MORE8_V1_Mise en page 1 04/12/12 13:53 Page1




         more                                                              #
                                                                                            In partnership with


                                                                             8
                                                                            Dec.
                                                                           2012
                                           by
     every 2 months: 1 consumer trend briefing • 4 retail real estate player’s viewpoints • online follow-up




      Crisis and retail
                                                                                                                  ©iStockphoto.com/Anastasia Pelikh
      consumption
     Retailers and shopping centre operators have risen to the economic challenges
     that have affected the world. Even more inventive than ever, they are constantly
     embracing new technologies and services. Shoppers are being attracted in new         Inside
     ways as pricing and retail become more about being smart, fun or just in time.       • The trend briefing
     With the mighty Tesco having reduced its profits for the first time in 18 years,     • Interviews:
     albeit to a still impressive £1.7 billion (2.12 billion Euro), times are changing.    TESCO PLC
     Shoppers have always been concerned with price, but with new technologies             QUINTAIN
     and services, attitudes to pricing have become ever more complex. Shopping
                                                                                           PRINTEMPS
     can be done for longer, in more places and in more ways. “The pace of
     change of technology is blistering” said Mike McNamara, Chief Information             DESIGN INTERNATIONAL
     Officer at Tesco.
     More Vision 8 looks at the latest trends in consumer attraction and retention,
     driving revenue through interaction, games, variable pricing, instant discounts
     and much more ... competitive, complex and compelling. It’s not about telling
     your customers that you are important, and they can have a slice of you if they
     pay for it. Instead, it’s about telling customers: “Whatever you need or want,
     we’re here to help” (or even better, “We know what you want, here, we’ve
     already done it for you”). It’s about being SERVILE …

                                               Follow us on
MORE8_V1_Mise en page 1 04/12/12 13:53 Page2




        more
                                                                                                    Follow us on
                     by

     every 2 months: 1 consumer trend briefing • 4 retail real estate player’s viewpoints • online follow-up




                          So what is SERVILE all about?
                          Put simply, servile companies always put themselves second. For most shopping
                          centres or retailers this means a radical change in mindset, for some the idea that
                          their customers could dictate how, what and where they trade would not come
                          naturally, being more used to dictating these things.
                          We all know that convenience has always been important but shoppers are now
                          being offered levels of convenience that they could not have dreamt of a few
                          years ago. Retailers are keeping ahead of their shoppers through online
                          technology and SERVILE BRANDS.
                          Yes, shoppers are more demanding, time-starved, informed, and choice-saturated
                          than ever-before (we know you know). For shopping centres and retail to prosper,
                          the solution is simple though: turn SERVILE. This goes far beyond offering great
                          customer service. SERVILE means turning your shopping centre or store into a
                          lifestyle servant focused on catering to the needs, desires and whims of your
                          customers, wherever and whenever they are.
                          For marketers, SERVILE means thinking about creating marketing that isn’t
                          marketing. If consumers aren’t searching for, adopting, installing, or sharing your
                          efforts (in whatever form: product, service, app, content etc.), then you need to
                          get back to the drawing board. Now!

                          So here are four SERVILE trends to drive customers towards
                          your shopping centre or store:
                          1. Give shoppers the best deals with variable pricing or price comparisons –
                             instantly

                          2. Encourage your customers to choose your products or experience them first

                          3. Go that extra mile to serve your customers – be truly servile

                          4. Make your offer more attractive to women (or men!)




     advertisement




                                                                           www.invalio.com
                                                                           Operational sales and retail solutions

                                                                                                                       A C C E L E R A T I N G   S A L E S




      *Source: trendwatching.com a London-based, independent trend firm, scans the globe for the most promising consumer trends, insights
      and related hands-on business ideas. Its free monthly Trend Briefings get sent to more than 160,000 business professionals in 180+ countries.”
MORE8_V1_Mise en page 1 04/12/12 13:53 Page3




        more
                                                                                                    Follow us on
                     by

     every 2 months: 1 consumer trend briefing • 4 retail real estate player’s viewpoints • online follow-up


     Trend 1:                                              Selected links
                                                           1. Here is a way to make sure you never miss
                                                                                                              Selected video
     Give shoppers the best deals                          a customer: Launched in the US, hukkster is        Lemonade Vending Machines Base
                                                           a free web browser add-on which enables            Pricing on Outside Temperature
     with variable pricing or price                        users to bookmark – or ‘hukk’ – any products
     comparisons – instantly                               they see online that they want to buy but
                                                           can’t afford at the current price tag. Users
                                                           can set the cost they would be willing to pay
                                                           for the item, and if the price drops below
                                                           that threshold (either through a sale or as
                                                           part of a discount offer), hukkster automati-
                                                           cally sends out a notification.
                                                           2.We all know the weather can change de-
                                                           mand for drinks so: temperature-sensitive                    How do you see it?
                                                           vending machines for Coca-Cola’s Limon &                     Share your view and join in
                                                           Nada lemonade beverage brand were in-                        the discussion!
                                                           stalled across Spain. Machines with integrated
      With information technology it is perfectly                                                                 Do you have a system of variable pricing or
                                                           thermometers were placed in traditional sum-
                                                                                                                        price comparisons? Share it with us.
      possible to gauge supply and demand, re-             mertime locations such as water or theme
      sponding by driving profits at busy times and        parks, with the temperature shown on a large                        Post your answer
      sustaining turnover when things go quiet.            display. Cans were priced at EUR 2 each when                                 4here
                                                           the temperature was below 25°C; at EUR 1.40
      Know what shoppers are looking for and you           for temperatures of 26-29°C, and EUR 1 when
      are half way there – so help them by finding         it was over 30°C.
      the best deals. And this does not necessarily
                                                           4More links on trendwatching
      mean permanently reducing margins, it is
      about making sales when you would other-
      wise not – it’s called supply and demand!




     Trend 2:                                              Selected links
                                                           1. Here is an interesting example from South
                                                                                                              Selected video
     Encourage your customers to                           Korea: Clinique introduced its Experience Bar      Househunter Test-Drive
                                                           at the Lotte Department Jamsil store in Seoul.
     choose your products or                               The retail counters feature sensory-themed
                                                           product displays with music and perfume dis-
     experience them first.                                pensers, and offer bespoke consultation serv-
                                                           ices. Equipped with Clinique’s Skin Diagnostic
                                                           Tool, iPads enable shoppers to access skin-
                                                           care information, and find out which products
                                                           would suit them. The Experience Bar service
                                                           is also available in New York.
                                                           2. And here is an idea that groups products
                                                           by colour, not brand: the LuxeFinds Color                   How do you see it?
                                                           Shopping Engine is a free mobile app that                    Share your view and join in
                                                           lets shoppers search by any colour for a va-                 the discussion!
                                                           riety of home decor, apparel, accessories
                                                                                                              How does YOUR business use IT to engage with
                                                           and other items. They use the app by either
      With ever more competition for customers,                                                                                           your customers?
                                                           by clicking on a tonal colour wheel or by
      retailers and shopping centres are finding           snapping a photo of a shade they hope to                            Post your answer
      ever-more sophisticated ways of attracting           match. When they find something they like,                                   4here
      AND KEEPING their customers. Unlike the              users can share this with friends via text,
      office or workplace, shopping centres are one        email, pin, post or tweet.
      of the places people are not paid to go to for       4More links on trendwatching
      shopping. Information technology gives you
      opportunities to track down those customers,
      give them a shopping experience they will
      enjoy and you can profit from the experience
      by attracting them time and again.




