SlideShare a Scribd company logo
Mohammed Ibrahim Elkhatib
Mechanical Commissioning & Operation and Field Engineer
Nationality : Egyptian.
Date of Birth : 5/10/1991.
Marital status : Married.
Military Status : Completed
Driving license : Private license valid 2024.
Address #1 : Al-fath Mosque, Al-Omraneyah, Giza, Egypt
Address #2 : Bani Mazar City, Al-Minya, Egypt
Tel : (+2)01007094224 & (+2)01113443259
E-mail : mpe.elkhatib@gmail.com
LinkedIn : eg.linkedin.com/in/mohammed-elkhatib
Skype ID : Mpe.elkhatib
Current location : EGYPT / Point of Origin: Egypt
Passport No. : A18727013, valid to 24/2/2023
Objective:
 An active & ambitious career in a position relevant to the fields of Mechanical Power & energy
engineering; Seeking for a career in a well-organized and established organization where I can
develop expertise and analytical skills.
Education:
University Degree : Bachelor of engineering 2014.
University : Minya University.
Faculty : Faculty of Engineering.
Department : Mechanical Power.
Cumulative degree : Good, 70.58%.
Project degree : Excellent, 94%.
Graduation Project : Design of a household refrigerator.
Courses:
 Auto cad 2012, 2D.
 Diploma of HVAC, Firefighting and Plumbing.
 Revit MEP 2016.
 Basic Hydraulic 2013.
 OSHA (Construction Safety).
Training:
 AFC (Abu Qir Fertilizers CO.)
(1st Jul.2012) to (29th Jul.2012)
 DTCGC (Delta Trade and Cotton Ginning CO.)
(1st Aug.2012) to (1st Sept.2012)
 DTCGC (Delta Trade and Cotton Ginning CO.)
(21st Jul.2013) to (15th Aug.2013)
 UEEPC (Upper Egypt Electricity Production CO.)
(17th Aug.2013) to (4th Sept.2013)
Experiences:
 Mechanical Commissioning & Operation and Field Engineer (shift days)
UEEPC (Upper Egypt Electricity Production CO.)
(1st
Apr.2016 until now)
 Working at Elkureimat III power plant
- Elkureimat combined power plant GE module contains (gas turbine GE frame 9FA and steam
turbine Alstom (P320 TGC)).
- Responsible of site components like:-
1- GE Gas turbine frame 9FA and its auxiliary
2- Auxiliaries systems are
2.1- Inlet air system
2.2- GT lube oil system, Combined hydraulic &lift oil system and Trip oil supply
2.3- Fuel purge system, Gas fuel system & liquid fuel system
2.4- Atomizing air system ,Water injection system
2.5- Cooling water system , Cooling and sealing air system
2.6- Generator and Excitation control , Compressor/ Turbine water wash system
3- B.O.P (Balance of plant) contains :
3.1- Closed cooling system (pumps, heat exchangers)
3.2- Instrument and Service compressors and its Air dryer
3.3-Demi water pumps, Service water pumps, Seal water pumps
3.4- Circulating water pumps
3.5- Deals with trash rack, Travelling screen water system
4- Familiar with valves (gate, globe, butterfly and check) and their operation (manual,
motorized and pneumatic)
• Responsible for managing and authorizing the daily LOTO / PTW /TSA
• Permitting. [Lock out - Tag Out / Permit to Work / Task Safety Awareness]
• Responsible for the preparation, organizing, and authorization of the required forms prior the execution of
any activities under the custody and control of the Commissioning Team.
• Responsible for supporting the Commissioning Leads in the preparation and issuing the required
