CHAPTER - I
INTRODUCTION
Introduction to the Topic :
An employee is any person hired by an employer to do a specific set of jobs. In most
modern economies, the term employee refers to a specific defined relationship between an
individual and a corporation, which differs from those of customer or client.
Absenteeism can be defined as the practice or habit of being an absentee and an
absentee is one who habitually stays away from work. Absenteeism is a habitual pattern of
absence from a duty or obligation. The manufacturing industry in India today also is labour
oriented i.e. it depends on the human workforce for its working. Today out of the many problems
faced by the manufacturing industry in India ‘absenteeism’ is one of the major problems which
directly affect the productivity of any manufacturing plant. More the magnitude of absenteeism;
more is the loss of productivity on plant.
There needs to be a proper study to have a check on absenteeism, its causes, types and
remedies. It is often easier for the manufacturing organisations to make arrangement to cover
staffs, which are going to be off for long periods. However, employees taking odd days off here
which become more problematic and can have an immediate impact. If remain unchecked, this
type of absence can send out the wrong signals to colleagues who, in some jobs, are likely to
have to cover for those absent. If employers fail to take action, a bugging turn mentality may
emerge. Frequent absence may have serious repercussions where staff is employed in customer -
facing roles or employed on industrial plant. The impact of absence may be most directly felt and
the need to arrange cover at short notice may be paramount.
This adversely affects the progress of work and loss of resources. Thus, there is a need
for such study in manufacturing industry. Till date a lot of study has been done on absenteeism
in various fields but the irony is that manufacturing/production industry being the most labour
oriented, no such study has been carried out on absenteeism – its causes, types and remedies.
This study focuses on the absenteeism of workforce in the manufacturing industry, along with
the different types and different causes of absenteeism. This study also includes seeking out the
remedial measure of absenteeism in manufacturing sector.
CHAPTER - II
INDUSTRY PROFILE
2.1 Industry profile
The automotive industry is a wide range of companies and organizations involved in the
design, development, manufacturing, marketing, and selling of motor vehicles. The automobiles
sector is divided into four segments – two wheelers (mopeds, scooters, motorcycles, electric two-
wheelers), passenger vehicles (passenger cars, utility vehicles, multi-purpose vehicle),
commercial vehicles (light and medium-heavy vehicles), and three wheelers (passenger carriers
and good carriers).
This industry is one of the world's most important economic sectors by revenue. It also is
one of the key drivers of economic growth of the nation. The world standings for the Indian
automobile sector, as per the Confederation of Indian Industry, are as follows: largest three-
wheeler market, second largest two-wheeler, tenth largest passenger car market, fourth largest
tractor market, fifth largest commercial vehicle market, fifth largest bus and truck segment.
2.1.1 Statistical data of India’s growth in the automobile industry:
Total Production of Automobiles In India (In millions)
FY 15FY 14FY 13FY 12FY 11FY 10FY 09FY 08FY 07FY 06FY 05
Passenger vehicle 3.2 3.1 3.2 3.1 3 2.4 1.8 1.6 1.3 1.3 1.2
Commercial vehicle 0.7 0.7 0.8 0.9 0.8 0.6 0.4 0.6 0.5 0.4 0.4
Three wheelers 0.9 0.8 0.8 0.9 0.8 0.6 0.5 0.5 0.6 0.4 0.4
Two wheelers 18.5 16.9 15.7 15.4 13.4 10.5 8.4 8 8.5 7.6 6.6
The Indian auto industry is one of the largest in the world. The industry accounts for
7.1 per cent of the country's Gross Domestic Product (GDP). As of FY 2014-15, around 31
per cent of small cars sold globally are manufactured in India.The Two Wheelers segment
with 81 per cent market share is the leader of the Indian Automobile market owing to a
growing middle class and a young population. Moreover, the growing interest of the
companies in exploring the rural markets further aided the growth of the sector. The overall
Passenger Vehicle (PV) segment has 13 per cent market share.
India is also a prominent auto exporter and has strong export growth expectations for
the near future. In April-January 2016, exports of Commercial Vehicles registered a growth
of 18.36 per cent over April-January 2015. In addition, several initiatives by the Government
of India and the major automobile players in the Indian market are expected to make India a
leader in the Two Wheeler (2W) and Four Wheeler (4W) market in the world by 2020.
2.1.2 Market Size
The auto industry produced a total 19.84 million vehicles in April-January 2016,
including passenger vehicles, commercial vehicles, three wheelers and two wheelers, as
against 19.64 million in April-January 2015.Domestic sales of Passenger Vehicles grew by
8.13 per cent in April-January 2016 over the same period last year. Within the Passenger
Vehicles, Passenger Cars rose by 10.18 per cent, during April-January 2016 over April-
January 2015. The domestic sales of Commercial Vehicles increased by 9.43 per cent in
April-January 2016 over the same period last year. Sales of Medium & Heavy Commercial
Vehicles (M&HCVs) increased at 30.19 per cent.
2.1.3 Investments
In order to keep up with the growing demand, several auto makers have started
investing heavily in various segments of the industry during the last few months. The
industry has attracted Foreign Direct Investment (FDI) worth US$ 14.32 billion during the
period April 2000 to December 2015, according to data released by Department of Industrial
Policy and Promotion (DIPP).
Some of the major investments and developments in the automobile sector in India are
as follows:
 Japanese two-wheeler manufacturer Honda Motorcycle and Scooter India (HMSI) has
opened its fourth and world’s largest scooter plant in Gujarat, set up to initially
produce 600,000 scooters per annum to be scaled up to 1.2 million scooters per
annum by mid-2016.
 American car maker Ford has unveiled its iconic Ford Mustang in India and will make
its debut in second quarter of FY2016 within the price band of Rs 45 lakh (US$
66,146) and Rs 50 lakh (US$ 73,496) in the Indian market.
 Nissan Motor Co. Ltd is in discussion with Government of India to bring electric and
hybrid technologies to India as the government plans to reduce air pollution caused by
vehicles.
 Global auto major Ford plans to manufacture in India two families of engines by
2017, a 2.2 litre diesel engine codenamed Panther, and a 1.2 litre petrol engine
codenamed Dragon, which are expected to power 270,000 Ford vehicles globally.
 The world’s largest air bag suppliers Autoliv Inc, Takata Corp, TRW Automotive Inc
and Toyoda Gosei Co are setting up plants and increasing capacity in India.
 General Motors plans to invest US$ 1 billion in India by 2020, mainly to increase the
capacity at the Talegaon plant in Maharashtra from 130,000 units a year to 220,000 by
2025.
 US-based car maker Chrysler has planned to invest Rs 3,500 crore (US$ 513.5
million) in Maharashtra, to manufacture Jeep Grand Cherokee model.
 Mercedes Benz has decided to manufacture the GLA entry SUV in India. The
company has doubled its India assembly capacity to 20,000 units per annum.
 Germany-based luxury car maker Bayerische Motoren Werke AG’s (BMW) local unit
has announced to procure components from seven India-based auto parts makers.
 Mahindra Two Wheelers Limited (MTWL) acquired 51 per cent shares in France-
based Peugeot Motorcycles (PMTC).
2.1.4 Government Initiatives
The Government of India encourages foreign investment in the automobile sector and
allows 100 per cent FDI under the automatic route.
Some of the major initiatives taken by the Government of India are:
 Mr Nitin Gadkari, Minister of Road Transport, Highways & Shipping has announced
plans to set up a separate independent Department for Transport, comprising of
experts from the automobile sector to resolve issues such as those related to fuel
technology, motor body specifications and fuel emissions, apart from exports.
 Government of India aims to make automobiles manufacturing the main driver of
‘Make in India’ initiative, as it expects passenger vehicles market to triple to 9.4
million units by 2026, as highlighted in the Auto Mission Plan (AMP) 2016-26.
 In the Union budget of 2015-16, the Government has announced to provide credit of
Rs 850,000 crore (US$ 124.71 billion) to farmers, which is expected to boost the
tractors segment sales.
 The Government plans to promote eco-friendly cars in the country i.e. CNG based
vehicle, hybrid vehicle, and electric vehicle and also made mandatory of 5 per cent
ethanol blending in petrol.
 The government has formulated a Scheme for Faster Adoption and Manufacturing of
Electric and Hybrid Vehicles in India, under the National Electric Mobility Mission
2020 to encourage the progressive induction of reliable, affordable and efficient
electric and hybrid vehicles in the country.
 The Automobile Mission Plan (AMP) for the period 2006–2016, designed by the
government is aimed at accelerating and sustaining growth in this sector. Also, the
well-established Regulatory Framework under the Ministry of Shipping, Road
Transport and Highways, plays a part in providing a boost to this sector.
2.1.5 Road Ahead
India’s automotive industry is one of the most competitive in the world. It does not
cover 100 per cent of technology or components required to make a car but it is giving a good
97 per cent, as highlighted by Mr Vicent Cobee, Corporate Vice-President, Nissan Motor’s
Datsun. Leading auto maker Maruti Suzuki expects Indian passenger car market to reach four
million units by 2020, up from 1.97 million units in 2014-15. The Indian automotive sector
has the potential to generate up to US$ 300 billion in annual revenue by 2026, create 65
million additional jobs and contribute over 12 per cent to India’s Gross Domestic Product, as
per the Automotive Mission Plan 2016-26 prepared jointly by the Society of Indian
Automobile Manufacturers (SIAM) and government. Exchange Rate Used: INR 1 = US$
0.0147 as on March 01, 2016
CHAPTER - III
COMPANY PROFILE
3.1 Organization Profile:
Rane holdings limited (RHL) is an Indian-based holding company the company is
engaged in manufacturing and marketing of automotive components such as steering linkages
products, manual steering gears, power steering gears that include both hydraulic and electric
power assisted steering systems, steering columns, seat belts, brake linings and disc pads and
engine valves. Rane group of companies was originally founded by Shri T. R. GanapathyIyer in
the year 1929 and the group was originally named as Rane Madras (Ltd). It started off as a
distributor of automobiles and parts. After his death, the business was taken over by his son-in-
law LakshamanaIyer, Lakshminarayan and the company was shaped into an auto-component
business house. LLN remained as the founder chairman of the group for over three decades. The
Group has seen four generations of entrepreneurship in automotive components industry. The
present chairman of Rane Group is L.Lakshmanan and L. Ganeshan.
Rane Madras was one of the first Indian companies in the region for automobile
distribution. Within a few years Rane Madras parts way with parent company and starts the
journey on its own. In 1936, Rane Madras Ltd went for public. In 1959, Rane diversified into
manufacturing by taking over Engine Valves ltd. In 1960, it entered into an alliance with
Quinton Hazer of England. It established plants to manufacture tie rod ends and ball joints. In
1979, Rane brake linings limited manufactured railway brake blocks for Indian railways. In
1987, it incepted Rane TRW for manufacturing steering systems.
3.2 Divisions of Rane
3.3 Company Overview:
Rane Power Steering System ltd (RPSL) was constituted with TRW Automotive, USE
for manufacturing of fully integral steering gears and aggregates and components. Subsequently
the company has been renamed as RANE TRW Steering Systems Private Limited (RTSSL).
RTSSL has five manufacturing plants in Tamil Nadu:
Plant 1 (Trichy) – Integrated Gear
Plant 2 & 3 (Chennai) – Pump and Power Rack & Pinion division
Pant 4 (Chennai) – Occupant Safety Division
Plant 5 (Uttarakhand) – Steering Gears & Pumps
The company has independent and comprehensive units to design, test and manufacture
complete range of power steering solutions and seat belt systems. It has established dominant
share of business in both commercial vehicle steering and passenger car steering industry. It is
the preferred OE partner to Indian OE majors in passenger car, multi utility vehicle, light
commercial vehicle, medium and commercial vehicle categories.
The company has a track record of sustained growth, since it was setup. RTSSL – SGD
have been certified under TS 16949 and ISO 14000 standards, ISO 140001 certified plants,
OHSAS 18001 certified, winner of the Deming prize in the year 2005, winner of Japan Quality
model (JQM) in the year 2011.
3.4 Vision, Mission and Quality policy:
Vision:
Steering Gear Division: To be a leader in domestic hydraulic power steering business and
enhance global presence.
Occupant Safety Division: To be a preferred supplier of Occupant Safety Systems, with a
commitment to safety.
Mission:
1. Provide Superior Products and Services to our customers and maintain market
leadership.
2. Evolve as an institute that serves the best interests of all stakeholders.
3. Pursue excellence though total quality management.
4. Ensure the highest standards of ethics and integrity in our actions.
Quality Policy:
We will strive to exceed customer expectations through
1. Continual improvement in quality, cost, delivery and technology.
2. Employee involvement.
3. Improving the effectiveness of quality Management System.
Their brand promise is to provide an exciting workplace founded on the principles of
values, fairness and transparency that provide challenging assignment, encourage learning and
enhance career opportunities.
3.5 Health, Safety & Environment Policy
We are committee to protect the Occupational Health, Safety and Environment in all our
operations. TO meet our commitment, we will endeavor to
1. Comply will all applicable Legal and other requirements.
2. Minimize impact on Environment, Occupational Health & Safety through Prevention of
pollution, injury and ill health.
3. Efficient use of natural resources, materials and energy through reducing, re-using and
re-cycling process.
4. Continual improvement of Occupational Health, Safety and Environment performance by
setting objectives and targets.
5. Communicate this policy to our employees, contracts and interested oarties of Rane
TRW.
3.6 Products:
There are three plants in RANE TRW steering Ltd, Trichy:
(i) HFB 64 PLANT (ii) HFB 54 PLANT (iii) VALVE PLANT
The corresponding assembly parts are done in respective plant (Gear assembly and valve
assembly). The various models of gear are HFB64, HFB50, HFB54, HFB52, HFB72. The
various vehicle models of pascar valves are Indica, Indigo, Santro, Tmlxi, L90, Corsa, Honda,
Itl, Pandran, Ford B376, Sports Car, Ford C 195, Fiat, Uno, Tml Ace, Lotus, Safari, Armada.
3.7 Customers to the Rane Company:
Major customers in India:
Major Overseas Customers:
3.8 Corporate Social Responsibility of the Company:
Rane TRW Steering Systems Private Limited (RTSS) is committed to contributing
towards its societal responsibilities beyond statutory obligations. It is to function in socially and
environmentally sustainable manner recognizing the interests of all its stakeholders.
The CSR annual budget will be decided as a part of RTSS’s annual budget. Any surplus
generated from CSR projects undertaken shall be channelized into the CSR corpus. These funds
shall further only be used for CSR projects and shall not be added to the profits of the company.
This policy applies to all CSR projects undertaken by the company and aims to full-fill the
requirements of the Section 135 of the Companies Act, 2013 and the rules made thereunder.
RTSS ensures that the CSR activities carried out by them are over and above the normal course
of business. This process will be periodically reviewed and updated in line with relevant codes of
legislation.
At all operating locations of RTSS actively promotes and engages by some ways in these
activities that help strengthen communities and contribute to the enrichment of society. RTSS
believes in good corporate citizenship that strives for creating maximum impact on education,
healthcare, environment and community development.
Some of the CSR activities carried out by RTSS in the past years are:
 Medical camp in villages;
 Provision of computers to schools,
 Provision of cycle stand,
 “VetriElidha” program for school students,
 Tree plantation,
 Provided of lunch for orphanage/ old age people/ mentally challenged children through
the “Nakshtra” program,
 Provision of groceries for Fathima health care center,
 Awareness and training on road safety measures.

3.9 STANDING ORDER PROCEDURES
3.9.1 EMPLOYEE POLICES AND BENEFITS:
RTSSL has various polices and benefits framed for the employees to adhere by it. Some of
them are:
1) Compensatory off – separately OT and C-offs for extra work on normal days, weekly
holidays and national holidays.
2) Loans and advances – Rs.5000 at 5% interest to be repaid in 12 monthly instalments
3) Attendance regulation
4) Marriage gift and loan policy, GPTW (Great Place To Work initiatives)
5) Transport, Canteen and issue of Birthday card & chocolates to employees.
6) Employee retirement – sandal garland, shawl, 75gms of silver material.
7) ESI and hospital claim cashless card
8) Picnic scheme, e-mail game.
9) Safety, health and environment – first aid and fire fighting training, work permit.
10) RIED ( RANE Institute of employee Development) and RAMP (RANE Advanced
Management Programme).
3.9.2 SHIFT TIMINGS:
I SHIFT II SHIFT IIISHIFT GENERAL SHIFT
06.30 to 15.00 15.00 to 23.30 23.30 to 06.30 08.30 to 17.00
Tea Break
09.00
Tea Break
16.00 & 21.20
Tea Break
00.30 & 04.30
Tea Break
09.00 & 16.00
Lunch Break
11.30 to` 12.00
Dinner
19.30 to 20.00
Midnight Tiffin
02.30 to 03.00
Lunch Break
12.00 to 12.30
CHAPTER - IV
THEORETICAL BACKGROUND
4.1 DEFINITION
Voluntary non attendance at work, without valid reason. Absenteeism means either
habitual evasion of work, or wilful absence as in a strike-action. It does not include involuntary
or occasional absence due to valid causes, or reasons beyond one's control, such
as accidents or sickness.
4.2 MEANING
Absenteeism refers to unauthorized absence of the worker from his job. Absenteeism
can be defined as failure of employees to report for work when they are scheduled to work.
Employees who are away from work on recognized holidays, vacations, approved leaves of
absence, or leaves of absence allowed for under the collective agreement provisions would not
be included .
When the employee takes time off, on a scheduled working day with permission, it is
authorized absence. When he remains absent without permission or informing, it is wilful
absence without leave.
In these days, when the needs of the country require greater emphasis upon increase of
productivity and the economic and rational utilization of time and materials at our disposal, it is
necessary to minimize absenteeism to the maximum possible extent.
4.3 CONCEPT OF ABSENTEEISM:
Absenteeism refers to employees‟ absence from his regular task when he is normally
scheduled to work.
According to Seligman : “Absenteeism is time lost in industrial establishments by
avoidable or unavoidable absence of employees”.
According to Hachette : “Absenteeism is the practice or habit of being an “absentee‟
and an “absentee” is one who habitually stays away”
In India two agencies collect and compile data on absenteeism.
 Labour Bureau, Shimla
 Annual Survey of Industries, Kolkatta.
According to Labour Bureau, Shimla: “Only unauthorized absence from work about
which the employer has no prior information of the workers‟ failure is considered as
absenteeism”.
According to Annual Survey of Industries, Calcutta: “All kinds of Vacations and leave
are considered as absenteeism”
For the purposes of this study, we take the stand of the Labour Bureau and reckon that
absenteeism signifies the absence of an employee from work that is unauthorized, unexplained
avoidable and wilful.
4.4 MEASUREMENT OF ABSENTEEISM
Absenteeism rate can be expressed as the result of total amount of time lost through non-
attendance to the planned working time (excluding over time). The calculation of absenteeism
rate can be made in terms of man-days by taking into account 2 factors.
 The number of persons scheduled to work
 The number actually present
Generally absenteeism is expressed as a percentage of overall strength of the
Department/ Organisation and also expressed as many days lost. But it is difficult to interpret
absenteeism in terms of value lost.
Rate of Absenteeism = No. of Total Man shifts Lost X 100
(No. of Total Man shifts scheduled to work)
4.5 KINDS OF ABSENTEES
 Escapist Absentee
 Casual absentee
 Seasonal absentee
 Immature Absentee
 Chronic Absentee
4.6 TYPES OF ABSENTEEISM:
 Authorized Absenteeism
 Unauthorized Absenteeism
 Wilful Absenteeism
REVIEW OF LITERATURE
Harrison, David A (1994) - The properties of self-reports and perceived norms of
absenteeism were examined and compared in 7 progressive studies. Regardless of attendance
context, time interval, type of estimate, or administration condition, individuals reported (on
average) having roughly half the absenteeism of the perceived norm among their peers; 85% to
95% of respondents reported being above average in their attendance record. This "Lake
Wobegon effect" was traced to a small negative bias (underreporting) in self-reports and a large
positive bias (over reporting) in perceived norms. Self-presentation and availability processes
were proposed as explanations for these biases. In a study in which direct observations of past
and future absenteeism were collected, self-reports correlated .69 with the direct observations.
Perceived norms explained unique variation in future absenteeism. (PsycINFO Database Record
(c) 2012 APA, all rights reserved
Ian R. Gellatly (1995) - This study examined whether an employee's level of
absenteeism was affected by age, organizational tenure, perceptions of interactional justice,
affective and continuance commitment, and the perceived absence norm in the employees' work
unit or department. One hundred and sixty-six nursing and food services employees in a mid-size
chronic care hospital provided attitudinal and perceptual data on an employee survey. Absence
data (absence frequency and total days absent) were collected during the 12-month period
immediately following an employee survey. Hypothesized relations between the various
individual- and group-level factors and employee absenteeism were specified in a structural
model and tested using LISREL 7 (Joreskog and Sorbom, 1989). General support was found for
the study hypotheses.
____________________
1
Harrison, David A.; Shaffer, Margaret A.Journal of Applied Psychology, Vol 79(2), Apr 1994.
2
Ian R. Gellatly Journal of Organizational Behavior Volume 16, Issue 5, pages 469–
485, September 1995.
Hanna A (2005) - Construction contractors continue to be faced with the challenge of
improving productivity in order to remain successful in an increasingly competitive industry.
One factor that contributes to lower productivity is absenteeism. Yet, little is known or
understood about the reasons electricians miss work, and very few studies have been conducted
on absenteeism in the construction industry. As a positive step to reduce the problems associated
with voluntary and involuntary absences.The main objectives of the study were to learn
the reasons for absenteeism and to quantify the impacts so that solutions can be developed to
help contractors improve their productivity. The study determined that managers and electricians
agreed that illnesses and medical appointments were two common reasons workers missed work.
However, managers also believed workers were absent because of a lack of interest or
irresponsibility, while electricians reported injuries and unsafe working conditions as reasons for
missing work. Furthermore, a quantitative analysis of the data revealed that when the
absenteeism rate was between 0 and 5%, there was no loss in productivity. However, when the
absenteeism rate was between 6 and 10%, a 24.4% loss in productivity was experienced. By
understanding what causes electricians to miss work, and the effect of absences on productivity,
a company can manage and control absenteeism on electrical construction projects.
Mark John Somers (1995) - A three component model of organizational
commitment was used to study job withdrawal intentions, turnover and absenteeism. Affective
commitment emerged as the most consistent predictor of these outcome variables and was the
only view of commitment related to turnover and to absenteeism. In contrast, normative
commitment was related only to withdrawal intentions while no direct effects for continuance
commitment were observed. Continuance commitment, however, interacted with affective
commitment in predicting job withdrawal intentions and absenteeism. The form of the
interaction was such that high sunk costs tempered relationships between affective commitment
and the relevant outcome variables.
___________________
3
Hanna A. Menches C, Sullivan K, and Sargent J. "Factors Affecting Absenteeism in Electrical
Construction." American Society of Civil Engineers (2005)
4
Mark John Somers– “Organizational commitment, turnover and absenteeism: An
examination of direct and interaction effects” Journal of Organizational Behavior Volume
16, Issue 1, pages 49–58, January 1995
Charles W. Mueller - The general unavailability of and difficulty associated with
obtaining records-based data on absenteeism suggests the potential value of self-report data for
those conducting research on absenteeism. This should not be recommended, however, until the
validity of these self-report measures is assessed. In this paper, we compare records-based and
self-report measures of absenteeism for the same employees for the same period of time. We find
that although the univariate descriptive data for the two measures are similar, the correlation
between the two is .299. Although this is in the expected direction, its magnitude is small enough
for us to question the validity of self- report measures of absenteeism. Several suggestions are
offered for additional study of this.
Steven J. Linton (2010) - This investigation addresses the reliability of self-reports of
sick leave. Although sick leave is an objective measure which is often relevant for determining
outcome and cost-benefit, obtaining records from employeers or insurance companies may be a
considerable task. Consequently, we compared reports of sick leave during the last month made
by 66 patients with musculoskeletal pain problems on the Outcome Evaluation Questionnaire
with records from their insurance office. Results indicated good reliability with a correlation of r
=.95, similar distributions, and no indication of systematic over or under reporting. Indeed, some
examples are provided where part of the discrepancy may depend on idiosyncrasies in the
insurance records or lack of clear definitions rather than poor accuracy on the patient's part. Our
results suggest that self-reports of sick leave are reliable for recent time periods and a duration of
one month.
_______________________
5
Charles W. Mueller. Douglas S. Wakefield James L. PriceJames P. Curry Joanne C. McCloskey
“A Note on the Validity of Self-Reports of Absenteeism”
6
Steven J. Lintona
, Karin Halldéna
& Anna-Lisa Hellsing : The Reliability of Self-reported Sick
Absenteeism: A Pilot Study, pages 145-150, 23 Mar 2010
Paul M Muchinsky - The purpose of this paper is to review the literature on
employee absenteeism as a form of withdrawal behavior apart from turnover. Studies examining
the psychometric properties of absence measures are reviewed, along with the relationship
between absenteeism and personal, attitudinal, and organizational variables. Studies exploring
the relationship between absenteeism and turnover are examined according to the unit of analysis
studied in the research. Programmatic efforts to reduce employee absenteeism are also reviewed.
Throughout the paper emphasis is placed on the indices used by investigators to measure
absenteeism, and the problems that have arisen in the literature through the use of multiple
indicators of absenteeism. The review concludes with suggestions for research that are of both
theoretical and practical concern.
Dr. Bertera, Robert L. (1991) - The impact of behavioral risk factors on
absenteeism and health-care costs was analyzed among 45,976 employees in a large, diversified
industrial work force. A cross-sectional design was used to evaluate health risk appraisal and
physical-examination data collected from 1984 through 1988. Employees with any of six
behavioral risks had significantly higher absenteeism (range = 10% to 32%) compared with those
without risks. These differences led to significantly higher illness costs (defined as
compensation, health care, and non-health care benefits) for those with risks compared with
those without risks. Annual excess illness costs per person at risk were smoking, $960;
overweight, $401; excess alcohol, $389; elevated cholesterol, $370; high blood pressure, $343;
inadequate seatbelt use, $372; and lack of exercise, $130; Only one factor, lack of exercise, was
not significant after adjusting for age, education, pay category, and the six other behavioral risks.
The total cost to the company of excess illness was conservatively estimated at $70.8 million
annually. These findings suggest that the cost of key behavioral risks provides an opportunity to
manage health-care cost increases through health promotion, financial incentives for healthy
lifestyle, and environmental changes that affect health behaviors.
_________________________
7
Paul M Muchinsky : Employee absenteeism: A review of the literature
8
Dr. Bertera, Robert L : The Effects of Behavioral Risks on Absenteeism and Health-Care Costs
in the Workplace. Journal of Occupational Medicine: November 1991
Robert P. Steel - The ability of three different types of self-report variables—
biographical, attitudinal, and stress—to predict 70 months of absenteeism data was evaluated.
Absence scores were aggregated in two different ways, as annualized segments and as
longitudinal data cumulations. Biographical variables and attitudinal measures significantly
predicted long-term absenteeism. In addition, results suggested that dependency relationships
between absence metrics and cumulation periods may affect validation outcomes.
Frayne (1991) - In this pioneering volume, Colette Frayne reports the results of the
first study to examine empirically the use of a simple straightforward self-management training
program to increase employee attendance. The author presents a complete description of the self-
management training process used in the study, shows how self-management can be of
significant value in reducing employee absenteeism, and offers precise information for the
human resources professional who wishes to organize and implement self-management training
within his or her own organization. Frayne also addresses other applications of self-management
in the workplace, demonstrating that the approach works because it accommodates both the
employee's needs for freedom and the organization's need for control. Frayne provides a detailed
overview of existing theories that were precursors to social learning theory. She then outlines the
methodology that was used for sample generation, data collection, and training implementation.
Two chapters examine the research results and discuss their implications for reducing employee
absenteeism. In the next chapter, Frayne discusses the results and interpretations derived from
conducting a follow-up study and replication of the initial research. Training in self-
management, she shows, offered many benefits to the individuals involved in the training
program and to the organization that supported the program. Specifically, many of the trainees
improved their attendance, their relationships with supervisors, their job performance, and their
career promotion opportunities improvements that held up well over time.
_____________
9
Robert P. Steel, Joan R. Rentsch : Influence of Cumulation Strategies on the long-Range
Prediction of Absenteeism.
10
Frayne, Colette A.: “Reducing employee absenteeism through self-management training: A
research-based analysis and guide”. New York, NY, England: (1991).
Chockalingam Viswesvaran (2002) - The correlations reported in the extant
literature between one form of counterproductive behaviors – absenteeism – and four different
indices of job performance were meta-analytically cumulated. Job performance indices utilized
were productivity, quality, interpersonal behaviors, and effort. The former two were measured
using organizational records, while the latter two were measured using supervisory ratings. The
results suggest that absenteeism measures are more highly correlated with organizational records
of quality, and supervisory ratings of both effort and interpersonal behaviors. Lower correlations
were found with organizational records of productivity. These results suggest the potential for
common determinants of absenteeism and some aspects of job performance. The fairly
independent literatures that have developed on absenteeism and job performance can inform one
another. Implications for modeling and assessing job performance are noted.
Paul P. Brooke Jr (1989) - LISREL estimates of the parameters of a causal model
of absenteeism are reported for a sample of 425 full-time employees of a 327-bed medical
centre. The model modifies and extends the conceptual framework of Steers & Rhodes (1978)
and includes routinization, centralization, pay, distributive justice, work involvement, role
ambiguity, conflict and overload, kinship responsibility, organizational permissiveness, job
satisfaction, job involvement, organizational commitment, health status and alcohol involvement
as the determinants of absenteeism. Based on self-report measures of absence frequency,
significant positive direct effects of kinship responsibility, organizational permissiveness, role
ambiguity and alcohol involvement, and negative direct effects of centralization, pay and job
satisfaction yielded an R2
for absenteeism of 21.6. Job satisfaction completely mediated the
effects of routinization and work involvement, and partially mediated the effects of centralization
and role ambiguity.
_________________
11
Chockalingam Viswesvaran: Absenteeism and Measures of Job Performance International
Journal of Selection and Assessment Volume 10, Issue 1-2, pages 12–17, March 2002
12
Paul P. Brooke, James L. Price : The determinants of employee absenteeism: An empirical test
of a causal model Journal of Occupational Psychology Volume 62, Issue 1, pages 1–19, March
1989.
Rick D. Hackett (1996) - It has been proposed that the break from work provided
by an occasional absence may help employees cope with various types of stress and thereby lead
to an improvement in their overall condition when they return. In this study, the mean levels of
nurses' daily ratings of personal problems, tiredness, ill-health, sleep disruption, stress and job
dissatisfaction were compared statistically across a period encompassing one shift of attendance,
an absence, and another shift of attendance. As expected, significant decreases in most variables
were observed between the day of the absence and the subsequent shift. However, improvements
were seldom found between the shifts immediately preceding and subsequent to the absence. The
findings were interpreted as suggesting that occasional absences may help maintain physical and
psychological states at manageable levels even if they do not result in immediately noticeable
improvements on the part of returning employee.
Gary Johns (2003) - It is argued that great strides have been made in absenteeism
research, in part due to the wide diversity of research methods that have been employed to study
the phenomenon. The inherent difficulties in studying a complex, low base rate behavior with
negative connotations have stimulated methodological diversity. In addition, methodological
diversity has expanded as a wide variety of academic and professional disciplines has become
interested in absenteeism. Variations in research designs, data sources, and the treatment of time
are discussed, and examples are provided of how these variations enhance the understanding of
absence. The article concludes with an illustration of the synergy of complementary methods
when they are used to investigate a particular research question. The impact of social influence
on absence and gender differences in absenteeism are used as cases in point.
