Relevance of Global Outlook to HYDRestoration of Urban Blue Acres_Relevance of Global Outlook to HYD
Restoration of Urban Blue Acres_Relevance of Global Outlook to HYD
WRI Ross Center for Sustainable Cities
 
Restoration of Urban Blue Acres_Ayala
Restoration of Urban Blue Acres_AyalaRestoration of Urban Blue Acres_Ayala
Restoration of Urban Blue Acres_Ayala
WRI Ross Center for Sustainable Cities
 
Restoration of Urban Blue Acres_Multi-stakeholder forum HYD
Restoration of Urban Blue Acres_Multi-stakeholder forum HYDRestoration of Urban Blue Acres_Multi-stakeholder forum HYD
Restoration of Urban Blue Acres_Multi-stakeholder forum HYD
WRI Ross Center for Sustainable Cities
 
Unlock Bengaluru 2018: Roadmap to the Townships and Campuses of the Future
Unlock Bengaluru 2018: Roadmap to the Townships and Campuses of the FutureUnlock Bengaluru 2018: Roadmap to the Townships and Campuses of the Future
Unlock Bengaluru 2018: Roadmap to the Townships and Campuses of the Future
WRI Ross Center for Sustainable Cities
 
Unlock Bengaluru 2018: Water - Are we nearing Day Zero?
Unlock Bengaluru 2018: Water - Are we nearing Day Zero?Unlock Bengaluru 2018: Water - Are we nearing Day Zero?
Unlock Bengaluru 2018: Water - Are we nearing Day Zero?
WRI Ross Center for Sustainable Cities
 
CK2018: Assessment of Istanbul Historic Peninsula Pedestrianization Project
CK2018: Assessment of Istanbul Historic Peninsula Pedestrianization ProjectCK2018: Assessment of Istanbul Historic Peninsula Pedestrianization Project
CK2018: Assessment of Istanbul Historic Peninsula Pedestrianization Project
WRI Ross Center for Sustainable Cities
 
CK2018: Green Corridor TOD Project - Cali, Colombia
CK2018: Green Corridor TOD Project - Cali, ColombiaCK2018: Green Corridor TOD Project - Cali, Colombia
CK2018: Green Corridor TOD Project - Cali, Colombia
WRI Ross Center for Sustainable Cities
 
CK2018: Land value capture in Brazil
CK2018: Land value capture in BrazilCK2018: Land value capture in Brazil
CK2018: Land value capture in Brazil
WRI Ross Center for Sustainable Cities
 
CK2018: Urban Development - Examples from Mexico
CK2018: Urban Development - Examples from MexicoCK2018: Urban Development - Examples from Mexico
CK2018: Urban Development - Examples from Mexico
WRI Ross Center for Sustainable Cities
 
CK2018: Working with Partners & Data Sharing
CK2018: Working with Partners & Data Sharing CK2018: Working with Partners & Data Sharing
CK2018: Working with Partners & Data Sharing
WRI Ross Center for Sustainable Cities
 
CK2018: Global Convenant of Mayors approach to Climate Action Planning
CK2018: Global Convenant of Mayors approach to Climate Action PlanningCK2018: Global Convenant of Mayors approach to Climate Action Planning
CK2018: Global Convenant of Mayors approach to Climate Action Planning
WRI Ross Center for Sustainable Cities
 
CK2018: GHG Platform India
CK2018: GHG Platform IndiaCK2018: GHG Platform India
CK2018: GHG Platform India
WRI Ross Center for Sustainable Cities
 
CK2018: Climate Actions for Cities India's NDC, NAPCC and SAPCC
CK2018: Climate Actions for Cities India's NDC, NAPCC and SAPCCCK2018: Climate Actions for Cities India's NDC, NAPCC and SAPCC
CK2018: Climate Actions for Cities India's NDC, NAPCC and SAPCC
WRI Ross Center for Sustainable Cities
 
CK2018: Barriers and Global Innovations for Electric Bus Fleets
CK2018: Barriers and Global Innovations for Electric Bus FleetsCK2018: Barriers and Global Innovations for Electric Bus Fleets
CK2018: Barriers and Global Innovations for Electric Bus Fleets
WRI Ross Center for Sustainable Cities
 