      *Source: trendwatching.com a London-based, independent trend firm, scans the globe for the most promising consumer trends, insights
      and related hands-on business ideas. Its free monthly Trend Briefings get sent to more than 160,000 business professionals in 180+ countries.”
MORE8_V1_Mise en page 1 04/12/12 13:53 Page4




        more
                                                                                                                                    Follow us on
                       by

     every 2 months: 1 consumer trend briefing • 4 retail real estate player’s viewpoints • online follow-up


     Trend 3:                                                                       Selected links
                                                                                    1. Here is the perfect solution to driving sales even
                                                                                                                                              Selected video
     Go that extra mile to serve your                                               if your customers cannot carry what they are buy-         IKEA Lounge at Roissy-
                                                                                    ing. Launched by Korean convenience store chain           Charles de Gaulle airport
     customers – be truly servile                                                   GS25, My Refrigerator is a free mobile app allow-
                                                                                    ing shoppers to purchase promotional deals and
                                                                                    collect them at a later date.
                                                                                    2. Or how about taking the shop to your cus-
                                                                                    tomers, even when they are going on holiday?
                                                                                    IKEA opened a pop-up showroom at the Roissy-
                                                                                    Charles de Gaulle airport in Paris. The 220-square
                                                                                    metre space featured nine differently rooms, and
                                                                                    passengers could take naps on the beds, watch
                                                                                    television or relax on sofas. The space also had a                     How do you see it?
                                                                                    supervised play area for kids.                                       Share your view and join in
                                                                                    3. And what if your customers could try your prod-                   the discussion!
      This edition of More VISION is all about beating                              ucts online before they buy? Marks and Spencer’s             Have you received particularly good service?
      recessionary forces by focussing on customer                                  Virtual Manicure is a free online service which en-                              Share your experience.
      needs. And it is creating needs that your cus-                                ables customers to test the UK retailer's nail polish
                                                                                    range on their own hands. Shoppers can upload                                Post your answer
      tomers don’t even know they want that can get
                                                                                    an image of their hands (or choose a similar one                                      4here
      best results. That is true marketing, studying the
                                                                                    from a selection) and then click on a nail colour to
      market and predicting trends. These examples                                  see what it would look like, before clicking to pur-
      show how retailers have thought about the                                     chase the product if they wish.
      whole retail process, looked for gaps and filled                              4More links on trendwatching
      them, creating need where it didn’t even exist.




     Trend 4:                                                                       Selected links                                            Selected video
                                                                                    1. Now we are not allowed to make comment
     Make your offer more                                                           on the ability of women drivers, but: Lotte shop-          Ladies parking at shopping malls
     attractive to women (or men!)                                                  ping mall in China's Tianjin province introduced
                                                                                    parking spaces designed for women. The un-
                                                                                    derground parking area is for use by women
                                                                                    only, and features extra-wide parking bays, fe-
                                                                                    male parking attendants and hazard bumpers
                                                                                    (to ensure that women can park easily), as well
                                                                                    as pink signage and female-friendly décor.
                                                                                    2. And here is one for the male shopper: the                         How do you see it?
                                                                                    Christian Louboutin men's store offers the
                                                              Photo: Eric Laignel




                                                                                    French brand's ranges of shoes and accessories                       Share your view and join in
                                                                                    in a retail space designed to appeal to male cus-                    the discussion!
                                                                                    tomers. The store's interior features leather pan-      Tell us what you would want in a shopping centre ...
                                                                                    elling and industrial-style decorative accents,
      It is not politically correct in any way to say this,                         while a 'tattoo parlour' space allows shoppers to                            Post your answer
      but women and men are different. They have                                    have images of their own tattoos embroidered                                          4here
                                                                                    onto any pair of Louboutin shoes.
      different skills, needs and wants. In an age when
      it seems that women and men are assumed to                                    3. Here is an example that matches fashion to
                                                                                    cities: French apparel retailer Pimkie launched
      have the same needs, there are opportunities to                               Color Forecast, a website that provides live up-
      drive retail sales through direct targeting at                                dates of trending colours in Europe's "most
      females or males. These are examples of offers                                fashionable cities". High-definition cameras
      made specifically for women or men –                                          were set up in Milan, Paris, and Antwerp, filming
      recognising those differences.                                                people on the streets, and analyzing the most
                                                                                    worn colours in real-time. Pimkie also provides
                                                                                    suggestions of apparel available to buy online
                                                                                    matching each city's trending shade.
                                                                                    4More links on trendwatching




      *Source: trendwatching.com a London-based, independent trend firm, scans the globe for the most promising consumer trends, insights
      and related hands-on business ideas. Its free monthly Trend Briefings get sent to more than 160,000 business professionals in 180+ countries.”
MORE8_V1_Mise en page 1 04/12/12 13:53 Page5




        more
                                                                                          Follow us on
                    by

     every 2 months: 1 consumer trend briefing • 4 retail real estate player’s viewpoints • online follow-up

     Interview 1                     Mr McNamara talks about the innovations at         “Well today you can use our mobile phone app
     Mike McNamara, CIO,             Tesco that will help customers get through         to scan a bar code of a product and add it to
     Tesco plc                       their shopping faster by integrating the best of   your virtual shopping list or your online order.
                                     Bricks and Mortar shopping with the conven-        Tomorrow you will simply take a photo of it.
                                     ience of Online.                                   Can you imagine opening up your fridge door
                                     “One of the great things about my job is that      simply holding up your camera. It recognises
                                     I get to work with loads of creative people to     the content and hey presto they are all added
                                     figure out how we can use technology to            to your virtual basket.
                                     make our customers shopping trip of the fu-        “In the future the Smartphone will be your
                                     ture easier and quicker and even more fun and      Club Card, your shopping list, your wallet and
                                     enjoyable. Some of the innovations we are          even your own personal till. As a customer
                                     working on like interactive screens and the        you will come into our store, you will connect
                                     micro home delivery. Interactive screens           with our WiFi and you may even get a per-
                                     might sound like something straight out of a       sonalised greeting informing you that your
                                     minority report, but we are not that far away.     click and collect orders will be waiting for you
                                     Our customer of the future is going to go into     when you leave or maybe even that there is
                                     one of our cafes and put down her iphone onto      a personalised promotion exclusive to you.
                                     a digital table and it will recognise who she is   You will use your mobile phone to scan as
                                     and maybe give her trailers from Blinkbox or       you go. When you get to the checkout it’ll be
                                     recipe based on her shopping list.                 simple, it will be reduced to a couple of taps
                                     “When I’m making something like say,               and bye bye paper receipts, we are going to
           @TescoMedia               Chicken with Tarragon, I always forget either      email you your receipt from hereon in. It will
                                     the chicken or the tarragon! Micro home deliv-     be quicker to checkout, no more queues. The
                                     ery would be a service that will save my life in   pace of change is blistering and none of
                                     those instances. In the future, our customer       these innovations is that far-fetched or that
                                     who is baking a cake and forgets the flour, a      far into the future.”
                                     couple of clicks later and within the hour and     Transcribed from an online interview with kind
                                     it’s delivered to her home.                        permission from Tesco plc.