______________________
13
Rick D. Hackett, Peter Bycio, An evaluation of employee absenteeism as a coping mechanism
among hospital nurse Journal of Occupational and Organizational Psychology Volume 69, Issue
4, pages 327–338, December 1996.
14
Gary Johns: “How methodological diversity has improved our understanding of absenteeism
from work” Volume 13, Issue 2, Summer 2003, Pages 157–184
Bross Michael H (1992) - Workers with a medical diagnosis of chemical
dependence were selected and compared with matched controls; we hypothesized there were
significant differences in absenteeism and certain medical illnesses. Employee data were
obtained from medical insurance sickness and accident reports. Illnesses were summarized into
diagnostic clusters for analysis. Chemically-dependent workers had significantly more (P<.05)
absenteeism, injuries, hypertension, and mental disorders than did the control group. Using these
findings, employers can conduct prospective studies that select workers to be screened for
chemical dependence.
Johns (1994) - The social cognition literature and a deviance model of absenteeism
were used to generate a series of predictions about employees' and managers' estimates of levels
of absenteeism. Employees revealed a clear self-serving pattern in comparing their own
absenteeism with occupational norms and their own work group's absence, and they
underestimated their own actual absenteeism. Managers estimated lower occupational norms and
lower work-group absence than did their subordinates. Managers also saw their own work
groups as having lower absenteeism than the company average, an estimate that also appeared to
be self-serving. Results suggest how people make sense of absence in a social context.
____________________
15
Bross Michael H. MD; Pace, S. Kelton BS; Cronin, Irvin H. MD: Chemical Dependence:
Analysis of Work Absenteeism and Associated Medical Illnesses. Journal of Occupational
Medicine: January 1992.
16
Johns, Gary : “Absenteeism estimates by employees and managers: Divergent perspectives
and self-serving perceptions”. Journal of Applied Psychology, Vol 79(2), Apr 1994.
Karin Sanders (1998) - This article discusses the relationship between the informal
ties of the employees within an organization and their absentee rates. To explain this
relationship, the assumption is made that within a department, a more or less stable norm
concerning illegal absenteeism exits, and that the strength of this norm is related to the tightness
of the informal relationships between the employees: the more consensus on the absentee norm,
irrespective of the degree of tolerance, the more cohesive this department. Furthermore,
according to the fairness theory of Adams (1965), a relationship between the tightness of the
informal relations, the norm concerning illegal absenteeism and the absentee rate is expected: the
more cohesive, the higher the effect of the group norm on the short-term absentee rate. Network
data of 62 employees of eight comparable teams within a housing corporation were collected by
means of a questionnaire, and combined with data on the absentee rates of the employees. The
data supported the hypotheses concerning the relationship between the group norm, the tightness
of the informal relations and the short-term absentee rates of the employees within a department.
Martocchio (1989) - Meta-analyses were performed on 34 samples that included
correlations of the age and employee absenteeism relationship. Samples were categorized into 2
groups for voluntary absenteeism and involuntary absenteeism based on the frequency index and
the time-lost index, respectively. Results indicated that both voluntary and involuntary absence
are inversely related to age. Unexplained variance remained for each of the absence measures
after variance due to sampling error and measurement unreliability was statistically estimated.
Work demand was negatively associated with age, but not in the expected direction. Work
demand did not moderate the age–absence relationship for either voluntary or involuntary
absence. Sex moderated the relationship between age and voluntary absenteeism only. For men,
the relationships were negative; for women, they did not differ significantly from 0. Implications
for research and human resource management practices regarding aging and absenteeism are
discussed.
_____________________
17
Karin Sanders, Sigrid K. Hoekstra, “Informal Networks and Absenteeism within an
Organization”., Volume 4, Issue 2, pp 149-163, June 1998
18
Martocchio, Joseph J : “Age-related differences in employee absenteeism: A meta-analysis”.
Psychology and Aging, Vol 4(4), Dec 1989,
CHAPTER V
OBJECTIVES OF THE STUDY
The objectives of the study are:
 To study the major causes of absenteeism in the organization.
 To analyse the workplace factors which leads to absenteeism in the organisation.
 To provide suggestions for reducing absenteeism of the employees in the
organisation.
CHAPTER VI
6.1 NEED OF THE RESEARCH
 Assessing causes of Absenteeism & suggest remedies to overcome it
 Finding out the costs of absenteeism and how to reduce it.
 Figuring out the solutions for this problem
6.2 .SCOPE OF THE STUDY
The scope of the study covers five categories of flexi workers such as CAPS, diploma
apprentice, ITI apprentice, STT, GAPS. The data for this study is collected from all the
departments. The study provides a base for understanding the employee’s problems and provides
possible remedies for it. . The period of the study is from 1st
may to 15th
June (45 days) of 2016.
6.3 METHODOLOGY
6.3.1 RESEARCH DESIGN
Descriptive research design was adopted for the study because the study attempts to reach
with conclusion to suggest the company with projects according findings. The complete and
accurate description cannot be given from the study.
6.3.2 NATURE OF DATA
Primary and Secondary data were used for the collection of information for the study.
Primary Data: The Primary data was collected from the flexi workers of the company (Rane
TRW Steering Systems Private Limited, Viralimalai) using questionnaire.
Secondary Data: Secondary data relating to review of literature was online journals such as
google scholar, scopus, proquest, etc. and also from various websites of internet sources.
6.3.3 SAMPLING METHOD
The sampling method used for the study is stratified sampling method. Workers having
experience of 3 months to 1year is the sample for this study.
6.3.4 SAMPLE SIZE
The sample size of this research is 120, workers from all the department in the company,
has been taken for the study.
6.3.5 DATA COLLECTION METHODS
The primary data is collected through questionnaire from flexi workers of the
company. Questions related to the categories like health, canteen facilities, bus facilities,
training, co-worker relationship, supervisor relationship has been set as base for the
questionnaire.
6.3.6 PILOT STUDY
A pilot study was conducted among 10 flexi workers for testing the method of data collection
with questionnaire in English. From the pilot study is seen that those people are struggling to
answer the questions in English. So, for the convenience of the data collection the questionnaire
has been translated into Tamil and used.
6.3.7 STATISTICAL ANALYSIS
The data collected had been analysed using SPSS package, by the available version of SPSS
(18.0).
6.4 .LIMITATIONS OF THE STUDY
 The study deals with sensitive area of the organization, it is difficult to extract accurate
information from the employees.
 The study is not comparative in nature
 The observation and conclusion which are presented in the report is based on
data collected only the sample employees and cannot be generalized to other areas.
CHAPTER VII
ANALYSIS AND INTERPRETATION
Table:7.1: Age group of the respondents
Source: Primary data
From the above table it is found that 59.2% of the respondents are 19-21yrs, 30.8% of the
respondents are 22-24yrs, 6.7% respondents are above 24yrs and 3.3% respondents are below
19 yrs.
Chart: 7.1. Age group of the respondents.
0
10
20
30
40
50
60
70
80
Below 19 yrs 19 - 21 yrs 22 - 24 yrs Above 24 yrs
No. Of respondents
Percentage
Age No. Of respondents Percentage
Below 19 yrs 7 5.8
19 - 21 yrs 68 56.7
22 - 24 yrs 37 30.8
Above 24 yrs 8 6.7
Total 120 100.0
Table: 7.2: Location of the respondents.
Location No. Of respondents Percentage
Chatram (Trichy) &
nearby
45 37.5
Woraiyur & nearby 29 24.2
Manaparai & nearby 16 13.3
Viralimalai & nearby 23 19.2
Others 7 5.8
Total 120 100.0
Source: Primary Data
From the above table it is found that 37.5% of the respondents are from Chatram (Trichy)
& nearby, 24.2% of the respondents are from Woraiyur & nearby, 19.2% Viralimalai &
nearby,13.3% of the respondents are from Manaparai & nearby, 5.8 of the respondents are
from other areas.
Chart: 7.2: Location of the respondents.
0
5
10
15
20
25
30
35
40
45
50
Chatram
(Trichy) &
nearby
Woraiyur &
nearby
Manaparai &
nearby
Viralimalai &
nearby
Others
No. of respondents
Percentage
Table: 7.3: Educational level of the respondents.
Qualification No. Of respondents Percentage
HSC 5 4.2
ITI 10 8.3
Diploma 99 82.5
BE 6 5.0
Total 120 100.0
Source: Primary Data
From the above table it is found that 82.5% of the respondents are from Diploma, 8.3% of the
respondents are from ITI, 5% of the respondents are from BE, 4.2% of the respondents are
from HSC
Chart: 7.3: Educational level of the respondents.
0
20
40
60
80
100
120
HSC ITI Diploma BE
No. Of respondents
Percentage
Table: 7.4. Designation of the respondents.
Designation No. Of respondents Percentage
CAPS 23 19.2
Diploma 62 51.7
STT 16 13.3
ITI 9 7.5
GAPS 10 8.3
Total 120 100.0
Source: Primary Data
From the above table it is found that 51.7% of the respondents are from diploma, 19.2% of
the respondents are from CAPS, 13.3% of the respondents are from STT, 8.3% of the
respondents are from GAPS, 7.5% of the respondents are from ITI.
Chart: 7.4: Designation of the respondents.
0
10
20
30
40
50
60
70
CAPS Diploma STT ITI GAPS
No. Of respondents
Percentage
Table: 7.5: Experience of the respondents.
Experience No. Of respondents Percentage
0 - 3 months 25 20.8
3 - 6 months 20 16.7
6 - 9 months 10 8.3
9 - 12 months 38 31.7
Above 1 yr 27 22.5
Total 120 100.0
Source: Primary Data
From the above table its is found that 31.7% of the respondents are working for 9-12months,
22.5% of the respondents are working above 1 year, 20.8% of the respondents are working
for 0-3months, 16.7% of the respondents are working for 3-6months, 8.3% of the respondents
are working for 6-9months.
Chart:7.5: Experience of the respondents.
0
5
10
15
20
25
30
35
40
0 - 3 months 3 - 6 months 6 - 9 months 9 - 12 months Above 1 yr
No. Of respondents
Percentage
Table: 7.6: Awareness about leave policy.
Awareness No. Of respondents Percentage
Know Very Well 37 30.8
Know 69 57.5
Not clear about the policy 11 9.2
Don’t Know 3 2.5
Total 120 100.0
Source: Primary Data
From the above table it is found that 57.5% of the respondents are know about the leave
policy of the company, 30.8% of the respondents are know about the leave policy of the
company, 9.2% of the respondents are not clear about the policy, 2.5% of the respondents are
don’t know about the policy.
Chart: 7.6: Awareness about leave policy.
0
10
20
30
40
50
60
70
80
Know Very Well Know Not clear about
the policy
Don’t Know
No. Of respondents
Percentage
Table: 7.7: Leave taken in a year.
Leave taken No. Of respondents Percentage
8 days 34 28.3
10 days 36 30.0
12 days 5 4.2
Above 12 days 10 8.3
Nil 35 29.2
Total 120 100.0
Source: Primary Data
From the above table it is found that 30% of the respondents are taking 10 days leave in a
year, 29.2% of the respondents are not taking any leave, 28.3% of the respondents are taking
8 days leave in a year, 8.3% of the respondents are taking above 12days leave, 4.2% of the
respondents are taking 12 days leave in a year.
Chart: 7.7: Leave taken in a year.
0
5
10
15
20
25
30
35
40
8 days 10 days 12 days Above 12 days Nil
No. Of respondents
Percentage
Table: 7.8: Reason to take leave.
Reason No. Of respondents Percentage
Health issues 34 28.3
Festival/ Function 25 20.8
Unexpected situation 59 49.2
other reasons 2 1.7
Total 120 100.0
Source: Primary Data
From the above table it is found that 49.2% of the respondents are taking leave because of
unexpected situation, 28.3% of the respondents are taking leave because of health issues,
20.8% of the respondents are taking leave because of festival/function, 1.7% of the
respondents are taking leave because of other reasons.
Chart: 7.8: Reason to take leave.
0
10
20
30
40
50
60
70
Health issues Festival/ Function Unexpected
situation
other reasons
No. Of respondents
Percentage
Table: 7.9: Sufficiency of provided leave.
Sufficiency No. Of respondents Percentage
Strongly agree 19 15.8
Agree 44 36.7
Neutral 18 15.0
Disagree 19 15.8
Strongly disagree 20 16.7
Total 120 100.0
Source: Primary Data
From the above table it is found that 36.7% of the respondents are strongly agreed, 16.7% of
the respondents are strongly disagreed, 15.8% of the respondents are strongly agreed, 15.8%
of the respondents are disagreed, 15% of the respondents are in neutral about leave provided
by the company.
Chart: 7.9: Sufficiency of provided leave.
0
5
10
15
20
25
30
35
40
45
50
Strongly agree Agree Neutral Disagree Strongly
disagree
No. Of respondents
Percentage
Table: 7.10: Attendance award system.
Attendance award system No. Of respondents Percentage
Strongly agree 34 28.3
Agree 55 45.8
Neutral 11 9.2
Disagree 9 7.5
Strongly disagree 11 9.2
Total 120 100.0
Source: Primary Data
From the above table it is found that 45.8% of the respondents are agreed, 28.3% of the
respondents are strongly agreed, 9.2% of the respondents are strongly disagreed, 9.2% of the
respondents are in neutral, 7.5% of the respondents are disagreed about the knowledge of
attendance award system provided by the company.
Chart: 7.10: Attendance award system.
0
10
20
30
40
50
60
Strongly agree Agree Neutral Disagree Strongly
disagree
No. Of respondents
Percentage
Table: 7.11: Frequency of attendance award received.
Frequency No. Of respondents Percentage
1 20 16.7
2 7 5.8
3 4 3.3
More than 3 10 8.3
Nil 79 65.8
Total 120 100.0
Source: Primary Data
From the above table it is found that 65.8% of the respondents are not received the attendance
award, 16.7% of the respondents have received once, 8.3% of the respondents have received
more than 3 times, 5.8% of the respondents have received twice, 3.3% of the respondents
have received thrice.
Chart: 7.11: Frequency of attendance award received.
0
10
20
30
40
50
60
70
80
90
1 2 3 More than 3 Nil
No. Of respondents
Percentage
Table: 7.12: Frequency of absence.
Frequency of absence. No. Of respondents Percentage
Very frequently 7 5.8
Frequently 4 3.3
At the time of requirement 52 43.3
Rarely 23 19.2
Very rarely 34 28.3
Total 120 100.0
Source: Primary Data
From the above table it is found that 43.3% of the respondents are absenting at the time of
requirement, 28.3% of the respondents are absenting very rarely, 19.2% of the respondents
are absenting rarely, 5.8% of the respondents are absenting very frequently, 3.3% of the
respondents are absenting frequently.
Chart: 4.12. Frequency of absence.
0
10
20
30
40
50
60
Very
frequently
Frequently At the time of
requirement
Rarely Very rarely
No. Of respondents
Percent
Table: 7.13.a: Prioritizing the reasons- Health problems
Health problems No. Of respondents Percentage
Ist priority 72 60.0
IInd priority 31 25.8
IIIrd priority 5 4.2
IVth priority 8 6.7
Vth priority 3 2.5
VIIth priority 1 .8
Total 120 100.0
Source: Primary Data
From the above table it is found that 60% of the respondents have given Ist
priority, 25.8% of
the respondents have given IInd
priority, 4.2% of the respondents have given IIIrd
priority,
6.7% of the respondents have given IVth
priority, 2.5% of the respondents have given Vth
priority, 0% of the respondents have given VIth
priority, 0.8% of the respondents have given
VIIth
priority for the health problems.
Chart7.13.a: Prioritizing the reasons- Health problems
0
10
20
30
40
50
60
70
80
Ist priority IInd
priority
IIIrd
priority
IVth
priority
Vth priority VIIth
priority
No. Of respondents
Percent
Table: 7.13.b: Prioritizing the reasons- Transport facilities
Transport facilities No. Of respondents Percentage
Ist priority 24 20.0
IInd priority 44 36.7
IIIrd priority 22 18.3
IVth priority 10 8.3
Vth priority 12 10.0
VI priority 8 6.7
Total 120 100.0
Source: Primary Data
From the above table it is found that 20% of the respondents have given Ist
priority, 36.7% of
the respondents have given IInd
priority, 18.3% of the respondents have given IIIrd
priority,
8.3% of the respondents have given IVth
priority, 10% of the respondents have given Vth
priority, 6.7% of the respondents have given VIth
priority, 0% of the respondents have given
VIIth
priority for the transport facilities.
Chart: : 7.13.b: Prioritizing the reasons- Transport facilities
0
5
10
15
20
25
30
35
40
45
50
Ist priority IInd priority IIIrd priority IVth priority Vth priority VI priority
No. Of respondents
Percent
Table:7.13.c: Prioritizing the reasons- Canteen facilities
Canteen facilities No. Of respondents Percentage
Ist priority 12 10.0
IInd priority 25 20.8
IIIrd priority 34 28.3
Ivth priority 23 19.2
Vth priority 15 12.5
VI priority 6 5.0
VIIth priority 5 4.2
Total 120 100.0
Source: Primary Data
From the above table it is found that 10% of the respondents have given Ist
priority, 20.8% of
the respondents have given IInd
priority, 28.3% of the respondents have given IIIrd
priority,
19.2% of the respondents have given IVth
priority,1 2.5% of the respondents have given Vth
priority, 5% of the respondents have given VIth
priority, 4.2% of the respondents have given
VIIth
priority for the canteen facilities.
Chart: 7.13.c: Prioritizing the reasons- Canteen facilities.
0
5
10
15
20
25
30
35
40
Ist priority IInd
priority
IIIrd
priority
Ivth
priority
Vth
priority
VI priority VIIth
priority
No. Of respondents
Percent
Table: 7.13.d: Prioritizing the reasons- Co-worker relationship
Co-worker relationship No. Of respondents Percentage
Ist priority 1 .8
IInd priority 8 6.7
IIIrd priority 10 8.3
IVth priority 23 19.2
Vth priority 25 20.8
VI priority 35 29.2
VIIth priority 18 15.0
Total 120 100.0
Source: Primary Data
From the above table it is found that 0.8% of the respondents have given Ist
priority, 6.7% of
the respondents have given IInd
priority, 8.3% of the respondents have given IIIrd
priority,
19.2% of the respondents have given IVth
priority, 20.8% of the respondents have given Vth
priority, 29.2% of the respondents have given VIth
priority, 15% of the respondents have
given VIIth
priority for the co-worker relationship.
Chart: 7.13.d: Prioritizing the reasons- Co-worker relationship
0
5
10
15
20
25
30
35
40
Ist priority IInd
priority
IIIrd
priority
IVth
priority
Vth priority VI priority VIIth
priority
No. Of respondents
Percent
Table: 7.13.e: Prioritizing the reasons- Supervisor relationship
Supervisor relationship No. Of respondents Percentage
Ist priority 2 1.7
IInd priority 5 4.2
IIIrd priority 15 12.5
IVth priority 14 11.7
Vth priority 29 24.2
VI priority 19 15.8
VIIth priority 36 30.0
Total 120 100.0
Source: Primary Data
From the above table it is found that 1.7% of the respondents have given Ist
priority, 4.2% of
the respondents have given IInd
priority, 12.5% of the respondents have given IIIrd
priority,
11.7% of the respondents have given IVth
priority, 24.2% of the respondents have given Vth
priority, 15.8% of the respondents have given VIth
priority, 30% of the respondents have
given VIIth
priority for the health problems.
Chart: 7.13.e: Prioritizing the reasons- Supervisor relationship.
0
5
10
15
20
25
30
35
40
Ist priority IInd
priority
IIIrd
priority
IVth
priority
Vth
priority
VI priority VIIth
priority
No. Of respondents
Percent
Table: 7.13.f: Prioritizing the reasons- Sufficient training
Sufficient training No. Of respondents Percentage
Ist priority 9 7.5
IInd priority 3 2.5
IIIrd priority 17 14.2
IVth priority 27 22.5
Vth priority 14 11.7
VI priority 26 21.7
VIIth priority 24 20.0
Total 120 100.0
Source: Primary Data
From the above table it is found that 7.5% of the respondents have given Ist
priority, 2.5% of
the respondents have given IInd
priority, 14.2% of the respondents have given IIIrd
priority,
22.5% of the respondents have given IVth
priority, 11.7% of the respondents have given Vth
priority, 21.7% of the respondents have given VIth
priority, 20% of the respondents have
given VIIth
priority for the sufficient training.
Chart: 7.13.f: Prioritizing the reasons- Sufficient training
0
5
10
15
20
25
30
Ist priority IInd
priority
IIIrd
priority
IVth
priority
Vth
priority
VI priority VIIth
priority
No. Of respondents
Percent
Table: 7.13.g: Prioritizing the reasons- Lenient management system
Lenient management
system
No. Of respondents Percentage
Ist priority 1 .8
IInd priority 3 2.5
IIIrd priority 20 16.7
IVth priority 13 10.8
Vth priority 21 17.5
VI priority 26 21.7
VIIth priority 36 30.0
Total 120 100.0
Source: Primary Data
From the above table it is found that 0.8% of the respondents have given Ist
priority, 2.5% of
the respondents have given IInd
priority, 16.7% of the respondents have given IIIrd
priority,
10.8% of the respondents have given IVth
priority, 17.5% of the respondents have given Vth
priority, 21.7% of the respondents have given VIth
priority, 30% of the respondents have
given VIIth
priority for the lenient management system.
Chart: 7.13.g: Prioritizing the reasons- Lenient management system
0
5
10
15
20
25
30
35
40
Ist priority IInd
priority
IIIrd
priority
IVth
priority
Vth priority VI priority VIIth
priority
No. Of respondents
Percent
Table: 7.14.a: Awareness about the company’s sufferings.
Awareness No. Of respondents Percentage
Strongly agree 59 49.2
Agree 30 25.0
Neutral 25 20.8
Disagree 2 1.7
Strongly disagree 4 3.3
Total 120 100.0
Source: Primary Data
From the above table it is found that 49.2% of the respondents are strongly agreed, 25% of
the respondents are agreed, 20.8% of the respondents are in neutral, 3.3% of the respondents
are strongly disagreed, 1.7% of the respondents are disagreed that they know about the
company’s sufferings if they absent without prior permission.
Chart: 7.14.a: Awareness about the company’s sufferings.
0
10
20
30
40
50
60
70
Strongly agree Agree Neutral Disagree Strongly
disagree
No. Of respondents
Percentage
Table: 7.14.b: Superiors are more concerned about their absence
Superiors concern No. Of respondents Percentage
Strongly agree 37 30.8
Agree 57 47.5
Neutral 21 17.5
Disagree 2 1.7
Strongly disagree 3 2.5
Total 120 100.0
Source: Primary Data
From the above table it is found that 30.8% of the respondents are strongly agreed, 47.5% of
the respondents are agreed, 17.5% of the respondents are in neutral, 1.7% of the respondents
are disagreed, 2.5% of the respondents are strongly disagreed that their superiors are more
concerned about their absence and advice them to attend regularly.
Chart: 7.14.b: Superiors are more concerned about their absence
0
10
20
30
40
50
60
Strongly agree Agree Neutral Disagree Strongly
disagree
No. Of respondents
Percentage
Table: 7.14.c: Actions against leave taken.
Actions No. Of respondents Percentage
Strongly agree 41 34.2
Agree 22 18.3
Neutral 21 17.5
Disagree 15 12.5
Strongly disagree 21 17.5
Total 120 100.0
Source: Primary Data
From the above table it is found that 34.2% of the respondents are strongly agreed, 18.3% of
the respondents are agreed, 17.5% of the respondents are in neutral, 12.5% of the
respondents are disagreed, 17.5% of the respondents are strongly disagreed that company is
not keen about taking any actions against their absence.
Chart: 7.14.c: Actions against leave taken.
0
5
10
15
20
25
30
35
40
45
Strongly agree Agree Neutral Disagree Strongly
disagree
No. of respondents
Percentage
Table: 7.15.a: Bus facilities are convenient for respondents.
Bus facilities No. Of respondents Percentage
Strongly agree 67 55.8
Agree 33 27.5
Neutral 9 7.5
Disagree 6 5.0
Strongly disagree 5 4.2
Total 120 100.0
Source: Primary Data
From the above table it is found that 55.8% of the respondents are strongly agreed, 27.5% of
the respondents are agreed, 7.5% of the respondents are in neutral, 5.0% of the respondents
are disagreed, 4.2% of the respondents are strongly disagreed that bus facilities provided by
the company is convenient for them.
Chart: 7.15.a: Bus facilities are convenient for respondents.
0
10
20
30
40
50
60
70
80
Strongly agree Agree Neutral Disagree Strongly
disagree
No. Of respondents
Percentage
Table: 7.15.b: convenient bus timings
Bus timings No. Of respondents Percentage
Strongly agree 54 45.0
Agree 29 24.2
Neutral 24 20.0
Disagree 7 5.8
Strongly disagree 6 5.0
Total 120 100.0
Source: Primary Data
From the above table it is found that 45.0% of the respondents are strongly agreed, 24.2% of
the respondents are agreed, 20% of the respondents are in neutral, 5.8% of the respondents
are disagreed, 5.0% of the respondents are strongly disagreed that bus timings are convenient
for them.
Chart: 7.15.b: convenient bus timings
0
10
20
30
40
50
60
Strongly agree Agree Neutral Disagree Strongly
disagree
No. Of respondents
Percentage
Table: 7.15.c: Convenient pickup points
Pickup points No. Of respondents Percentage
Strongly agree 53 44.2
Agree 31 25.8
Neutral 19 15.8
Disagree 6 5.0
Strongly disagree 11 9.2
Total 120 100.0
Source: Primary Data
From the above table it is found that 44.2% of the respondents are strongly agreed, 25.8% of
the respondents are agreed, 15.8% of the respondents are in neutral, 5.0% of the respondents
are disagreed, 9.2% of the respondents are strongly disagreed that bus pick-up points are
convenient for them.
Chart: 7.15.c: Convenient pickup points
0
10
20
30
40
50
60
Strongly agree Agree Neutral Disagree Strongly
disagree
No. Of respondents
Percentage
Table: 7.16.a: food provided for me is tasty & healthy for the respondents
Food quality No. Of respondents Percentage
Strongly agree 20 16.7
Agree 18 15.0
Neutral 40 33.3
Disagree 30 25.0
Strongly disagree 12 10.0
Total 120 100.0
Source: Primary Data
From the above table it is found that 16.7% of the respondents are strongly agreed, 15% of
the respondents are agreed, 33.3% of the respondents are in neutral, 25% of the respondents
are disagreed, 10% of the respondents are strongly disagreed that food provided by the
company is tasty and healthy for them.
Chart: 7.16.a: food provided for me is tasty & healthy for the respondents
0
5
10
15
20
25
30
35
40
45
Strongly agree Agree Neutral Disagree Strongly
disagree
No. Of respondents
Percentage
Table: 7.16.b: Food provided by the company is cooked in a hygienic way for the
respondents
Hygienic food No. Of respondents Percentage
Strongly agree 13 10.8
Agree 18 15.0
Neutral 55 45.8
Disagree 16 13.3
Strongly disagree 18 15.0
Total 120 100.0
Source: Primary Data
From the above table it is found that 10.8% of the respondents are strongly agreed, 15% of
the respondents are agreed, 45.8% of the respondents are in neutral, 13.3% of the
respondents are disagreed, 15% of the respondents are strongly disagreed that food provided
by the company is cooked in a hygienic way.
Chart: 7.16.b: Food provided by the company is cooked in a hygienic way for the
respondents
0
10
20
30
40
50
60
Strongly agree Agree Neutral Disagree Strongly
disagree
No. Of respondents
Percentage
Table: 7.16.c: Food provided by the company is worthy for the respondents
Worthiness of food No. Of respondents Percentage
Strongly agree 19 15.8
Agree 28 23.3
Neutral 30 25.0
Disagree 24 20.0
Strongly disagree 19 15.8
Total 120 100.0
Source: Primary Data
From the above table it is found that 15.8% of the respondents are strongly agreed, 23.3% of
the respondents are agreed, 25% of the respondents are in neutral, 20% of the respondents
are disagreed, 15.8% of the respondents are strongly disagreed that food provided by the
company is worthy.
Chart: 7.16.c: Food provided by the company is worthy for the respondents
0
5
10
15
20
25
30
35
Strongly agree Agree Neutral Disagree Strongly
disagree
No. Of respondents
Percentage
Table: 7.16.d.: Break timings are comfortable for the respondents
Break timings No. Of respondents Percent
Strongly agree 19 15.8
Agree 17 14.2
Neutral 25 20.8
Disagree 26 21.7
Strongly disagree 33 27.5
Total 120 100.0
Source: Primary Data
From the above table it is found that 15.8% of the respondents are strongly agreed, 14.2% of
the respondents are agreed, 20.8% of the respondents are in neutral, 21.7% of the
respondents are disagreed, 27.5% of the respondents are strongly disagreed that break timings
are comfortable for them.
Chart: 7.16.d.: Break timings are comfortable for the respondents
0
5
10
15
20
25
30
35
Strongly agree Agree Neutral Disagree Strongly
disagree
No. Of respondents
Percent
Table: 7.17.a: Training provided by the company is sufficient for the respondents
Sufficient training No. Of respondents Percentage
Strongly agree 42 35.0
Agree 30 25.0
Neutral 17 14.2
Disagree 13 10.8
Strongly disagree 18 15.0
Total 120 100.0
Source: Primary Data
From the above table it is found that 35% of the respondents are strongly agreed, 25% of the
respondents are agreed, 14.2% of the respondents are in neutral, 10.8% of the respondents
are disagreed, 15% of the respondents are strongly disagreed that training provided by the
company is sufficient for them.
Chart: 7.17.a: Training provided by the company is sufficient for the respondents
0
5
10
15
20
25
30
35
40
45
Strongly
agree
Agree Neutral Disagree Strongly
disagree
No. Of respondents
Percentage
Table: 7.17.b: Respondents are clear about the responsibilities of their work
Know bout responsibilities No. Of respondents Percentage
Strongly agree 39 32.5
Agree 51 42.5
Neutral 23 19.2
Disagree 4 3.3
Strongly disagree 3 2.5
Total 120 100.0
Source: Primary Data
From the above table it is found that 32.5% of the respondents are strongly agreed, 42.5% of
the respondents are agreed, 19.2% of the respondents are in neutral, 3.3% of the respondents
are disagreed, 2.5% of the respondents are strongly disagreed that they are clear about the
responsibilities of their work.
Chart: 7.17.b: Respondents are clear about the responsibilities of their work
0
10
20
30
40
50
60
Strongly agree Agree Neutral Disagree Strongly
disagree
No. Of respondents
Percentage
Table: 7.18.a: Respondents feel easy to communicate with their co-worker
Easy to communicate No. Of respondents Percentage
Strongly agree 49 40.8
Agree 57 47.5
Neutral 10 8.3
Disagree 1 .8
Strongly disagree 3 2.5
Total 120 100.0
Source: Primary Data
From the above table it is found that 40.8% of the respondents are strongly agreed, 47.5% of
the respondents are agreed, 8.3% of the respondents are in neutral, 0.8% of the respondents
are disagreed, 2.5% of the respondents are strongly disagreed that they feel easy to
communicate with their co-workers.
Chart: 7.18.a: Respondents feel easy to communicate with their co-worker.
0
10
20
30
40
50
60
Strongly agree Agree Neutral Disagree Strongly
disagree
No. Of respondents
Percentage
Table: 7.18.b: No conflicts among co-workers regarding the work
No conflicts No. Of respondents Percentage
Strongly agree 47 39.2
Agree 51 42.5
Neutral 9 7.5
Disagree 4 3.3
Strongly disagree 9 7.5
Total 120 100.0
Source: Primary Data
From the above table it is found that 39.2% of the respondents are strongly agreed, 42.5% of
the respondents are agreed,7.53% of the respondents are in neutral, 3.3% of the respondents
are disagreed, 7.5% of the respondents are strongly disagreed that no conflicts amongst them
regarding the work.