CK2018: Electric Vehicle Financing
CK2018: Electric Vehicle FinancingCK2018: Electric Vehicle Financing
CK2018: Electric Vehicle Financing
WRI Ross Center for Sustainable Cities
 

More from WRI Ross Center for Sustainable Cities (20)

Restoration of Urban Blue Acres_Case of Rajokari Village
Restoration of Urban Blue Acres_Case of Rajokari VillageRestoration of Urban Blue Acres_Case of Rajokari Village
Restoration of Urban Blue Acres_Case of Rajokari Village
 
Restoration of Urban Blue Acres_Nualgi Pyco-remediation of sewage and lakes
Restoration of Urban Blue Acres_Nualgi Pyco-remediation of sewage and lakesRestoration of Urban Blue Acres_Nualgi Pyco-remediation of sewage and lakes
Restoration of Urban Blue Acres_Nualgi Pyco-remediation of sewage and lakes
 
Restoration of Urban Blue Acres_Green Water Revoln. Pune
Restoration of Urban Blue Acres_Green Water Revoln. PuneRestoration of Urban Blue Acres_Green Water Revoln. Pune
Restoration of Urban Blue Acres_Green Water Revoln. Pune
 
Restoration of Urban Blue Acres_Biostarts Ventures
Restoration of Urban Blue Acres_Biostarts VenturesRestoration of Urban Blue Acres_Biostarts Ventures
Restoration of Urban Blue Acres_Biostarts Ventures
 
Restoration of Urban Blue Acres_Biome Water for Cities
Restoration of Urban Blue Acres_Biome Water for CitiesRestoration of Urban Blue Acres_Biome Water for Cities
Restoration of Urban Blue Acres_Biome Water for Cities
 
Restoration of Urban Blue Acres_Relevance of Global Outlook to HYD
Restoration of Urban Blue Acres_Relevance of Global Outlook to HYDRestoration of Urban Blue Acres_Relevance of Global Outlook to HYD
Restoration of Urban Blue Acres_Relevance of Global Outlook to HYD
 
Restoration of Urban Blue Acres_Ayala
Restoration of Urban Blue Acres_AyalaRestoration of Urban Blue Acres_Ayala
Restoration of Urban Blue Acres_Ayala
 
Restoration of Urban Blue Acres_Multi-stakeholder forum HYD
Restoration of Urban Blue Acres_Multi-stakeholder forum HYDRestoration of Urban Blue Acres_Multi-stakeholder forum HYD
Restoration of Urban Blue Acres_Multi-stakeholder forum HYD
 
Unlock Bengaluru 2018: Roadmap to the Townships and Campuses of the Future
Unlock Bengaluru 2018: Roadmap to the Townships and Campuses of the FutureUnlock Bengaluru 2018: Roadmap to the Townships and Campuses of the Future
Unlock Bengaluru 2018: Roadmap to the Townships and Campuses of the Future
 
Unlock Bengaluru 2018: Water - Are we nearing Day Zero?
Unlock Bengaluru 2018: Water - Are we nearing Day Zero?Unlock Bengaluru 2018: Water - Are we nearing Day Zero?
Unlock Bengaluru 2018: Water - Are we nearing Day Zero?
 
CK2018: Assessment of Istanbul Historic Peninsula Pedestrianization Project
CK2018: Assessment of Istanbul Historic Peninsula Pedestrianization ProjectCK2018: Assessment of Istanbul Historic Peninsula Pedestrianization Project
CK2018: Assessment of Istanbul Historic Peninsula Pedestrianization Project
 
CK2018: Green Corridor TOD Project - Cali, Colombia
CK2018: Green Corridor TOD Project - Cali, ColombiaCK2018: Green Corridor TOD Project - Cali, Colombia
CK2018: Green Corridor TOD Project - Cali, Colombia
 
CK2018: Land value capture in Brazil
CK2018: Land value capture in BrazilCK2018: Land value capture in Brazil
CK2018: Land value capture in Brazil
 