authorizations in a timely manner so as to not delay the planned and or reactive daily activities.
-Working at control programme (mark VIe).
- Attended The (GE) Major Inspection For Gas Turbine (Unit4).
- Attended The (GE) Hot Gas Path Inspection For Gas Turbine (Unit3) And The Update Of The GE Gas
Turbine From Frame 9FA To Frame 9FAe .
 Field Engineer for the CMI HRSG at Elkureimat III and II.
 Deals with DCS (ALSPA P320)
 Working at Elkureimat II power plant
- Elkureimat combined power plant SIEMENS module contains (gas turbine SIEMENS frame
SGT5-4000F).
- Responsible of site components like:-
- Gas turbine SIEMENS frame (SGT5-4000F).
- Working at control programme (T3000).
 Mechanical Project Engineer
NVGC (Nile Valley Gas CO. Once of TAQA Gas group)
(18th Dec.2016) to (1st
June.2018)
- Working at Bani Mazar gas project.
- Responsible of all project parts :
1- Network pipelines welding, testing and construction of city network pipelines.
2- Installing and testing of pipes and fittings at customers' homes.
3- Installing, testing and operating of regulators that regulates pressure from medium
pressure (7 bar) to low pressure (100 mbar).
4- Converting devices from operating with LPG to operate natural gas.
5- Installing of pipeline under Hilton Bridge at Bani Mazar and al-ibrahimia and railway to
connect the east sectors with west sectors by hydraulic auger.
- Completed Ten sectors of Bani Mazar and made them operating with natural gas which service
more than thirty thousand customers.
 Mechanical Technical Engineer
IPI Egypt (Intelligent Power International CO.)
(1st Nov.2016) to (10th Dec.2016)
- Working at control of air conditions to save electrical power consumed.
- Responsible of installing and maintenance of Airco-Delta device that installing with air condition to
save electrical power.
- Installing the Airco -Delta at CIB branches (Al-Sadat, Assuit, Luxor, Aswan, Nabq, and Sharm
Elshikh).
- Making tests for the Airco-Delta for Banque Misr branches (Shoubra and Rod Elfarag) .
Languages:
Arabic : Mother tongue.
English : Very Good command (Written and spoken).
Computer Skills:
 Quick understanding new software due to familiarity with computers.
 Operating systems. (Windows 7, vista, XP, Me, 2000, 98, 95, DOS).
 Proficient user of Microsoft Office applications.
 Excellent knowledge of the Internet.
Personal Skills and Abilities:
 Knowledge of revelent plant equipment and control room operations
 Awareness of HSE and quality standards
 Knowledge of all revelent power plant processes and equipment
 Knowledge of operating systems like DCS,Mark VIe.
 Knowledge of downtime analysis and attention to details
 Knowledge of power operational activities
 Mentoring ,coaching and people management skills
 Hard worker under stress, Self Planning and Time Management.
 Economic feasibility studies, Very quick learner.
 Ability to face & solve problems, the ability to learn new tools.
 Excellent communication skills and work in team.
 Making good presentation of my ideas, Work for long time with high efficiency
Scientific visits:
 Kureimat power plant March 2012
 High dam power plant August 2012
 Aswan I power plant and Aswan II power plant August 2012
 Nage hamadi hydraulic power plant August 2012
 Zafrana renewable energy station April 2013