Chart: 7.18.b: No conflicts among co-workers regarding the work
.
0
10
20
30
40
50
60
Strongly
agree
Agree Neutral Disagree Strongly
disagree
No. Of respondents
No. Of respondents Percentage
Table: 7.18.c: co-worker helps them/ clears their doubt
Helping/ clearing doubts No. Of respondents Percentage
Strongly agree 42 35.0
Agree 57 47.5
Neutral 9 7.5
Disagree 2 1.7
Strongly disagree 10 8.3
Total 120 100.0
Source: Primary Data
From the above table it is found that 35% of the respondents are strongly agreed, 47.5% of
the respondents are agreed, 7.5% of the respondents are in neutral, 1.7% of the respondents
are disagreed, 8.3% of the respondents are strongly disagreed that co-worker helps him/clears
his doubts.
Chart: 7.18.c: co-worker helps them/ clears their doubt
0
10
20
30
40
50
60
Strongly agree Agree Neutral Disagree Strongly
disagree
No. Of respondents
Percentage
Table: 7.19.a: respondents feel easy to communicate with their supervisor
Easy to communicate No. Of respondents Percentage
Strongly agree 65 54.2
Agree 30 25.0
Neutral 17 14.2
Disagree 6 5.0
Strongly disagree 2 1.7
Total 120 100.0
Source: Primary Data
From the above table it is found that 54.2% of the respondents are strongly agreed, 25% of
the respondents are agreed, 14.2% of the respondents are in neutral, 5% of the respondents
are disagreed, 1.7% of the respondents are strongly disagreed that they feel easy to
communicate with their supervisor.
Chart: 7.19.a: respondents feel easy to communicate with their supervisor
0
10
20
30
40
50
60
70
Strongly agree Agree Neutral Disagree Strongly
disagree
No. Of respondents
Percentage
Table: 7.19.b: supervisor helps them/ clears their doubt
Helping/clears doubts No. Of respondents Percentage
Strongly agree 31 25.8
Agree 65 54.2
Neutral 17 14.2
Disagree 3 2.5
Strongly disagree 4 3.3
Total 120 100.0
Source: Primary Data
From the above table it is found that 25.8% of the respondents are strongly agreed, 54.2% of
the respondents are agreed, 14.2% of the respondents are in neutral, 2.5% of the respondents
are disagreed, 3.3% of the respondents are strongly disagreed that supervisor helps him/clears
his doubt promptly.
Chart: 7.19.b: supervisor helps them/ clears their doubt
0
10
20
30
40
50
60
70
Strongly agree Agree Neutral Disagree Strongly
disagree
No. Of respondents
Percentage
Table: 7.19.c: No conflicts among them regarding the work
No conflicts No. Of respondents Percentage
Strongly agree 61 50.8
Agree 35 29.2
Neutral 14 11.7
Disagree 2 1.7
Strongly disagree 8 6.7
Total 120 100.0
Source: Primary Data
From the above table it is found that 50.8% of the respondents are strongly agreed, 29.2% of
the respondents are agreed, 11.7% of the respondents are in neutral, 1.7% of the respondents
are disagreed, 6.7% of the respondents are strongly disagreed that there is no conflicts
amongst them regarding the work.
Chart: 7.19.c: No conflicts among them regarding the work.
0
10
20
30
40
50
60
70
Strongly agree Agree Neutral Disagree Strongly
disagree
No. Of respondents
Percentage
Table: 7.20.a: Respondents are comfortable to continue shifts
Continue shifts Frequency Percent
Strongly agree 27 22.5
Agree 20 16.7
Neutral 24 20.0
Disagree 36 30.0
Strongly disagree 13 10.8
Total 120 100.0
Source: Primary Data
From the above table it is found that 22.5% of the respondents are strongly agreed, 16.7% of
the respondents are agreed, 20% of the respondents are in neutral, 30% of the respondents
are disagreed, 10.8% of the respondents are strongly disagreed that they are comfortable to
continue shifts.
Chart: 7.20.a: Respondents are comfortable to continue shifts
0
5
10
15
20
25
30
35
40
Strongly agree Agree Neutral Disagree Strongly
disagree
Frequency
Percent
Table: 7.20.b1: Respondents are comfortable to work continuously in I & II shift
Continue I and II shift Frequency Percent
Strongly agree 25 20.8
Agree 17 14.2
Neutral 17 14.2
Disagree 38 31.7
Strongly disagree 23 19.2
Total 120 100.0
Source: Primary Data
From the above table it is found that 20.8% of the respondents are strongly agreed, 14.2% of
the respondents are agreed, 14.2% of the respondents are in neutral, 31.7% of the
respondents are disagreed, 19.2% of the respondents are strongly disagreed that they are
comfortable to work continuously in I & II shift.
Chart: 7.20.b1: Respondents are comfortable to work continuously in I & II shift
0
5
10
15
20
25
30
35
40
Strongly agree Agree Neutral Disagree Strongly
disagree
Frequency
Percent
Table: 7.20.b2: Respondents are comfortable to work continue in II & III shift
Continue II and III shift No. Of respondents Percentage
Strongly agree 28 23.3
Agree 30 25.0
Neutral 17 14.2
Disagree 32 26.7
Strongly disagree 13 10.8
Total 120 100.0
Source: Primary Data
From the above table it is found that 23.3% of the respondents are strongly agreed, 25% of
the respondents are agreed, 14.2% of the respondents are in neutral, 26.7% of the
respondents are disagreed, 10.8% of the respondents are strongly disagreed that they are
comfortable to work continuously in II & III shift.
Chart: 7.20.b2: Respondents are comfortable to work continue in II & III shift
0
5
10
15
20
25
30
35
Strongly agree Agree Neutral Disagree Strongly
disagree
No. Of respondents
Percentage
Table: 7.20.b3: Respondents are comfortable to work continuously in III & I shift
Continue III and I shift No. Of respondents Percentage
Strongly agree 21 17.5
Agree 20 16.7
Neutral 15 12.5
Disagree 43 35.8
Strongly disagree 21 17.5
Total 120 100.0
Source: Primary Data
From the above table it is found that 17.5% of the respondents are strongly agreed, 16.7% of
the respondents are agreed, 12.5% of the respondents are in neutral, 35.8% of the
respondents are disagreed, 17.5% of the respondents are strongly disagreed that they are
comfortable to work continuously in III & I shift.
Chart: 7.20.b3: Respondents are comfortable to work continuously in III & I shift
0
5
10
15
20
25
30
35
40
45
50
Strongly
agree
Agree Neutral Disagree Strongly
disagree
No. Of respondents
Percentage
Table: 7.20..c: Respondents are permitted to take the comp.off as and when i need
Comp.off No. Of respondents Percentage
Strongly agree 19 15.8
Agree 21 17.5
Neutral 33 27.5
Disagree 29 24.2
Strongly disagree 18 15.0
Total 120 100.0
Source: Primary Data
From the above table it is found that 15.8% of the respondents are strongly agreed, 17.5% of
the respondents are agreed, 27.5% of the respondents are in neutral, 24.2% of the
respondents are disagreed, 15% of the respondents are strongly disagreed that they are
permitted to take the comp.off as and when they need.
Chart: 7.20..c: Respondents are permitted to take the comp.off as and when i need
0
5
10
15
20
25
30
35
Strongly agree Agree Neutral Disagree Strongly
disagree
No. Of respondents
Percentage
Table: 7.20.d: Respondents are given OT from extra work
OT No. Of respondents Percentage
Strongly agree 14 11.7
Agree 16 13.3
Neutral 18 15.0
Disagree 40 33.3
Strongly disagree 32 26.7
Total 120 100.0
Source: Primary Data
From the above table it is found that 11.7% of the respondents are strongly agreed, 13.3% of
the respondents are agreed, 15% of the respondents are in neutral, 33.3% of the respondents
are disagreed, 26.7% of the respondents are strongly disagreed that they are given OT from
extra work.
Chart: 7.20.d: Respondents are given OT from extra work
0
5
10
15
20
25
30
35
40
45
Strongly
agree
Agree Neutral Disagree Strongly
disagree
No. Of respondents
Percentage
Table: 7.21.a: Uniform provided by the company is of good quality for the respondents
21.a.
Uniform quality No. Of respondents Percentage
Strongly agree 25 20.8
Agree 20 16.7
Neutral 32 26.7
Disagree 14 11.7
Strongly disagree 29 24.2
Total 120 100.0
Source: Primary Data
From the above table it is found that 20.8% of the respondents are strongly agreed, 16.7% of
the respondents are agreed, 26.7% of the respondents are in neutral, 11.7% of the
respondents are disagreed, 24.2% of the respondents are strongly disagreed that uniform
provided by the company is of good quality.
Chart: 7.21.a: Uniform provided by the company is of good quality for the respondents
0
5
10
15
20
25
30
35
Strongly agree Agree Neutral Disagree Strongly
disagree
No. Of respondents
Percentage
Table: 7.21: b: Shoes provided by the company is of good quality for the respondents
Shoe quality No. Of respondents Percentage
Strongly agree 17 14.2
Agree 16 13.3
Neutral 16 13.3
Disagree 27 22.5
Strongly disagree 44 36.7
Total 120 100.0
Source: Primary Data
From the above table it is found that 14.2% of the respondents are strongly agreed, 13.3% of
the respondents are agreed, 13.3% of the respondents are in neutral, 22.5% of the
respondents are disagreed, 36.7% of the respondents are strongly disagreed that shoes
provided by the company is of good quality.
Chart: 7.21: b: Shoes provided by the company is of good quality for the respondents
0
5
10
15
20
25
30
35
40
45
50
Strongly
agree
Agree Neutral Disagree Strongly
disagree
No. Of respondents
Percentage
Table: 7.21.c: Respondents are clear about the importance of PPE's
Importance of PPE No. Of respondents Percentage
Strongly agree 42 35.0
Agree 33 27.5
Neutral 28 23.3
Disagree 12 10.0
Strongly disagree 5 4.2
Total 120 100.0
Source: Primary Data
From the above table it is found that 35% of the respondents are strongly agreed, 27.5% of
the respondents are agreed, 23.3.% of the respondents are in neutral, 10% of the respondents
are disagreed, 4.2% of the respondents are strongly disagreed that they are clear about the
importance of PPE’s.
Chart: : 7.21.c: Respondents are clear about the importance of PPE's
0
5
10
15
20
25
30
35
40
45
Strongly
agree
Agree Neutral Disagree Strongly
disagree
No. Of respondents
Percentage
CROSS TABULATIOS
Table: 7.22: Designation of the respondents * Health problems – Cross tabulation
Designation
Health problems
TotalIst
priority
IInd
priority
IIIrd
priority
IVth
priority
Vth
priority
VIIth
priority
CAPS 12 6 2 1 2 0 23
Diploma 38 17 2 4 0 1 62
STT 9 3 0 3 1 0 16
ITI 6 3 0 0 0 0 9
GAPS 7 2 1 0 0 0 10
Total
72 31 5 8 3 1 120
Source: Primary Data
From the above table, it is found that
 In CAPS 12 respondents has given 1st
priority, 6 respondents has given 2nd
priority, 2
respondents has given 3rd
priority, 1 respondent has given 4th
priority, 2 respondents
has given 5th
priority for health problems.
 In Diploma 38 respondents has given 1st
priority, 17 respondents has given 2nd
priority, 2 respondents has given 3rd
priority, 4 respondent has given 4th
priority, 1
respondent has given 7th
priority for health problems.
 In STT 9 respondents has given 1st
priority, 3 respondents has given 2nd
priority, 3
respondents has given 4th
priority, 1 respondent has given 5th
priority for health
problems.
 In ITI 6 respondents has given 1st
priority, 3 respondents has given 2nd
priority for
health problems.
 In GAPS 7 respondents has given 1st
priority, 2 respondents has given 2nd
priority, 1
respondents has given 3rd
priority for health problems.
Chart:7.22: Designation of the respondents * Health problems – Cross
tabulation
0
5
10
15
20
25
Ist priority IInd priority IIIrd priority IVth priority Vth priority VIth priority VIIth priority
CAPS
Diploma
STT
ITI
GAPS
Table: 7.23: Designation of the respondents * Transport facilities - Cross tabulation
Designation
Transport facilities Total
Ist
priority
IInd
priority
IIIrd
priority
IVth
priority
Vth
priority
VI
priority
CAPS 4 11 4 2 0 2 23
Diploma 13 22 8 5 10 4 62
STT 3 6 5 1 1 0 16
ITI 1 2 4 1 0 1 9
GAPS 3 3 1 1 1 1 10
Total 24 44 22 10 12 8 120
Source: Primary Data
From the above table, it is found that
 In CAPS 4 respondents has given 1st
priority, 11 respondents has given 2nd
priority, 4
respondents has given 3rd
priority, 2 respondents has given 4th
priority, 2 respondents
has given 6th
priority for transport facilities.
 In diploma 13 respondents has given 1st
priority, 22 respondents has given 2nd
priority, 8 respondents has given 3rd
priority, 5 respondents has given 4th
priority, 10
respondents has given 5th
priority, 4 respondents has given 6th
priority for transport
facilities.
 In STT 3 respondents has given 1st
priority, 6 respondents has given 2nd
priority, 5
respondents has given 3rd
priority, 1 respondent has given 4th
priority, 1 respondent
has given 5th
priority for transport facilities.
 In ITI 1 respondent has given 1st
priority, 2 respondents has given 2nd
priority, 4
respondents has given 3rd
priority, 1 respondent has given 4th
priority, 1 respondent
has given 6th
priority for transport facilities.
 In GAPS 3 respondents has given 1st
priority, 3 respondents has given 2nd
priority, 1
respondent has given 3rd
priority, 1 respondent has given 4th
priority, 1 respondent has
given 5th
priority, 1 respondent has given 6th
priority for transport facilities.
Chart :7.23: 7.23: Designation of the respondents * Transport facilities - Cross tabulation

0
5
10
15
20
25
Ist priority IInd priority IIIrd
priority
IVth
priority
Vth priority VIth
priority
VIIth
priority
CAPS
Diploma
STT
ITI
GAPS
Table: 7.24: Designation of the respondents * canteen facilities - Cross
tabulation
Designation
Canteen facilities
TotalIst
priority
IInd
priority
IIIrd
priority
IVth
priority
Vth
priority
VI
priorit
y
VIIth
priority
CAPS 4 3 8 6 2 0 0 23
Diploma 6 12 18 9 8 4 5 62
STT 1 5 3 3 4 0 0 16
ITI 1 1 0 5 1 1 0 9
GAPS 0 4 5 0 0 1 0 10
Total 12 25 34 23 15 6 5 120
Source: Primary Data
From the above table, it is found that
 In CAPS 4 respondents has given 1st
priority, 3 respondents has given 2nd
priority, 8
respondents has given 3rd
priority, 6 respondents has given 4th
priority, 2 respondents
has given 5th
priority for canteen facilities.
 In Diploma 6 respondents has given 1st
priority, 12 respondents has given 2nd
priority,
18 respondents has given 3rd
priority, 9 respondents has given 4th
priority, 8
respondents has given 5th
priority, 4 respondents has given 6th
priority, 5 respondents
has given 7th
priority for canteen facilities.
 In STT 1 respondent has given 1st
priority, 5 respondents has given 2nd
priority, 3
respondents has given 3rd
priority, 3 respondents has given 4th
priority, 4 respondents
has given 5th
priority for canteen facilities.
 In ITI 1 respondent has given 1st
priority, 5 respondents has given 2nd
priority, 3
respondents has given 3rd
priority, 3 respondents has given 4th
priority, 4 respondents
has given 5th
priority for canteen facilities.
 In GAPS 4 respondents has given 2nd
priority, 5 respondents has given 3rd
priority, 1
respondent has given 6th
priority for canteen facilities.
Chart: 7.24: Designation of the respondents * canteen facilities - Cross tabulation
0
2
4
6
8
10
12
14
16
18
Ist priority IInd priority IIIrd priority IVth priority Vth priority VIth priority VIIth
priority
CAPS
Diploma
STT
ITI
GAPS
Table:7.25: Designation of the respondents * co-worker relationship - Cross tabulation
Designation
Co-worker relationship Total
Ist
priority
IInd
priority
IIIrd
priority
IVth
priority
Vth
priority
VI
priorit
y
VIIth
priority
CAPS 0 1 3 5 6 5 3 23
Diploma 1 4 5 15 9 16 12 62
STT 0 1 0 2 6 6 1 16
ITI 0 2 2 1 1 3 0 9
GAPS 0 0 0 0 3 5 2 10
Total 1 8 10 23 25 35 18 120
Source: Primary Data
From the above table, it is found that
 In CAPS 1 respondent has given 2nd
priority, 3 respondents has given 3rd
priority, 5
respondents has given 4th
priority, 6 respondents has given 5th
priority, 5 respondents
has given 6th
priority, 3 respondents has given 7th
priority for co-worker relationship.
 In Diploma1 respondent has given 1st
priority, 4 respondents has given 2nd
priority, 5
respondents has given 3rd
priority, 15 respondents has given 4th
priority, 9 respondents
has given 5th
priority, 16 respondents has given 6th
priority, 12 respondents has given
7th
priority for co-worker relationship.
 In STT 1 respondent has given 2nd
priority, 2 respondents has given 4th
priority, 6
respondents has given 5th
priority, 6 respondents has given 6th
priority, 1 respondent
has given 7th
priority for co-worker relationship.
 In ITI 2 respondents has given 2nd
priority, 2 respondents has given 3rd
priority, 1
respondent has given 4th
priority, 1 respondent has given 5th
priority, 3 respondents
has given 6th
priority for co-worker relationship.
 In GAPS 3 respondents has given 5th
priority, 6 respondents has given 6th
priority, 2
respondents has given 7th
priority for co-worker relationship.
Chart: 7.25: Designation of the respondents * co-worker relationship - Cross tabulation
0
2
4
6
8
10
12
14
16
18
Ist priority IInd priority IIIrd priority IVth priority Vth priority VIth priority VIIth priority
CAPS
Diploma
STT
ITI
GAPS
Table: 7.26: Designation of the respondents * supervisor relationship - Cross tabulation
Designation
Supervisor relationship
Total
Ist
priority
IInd
priority
IIIrd
priority
IVth
priority
Vth
priority
VI
priority
VIIth
priority
CAPS 0 0 2 1 5 8 7 23
Diploma 2 4 8 11 16 5 16 62
STT 0 0 3 1 2 3 7 16
ITI 0 0 1 1 4 0 3 9
GAPS 0 1 1 0 2 3 3 10
Total 2 5 15 14 29 19 36 120
Source: Primary Data
From the above table, it is found that
 In CAPS 2 respondents has given 3rd
priority, 1 respondent has given 4th
priority, 5
respondents has given 5th
priority, 8 respondents has given 6th
priority, 7 respondents
has given 7th
priority for supervisor relationship.
 In Diploma2 respondent has given 1st priority, 4 respondents has given 2nd
priority, 8
respondents has given 3rd
priority, 11 respondents has given 4th
priority, 16
respondents has given 5th
priority, 5 respondents has given 6th
priority, 16 respondents
has given 7th
priority for supervisor relationship.
 In STT 3 respondents has given 3rd
priority, 1 respondent has given 4th
priority, 2
respondents has given 5th
priority, 3 respondents has given 6th
priority, 7 respondents
has given 7th
priority for supervisor relationship.
 In ITI 1 respondent has given 3rd
priority, 1 respondent has given 4th
priority, 4
respondents has given 5th
priority, 3 respondents has given 7th
priority for supervisor
relationship
 In GAPS 1 respondent has given 2nd
priority, 1 respondent has given 3rd
priority, 2
respondents has given 5th
priority, 3 respondents has given 6th
priority, 3 respondents
has given 7th
priority for supervisor relationship.
Chart: 7.26: Designation of the respondents * supervisor relationship Cross tabulation
0
2
4
6
8
10
12
14
16
18
Ist priority IInd priority IIIrd priority IVth priority Vth priority VIth priority VIIth priority
CAPS
Diploma
STT
ITI
GAPS
Table: 7. 27: Designation of the respondents * sufficient training Cross tabulation
Designation
Sufficient training
TotalIst
priority
IInd
priority
IIIrd
priority
IVth
priority
Vth
priority
VI
priority
VIIth
priority
CAPS 3 0 4 5 5 4 2 23
Diploma 2 3 8 14 5 17 13 62
STT 3 0 1 5 0 3 4 16
ITI 1 0 2 0 0 2 4 9
GAPS 0 0 2 3 4 0 1 10
Total 9 3 17 27 14 26 24 120
Source: Primary Data
From the above table, it is found that
 In CAPS 3 respondents has given 1st
priority,4respondents has given 3rd
priority, 5
respondent has given 4th
priority, 5 respondents has given 5th
priority, 4 respondents
has given 6th
priority, 2 respondents has given 7th
priority for sufficient training.
 In Diploma 2 respondents has given 1st
priority, 3 respondents has given 2nd
priority, 8
respondents has given 3rd
priority, 14 respondent has given 4th
priority, 5 respondents
has given 5th
priority, 17 respondents has given 6th
priority, 13 respondents has given
7th
priority for sufficient training.
 In STT 3 respondents has given 1st
priority, 1 respondents has given 3rd
priority, 5
respondent has given 4th
priority, 3 respondents has given 6th
priority, 4 respondents
has given 7th
priority for sufficient training.
 In ITI 1 respondent has given 1st
priority, 2 respondents has given 3rd
priority, 2
respondents has given 6th
priority, 4 respondents has given 7th
priority for sufficient
training.
 In GAPS 2 respondents has given 3rd
priority, 3 respondent has given 4th
priority, 4
respondents has given 5th
priority, 1 respondent has given 7th
priority for sufficient
training.
Chart: 7. 27: Designation of the respondents * sufficient training - Cross tabulation
0
2
4
6
8
10
12
14
16
18
Ist priority IInd priority IIIrd priorityIVth priority Vth priority VIth priority VIIth
priority
CAPS
Diploma
STT
ITI
GAPS
Table: 7.28: Designation of the respondents * Lenient management system - Cross
tabulation
Designation
Lenient management system
TotalIst
priority
IInd
priority
IIIrd
priority
IVth
priority
Vth
priority
VI
priority
VIIth
priority
CAPS 0 1 1 3 3 4 11 23
Diploma 1 0 14 3 13 16 15 62
STT 0 1 4 1 2 4 4 16
ITI 0 1 0 1 3 2 2 9
GAPS 0 0 1 5 0 0 4 10
Total 1 3 20 13 21 26 36 120
Source: Primary Data
From the above table, it is found that
 In CAPS 1 respondents has given 2nd
priority, 1respondent has given 3rd
priority, 3
respondent has given 4th
priority, 3 respondents has given 5th
priority, 4 respondents
has given 6th
priority, 11 respondents has given 7th
priority for Lenient management
system .
 In Diploma 1 respondents has given 1st
priority, 14 respondents has given 3rd
priority,
3 respondent has given 4th
priority, 13 respondents has given 5th
priority, 16
respondents has given 6th
priority, 15 respondents has given 7th
priority for Lenient
management system .
 In STT 1 respondent has given 2nd
priority,4 respondents has given 3rd
priority, 1
respondent has given 4th
priority, 2 respondents has given 5th
priority, 4 respondents
has given 6th
priority, 4 respondents has given 7th
priority for Lenient management
system .
 In ITI 1 respondent has given 2nd
priority, 1 respondent has given 4th
priority, 3
respondents has given 5th
priority, 2 respondents has given 6th
priority, 2 respondents
has given 7th
priority for Lenient management system .
 In GAPS 1 respondents has given 3rd
priority, 5 respondent has given 4th
priority, 4
respondents has given 7th
priority for Lenient management system .
Chart: 7.28: Designation of the respondents * Lenient management system - Cross tabulation
0
2
4
6
8
10
12
14
16
18
Ist priority IInd priority IIIrd priority IVth priority Vth priority VIth priority VIIth priority
CAPS
Diploma
STT
ITI
GAPS
CHI-TEST;
Table: 7.29 Age Vs Health problems of the respondents
H0 (null hypothesis) = Age of the respondents is not the reason for the health problems
H1 (alternative hypothesis) = Age of the respondents is the reason for the health problems
Age
Health reasons
Ist priority IInd
priority
IIIrd
priority
Vth
priority
VI priority Total
< 19 yrs 6.525 5.625 5.175 5.175 4.5 27
19-21 yrs 8.216667 7.083333 6.516667 6.516667 5.666667 34
22-24 yrs 7.25 6.25 5.75 5.75 5 30
> 24 yrs 7.008333 6.041667 5.558333 5.558333 4.833333 29
total 29 25 23 23 20 120
Degrees of freedom =3*4=12, the table value for 5% level of significance is 21.021 and
calculated value is 0.999976.
INFERENCE:
Since table value is greater than calculated value H0 null hypothesis is accepted.
Table 7.30: Location of the respondents Vs Transport
H0 (null hypothesis) = location of the respondents is not the reason for the transport
problems.
H1 (alternative hypothesis) = location of the respondents is not the reason for the transport
problems.
Location
Transport facilities
Ist priority IInd
priority
IIIrd
priority
Vth
priority
VI
priority
Total
Chatram
(Trichy) &
nearby 8.783333 7.083333 6.233333 5.95 5.95 34
Woraiyur &
nearby 7.233333 5.833333 5.133333 4.9 4.9 28
Manaparai &
nearby 7.233333 5.833333 5.133333 4.9 4.9 28
Viralimalai &
nearby 7.75 6.25 5.5 5.25 5.25 30
Total 31 25 22 21 21 120
Degrees of freedom =3*4=12, the table value for 5% level of significance is 21.021 and
calculated value is 0.9999541.
INFERENCE:
Since table value is greater than calculated value H0 null hypothesis is accepted.
CHAPTER – VIII
FINDINGS, SUGGESTIONS AND CONCLUSION.
The following pages deals with the summary of findings after a careful analysis of the
data collected from the respondents in a significant manner. The findings are supported with
suitable solutions that are offered for the effective absenteeism management in near future. It
is also concluded with the remarks at the last.
FINDINGS:
 From the table (7.1) it is found that 59.2% of the respondents are 19-21yrs, 30.8% of
the respondents are 22-24yrs, 6.7% respondents are above 24yrs and 3.3%
respondents are below 19 yrs.
 From the table (7.2) it is found that 37.5% of the respondents are from Chatram
(Trichy) & nearby, 24.2% of the respondents are from Woraiyur & nearby, 19.2%
Viralimalai & nearby,13.3% of the respondents are from Manaparai & nearby, 5.8 of
the respondents are from other areas.
 From the table (7.3) it is found that 82.5% of the respondents are from Diploma, 8.3%
of the respondents are from ITI, 5% of the respondents are from BE, 4.2% of the
respondents are from HSC
 From the table (7.4) it is found that 51.7% of the respondents are from diploma,
19.2% of the respondents are from CAPS, 13.3% of the respondents are from STT,
8.3% of the respondents are from GAPS, 7.5% of the respondents are from ITI.
 From the table (7.5) its is found that 31.7% of the respondents are working for 9-
12months, 22.5% of the respondents are working above 1 year, 20.8% of the
respondents are working for 0-3months, 16.7% of the respondents are working for 3-
6months, 8.3% of the respondents are working for 6-9months.
 From the table (7.6) it is found that 57.5% of the respondents are know about the
leave policy of the company, 30.8% of the respondents are know about the leave
policy of the company, 9.2% of the respondents are not clear about the policy, 2.5%
of the respondents are don’t know about the policy.
 From the table (7.7) it is found that 30% of the respondents are taking 10 days leave
in a year, 29.2% of the respondents are not taking any leave, 28.3% of the
respondents are taking 8 days leave in a year, 8.3% of the respondents are taking
above 12days leave, 4.2% of the respondents are taking 12 days leave in a year.
 From the table (7.8) it is found that 49.2% of the respondents are taking leave because
of unexpected situation, 28.3% of the respondents are taking leave because of health
issues, 20.8% of the respondents are taking leave because of festival/function, 1.7% of
the respondents are taking leave because of other reasons.
 From the table (7.9) it is found that 36.7% of the respondents are strongly agreed,
16.7% of the respondents are strongly disagreed, 15.8% of the respondents are
strongly agreed, 15.8% of the respondents are disagreed, 15% of the respondents are
in neutral about leave provided by the company.
 From the table (7.10) it is found that 45.8% of the respondents are agreed, 28.3% of
the respondents are strongly agreed, 9.2% of the respondents are strongly disagreed,
9.2% of the respondents are in neutral, 7.5% of the respondents are disagreed about
the knowledge of attendance award system provided by the company.
 From the table (7.11) it is found that 65.8% of the respondents are not received the
attendance award, 16.7% of the respondents have received once, 8.3% of the
respondents have received more than 3 times, 5.8% of the respondents have received
twice, 3.3% of the respondents have received thrice.
 From the table (7.12) it is found that 43.3% of the respondents are absenting at the
time of requirement, 28.3% of the respondents are absenting very rarely, 19.2% of the
respondents are absenting rarely, 5.8% of the respondents are absenting very
frequently, 3.3% of the respondents are absenting frequently.
 From the table (7.13.a) it is found that 60% of the respondents have given Ist
priority,
25.8% of the respondents have given IInd
priority, 4.2% of the respondents have
given IIIrd
priority, 6.7% of the respondents have given IVth
priority, 2.5% of the
respondents have given Vth
priority, 0% of the respondents have given VIth
priority,
0.8% of the respondents have given VIIth
priority for the health problems.
 From the table (7.13.b.) it is found that 20% of the respondents have given Ist
priority,
36.7% of the respondents have given IInd
priority, 18.3% of the respondents have
given IIIrd
priority, 8.3% of the respondents have given IVth
priority, 10% of the
respondents have given Vth
priority, 6.7% of the respondents have given VIth
priority,
0% of the respondents have given VIIth
priority for the transport facilities.
 From the table (7.13.c.) it is found that 10% of the respondents have given Ist
priority,
20.8% of the respondents have given IInd
priority, 28.3% of the respondents have
given IIIrd
priority, 19.2% of the respondents have given IVth
priority,1 2.5% of the
respondents have given Vth
priority, 5% of the respondents have given VIth
priority,
4.2% of the respondents have given VIIth
priority for the canteen facilities.
 From the table (7.13.d.) it is found that 0.8% of the respondents have given Ist
priority,
6.7% of the respondents have given IInd
priority, 8.3% of the respondents have given
IIIrd
priority, 19.2% of the respondents have given IVth
priority, 20.8% of the
respondents have given Vth
priority, 29.2% of the respondents have given VIth
priority, 15% of the respondents have given VIIth
priority for the co-worker
relationship.
 From the table (7.13.e.) it is found that 1.7% of the respondents have given Ist
priority,
4.2% of the respondents have given IInd
priority, 12.5% of the respondents have
given IIIrd
priority, 11.7% of the respondents have given IVth
priority, 24.2% of the
respondents have given Vth
priority, 15.8% of the respondents have given VIth
priority, 30% of the respondents have given VIIth
priority for the health problems.
 From the table (7.13.f.) it is found that 7.5% of the respondents have given Ist
priority,
2.5% of the respondents have given IInd
priority, 14.2% of the respondents have
given IIIrd
priority, 22.5% of the respondents have given IVth
priority, 11.7% of the
respondents have given Vth
priority, 21.7% of the respondents have given VIth
priority, 20% of the respondents have given VIIth
priority for the sufficient training.
 From the table (7.13.g.) it is found that 0.8% of the respondents have given Ist
priority,
2.5% of the respondents have given IInd
priority, 16.7% of the respondents have
given IIIrd
priority, 10.8% of the respondents have given IVth
priority, 17.5% of the
respondents have given Vth
priority, 21.7% of the respondents have given VIth
priority, 30% of the respondents have given VIIth
priority for the lenient management
system.