CK2018: Urban Development - Examples from Mexico
CK2018: Urban Development - Examples from MexicoCK2018: Urban Development - Examples from Mexico
CK2018: Urban Development - Examples from Mexico
 
CK2018: Working with Partners & Data Sharing
CK2018: Working with Partners & Data Sharing CK2018: Working with Partners & Data Sharing
CK2018: Working with Partners & Data Sharing
 
CK2018: Global Convenant of Mayors approach to Climate Action Planning
CK2018: Global Convenant of Mayors approach to Climate Action PlanningCK2018: Global Convenant of Mayors approach to Climate Action Planning
CK2018: Global Convenant of Mayors approach to Climate Action Planning
 
CK2018: GHG Platform India
CK2018: GHG Platform IndiaCK2018: GHG Platform India
CK2018: GHG Platform India
 
CK2018: Climate Actions for Cities India's NDC, NAPCC and SAPCC
CK2018: Climate Actions for Cities India's NDC, NAPCC and SAPCCCK2018: Climate Actions for Cities India's NDC, NAPCC and SAPCC
CK2018: Climate Actions for Cities India's NDC, NAPCC and SAPCC
 
CK2018: Barriers and Global Innovations for Electric Bus Fleets
CK2018: Barriers and Global Innovations for Electric Bus FleetsCK2018: Barriers and Global Innovations for Electric Bus Fleets
CK2018: Barriers and Global Innovations for Electric Bus Fleets
 
CK2018: Electric Vehicle Financing
CK2018: Electric Vehicle FinancingCK2018: Electric Vehicle Financing
CK2018: Electric Vehicle Financing
 

Recently uploaded

一比一原版(ANU毕业证)澳大利亚国立大学毕业证成绩单
一比一原版(ANU毕业证)澳大利亚国立大学毕业证成绩单一比一原版(ANU毕业证)澳大利亚国立大学毕业证成绩单
一比一原版(ANU毕业证)澳大利亚国立大学毕业证成绩单
ehbuaw
 
PPT Item # 8 - Tuxedo Columbine 3way Stop
PPT Item # 8 - Tuxedo Columbine 3way StopPPT Item # 8 - Tuxedo Columbine 3way Stop
PPT Item # 8 - Tuxedo Columbine 3way Stop
ahcitycouncil
 
Russian anarchist and anti-war movement in the third year of full-scale war
Russian anarchist and anti-war movement in the third year of full-scale warRussian anarchist and anti-war movement in the third year of full-scale war
Russian anarchist and anti-war movement in the third year of full-scale war
Antti Rautiainen
 
2024: The FAR - Federal Acquisition Regulations, Part 36
2024: The FAR - Federal Acquisition Regulations, Part 362024: The FAR - Federal Acquisition Regulations, Part 36
2024: The FAR - Federal Acquisition Regulations, Part 36
JSchaus & Associates
 
一比一原版(UQ毕业证)昆士兰大学毕业证成绩单
一比一原版(UQ毕业证)昆士兰大学毕业证成绩单一比一原版(UQ毕业证)昆士兰大学毕业证成绩单
一比一原版(UQ毕业证)昆士兰大学毕业证成绩单
ehbuaw
 
PNRR MADRID GREENTECH FOR BROWN NETWORKS NETWORKS MUR_MUSA_TEBALDI.pdf
PNRR MADRID GREENTECH FOR BROWN NETWORKS NETWORKS MUR_MUSA_TEBALDI.pdfPNRR MADRID GREENTECH FOR BROWN NETWORKS NETWORKS MUR_MUSA_TEBALDI.pdf
PNRR MADRID GREENTECH FOR BROWN NETWORKS NETWORKS MUR_MUSA_TEBALDI.pdf
ClaudioTebaldi2
 
PD-1602-as-amended-by-RA-9287-Anti-Illegal-Gambling-Law.pptx
PD-1602-as-amended-by-RA-9287-Anti-Illegal-Gambling-Law.pptxPD-1602-as-amended-by-RA-9287-Anti-Illegal-Gambling-Law.pptx
PD-1602-as-amended-by-RA-9287-Anti-Illegal-Gambling-Law.pptx
RIDPRO11
 