More Related Content

Similar to Mpe. muhammad elkhatib

ramez_el_sayed_sami_ahmmed_(1) (2)
ramez_el_sayed_sami_ahmmed_(1) (2)ramez_el_sayed_sami_ahmmed_(1) (2)
ramez_el_sayed_sami_ahmmed_(1) (2)ramez El sayed sami
 
mohamed moustafa resume
mohamed moustafa resumemohamed moustafa resume
mohamed moustafa resume
mohamed ahmed
 
Rotating_Equipment_Maintenance_Engineer
Rotating_Equipment_Maintenance_EngineerRotating_Equipment_Maintenance_Engineer
Rotating_Equipment_Maintenance_EngineerAmgad Ismail
 
Islam's CV.pdf
Islam's CV.pdfIslam's CV.pdf
Islam's CV.pdf
IslamAzkoul1
 
Muh.samir mech power engineer
Muh.samir mech power engineerMuh.samir mech power engineer
Muh.samir mech power engineer
Muhammad Samir
 
Magdy hussine cv
Magdy hussine cvMagdy hussine cv
Magdy hussine cv
Magdy Hussine
 
Abdelrazek Kamal Ali C.V
Abdelrazek Kamal  Ali C.VAbdelrazek Kamal  Ali C.V
Abdelrazek Kamal Ali C.V
Abdelrazek Ali
 
Mohamed Ahmed Gado
Mohamed Ahmed GadoMohamed Ahmed Gado
Mohamed Ahmed Gadomohamed Gado
 

Similar to Mpe. muhammad elkhatib (20)

Mohanad 123-4
Mohanad 123-4Mohanad 123-4
Mohanad 123-4
 
ramez_el_sayed_sami_ahmmed_(1) (2)
ramez_el_sayed_sami_ahmmed_(1) (2)ramez_el_sayed_sami_ahmmed_(1) (2)
ramez_el_sayed_sami_ahmmed_(1) (2)
 
mohamed moustafa resume
mohamed moustafa resumemohamed moustafa resume
mohamed moustafa resume
 
khaled cv
khaled cvkhaled cv
khaled cv
 
Rotating_Equipment_Maintenance_Engineer
Rotating_Equipment_Maintenance_EngineerRotating_Equipment_Maintenance_Engineer
Rotating_Equipment_Maintenance_Engineer
 
Ahmed Hussein
Ahmed HusseinAhmed Hussein
Ahmed Hussein
 
Islam's CV.pdf
Islam's CV.pdfIslam's CV.pdf
Islam's CV.pdf
 
Ahmed CV 2016
Ahmed CV 2016Ahmed CV 2016
Ahmed CV 2016
 
Muh.samir mech power engineer
Muh.samir mech power engineerMuh.samir mech power engineer
Muh.samir mech power engineer
 
Mohamed abdulazeem_C V.
Mohamed abdulazeem_C V.Mohamed abdulazeem_C V.
Mohamed abdulazeem_C V.
 
abdelrazek Kamal C.V
abdelrazek Kamal C.Vabdelrazek Kamal C.V
abdelrazek Kamal C.V
 
Magdy hussine cv
Magdy hussine cvMagdy hussine cv
Magdy hussine cv
 
Abdelrazek Kamal Ali C.V
Abdelrazek Kamal  Ali C.VAbdelrazek Kamal  Ali C.V
Abdelrazek Kamal Ali C.V
 
Mohamed Abou Bakr CV
Mohamed Abou Bakr CVMohamed Abou Bakr CV
Mohamed Abou Bakr CV
 
Ahmed El_Nashar
Ahmed El_NasharAhmed El_Nashar
Ahmed El_Nashar
 
ibrahim cv10
ibrahim cv10ibrahim cv10
ibrahim cv10
 
cv-11with photo
cv-11with photocv-11with photo
cv-11with photo
 
Mohamed Ahmed Gado
Mohamed Ahmed GadoMohamed Ahmed Gado
Mohamed Ahmed Gado
 
AHMED SAYED KALIL
AHMED SAYED KALILAHMED SAYED KALIL
AHMED SAYED KALIL
 
c.v. abdooo
c.v. abdoooc.v. abdooo
c.v. abdooo
 

Recently uploaded

DESIGN A COTTON SEED SEPARATION MACHINE.docx
DESIGN A COTTON SEED SEPARATION MACHINE.docxDESIGN A COTTON SEED SEPARATION MACHINE.docx
DESIGN A COTTON SEED SEPARATION MACHINE.docx
FluxPrime1
 
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
bakpo1
 
ethical hacking in wireless-hacking1.ppt
ethical hacking in wireless-hacking1.pptethical hacking in wireless-hacking1.ppt
ethical hacking in wireless-hacking1.ppt
Jayaprasanna4
 
Student information management system project report ii.pdf
Student information management system project report ii.pdfStudent information management system project report ii.pdf
Student information management system project report ii.pdf
Kamal Acharya
 
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdfAKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
SamSarthak3
 
Water Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation and Control Monthly - May 2024.pdfWater Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation & Control
 
block diagram and signal flow graph representation
block diagram and signal flow graph representationblock diagram and signal flow graph representation
block diagram and signal flow graph representation
Divya Somashekar
 