 From the table (7.14.a.) it is found that 49.2% of the respondents are strongly agreed,
25% of the respondents are agreed, 20.8% of the respondents are in neutral, 3.3% of
the respondents are strongly disagreed, 1.7% of the respondents are disagreed that
they know about the company’s sufferings if they absent without prior permission.
 From the table (7.14.b.) it is found that 30.8% of the respondents are strongly agreed,
47.5% of the respondents are agreed, 17.5% of the respondents are in neutral, 1.7%
of the respondents are disagreed, 2.5% of the respondents are strongly disagreed that
their superiors are more concerned about their absence and advice them to attend
regularly.
 From the table (7.14.c.) it is found that 34.2% of the respondents are strongly agreed,
18.3% of the respondents are agreed, 17.5% of the respondents are in neutral, 12.5%
of the respondents are disagreed, 17.5% of the respondents are strongly disagreed that
company is not keen about taking any actions against their absence.
 From the table (7.15.a.) it is found that 55.8% of the respondents are strongly agreed,
27.5% of the respondents are agreed, 7.5% of the respondents are in neutral, 5.0% of
the respondents are disagreed, 4.2% of the respondents are strongly disagreed that bus
facilities provided by the company is convenient for them.
 From the table (7.15.b.) it is found that 45.0% of the respondents are strongly agreed,
24.2% of the respondents are agreed, 20% of the respondents are in neutral, 5.8% of
the respondents are disagreed, 5.0% of the respondents are strongly disagreed that bus
timings are convenient for them.
 From the table(7.15.c.) it is found that 44.2% of the respondents are strongly agreed,
25.8% of the respondents are agreed, 15.8% of the respondents are in neutral, 5.0%
of the respondents are disagreed, 9.2% of the respondents are strongly disagreed that
bus pick-up points are convenient for them.
 From the table (7.16.a.) it is found that 16.7% of the respondents are strongly agreed,
15% of the respondents are agreed, 33.3% of the respondents are in neutral, 25% of
the respondents are disagreed, 10% of the respondents are strongly disagreed that
food provided by the company is tasty and healthy for them.
 From the table (7.16.b.) it is found that 10.8% of the respondents are strongly agreed,
15% of the respondents are agreed, 45.8% of the respondents are in neutral, 13.3%
of the respondents are disagreed, 15% of the respondents are strongly disagreed that
food provided by the company is cooked in a hygienic way.
 From the table (7.16.c.) it is found that 15.8% of the respondents are strongly agreed,
23.3% of the respondents are agreed, 25% of the respondents are in neutral, 20% of
the respondents are disagreed, 15.8% of the respondents are strongly disagreed that
food provided by the company is worthy.
 From the table (7.16.d.) it is found that 15.8% of the respondents are strongly agreed,
14.2% of the respondents are agreed, 20.8% of the respondents are in neutral, 21.7%
of the respondents are disagreed, 27.5% of the respondents are strongly disagreed that
break timings are comfortable for them.
 From the table (7.17.a) it is found that 35% of the respondents are strongly agreed,
25% of the respondents are agreed, 14.2% of the respondents are in neutral, 10.8%
of the respondents are disagreed, 15% of the respondents are strongly disagreed that
training provided by the company is sufficient for them.
 From the table (7.17.b.) it is found that 32.5% of the respondents are strongly agreed,
42.5% of the respondents are agreed, 19.2% of the respondents are in neutral, 3.3%
of the respondents are disagreed, 2.5% of the respondents are strongly disagreed that
they are clear about the responsibilities of their work.
 From the table (7.18.a.) it is found that 40.8% of the respondents are strongly agreed,
47.5% of the respondents are agreed, 8.3% of the respondents are in neutral, 0.8% of
the respondents are disagreed, 2.5% of the respondents are strongly disagreed that
they feel easy to communicate with their co-workers.
 From the table (7.18.b.) it is found that 39.2% of the respondents are strongly agreed,
42.5% of the respondents are agreed,7.53% of the respondents are in neutral, 3.3% of
the respondents are disagreed, 7.5% of the respondents are strongly disagreed that no
conflicts amongst them regarding the work.
 From the table (7.18.c.) it is found that 35% of the respondents are strongly agreed,
47.5% of the respondents are agreed, 7.5% of the respondents are in neutral, 1.7% of
the respondents are disagreed, 8.3% of the respondents are strongly disagreed that co-
worker helps him/clears his doubts.
 From the table (7.19.a.) it is found that 54.2% of the respondents are strongly agreed,
25% of the respondents are agreed, 14.2% of the respondents are in neutral, 5% of
the respondents are disagreed, 1.7% of the respondents are strongly disagreed that
they feel easy to communicate with their supervisor.
 From the table (7.19.b.) it is found that 25.8% of the respondents are strongly agreed,
54.2% of the respondents are agreed, 14.2% of the respondents are in neutral, 2.5%
of the respondents are disagreed, 3.3% of the respondents are strongly disagreed that
supervisor helps him/clears his doubt promptly.
 From the table (7.19.c.) it is found that 50.8% of the respondents are strongly agreed,
29.2% of the respondents are agreed, 11.7% of the respondents are in neutral, 1.7%
of the respondents are disagreed, 6.7% of the respondents are strongly disagreed that
there is no conflicts amongst them regarding the work.
 From the table (7.20.a.) it is found that 22.5% of the respondents are strongly agreed,
16.7% of the respondents are agreed, 20% of the respondents are in neutral, 30% of
the respondents are disagreed, 10.8% of the respondents are strongly disagreed that
they are comfortable to continue shifts.
 From the table (7.20.b1.) it is found that 20.8% of the respondents are strongly agreed,
14.2% of the respondents are agreed, 14.2% of the respondents are in neutral, 31.7%
of the respondents are disagreed, 19.2% of the respondents are strongly disagreed that
they are comfortable to work continuously in I & II shift.
 From the table (7.20.b2.) it is found that 23.3% of the respondents are strongly agreed,
25% of the respondents are agreed, 14.2% of the respondents are in neutral, 26.7%
of the respondents are disagreed, 10.8% of the respondents are strongly disagreed that
they are comfortable to work continuously in II & III shift.
 From the table (7.20.b3) it is found that 17.5% of the respondents are strongly agreed,
16.7% of the respondents are agreed, 12.5% of the respondents are in neutral, 35.8%
of the respondents are disagreed, 17.5% of the respondents are strongly disagreed that
they are comfortable to work continuously in III & I shift.
 From the table (7.20.c.) it is found that 15.8% of the respondents are strongly agreed,
17.5% of the respondents are agreed, 27.5% of the respondents are in neutral, 24.2%
of the respondents are disagreed, 15% of the respondents are strongly disagreed that
they are permitted to take the comp.off as and when they need.
 From the table (7.20.d.) it is found that 11.7% of the respondents are strongly agreed,
13.3% of the respondents are agreed, 15% of the respondents are in neutral, 33.3%
of the respondents are disagreed, 26.7% of the respondents are strongly disagreed that
they are given OT from extra work.
 From the table (7.21.a.) it is found that 20.8% of the respondents are strongly agreed,
16.7% of the respondents are agreed, 26.7% of the respondents are in neutral, 11.7%
of the respondents are disagreed, 24.2% of the respondents are strongly disagreed that
uniform provided by the company is of good quality.
 From the table (7.21.b.) it is found that 14.2% of the respondents are strongly agreed,
13.3% of the respondents are agreed, 13.3% of the respondents are in neutral, 22.5%
of the respondents are disagreed, 36.7% of the respondents are strongly disagreed that
shoes provided by the company is of good quality.
 From the table (7.21.c.) it is found that 35% of the respondents are strongly agreed,
27.5% of the respondents are agreed, 23.3.% of the respondents are in neutral, 10%
of the respondents are disagreed, 4.2% of the respondents are strongly disagreed that
they are clear about the importance of PPE’s.
From the table (7.22), it is found that
 In CAPS 12 respondents has given 1st
priority, 6 respondents has given 2nd
priority, 2
respondents has given 3rd
priority, 1 respondent has given 4th
priority, 2 respondents
has given 5th
priority for health problems.
 In Diploma 38 respondents has given 1st
priority, 17 respondents has given 2nd
priority, 2 respondents has given 3rd
priority, 4 respondent has given 4th
priority, 1
respondent has given 7th
priority for health problems.
 In STT 9 respondents has given 1st
priority, 3 respondents has given 2nd
priority, 3
respondents has given 4th
priority, 1 respondent has given 5th
priority for health
problems.
 In ITI 6 respondents has given 1st
priority, 3 respondents has given 2nd
priority for
health problems.
 In GAPS 7 respondents has given 1st
priority, 2 respondents has given 2nd
priority, 1
respondents has given 3rd
priority for health problems.
From the table (7.23), it is found that
 In CAPS 4 respondents has given 1st
priority, 11 respondents has given 2nd
priority, 4
respondents has given 3rd
priority, 2 respondents has given 4th
priority, 2 respondents
has given 6th
priority for transport facilities.
 In diploma 13 respondents has given 1st
priority, 22 respondents has given 2nd
priority, 8 respondents has given 3rd
priority, 5 respondents has given 4th
priority, 10
respondents has given 5th
priority, 4 respondents has given 6th
priority for transport
facilities.
 In STT 3 respondents has given 1st
priority, 6 respondents has given 2nd
priority, 5
respondents has given 3rd
priority, 1 respondent has given 4th
priority, 1 respondent
has given 5th
priority for transport facilities.
 In ITI 1 respondent has given 1st
priority, 2 respondents has given 2nd
priority, 4
respondents has given 3rd
priority, 1 respondent has given 4th
priority, 1 respondent
has given 6th
priority for transport facilities.
 In GAPS 3 respondents has given 1st
priority, 3 respondents has given 2nd
priority, 1
respondent has given 3rd
priority, 1 respondent has given 4th
priority, 1 respondent has
given 5th
priority, 1 respondent has given 6th
priority for transport facilities.
From the table (7.24), it is found that
 In CAPS 4 respondents has given 1st
priority, 3 respondents has given 2nd
priority, 8
respondents has given 3rd
priority, 6 respondents has given 4th
priority, 2 respondents
has given 5th
priority for canteen facilities.
 In Diploma 6 respondents has given 1st
priority, 12 respondents has given 2nd
priority,
18 respondents has given 3rd
priority, 9 respondents has given 4th
priority, 8
respondents has given 5th
priority, 4 respondents has given 6th
priority, 5 respondents
has given 7th
priority for canteen facilities.
 In STT 1 respondent has given 1st
priority, 5 respondents has given 2nd
priority, 3
respondents has given 3rd
priority, 3 respondents has given 4th
priority, 4 respondents
has given 5th
priority for canteen facilities.
 In ITI 1 respondent has given 1st
priority, 5 respondents has given 2nd
priority, 3
respondents has given 3rd
priority, 3 respondents has given 4th
priority, 4 respondents
has given 5th
priority for canteen facilities.
 In GAPS 4 respondents has given 2nd
priority, 5 respondents has given 3rd
priority, 1
respondent has given 6th
priority for canteen facilities.
From the table (7.25), it is found that
 In CAPS 1 respondent has given 2nd
priority, 3 respondents has given 3rd
priority, 5
respondents has given 4th
priority, 6 respondents has given 5th
priority, 5 respondents
has given 6th
priority, 3 respondents has given 7th
priority for co-worker relationship.
 In Diploma1 respondent has given 1st
priority, 4 respondents has given 2nd
priority, 5
respondents has given 3rd
priority, 15 respondents has given 4th
priority, 9 respondents
has given 5th
priority, 16 respondents has given 6th
priority, 12 respondents has given
7th
priority for co-worker relationship.
 In STT 1 respondent has given 2nd
priority, 2 respondents has given 4th
priority, 6
respondents has given 5th
priority, 6 respondents has given 6th
priority, 1 respondent
has given 7th
priority for co-worker relationship.
 In ITI 2 respondents has given 2nd
priority, 2 respondents has given 3rd
priority, 1
respondent has given 4th
priority, 1 respondent has given 5th
priority, 3 respondents
has given 6th
priority for co-worker relationship.
 In GAPS 3 respondents has given 5th
priority, 6 respondents has given 6th
priority, 2
respondents has given 7th
priority for co-worker relationship.
From the table(7.26), it is found that
 In CAPS 2 respondents has given 3rd
priority, 1 respondent has given 4th
priority, 5
respondents has given 5th
priority, 8 respondents has given 6th
priority, 7 respondents
has given 7th
priority for supervisor relationship.
 In Diploma2 respondent has given 1st priority, 4 respondents has given 2nd
priority, 8
respondents has given 3rd
priority, 11 respondents has given 4th
priority, 16
respondents has given 5th
priority, 5 respondents has given 6th
priority, 16 respondents
has given 7th
priority for supervisor relationship.
 In STT 3 respondents has given 3rd
priority, 1 respondent has given 4th
priority, 2
respondents has given 5th
priority, 3 respondents has given 6th
priority, 7 respondents
has given 7th
priority for supervisor relationship.
 In ITI 1 respondent has given 3rd
priority, 1 respondent has given 4th
priority, 4
respondents has given 5th
priority, 3 respondents has given 7th
priority for supervisor
relationship
 In GAPS 1 respondent has given 2nd
priority, 1 respondent has given 3rd
priority, 2
respondents has given 5th
priority, 3 respondents has given 6th
priority, 3 respondents
has given 7th
priority for supervisor relationship.
From the table (7.27), it is found that
 In CAPS 3 respondents has given 1st
priority,4respondents has given 3rd
priority, 5
respondent has given 4th
priority, 5 respondents has given 5th
priority, 4 respondents
has given 6th
priority, 2 respondents has given 7th
priority for sufficient training.
 In Diploma 2 respondents has given 1st
priority, 3 respondents has given 2nd
priority, 8
respondents has given 3rd
priority, 14 respondent has given 4th
priority, 5 respondents
has given 5th
priority, 17 respondents has given 6th
priority, 13 respondents has given
7th
priority for sufficient training.
 In STT 3 respondents has given 1st
priority, 1 respondents has given 3rd
priority, 5
respondent has given 4th
priority, 3 respondents has given 6th
priority, 4 respondents
has given 7th
priority for sufficient training.
 In ITI 1 respondent has given 1st
priority, 2 respondents has given 3rd
priority, 2
respondents has given 6th
priority, 4 respondents has given 7th
priority for sufficient
training.
 In GAPS 2 respondents has given 3rd
priority, 3 respondent has given 4th
priority, 4
respondents has given 5th
priority, 1 respondent has given 7th
priority for sufficient
training.
From the table (7.28), it is found that
 In CAPS 1 respondents has given 2nd
priority, 1respondent has given 3rd
priority, 3
respondent has given 4th
priority, 3 respondents has given 5th
priority, 4 respondents
has given 6th
priority, 11 respondents has given 7th
priority for Lenient management
system .
 In Diploma 1 respondents has given 1st
priority, 14 respondents has given 3rd
priority,
3 respondent has given 4th
priority, 13 respondents has given 5th
priority, 16
respondents has given 6th
priority, 15 respondents has given 7th
priority for Lenient
management system .
 In STT 1 respondent has given 2nd
priority,4 respondents has given 3rd
priority, 1
respondent has given 4th
priority, 2 respondents has given 5th
priority, 4 respondents
has given 6th
priority, 4 respondents has given 7th
priority for Lenient management
system .
 In ITI 1 respondent has given 2nd
priority, 1 respondent has given 4th
priority, 3
respondents has given 5th
priority, 2 respondents has given 6th
priority, 2 respondents
has given 7th
priority for Lenient management system .
 In GAPS 1 respondents has given 3rd
priority, 5 respondent has given 4th
priority, 4
respondents has given 7th
priority for Lenient management system .
SUGGESTIONS TO THE COMPANY:
From the above findings, some of those are been selected for the suggesting to the
company to take up as a project in their absenteeism management frame work of the current
year. These are based on the direct observations by the researcher in the field. The
recommendations given to the company are,
 Policy like attendance award system should be reviewed.
 Company should reflect and project that it is taking attendance matters
seriously. This can be done by rewarding good attendance holders and
punishing heavy absentees.
 They should have a well constructed Induction scheme for newly recruited
flexi workers.
 The company should arrange for a medical camp once in a year to check
and improve the health condition of the flexi workers especially for the
workers between the age of 19 to 21 years.
 Many of the employees are lagging in training so sufficient training should
be given to flexi workers.
 The pickup –points scheduled by the company’s transport for
Chatram(trichy) and viralimalai route should be reviewed .
 The quality of the shoes provided by the company needs improvement.
 Continuous shift system which is followed in the company should be
reviewed.
CONCLUSION:
The study analyses the various factors that lead to the employee absenteeism - like
lack of training, quality of PPE, policy regarding rewarding, problems regarding transport,
health etc., Based on the study, the researcher has given suggestions to the company to reduce
the absenteeism and to increase the productivity and turnover of the organization.
In this study it is found that 35% of the respondents are strongly agreed, 25% of
the respondents are agreed, 14.2% of the respondents are in neutral, 10.8% of the
respondents are disagreed, 15% of the respondents are strongly disagreed that training
provided by the company is sufficient for them. These could be related to another important
cause of absenteeism in a company. We did not study this aspect in our study and we suggest
further studies could be taken up in this regard.
BIBLIOGRAPHY
TEXT FOR REFERENCE:
1. K. Aswathappa Tata Me Graw Hill, Human Resource and Personnel
Management 2003
2. Pareek udai, Rao, Designing and Managing Human Resource Systems
3. Kothari C.R Research Methodology Methods and Techniques, New Age
International Publishers, New Delhi, 2004, P.122.
4. Kothari, C.R.,1985, Research Methodology-Methods and Techniques, New
Delhi,
5. Salaman and Storey, Strategic Human Resource Management.
Journals:
 Harrison, David A.; Shaffer, Margaret A.Journal of Applied Psychology, Vol 79(2),
Apr 1994.
 Ian R. Gellatly Journal of Organizational Behavior Volume 16, Issue 5, pages 469–
485, September 1995.
 Hanna A. Menches C, Sullivan K, and Sargent J. "Factors Affecting Absenteeism in
Electrical Construction." American Society of Civil Engineers (2005)
 Mark John Somers– “Organizational commitment, turnover and absenteeism: An
 examination of direct and interaction effects” Journal of Organizational Behavior
Volume 16, Issue 1, pages 49–58, January 1995
 Charles W. Mueller. Douglas S. Wakefield James L. PriceJames P. Curry Joanne C.
McCloskey “A Note on the Validity of Self-Reports of Absenteeism”
 Steven J. Lintona
, Karin Halldéna
& Anna-Lisa Hellsing : The Reliability of Self-
reported Sick Absenteeism: A Pilot Study, pages 145-150, 23 Mar 2010.
 Paul M Muchinsky : Employee absenteeism: A review of the literature
 Dr. Bertera, Robert L : The Effects of Behavioral Risks on Absenteeism and Health-
Care Costs in the Workplace. Journal of Occupational Medicine: November 1991
 Robert P. Steel, Joan R. Rentsch : Influence of Cumulation Strategies on the long-
Range Prediction of Absenteeism.
 Frayne, Colette A.: “Reducing employee absenteeism through self-management
training: A research-based analysis and guide”. New York, NY, England: (1991).
 Chockalingam Viswesvaran: Absenteeism and Measures of Job Performance
International
 Journal of Selection and Assessment Volume 10, Issue 1-2, pages 12–17, March 2002
 Paul P. Brooke, James L. Price : The determinants of employee absenteeism: An
empirical test of a causal model Journal of Occupational Psychology Volume 62, Issue
1, pages 1–19, March 1989.
 Rick D. Hackett, Peter Bycio, An evaluation of employee absenteeism as a coping
mechanism among hospital nurse Journal of Occupational and Organizational
Psychology Volume 69, Issue 4, pages 327–338, December 1996.
 Gary Johns: “How methodological diversity has improved our understanding of
absenteeism from work” Volume 13, Issue 2, Summer 2003, Pages 157–184
 Bross Michael H. MD; Pace, S. Kelton BS; Cronin, Irvin H. MD: Chemical
Dependence: Analysis of Work Absenteeism and Associated Medical Illnesses. Journal
of Occupational Medicine: January 1992.
 Johns, Gary : “Absenteeism estimates by employees and managers: Divergent
perspectives and self-serving perceptions”. Journal of Applied Psychology, Vol 79(2),
Apr 1994.
 Karin Sanders, Sigrid K. Hoekstra, “Informal Networks and Absenteeism within an
Organization”., Volume 4, Issue 2, pp 149-163, June 1998
 Martocchio, Joseph J : “Age-related differences in employee absenteeism: A meta-
analysis”.
 Psychology and Aging, Vol 4(4), Dec 1989.
Websites:
 www.wikipedia.com
 http://www.rane.co.in/ranetrwsteering/ranetrwsteering.html
 http://www.ibef.org/industry/india-automobiles.aspxbalization
 https://en.wikipedia.org/wiki/Automotive_industry
APPENDIX
RANE TRW STEERING SYSTEMS Pvt.Ltd, VIRALIMALAI
1) I am
a) Below 19yrs b) 19-21 yrs c) 22-24 yrs
d) Above 24
2) I am coming from
a) Chatram(Trichy) & nearby b) Woraiyur & nearby c) Manaparai & nearby
d) Viralimalai and nearby e) Others please specify ____________
3) My educational qualification is:
a) SSLC b) HSC c) ITI
d) Diploma e) BE
4) I am attached with this company as
a) CAPS b) DIPLOMA c) STT
d) ITI e) GAPS
5) I am working in this company for
a) 0-3 Months b) 3-6 Months c) 6-9 Months
A STUDY ON THE ABSENTEEISM OF FLEXI WORKERS
(CAPS, DIPLOMA APPRENTICE, ITI APPRENTICE, STT, GAPS)
 I am a management student from “Ethiraj College for women, Chennai” conducting a
study relating to absenteeism in Rane TRW Steering Systems Pvt.Ltd.
 Kindly, co-operate in filling the following questionnaire.
 In case if you have any doubts or clarifications, don’t hesitate to ask.
Thank you.
d) 9-12 Months e) Above 1 year
6) I am aware of the leave policy of this company
a) Know Very Well b) Know c) Not Clear about the Policy
d) Don’t Know
7) I am taking _________ days leave in a year.
a) 8 Days b) 10 Days c) 12 Days
d) Above 12 Days e) Nil
8) The reason for me to take leave is
a) Health Issues b) Festival/Function c) Unexpected Situation
d) Others please specify _________________________
9) The leave provided by the company is sufficient for me
a) Strongly agree b) agree c) Neutral
d) Disagree e) strongly disagree
10) I know about the attendance award system
a) Strongly agree b) agree c) Neutral
d) Disagree e) strongly disagree
11) I have received the attendance award for _______ times.
a) 1 Time b) 2Times c) 3Times
d) more than 3 times e) Nil
12) I absent myself from work
a) Very Frequently b) Frequently c) At the time of requirement
d) Rarely e) Very Rarely
13) The reason for my absence is (Please prioritise. Number as 1 for the most frequent
reason, 2 for the next frequent reason and so on)
a) Health problem_______________________
b) Transport facilities____________________
c) Canteen facilities______________________
d) Co-worker relationship_________________
e) Supervisor relationship__________________
f) Sufficient training______________________
g) Lenient Management system_____________
1- Strongly agree 2- Agree 3- Needs Improvement 4- Disagree 5- Strongly
Disagree
S.No Particulars 1 2 3 4 5
14 Management System
I know about the company’s sufferings if I absent without prior
intimation
My superiors are more concerned about my absence and advices
me to attend regularly
Company is not keen about taking any actions against my absence
15 Transport Facilities
Bus facilities are convenient for me
Bus timings are convenient for me
Bus pickup points are convenient for me
16 Canteen Facilities
Food provided for me is tasty and healthy
Food provided by the company is cooked in a hygienic way
Food provided by the company is worthy
Break timings are comfortable for me
17 Training Facilities
Training provided by the company is sufficient for me.
I am clear about the responsibilities of my work
18 Co-worker Relationship
I feel easy to communicate with my co-worker
No conflicts amongst us regarding the work
He helps me/clears my doubts
19 Supervisor Relationship
I feel easy to communicate with my Supervisor
He clarifies my doubts promptly
No conflicts amongst us regarding the work
20 Shifts Continuation
I am comfortable to continue shifts
I am comfortable to work continuously in
 I and II shifts
 II and III shifts
 III and I shifts
I am permitted to take the comp.off as and when I need
I am given OT from extra work
21 Uniform and Shoes
Uniform provided by the company is of good quality
Shoes provided by the company is of good quality
I am clear about the importance of PPE’s
RANE TRW STEERING SYSTEMS Pvt.Ltd, VIRALIMALAI
1) எனது வயது ______
a) 19 வயதுக்கு கீழ் b) 19-21 c) 22-24
d) 24 வயதுக்கு மேல்
2) நான் ____________________பகுதியிலிருந்து வருகிறேன்.
a) சத்திரம் (திருச்சி) & அருகிலுள்ள b) உறையூர் & அருகிலுள்ள
c) ேணப்பாறை & அருகிலுள்ள d) விராலிேறை & அருகிலுள்ள
e) ேற்ைவர்கள் தயவுசசய்து குறிப்பிடவும் ____________
3) எனது கல்வி தகுதி _________________
a) SSLC b) HSC c) ITI
d) Diploma e) BE
4) நான் இந்த நிறுவனத்தில் ____________ ஆக பணிப்புரிகிறேன்.
a) CAPS b) DIPLOMA c) STT
d) ITI e) GAPS
5) நான் இந்த நிறுவனத்தில் __________________ ஆக பணிப்புரிகிறேன்.
a) 0-3 ோதங்கள் b) 3-6 ோதங்கள் c) 6-9 ோதங்கள்
d) 9-12 ோதங்கள் e) 1 வருடத்திற்கு மேைாக
6) நான் இந்த நிறுவனத்தின் விடுப்பு ககாள்கக பற்றி அறிந்து இருக்கிறேன்
a) மிக நன்ைாக சதரியும் b)சதரியும் c)சகாள்றக பற்றி சதளிவாக இல்றை
d) சதரியவில்றை
A STUDY ON THE ABSENTEEISM OF FLEXI WORKERS
(CAPS, DIPLOMA APPRENTICE, ITI APPRENTICE, STT, GAPS)
 நான் " எத்திராஜ் சபண்கள் கல்லூரி, சசன்றை " யில் மேைாண்றே பயிலும் ோணவி. RANE
TRW STEERING SYSTEMS Pvt.Ltd, வில் absenteeism சதாடர்பாக ஒரு ஆய்வு
நடத்துகிமைன்.
 தயவுசசய்து, பின்வரும் மகள்வித்தாறள பூர்த்தி சசய்து ஒத்துறைக்கவும்.
 சந்மதகம் அல்ைது விளக்கங்கள் இருந்தால் மகட்க தயங்க மவண்டாம்,
நன்றி.
7) நான் ஒரு வருட த்தில் _________ விடுப்பு எடுத்து கெல்கிறேன்.
a) 8 நாட்கள் b) 10 நாட்கள் c) 12 நாட்கள்
d) 12 நாட்க ளுக்கு மேல் e) எடுப்பதில்றை
8) நான் விடுப்பு எடுக்க காரணம்___________
a) உடல்நிறை காரணங்கள் b) குடும்ப/உள்ளூர் விமசஷங்கள்
c) எதிர்பாராத சூைல் d) ேற்ைவர்கள் தயவுசசய்து குறிப்பிடவும் ______________
9) நிறுவனம் மூலம் வழங்கப்படும் விடுப்பு எனக்கு றபாதுமானதாக உள்ளது
a) உறுதியாக ஒப்புக்சகாள்கிமைன் b) ஒப்புக்சகாள்கிமைன் c) நடுநிறை
d) ஒப்புக்சகாள்ளவில்றை e) உறுதியாக ஒப்புக்சகாள்ளவில்றை
10) நான் வருகக விருது அகமப்பு பற்றி அறிந்துள்றளன்
a) உறுதியாக ஒப்புக்சகாள்கிமைன் b) ஒப்புக்சகாள்கிமைன் c) நடுநிறை
d) ஒப்புக்சகாள்ளவில்றை e) உறுதியாக ஒப்புக்சகாள்ளவில்றை
11) நான் _______ முகே வருகக விருது கபற்றுள்றளன்.
a) 1 b) 2 c) 3
d) 3 க்கும் மேல் e) இல்றை
12) நான் _____________ பணிக்கு வராமல் இருக்கிறேன்.
a) மிகவும் அடிக்கடி b) அடிக்கடி c) மதறவ மநரத்தில் ேட்டும்
d) அரிதாக e) மிக அரிதாக
13) நான் பணிக்கு வராமல் இருக்க காரணங்கள் (முதன்கம காரனத்கத 1 என
முன்னிகலப்படுத்தவும் அடுத்தடுத்த காரணங்ககள 2,3,4,5,6 என குறிப்பிடவும் )
a) உடல்நிறை காரணங்கள் _________________________
b) மபாக்குவரத்து வசதிகள் _________________________
c) மகன்டீன் வசதிகள் ______________________________
d) சக சதாழிைாளர்கள் உடைாை உைவு ____________
e) மேற்பார்றவயாளர்கள் உடைாை உைவு __________
f) மபாதுோை பயிற்சி வசதிகள் _____________________
g) குறைந்த கட்டுப்பாடுறடய நிர்வாகம்____________
1- உறுதியாக ஒப்புக்சகாள்கிமைன் 2- ஒப்புக்சகாள்கிமைன் 3- நடுநிறை
4- ஒப்புக்சகாள்ளவில்றை 5- உறுதியாக ஒப்புக்சகாள்ளவில்றை
s.no விபரங்கள் 1 2 3 4 5
14 றமலாண்கம அகமப்பு
நான் முன் அறிவிப்பின்றி வரவில்றை என்ைால் அதைால் நிறுவைத்தில்
ஏற்படும் விறளவுகள் பற்றி அறிந்துள்மளன்
நான் பணிக்கு வரவில்றை என்ைால் எைது உயர் அதிகாரிகள் அக்கறை
சகாண்டு அறிவுறை கூறுவார்கள்
நான் முன் அறிவிப்பின்றி வரவில்றை என்ைால் அதற்கு நிறுவைம் எந்த
நடவடிக்றகயும் எடுப்பதில்றை
15 றபாக்குவரத்து வெதிகள்
எைக்கு நிறுவைப்மபருந்து வசதிகள் வசதியாக உள்ளது
எைக்கு நிறுவைப்மபருந்து மநரம் வசதியாக உள்ளது
எைக்கு நிறுவைப்மபருந்து நிறுத்தங்கள் வசதியாக உள்ளது
16 றகன்டீன் வெதிகள்
மகன்டீன் உணவு சுறவயாக ேற்றும் ஆமராக்கியோக உள்ளது
மகன்டீன் உணவு சுகாதாரோை முறையில் சறேக்கப்படுகிைது
நிறுவைம் மூைம் வைங்கப்படும் உணவு சம்பள பிடித்ததிற்கு தகுதி உறடயது
ப்மரக் மநரம் எைக்கு மபாதுோைதாக உள்ளது
17 பயிற்சி வெதிகள்
நிறுவைம் மூைம் வைங்கப்படும் பயிற்சி எைக்கு மபாதுோைதாக உள்ளது
நான் என் மவறை சபாறுப்புகள் பற்றி சதளிவாக உள்மளன்
18 ெக கதாழிலாளர்கள் உடனான உேவு
நான் சக சதாழிைாளர்களுடன் சதாடர்பு சகாள்ள எளிதாக உணர்கிமைன்.