一比一原版(WSU毕业证)西悉尼大学毕业证成绩单
一比一原版(WSU毕业证)西悉尼大学毕业证成绩单一比一原版(WSU毕业证)西悉尼大学毕业证成绩单
一比一原版(WSU毕业证)西悉尼大学毕业证成绩单
evkovas
 
一比一原版(QUT毕业证)昆士兰科技大学毕业证成绩单
一比一原版(QUT毕业证)昆士兰科技大学毕业证成绩单一比一原版(QUT毕业证)昆士兰科技大学毕业证成绩单
一比一原版(QUT毕业证)昆士兰科技大学毕业证成绩单
ukyewh
 
Understanding the Challenges of Street Children
Understanding the Challenges of Street ChildrenUnderstanding the Challenges of Street Children
Understanding the Challenges of Street Children
SERUDS INDIA
 
Canadian Immigration Tracker March 2024 - Key Slides
Canadian Immigration Tracker March 2024 - Key SlidesCanadian Immigration Tracker March 2024 - Key Slides
Canadian Immigration Tracker March 2024 - Key Slides
Andrew Griffith
 
Effects of Extreme Temperatures From Climate Change on the Medicare Populatio...
Effects of Extreme Temperatures From Climate Change on the Medicare Populatio...Effects of Extreme Temperatures From Climate Change on the Medicare Populatio...
Effects of Extreme Temperatures From Climate Change on the Medicare Populatio...
Congressional Budget Office
 
ZGB - The Role of Generative AI in Government transformation.pdf
ZGB - The Role of Generative AI in Government transformation.pdfZGB - The Role of Generative AI in Government transformation.pdf
ZGB - The Role of Generative AI in Government transformation.pdf
Saeed Al Dhaheri
 
PPT Item # 7 - BB Inspection Services Agmt
PPT Item # 7 - BB Inspection Services AgmtPPT Item # 7 - BB Inspection Services Agmt
PPT Item # 7 - BB Inspection Services Agmt
ahcitycouncil
 
PACT launching workshop presentation-Final.pdf
PACT launching workshop presentation-Final.pdfPACT launching workshop presentation-Final.pdf
PACT launching workshop presentation-Final.pdf
Mohammed325561
 
一比一原版(UOW毕业证)伍伦贡大学毕业证成绩单
一比一原版(UOW毕业证)伍伦贡大学毕业证成绩单一比一原版(UOW毕业证)伍伦贡大学毕业证成绩单
一比一原版(UOW毕业证)伍伦贡大学毕业证成绩单
ehbuaw
 
PPT Item # 5 - 5330 Broadway ARB Case # 930F
PPT Item # 5 - 5330 Broadway ARB Case # 930FPPT Item # 5 - 5330 Broadway ARB Case # 930F
PPT Item # 5 - 5330 Broadway ARB Case # 930F
ahcitycouncil
 
PPT Item # 6 - 7001 Broadway ARB Case # 933F
PPT Item # 6 - 7001 Broadway ARB Case # 933FPPT Item # 6 - 7001 Broadway ARB Case # 933F
PPT Item # 6 - 7001 Broadway ARB Case # 933F
ahcitycouncil
 
Counting Class for Micro Observers 2024.pptx
Counting Class for Micro Observers 2024.pptxCounting Class for Micro Observers 2024.pptx
Counting Class for Micro Observers 2024.pptx
Revenue Department Kerala State
 
Many ways to support street children.pptx
Many ways to support street children.pptxMany ways to support street children.pptx
Many ways to support street children.pptx
SERUDS INDIA
 

Recently uploaded (20)

一比一原版(ANU毕业证)澳大利亚国立大学毕业证成绩单
一比一原版(ANU毕业证)澳大利亚国立大学毕业证成绩单一比一原版(ANU毕业证)澳大利亚国立大学毕业证成绩单
一比一原版(ANU毕业证)澳大利亚国立大学毕业证成绩单
 
PPT Item # 8 - Tuxedo Columbine 3way Stop
PPT Item # 8 - Tuxedo Columbine 3way StopPPT Item # 8 - Tuxedo Columbine 3way Stop
PPT Item # 8 - Tuxedo Columbine 3way Stop
 