Final project report on grocery store management system..pdf
Final project report on grocery store management system..pdfFinal project report on grocery store management system..pdf
Final project report on grocery store management system..pdf
Kamal Acharya
 
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&BDesign and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
Sreedhar Chowdam
 
Nuclear Power Economics and Structuring 2024
Nuclear Power Economics and Structuring 2024Nuclear Power Economics and Structuring 2024
Nuclear Power Economics and Structuring 2024
Massimo Talia
 
Runway Orientation Based on the Wind Rose Diagram.pptx
Runway Orientation Based on the Wind Rose Diagram.pptxRunway Orientation Based on the Wind Rose Diagram.pptx
Runway Orientation Based on the Wind Rose Diagram.pptx
SupreethSP4
 
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdfTop 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Teleport Manpower Consultant
 
space technology lecture notes on satellite
space technology lecture notes on satellitespace technology lecture notes on satellite
space technology lecture notes on satellite
ongomchris
 
English lab ppt no titlespecENG PPTt.pdf
English lab ppt no titlespecENG PPTt.pdfEnglish lab ppt no titlespecENG PPTt.pdf
English lab ppt no titlespecENG PPTt.pdf
BrazilAccount1
 
Hierarchical Digital Twin of a Naval Power System
Hierarchical Digital Twin of a Naval Power SystemHierarchical Digital Twin of a Naval Power System
Hierarchical Digital Twin of a Naval Power System
Kerry Sado
 
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
Amil Baba Dawood bangali
 
ethical hacking-mobile hacking methods.ppt
ethical hacking-mobile hacking methods.pptethical hacking-mobile hacking methods.ppt
ethical hacking-mobile hacking methods.ppt
Jayaprasanna4
 
weather web application report.pdf
weather web application report.pdfweather web application report.pdf
weather web application report.pdf
Pratik Pawar
 
Planning Of Procurement o different goods and services
Planning Of Procurement o different goods and servicesPlanning Of Procurement o different goods and services
Planning Of Procurement o different goods and services
JoytuBarua2
 
Immunizing Image Classifiers Against Localized Adversary Attacks
Immunizing Image Classifiers Against Localized Adversary AttacksImmunizing Image Classifiers Against Localized Adversary Attacks
Immunizing Image Classifiers Against Localized Adversary Attacks
gerogepatton
 

Recently uploaded (20)

DESIGN A COTTON SEED SEPARATION MACHINE.docx
DESIGN A COTTON SEED SEPARATION MACHINE.docxDESIGN A COTTON SEED SEPARATION MACHINE.docx
DESIGN A COTTON SEED SEPARATION MACHINE.docx
 
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
 
ethical hacking in wireless-hacking1.ppt
ethical hacking in wireless-hacking1.pptethical hacking in wireless-hacking1.ppt
ethical hacking in wireless-hacking1.ppt
 
Student information management system project report ii.pdf
Student information management system project report ii.pdfStudent information management system project report ii.pdf
Student information management system project report ii.pdf
 
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdfAKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
 
Water Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation and Control Monthly - May 2024.pdfWater Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation and Control Monthly - May 2024.pdf
 
block diagram and signal flow graph representation
block diagram and signal flow graph representationblock diagram and signal flow graph representation
block diagram and signal flow graph representation
 
Final project report on grocery store management system..pdf
Final project report on grocery store management system..pdfFinal project report on grocery store management system..pdf
Final project report on grocery store management system..pdf
 
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&BDesign and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
 
Nuclear Power Economics and Structuring 2024
Nuclear Power Economics and Structuring 2024Nuclear Power Economics and Structuring 2024
Nuclear Power Economics and Structuring 2024
 
Runway Orientation Based on the Wind Rose Diagram.pptx
Runway Orientation Based on the Wind Rose Diagram.pptxRunway Orientation Based on the Wind Rose Diagram.pptx
Runway Orientation Based on the Wind Rose Diagram.pptx
 