     Interview 2                      Mr. Cottingham talks about going the extra        wards brands they trust, and the challenge
     Phil Cottingham,                 mile…                                             for developers is to create an environment
     Head of Retail, Quintain         “Given the current trading conditions in most     befitting these brands and a more fulfilling
                                      European markets it is increasingly important     and enjoyable experience for the shopper.
                                      that developers create an environment which       “The leading outlet centres have increasingly
                                      is attractive to consumers and in which retail-   become more holistic retail and leisure des-
                                      ers can thrive.                                   tinations. Restaurants, bars and leisure facil-
                                      “The starting point has to be: what do shop-      ities such as cinemas have become a key
                                      pers want? Fashion magazine Drapers re-           element of many schemes. At LDO, we will
                                      cently polled 2,000 consumers on what they        have a range of bars and restaurants and a
                                      want and don't want when shopping. Across         nine-screen cinema, which together will
                                      the sample, product ‘quality’ and ‘price’ were    mean shopper dwell time is increased and
                                      identified as the most important factors          with it, customer spend. However, one of
                                      when deciding where to shop, closely fol-         LDO’s key differentiators is that it is located
                                      lowed by ‘value’. Indeed, research into cus-      between one of the world’s most iconic
                                      tomer needs and wants has become the holy         sports arenas, Wembley Stadium, and one of
                                      grail in respect of creating a viable and suc-    the UK’s premier entertainment venues,
                                      cessful retail development in any geographi-      Wembley Arena, which between them at-
                                      cal location.                                     tract millions of visitors every year. These el-
                                      “Over the past ten years the outlet centre mar-   ements will ensure a high level of footfall, not
                                      ket has grown significantly. There are now 200    just from event-goers and tourists, but the
                                      centres operating across Europe, with a further   local catchment as well.
                                      50 in various stages of development, including    “The combination of strong leisure attractions
            @QuintainPlc              our own London Designer Outlet (LDO) at           is a vital ingredient in helping developers de-
                                      Wembley – London’s first outlet centre.           liver a mixed-use scheme that in turn enables
                                      “Consumers are continuing to gravitate to-        retailers to achieve significant sales growth.”
MORE8_V1_Mise en page 1 04/12/12 13:54 Page6




        more
                                                                                            Follow us on
                    by

     every 2 months: 1 consumer trend briefing • 4 retail real estate player’s viewpoints • online follow-up

     Interview 3:                    How is Printemps attracting shoppers                How to you see luxury department
     Stephane Moise, Head of         when the economic situation is hard for             stores such as yours continuing to com-
     Real Estate, Printemps          everyone?                                           pete against online retailers?
                                     One word could qualify our way of attracting        The major difference between online retail-
                                     our customers. This word is “Uniqueness”        .   ers and our department stores, is really the
                                     What we are trying to create for our cus-           unique shopping experience we create for
                                     tomers is a unique shopping experience in           our customers.
                                     our department stores, with a mix of 3 major        With the web, you won’t get a personalised
                                     elements:                                           shopping experience. New concepts like
                                     A specific concept in terms of architecture,        our “Belle Parfumerie” with perfume cre-
                                                                                                                  ,
                                     with our flagships in Paris built in 1865 and       ators that will allow you to realise your
                                     1924                                                “made for you perfume” or “Denim Bar”       ,
                                     Particular attention to our services towards        that offers all colours, shapes and types of
                                     our customers worldwide, coming from                jeans, are specific concepts that are very
                                     Asia, Middle East, Americas and Europe              difficult or impossible to offer online.
                                     The best offer in terms of ‘Savoir-Faire’, in all   As a second example, specific events cre-
                                     departments, Fashion, Beauty, Acces-                ated: A wonderful pop-up store with Louis
                                     sories,…                                            Vuitton and the artist “Yayoi Kusama” in our
                                     We have been implementing this strategy             store in Haussmann, or specific partnership
                                     in our department stores since 2006 and it          with “la Maison Dior” for our Christmas
            @Printemps               is becoming a success, always being trendy          decorations. These are events that should
                                     and answering our customers wishes with             be lived in our stores and it is hard to get
                                     our unique concept.                                 those unique emotions on the web.




     Interview 4                    Mr. Mollé, as our guest interviewee, sums            help build loyalty without impacting the
     Paul Mollé, Managing Director, up his view of the retail economy in No-             long-term revenues or dilute the brand
     Design International           vember 2012                                          image. Social networks such as Facebook
                                    “It remains to be seen if the rumours of             or Twitter play an increasing role in this
                                    green shoots in the economy will turn into           area, as they allow the fast dissipation of in-
                                    reality in the short term, but the downturn          formation and speed up the ‘word of
                                    has certainly prompted some interesting ini-         mouth’ advertising.
                                    tiatives in the retail industry that will have a     • Smart owners are also using these tough
                                    lasting impact for years to come.                    times to negotiate advantageous terms with
                                    “Faced with failing shops, reluctant cus-            contractors and tenants to refurbish and im-
                                    tomers and increased costs developers and            prove their centres in time for the upturn. The
                                    centre owners have had to develop innova-            benefits are obvious: Contractors are keen to
                                    tive strategies and new partnerships with            secure work, the centres are not as busy so
                                    their tenants in key areas:                          building work can be more easily accommo-
                                    • Centres are increasingly prepared to offer         dated and tenants are able to obtain im-
                                    short-term rentals and we are seeing an in-          proved outlets on their current leases.
                                    creasing number of pop-up shops being de-            • And those developers and funders with
                                    ployed to maximise occupancy and keep                deep pockets are taking advantage of the
                                    customer interest alive. Pop-up shops are            slump in property prices to purchase poten-
                                    frequently used by major retail brands to            tially valuable parcels of land to bank for fu-
                                    maximise their exposure while start up retail-       ture development in more favourable times.
                                    ers are happy to reduce their risk with short        “The survivors of this recession will be those
                                    leases which fill space and are an advantage         centres that were well designed in the first
                                    to both the centre owner and the tenant.             place, have the right mix of retailers and are
                                    • Special events and promotions in cooper-           operated by owners that are prepared to
                                    ation with the tenants are used to tempt             partner with their tenants in trying innovative
                                    shoppers to spend longer in the centre and           approaches to retain their customer loyalty.  ”
MORE8_V1_Mise en page 1 04/12/12 13:54 Page7




                                                                                                                             more
                                                                                                                                                                                                             Join us at MAPIC 2013 :
                                                                                                                                                                                                             13-15 November,
                                                                                                                                                                     by                                      Palais des Festivals, Cannes, France




                                                                                                                                                              Every two months, More VISION newsletter introduces a new
                                                                                                                                                              trend that is influencing retail property strategy.


