Modeling Mastery Performance and Systematically Deriving the Enablers Concurrent Session ISPI 2006 Spring Conference Dallas Guy W. Wallace, CPT
Session Administrative Open Terminal Performance Objectives Describe the expertise required, the process steps, and the “analysis questions” for facilitating a group of Master Performers and SMEs to generate a Performance Model and a set of Enabler Matrices data Describe the uses of the Performance Model and the Enabler Matrices data in downstream instructional and non-instructional interventions
Session Map Session Open and Kick-off Analysis Process – Introduction & Orientation AoPs and Performance Modeling Categories and Systematically Deriving the Enablers Session Summary and Close = Application Exercises
Session Participant Poll What is the  total number of ISD/HPT staff   in your ISD/HPT function? Less than 5 Between 5 and 10 Between 10 and 50 Between 50 and 100 More than 100 How many  distinct customer segments  does your ISD/HPT function serve? Only 1 Between 2 and 5   Between 5 and 10   Between 10 and 20 More than 20 What, in your ISD/HPT function,  is your  role ? Leadership  or  Management/Supervisory  or  Individual Contributor  or  multi-role What is your department/function’s primary  role ? ISD  and/or  HPT
Enterprise Processes Types © 2002 EPPIC, Inc. 1 - Leadership   Processes   lead the system/process-set 2 - Core  Processes   are the reason for being for the organization 3 - Support  Processes   exist to enable L C S Leadership Core Support measures Downstream Value-Stream Processes Upstream   Value Stream  Processes Outputs Inputs
Every Enterprise System and Process has Stakeholder Requirements to Meet measures Government Shareholders/Owners Board of Directors Executives Management Customers Employees Suppliers Community ©2002 EPPIC, Inc. measures One view of a… Stakeholder Hierarchy Downstream Value Stream Processes In-Process Measures Output Measures Outputs Inputs L C S
Map and/or Model  the Critical Processes Downstream Processes EPPI - Tier 2 View Upstream Processes Process Map View Performance Model View Area of Performance: Key Outputs Key Tasks Roles/Responsibilities 1 2 3 4 5 Typical Perf . Gaps Prob. Gap Cause dE dK dI Role: < = Role 1 Role 2 Role 3 Role 4 Role 5 Process Map  View Performance Model  View Area of Performance: Key Outputs Key Tasks Roles/Responsibilities 1 2 3 4 5 Typical Perf . Gaps Prob. Gap Cause dE dK dI Role: Area of Performance: Key Outputs Key Tasks Roles/Responsibilities 1 2 3 4 5 Typical Perf . Gaps Prob. Gap Cause dE dK dI Role: < = Role 1 Role 2 Role 3 Role 4 Role 5 Role 1 Role 2 Role 3 Role 4 Role 5 Outputs Inputs Outputs Inputs
2 Types of Process Enablers Human  and  Environmental Knowledge/Skills Attributes/Values L C S (Psychological, Physical, Intellectual) © 2002 EPPIC , Inc. EPPI - Tier 3 View Human Asset Enablers Environmental Asset Enablers Data & Information Facilities Machinery, Equipment, & Tools Materials & Supplies Consequences $$$ L C S L C S Process Map View Performance Model View Area of Performance: Key Outputs Key Tasks Roles/Responsibilities 1 2 3 4 5 Typical Perf . Gaps Prob. Gap Cause dE dK dI Role: < = Role 1 Role 2 Role 3 Role 4 Role 5 Process Map  View Performance Model  View Area of Performance: Key Outputs Key Tasks Roles/Responsibilities 1 2 3 4 5 Typical Perf . Gaps Prob. Gap Cause dE dK dI Role: Area of Performance: Key Outputs Key Tasks Roles/Responsibilities 1 2 3 4 5 Typical Perf . Gaps Prob. Gap Cause dE dK dI Role: < = Role 1 Role 2 Role 3 Role 4 Role 5 Role 1 Role 2 Role 3 Role 4 Role 5
Analysis Sets Human Enablers Enabling Knowledge/Skills Enabling  Intellectual Attributes Enabling  Psychological  Attributes Enabling Physical Attributes Enabling Values Environmental Enablers Data/Information Materials/Supplies Tools/Equipment Facilities/Grounds Budget/Headcount Culture/Consequences Process Performance Areas of Performance Performance Model data
Areas of Performance - AoPs Areas of Performance Segment process/performance into  “chunks”  for analysis efforts  Take a  process/performance orientation  versus topical/ content orientation To segment, look first for linear process flows or  “cycles”  within the performance scope and then all other job/performance “components” Cycles within cycles Separate cycles AKA: Key result areas, accomplishments, duties, etc. Example Example AoPs Payroll,  Banking, and  Financial  Management Payroll,  Banking, and  Financial  Management G. Staff Recruiting, Selection, and Training Staff Recruiting, Selection, and Training Work Scheduling Work Scheduling A. B. Progressive Discipline Progressive Discipline Store Operations Store Operations Customer Service Customer Service Inventory Management Inventory Management TMC Stores Store Manager PERFORMANCE MODEL Areas of Performance C. D. E. F. ©1999 CADDI, Inc. Example Example AoPs Payroll,  Banking, and  Financial  Management Payroll,  Banking, and  Financial  Management G. Staff Recruiting, Selection, and Training Staff Recruiting, Selection, and Training Work Scheduling Work Scheduling A. B. Progressive Discipline Progressive Discipline Store Operations Store Operations Customer Service Customer Service Inventory Management Inventory Management TMC Stores Store Manager PERFORMANCE MODEL Areas of Performance C. D. E. F. Example Example AoPs Payroll,  Banking, and  Financial  Management Payroll,  Banking, and  Financial  Management G. Staff Recruiting, Selection, and Training Staff Recruiting, Selection, and Training Work Scheduling Work Scheduling A. B. Progressive Discipline Progressive Discipline Store Operations Store Operations Customer Service Customer Service Inventory Management Inventory Management TMC Stores Store Manager PERFORMANCE MODEL Areas of Performance C. D. E. F. Payroll,  Banking, and  Financial  Management Payroll,  Banking, and  Financial  Management G. Staff Recruiting, Selection, and Training Staff Recruiting, Selection, and Training Work Scheduling Work Scheduling A. B. Progressive Discipline Progressive Discipline Store Operations Store Operations Customer Service Customer Service Inventory Management Inventory Management TMC Stores Store Manager PERFORMANCE MODEL Areas of Performance C. D. E. F. ©2002 EPPIC, Inc.