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdfTop 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
 
space technology lecture notes on satellite
space technology lecture notes on satellitespace technology lecture notes on satellite
space technology lecture notes on satellite
 
English lab ppt no titlespecENG PPTt.pdf
English lab ppt no titlespecENG PPTt.pdfEnglish lab ppt no titlespecENG PPTt.pdf
English lab ppt no titlespecENG PPTt.pdf
 
Hierarchical Digital Twin of a Naval Power System
Hierarchical Digital Twin of a Naval Power SystemHierarchical Digital Twin of a Naval Power System
Hierarchical Digital Twin of a Naval Power System
 
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
 
ethical hacking-mobile hacking methods.ppt
ethical hacking-mobile hacking methods.pptethical hacking-mobile hacking methods.ppt
ethical hacking-mobile hacking methods.ppt
 
weather web application report.pdf
weather web application report.pdfweather web application report.pdf
weather web application report.pdf
 
Planning Of Procurement o different goods and services
Planning Of Procurement o different goods and servicesPlanning Of Procurement o different goods and services
Planning Of Procurement o different goods and services
 
Immunizing Image Classifiers Against Localized Adversary Attacks
Immunizing Image Classifiers Against Localized Adversary AttacksImmunizing Image Classifiers Against Localized Adversary Attacks
Immunizing Image Classifiers Against Localized Adversary Attacks
 