                                                                                                                           Previous More VISION newsletter                                                                                                                                         more
                                                                                                                           editions covered topics such as:                                                                                                                                                                                                  by

                                                                                                                           #1 What is your retail social media
                                                                                                                              strategy?                                                                                                                                                                                                          #1


                                                                                                                                                                                                                                                                                                                                                                                                                                                   #2
                                                                                                                           #2 Why retail must reach out to
                                                                                                                              Citysumers
                                                                                                                                                                                                                                                                                                                            #3


                                                                                                                           #3 Culture, leisure: traffic generator?
                                                                                                                           #4 What’s in store for 2012?
MAPIC ® is a registered trademark of Reed MIDEM - All rights reserved - Reed MIDEM, a member of Reed Exhibitions, © 2012




                                                                                                                                                                                                                                                                                                                                                                                                                                                #4



                                                                                                                           #5 Retail in motion
                                                                                                                           #6 Staying top of the pop-ups                                                                                                                                                                                         #5



                                                                                                                           #7 The human touch in a world of
                                                                                                                              screen culture
                                                                                                                                                                                                                                                                                                                                                                                                                                   MORE+
                                                                                                                                                                                                                                                                                                                                                                                                                                           Vision n
                                                                                                                                                                                                                                                                                                                                                                                                                                   June 20          °6
                                                                                                                                                                                                                                                                                                                                                                                                                                          12
                                                                                                                                                                                                                                                                                                                                                                                     Vision b
                                                                                                                                                                                                                                                                                                                                                                                             y
                                                                                                                                                                                                                                                                                                                                                                                                                                                   #6
                                                                                                                                                                                                                                                                                                                       ith
                                                                                                                                                                                                                                                                                                                         t
                                                                                                                                                                                                                                                                                                                         th                                       r trend b
                                                                                                                                                                                                                                                                                                                rship wi                                                   riefing •

                                                                                                                                                                                                                                                                                                                                    #7
                                                                                                                                                                                                                                                                                                                                                                                     4 retail re
                                                                                                                                                                                                                                                                                                   In partne                                                                                    al estate
                                                                                                                                                                                                                                                                                                                                                                                                      a playe
                                                                                                                                                                                                                                                                                                                                                                                                             r’s viewp
                                                                                                                                                                                                                                                                                                                                                                                                                      oints • o
                                                                                                                                                                                                                                                                                                                                                                                                                               nline foll
                                                                                                                                                                                                                                                                                                                                                                                                                                         ow-up




                                                                                                                                                                                                         more                                                                                                       ow- p
                                                                                                                                                                                                                                                                                                                  llow u



                                                                                                                           Accessible on our blog
                                                                                                                                                                                                                                                                                                            lin fo
                                                                                                                                                                                                                                                                                                          onl e
                                                                                                                                                                                                                                                                                                     in •
                                                                                                                                                                                                                                                                                                    oints
                                                                                                                                                                                                                                                                                            ’s viewp
                                                                                                                                                                                                                                                                                      player
                                                                                                                                                                                                                                          by                     retail
                                                                                                                                                                                                                                                                        real   estate
                                                                                                                                                                                                                                                        g•4
                                                                                                                                                                                                                                       end       briefin
                                                                                                                                                                                                                                                  ri
                                                                                                                                                                                                                                 mer tr
                                                                                                                                                                                                                            consu
                                                                                                                                                                                                                     t s: 1
                                                                                                                                                                                                                     th
                                                                                                                                                                                                                2 mon
                                                                                                                                                                                                          every




                                                                                                                                                                                                                                                                                                                                                                      concepts
                                                                                                                                                                                                                                                                                                                                                                  be here            have ce
                                                                                                                                                                                                                                                                                                                                                                            e tod            rtainly p
                                                                                                                                                                                                                                                                                                                                                                  dentified ay, gone tomorro roven
                                                                                                                                                                                                                                                                                                                                                                                ba
                                                                                                                                                                                                                                                                                                                                                                   of tempo ck in late 2003, p , the
                                                                                                                                                                                                                                                                                                                                                                                ra
                                                                                                                                                                                                                                                                                                                                                                  The pop ry installation to a p-up
                                                                                                                                                                                                                                                                                                                                                                  Th
                                                                                                                                                                                                                                                                                                                                                                                                    ow
                                                                                                                                                                                                                                                                                                                                                                                                      o   Inside
                                                                                                                                                                                                                                                                                                                                                                               -up                   fixt
                                                                                                                                                                                                                                                                                                                                                                     retail, thr mantra now inc ure • The trend br
                                                                                                                                                                                                                                                                                                                                                                                                                 e
                                                                                                                                                                                                                                                                                                                                                                                 o                    lu                 iefing
                                                                                                                                                                                                                                                                                                                                                                  a wide va ugh to the first p des • Intervie
                                                                                                                                                                                                                                                                                                                                                                                riet                op-u           ws:
                                                                                                                                                                                                                                                                                                                                                                      surprise, y of temporary br p        Marks &
                                                                                                                                                                                                                                                                                                                                                                                                       a
                                                                                                                                                                                                                                                                                                                                                                     inment, l urgency, and m nd           AMF Fas
                                                                                                                                                                                                                                                                                                                                                                                                                    Spencer
                                                                                                                                                                                                                                                                                                                                                                                odging a
                                                                                                                                                                                                                                                                                                                                                                                          nd exhib ust-
                                                                                                                                                                                                                                                                                                                                                                                                h iting.
                                                                                                                                                                                                                                                                                                                                                                                                                   tigheter
                                                                                                                                                                                                                                                                                                                                                                  chnologi                                My Pop
                                                                                                                                                                                                                                                                                                                                                                                                                 Up Store
                                                                                                                                                                                                                                                                                                                                                                               cal
                                                                                                                                                                                                                                                                                                                                                                    ience wi innovation and h             Cushma
                                                                                                                                                                                                                                                                                                                                                                                th                    av         n & Wak

                                                                                                                                                                                                                                                                                                                             Inside
                                                                                                                                                                                                                                                                                                                                                                   een use soci ally respons e                            efield
                                                                                                                                                                                                                                                                                                                         how                                                    d                    ib
                                                                                                                                                                                                                                                                                                             online, E N
                                                                                                                                                                                                                                                                                                                 l                                                ems, pro to help regenera le
                                                                                                                                                                                                                                                                                                  y i g
                                                                                                                                                                                                                                                                                                 rythin d SCREE                                   briefing                    ovidi                  ate
                                                                                                                                                                                                                                                                                       ve eve               an                            trend                      services ng as they do qui
                                                                                                                                                                                                                                                                               ld mo AN TOUCH                                      • The                                         to a loca            ck
                                                                                                                                                                                                                                                                  p rty
                                                                                                                                                                                                                                                                          worl        M                                                      iews:                                        tion.
                                                                                                                                                                                                                                                             prope en THE HU                                                 to       Interv                      hat we



