Industry Scenario                                                Railroads often face the following challenges in effective
                                                                 deployment and utilization of resources for MOW:
Freight railroads are one of the most capital intensive          ?  Information is manually recorded in the field using pen and
industries, where a major share of revenue is spent on capital       paper
expenditure and maintenance expenses related to                  ? of real-time connectivity to the legacy
                                                                    Absence
infrastructure and equipment acquisition.                           applications
                                                                 ?  Lack of reference manuals/ guidelines at fingertips
Within North America, nearly 100% of freight rail tracks are
?                                                                ?control (real-time reporting) of field expenses on
                                                                    Lack of
owned, built and maintained by the railroads, not by the            remote projects
government
? out of every revenue dollar is invested right back
40 cents                                                         HCL’s Mobility Solution for Railroads
into the rail network. In North America alone, from 1980 to
2010, freight railroads reinvested approximately $480            HCL’s Mobility solution for railroads helps the rail industry
billion of their own funds on locomotives, freight cars,         achieve better return on investments on their maintenance
tracks, bridges, tunnels and other infrastructure.               expenditures through real-time visibility, increased
Germany’s annual investments in rail infrastructure have
?                                                                productivity and better resource utilization.
increased from less than $5 billion in 2008 to $5.6 billion in
2011 - substantially more than the United States on a per        HCL’s solution would allow the user to access a particular
capita level                                                     project by entering the project ID or project number into the
                                                                 screen. The system would present relevant information on the
All activities related to the repair and maintenance of fixed    project like:
linear assets of the railway, including track and roadway,
buildings, bridges, signals, crossing gates, communication       Mile Post (MP) markers for the project’s location
                                                                 ?
and power facilities, terminals and fuel stations are known as   identification
“Maintenance of Way” (MOW). Globally, the installed base of      Project details (work description of the project)
                                                                 ?
rail track has now reached approximately 1.6 million             ? project dates (start, end)
                                                                 Relevant
kilometers i.e., 40 times the circumference of the Earth.        ? required with specific resource delivery dates
                                                                 Materials
                                                                 on-site
                                                                 ? to work on the project (B&B gangs, equipment)
                                                                 The crew
HCL’s mobility solution helps the field staff connect in real-time with core systems to access and assess information from remote
field locations. MOW project managers would be able to accurately capture/ associate all the costs (time and materials) to a
specific project.

                                                           Maintenance of Way (MOW)

         Project list                             Project planning                            Project survey                             Estimation




                                                                    Maintenance Process




        Completion                                       ERP                                       PDA                             Project assignment




Potential Benefits:                                                                 Key Differentiators:

Overall improvement in resource utilization
?                                                                                   ? detailed and complete control on MOW service
                                                                                    Effective,
? visibility in service assignments and status
Complete                                                                            process
? field staff productivity by 20%
Improved                                                                            Real-time information updates on assignment and
                                                                                    ?
? to timelines committed to internal customers
Adherence                                                                           deviations (Exception Reporting) to the system
                                                                                    Drill down to individual operational locations and
                                                                                    ?
                                                                                    resources in field
                                                                                    ? planning module that enables effective planning
                                                                                    Powerful
                                                                                    prior to execution
                                                                                    ? offered in terms of customizing the solution to
                                                                                    Flexibility
                                                                                    the hardware and software preferred by the client


                                         For more information please contact – ttl@hcl.com




      Hello, I’m from HCL. We work behind the scenes, helping our customers to shift paradigms and start revolutions. We use digital engineering to build
      superhuman capabilities. We make sure that the rate of progress far exceeds the price. And right now, 85,000 of us bright sparks are busy developing solutions
      for 500 customers in 31 countries across the world.
      How can I help you?


      www.hcltech.com

HCLT Brochure: Mobile Data Terminal - Maintenance of Way (MOW)

  • 1.
    Industry Scenario Railroads often face the following challenges in effective deployment and utilization of resources for MOW: Freight railroads are one of the most capital intensive ? Information is manually recorded in the field using pen and industries, where a major share of revenue is spent on capital paper expenditure and maintenance expenses related to ? of real-time connectivity to the legacy Absence infrastructure and equipment acquisition. applications ? Lack of reference manuals/ guidelines at fingertips Within North America, nearly 100% of freight rail tracks are ? ?control (real-time reporting) of field expenses on Lack of owned, built and maintained by the railroads, not by the remote projects government ? out of every revenue dollar is invested right back 40 cents HCL’s Mobility Solution for Railroads into the rail network. In North America alone, from 1980 to 2010, freight railroads reinvested approximately $480 HCL’s Mobility solution for railroads helps the rail industry billion of their own funds on locomotives, freight cars, achieve better return on investments on their maintenance tracks, bridges, tunnels and other infrastructure. expenditures through real-time visibility, increased Germany’s annual investments in rail infrastructure have ? productivity and better resource utilization. increased from less than $5 billion in 2008 to $5.6 billion in 2011 - substantially more than the United States on a per HCL’s solution would allow the user to access a particular capita level project by entering the project ID or project number into the screen. The system would present relevant information on the All activities related to the repair and maintenance of fixed project like: linear assets of the railway, including track and roadway, buildings, bridges, signals, crossing gates, communication Mile Post (MP) markers for the project’s location ? and power facilities, terminals and fuel stations are known as identification “Maintenance of Way” (MOW). Globally, the installed base of Project details (work description of the project) ? rail track has now reached approximately 1.6 million ? project dates (start, end) Relevant kilometers i.e., 40 times the circumference of the Earth. ? required with specific resource delivery dates Materials on-site ? to work on the project (B&B gangs, equipment) The crew
  • 2.
    HCL’s mobility solutionhelps the field staff connect in real-time with core systems to access and assess information from remote field locations. MOW project managers would be able to accurately capture/ associate all the costs (time and materials) to a specific project. Maintenance of Way (MOW) Project list Project planning Project survey Estimation Maintenance Process Completion ERP PDA Project assignment Potential Benefits: Key Differentiators: Overall improvement in resource utilization ? ? detailed and complete control on MOW service Effective, ? visibility in service assignments and status Complete process ? field staff productivity by 20% Improved Real-time information updates on assignment and ? ? to timelines committed to internal customers Adherence deviations (Exception Reporting) to the system Drill down to individual operational locations and ? resources in field ? planning module that enables effective planning Powerful prior to execution ? offered in terms of customizing the solution to Flexibility the hardware and software preferred by the client For more information please contact – ttl@hcl.com Hello, I’m from HCL. We work behind the scenes, helping our customers to shift paradigms and start revolutions. We use digital engineering to build superhuman capabilities. We make sure that the rate of progress far exceeds the price. And right now, 85,000 of us bright sparks are busy developing solutions for 500 customers in 31 countries across the world. How can I help you? www.hcltech.com