எங்களுக்கு ேத்தியில் மவறை சம்பந்தோக எந்த முரண்பாடுகளும் இல்றை
எைது சந்மதகத்றத சதளிவுபடுத்துகிைார்/ அவர் எைக்கு உதவுகிைார்
19 றமற்பார்கவயாளர்கள் உடனான உேவு
நான் எைது மேற்பார்றவயாளர்களுடன் சதாடர்பு சகாள்ள எளிதாக
உணர்கிமைன்.
அவர் உடைடியாக எைக்கு உதவுகிைார் /எைது சந்மதகத்றத
சதளிவுபடுத்துகிைார்
எங்களுக்கு ேத்தியில் மவறை சம்பந்தோக எந்த முரண்பாடுகளும் இல்றை
20 ஷிப்டு கதாடர்ச்சி
நான் இரண்டு ஷிப்டுகளில் சதாடர்ந்து பணிப்புரிய வசதியாக உணர்கிமைன்
நான் சதாடர்ந்து பணிப்புரிய வசதியாக உணரும் இரண்டு ஷிப்டுகள்
 I and II shifts
 II and III shifts
 III and I shifts
நான் மவண்டும் மபாது comp.off எடுக்க அனுேதிக்க படுகிமைன்
எைக்கு OT வைங்கப்படுகிைது
21 சீருகட மற்றும் காலணிகள்
நிறுவைம் மூைம் வைங்கப்படும் சீருறட தரோக உள்ளது
நிறுவைம் மூைம் வைங்கப்படும் காைணிகள் தரோக உள்ளது
நான் பணியாளர் பாதுகாப்புக் கருவிகளின் முக்கியத்துவம் பற்றி சதளிவாக
உள்மளன்
modr

modr

  • 1.
  • 2.
    INTRODUCTION Introduction to theTopic : An employee is any person hired by an employer to do a specific set of jobs. In most modern economies, the term employee refers to a specific defined relationship between an individual and a corporation, which differs from those of customer or client. Absenteeism can be defined as the practice or habit of being an absentee and an absentee is one who habitually stays away from work. Absenteeism is a habitual pattern of absence from a duty or obligation. The manufacturing industry in India today also is labour oriented i.e. it depends on the human workforce for its working. Today out of the many problems faced by the manufacturing industry in India ‘absenteeism’ is one of the major problems which directly affect the productivity of any manufacturing plant. More the magnitude of absenteeism; more is the loss of productivity on plant. There needs to be a proper study to have a check on absenteeism, its causes, types and remedies. It is often easier for the manufacturing organisations to make arrangement to cover staffs, which are going to be off for long periods. However, employees taking odd days off here which become more problematic and can have an immediate impact. If remain unchecked, this type of absence can send out the wrong signals to colleagues who, in some jobs, are likely to have to cover for those absent. If employers fail to take action, a bugging turn mentality may emerge. Frequent absence may have serious repercussions where staff is employed in customer - facing roles or employed on industrial plant. The impact of absence may be most directly felt and the need to arrange cover at short notice may be paramount. This adversely affects the progress of work and loss of resources. Thus, there is a need for such study in manufacturing industry. Till date a lot of study has been done on absenteeism in various fields but the irony is that manufacturing/production industry being the most labour oriented, no such study has been carried out on absenteeism – its causes, types and remedies. This study focuses on the absenteeism of workforce in the manufacturing industry, along with the different types and different causes of absenteeism. This study also includes seeking out the remedial measure of absenteeism in manufacturing sector.
  • 3.
  • 4.
    INDUSTRY PROFILE 2.1 Industryprofile The automotive industry is a wide range of companies and organizations involved in the design, development, manufacturing, marketing, and selling of motor vehicles. The automobiles sector is divided into four segments – two wheelers (mopeds, scooters, motorcycles, electric two- wheelers), passenger vehicles (passenger cars, utility vehicles, multi-purpose vehicle), commercial vehicles (light and medium-heavy vehicles), and three wheelers (passenger carriers and good carriers). This industry is one of the world's most important economic sectors by revenue. It also is one of the key drivers of economic growth of the nation. The world standings for the Indian automobile sector, as per the Confederation of Indian Industry, are as follows: largest three- wheeler market, second largest two-wheeler, tenth largest passenger car market, fourth largest tractor market, fifth largest commercial vehicle market, fifth largest bus and truck segment. 2.1.1 Statistical data of India’s growth in the automobile industry: Total Production of Automobiles In India (In millions) FY 15FY 14FY 13FY 12FY 11FY 10FY 09FY 08FY 07FY 06FY 05 Passenger vehicle 3.2 3.1 3.2 3.1 3 2.4 1.8 1.6 1.3 1.3 1.2 Commercial vehicle 0.7 0.7 0.8 0.9 0.8 0.6 0.4 0.6 0.5 0.4 0.4 Three wheelers 0.9 0.8 0.8 0.9 0.8 0.6 0.5 0.5 0.6 0.4 0.4 Two wheelers 18.5 16.9 15.7 15.4 13.4 10.5 8.4 8 8.5 7.6 6.6 The Indian auto industry is one of the largest in the world. The industry accounts for 7.1 per cent of the country's Gross Domestic Product (GDP). As of FY 2014-15, around 31 per cent of small cars sold globally are manufactured in India.The Two Wheelers segment with 81 per cent market share is the leader of the Indian Automobile market owing to a growing middle class and a young population. Moreover, the growing interest of the companies in exploring the rural markets further aided the growth of the sector. The overall Passenger Vehicle (PV) segment has 13 per cent market share. India is also a prominent auto exporter and has strong export growth expectations for the near future. In April-January 2016, exports of Commercial Vehicles registered a growth
  • 5.
    of 18.36 percent over April-January 2015. In addition, several initiatives by the Government of India and the major automobile players in the Indian market are expected to make India a leader in the Two Wheeler (2W) and Four Wheeler (4W) market in the world by 2020. 2.1.2 Market Size The auto industry produced a total 19.84 million vehicles in April-January 2016, including passenger vehicles, commercial vehicles, three wheelers and two wheelers, as against 19.64 million in April-January 2015.Domestic sales of Passenger Vehicles grew by 8.13 per cent in April-January 2016 over the same period last year. Within the Passenger Vehicles, Passenger Cars rose by 10.18 per cent, during April-January 2016 over April- January 2015. The domestic sales of Commercial Vehicles increased by 9.43 per cent in April-January 2016 over the same period last year. Sales of Medium & Heavy Commercial Vehicles (M&HCVs) increased at 30.19 per cent. 2.1.3 Investments In order to keep up with the growing demand, several auto makers have started investing heavily in various segments of the industry during the last few months. The industry has attracted Foreign Direct Investment (FDI) worth US$ 14.32 billion during the period April 2000 to December 2015, according to data released by Department of Industrial Policy and Promotion (DIPP). Some of the major investments and developments in the automobile sector in India are as follows:  Japanese two-wheeler manufacturer Honda Motorcycle and Scooter India (HMSI) has opened its fourth and world’s largest scooter plant in Gujarat, set up to initially produce 600,000 scooters per annum to be scaled up to 1.2 million scooters per annum by mid-2016.  American car maker Ford has unveiled its iconic Ford Mustang in India and will make its debut in second quarter of FY2016 within the price band of Rs 45 lakh (US$ 66,146) and Rs 50 lakh (US$ 73,496) in the Indian market.  Nissan Motor Co. Ltd is in discussion with Government of India to bring electric and hybrid technologies to India as the government plans to reduce air pollution caused by vehicles.  Global auto major Ford plans to manufacture in India two families of engines by 2017, a 2.2 litre diesel engine codenamed Panther, and a 1.2 litre petrol engine codenamed Dragon, which are expected to power 270,000 Ford vehicles globally.
  • 6.
     The world’slargest air bag suppliers Autoliv Inc, Takata Corp, TRW Automotive Inc and Toyoda Gosei Co are setting up plants and increasing capacity in India.  General Motors plans to invest US$ 1 billion in India by 2020, mainly to increase the capacity at the Talegaon plant in Maharashtra from 130,000 units a year to 220,000 by 2025.  US-based car maker Chrysler has planned to invest Rs 3,500 crore (US$ 513.5 million) in Maharashtra, to manufacture Jeep Grand Cherokee model.  Mercedes Benz has decided to manufacture the GLA entry SUV in India. The company has doubled its India assembly capacity to 20,000 units per annum.  Germany-based luxury car maker Bayerische Motoren Werke AG’s (BMW) local unit has announced to procure components from seven India-based auto parts makers.  Mahindra Two Wheelers Limited (MTWL) acquired 51 per cent shares in France- based Peugeot Motorcycles (PMTC). 2.1.4 Government Initiatives The Government of India encourages foreign investment in the automobile sector and allows 100 per cent FDI under the automatic route. Some of the major initiatives taken by the Government of India are:  Mr Nitin Gadkari, Minister of Road Transport, Highways & Shipping has announced plans to set up a separate independent Department for Transport, comprising of experts from the automobile sector to resolve issues such as those related to fuel technology, motor body specifications and fuel emissions, apart from exports.  Government of India aims to make automobiles manufacturing the main driver of ‘Make in India’ initiative, as it expects passenger vehicles market to triple to 9.4 million units by 2026, as highlighted in the Auto Mission Plan (AMP) 2016-26.  In the Union budget of 2015-16, the Government has announced to provide credit of Rs 850,000 crore (US$ 124.71 billion) to farmers, which is expected to boost the tractors segment sales.  The Government plans to promote eco-friendly cars in the country i.e. CNG based vehicle, hybrid vehicle, and electric vehicle and also made mandatory of 5 per cent ethanol blending in petrol.  The government has formulated a Scheme for Faster Adoption and Manufacturing of Electric and Hybrid Vehicles in India, under the National Electric Mobility Mission
  • 7.
    2020 to encouragethe progressive induction of reliable, affordable and efficient electric and hybrid vehicles in the country.  The Automobile Mission Plan (AMP) for the period 2006–2016, designed by the government is aimed at accelerating and sustaining growth in this sector. Also, the well-established Regulatory Framework under the Ministry of Shipping, Road Transport and Highways, plays a part in providing a boost to this sector. 2.1.5 Road Ahead India’s automotive industry is one of the most competitive in the world. It does not cover 100 per cent of technology or components required to make a car but it is giving a good 97 per cent, as highlighted by Mr Vicent Cobee, Corporate Vice-President, Nissan Motor’s Datsun. Leading auto maker Maruti Suzuki expects Indian passenger car market to reach four million units by 2020, up from 1.97 million units in 2014-15. The Indian automotive sector has the potential to generate up to US$ 300 billion in annual revenue by 2026, create 65 million additional jobs and contribute over 12 per cent to India’s Gross Domestic Product, as per the Automotive Mission Plan 2016-26 prepared jointly by the Society of Indian Automobile Manufacturers (SIAM) and government. Exchange Rate Used: INR 1 = US$ 0.0147 as on March 01, 2016
  • 8.
  • 9.
    COMPANY PROFILE 3.1 OrganizationProfile: Rane holdings limited (RHL) is an Indian-based holding company the company is engaged in manufacturing and marketing of automotive components such as steering linkages products, manual steering gears, power steering gears that include both hydraulic and electric power assisted steering systems, steering columns, seat belts, brake linings and disc pads and engine valves. Rane group of companies was originally founded by Shri T. R. GanapathyIyer in the year 1929 and the group was originally named as Rane Madras (Ltd). It started off as a distributor of automobiles and parts. After his death, the business was taken over by his son-in- law LakshamanaIyer, Lakshminarayan and the company was shaped into an auto-component business house. LLN remained as the founder chairman of the group for over three decades. The Group has seen four generations of entrepreneurship in automotive components industry. The present chairman of Rane Group is L.Lakshmanan and L. Ganeshan. Rane Madras was one of the first Indian companies in the region for automobile distribution. Within a few years Rane Madras parts way with parent company and starts the journey on its own. In 1936, Rane Madras Ltd went for public. In 1959, Rane diversified into manufacturing by taking over Engine Valves ltd. In 1960, it entered into an alliance with Quinton Hazer of England. It established plants to manufacture tie rod ends and ball joints. In 1979, Rane brake linings limited manufactured railway brake blocks for Indian railways. In 1987, it incepted Rane TRW for manufacturing steering systems. 3.2 Divisions of Rane
  • 10.
    3.3 Company Overview: RanePower Steering System ltd (RPSL) was constituted with TRW Automotive, USE for manufacturing of fully integral steering gears and aggregates and components. Subsequently the company has been renamed as RANE TRW Steering Systems Private Limited (RTSSL). RTSSL has five manufacturing plants in Tamil Nadu: Plant 1 (Trichy) – Integrated Gear Plant 2 & 3 (Chennai) – Pump and Power Rack & Pinion division Pant 4 (Chennai) – Occupant Safety Division Plant 5 (Uttarakhand) – Steering Gears & Pumps The company has independent and comprehensive units to design, test and manufacture complete range of power steering solutions and seat belt systems. It has established dominant share of business in both commercial vehicle steering and passenger car steering industry. It is the preferred OE partner to Indian OE majors in passenger car, multi utility vehicle, light commercial vehicle, medium and commercial vehicle categories. The company has a track record of sustained growth, since it was setup. RTSSL – SGD have been certified under TS 16949 and ISO 14000 standards, ISO 140001 certified plants, OHSAS 18001 certified, winner of the Deming prize in the year 2005, winner of Japan Quality model (JQM) in the year 2011. 3.4 Vision, Mission and Quality policy: Vision: Steering Gear Division: To be a leader in domestic hydraulic power steering business and enhance global presence. Occupant Safety Division: To be a preferred supplier of Occupant Safety Systems, with a commitment to safety.
  • 11.
    Mission: 1. Provide SuperiorProducts and Services to our customers and maintain market leadership. 2. Evolve as an institute that serves the best interests of all stakeholders. 3. Pursue excellence though total quality management. 4. Ensure the highest standards of ethics and integrity in our actions. Quality Policy: We will strive to exceed customer expectations through 1. Continual improvement in quality, cost, delivery and technology. 2. Employee involvement. 3. Improving the effectiveness of quality Management System. Their brand promise is to provide an exciting workplace founded on the principles of values, fairness and transparency that provide challenging assignment, encourage learning and enhance career opportunities. 3.5 Health, Safety & Environment Policy We are committee to protect the Occupational Health, Safety and Environment in all our operations. TO meet our commitment, we will endeavor to 1. Comply will all applicable Legal and other requirements. 2. Minimize impact on Environment, Occupational Health & Safety through Prevention of pollution, injury and ill health. 3. Efficient use of natural resources, materials and energy through reducing, re-using and re-cycling process. 4. Continual improvement of Occupational Health, Safety and Environment performance by setting objectives and targets. 5. Communicate this policy to our employees, contracts and interested oarties of Rane TRW.
  • 12.
    3.6 Products: There arethree plants in RANE TRW steering Ltd, Trichy: (i) HFB 64 PLANT (ii) HFB 54 PLANT (iii) VALVE PLANT The corresponding assembly parts are done in respective plant (Gear assembly and valve assembly). The various models of gear are HFB64, HFB50, HFB54, HFB52, HFB72. The various vehicle models of pascar valves are Indica, Indigo, Santro, Tmlxi, L90, Corsa, Honda, Itl, Pandran, Ford B376, Sports Car, Ford C 195, Fiat, Uno, Tml Ace, Lotus, Safari, Armada. 3.7 Customers to the Rane Company: Major customers in India:
  • 13.
    Major Overseas Customers: 3.8Corporate Social Responsibility of the Company: Rane TRW Steering Systems Private Limited (RTSS) is committed to contributing towards its societal responsibilities beyond statutory obligations. It is to function in socially and environmentally sustainable manner recognizing the interests of all its stakeholders. The CSR annual budget will be decided as a part of RTSS’s annual budget. Any surplus generated from CSR projects undertaken shall be channelized into the CSR corpus. These funds shall further only be used for CSR projects and shall not be added to the profits of the company.
  • 14.
    This policy appliesto all CSR projects undertaken by the company and aims to full-fill the requirements of the Section 135 of the Companies Act, 2013 and the rules made thereunder. RTSS ensures that the CSR activities carried out by them are over and above the normal course of business. This process will be periodically reviewed and updated in line with relevant codes of legislation. At all operating locations of RTSS actively promotes and engages by some ways in these activities that help strengthen communities and contribute to the enrichment of society. RTSS believes in good corporate citizenship that strives for creating maximum impact on education, healthcare, environment and community development. Some of the CSR activities carried out by RTSS in the past years are:  Medical camp in villages;  Provision of computers to schools,  Provision of cycle stand,  “VetriElidha” program for school students,  Tree plantation,  Provided of lunch for orphanage/ old age people/ mentally challenged children through the “Nakshtra” program,  Provision of groceries for Fathima health care center,  Awareness and training on road safety measures.  3.9 STANDING ORDER PROCEDURES 3.9.1 EMPLOYEE POLICES AND BENEFITS: RTSSL has various polices and benefits framed for the employees to adhere by it. Some of them are: 1) Compensatory off – separately OT and C-offs for extra work on normal days, weekly holidays and national holidays. 2) Loans and advances – Rs.5000 at 5% interest to be repaid in 12 monthly instalments 3) Attendance regulation 4) Marriage gift and loan policy, GPTW (Great Place To Work initiatives) 5) Transport, Canteen and issue of Birthday card & chocolates to employees. 6) Employee retirement – sandal garland, shawl, 75gms of silver material. 7) ESI and hospital claim cashless card
  • 15.
    8) Picnic scheme,e-mail game. 9) Safety, health and environment – first aid and fire fighting training, work permit. 10) RIED ( RANE Institute of employee Development) and RAMP (RANE Advanced Management Programme). 3.9.2 SHIFT TIMINGS: I SHIFT II SHIFT IIISHIFT GENERAL SHIFT 06.30 to 15.00 15.00 to 23.30 23.30 to 06.30 08.30 to 17.00 Tea Break 09.00 Tea Break 16.00 & 21.20 Tea Break 00.30 & 04.30 Tea Break 09.00 & 16.00 Lunch Break 11.30 to` 12.00 Dinner 19.30 to 20.00 Midnight Tiffin 02.30 to 03.00 Lunch Break 12.00 to 12.30
  • 16.
  • 17.
    THEORETICAL BACKGROUND 4.1 DEFINITION Voluntarynon attendance at work, without valid reason. Absenteeism means either habitual evasion of work, or wilful absence as in a strike-action. It does not include involuntary or occasional absence due to valid causes, or reasons beyond one's control, such as accidents or sickness. 4.2 MEANING Absenteeism refers to unauthorized absence of the worker from his job. Absenteeism can be defined as failure of employees to report for work when they are scheduled to work. Employees who are away from work on recognized holidays, vacations, approved leaves of absence, or leaves of absence allowed for under the collective agreement provisions would not be included . When the employee takes time off, on a scheduled working day with permission, it is authorized absence. When he remains absent without permission or informing, it is wilful absence without leave. In these days, when the needs of the country require greater emphasis upon increase of productivity and the economic and rational utilization of time and materials at our disposal, it is necessary to minimize absenteeism to the maximum possible extent. 4.3 CONCEPT OF ABSENTEEISM: Absenteeism refers to employees‟ absence from his regular task when he is normally scheduled to work. According to Seligman : “Absenteeism is time lost in industrial establishments by avoidable or unavoidable absence of employees”. According to Hachette : “Absenteeism is the practice or habit of being an “absentee‟ and an “absentee” is one who habitually stays away” In India two agencies collect and compile data on absenteeism.  Labour Bureau, Shimla  Annual Survey of Industries, Kolkatta.
  • 18.
    According to LabourBureau, Shimla: “Only unauthorized absence from work about which the employer has no prior information of the workers‟ failure is considered as absenteeism”. According to Annual Survey of Industries, Calcutta: “All kinds of Vacations and leave are considered as absenteeism” For the purposes of this study, we take the stand of the Labour Bureau and reckon that absenteeism signifies the absence of an employee from work that is unauthorized, unexplained avoidable and wilful. 4.4 MEASUREMENT OF ABSENTEEISM Absenteeism rate can be expressed as the result of total amount of time lost through non- attendance to the planned working time (excluding over time). The calculation of absenteeism rate can be made in terms of man-days by taking into account 2 factors.  The number of persons scheduled to work  The number actually present Generally absenteeism is expressed as a percentage of overall strength of the Department/ Organisation and also expressed as many days lost. But it is difficult to interpret absenteeism in terms of value lost. Rate of Absenteeism = No. of Total Man shifts Lost X 100 (No. of Total Man shifts scheduled to work) 4.5 KINDS OF ABSENTEES  Escapist Absentee  Casual absentee  Seasonal absentee  Immature Absentee  Chronic Absentee 4.6 TYPES OF ABSENTEEISM:  Authorized Absenteeism  Unauthorized Absenteeism  Wilful Absenteeism
  • 19.
    REVIEW OF LITERATURE Harrison,David A (1994) - The properties of self-reports and perceived norms of absenteeism were examined and compared in 7 progressive studies. Regardless of attendance context, time interval, type of estimate, or administration condition, individuals reported (on average) having roughly half the absenteeism of the perceived norm among their peers; 85% to 95% of respondents reported being above average in their attendance record. This "Lake Wobegon effect" was traced to a small negative bias (underreporting) in self-reports and a large positive bias (over reporting) in perceived norms. Self-presentation and availability processes were proposed as explanations for these biases. In a study in which direct observations of past and future absenteeism were collected, self-reports correlated .69 with the direct observations. Perceived norms explained unique variation in future absenteeism. (PsycINFO Database Record (c) 2012 APA, all rights reserved Ian R. Gellatly (1995) - This study examined whether an employee's level of absenteeism was affected by age, organizational tenure, perceptions of interactional justice, affective and continuance commitment, and the perceived absence norm in the employees' work unit or department. One hundred and sixty-six nursing and food services employees in a mid-size chronic care hospital provided attitudinal and perceptual data on an employee survey. Absence data (absence frequency and total days absent) were collected during the 12-month period immediately following an employee survey. Hypothesized relations between the various individual- and group-level factors and employee absenteeism were specified in a structural model and tested using LISREL 7 (Joreskog and Sorbom, 1989). General support was found for the study hypotheses. ____________________ 1 Harrison, David A.; Shaffer, Margaret A.Journal of Applied Psychology, Vol 79(2), Apr 1994. 2 Ian R. Gellatly Journal of Organizational Behavior Volume 16, Issue 5, pages 469– 485, September 1995.
  • 20.
    Hanna A (2005)- Construction contractors continue to be faced with the challenge of improving productivity in order to remain successful in an increasingly competitive industry. One factor that contributes to lower productivity is absenteeism. Yet, little is known or understood about the reasons electricians miss work, and very few studies have been conducted on absenteeism in the construction industry. As a positive step to reduce the problems associated with voluntary and involuntary absences.The main objectives of the study were to learn the reasons for absenteeism and to quantify the impacts so that solutions can be developed to help contractors improve their productivity. The study determined that managers and electricians agreed that illnesses and medical appointments were two common reasons workers missed work. However, managers also believed workers were absent because of a lack of interest or irresponsibility, while electricians reported injuries and unsafe working conditions as reasons for missing work. Furthermore, a quantitative analysis of the data revealed that when the absenteeism rate was between 0 and 5%, there was no loss in productivity. However, when the absenteeism rate was between 6 and 10%, a 24.4% loss in productivity was experienced. By understanding what causes electricians to miss work, and the effect of absences on productivity, a company can manage and control absenteeism on electrical construction projects. Mark John Somers (1995) - A three component model of organizational commitment was used to study job withdrawal intentions, turnover and absenteeism. Affective commitment emerged as the most consistent predictor of these outcome variables and was the only view of commitment related to turnover and to absenteeism. In contrast, normative commitment was related only to withdrawal intentions while no direct effects for continuance commitment were observed. Continuance commitment, however, interacted with affective commitment in predicting job withdrawal intentions and absenteeism. The form of the interaction was such that high sunk costs tempered relationships between affective commitment and the relevant outcome variables. ___________________ 3 Hanna A. Menches C, Sullivan K, and Sargent J. "Factors Affecting Absenteeism in Electrical Construction." American Society of Civil Engineers (2005) 4 Mark John Somers– “Organizational commitment, turnover and absenteeism: An examination of direct and interaction effects” Journal of Organizational Behavior Volume 16, Issue 1, pages 49–58, January 1995
  • 21.
    Charles W. Mueller- The general unavailability of and difficulty associated with obtaining records-based data on absenteeism suggests the potential value of self-report data for those conducting research on absenteeism. This should not be recommended, however, until the validity of these self-report measures is assessed. In this paper, we compare records-based and self-report measures of absenteeism for the same employees for the same period of time. We find that although the univariate descriptive data for the two measures are similar, the correlation between the two is .299. Although this is in the expected direction, its magnitude is small enough for us to question the validity of self- report measures of absenteeism. Several suggestions are offered for additional study of this. Steven J. Linton (2010) - This investigation addresses the reliability of self-reports of sick leave. Although sick leave is an objective measure which is often relevant for determining outcome and cost-benefit, obtaining records from employeers or insurance companies may be a considerable task. Consequently, we compared reports of sick leave during the last month made by 66 patients with musculoskeletal pain problems on the Outcome Evaluation Questionnaire with records from their insurance office. Results indicated good reliability with a correlation of r =.95, similar distributions, and no indication of systematic over or under reporting. Indeed, some examples are provided where part of the discrepancy may depend on idiosyncrasies in the insurance records or lack of clear definitions rather than poor accuracy on the patient's part. Our results suggest that self-reports of sick leave are reliable for recent time periods and a duration of one month. _______________________ 5 Charles W. Mueller. Douglas S. Wakefield James L. PriceJames P. Curry Joanne C. McCloskey “A Note on the Validity of Self-Reports of Absenteeism” 6 Steven J. Lintona , Karin Halldéna & Anna-Lisa Hellsing : The Reliability of Self-reported Sick Absenteeism: A Pilot Study, pages 145-150, 23 Mar 2010
  • 22.
    Paul M Muchinsky- The purpose of this paper is to review the literature on employee absenteeism as a form of withdrawal behavior apart from turnover. Studies examining the psychometric properties of absence measures are reviewed, along with the relationship between absenteeism and personal, attitudinal, and organizational variables. Studies exploring the relationship between absenteeism and turnover are examined according to the unit of analysis studied in the research. Programmatic efforts to reduce employee absenteeism are also reviewed. Throughout the paper emphasis is placed on the indices used by investigators to measure absenteeism, and the problems that have arisen in the literature through the use of multiple indicators of absenteeism. The review concludes with suggestions for research that are of both theoretical and practical concern. Dr. Bertera, Robert L. (1991) - The impact of behavioral risk factors on absenteeism and health-care costs was analyzed among 45,976 employees in a large, diversified industrial work force. A cross-sectional design was used to evaluate health risk appraisal and physical-examination data collected from 1984 through 1988. Employees with any of six behavioral risks had significantly higher absenteeism (range = 10% to 32%) compared with those without risks. These differences led to significantly higher illness costs (defined as compensation, health care, and non-health care benefits) for those with risks compared with those without risks. Annual excess illness costs per person at risk were smoking, $960; overweight, $401; excess alcohol, $389; elevated cholesterol, $370; high blood pressure, $343; inadequate seatbelt use, $372; and lack of exercise, $130; Only one factor, lack of exercise, was not significant after adjusting for age, education, pay category, and the six other behavioral risks. The total cost to the company of excess illness was conservatively estimated at $70.8 million annually. These findings suggest that the cost of key behavioral risks provides an opportunity to manage health-care cost increases through health promotion, financial incentives for healthy lifestyle, and environmental changes that affect health behaviors. _________________________ 7 Paul M Muchinsky : Employee absenteeism: A review of the literature 8 Dr. Bertera, Robert L : The Effects of Behavioral Risks on Absenteeism and Health-Care Costs in the Workplace. Journal of Occupational Medicine: November 1991
  • 23.
    Robert P. Steel- The ability of three different types of self-report variables— biographical, attitudinal, and stress—to predict 70 months of absenteeism data was evaluated. Absence scores were aggregated in two different ways, as annualized segments and as longitudinal data cumulations. Biographical variables and attitudinal measures significantly predicted long-term absenteeism. In addition, results suggested that dependency relationships between absence metrics and cumulation periods may affect validation outcomes. Frayne (1991) - In this pioneering volume, Colette Frayne reports the results of the first study to examine empirically the use of a simple straightforward self-management training program to increase employee attendance. The author presents a complete description of the self- management training process used in the study, shows how self-management can be of significant value in reducing employee absenteeism, and offers precise information for the human resources professional who wishes to organize and implement self-management training within his or her own organization. Frayne also addresses other applications of self-management in the workplace, demonstrating that the approach works because it accommodates both the employee's needs for freedom and the organization's need for control. Frayne provides a detailed overview of existing theories that were precursors to social learning theory. She then outlines the methodology that was used for sample generation, data collection, and training implementation. Two chapters examine the research results and discuss their implications for reducing employee absenteeism. In the next chapter, Frayne discusses the results and interpretations derived from conducting a follow-up study and replication of the initial research. Training in self- management, she shows, offered many benefits to the individuals involved in the training program and to the organization that supported the program. Specifically, many of the trainees improved their attendance, their relationships with supervisors, their job performance, and their career promotion opportunities improvements that held up well over time. _____________ 9 Robert P. Steel, Joan R. Rentsch : Influence of Cumulation Strategies on the long-Range Prediction of Absenteeism. 10 Frayne, Colette A.: “Reducing employee absenteeism through self-management training: A research-based analysis and guide”. New York, NY, England: (1991).
  • 24.
    Chockalingam Viswesvaran (2002)- The correlations reported in the extant literature between one form of counterproductive behaviors – absenteeism – and four different indices of job performance were meta-analytically cumulated. Job performance indices utilized were productivity, quality, interpersonal behaviors, and effort. The former two were measured using organizational records, while the latter two were measured using supervisory ratings. The results suggest that absenteeism measures are more highly correlated with organizational records of quality, and supervisory ratings of both effort and interpersonal behaviors. Lower correlations were found with organizational records of productivity. These results suggest the potential for common determinants of absenteeism and some aspects of job performance. The fairly independent literatures that have developed on absenteeism and job performance can inform one another. Implications for modeling and assessing job performance are noted. Paul P. Brooke Jr (1989) - LISREL estimates of the parameters of a causal model of absenteeism are reported for a sample of 425 full-time employees of a 327-bed medical centre. The model modifies and extends the conceptual framework of Steers & Rhodes (1978) and includes routinization, centralization, pay, distributive justice, work involvement, role ambiguity, conflict and overload, kinship responsibility, organizational permissiveness, job satisfaction, job involvement, organizational commitment, health status and alcohol involvement as the determinants of absenteeism. Based on self-report measures of absence frequency, significant positive direct effects of kinship responsibility, organizational permissiveness, role ambiguity and alcohol involvement, and negative direct effects of centralization, pay and job satisfaction yielded an R2 for absenteeism of 21.6. Job satisfaction completely mediated the effects of routinization and work involvement, and partially mediated the effects of centralization and role ambiguity. _________________ 11 Chockalingam Viswesvaran: Absenteeism and Measures of Job Performance International Journal of Selection and Assessment Volume 10, Issue 1-2, pages 12–17, March 2002 12 Paul P. Brooke, James L. Price : The determinants of employee absenteeism: An empirical test of a causal model Journal of Occupational Psychology Volume 62, Issue 1, pages 1–19, March 1989.
  • 25.