                                                                                                                                                        Next More VISION issue:                                                                    retail                                                    te possitively us •
                                                                                                                                                                                                                                                                                                                      iti                   IEL &
                                                                                                                                                                                                                                                                                                                                                  POW                           ha
                                                                                                                                                                                                                                                                                                                                                                    n street ve restricted ou
                                                                                                                                                                                                                                            d the              betwe                                 ntr u
                                                                                                                                                                                                                                                                                                 contrib act, show
                                                                                                                                                                                                                                                                                                                                       DALZ                                       a                    r
                                                                                                                                                                                                                                   ers an
                                                                                                                                                                                                                            retaile i tain a ba
                                                                                                                                                                                                                                                    lance
                                                                                                                                                                                                                                                                                     ies that onality. In f at least for
                                                                                                                                                                                                                                                                                     i                  ty                              GALAE
                                                                                                                                                                                                                                                                                                                                                                   f you who nd public realm
                                                                                                                                                                                                                         As                                                        n
                                                                                                                                                                                                                                                                                  an                                                                                              s
                                                                                                                                                                                                                                 ma ain                                   comp              ers                 or                             O                  her with k hared with ‘MOR
                                                                                                                                                                                                                         do we RE?                                 brace           ome p t i bigger
                                                                                                                                                                                                                                                                                   o                                                    INVALI                                   ey                  E
                                                                                                                                                                                                                                                           rs em just have s something al.
                                                                                                                                                                                                                                                                                                                                                       CA
                                                                                                                                                                                                                                   RE                                                                                                            AMERI                MORE V data, useful links
                                                                                                                                                                                                                          CULT TU                 sume ing or u
                                                                                                                                                                                                                                                                             part of transaction    ti                      , fun,       BALTIC
                                                                                                                                                                                                                                                                                                                                            L                                    ision.
                                                                                                                                                                                                                                        that con         ethin
                                                                                                                                                                                                                                                          t                                                           o st
                                                                                                                                                                                                                                                                                                                   hones MA
                                                                                                                                                                                                                                                                  e feel si pl tr
                                                                                                                                                                                                                             e know tand for somldn’t like to than simply                                  open, he HUMAN
                                                                                                                                                                                                                          W
                                                                                                                                                                                                                                 ty, s who woul        u            ther th                       light, e to th
                                                                                                                                                                                                                                                                                                    gh ht
                                                                                                                                                                                                                           societ                          ble, rat                      a new            om
                                                                                                                                                                                                                                    o er          njjoyab
                                                                                                                                                                                                                                                             l                itself in arms. Welc



                                                                                                                                                                      January 2013
                                                                                                                                                                                                                                    om
                                                                                                                                                                                                                            a cust g to be en                          show          en                                        t us,
                                                                                                                                                                                                                                                                                                                               to
                                                                                                                                                                                                                            shopp
                                                                                                                                                                                                                                     in
                                                                                                                                                                                                                                     i                     that can d with op
                                                                                                                                                                                                                                                            h
                                                                                                                                                                                                                                                            hat               t                                       : ubiquii
                                                                                                                                                                                                                                               erience is welcome
                                                                                                                                                                                                                                                ri n                                                      U LTURE (via touch
                                                                                                                                                                                                                                       ail exp                                                REEN
                                                                                                                                                                                                                                                                                                        CU
                                                                                                                                                                                                                                                                                                                n ti
                                                                                                                                                                                                                                                                                                               intuiitive       eyond
                                                                                                                                                                                                                             Any ret rthy, reactive  i
                                                                                                                                                                                                                                                                                   rds SC active and g that lies b
                                                                                                                                                                                                                              tru wo
                                                                                                                                                                                                                              trustw
                                                                                                                                                                                                                               r                                           r towa        inter
                                                                                                                                                                                                                                                                                          n
                                                                                                                                                                                                                                                                                                  ti           n
                                                                                                                                                                                                                                                                                                         nythiin
                                                                                                                                                                                                                                   UCH.                   a shiifft furthe ays on; g and anyt ud’).
                                                                                                                                                                                                                               TOU                                        alw           t iin
                                                                                                                                                                                                                                               seeing cheap and to everyth ingly, ‘the clo             th                         n ain
                                                                                                                                                                                                                                                                                                                              maint
                                                                                                                                                                                                                                         e are           ,                    o v          si                          e and
                                                                                                                                                                                                                                But w technology ) an interface d, increas
                                                                                                                                                                                                                                                                   int r an                                elp creat
                                                                                                                                                                                                                                            e
                                                                                                                                                                                                                                                    b ts); b
                                                                                                                                                                                                                                                         ts
                                                                                                                                                                                                                                 mobile s and tabllet mobiile web                                 can h
                                                                                                                                                                                                                                                                                         ul e success.
                                                                                                                                                                                                                                                                                       cultur
                                                                                                                                                                                                                                 screen een (via the   th                      creen          retail
                                                                                                                                                                                                                                                                        ho s

                                                                                                                                           Register here if you wish to be notified                                               the sc
                                                                                                                                                                                                                                   In
                                                                                                                                                                                                                                        scr


                                                                                                                                                                                                                                    the hu
                                                                                                                                                                                                                                          i su
                                                                                                                                                                                                                                       this is n touch - ju
                                                                                                                                                                                                                                             ma
                                                                                                                                                                                                                                                               look
                                                                                                                                                                                                                                                e we will ust one wa
                                                                                                                                                                                                                                                                     at how to ensure
                                                                                                                                                                                                                                                                             y


                                                                                                                                                                                                                                                                                     Follow
                                                                                                                                                                                                                                                                                                us on




                                                                                                                           Contacts                                               Credits
                                                                                                                           Any questions on MORE+ Vision,                         Contributors: Peter Clucas • Jean-Marc André
                                                                                                                           please contact Editor: jean-marc.andre@reedmidem.com   Acknowledgement: MORE+ Vision wishes to thank the interviewees for their kind participation
                                                                                                                                                                                  Design: Frédéric Beauseigneur – Reed MIDEM Publishing Dept.
                                                                                                                           Want to advertise in MORE+ Vision,                     Sources: “trendwatching.com, a London-based, independent trend firm, scans the globe for the most
                                                                                                                                                                                  promising consumer trends, insights and related hands-on business ideas. Its free monthly Trend
                                                                                                                           please contact iris.terre@reedmidem.com                Briefings get sent to more than 160,000 business professionals in 180+ countries”