Russian anarchist and anti-war movement in the third year of full-scale war
Russian anarchist and anti-war movement in the third year of full-scale warRussian anarchist and anti-war movement in the third year of full-scale war
Russian anarchist and anti-war movement in the third year of full-scale war
 
2024: The FAR - Federal Acquisition Regulations, Part 36
2024: The FAR - Federal Acquisition Regulations, Part 362024: The FAR - Federal Acquisition Regulations, Part 36
2024: The FAR - Federal Acquisition Regulations, Part 36
 
一比一原版(UQ毕业证)昆士兰大学毕业证成绩单
一比一原版(UQ毕业证)昆士兰大学毕业证成绩单一比一原版(UQ毕业证)昆士兰大学毕业证成绩单
一比一原版(UQ毕业证)昆士兰大学毕业证成绩单
 
PNRR MADRID GREENTECH FOR BROWN NETWORKS NETWORKS MUR_MUSA_TEBALDI.pdf
PNRR MADRID GREENTECH FOR BROWN NETWORKS NETWORKS MUR_MUSA_TEBALDI.pdfPNRR MADRID GREENTECH FOR BROWN NETWORKS NETWORKS MUR_MUSA_TEBALDI.pdf
PNRR MADRID GREENTECH FOR BROWN NETWORKS NETWORKS MUR_MUSA_TEBALDI.pdf
 
PD-1602-as-amended-by-RA-9287-Anti-Illegal-Gambling-Law.pptx
PD-1602-as-amended-by-RA-9287-Anti-Illegal-Gambling-Law.pptxPD-1602-as-amended-by-RA-9287-Anti-Illegal-Gambling-Law.pptx
PD-1602-as-amended-by-RA-9287-Anti-Illegal-Gambling-Law.pptx
 
一比一原版(WSU毕业证)西悉尼大学毕业证成绩单
一比一原版(WSU毕业证)西悉尼大学毕业证成绩单一比一原版(WSU毕业证)西悉尼大学毕业证成绩单
一比一原版(WSU毕业证)西悉尼大学毕业证成绩单
 
一比一原版(QUT毕业证)昆士兰科技大学毕业证成绩单
一比一原版(QUT毕业证)昆士兰科技大学毕业证成绩单一比一原版(QUT毕业证)昆士兰科技大学毕业证成绩单
一比一原版(QUT毕业证)昆士兰科技大学毕业证成绩单
 
Understanding the Challenges of Street Children
Understanding the Challenges of Street ChildrenUnderstanding the Challenges of Street Children
Understanding the Challenges of Street Children
 
Canadian Immigration Tracker March 2024 - Key Slides
Canadian Immigration Tracker March 2024 - Key SlidesCanadian Immigration Tracker March 2024 - Key Slides
Canadian Immigration Tracker March 2024 - Key Slides
 
Effects of Extreme Temperatures From Climate Change on the Medicare Populatio...
Effects of Extreme Temperatures From Climate Change on the Medicare Populatio...Effects of Extreme Temperatures From Climate Change on the Medicare Populatio...
Effects of Extreme Temperatures From Climate Change on the Medicare Populatio...
 
ZGB - The Role of Generative AI in Government transformation.pdf
ZGB - The Role of Generative AI in Government transformation.pdfZGB - The Role of Generative AI in Government transformation.pdf
ZGB - The Role of Generative AI in Government transformation.pdf
 
PPT Item # 7 - BB Inspection Services Agmt
PPT Item # 7 - BB Inspection Services AgmtPPT Item # 7 - BB Inspection Services Agmt
PPT Item # 7 - BB Inspection Services Agmt
 
PACT launching workshop presentation-Final.pdf
PACT launching workshop presentation-Final.pdfPACT launching workshop presentation-Final.pdf
PACT launching workshop presentation-Final.pdf
 
一比一原版(UOW毕业证)伍伦贡大学毕业证成绩单
一比一原版(UOW毕业证)伍伦贡大学毕业证成绩单一比一原版(UOW毕业证)伍伦贡大学毕业证成绩单
一比一原版(UOW毕业证)伍伦贡大学毕业证成绩单
 