Mpe. muhammad elkhatib

  • 1. Mohammed Ibrahim Elkhatib Mechanical Commissioning & Operation and Field Engineer Nationality : Egyptian. Date of Birth : 5/10/1991. Marital status : Married. Military Status : Completed Driving license : Private license valid 2024. Address #1 : Al-fath Mosque, Al-Omraneyah, Giza, Egypt Address #2 : Bani Mazar City, Al-Minya, Egypt Tel : (+2)01007094224 & (+2)01113443259 E-mail : mpe.elkhatib@gmail.com LinkedIn : eg.linkedin.com/in/mohammed-elkhatib Skype ID : Mpe.elkhatib Current location : EGYPT / Point of Origin: Egypt Passport No. : A18727013, valid to 24/2/2023 Objective:  An active & ambitious career in a position relevant to the fields of Mechanical Power & energy engineering; Seeking for a career in a well-organized and established organization where I can develop expertise and analytical skills. Education: University Degree : Bachelor of engineering 2014. University : Minya University. Faculty : Faculty of Engineering. Department : Mechanical Power. Cumulative degree : Good, 70.58%. Project degree : Excellent, 94%. Graduation Project : Design of a household refrigerator. Courses:  Auto cad 2012, 2D.  Diploma of HVAC, Firefighting and Plumbing.  Revit MEP 2016.  Basic Hydraulic 2013.  OSHA (Construction Safety). Training:  AFC (Abu Qir Fertilizers CO.) (1st Jul.2012) to (29th Jul.2012)  DTCGC (Delta Trade and Cotton Ginning CO.) (1st Aug.2012) to (1st Sept.2012)  DTCGC (Delta Trade and Cotton Ginning CO.) (21st Jul.2013) to (15th Aug.2013)  UEEPC (Upper Egypt Electricity Production CO.) (17th Aug.2013) to (4th Sept.2013)
  • 2. Experiences:  Mechanical Commissioning & Operation and Field Engineer (shift days) UEEPC (Upper Egypt Electricity Production CO.) (1st Apr.2016 until now)  Working at Elkureimat III power plant - Elkureimat combined power plant GE module contains (gas turbine GE frame 9FA and steam turbine Alstom (P320 TGC)). - Responsible of site components like:- 1- GE Gas turbine frame 9FA and its auxiliary 2- Auxiliaries systems are 2.1- Inlet air system 2.2- GT lube oil system, Combined hydraulic &lift oil system and Trip oil supply 2.3- Fuel purge system, Gas fuel system & liquid fuel system 2.4- Atomizing air system ,Water injection system 2.5- Cooling water system , Cooling and sealing air system 2.6- Generator and Excitation control , Compressor/ Turbine water wash system 3- B.O.P (Balance of plant) contains : 3.1- Closed cooling system (pumps, heat exchangers) 3.2- Instrument and Service compressors and its Air dryer 3.3-Demi water pumps, Service water pumps, Seal water pumps 3.4- Circulating water pumps 3.5- Deals with trash rack, Travelling screen water system 4- Familiar with valves (gate, globe, butterfly and check) and their operation (manual, motorized and pneumatic) • Responsible for managing and authorizing the daily LOTO / PTW /TSA • Permitting. [Lock out - Tag Out / Permit to Work / Task Safety Awareness] • Responsible for the preparation, organizing, and authorization of the required forms prior the execution of any activities under the custody and control of the Commissioning Team. • Responsible for supporting the Commissioning Leads in the preparation and issuing the required authorizations in a timely manner so as to not delay the planned and or reactive daily activities. -Working at control programme (mark VIe). - Attended The (GE) Major Inspection For Gas Turbine (Unit4). - Attended The (GE) Hot Gas Path Inspection For Gas Turbine (Unit3) And The Update Of The GE Gas Turbine From Frame 9FA To Frame 9FAe .  Field Engineer for the CMI HRSG at Elkureimat III and II.  Deals with DCS (ALSPA P320)  Working at Elkureimat II power plant - Elkureimat combined power plant SIEMENS module contains (gas turbine SIEMENS frame SGT5-4000F). - Responsible of site components like:- - Gas turbine SIEMENS frame (SGT5-4000F). - Working at control programme (T3000).  Mechanical Project Engineer NVGC (Nile Valley Gas CO. Once of TAQA Gas group) (18th Dec.2016) to (1st June.2018) - Working at Bani Mazar gas project. - Responsible of all project parts : 1- Network pipelines welding, testing and construction of city network pipelines. 2- Installing and testing of pipes and fittings at customers' homes.
  • 3. 3- Installing, testing and operating of regulators that regulates pressure from medium pressure (7 bar) to low pressure (100 mbar). 4- Converting devices from operating with LPG to operate natural gas. 5- Installing of pipeline under Hilton Bridge at Bani Mazar and al-ibrahimia and railway to connect the east sectors with west sectors by hydraulic auger. - Completed Ten sectors of Bani Mazar and made them operating with natural gas which service more than thirty thousand customers.  Mechanical Technical Engineer IPI Egypt (Intelligent Power International CO.) (1st Nov.2016) to (10th Dec.2016) - Working at control of air conditions to save electrical power consumed. - Responsible of installing and maintenance of Airco-Delta device that installing with air condition to save electrical power. - Installing the Airco -Delta at CIB branches (Al-Sadat, Assuit, Luxor, Aswan, Nabq, and Sharm Elshikh). - Making tests for the Airco-Delta for Banque Misr branches (Shoubra and Rod Elfarag) . Languages: Arabic : Mother tongue. English : Very Good command (Written and spoken). Computer Skills:  Quick understanding new software due to familiarity with computers.  Operating systems. (Windows 7, vista, XP, Me, 2000, 98, 95, DOS).  Proficient user of Microsoft Office applications.  Excellent knowledge of the Internet. Personal Skills and Abilities:  Knowledge of revelent plant equipment and control room operations  Awareness of HSE and quality standards  Knowledge of all revelent power plant processes and equipment  Knowledge of operating systems like DCS,Mark VIe.  Knowledge of downtime analysis and attention to details  Knowledge of power operational activities  Mentoring ,coaching and people management skills  Hard worker under stress, Self Planning and Time Management.  Economic feasibility studies, Very quick learner.  Ability to face & solve problems, the ability to learn new tools.  Excellent communication skills and work in team.  Making good presentation of my ideas, Work for long time with high efficiency Scientific visits:  Kureimat power plant March 2012  High dam power plant August 2012  Aswan I power plant and Aswan II power plant August 2012  Nage hamadi hydraulic power plant August 2012  Zafrana renewable energy station April 2013