MORE Vision 8: Crisis & Retail Consumption

  • 1.
    MORE8_V1_Mise en page1 04/12/12 13:53 Page1 more # In partnership with 8 Dec. 2012 by every 2 months: 1 consumer trend briefing • 4 retail real estate player’s viewpoints • online follow-up Crisis and retail ©iStockphoto.com/Anastasia Pelikh consumption Retailers and shopping centre operators have risen to the economic challenges that have affected the world. Even more inventive than ever, they are constantly embracing new technologies and services. Shoppers are being attracted in new Inside ways as pricing and retail become more about being smart, fun or just in time. • The trend briefing With the mighty Tesco having reduced its profits for the first time in 18 years, • Interviews: albeit to a still impressive £1.7 billion (2.12 billion Euro), times are changing. TESCO PLC Shoppers have always been concerned with price, but with new technologies QUINTAIN and services, attitudes to pricing have become ever more complex. Shopping PRINTEMPS can be done for longer, in more places and in more ways. “The pace of change of technology is blistering” said Mike McNamara, Chief Information DESIGN INTERNATIONAL Officer at Tesco. More Vision 8 looks at the latest trends in consumer attraction and retention, driving revenue through interaction, games, variable pricing, instant discounts and much more ... competitive, complex and compelling. It’s not about telling your customers that you are important, and they can have a slice of you if they pay for it. Instead, it’s about telling customers: “Whatever you need or want, we’re here to help” (or even better, “We know what you want, here, we’ve already done it for you”). It’s about being SERVILE … Follow us on
  • 2.
    MORE8_V1_Mise en page1 04/12/12 13:53 Page2 more Follow us on by every 2 months: 1 consumer trend briefing • 4 retail real estate player’s viewpoints • online follow-up So what is SERVILE all about? Put simply, servile companies always put themselves second. For most shopping centres or retailers this means a radical change in mindset, for some the idea that their customers could dictate how, what and where they trade would not come naturally, being more used to dictating these things. We all know that convenience has always been important but shoppers are now being offered levels of convenience that they could not have dreamt of a few years ago. Retailers are keeping ahead of their shoppers through online technology and SERVILE BRANDS. Yes, shoppers are more demanding, time-starved, informed, and choice-saturated than ever-before (we know you know). For shopping centres and retail to prosper, the solution is simple though: turn SERVILE. This goes far beyond offering great customer service. SERVILE means turning your shopping centre or store into a lifestyle servant focused on catering to the needs, desires and whims of your customers, wherever and whenever they are. For marketers, SERVILE means thinking about creating marketing that isn’t marketing. If consumers aren’t searching for, adopting, installing, or sharing your efforts (in whatever form: product, service, app, content etc.), then you need to get back to the drawing board. Now! So here are four SERVILE trends to drive customers towards your shopping centre or store: 1. Give shoppers the best deals with variable pricing or price comparisons – instantly 2. Encourage your customers to choose your products or experience them first 3. Go that extra mile to serve your customers – be truly servile 4. Make your offer more attractive to women (or men!) advertisement www.invalio.com Operational sales and retail solutions A C C E L E R A T I N G S A L E S *Source: trendwatching.com a London-based, independent trend firm, scans the globe for the most promising consumer trends, insights and related hands-on business ideas. Its free monthly Trend Briefings get sent to more than 160,000 business professionals in 180+ countries.”
  • 3.
    MORE8_V1_Mise en page1 04/12/12 13:53 Page3 more Follow us on by every 2 months: 1 consumer trend briefing • 4 retail real estate player’s viewpoints • online follow-up Trend 1: Selected links 1. Here is a way to make sure you never miss Selected video Give shoppers the best deals a customer: Launched in the US, hukkster is Lemonade Vending Machines Base a free web browser add-on which enables Pricing on Outside Temperature with variable pricing or price users to bookmark – or ‘hukk’ – any products comparisons – instantly they see online that they want to buy but can’t afford at the current price tag. Users can set the cost they would be willing to pay for the item, and if the price drops below that threshold (either through a sale or as part of a discount offer), hukkster automati- cally sends out a notification. 2.We all know the weather can change de- mand for drinks so: temperature-sensitive How do you see it? vending machines for Coca-Cola’s Limon & Share your view and join in Nada lemonade beverage brand were in- the discussion! stalled across Spain. Machines with integrated With information technology it is perfectly Do you have a system of variable pricing or thermometers were placed in traditional sum- price comparisons? Share it with us. possible to gauge supply and demand, re- mertime locations such as water or theme sponding by driving profits at busy times and parks, with the temperature shown on a large Post your answer sustaining turnover when things go quiet. display. Cans were priced at EUR 2 each when 4here the temperature was below 25°C; at EUR 1.40 Know what shoppers are looking for and you for temperatures of 26-29°C, and EUR 1 when are half way there – so help them by finding it was over 30°C. the best deals. And this does not necessarily 4More links on trendwatching mean permanently reducing margins, it is about making sales when you would other- wise not – it’s called supply and demand! Trend 2: Selected links 1. Here is an interesting example from South Selected video Encourage your customers to Korea: Clinique introduced its Experience Bar Househunter Test-Drive at the Lotte Department Jamsil store in Seoul. choose your products or The retail counters feature sensory-themed product displays with music and perfume dis- experience them first. pensers, and offer bespoke consultation serv- ices. Equipped with Clinique’s Skin Diagnostic Tool, iPads enable shoppers to access skin- care information, and find out which products would suit them. The Experience Bar service is also available in New York. 2. And here is an idea that groups products by colour, not brand: the LuxeFinds Color How do you see it? Shopping Engine is a free mobile app that Share your view and join in lets shoppers search by any colour for a va- the discussion! riety of home decor, apparel, accessories How does YOUR business use IT to engage with and other items. They use the app by either With ever more competition for customers, your customers? by clicking on a tonal colour wheel or by retailers and shopping centres are finding snapping a photo of a shade they hope to Post your answer ever-more sophisticated ways of attracting match. When they find something they like, 4here AND KEEPING their customers. Unlike the users can share this with friends via text, office or workplace, shopping centres are one email, pin, post or tweet. of the places people are not paid to go to for 4More links on trendwatching shopping. Information technology gives you opportunities to track down those customers, give them a shopping experience they will enjoy and you can profit from the experience by attracting them time and again. *Source: trendwatching.com a London-based, independent trend firm, scans the globe for the most promising consumer trends, insights and related hands-on business ideas. Its free monthly Trend Briefings get sent to more than 160,000 business professionals in 180+ countries.”
  • 4.