    Rick D. Hackett(1996) - It has been proposed that the break from work provided by an occasional absence may help employees cope with various types of stress and thereby lead to an improvement in their overall condition when they return. In this study, the mean levels of nurses' daily ratings of personal problems, tiredness, ill-health, sleep disruption, stress and job dissatisfaction were compared statistically across a period encompassing one shift of attendance, an absence, and another shift of attendance. As expected, significant decreases in most variables were observed between the day of the absence and the subsequent shift. However, improvements were seldom found between the shifts immediately preceding and subsequent to the absence. The findings were interpreted as suggesting that occasional absences may help maintain physical and psychological states at manageable levels even if they do not result in immediately noticeable improvements on the part of returning employee. Gary Johns (2003) - It is argued that great strides have been made in absenteeism research, in part due to the wide diversity of research methods that have been employed to study the phenomenon. The inherent difficulties in studying a complex, low base rate behavior with negative connotations have stimulated methodological diversity. In addition, methodological diversity has expanded as a wide variety of academic and professional disciplines has become interested in absenteeism. Variations in research designs, data sources, and the treatment of time are discussed, and examples are provided of how these variations enhance the understanding of absence. The article concludes with an illustration of the synergy of complementary methods when they are used to investigate a particular research question. The impact of social influence on absence and gender differences in absenteeism are used as cases in point. ______________________ 13 Rick D. Hackett, Peter Bycio, An evaluation of employee absenteeism as a coping mechanism among hospital nurse Journal of Occupational and Organizational Psychology Volume 69, Issue 4, pages 327–338, December 1996. 14 Gary Johns: “How methodological diversity has improved our understanding of absenteeism from work” Volume 13, Issue 2, Summer 2003, Pages 157–184
  • 26.
    Bross Michael H(1992) - Workers with a medical diagnosis of chemical dependence were selected and compared with matched controls; we hypothesized there were significant differences in absenteeism and certain medical illnesses. Employee data were obtained from medical insurance sickness and accident reports. Illnesses were summarized into diagnostic clusters for analysis. Chemically-dependent workers had significantly more (P<.05) absenteeism, injuries, hypertension, and mental disorders than did the control group. Using these findings, employers can conduct prospective studies that select workers to be screened for chemical dependence. Johns (1994) - The social cognition literature and a deviance model of absenteeism were used to generate a series of predictions about employees' and managers' estimates of levels of absenteeism. Employees revealed a clear self-serving pattern in comparing their own absenteeism with occupational norms and their own work group's absence, and they underestimated their own actual absenteeism. Managers estimated lower occupational norms and lower work-group absence than did their subordinates. Managers also saw their own work groups as having lower absenteeism than the company average, an estimate that also appeared to be self-serving. Results suggest how people make sense of absence in a social context. ____________________ 15 Bross Michael H. MD; Pace, S. Kelton BS; Cronin, Irvin H. MD: Chemical Dependence: Analysis of Work Absenteeism and Associated Medical Illnesses. Journal of Occupational Medicine: January 1992. 16 Johns, Gary : “Absenteeism estimates by employees and managers: Divergent perspectives and self-serving perceptions”. Journal of Applied Psychology, Vol 79(2), Apr 1994.
  • 27.
    Karin Sanders (1998)- This article discusses the relationship between the informal ties of the employees within an organization and their absentee rates. To explain this relationship, the assumption is made that within a department, a more or less stable norm concerning illegal absenteeism exits, and that the strength of this norm is related to the tightness of the informal relationships between the employees: the more consensus on the absentee norm, irrespective of the degree of tolerance, the more cohesive this department. Furthermore, according to the fairness theory of Adams (1965), a relationship between the tightness of the informal relations, the norm concerning illegal absenteeism and the absentee rate is expected: the more cohesive, the higher the effect of the group norm on the short-term absentee rate. Network data of 62 employees of eight comparable teams within a housing corporation were collected by means of a questionnaire, and combined with data on the absentee rates of the employees. The data supported the hypotheses concerning the relationship between the group norm, the tightness of the informal relations and the short-term absentee rates of the employees within a department. Martocchio (1989) - Meta-analyses were performed on 34 samples that included correlations of the age and employee absenteeism relationship. Samples were categorized into 2 groups for voluntary absenteeism and involuntary absenteeism based on the frequency index and the time-lost index, respectively. Results indicated that both voluntary and involuntary absence are inversely related to age. Unexplained variance remained for each of the absence measures after variance due to sampling error and measurement unreliability was statistically estimated. Work demand was negatively associated with age, but not in the expected direction. Work demand did not moderate the age–absence relationship for either voluntary or involuntary absence. Sex moderated the relationship between age and voluntary absenteeism only. For men, the relationships were negative; for women, they did not differ significantly from 0. Implications for research and human resource management practices regarding aging and absenteeism are discussed. _____________________ 17 Karin Sanders, Sigrid K. Hoekstra, “Informal Networks and Absenteeism within an Organization”., Volume 4, Issue 2, pp 149-163, June 1998 18 Martocchio, Joseph J : “Age-related differences in employee absenteeism: A meta-analysis”. Psychology and Aging, Vol 4(4), Dec 1989,
  • 28.
  • 29.
    OBJECTIVES OF THESTUDY The objectives of the study are:  To study the major causes of absenteeism in the organization.  To analyse the workplace factors which leads to absenteeism in the organisation.  To provide suggestions for reducing absenteeism of the employees in the organisation.
  • 30.
  • 31.
    6.1 NEED OFTHE RESEARCH  Assessing causes of Absenteeism & suggest remedies to overcome it  Finding out the costs of absenteeism and how to reduce it.  Figuring out the solutions for this problem 6.2 .SCOPE OF THE STUDY The scope of the study covers five categories of flexi workers such as CAPS, diploma apprentice, ITI apprentice, STT, GAPS. The data for this study is collected from all the departments. The study provides a base for understanding the employee’s problems and provides possible remedies for it. . The period of the study is from 1st may to 15th June (45 days) of 2016. 6.3 METHODOLOGY 6.3.1 RESEARCH DESIGN Descriptive research design was adopted for the study because the study attempts to reach with conclusion to suggest the company with projects according findings. The complete and accurate description cannot be given from the study. 6.3.2 NATURE OF DATA Primary and Secondary data were used for the collection of information for the study. Primary Data: The Primary data was collected from the flexi workers of the company (Rane TRW Steering Systems Private Limited, Viralimalai) using questionnaire. Secondary Data: Secondary data relating to review of literature was online journals such as google scholar, scopus, proquest, etc. and also from various websites of internet sources. 6.3.3 SAMPLING METHOD The sampling method used for the study is stratified sampling method. Workers having experience of 3 months to 1year is the sample for this study. 6.3.4 SAMPLE SIZE The sample size of this research is 120, workers from all the department in the company, has been taken for the study. 6.3.5 DATA COLLECTION METHODS The primary data is collected through questionnaire from flexi workers of the company. Questions related to the categories like health, canteen facilities, bus facilities,
  • 32.
    training, co-worker relationship,supervisor relationship has been set as base for the questionnaire. 6.3.6 PILOT STUDY A pilot study was conducted among 10 flexi workers for testing the method of data collection with questionnaire in English. From the pilot study is seen that those people are struggling to answer the questions in English. So, for the convenience of the data collection the questionnaire has been translated into Tamil and used. 6.3.7 STATISTICAL ANALYSIS The data collected had been analysed using SPSS package, by the available version of SPSS (18.0). 6.4 .LIMITATIONS OF THE STUDY  The study deals with sensitive area of the organization, it is difficult to extract accurate information from the employees.  The study is not comparative in nature  The observation and conclusion which are presented in the report is based on data collected only the sample employees and cannot be generalized to other areas.
  • 33.
  • 34.
    ANALYSIS AND INTERPRETATION Table:7.1:Age group of the respondents Source: Primary data From the above table it is found that 59.2% of the respondents are 19-21yrs, 30.8% of the respondents are 22-24yrs, 6.7% respondents are above 24yrs and 3.3% respondents are below 19 yrs. Chart: 7.1. Age group of the respondents. 0 10 20 30 40 50 60 70 80 Below 19 yrs 19 - 21 yrs 22 - 24 yrs Above 24 yrs No. Of respondents Percentage Age No. Of respondents Percentage Below 19 yrs 7 5.8 19 - 21 yrs 68 56.7 22 - 24 yrs 37 30.8 Above 24 yrs 8 6.7 Total 120 100.0
  • 35.
    Table: 7.2: Locationof the respondents. Location No. Of respondents Percentage Chatram (Trichy) & nearby 45 37.5 Woraiyur & nearby 29 24.2 Manaparai & nearby 16 13.3 Viralimalai & nearby 23 19.2 Others 7 5.8 Total 120 100.0 Source: Primary Data From the above table it is found that 37.5% of the respondents are from Chatram (Trichy) & nearby, 24.2% of the respondents are from Woraiyur & nearby, 19.2% Viralimalai & nearby,13.3% of the respondents are from Manaparai & nearby, 5.8 of the respondents are from other areas. Chart: 7.2: Location of the respondents. 0 5 10 15 20 25 30 35 40 45 50 Chatram (Trichy) & nearby Woraiyur & nearby Manaparai & nearby Viralimalai & nearby Others No. of respondents Percentage
  • 36.
    Table: 7.3: Educationallevel of the respondents. Qualification No. Of respondents Percentage HSC 5 4.2 ITI 10 8.3 Diploma 99 82.5 BE 6 5.0 Total 120 100.0 Source: Primary Data From the above table it is found that 82.5% of the respondents are from Diploma, 8.3% of the respondents are from ITI, 5% of the respondents are from BE, 4.2% of the respondents are from HSC Chart: 7.3: Educational level of the respondents. 0 20 40 60 80 100 120 HSC ITI Diploma BE No. Of respondents Percentage
  • 37.
    Table: 7.4. Designationof the respondents. Designation No. Of respondents Percentage CAPS 23 19.2 Diploma 62 51.7 STT 16 13.3 ITI 9 7.5 GAPS 10 8.3 Total 120 100.0 Source: Primary Data From the above table it is found that 51.7% of the respondents are from diploma, 19.2% of the respondents are from CAPS, 13.3% of the respondents are from STT, 8.3% of the respondents are from GAPS, 7.5% of the respondents are from ITI. Chart: 7.4: Designation of the respondents. 0 10 20 30 40 50 60 70 CAPS Diploma STT ITI GAPS No. Of respondents Percentage
  • 38.
    Table: 7.5: Experienceof the respondents. Experience No. Of respondents Percentage 0 - 3 months 25 20.8 3 - 6 months 20 16.7 6 - 9 months 10 8.3 9 - 12 months 38 31.7 Above 1 yr 27 22.5 Total 120 100.0 Source: Primary Data From the above table its is found that 31.7% of the respondents are working for 9-12months, 22.5% of the respondents are working above 1 year, 20.8% of the respondents are working for 0-3months, 16.7% of the respondents are working for 3-6months, 8.3% of the respondents are working for 6-9months. Chart:7.5: Experience of the respondents. 0 5 10 15 20 25 30 35 40 0 - 3 months 3 - 6 months 6 - 9 months 9 - 12 months Above 1 yr No. Of respondents Percentage
  • 39.
    Table: 7.6: Awarenessabout leave policy. Awareness No. Of respondents Percentage Know Very Well 37 30.8 Know 69 57.5 Not clear about the policy 11 9.2 Don’t Know 3 2.5 Total 120 100.0 Source: Primary Data From the above table it is found that 57.5% of the respondents are know about the leave policy of the company, 30.8% of the respondents are know about the leave policy of the company, 9.2% of the respondents are not clear about the policy, 2.5% of the respondents are don’t know about the policy. Chart: 7.6: Awareness about leave policy. 0 10 20 30 40 50 60 70 80 Know Very Well Know Not clear about the policy Don’t Know No. Of respondents Percentage
  • 40.
    Table: 7.7: Leavetaken in a year. Leave taken No. Of respondents Percentage 8 days 34 28.3 10 days 36 30.0 12 days 5 4.2 Above 12 days 10 8.3 Nil 35 29.2 Total 120 100.0 Source: Primary Data From the above table it is found that 30% of the respondents are taking 10 days leave in a year, 29.2% of the respondents are not taking any leave, 28.3% of the respondents are taking 8 days leave in a year, 8.3% of the respondents are taking above 12days leave, 4.2% of the respondents are taking 12 days leave in a year. Chart: 7.7: Leave taken in a year. 0 5 10 15 20 25 30 35 40 8 days 10 days 12 days Above 12 days Nil No. Of respondents Percentage
  • 41.
    Table: 7.8: Reasonto take leave. Reason No. Of respondents Percentage Health issues 34 28.3 Festival/ Function 25 20.8 Unexpected situation 59 49.2 other reasons 2 1.7 Total 120 100.0 Source: Primary Data From the above table it is found that 49.2% of the respondents are taking leave because of unexpected situation, 28.3% of the respondents are taking leave because of health issues, 20.8% of the respondents are taking leave because of festival/function, 1.7% of the respondents are taking leave because of other reasons. Chart: 7.8: Reason to take leave. 0 10 20 30 40 50 60 70 Health issues Festival/ Function Unexpected situation other reasons No. Of respondents Percentage
  • 42.
    Table: 7.9: Sufficiencyof provided leave. Sufficiency No. Of respondents Percentage Strongly agree 19 15.8 Agree 44 36.7 Neutral 18 15.0 Disagree 19 15.8 Strongly disagree 20 16.7 Total 120 100.0 Source: Primary Data From the above table it is found that 36.7% of the respondents are strongly agreed, 16.7% of the respondents are strongly disagreed, 15.8% of the respondents are strongly agreed, 15.8% of the respondents are disagreed, 15% of the respondents are in neutral about leave provided by the company. Chart: 7.9: Sufficiency of provided leave. 0 5 10 15 20 25 30 35 40 45 50 Strongly agree Agree Neutral Disagree Strongly disagree No. Of respondents Percentage
  • 43.
    Table: 7.10: Attendanceaward system. Attendance award system No. Of respondents Percentage Strongly agree 34 28.3 Agree 55 45.8 Neutral 11 9.2 Disagree 9 7.5 Strongly disagree 11 9.2 Total 120 100.0 Source: Primary Data From the above table it is found that 45.8% of the respondents are agreed, 28.3% of the respondents are strongly agreed, 9.2% of the respondents are strongly disagreed, 9.2% of the respondents are in neutral, 7.5% of the respondents are disagreed about the knowledge of attendance award system provided by the company. Chart: 7.10: Attendance award system. 0 10 20 30 40 50 60 Strongly agree Agree Neutral Disagree Strongly disagree No. Of respondents Percentage
  • 44.
    Table: 7.11: Frequencyof attendance award received. Frequency No. Of respondents Percentage 1 20 16.7 2 7 5.8 3 4 3.3 More than 3 10 8.3 Nil 79 65.8 Total 120 100.0 Source: Primary Data From the above table it is found that 65.8% of the respondents are not received the attendance award, 16.7% of the respondents have received once, 8.3% of the respondents have received more than 3 times, 5.8% of the respondents have received twice, 3.3% of the respondents have received thrice. Chart: 7.11: Frequency of attendance award received. 0 10 20 30 40 50 60 70 80 90 1 2 3 More than 3 Nil No. Of respondents Percentage
  • 45.
    Table: 7.12: Frequencyof absence. Frequency of absence. No. Of respondents Percentage Very frequently 7 5.8 Frequently 4 3.3 At the time of requirement 52 43.3 Rarely 23 19.2 Very rarely 34 28.3 Total 120 100.0 Source: Primary Data From the above table it is found that 43.3% of the respondents are absenting at the time of requirement, 28.3% of the respondents are absenting very rarely, 19.2% of the respondents are absenting rarely, 5.8% of the respondents are absenting very frequently, 3.3% of the respondents are absenting frequently. Chart: 4.12. Frequency of absence. 0 10 20 30 40 50 60 Very frequently Frequently At the time of requirement Rarely Very rarely No. Of respondents Percent
  • 46.
    Table: 7.13.a: Prioritizingthe reasons- Health problems Health problems No. Of respondents Percentage Ist priority 72 60.0 IInd priority 31 25.8 IIIrd priority 5 4.2 IVth priority 8 6.7 Vth priority 3 2.5 VIIth priority 1 .8 Total 120 100.0 Source: Primary Data From the above table it is found that 60% of the respondents have given Ist priority, 25.8% of the respondents have given IInd priority, 4.2% of the respondents have given IIIrd priority, 6.7% of the respondents have given IVth priority, 2.5% of the respondents have given Vth priority, 0% of the respondents have given VIth priority, 0.8% of the respondents have given VIIth priority for the health problems. Chart7.13.a: Prioritizing the reasons- Health problems 0 10 20 30 40 50 60 70 80 Ist priority IInd priority IIIrd priority IVth priority Vth priority VIIth priority No. Of respondents Percent
  • 47.
    Table: 7.13.b: Prioritizingthe reasons- Transport facilities Transport facilities No. Of respondents Percentage Ist priority 24 20.0 IInd priority 44 36.7 IIIrd priority 22 18.3 IVth priority 10 8.3 Vth priority 12 10.0 VI priority 8 6.7 Total 120 100.0 Source: Primary Data From the above table it is found that 20% of the respondents have given Ist priority, 36.7% of the respondents have given IInd priority, 18.3% of the respondents have given IIIrd priority, 8.3% of the respondents have given IVth priority, 10% of the respondents have given Vth priority, 6.7% of the respondents have given VIth priority, 0% of the respondents have given VIIth priority for the transport facilities. Chart: : 7.13.b: Prioritizing the reasons- Transport facilities 0 5 10 15 20 25 30 35 40 45 50 Ist priority IInd priority IIIrd priority IVth priority Vth priority VI priority No. Of respondents Percent
  • 48.
    Table:7.13.c: Prioritizing thereasons- Canteen facilities Canteen facilities No. Of respondents Percentage Ist priority 12 10.0 IInd priority 25 20.8 IIIrd priority 34 28.3 Ivth priority 23 19.2 Vth priority 15 12.5 VI priority 6 5.0 VIIth priority 5 4.2 Total 120 100.0 Source: Primary Data From the above table it is found that 10% of the respondents have given Ist priority, 20.8% of the respondents have given IInd priority, 28.3% of the respondents have given IIIrd priority, 19.2% of the respondents have given IVth priority,1 2.5% of the respondents have given Vth priority, 5% of the respondents have given VIth priority, 4.2% of the respondents have given VIIth priority for the canteen facilities. Chart: 7.13.c: Prioritizing the reasons- Canteen facilities. 0 5 10 15 20 25 30 35 40 Ist priority IInd priority IIIrd priority Ivth priority Vth priority VI priority VIIth priority No. Of respondents Percent
  • 49.
    Table: 7.13.d: Prioritizingthe reasons- Co-worker relationship Co-worker relationship No. Of respondents Percentage Ist priority 1 .8 IInd priority 8 6.7 IIIrd priority 10 8.3 IVth priority 23 19.2 Vth priority 25 20.8 VI priority 35 29.2 VIIth priority 18 15.0 Total 120 100.0 Source: Primary Data From the above table it is found that 0.8% of the respondents have given Ist priority, 6.7% of the respondents have given IInd priority, 8.3% of the respondents have given IIIrd priority, 19.2% of the respondents have given IVth priority, 20.8% of the respondents have given Vth priority, 29.2% of the respondents have given VIth priority, 15% of the respondents have given VIIth priority for the co-worker relationship. Chart: 7.13.d: Prioritizing the reasons- Co-worker relationship 0 5 10 15 20 25 30 35 40 Ist priority IInd priority IIIrd priority IVth priority Vth priority VI priority VIIth priority No. Of respondents Percent
  • 50.
    Table: 7.13.e: Prioritizingthe reasons- Supervisor relationship Supervisor relationship No. Of respondents Percentage Ist priority 2 1.7 IInd priority 5 4.2 IIIrd priority 15 12.5 IVth priority 14 11.7 Vth priority 29 24.2 VI priority 19 15.8 VIIth priority 36 30.0 Total 120 100.0 Source: Primary Data From the above table it is found that 1.7% of the respondents have given Ist priority, 4.2% of the respondents have given IInd priority, 12.5% of the respondents have given IIIrd priority, 11.7% of the respondents have given IVth priority, 24.2% of the respondents have given Vth priority, 15.8% of the respondents have given VIth priority, 30% of the respondents have given VIIth priority for the health problems. Chart: 7.13.e: Prioritizing the reasons- Supervisor relationship. 0 5 10 15 20 25 30 35 40 Ist priority IInd priority IIIrd priority IVth priority Vth priority VI priority VIIth priority No. Of respondents Percent
  • 51.
    Table: 7.13.f: Prioritizingthe reasons- Sufficient training Sufficient training No. Of respondents Percentage Ist priority 9 7.5 IInd priority 3 2.5 IIIrd priority 17 14.2 IVth priority 27 22.5 Vth priority 14 11.7 VI priority 26 21.7 VIIth priority 24 20.0 Total 120 100.0 Source: Primary Data From the above table it is found that 7.5% of the respondents have given Ist priority, 2.5% of the respondents have given IInd priority, 14.2% of the respondents have given IIIrd priority, 22.5% of the respondents have given IVth priority, 11.7% of the respondents have given Vth priority, 21.7% of the respondents have given VIth priority, 20% of the respondents have given VIIth priority for the sufficient training. Chart: 7.13.f: Prioritizing the reasons- Sufficient training 0 5 10 15 20 25 30 Ist priority IInd priority IIIrd priority IVth priority Vth priority VI priority VIIth priority No. Of respondents Percent
  • 52.
    Table: 7.13.g: Prioritizingthe reasons- Lenient management system Lenient management system No. Of respondents Percentage Ist priority 1 .8 IInd priority 3 2.5 IIIrd priority 20 16.7 IVth priority 13 10.8 Vth priority 21 17.5 VI priority 26 21.7 VIIth priority 36 30.0 Total 120 100.0 Source: Primary Data From the above table it is found that 0.8% of the respondents have given Ist priority, 2.5% of the respondents have given IInd priority, 16.7% of the respondents have given IIIrd priority, 10.8% of the respondents have given IVth priority, 17.5% of the respondents have given Vth priority, 21.7% of the respondents have given VIth priority, 30% of the respondents have given VIIth priority for the lenient management system. Chart: 7.13.g: Prioritizing the reasons- Lenient management system 0 5 10 15 20 25 30 35 40 Ist priority IInd priority IIIrd priority IVth priority Vth priority VI priority VIIth priority No. Of respondents Percent
  • 53.
    Table: 7.14.a: Awarenessabout the company’s sufferings. Awareness No. Of respondents Percentage Strongly agree 59 49.2 Agree 30 25.0 Neutral 25 20.8 Disagree 2 1.7 Strongly disagree 4 3.3 Total 120 100.0 Source: Primary Data From the above table it is found that 49.2% of the respondents are strongly agreed, 25% of the respondents are agreed, 20.8% of the respondents are in neutral, 3.3% of the respondents are strongly disagreed, 1.7% of the respondents are disagreed that they know about the company’s sufferings if they absent without prior permission. Chart: 7.14.a: Awareness about the company’s sufferings. 0 10 20 30 40 50 60 70 Strongly agree Agree Neutral Disagree Strongly disagree No. Of respondents Percentage
  • 54.
    Table: 7.14.b: Superiorsare more concerned about their absence Superiors concern No. Of respondents Percentage Strongly agree 37 30.8 Agree 57 47.5 Neutral 21 17.5 Disagree 2 1.7 Strongly disagree 3 2.5 Total 120 100.0 Source: Primary Data From the above table it is found that 30.8% of the respondents are strongly agreed, 47.5% of the respondents are agreed, 17.5% of the respondents are in neutral, 1.7% of the respondents are disagreed, 2.5% of the respondents are strongly disagreed that their superiors are more concerned about their absence and advice them to attend regularly. Chart: 7.14.b: Superiors are more concerned about their absence 0 10 20 30 40 50 60 Strongly agree Agree Neutral Disagree Strongly disagree No. Of respondents Percentage
  • 55.
    Table: 7.14.c: Actionsagainst leave taken. Actions No. Of respondents Percentage Strongly agree 41 34.2 Agree 22 18.3 Neutral 21 17.5 Disagree 15 12.5 Strongly disagree 21 17.5 Total 120 100.0 Source: Primary Data From the above table it is found that 34.2% of the respondents are strongly agreed, 18.3% of the respondents are agreed, 17.5% of the respondents are in neutral, 12.5% of the respondents are disagreed, 17.5% of the respondents are strongly disagreed that company is not keen about taking any actions against their absence. Chart: 7.14.c: Actions against leave taken. 0 5 10 15 20 25 30 35 40 45 Strongly agree Agree Neutral Disagree Strongly disagree No. of respondents Percentage
  • 56.
    Table: 7.15.a: Busfacilities are convenient for respondents. Bus facilities No. Of respondents Percentage Strongly agree 67 55.8 Agree 33 27.5 Neutral 9 7.5 Disagree 6 5.0 Strongly disagree 5 4.2 Total 120 100.0 Source: Primary Data From the above table it is found that 55.8% of the respondents are strongly agreed, 27.5% of the respondents are agreed, 7.5% of the respondents are in neutral, 5.0% of the respondents are disagreed, 4.2% of the respondents are strongly disagreed that bus facilities provided by the company is convenient for them. Chart: 7.15.a: Bus facilities are convenient for respondents. 0 10 20 30 40 50 60 70 80 Strongly agree Agree Neutral Disagree Strongly disagree No. Of respondents Percentage
  • 57.
    Table: 7.15.b: convenientbus timings Bus timings No. Of respondents Percentage Strongly agree 54 45.0 Agree 29 24.2 Neutral 24 20.0 Disagree 7 5.8 Strongly disagree 6 5.0 Total 120 100.0 Source: Primary Data From the above table it is found that 45.0% of the respondents are strongly agreed, 24.2% of the respondents are agreed, 20% of the respondents are in neutral, 5.8% of the respondents are disagreed, 5.0% of the respondents are strongly disagreed that bus timings are convenient for them. Chart: 7.15.b: convenient bus timings 0 10 20 30 40 50 60 Strongly agree Agree Neutral Disagree Strongly disagree No. Of respondents Percentage
  • 58.
    Table: 7.15.c: Convenientpickup points Pickup points No. Of respondents Percentage Strongly agree 53 44.2 Agree 31 25.8 Neutral 19 15.8 Disagree 6 5.0 Strongly disagree 11 9.2 Total 120 100.0 Source: Primary Data From the above table it is found that 44.2% of the respondents are strongly agreed, 25.8% of the respondents are agreed, 15.8% of the respondents are in neutral, 5.0% of the respondents are disagreed, 9.2% of the respondents are strongly disagreed that bus pick-up points are convenient for them. Chart: 7.15.c: Convenient pickup points 0 10 20 30 40 50 60 Strongly agree Agree Neutral Disagree Strongly disagree No. Of respondents Percentage
  • 59.
    Table: 7.16.a: foodprovided for me is tasty & healthy for the respondents Food quality No. Of respondents Percentage Strongly agree 20 16.7 Agree 18 15.0 Neutral 40 33.3 Disagree 30 25.0 Strongly disagree 12 10.0 Total 120 100.0 Source: Primary Data From the above table it is found that 16.7% of the respondents are strongly agreed, 15% of the respondents are agreed, 33.3% of the respondents are in neutral, 25% of the respondents are disagreed, 10% of the respondents are strongly disagreed that food provided by the company is tasty and healthy for them. Chart: 7.16.a: food provided for me is tasty & healthy for the respondents 0 5 10 15 20 25 30 35 40 45 Strongly agree Agree Neutral Disagree Strongly disagree No. Of respondents Percentage
  • 60.
    Table: 7.16.b: Foodprovided by the company is cooked in a hygienic way for the respondents Hygienic food No. Of respondents Percentage Strongly agree 13 10.8 Agree 18 15.0 Neutral 55 45.8 Disagree 16 13.3 Strongly disagree 18 15.0 Total 120 100.0 Source: Primary Data From the above table it is found that 10.8% of the respondents are strongly agreed, 15% of the respondents are agreed, 45.8% of the respondents are in neutral, 13.3% of the respondents are disagreed, 15% of the respondents are strongly disagreed that food provided by the company is cooked in a hygienic way. Chart: 7.16.b: Food provided by the company is cooked in a hygienic way for the respondents 0 10 20 30 40 50 60 Strongly agree Agree Neutral Disagree Strongly disagree No. Of respondents Percentage
  • 61.
    Table: 7.16.c: Foodprovided by the company is worthy for the respondents Worthiness of food No. Of respondents Percentage Strongly agree 19 15.8 Agree 28 23.3 Neutral 30 25.0 Disagree 24 20.0 Strongly disagree 19 15.8 Total 120 100.0 Source: Primary Data From the above table it is found that 15.8% of the respondents are strongly agreed, 23.3% of the respondents are agreed, 25% of the respondents are in neutral, 20% of the respondents are disagreed, 15.8% of the respondents are strongly disagreed that food provided by the company is worthy. Chart: 7.16.c: Food provided by the company is worthy for the respondents 0 5 10 15 20 25 30 35 Strongly agree Agree Neutral Disagree Strongly disagree No. Of respondents Percentage
  • 62.
    Table: 7.16.d.: Breaktimings are comfortable for the respondents Break timings No. Of respondents Percent Strongly agree 19 15.8 Agree 17 14.2 Neutral 25 20.8 Disagree 26 21.7 Strongly disagree 33 27.5 Total 120 100.0 Source: Primary Data From the above table it is found that 15.8% of the respondents are strongly agreed, 14.2% of the respondents are agreed, 20.8% of the respondents are in neutral, 21.7% of the respondents are disagreed, 27.5% of the respondents are strongly disagreed that break timings are comfortable for them. Chart: 7.16.d.: Break timings are comfortable for the respondents 0 5 10 15 20 25 30 35 Strongly agree Agree Neutral Disagree Strongly disagree No. Of respondents Percent
  • 63.
    Table: 7.17.a: Trainingprovided by the company is sufficient for the respondents Sufficient training No. Of respondents Percentage Strongly agree 42 35.0 Agree 30 25.0 Neutral 17 14.2 Disagree 13 10.8 Strongly disagree 18 15.0 Total 120 100.0 Source: Primary Data From the above table it is found that 35% of the respondents are strongly agreed, 25% of the respondents are agreed, 14.2% of the respondents are in neutral, 10.8% of the respondents are disagreed, 15% of the respondents are strongly disagreed that training provided by the company is sufficient for them. Chart: 7.17.a: Training provided by the company is sufficient for the respondents 0 5 10 15 20 25 30 35 40 45 Strongly agree Agree Neutral Disagree Strongly disagree No. Of respondents Percentage
  • 64.
    Table: 7.17.b: Respondentsare clear about the responsibilities of their work Know bout responsibilities No. Of respondents Percentage Strongly agree 39 32.5 Agree 51 42.5 Neutral 23 19.2 Disagree 4 3.3 Strongly disagree 3 2.5 Total 120 100.0 Source: Primary Data From the above table it is found that 32.5% of the respondents are strongly agreed, 42.5% of the respondents are agreed, 19.2% of the respondents are in neutral, 3.3% of the respondents are disagreed, 2.5% of the respondents are strongly disagreed that they are clear about the responsibilities of their work. Chart: 7.17.b: Respondents are clear about the responsibilities of their work 0 10 20 30 40 50 60 Strongly agree Agree Neutral Disagree Strongly disagree No. Of respondents Percentage
  • 65.
    Table: 7.18.a: Respondentsfeel easy to communicate with their co-worker Easy to communicate No. Of respondents Percentage Strongly agree 49 40.8 Agree 57 47.5 Neutral 10 8.3 Disagree 1 .8 Strongly disagree 3 2.5 Total 120 100.0 Source: Primary Data From the above table it is found that 40.8% of the respondents are strongly agreed, 47.5% of the respondents are agreed, 8.3% of the respondents are in neutral, 0.8% of the respondents are disagreed, 2.5% of the respondents are strongly disagreed that they feel easy to communicate with their co-workers. Chart: 7.18.a: Respondents feel easy to communicate with their co-worker. 0 10 20 30 40 50 60 Strongly agree Agree Neutral Disagree Strongly disagree No. Of respondents Percentage
  • 66.