PPT Item # 5 - 5330 Broadway ARB Case # 930F
PPT Item # 5 - 5330 Broadway ARB Case # 930FPPT Item # 5 - 5330 Broadway ARB Case # 930F
PPT Item # 5 - 5330 Broadway ARB Case # 930F
 
PPT Item # 6 - 7001 Broadway ARB Case # 933F
PPT Item # 6 - 7001 Broadway ARB Case # 933FPPT Item # 6 - 7001 Broadway ARB Case # 933F
PPT Item # 6 - 7001 Broadway ARB Case # 933F
 
Counting Class for Micro Observers 2024.pptx
Counting Class for Micro Observers 2024.pptxCounting Class for Micro Observers 2024.pptx
Counting Class for Micro Observers 2024.pptx
 
Many ways to support street children.pptx
Many ways to support street children.pptxMany ways to support street children.pptx
Many ways to support street children.pptx
 

CONNECTKaro 2015 - Session 10A - BRT - Challenges for Sustainable Transport System

  • 1. CHALLENGES FOR SUSTAINABLE TRANSPORT SYSTEM BRTS Presented by: Mr. Deepak Trivedi General Manager, Ahmedabad Janmarg Limited, Ahmedabad Municipal Corporation, Ahmedabad.
  • 2. JANMARG TODAY Proposed BRT Corridor: 89 km (Phase I & II) Operational BRT Corridor : 96 Km (with connection of End Nodes)
  • 3. Period 15th August 2014 – 14th September 2014 15th January 2015 – 14th February 2015 Network Length 82 Km 96 Km (Connect with End Nodes) Number of Stations 127 149 (Cabin - 16 ) Operations Timing 6:00 AM to 11:00 PM 6:00 AM to 11:00 PM Peak Hours 8:00 AM – 11:00 AM ; 5:00 PM – 8:30 PM 8:00 AM – 11:00 AM ; 5:00 PM – 8:30 PM Buses Operated 143 (Weekdays) , 135 (Sunday/Holiday) 209 (Weekdays) , 200 (Sunday/Holiday) Average Daily Round Trips 896 1108 Average Daily Passenger 111899 121160 Average Daily Collection 1467698 1579272 Average Daily Kilometres Scheduled: 38093 Operated (including dead):35161 Scheduled: 52290 Operated (including dead): 48560 Average Daily Passenger Per kilometer: 3.18 Per bus: 782 Per trip:62 Per kilometer: 2.50 Per bus: 579 Per trip:55 Average Daily Income Per passenger: Rs. 13.1 Per bus: Rs. 10269 Per trip: Rs. 820 Per passenger: Rs. 13.03 Per bus: Rs. 7545 Per trip: Rs. 713 JANMARG TODAY
  • 4. Bus Rapid Transit is high-quality, customer-orientated transit that delivers fast, comfortable and low-cost urban mobility. : • Segregated bus ways • Rapid boarding and alighting • Efficient fare collection • Comfortable shelters and stations • Clean bus & modern technologies • Sophisticated marketing identity • Excellence in customer service WHAT IS BUS RAPID TRANSIT (BRT) SYSTEM? BRT - A METRO EXPERIENCE ON ROAD THROUGH TECHNOLOGY INNOVATIONS AT 1/20th THE COST Centre of Excellence in Urban Transport, CEPT University, Ahmedabad High Quality Transport at Affordable Costs
  • 5. • Janmarg focused corridor utilization with economic viability. • Janmarg has focused to keep atleast two routes on each corridor to regulate cumulative frequency (i.e. corridor utilization) thus keeping corridor busy. • Busiest corridor in Janmarg has 48 buses per hour per direction in peak hour. 1. Maintaining Corridor Exclusivity • Creating a BRTS Identity • An idle corridor creates a negative image for MV Lane users, hence maintaining frequency is challenge.
  • 6. • Currently Traffic Management for BRTS Junctions are handed over to Traffic Police. While due to over burden on expanding services with limited Human Resource junction management has been an issue. 2. Regulatory Challenges • Janmarg is finding an Alternate mechanism for managing exclusivity of BRTS corridor through BPMC Act – 208 & Penalty for violation through BPMC Act – 393 applicable under municipal corporation.
  • 7. • Indian society is fare sensitive. • There is a market competition existing with private services and informal transit systems such as IPT which have low fares. • Equivalent competitions is with 2-Wheelers • Janmarg has developed Fare Regulatory Mechanism, a formula approved by state which allows annual updating of fare based on WPI and Fuel price variation. • Janmarg is also exploring strategic fare such as adopting reduced fare for low demand corridor 3. Fare Management