    MORE8_V1_Mise en page1 04/12/12 13:53 Page4 more Follow us on by every 2 months: 1 consumer trend briefing • 4 retail real estate player’s viewpoints • online follow-up Trend 3: Selected links 1. Here is the perfect solution to driving sales even Selected video Go that extra mile to serve your if your customers cannot carry what they are buy- IKEA Lounge at Roissy- ing. Launched by Korean convenience store chain Charles de Gaulle airport customers – be truly servile GS25, My Refrigerator is a free mobile app allow- ing shoppers to purchase promotional deals and collect them at a later date. 2. Or how about taking the shop to your cus- tomers, even when they are going on holiday? IKEA opened a pop-up showroom at the Roissy- Charles de Gaulle airport in Paris. The 220-square metre space featured nine differently rooms, and passengers could take naps on the beds, watch television or relax on sofas. The space also had a How do you see it? supervised play area for kids. Share your view and join in 3. And what if your customers could try your prod- the discussion! This edition of More VISION is all about beating ucts online before they buy? Marks and Spencer’s Have you received particularly good service? recessionary forces by focussing on customer Virtual Manicure is a free online service which en- Share your experience. needs. And it is creating needs that your cus- ables customers to test the UK retailer's nail polish range on their own hands. Shoppers can upload Post your answer tomers don’t even know they want that can get an image of their hands (or choose a similar one 4here best results. That is true marketing, studying the from a selection) and then click on a nail colour to market and predicting trends. These examples see what it would look like, before clicking to pur- show how retailers have thought about the chase the product if they wish. whole retail process, looked for gaps and filled 4More links on trendwatching them, creating need where it didn’t even exist. Trend 4: Selected links Selected video 1. Now we are not allowed to make comment Make your offer more on the ability of women drivers, but: Lotte shop- Ladies parking at shopping malls attractive to women (or men!) ping mall in China's Tianjin province introduced parking spaces designed for women. The un- derground parking area is for use by women only, and features extra-wide parking bays, fe- male parking attendants and hazard bumpers (to ensure that women can park easily), as well as pink signage and female-friendly décor. 2. And here is one for the male shopper: the How do you see it? Christian Louboutin men's store offers the Photo: Eric Laignel French brand's ranges of shoes and accessories Share your view and join in in a retail space designed to appeal to male cus- the discussion! tomers. The store's interior features leather pan- Tell us what you would want in a shopping centre ... elling and industrial-style decorative accents, It is not politically correct in any way to say this, while a 'tattoo parlour' space allows shoppers to Post your answer but women and men are different. They have have images of their own tattoos embroidered 4here onto any pair of Louboutin shoes. different skills, needs and wants. In an age when it seems that women and men are assumed to 3. Here is an example that matches fashion to cities: French apparel retailer Pimkie launched have the same needs, there are opportunities to Color Forecast, a website that provides live up- drive retail sales through direct targeting at dates of trending colours in Europe's "most females or males. These are examples of offers fashionable cities". High-definition cameras made specifically for women or men – were set up in Milan, Paris, and Antwerp, filming recognising those differences. people on the streets, and analyzing the most worn colours in real-time. Pimkie also provides suggestions of apparel available to buy online matching each city's trending shade. 4More links on trendwatching *Source: trendwatching.com a London-based, independent trend firm, scans the globe for the most promising consumer trends, insights and related hands-on business ideas. Its free monthly Trend Briefings get sent to more than 160,000 business professionals in 180+ countries.”
  • 5.
    MORE8_V1_Mise en page1 04/12/12 13:53 Page5 more Follow us on by every 2 months: 1 consumer trend briefing • 4 retail real estate player’s viewpoints • online follow-up Interview 1 Mr McNamara talks about the innovations at “Well today you can use our mobile phone app Mike McNamara, CIO, Tesco that will help customers get through to scan a bar code of a product and add it to Tesco plc their shopping faster by integrating the best of your virtual shopping list or your online order. Bricks and Mortar shopping with the conven- Tomorrow you will simply take a photo of it. ience of Online. Can you imagine opening up your fridge door “One of the great things about my job is that simply holding up your camera. It recognises I get to work with loads of creative people to the content and hey presto they are all added figure out how we can use technology to to your virtual basket. make our customers shopping trip of the fu- “In the future the Smartphone will be your ture easier and quicker and even more fun and Club Card, your shopping list, your wallet and enjoyable. Some of the innovations we are even your own personal till. As a customer working on like interactive screens and the you will come into our store, you will connect micro home delivery. Interactive screens with our WiFi and you may even get a per- might sound like something straight out of a sonalised greeting informing you that your minority report, but we are not that far away. click and collect orders will be waiting for you Our customer of the future is going to go into when you leave or maybe even that there is one of our cafes and put down her iphone onto a personalised promotion exclusive to you. a digital table and it will recognise who she is You will use your mobile phone to scan as and maybe give her trailers from Blinkbox or you go. When you get to the checkout it’ll be recipe based on her shopping list. simple, it will be reduced to a couple of taps “When I’m making something like say, and bye bye paper receipts, we are going to @TescoMedia Chicken with Tarragon, I always forget either email you your receipt from hereon in. It will the chicken or the tarragon! Micro home deliv- be quicker to checkout, no more queues. The ery would be a service that will save my life in pace of change is blistering and none of those instances. In the future, our customer these innovations is that far-fetched or that who is baking a cake and forgets the flour, a far into the future.” couple of clicks later and within the hour and Transcribed from an online interview with kind it’s delivered to her home. permission from Tesco plc. Interview 2 Mr. Cottingham talks about going the extra wards brands they trust, and the challenge Phil Cottingham, mile… for developers is to create an environment Head of Retail, Quintain “Given the current trading conditions in most befitting these brands and a more fulfilling European markets it is increasingly important and enjoyable experience for the shopper. that developers create an environment which “The leading outlet centres have increasingly is attractive to consumers and in which retail- become more holistic retail and leisure des- ers can thrive. tinations. Restaurants, bars and leisure facil- “The starting point has to be: what do shop- ities such as cinemas have become a key pers want? Fashion magazine Drapers re- element of many schemes. At LDO, we will cently polled 2,000 consumers on what they have a range of bars and restaurants and a want and don't want when shopping. Across nine-screen cinema, which together will the sample, product ‘quality’ and ‘price’ were mean shopper dwell time is increased and identified as the most important factors with it, customer spend. However, one of when deciding where to shop, closely fol- LDO’s key differentiators is that it is located lowed by ‘value’. Indeed, research into cus- between one of the world’s most iconic tomer needs and wants has become the holy sports arenas, Wembley Stadium, and one of grail in respect of creating a viable and suc- the UK’s premier entertainment venues, cessful retail development in any geographi- Wembley Arena, which between them at- cal location. tract millions of visitors every year. These el- “Over the past ten years the outlet centre mar- ements will ensure a high level of footfall, not ket has grown significantly. There are now 200 just from event-goers and tourists, but the centres operating across Europe, with a further local catchment as well. 50 in various stages of development, including “The combination of strong leisure attractions @QuintainPlc our own London Designer Outlet (LDO) at is a vital ingredient in helping developers de- Wembley – London’s first outlet centre. liver a mixed-use scheme that in turn enables “Consumers are continuing to gravitate to- retailers to achieve significant sales growth.”