    Table: 7.18.b: Noconflicts among co-workers regarding the work No conflicts No. Of respondents Percentage Strongly agree 47 39.2 Agree 51 42.5 Neutral 9 7.5 Disagree 4 3.3 Strongly disagree 9 7.5 Total 120 100.0 Source: Primary Data From the above table it is found that 39.2% of the respondents are strongly agreed, 42.5% of the respondents are agreed,7.53% of the respondents are in neutral, 3.3% of the respondents are disagreed, 7.5% of the respondents are strongly disagreed that no conflicts amongst them regarding the work. Chart: 7.18.b: No conflicts among co-workers regarding the work . 0 10 20 30 40 50 60 Strongly agree Agree Neutral Disagree Strongly disagree No. Of respondents No. Of respondents Percentage
  • 67.
    Table: 7.18.c: co-workerhelps them/ clears their doubt Helping/ clearing doubts No. Of respondents Percentage Strongly agree 42 35.0 Agree 57 47.5 Neutral 9 7.5 Disagree 2 1.7 Strongly disagree 10 8.3 Total 120 100.0 Source: Primary Data From the above table it is found that 35% of the respondents are strongly agreed, 47.5% of the respondents are agreed, 7.5% of the respondents are in neutral, 1.7% of the respondents are disagreed, 8.3% of the respondents are strongly disagreed that co-worker helps him/clears his doubts. Chart: 7.18.c: co-worker helps them/ clears their doubt 0 10 20 30 40 50 60 Strongly agree Agree Neutral Disagree Strongly disagree No. Of respondents Percentage
  • 68.
    Table: 7.19.a: respondentsfeel easy to communicate with their supervisor Easy to communicate No. Of respondents Percentage Strongly agree 65 54.2 Agree 30 25.0 Neutral 17 14.2 Disagree 6 5.0 Strongly disagree 2 1.7 Total 120 100.0 Source: Primary Data From the above table it is found that 54.2% of the respondents are strongly agreed, 25% of the respondents are agreed, 14.2% of the respondents are in neutral, 5% of the respondents are disagreed, 1.7% of the respondents are strongly disagreed that they feel easy to communicate with their supervisor. Chart: 7.19.a: respondents feel easy to communicate with their supervisor 0 10 20 30 40 50 60 70 Strongly agree Agree Neutral Disagree Strongly disagree No. Of respondents Percentage
  • 69.
    Table: 7.19.b: supervisorhelps them/ clears their doubt Helping/clears doubts No. Of respondents Percentage Strongly agree 31 25.8 Agree 65 54.2 Neutral 17 14.2 Disagree 3 2.5 Strongly disagree 4 3.3 Total 120 100.0 Source: Primary Data From the above table it is found that 25.8% of the respondents are strongly agreed, 54.2% of the respondents are agreed, 14.2% of the respondents are in neutral, 2.5% of the respondents are disagreed, 3.3% of the respondents are strongly disagreed that supervisor helps him/clears his doubt promptly. Chart: 7.19.b: supervisor helps them/ clears their doubt 0 10 20 30 40 50 60 70 Strongly agree Agree Neutral Disagree Strongly disagree No. Of respondents Percentage
  • 70.
    Table: 7.19.c: Noconflicts among them regarding the work No conflicts No. Of respondents Percentage Strongly agree 61 50.8 Agree 35 29.2 Neutral 14 11.7 Disagree 2 1.7 Strongly disagree 8 6.7 Total 120 100.0 Source: Primary Data From the above table it is found that 50.8% of the respondents are strongly agreed, 29.2% of the respondents are agreed, 11.7% of the respondents are in neutral, 1.7% of the respondents are disagreed, 6.7% of the respondents are strongly disagreed that there is no conflicts amongst them regarding the work. Chart: 7.19.c: No conflicts among them regarding the work. 0 10 20 30 40 50 60 70 Strongly agree Agree Neutral Disagree Strongly disagree No. Of respondents Percentage
  • 71.
    Table: 7.20.a: Respondentsare comfortable to continue shifts Continue shifts Frequency Percent Strongly agree 27 22.5 Agree 20 16.7 Neutral 24 20.0 Disagree 36 30.0 Strongly disagree 13 10.8 Total 120 100.0 Source: Primary Data From the above table it is found that 22.5% of the respondents are strongly agreed, 16.7% of the respondents are agreed, 20% of the respondents are in neutral, 30% of the respondents are disagreed, 10.8% of the respondents are strongly disagreed that they are comfortable to continue shifts. Chart: 7.20.a: Respondents are comfortable to continue shifts 0 5 10 15 20 25 30 35 40 Strongly agree Agree Neutral Disagree Strongly disagree Frequency Percent
  • 72.
    Table: 7.20.b1: Respondentsare comfortable to work continuously in I & II shift Continue I and II shift Frequency Percent Strongly agree 25 20.8 Agree 17 14.2 Neutral 17 14.2 Disagree 38 31.7 Strongly disagree 23 19.2 Total 120 100.0 Source: Primary Data From the above table it is found that 20.8% of the respondents are strongly agreed, 14.2% of the respondents are agreed, 14.2% of the respondents are in neutral, 31.7% of the respondents are disagreed, 19.2% of the respondents are strongly disagreed that they are comfortable to work continuously in I & II shift. Chart: 7.20.b1: Respondents are comfortable to work continuously in I & II shift 0 5 10 15 20 25 30 35 40 Strongly agree Agree Neutral Disagree Strongly disagree Frequency Percent
  • 73.
    Table: 7.20.b2: Respondentsare comfortable to work continue in II & III shift Continue II and III shift No. Of respondents Percentage Strongly agree 28 23.3 Agree 30 25.0 Neutral 17 14.2 Disagree 32 26.7 Strongly disagree 13 10.8 Total 120 100.0 Source: Primary Data From the above table it is found that 23.3% of the respondents are strongly agreed, 25% of the respondents are agreed, 14.2% of the respondents are in neutral, 26.7% of the respondents are disagreed, 10.8% of the respondents are strongly disagreed that they are comfortable to work continuously in II & III shift. Chart: 7.20.b2: Respondents are comfortable to work continue in II & III shift 0 5 10 15 20 25 30 35 Strongly agree Agree Neutral Disagree Strongly disagree No. Of respondents Percentage
  • 74.
    Table: 7.20.b3: Respondentsare comfortable to work continuously in III & I shift Continue III and I shift No. Of respondents Percentage Strongly agree 21 17.5 Agree 20 16.7 Neutral 15 12.5 Disagree 43 35.8 Strongly disagree 21 17.5 Total 120 100.0 Source: Primary Data From the above table it is found that 17.5% of the respondents are strongly agreed, 16.7% of the respondents are agreed, 12.5% of the respondents are in neutral, 35.8% of the respondents are disagreed, 17.5% of the respondents are strongly disagreed that they are comfortable to work continuously in III & I shift. Chart: 7.20.b3: Respondents are comfortable to work continuously in III & I shift 0 5 10 15 20 25 30 35 40 45 50 Strongly agree Agree Neutral Disagree Strongly disagree No. Of respondents Percentage
  • 75.
    Table: 7.20..c: Respondentsare permitted to take the comp.off as and when i need Comp.off No. Of respondents Percentage Strongly agree 19 15.8 Agree 21 17.5 Neutral 33 27.5 Disagree 29 24.2 Strongly disagree 18 15.0 Total 120 100.0 Source: Primary Data From the above table it is found that 15.8% of the respondents are strongly agreed, 17.5% of the respondents are agreed, 27.5% of the respondents are in neutral, 24.2% of the respondents are disagreed, 15% of the respondents are strongly disagreed that they are permitted to take the comp.off as and when they need. Chart: 7.20..c: Respondents are permitted to take the comp.off as and when i need 0 5 10 15 20 25 30 35 Strongly agree Agree Neutral Disagree Strongly disagree No. Of respondents Percentage
  • 76.
    Table: 7.20.d: Respondentsare given OT from extra work OT No. Of respondents Percentage Strongly agree 14 11.7 Agree 16 13.3 Neutral 18 15.0 Disagree 40 33.3 Strongly disagree 32 26.7 Total 120 100.0 Source: Primary Data From the above table it is found that 11.7% of the respondents are strongly agreed, 13.3% of the respondents are agreed, 15% of the respondents are in neutral, 33.3% of the respondents are disagreed, 26.7% of the respondents are strongly disagreed that they are given OT from extra work. Chart: 7.20.d: Respondents are given OT from extra work 0 5 10 15 20 25 30 35 40 45 Strongly agree Agree Neutral Disagree Strongly disagree No. Of respondents Percentage
  • 77.
    Table: 7.21.a: Uniformprovided by the company is of good quality for the respondents 21.a. Uniform quality No. Of respondents Percentage Strongly agree 25 20.8 Agree 20 16.7 Neutral 32 26.7 Disagree 14 11.7 Strongly disagree 29 24.2 Total 120 100.0 Source: Primary Data From the above table it is found that 20.8% of the respondents are strongly agreed, 16.7% of the respondents are agreed, 26.7% of the respondents are in neutral, 11.7% of the respondents are disagreed, 24.2% of the respondents are strongly disagreed that uniform provided by the company is of good quality. Chart: 7.21.a: Uniform provided by the company is of good quality for the respondents 0 5 10 15 20 25 30 35 Strongly agree Agree Neutral Disagree Strongly disagree No. Of respondents Percentage
  • 78.
    Table: 7.21: b:Shoes provided by the company is of good quality for the respondents Shoe quality No. Of respondents Percentage Strongly agree 17 14.2 Agree 16 13.3 Neutral 16 13.3 Disagree 27 22.5 Strongly disagree 44 36.7 Total 120 100.0 Source: Primary Data From the above table it is found that 14.2% of the respondents are strongly agreed, 13.3% of the respondents are agreed, 13.3% of the respondents are in neutral, 22.5% of the respondents are disagreed, 36.7% of the respondents are strongly disagreed that shoes provided by the company is of good quality. Chart: 7.21: b: Shoes provided by the company is of good quality for the respondents 0 5 10 15 20 25 30 35 40 45 50 Strongly agree Agree Neutral Disagree Strongly disagree No. Of respondents Percentage
  • 79.
    Table: 7.21.c: Respondentsare clear about the importance of PPE's Importance of PPE No. Of respondents Percentage Strongly agree 42 35.0 Agree 33 27.5 Neutral 28 23.3 Disagree 12 10.0 Strongly disagree 5 4.2 Total 120 100.0 Source: Primary Data From the above table it is found that 35% of the respondents are strongly agreed, 27.5% of the respondents are agreed, 23.3.% of the respondents are in neutral, 10% of the respondents are disagreed, 4.2% of the respondents are strongly disagreed that they are clear about the importance of PPE’s. Chart: : 7.21.c: Respondents are clear about the importance of PPE's 0 5 10 15 20 25 30 35 40 45 Strongly agree Agree Neutral Disagree Strongly disagree No. Of respondents Percentage
  • 80.
    CROSS TABULATIOS Table: 7.22:Designation of the respondents * Health problems – Cross tabulation Designation Health problems TotalIst priority IInd priority IIIrd priority IVth priority Vth priority VIIth priority CAPS 12 6 2 1 2 0 23 Diploma 38 17 2 4 0 1 62 STT 9 3 0 3 1 0 16 ITI 6 3 0 0 0 0 9 GAPS 7 2 1 0 0 0 10 Total 72 31 5 8 3 1 120 Source: Primary Data From the above table, it is found that  In CAPS 12 respondents has given 1st priority, 6 respondents has given 2nd priority, 2 respondents has given 3rd priority, 1 respondent has given 4th priority, 2 respondents has given 5th priority for health problems.  In Diploma 38 respondents has given 1st priority, 17 respondents has given 2nd priority, 2 respondents has given 3rd priority, 4 respondent has given 4th priority, 1 respondent has given 7th priority for health problems.  In STT 9 respondents has given 1st priority, 3 respondents has given 2nd priority, 3 respondents has given 4th priority, 1 respondent has given 5th priority for health problems.  In ITI 6 respondents has given 1st priority, 3 respondents has given 2nd priority for health problems.  In GAPS 7 respondents has given 1st priority, 2 respondents has given 2nd priority, 1 respondents has given 3rd priority for health problems.
  • 81.
    Chart:7.22: Designation ofthe respondents * Health problems – Cross tabulation 0 5 10 15 20 25 Ist priority IInd priority IIIrd priority IVth priority Vth priority VIth priority VIIth priority CAPS Diploma STT ITI GAPS
  • 82.
    Table: 7.23: Designationof the respondents * Transport facilities - Cross tabulation Designation Transport facilities Total Ist priority IInd priority IIIrd priority IVth priority Vth priority VI priority CAPS 4 11 4 2 0 2 23 Diploma 13 22 8 5 10 4 62 STT 3 6 5 1 1 0 16 ITI 1 2 4 1 0 1 9 GAPS 3 3 1 1 1 1 10 Total 24 44 22 10 12 8 120 Source: Primary Data From the above table, it is found that  In CAPS 4 respondents has given 1st priority, 11 respondents has given 2nd priority, 4 respondents has given 3rd priority, 2 respondents has given 4th priority, 2 respondents has given 6th priority for transport facilities.  In diploma 13 respondents has given 1st priority, 22 respondents has given 2nd priority, 8 respondents has given 3rd priority, 5 respondents has given 4th priority, 10 respondents has given 5th priority, 4 respondents has given 6th priority for transport facilities.  In STT 3 respondents has given 1st priority, 6 respondents has given 2nd priority, 5 respondents has given 3rd priority, 1 respondent has given 4th priority, 1 respondent has given 5th priority for transport facilities.  In ITI 1 respondent has given 1st priority, 2 respondents has given 2nd priority, 4 respondents has given 3rd priority, 1 respondent has given 4th priority, 1 respondent has given 6th priority for transport facilities.  In GAPS 3 respondents has given 1st priority, 3 respondents has given 2nd priority, 1 respondent has given 3rd priority, 1 respondent has given 4th priority, 1 respondent has given 5th priority, 1 respondent has given 6th priority for transport facilities.
  • 83.
    Chart :7.23: 7.23:Designation of the respondents * Transport facilities - Cross tabulation 0 5 10 15 20 25 Ist priority IInd priority IIIrd priority IVth priority Vth priority VIth priority VIIth priority CAPS Diploma STT ITI GAPS
  • 84.
    Table: 7.24: Designationof the respondents * canteen facilities - Cross tabulation Designation Canteen facilities TotalIst priority IInd priority IIIrd priority IVth priority Vth priority VI priorit y VIIth priority CAPS 4 3 8 6 2 0 0 23 Diploma 6 12 18 9 8 4 5 62 STT 1 5 3 3 4 0 0 16 ITI 1 1 0 5 1 1 0 9 GAPS 0 4 5 0 0 1 0 10 Total 12 25 34 23 15 6 5 120 Source: Primary Data From the above table, it is found that  In CAPS 4 respondents has given 1st priority, 3 respondents has given 2nd priority, 8 respondents has given 3rd priority, 6 respondents has given 4th priority, 2 respondents has given 5th priority for canteen facilities.  In Diploma 6 respondents has given 1st priority, 12 respondents has given 2nd priority, 18 respondents has given 3rd priority, 9 respondents has given 4th priority, 8 respondents has given 5th priority, 4 respondents has given 6th priority, 5 respondents has given 7th priority for canteen facilities.  In STT 1 respondent has given 1st priority, 5 respondents has given 2nd priority, 3 respondents has given 3rd priority, 3 respondents has given 4th priority, 4 respondents has given 5th priority for canteen facilities.  In ITI 1 respondent has given 1st priority, 5 respondents has given 2nd priority, 3 respondents has given 3rd priority, 3 respondents has given 4th priority, 4 respondents has given 5th priority for canteen facilities.  In GAPS 4 respondents has given 2nd priority, 5 respondents has given 3rd priority, 1 respondent has given 6th priority for canteen facilities.
  • 85.
    Chart: 7.24: Designationof the respondents * canteen facilities - Cross tabulation 0 2 4 6 8 10 12 14 16 18 Ist priority IInd priority IIIrd priority IVth priority Vth priority VIth priority VIIth priority CAPS Diploma STT ITI GAPS
  • 86.
    Table:7.25: Designation ofthe respondents * co-worker relationship - Cross tabulation Designation Co-worker relationship Total Ist priority IInd priority IIIrd priority IVth priority Vth priority VI priorit y VIIth priority CAPS 0 1 3 5 6 5 3 23 Diploma 1 4 5 15 9 16 12 62 STT 0 1 0 2 6 6 1 16 ITI 0 2 2 1 1 3 0 9 GAPS 0 0 0 0 3 5 2 10 Total 1 8 10 23 25 35 18 120 Source: Primary Data From the above table, it is found that  In CAPS 1 respondent has given 2nd priority, 3 respondents has given 3rd priority, 5 respondents has given 4th priority, 6 respondents has given 5th priority, 5 respondents has given 6th priority, 3 respondents has given 7th priority for co-worker relationship.  In Diploma1 respondent has given 1st priority, 4 respondents has given 2nd priority, 5 respondents has given 3rd priority, 15 respondents has given 4th priority, 9 respondents has given 5th priority, 16 respondents has given 6th priority, 12 respondents has given 7th priority for co-worker relationship.  In STT 1 respondent has given 2nd priority, 2 respondents has given 4th priority, 6 respondents has given 5th priority, 6 respondents has given 6th priority, 1 respondent has given 7th priority for co-worker relationship.  In ITI 2 respondents has given 2nd priority, 2 respondents has given 3rd priority, 1 respondent has given 4th priority, 1 respondent has given 5th priority, 3 respondents has given 6th priority for co-worker relationship.  In GAPS 3 respondents has given 5th priority, 6 respondents has given 6th priority, 2 respondents has given 7th priority for co-worker relationship.
  • 87.
    Chart: 7.25: Designationof the respondents * co-worker relationship - Cross tabulation 0 2 4 6 8 10 12 14 16 18 Ist priority IInd priority IIIrd priority IVth priority Vth priority VIth priority VIIth priority CAPS Diploma STT ITI GAPS
  • 88.
    Table: 7.26: Designationof the respondents * supervisor relationship - Cross tabulation Designation Supervisor relationship Total Ist priority IInd priority IIIrd priority IVth priority Vth priority VI priority VIIth priority CAPS 0 0 2 1 5 8 7 23 Diploma 2 4 8 11 16 5 16 62 STT 0 0 3 1 2 3 7 16 ITI 0 0 1 1 4 0 3 9 GAPS 0 1 1 0 2 3 3 10 Total 2 5 15 14 29 19 36 120 Source: Primary Data From the above table, it is found that  In CAPS 2 respondents has given 3rd priority, 1 respondent has given 4th priority, 5 respondents has given 5th priority, 8 respondents has given 6th priority, 7 respondents has given 7th priority for supervisor relationship.  In Diploma2 respondent has given 1st priority, 4 respondents has given 2nd priority, 8 respondents has given 3rd priority, 11 respondents has given 4th priority, 16 respondents has given 5th priority, 5 respondents has given 6th priority, 16 respondents has given 7th priority for supervisor relationship.  In STT 3 respondents has given 3rd priority, 1 respondent has given 4th priority, 2 respondents has given 5th priority, 3 respondents has given 6th priority, 7 respondents has given 7th priority for supervisor relationship.  In ITI 1 respondent has given 3rd priority, 1 respondent has given 4th priority, 4 respondents has given 5th priority, 3 respondents has given 7th priority for supervisor relationship  In GAPS 1 respondent has given 2nd priority, 1 respondent has given 3rd priority, 2 respondents has given 5th priority, 3 respondents has given 6th priority, 3 respondents has given 7th priority for supervisor relationship.
  • 89.
    Chart: 7.26: Designationof the respondents * supervisor relationship Cross tabulation 0 2 4 6 8 10 12 14 16 18 Ist priority IInd priority IIIrd priority IVth priority Vth priority VIth priority VIIth priority CAPS Diploma STT ITI GAPS
  • 90.
    Table: 7. 27:Designation of the respondents * sufficient training Cross tabulation Designation Sufficient training TotalIst priority IInd priority IIIrd priority IVth priority Vth priority VI priority VIIth priority CAPS 3 0 4 5 5 4 2 23 Diploma 2 3 8 14 5 17 13 62 STT 3 0 1 5 0 3 4 16 ITI 1 0 2 0 0 2 4 9 GAPS 0 0 2 3 4 0 1 10 Total 9 3 17 27 14 26 24 120 Source: Primary Data From the above table, it is found that  In CAPS 3 respondents has given 1st priority,4respondents has given 3rd priority, 5 respondent has given 4th priority, 5 respondents has given 5th priority, 4 respondents has given 6th priority, 2 respondents has given 7th priority for sufficient training.  In Diploma 2 respondents has given 1st priority, 3 respondents has given 2nd priority, 8 respondents has given 3rd priority, 14 respondent has given 4th priority, 5 respondents has given 5th priority, 17 respondents has given 6th priority, 13 respondents has given 7th priority for sufficient training.  In STT 3 respondents has given 1st priority, 1 respondents has given 3rd priority, 5 respondent has given 4th priority, 3 respondents has given 6th priority, 4 respondents has given 7th priority for sufficient training.  In ITI 1 respondent has given 1st priority, 2 respondents has given 3rd priority, 2 respondents has given 6th priority, 4 respondents has given 7th priority for sufficient training.  In GAPS 2 respondents has given 3rd priority, 3 respondent has given 4th priority, 4 respondents has given 5th priority, 1 respondent has given 7th priority for sufficient training.
  • 91.
    Chart: 7. 27:Designation of the respondents * sufficient training - Cross tabulation 0 2 4 6 8 10 12 14 16 18 Ist priority IInd priority IIIrd priorityIVth priority Vth priority VIth priority VIIth priority CAPS Diploma STT ITI GAPS
  • 92.
    Table: 7.28: Designationof the respondents * Lenient management system - Cross tabulation Designation Lenient management system TotalIst priority IInd priority IIIrd priority IVth priority Vth priority VI priority VIIth priority CAPS 0 1 1 3 3 4 11 23 Diploma 1 0 14 3 13 16 15 62 STT 0 1 4 1 2 4 4 16 ITI 0 1 0 1 3 2 2 9 GAPS 0 0 1 5 0 0 4 10 Total 1 3 20 13 21 26 36 120 Source: Primary Data From the above table, it is found that  In CAPS 1 respondents has given 2nd priority, 1respondent has given 3rd priority, 3 respondent has given 4th priority, 3 respondents has given 5th priority, 4 respondents has given 6th priority, 11 respondents has given 7th priority for Lenient management system .  In Diploma 1 respondents has given 1st priority, 14 respondents has given 3rd priority, 3 respondent has given 4th priority, 13 respondents has given 5th priority, 16 respondents has given 6th priority, 15 respondents has given 7th priority for Lenient management system .  In STT 1 respondent has given 2nd priority,4 respondents has given 3rd priority, 1 respondent has given 4th priority, 2 respondents has given 5th priority, 4 respondents has given 6th priority, 4 respondents has given 7th priority for Lenient management system .  In ITI 1 respondent has given 2nd priority, 1 respondent has given 4th priority, 3 respondents has given 5th priority, 2 respondents has given 6th priority, 2 respondents has given 7th priority for Lenient management system .  In GAPS 1 respondents has given 3rd priority, 5 respondent has given 4th priority, 4 respondents has given 7th priority for Lenient management system .
  • 93.
    Chart: 7.28: Designationof the respondents * Lenient management system - Cross tabulation 0 2 4 6 8 10 12 14 16 18 Ist priority IInd priority IIIrd priority IVth priority Vth priority VIth priority VIIth priority CAPS Diploma STT ITI GAPS
  • 94.
    CHI-TEST; Table: 7.29 AgeVs Health problems of the respondents H0 (null hypothesis) = Age of the respondents is not the reason for the health problems H1 (alternative hypothesis) = Age of the respondents is the reason for the health problems Age Health reasons Ist priority IInd priority IIIrd priority Vth priority VI priority Total < 19 yrs 6.525 5.625 5.175 5.175 4.5 27 19-21 yrs 8.216667 7.083333 6.516667 6.516667 5.666667 34 22-24 yrs 7.25 6.25 5.75 5.75 5 30 > 24 yrs 7.008333 6.041667 5.558333 5.558333 4.833333 29 total 29 25 23 23 20 120 Degrees of freedom =3*4=12, the table value for 5% level of significance is 21.021 and calculated value is 0.999976. INFERENCE: Since table value is greater than calculated value H0 null hypothesis is accepted.
  • 95.
    Table 7.30: Locationof the respondents Vs Transport H0 (null hypothesis) = location of the respondents is not the reason for the transport problems. H1 (alternative hypothesis) = location of the respondents is not the reason for the transport problems. Location Transport facilities Ist priority IInd priority IIIrd priority Vth priority VI priority Total Chatram (Trichy) & nearby 8.783333 7.083333 6.233333 5.95 5.95 34 Woraiyur & nearby 7.233333 5.833333 5.133333 4.9 4.9 28 Manaparai & nearby 7.233333 5.833333 5.133333 4.9 4.9 28 Viralimalai & nearby 7.75 6.25 5.5 5.25 5.25 30 Total 31 25 22 21 21 120 Degrees of freedom =3*4=12, the table value for 5% level of significance is 21.021 and calculated value is 0.9999541. INFERENCE: Since table value is greater than calculated value H0 null hypothesis is accepted.
  • 96.
  • 97.
    FINDINGS, SUGGESTIONS ANDCONCLUSION. The following pages deals with the summary of findings after a careful analysis of the data collected from the respondents in a significant manner. The findings are supported with suitable solutions that are offered for the effective absenteeism management in near future. It is also concluded with the remarks at the last. FINDINGS:  From the table (7.1) it is found that 59.2% of the respondents are 19-21yrs, 30.8% of the respondents are 22-24yrs, 6.7% respondents are above 24yrs and 3.3% respondents are below 19 yrs.  From the table (7.2) it is found that 37.5% of the respondents are from Chatram (Trichy) & nearby, 24.2% of the respondents are from Woraiyur & nearby, 19.2% Viralimalai & nearby,13.3% of the respondents are from Manaparai & nearby, 5.8 of the respondents are from other areas.  From the table (7.3) it is found that 82.5% of the respondents are from Diploma, 8.3% of the respondents are from ITI, 5% of the respondents are from BE, 4.2% of the respondents are from HSC  From the table (7.4) it is found that 51.7% of the respondents are from diploma, 19.2% of the respondents are from CAPS, 13.3% of the respondents are from STT, 8.3% of the respondents are from GAPS, 7.5% of the respondents are from ITI.  From the table (7.5) its is found that 31.7% of the respondents are working for 9- 12months, 22.5% of the respondents are working above 1 year, 20.8% of the respondents are working for 0-3months, 16.7% of the respondents are working for 3- 6months, 8.3% of the respondents are working for 6-9months.  From the table (7.6) it is found that 57.5% of the respondents are know about the leave policy of the company, 30.8% of the respondents are know about the leave policy of the company, 9.2% of the respondents are not clear about the policy, 2.5% of the respondents are don’t know about the policy.  From the table (7.7) it is found that 30% of the respondents are taking 10 days leave in a year, 29.2% of the respondents are not taking any leave, 28.3% of the respondents are taking 8 days leave in a year, 8.3% of the respondents are taking above 12days leave, 4.2% of the respondents are taking 12 days leave in a year.
  • 98.
     From thetable (7.8) it is found that 49.2% of the respondents are taking leave because of unexpected situation, 28.3% of the respondents are taking leave because of health issues, 20.8% of the respondents are taking leave because of festival/function, 1.7% of the respondents are taking leave because of other reasons.  From the table (7.9) it is found that 36.7% of the respondents are strongly agreed, 16.7% of the respondents are strongly disagreed, 15.8% of the respondents are strongly agreed, 15.8% of the respondents are disagreed, 15% of the respondents are in neutral about leave provided by the company.  From the table (7.10) it is found that 45.8% of the respondents are agreed, 28.3% of the respondents are strongly agreed, 9.2% of the respondents are strongly disagreed, 9.2% of the respondents are in neutral, 7.5% of the respondents are disagreed about the knowledge of attendance award system provided by the company.  From the table (7.11) it is found that 65.8% of the respondents are not received the attendance award, 16.7% of the respondents have received once, 8.3% of the respondents have received more than 3 times, 5.8% of the respondents have received twice, 3.3% of the respondents have received thrice.  From the table (7.12) it is found that 43.3% of the respondents are absenting at the time of requirement, 28.3% of the respondents are absenting very rarely, 19.2% of the respondents are absenting rarely, 5.8% of the respondents are absenting very frequently, 3.3% of the respondents are absenting frequently.  From the table (7.13.a) it is found that 60% of the respondents have given Ist priority, 25.8% of the respondents have given IInd priority, 4.2% of the respondents have given IIIrd priority, 6.7% of the respondents have given IVth priority, 2.5% of the respondents have given Vth priority, 0% of the respondents have given VIth priority, 0.8% of the respondents have given VIIth priority for the health problems.  From the table (7.13.b.) it is found that 20% of the respondents have given Ist priority, 36.7% of the respondents have given IInd priority, 18.3% of the respondents have given IIIrd priority, 8.3% of the respondents have given IVth priority, 10% of the respondents have given Vth priority, 6.7% of the respondents have given VIth priority, 0% of the respondents have given VIIth priority for the transport facilities.  From the table (7.13.c.) it is found that 10% of the respondents have given Ist priority, 20.8% of the respondents have given IInd priority, 28.3% of the respondents have given IIIrd priority, 19.2% of the respondents have given IVth priority,1 2.5% of the
  • 99.
    respondents have givenVth priority, 5% of the respondents have given VIth priority, 4.2% of the respondents have given VIIth priority for the canteen facilities.  From the table (7.13.d.) it is found that 0.8% of the respondents have given Ist priority, 6.7% of the respondents have given IInd priority, 8.3% of the respondents have given IIIrd priority, 19.2% of the respondents have given IVth priority, 20.8% of the respondents have given Vth priority, 29.2% of the respondents have given VIth priority, 15% of the respondents have given VIIth priority for the co-worker relationship.  From the table (7.13.e.) it is found that 1.7% of the respondents have given Ist priority, 4.2% of the respondents have given IInd priority, 12.5% of the respondents have given IIIrd priority, 11.7% of the respondents have given IVth priority, 24.2% of the respondents have given Vth priority, 15.8% of the respondents have given VIth priority, 30% of the respondents have given VIIth priority for the health problems.  From the table (7.13.f.) it is found that 7.5% of the respondents have given Ist priority, 2.5% of the respondents have given IInd priority, 14.2% of the respondents have given IIIrd priority, 22.5% of the respondents have given IVth priority, 11.7% of the respondents have given Vth priority, 21.7% of the respondents have given VIth priority, 20% of the respondents have given VIIth priority for the sufficient training.  From the table (7.13.g.) it is found that 0.8% of the respondents have given Ist priority, 2.5% of the respondents have given IInd priority, 16.7% of the respondents have given IIIrd priority, 10.8% of the respondents have given IVth priority, 17.5% of the respondents have given Vth priority, 21.7% of the respondents have given VIth priority, 30% of the respondents have given VIIth priority for the lenient management system.  From the table (7.14.a.) it is found that 49.2% of the respondents are strongly agreed, 25% of the respondents are agreed, 20.8% of the respondents are in neutral, 3.3% of the respondents are strongly disagreed, 1.7% of the respondents are disagreed that they know about the company’s sufferings if they absent without prior permission.  From the table (7.14.b.) it is found that 30.8% of the respondents are strongly agreed, 47.5% of the respondents are agreed, 17.5% of the respondents are in neutral, 1.7% of the respondents are disagreed, 2.5% of the respondents are strongly disagreed that their superiors are more concerned about their absence and advice them to attend regularly.