  • 8. • BRTS is more about Operations & Management than just infrastructure development. • Reducing Dead km have been challenge and therefore Depot locations are identified closer to terminal points in different zones. Still rationalizing dead km with limitations for land availability in urban context is a challenge. 4. Bus Operations • Janmarg has flexible scheduling depending of weekday, festivals (like navratri) and seasons. • Janmarg has also abided all operations under labour laws Zund al IIT A E C Sola Bahgwat Lal Darwaj a Gita Man dir Soni ni Chali Odhav Ring road Odhav GIDC Naroda Gam Hatkesw ar Jasoda nagar Vasana Janmarg Routes
  • 9. • Though it is difficult to satisfy expectations individual commuters (received through regular user feedback) though Janmarg has responded to suggestion from society to deliver the best practice. • Janmarg has continuously achieved a rating of 8.7 to 9.2 out of 10 in all monthly surveys. • To avoid fair leakages, Janmarg has a policy for staff rotation on BRTS stations 5. Operation Monitoring • Janmarg has kept a closer look on regular service levels through monthly surveys.
  • 10. • Smart Management through ITMS has resolved many regulatory issues for Janmarg. • Janmarg uses PIS, AVLS, Afc, O&M and Scheduling through IT management. • While IT industry is continuously developing it is a challenge to maintain skill resources and deliver diverse task as single system • Hardware have 9yr lifecycle while Software have perpetual life. Continuously changing its compatibility and continuity. 6. ITMS
  • 11. • For delivering the desired services regular maintenance is equally important. • Regular maintenance of IT-hardware and Civil works are monitored weekly directly by Janmarg. • Janmarg deliver all its services through contracts, hence contract management monitoring has been key strength of Janmarg for achieving service levels. 7. Maintenance Issues Rutting in Pavement IT Hardware
  • 12. • The Roadway infrastructure is designed with a concept of COMPLETE STREET. Utilising RoW for Mobility. • The utilization of roadway edges has limited the designed capacity for MV lane. 8. Managing Road Edge • Parking and Encroachments has reduced upon MV lane capacity. • Enforcement of corridor utilization is with corporation and efforts are being made on same. Footpath & Curbing
  • 13. • Lack of Technical Human Resource both expertise as well as experienced • With AFC and ATC adding new dimensions in decision making • Skill requirements are modifying with regular up-gradation of IT and its utility in PT Services • Need for extensive Training and Development Programme in field of Transport Operation and Management • Janmarg is enrolling in events like leaders program by SUTP and other technical capacity building programme • Also Janmarg gives advisory support to other organizations and sharing experience. 9. Capacity Building
  • 14. Need of Cultural Change • Companies to Take Ownership • Not to depend on Subsidies • Address Market Competition • Identify Non-fare box revenue resources • Achieve Sustainability in Operation-Management 10. Companies to Act like Companies
  • 15. • Maintaining Identity of System • Multimodal integration (physical, fare, institutional) • Janmarg exploring opportunities for AMTS-BRTS integration (pilot started with sharing 35CNG buses with right side door to 5-AMTS routes) • Last Mile Connectivity (Feeder services) – Janmarg exploring impacts of extended routes to 6-locations (AMTS terminals) within a km from corridor. • Development of UMTA • Exploring TOD is in process with AUDA announcing higher FSI along BRTS corridor. GOING BEYOND BRTS

Editor's Notes

  1. Eg: There is no sense is operating BRTS exclusive lanes with bus every 10mins. Which makes MTL user feel underutilization of roadway. Also, more headway discourages commuters on waiting time.
  2. Companies to act like companies than extended arm of municipal corporation
  3. UMTA – Unified Metropolitan Development Authority