  • 6.
    MORE8_V1_Mise en page1 04/12/12 13:54 Page6 more Follow us on by every 2 months: 1 consumer trend briefing • 4 retail real estate player’s viewpoints • online follow-up Interview 3: How is Printemps attracting shoppers How to you see luxury department Stephane Moise, Head of when the economic situation is hard for stores such as yours continuing to com- Real Estate, Printemps everyone? pete against online retailers? One word could qualify our way of attracting The major difference between online retail- our customers. This word is “Uniqueness” . ers and our department stores, is really the What we are trying to create for our cus- unique shopping experience we create for tomers is a unique shopping experience in our customers. our department stores, with a mix of 3 major With the web, you won’t get a personalised elements: shopping experience. New concepts like A specific concept in terms of architecture, our “Belle Parfumerie” with perfume cre- , with our flagships in Paris built in 1865 and ators that will allow you to realise your 1924 “made for you perfume” or “Denim Bar” , Particular attention to our services towards that offers all colours, shapes and types of our customers worldwide, coming from jeans, are specific concepts that are very Asia, Middle East, Americas and Europe difficult or impossible to offer online. The best offer in terms of ‘Savoir-Faire’, in all As a second example, specific events cre- departments, Fashion, Beauty, Acces- ated: A wonderful pop-up store with Louis sories,… Vuitton and the artist “Yayoi Kusama” in our We have been implementing this strategy store in Haussmann, or specific partnership in our department stores since 2006 and it with “la Maison Dior” for our Christmas @Printemps is becoming a success, always being trendy decorations. These are events that should and answering our customers wishes with be lived in our stores and it is hard to get our unique concept. those unique emotions on the web. Interview 4 Mr. Mollé, as our guest interviewee, sums help build loyalty without impacting the Paul Mollé, Managing Director, up his view of the retail economy in No- long-term revenues or dilute the brand Design International vember 2012 image. Social networks such as Facebook “It remains to be seen if the rumours of or Twitter play an increasing role in this green shoots in the economy will turn into area, as they allow the fast dissipation of in- reality in the short term, but the downturn formation and speed up the ‘word of has certainly prompted some interesting ini- mouth’ advertising. tiatives in the retail industry that will have a • Smart owners are also using these tough lasting impact for years to come. times to negotiate advantageous terms with “Faced with failing shops, reluctant cus- contractors and tenants to refurbish and im- tomers and increased costs developers and prove their centres in time for the upturn. The centre owners have had to develop innova- benefits are obvious: Contractors are keen to tive strategies and new partnerships with secure work, the centres are not as busy so their tenants in key areas: building work can be more easily accommo- • Centres are increasingly prepared to offer dated and tenants are able to obtain im- short-term rentals and we are seeing an in- proved outlets on their current leases. creasing number of pop-up shops being de- • And those developers and funders with ployed to maximise occupancy and keep deep pockets are taking advantage of the customer interest alive. Pop-up shops are slump in property prices to purchase poten- frequently used by major retail brands to tially valuable parcels of land to bank for fu- maximise their exposure while start up retail- ture development in more favourable times. ers are happy to reduce their risk with short “The survivors of this recession will be those leases which fill space and are an advantage centres that were well designed in the first to both the centre owner and the tenant. place, have the right mix of retailers and are • Special events and promotions in cooper- operated by owners that are prepared to ation with the tenants are used to tempt partner with their tenants in trying innovative shoppers to spend longer in the centre and approaches to retain their customer loyalty. ”
  • 7.
    MORE8_V1_Mise en page1 04/12/12 13:54 Page7 more Join us at MAPIC 2013 : 13-15 November, by Palais des Festivals, Cannes, France Every two months, More VISION newsletter introduces a new trend that is influencing retail property strategy. Previous More VISION newsletter more editions covered topics such as: by #1 What is your retail social media strategy? #1 #2 #2 Why retail must reach out to Citysumers #3 #3 Culture, leisure: traffic generator? #4 What’s in store for 2012? MAPIC ® is a registered trademark of Reed MIDEM - All rights reserved - Reed MIDEM, a member of Reed Exhibitions, © 2012 #4 #5 Retail in motion #6 Staying top of the pop-ups #5 #7 The human touch in a world of screen culture MORE+ Vision n June 20 °6 12 Vision b y #6 ith t th r trend b rship wi riefing • #7 4 retail re In partne al estate a playe r’s viewp oints • o nline foll ow-up more ow- p llow u Accessible on our blog lin fo onl e in • oints ’s viewp player by retail real estate g•4 end briefin ri mer tr consu t s: 1 th 2 mon every concepts be here have ce e tod rtainly p dentified ay, gone tomorro roven ba of tempo ck in late 2003, p , the ra The pop ry installation to a p-up Th ow o Inside -up fixt retail, thr mantra now inc ure • The trend br e o lu iefing a wide va ugh to the first p des • Intervie riet op-u ws: surprise, y of temporary br p Marks & a inment, l urgency, and m nd AMF Fas Spencer odging a nd exhib ust- h iting. tigheter chnologi My Pop Up Store cal ience wi innovation and h Cushma th av n & Wak Inside een use soci ally respons e efield how d ib online, E N l ems, pro to help regenera le y i g rythin d SCREE briefing ovidi ate ve eve an trend services ng as they do qui ld mo AN TOUCH • The to a loca ck p rty worl M iews: tion. prope en THE HU to Interv hat we Next More VISION issue: retail te possitively us • iti IEL & POW ha n street ve restricted ou d the betwe ntr u contrib act, show DALZ a r ers an retaile i tain a ba lance ies that onality. In f at least for i ty GALAE f you who nd public realm As n an s ma ain comp ers or O her with k hared with ‘MOR do we RE? brace ome p t i bigger o INVALI ey E rs em just have s something al. CA RE AMERI MORE V data, useful links CULT TU sume ing or u part of transaction ti , fun, BALTIC L ision. that con ethin t o st hones MA e feel si pl tr e know tand for somldn’t like to than simply open, he HUMAN W ty, s who woul u ther th light, e to th gh ht societ ble, rat a new om o er njjoyab l itself in arms. Welc January 2013 om a cust g to be en show en t us, to shopp in i that can d with op h hat t : ubiquii erience is welcome ri n U LTURE (via touch ail exp REEN CU n ti intuiitive eyond Any ret rthy, reactive i rds SC active and g that lies b tru wo trustw r r towa inter n ti n nythiin UCH. a shiifft furthe ays on; g and anyt ud’). TOU alw t iin seeing cheap and to everyth ingly, ‘the clo th n ain maint e are , o v si e and But w technology ) an interface d, increas int r an elp creat e b ts); b ts mobile s and tabllet mobiile web can h ul e success. cultur screen een (via the th creen retail ho s Register here if you wish to be notified the sc In scr the hu i su this is n touch - ju ma look e we will ust one wa at how to ensure y Follow us on Contacts Credits Any questions on MORE+ Vision, Contributors: Peter Clucas • Jean-Marc André please contact Editor: jean-marc.andre@reedmidem.com Acknowledgement: MORE+ Vision wishes to thank the interviewees for their kind participation Design: Frédéric Beauseigneur – Reed MIDEM Publishing Dept. Want to advertise in MORE+ Vision, Sources: “trendwatching.com, a London-based, independent trend firm, scans the globe for the most promising consumer trends, insights and related hands-on business ideas. Its free monthly Trend please contact iris.terre@reedmidem.com Briefings get sent to more than 160,000 business professionals in 180+ countries”