  • 100.
     From thetable (7.14.c.) it is found that 34.2% of the respondents are strongly agreed, 18.3% of the respondents are agreed, 17.5% of the respondents are in neutral, 12.5% of the respondents are disagreed, 17.5% of the respondents are strongly disagreed that company is not keen about taking any actions against their absence.  From the table (7.15.a.) it is found that 55.8% of the respondents are strongly agreed, 27.5% of the respondents are agreed, 7.5% of the respondents are in neutral, 5.0% of the respondents are disagreed, 4.2% of the respondents are strongly disagreed that bus facilities provided by the company is convenient for them.  From the table (7.15.b.) it is found that 45.0% of the respondents are strongly agreed, 24.2% of the respondents are agreed, 20% of the respondents are in neutral, 5.8% of the respondents are disagreed, 5.0% of the respondents are strongly disagreed that bus timings are convenient for them.  From the table(7.15.c.) it is found that 44.2% of the respondents are strongly agreed, 25.8% of the respondents are agreed, 15.8% of the respondents are in neutral, 5.0% of the respondents are disagreed, 9.2% of the respondents are strongly disagreed that bus pick-up points are convenient for them.  From the table (7.16.a.) it is found that 16.7% of the respondents are strongly agreed, 15% of the respondents are agreed, 33.3% of the respondents are in neutral, 25% of the respondents are disagreed, 10% of the respondents are strongly disagreed that food provided by the company is tasty and healthy for them.  From the table (7.16.b.) it is found that 10.8% of the respondents are strongly agreed, 15% of the respondents are agreed, 45.8% of the respondents are in neutral, 13.3% of the respondents are disagreed, 15% of the respondents are strongly disagreed that food provided by the company is cooked in a hygienic way.  From the table (7.16.c.) it is found that 15.8% of the respondents are strongly agreed, 23.3% of the respondents are agreed, 25% of the respondents are in neutral, 20% of the respondents are disagreed, 15.8% of the respondents are strongly disagreed that food provided by the company is worthy.  From the table (7.16.d.) it is found that 15.8% of the respondents are strongly agreed, 14.2% of the respondents are agreed, 20.8% of the respondents are in neutral, 21.7% of the respondents are disagreed, 27.5% of the respondents are strongly disagreed that break timings are comfortable for them.  From the table (7.17.a) it is found that 35% of the respondents are strongly agreed, 25% of the respondents are agreed, 14.2% of the respondents are in neutral, 10.8%
  • 101.
    of the respondentsare disagreed, 15% of the respondents are strongly disagreed that training provided by the company is sufficient for them.  From the table (7.17.b.) it is found that 32.5% of the respondents are strongly agreed, 42.5% of the respondents are agreed, 19.2% of the respondents are in neutral, 3.3% of the respondents are disagreed, 2.5% of the respondents are strongly disagreed that they are clear about the responsibilities of their work.  From the table (7.18.a.) it is found that 40.8% of the respondents are strongly agreed, 47.5% of the respondents are agreed, 8.3% of the respondents are in neutral, 0.8% of the respondents are disagreed, 2.5% of the respondents are strongly disagreed that they feel easy to communicate with their co-workers.  From the table (7.18.b.) it is found that 39.2% of the respondents are strongly agreed, 42.5% of the respondents are agreed,7.53% of the respondents are in neutral, 3.3% of the respondents are disagreed, 7.5% of the respondents are strongly disagreed that no conflicts amongst them regarding the work.  From the table (7.18.c.) it is found that 35% of the respondents are strongly agreed, 47.5% of the respondents are agreed, 7.5% of the respondents are in neutral, 1.7% of the respondents are disagreed, 8.3% of the respondents are strongly disagreed that co- worker helps him/clears his doubts.  From the table (7.19.a.) it is found that 54.2% of the respondents are strongly agreed, 25% of the respondents are agreed, 14.2% of the respondents are in neutral, 5% of the respondents are disagreed, 1.7% of the respondents are strongly disagreed that they feel easy to communicate with their supervisor.  From the table (7.19.b.) it is found that 25.8% of the respondents are strongly agreed, 54.2% of the respondents are agreed, 14.2% of the respondents are in neutral, 2.5% of the respondents are disagreed, 3.3% of the respondents are strongly disagreed that supervisor helps him/clears his doubt promptly.  From the table (7.19.c.) it is found that 50.8% of the respondents are strongly agreed, 29.2% of the respondents are agreed, 11.7% of the respondents are in neutral, 1.7% of the respondents are disagreed, 6.7% of the respondents are strongly disagreed that there is no conflicts amongst them regarding the work.  From the table (7.20.a.) it is found that 22.5% of the respondents are strongly agreed, 16.7% of the respondents are agreed, 20% of the respondents are in neutral, 30% of the respondents are disagreed, 10.8% of the respondents are strongly disagreed that they are comfortable to continue shifts.
  • 102.
     From thetable (7.20.b1.) it is found that 20.8% of the respondents are strongly agreed, 14.2% of the respondents are agreed, 14.2% of the respondents are in neutral, 31.7% of the respondents are disagreed, 19.2% of the respondents are strongly disagreed that they are comfortable to work continuously in I & II shift.  From the table (7.20.b2.) it is found that 23.3% of the respondents are strongly agreed, 25% of the respondents are agreed, 14.2% of the respondents are in neutral, 26.7% of the respondents are disagreed, 10.8% of the respondents are strongly disagreed that they are comfortable to work continuously in II & III shift.  From the table (7.20.b3) it is found that 17.5% of the respondents are strongly agreed, 16.7% of the respondents are agreed, 12.5% of the respondents are in neutral, 35.8% of the respondents are disagreed, 17.5% of the respondents are strongly disagreed that they are comfortable to work continuously in III & I shift.  From the table (7.20.c.) it is found that 15.8% of the respondents are strongly agreed, 17.5% of the respondents are agreed, 27.5% of the respondents are in neutral, 24.2% of the respondents are disagreed, 15% of the respondents are strongly disagreed that they are permitted to take the comp.off as and when they need.  From the table (7.20.d.) it is found that 11.7% of the respondents are strongly agreed, 13.3% of the respondents are agreed, 15% of the respondents are in neutral, 33.3% of the respondents are disagreed, 26.7% of the respondents are strongly disagreed that they are given OT from extra work.  From the table (7.21.a.) it is found that 20.8% of the respondents are strongly agreed, 16.7% of the respondents are agreed, 26.7% of the respondents are in neutral, 11.7% of the respondents are disagreed, 24.2% of the respondents are strongly disagreed that uniform provided by the company is of good quality.  From the table (7.21.b.) it is found that 14.2% of the respondents are strongly agreed, 13.3% of the respondents are agreed, 13.3% of the respondents are in neutral, 22.5% of the respondents are disagreed, 36.7% of the respondents are strongly disagreed that shoes provided by the company is of good quality.  From the table (7.21.c.) it is found that 35% of the respondents are strongly agreed, 27.5% of the respondents are agreed, 23.3.% of the respondents are in neutral, 10% of the respondents are disagreed, 4.2% of the respondents are strongly disagreed that they are clear about the importance of PPE’s.
  • 103.
    From the table(7.22), it is found that  In CAPS 12 respondents has given 1st priority, 6 respondents has given 2nd priority, 2 respondents has given 3rd priority, 1 respondent has given 4th priority, 2 respondents has given 5th priority for health problems.  In Diploma 38 respondents has given 1st priority, 17 respondents has given 2nd priority, 2 respondents has given 3rd priority, 4 respondent has given 4th priority, 1 respondent has given 7th priority for health problems.  In STT 9 respondents has given 1st priority, 3 respondents has given 2nd priority, 3 respondents has given 4th priority, 1 respondent has given 5th priority for health problems.  In ITI 6 respondents has given 1st priority, 3 respondents has given 2nd priority for health problems.  In GAPS 7 respondents has given 1st priority, 2 respondents has given 2nd priority, 1 respondents has given 3rd priority for health problems. From the table (7.23), it is found that  In CAPS 4 respondents has given 1st priority, 11 respondents has given 2nd priority, 4 respondents has given 3rd priority, 2 respondents has given 4th priority, 2 respondents has given 6th priority for transport facilities.  In diploma 13 respondents has given 1st priority, 22 respondents has given 2nd priority, 8 respondents has given 3rd priority, 5 respondents has given 4th priority, 10 respondents has given 5th priority, 4 respondents has given 6th priority for transport facilities.  In STT 3 respondents has given 1st priority, 6 respondents has given 2nd priority, 5 respondents has given 3rd priority, 1 respondent has given 4th priority, 1 respondent has given 5th priority for transport facilities.  In ITI 1 respondent has given 1st priority, 2 respondents has given 2nd priority, 4 respondents has given 3rd priority, 1 respondent has given 4th priority, 1 respondent has given 6th priority for transport facilities.  In GAPS 3 respondents has given 1st priority, 3 respondents has given 2nd priority, 1 respondent has given 3rd priority, 1 respondent has given 4th priority, 1 respondent has given 5th priority, 1 respondent has given 6th priority for transport facilities.
  • 104.
    From the table(7.24), it is found that  In CAPS 4 respondents has given 1st priority, 3 respondents has given 2nd priority, 8 respondents has given 3rd priority, 6 respondents has given 4th priority, 2 respondents has given 5th priority for canteen facilities.  In Diploma 6 respondents has given 1st priority, 12 respondents has given 2nd priority, 18 respondents has given 3rd priority, 9 respondents has given 4th priority, 8 respondents has given 5th priority, 4 respondents has given 6th priority, 5 respondents has given 7th priority for canteen facilities.  In STT 1 respondent has given 1st priority, 5 respondents has given 2nd priority, 3 respondents has given 3rd priority, 3 respondents has given 4th priority, 4 respondents has given 5th priority for canteen facilities.  In ITI 1 respondent has given 1st priority, 5 respondents has given 2nd priority, 3 respondents has given 3rd priority, 3 respondents has given 4th priority, 4 respondents has given 5th priority for canteen facilities.  In GAPS 4 respondents has given 2nd priority, 5 respondents has given 3rd priority, 1 respondent has given 6th priority for canteen facilities. From the table (7.25), it is found that  In CAPS 1 respondent has given 2nd priority, 3 respondents has given 3rd priority, 5 respondents has given 4th priority, 6 respondents has given 5th priority, 5 respondents has given 6th priority, 3 respondents has given 7th priority for co-worker relationship.  In Diploma1 respondent has given 1st priority, 4 respondents has given 2nd priority, 5 respondents has given 3rd priority, 15 respondents has given 4th priority, 9 respondents has given 5th priority, 16 respondents has given 6th priority, 12 respondents has given 7th priority for co-worker relationship.  In STT 1 respondent has given 2nd priority, 2 respondents has given 4th priority, 6 respondents has given 5th priority, 6 respondents has given 6th priority, 1 respondent has given 7th priority for co-worker relationship.  In ITI 2 respondents has given 2nd priority, 2 respondents has given 3rd priority, 1 respondent has given 4th priority, 1 respondent has given 5th priority, 3 respondents has given 6th priority for co-worker relationship.  In GAPS 3 respondents has given 5th priority, 6 respondents has given 6th priority, 2 respondents has given 7th priority for co-worker relationship.
  • 105.
    From the table(7.26),it is found that  In CAPS 2 respondents has given 3rd priority, 1 respondent has given 4th priority, 5 respondents has given 5th priority, 8 respondents has given 6th priority, 7 respondents has given 7th priority for supervisor relationship.  In Diploma2 respondent has given 1st priority, 4 respondents has given 2nd priority, 8 respondents has given 3rd priority, 11 respondents has given 4th priority, 16 respondents has given 5th priority, 5 respondents has given 6th priority, 16 respondents has given 7th priority for supervisor relationship.  In STT 3 respondents has given 3rd priority, 1 respondent has given 4th priority, 2 respondents has given 5th priority, 3 respondents has given 6th priority, 7 respondents has given 7th priority for supervisor relationship.  In ITI 1 respondent has given 3rd priority, 1 respondent has given 4th priority, 4 respondents has given 5th priority, 3 respondents has given 7th priority for supervisor relationship  In GAPS 1 respondent has given 2nd priority, 1 respondent has given 3rd priority, 2 respondents has given 5th priority, 3 respondents has given 6th priority, 3 respondents has given 7th priority for supervisor relationship. From the table (7.27), it is found that  In CAPS 3 respondents has given 1st priority,4respondents has given 3rd priority, 5 respondent has given 4th priority, 5 respondents has given 5th priority, 4 respondents has given 6th priority, 2 respondents has given 7th priority for sufficient training.  In Diploma 2 respondents has given 1st priority, 3 respondents has given 2nd priority, 8 respondents has given 3rd priority, 14 respondent has given 4th priority, 5 respondents has given 5th priority, 17 respondents has given 6th priority, 13 respondents has given 7th priority for sufficient training.  In STT 3 respondents has given 1st priority, 1 respondents has given 3rd priority, 5 respondent has given 4th priority, 3 respondents has given 6th priority, 4 respondents has given 7th priority for sufficient training.  In ITI 1 respondent has given 1st priority, 2 respondents has given 3rd priority, 2 respondents has given 6th priority, 4 respondents has given 7th priority for sufficient training.  In GAPS 2 respondents has given 3rd priority, 3 respondent has given 4th priority, 4 respondents has given 5th priority, 1 respondent has given 7th priority for sufficient training.
  • 106.
    From the table(7.28), it is found that  In CAPS 1 respondents has given 2nd priority, 1respondent has given 3rd priority, 3 respondent has given 4th priority, 3 respondents has given 5th priority, 4 respondents has given 6th priority, 11 respondents has given 7th priority for Lenient management system .  In Diploma 1 respondents has given 1st priority, 14 respondents has given 3rd priority, 3 respondent has given 4th priority, 13 respondents has given 5th priority, 16 respondents has given 6th priority, 15 respondents has given 7th priority for Lenient management system .  In STT 1 respondent has given 2nd priority,4 respondents has given 3rd priority, 1 respondent has given 4th priority, 2 respondents has given 5th priority, 4 respondents has given 6th priority, 4 respondents has given 7th priority for Lenient management system .  In ITI 1 respondent has given 2nd priority, 1 respondent has given 4th priority, 3 respondents has given 5th priority, 2 respondents has given 6th priority, 2 respondents has given 7th priority for Lenient management system .  In GAPS 1 respondents has given 3rd priority, 5 respondent has given 4th priority, 4 respondents has given 7th priority for Lenient management system . SUGGESTIONS TO THE COMPANY: From the above findings, some of those are been selected for the suggesting to the company to take up as a project in their absenteeism management frame work of the current year. These are based on the direct observations by the researcher in the field. The recommendations given to the company are,  Policy like attendance award system should be reviewed.  Company should reflect and project that it is taking attendance matters seriously. This can be done by rewarding good attendance holders and punishing heavy absentees.  They should have a well constructed Induction scheme for newly recruited flexi workers.  The company should arrange for a medical camp once in a year to check and improve the health condition of the flexi workers especially for the workers between the age of 19 to 21 years.  Many of the employees are lagging in training so sufficient training should be given to flexi workers.
  • 107.
     The pickup–points scheduled by the company’s transport for Chatram(trichy) and viralimalai route should be reviewed .  The quality of the shoes provided by the company needs improvement.  Continuous shift system which is followed in the company should be reviewed. CONCLUSION: The study analyses the various factors that lead to the employee absenteeism - like lack of training, quality of PPE, policy regarding rewarding, problems regarding transport, health etc., Based on the study, the researcher has given suggestions to the company to reduce the absenteeism and to increase the productivity and turnover of the organization. In this study it is found that 35% of the respondents are strongly agreed, 25% of the respondents are agreed, 14.2% of the respondents are in neutral, 10.8% of the respondents are disagreed, 15% of the respondents are strongly disagreed that training provided by the company is sufficient for them. These could be related to another important cause of absenteeism in a company. We did not study this aspect in our study and we suggest further studies could be taken up in this regard.
  • 108.
    BIBLIOGRAPHY TEXT FOR REFERENCE: 1.K. Aswathappa Tata Me Graw Hill, Human Resource and Personnel Management 2003 2. Pareek udai, Rao, Designing and Managing Human Resource Systems 3. Kothari C.R Research Methodology Methods and Techniques, New Age International Publishers, New Delhi, 2004, P.122. 4. Kothari, C.R.,1985, Research Methodology-Methods and Techniques, New Delhi, 5. Salaman and Storey, Strategic Human Resource Management. Journals:  Harrison, David A.; Shaffer, Margaret A.Journal of Applied Psychology, Vol 79(2), Apr 1994.  Ian R. Gellatly Journal of Organizational Behavior Volume 16, Issue 5, pages 469– 485, September 1995.  Hanna A. Menches C, Sullivan K, and Sargent J. "Factors Affecting Absenteeism in Electrical Construction." American Society of Civil Engineers (2005)  Mark John Somers– “Organizational commitment, turnover and absenteeism: An  examination of direct and interaction effects” Journal of Organizational Behavior Volume 16, Issue 1, pages 49–58, January 1995  Charles W. Mueller. Douglas S. Wakefield James L. PriceJames P. Curry Joanne C. McCloskey “A Note on the Validity of Self-Reports of Absenteeism”  Steven J. Lintona , Karin Halldéna & Anna-Lisa Hellsing : The Reliability of Self- reported Sick Absenteeism: A Pilot Study, pages 145-150, 23 Mar 2010.  Paul M Muchinsky : Employee absenteeism: A review of the literature  Dr. Bertera, Robert L : The Effects of Behavioral Risks on Absenteeism and Health- Care Costs in the Workplace. Journal of Occupational Medicine: November 1991  Robert P. Steel, Joan R. Rentsch : Influence of Cumulation Strategies on the long- Range Prediction of Absenteeism.
  • 109.
     Frayne, ColetteA.: “Reducing employee absenteeism through self-management training: A research-based analysis and guide”. New York, NY, England: (1991).  Chockalingam Viswesvaran: Absenteeism and Measures of Job Performance International  Journal of Selection and Assessment Volume 10, Issue 1-2, pages 12–17, March 2002  Paul P. Brooke, James L. Price : The determinants of employee absenteeism: An empirical test of a causal model Journal of Occupational Psychology Volume 62, Issue 1, pages 1–19, March 1989.  Rick D. Hackett, Peter Bycio, An evaluation of employee absenteeism as a coping mechanism among hospital nurse Journal of Occupational and Organizational Psychology Volume 69, Issue 4, pages 327–338, December 1996.  Gary Johns: “How methodological diversity has improved our understanding of absenteeism from work” Volume 13, Issue 2, Summer 2003, Pages 157–184  Bross Michael H. MD; Pace, S. Kelton BS; Cronin, Irvin H. MD: Chemical Dependence: Analysis of Work Absenteeism and Associated Medical Illnesses. Journal of Occupational Medicine: January 1992.  Johns, Gary : “Absenteeism estimates by employees and managers: Divergent perspectives and self-serving perceptions”. Journal of Applied Psychology, Vol 79(2), Apr 1994.  Karin Sanders, Sigrid K. Hoekstra, “Informal Networks and Absenteeism within an Organization”., Volume 4, Issue 2, pp 149-163, June 1998  Martocchio, Joseph J : “Age-related differences in employee absenteeism: A meta- analysis”.  Psychology and Aging, Vol 4(4), Dec 1989. Websites:  www.wikipedia.com  http://www.rane.co.in/ranetrwsteering/ranetrwsteering.html  http://www.ibef.org/industry/india-automobiles.aspxbalization  https://en.wikipedia.org/wiki/Automotive_industry
  • 110.
    APPENDIX RANE TRW STEERINGSYSTEMS Pvt.Ltd, VIRALIMALAI 1) I am a) Below 19yrs b) 19-21 yrs c) 22-24 yrs d) Above 24 2) I am coming from a) Chatram(Trichy) & nearby b) Woraiyur & nearby c) Manaparai & nearby d) Viralimalai and nearby e) Others please specify ____________ 3) My educational qualification is: a) SSLC b) HSC c) ITI d) Diploma e) BE 4) I am attached with this company as a) CAPS b) DIPLOMA c) STT d) ITI e) GAPS 5) I am working in this company for a) 0-3 Months b) 3-6 Months c) 6-9 Months A STUDY ON THE ABSENTEEISM OF FLEXI WORKERS (CAPS, DIPLOMA APPRENTICE, ITI APPRENTICE, STT, GAPS)  I am a management student from “Ethiraj College for women, Chennai” conducting a study relating to absenteeism in Rane TRW Steering Systems Pvt.Ltd.  Kindly, co-operate in filling the following questionnaire.  In case if you have any doubts or clarifications, don’t hesitate to ask. Thank you.
  • 111.
    d) 9-12 Monthse) Above 1 year 6) I am aware of the leave policy of this company a) Know Very Well b) Know c) Not Clear about the Policy d) Don’t Know 7) I am taking _________ days leave in a year. a) 8 Days b) 10 Days c) 12 Days d) Above 12 Days e) Nil 8) The reason for me to take leave is a) Health Issues b) Festival/Function c) Unexpected Situation d) Others please specify _________________________ 9) The leave provided by the company is sufficient for me a) Strongly agree b) agree c) Neutral d) Disagree e) strongly disagree 10) I know about the attendance award system a) Strongly agree b) agree c) Neutral d) Disagree e) strongly disagree 11) I have received the attendance award for _______ times. a) 1 Time b) 2Times c) 3Times d) more than 3 times e) Nil 12) I absent myself from work a) Very Frequently b) Frequently c) At the time of requirement d) Rarely e) Very Rarely
  • 112.
    13) The reasonfor my absence is (Please prioritise. Number as 1 for the most frequent reason, 2 for the next frequent reason and so on) a) Health problem_______________________ b) Transport facilities____________________ c) Canteen facilities______________________ d) Co-worker relationship_________________ e) Supervisor relationship__________________ f) Sufficient training______________________ g) Lenient Management system_____________ 1- Strongly agree 2- Agree 3- Needs Improvement 4- Disagree 5- Strongly Disagree S.No Particulars 1 2 3 4 5 14 Management System I know about the company’s sufferings if I absent without prior intimation My superiors are more concerned about my absence and advices me to attend regularly Company is not keen about taking any actions against my absence 15 Transport Facilities Bus facilities are convenient for me Bus timings are convenient for me Bus pickup points are convenient for me 16 Canteen Facilities Food provided for me is tasty and healthy Food provided by the company is cooked in a hygienic way Food provided by the company is worthy Break timings are comfortable for me
  • 113.
    17 Training Facilities Trainingprovided by the company is sufficient for me. I am clear about the responsibilities of my work 18 Co-worker Relationship I feel easy to communicate with my co-worker No conflicts amongst us regarding the work He helps me/clears my doubts 19 Supervisor Relationship I feel easy to communicate with my Supervisor He clarifies my doubts promptly No conflicts amongst us regarding the work 20 Shifts Continuation I am comfortable to continue shifts I am comfortable to work continuously in  I and II shifts  II and III shifts  III and I shifts I am permitted to take the comp.off as and when I need I am given OT from extra work 21 Uniform and Shoes Uniform provided by the company is of good quality Shoes provided by the company is of good quality I am clear about the importance of PPE’s
  • 114.
    RANE TRW STEERINGSYSTEMS Pvt.Ltd, VIRALIMALAI 1) எனது வயது ______ a) 19 வயதுக்கு கீழ் b) 19-21 c) 22-24 d) 24 வயதுக்கு மேல் 2) நான் ____________________பகுதியிலிருந்து வருகிறேன். a) சத்திரம் (திருச்சி) & அருகிலுள்ள b) உறையூர் & அருகிலுள்ள c) ேணப்பாறை & அருகிலுள்ள d) விராலிேறை & அருகிலுள்ள e) ேற்ைவர்கள் தயவுசசய்து குறிப்பிடவும் ____________ 3) எனது கல்வி தகுதி _________________ a) SSLC b) HSC c) ITI d) Diploma e) BE 4) நான் இந்த நிறுவனத்தில் ____________ ஆக பணிப்புரிகிறேன். a) CAPS b) DIPLOMA c) STT d) ITI e) GAPS 5) நான் இந்த நிறுவனத்தில் __________________ ஆக பணிப்புரிகிறேன். a) 0-3 ோதங்கள் b) 3-6 ோதங்கள் c) 6-9 ோதங்கள் d) 9-12 ோதங்கள் e) 1 வருடத்திற்கு மேைாக 6) நான் இந்த நிறுவனத்தின் விடுப்பு ககாள்கக பற்றி அறிந்து இருக்கிறேன் a) மிக நன்ைாக சதரியும் b)சதரியும் c)சகாள்றக பற்றி சதளிவாக இல்றை d) சதரியவில்றை A STUDY ON THE ABSENTEEISM OF FLEXI WORKERS (CAPS, DIPLOMA APPRENTICE, ITI APPRENTICE, STT, GAPS)  நான் " எத்திராஜ் சபண்கள் கல்லூரி, சசன்றை " யில் மேைாண்றே பயிலும் ோணவி. RANE TRW STEERING SYSTEMS Pvt.Ltd, வில் absenteeism சதாடர்பாக ஒரு ஆய்வு நடத்துகிமைன்.  தயவுசசய்து, பின்வரும் மகள்வித்தாறள பூர்த்தி சசய்து ஒத்துறைக்கவும்.  சந்மதகம் அல்ைது விளக்கங்கள் இருந்தால் மகட்க தயங்க மவண்டாம், நன்றி.
  • 115.
    7) நான் ஒருவருட த்தில் _________ விடுப்பு எடுத்து கெல்கிறேன். a) 8 நாட்கள் b) 10 நாட்கள் c) 12 நாட்கள் d) 12 நாட்க ளுக்கு மேல் e) எடுப்பதில்றை 8) நான் விடுப்பு எடுக்க காரணம்___________ a) உடல்நிறை காரணங்கள் b) குடும்ப/உள்ளூர் விமசஷங்கள் c) எதிர்பாராத சூைல் d) ேற்ைவர்கள் தயவுசசய்து குறிப்பிடவும் ______________ 9) நிறுவனம் மூலம் வழங்கப்படும் விடுப்பு எனக்கு றபாதுமானதாக உள்ளது a) உறுதியாக ஒப்புக்சகாள்கிமைன் b) ஒப்புக்சகாள்கிமைன் c) நடுநிறை d) ஒப்புக்சகாள்ளவில்றை e) உறுதியாக ஒப்புக்சகாள்ளவில்றை 10) நான் வருகக விருது அகமப்பு பற்றி அறிந்துள்றளன் a) உறுதியாக ஒப்புக்சகாள்கிமைன் b) ஒப்புக்சகாள்கிமைன் c) நடுநிறை d) ஒப்புக்சகாள்ளவில்றை e) உறுதியாக ஒப்புக்சகாள்ளவில்றை 11) நான் _______ முகே வருகக விருது கபற்றுள்றளன். a) 1 b) 2 c) 3 d) 3 க்கும் மேல் e) இல்றை 12) நான் _____________ பணிக்கு வராமல் இருக்கிறேன். a) மிகவும் அடிக்கடி b) அடிக்கடி c) மதறவ மநரத்தில் ேட்டும் d) அரிதாக e) மிக அரிதாக 13) நான் பணிக்கு வராமல் இருக்க காரணங்கள் (முதன்கம காரனத்கத 1 என முன்னிகலப்படுத்தவும் அடுத்தடுத்த காரணங்ககள 2,3,4,5,6 என குறிப்பிடவும் ) a) உடல்நிறை காரணங்கள் _________________________ b) மபாக்குவரத்து வசதிகள் _________________________ c) மகன்டீன் வசதிகள் ______________________________ d) சக சதாழிைாளர்கள் உடைாை உைவு ____________ e) மேற்பார்றவயாளர்கள் உடைாை உைவு __________ f) மபாதுோை பயிற்சி வசதிகள் _____________________ g) குறைந்த கட்டுப்பாடுறடய நிர்வாகம்____________
  • 116.
    1- உறுதியாக ஒப்புக்சகாள்கிமைன்2- ஒப்புக்சகாள்கிமைன் 3- நடுநிறை 4- ஒப்புக்சகாள்ளவில்றை 5- உறுதியாக ஒப்புக்சகாள்ளவில்றை s.no விபரங்கள் 1 2 3 4 5 14 றமலாண்கம அகமப்பு நான் முன் அறிவிப்பின்றி வரவில்றை என்ைால் அதைால் நிறுவைத்தில் ஏற்படும் விறளவுகள் பற்றி அறிந்துள்மளன் நான் பணிக்கு வரவில்றை என்ைால் எைது உயர் அதிகாரிகள் அக்கறை சகாண்டு அறிவுறை கூறுவார்கள் நான் முன் அறிவிப்பின்றி வரவில்றை என்ைால் அதற்கு நிறுவைம் எந்த நடவடிக்றகயும் எடுப்பதில்றை 15 றபாக்குவரத்து வெதிகள் எைக்கு நிறுவைப்மபருந்து வசதிகள் வசதியாக உள்ளது எைக்கு நிறுவைப்மபருந்து மநரம் வசதியாக உள்ளது எைக்கு நிறுவைப்மபருந்து நிறுத்தங்கள் வசதியாக உள்ளது 16 றகன்டீன் வெதிகள் மகன்டீன் உணவு சுறவயாக ேற்றும் ஆமராக்கியோக உள்ளது மகன்டீன் உணவு சுகாதாரோை முறையில் சறேக்கப்படுகிைது நிறுவைம் மூைம் வைங்கப்படும் உணவு சம்பள பிடித்ததிற்கு தகுதி உறடயது ப்மரக் மநரம் எைக்கு மபாதுோைதாக உள்ளது 17 பயிற்சி வெதிகள் நிறுவைம் மூைம் வைங்கப்படும் பயிற்சி எைக்கு மபாதுோைதாக உள்ளது நான் என் மவறை சபாறுப்புகள் பற்றி சதளிவாக உள்மளன் 18 ெக கதாழிலாளர்கள் உடனான உேவு நான் சக சதாழிைாளர்களுடன் சதாடர்பு சகாள்ள எளிதாக உணர்கிமைன். எங்களுக்கு ேத்தியில் மவறை சம்பந்தோக எந்த முரண்பாடுகளும் இல்றை எைது சந்மதகத்றத சதளிவுபடுத்துகிைார்/ அவர் எைக்கு உதவுகிைார் 19 றமற்பார்கவயாளர்கள் உடனான உேவு நான் எைது மேற்பார்றவயாளர்களுடன் சதாடர்பு சகாள்ள எளிதாக உணர்கிமைன். அவர் உடைடியாக எைக்கு உதவுகிைார் /எைது சந்மதகத்றத சதளிவுபடுத்துகிைார் எங்களுக்கு ேத்தியில் மவறை சம்பந்தோக எந்த முரண்பாடுகளும் இல்றை 20 ஷிப்டு கதாடர்ச்சி நான் இரண்டு ஷிப்டுகளில் சதாடர்ந்து பணிப்புரிய வசதியாக உணர்கிமைன் நான் சதாடர்ந்து பணிப்புரிய வசதியாக உணரும் இரண்டு ஷிப்டுகள்  I and II shifts  II and III shifts  III and I shifts நான் மவண்டும் மபாது comp.off எடுக்க அனுேதிக்க படுகிமைன் எைக்கு OT வைங்கப்படுகிைது 21 சீருகட மற்றும் காலணிகள் நிறுவைம் மூைம் வைங்கப்படும் சீருறட தரோக உள்ளது நிறுவைம் மூைம் வைங்கப்படும் காைணிகள் தரோக உள்ளது நான் பணியாளர் பாதுகாப்புக் கருவிகளின் முக்கியத்துவம் பற்றி சதளிவாக உள்மளன்