AoP Segments  Goal:  Minimize overlaps and gaps of AoP “content segments” Good No gaps or overlaps Gaps Overlaps Bad AoP AoP AoP AoP AoP AoP AoP AoP AoP AoP Example Segmentation
Performance Segments  Goal:  Minimize overlaps and gaps of AoP “content segments” Good No gaps or overlaps Gaps Overlaps Bad AoP AoP AoP AoP AoP AoP AoP AoP AoP AoP Example Segmentation Customer Contact Customer Service Active Listening Requirements Definition Conduct Project Meetings with Client Electrical Engineering Customer Satisfaction Design Solution Oversee Installation
Performance Segments  Goal:  Minimize overlaps and gaps of AoP “content segments” Good No gaps or overlaps Gaps Overlaps Bad AoP AoP AoP AoP AoP AoP AoP AoP AoP AoP Example Segmentation Project Planning Analysis Design Development Pilot Test Update Roll Out Recruiting Support Special Assignments
Processing a Group When identifying AoPs Start by  wasting  a flip chart page…and  announcing  your intent to do so…to rough it out before finalizing First thing said gets written, and then ask the group to react after a “stake has been planted.” Then try to “plant” another one…upstream or downstream Ask for/listen for  Outputs /deliverables/outcomes/results  Key performance  cycles Natural  breaks in work flow Clean-up Minimize gaps/overlaps  Sequence AoPs last
Do one of the following… Example _____________ Example _____________ Example _____________ Postal Delivery Person Gas Station Attendant Grocery Store Bagger
Another Example TMC Stores Store Manager PERFORMANCE MODEL Areas of Performance ©2002 EPPIC, Inc. Payroll,  Banking, and  Financial  Management G. Staff Recruiting, Selection, and Training A. Work Scheduling B. Progressive Discipline C. Store Operations D. Customer Service E. Inventory Management F.
Exercise… Segmenting the AoPs Work in teams of two as assigned to construct an AoP framework for a “past” Summer Job for each person.  Switch roles (Analyst-Performer) 3 Readouts    2 General debrief  (10 minutes)  1.5 # Step Minutes Start Stop 1 2 3 4 5 Select past Summer Job to use   .5 Select other person’s Summer Job and identify the AoPs   3  Start time:  Stop time:
Exercise…   Segmenting the AoPs Self-test Questions: Does everything about this performance fit within one of these AoP “buckets”? Are there no overlaps? Will others accept this configuration? Summer Job:
Exercise Debriefing…   Segmenting the AoPs
 
PM- Performance Model Areas of Performance (AoPs) AoPs segment the performance into chunks Linear performance chunks Nonlinear performance chunks Example:  Convenient Store  Manager Payroll,  Banking, and  Financial  Management Payroll,  Banking, and  Financial  Management G. Staff Recruiting, Selection, and Training Staff Recruiting, Selection, and Training Work Scheduling Work Scheduling A. B. Progressive Discipline Progressive Discipline Store Operations Store Operations Customer Service Customer Service Inventory Management Inventory Management TMC Stores Store Manager PERFORMANCE MODEL Areas of Performance C. D. E. F. ©2002 EPPIC, Inc. Simple Example
EPPI Analysis Method #2 Performance Model Chart The Performance Model establishes “mastery performance” as the benchmark criterion Key Tasks Describes the key  activities needed to  produce the outputs Roles/Responsibilities Clarifies who is typically  responsible for performing  the tasks Deficiency dE=Environment dK=Knowledge/skill dI=Individual  attribute/value Key Outputs and  Metrics or Measures Describes what is  produced from  doing the job tasks  and identifies key  performance  measures of each  output Typical Performance Gaps Identifies any typical ways  the output or task does not  meet performance  standards Probable Gap Cause(s) Identifies most likely causes  for each typical  performance issue/  deficiency The Most Convenient Stores Store Management Performance Model ©2002 EPPIC, Inc. A. Staff Recruiting, Selection, and Training 1 = District Manager 2 = Store Manager 3 = Assistant Manager 4 = Clerk • New staff hired - Timely - Qualified • Identify need for  additional staff and  complete internal  paperwork • Create and place  local ads • Select candidates for  interviewing • Interview and select  candidates for offer • Make hiring offer(s) • Complete paperwork  to fill the position        • Too few candidates • Poor choice • Poor recruiting • Local economy • Neglect to check  references • References do not  provide key  information dK dE dK dE Key Tasks Describes the key  activities needed to  produce the outputs Roles/Responsibilities Clarifies who is typically  responsible for performing  the tasks Deficiency dE=Environment dK=Knowledge/skill dI=Individual  attribute/value Key Outputs and  Metrics or Measures Describes what is  produced from  doing the job tasks  and identifies key  performance  measures of each  output Typical Performance Gaps Identifies any typical ways  the output or task does not  meet performance  standards Probable Gap Cause(s) Identifies most likely causes  for each typical  performance issue/  deficiency The Most Convenient Stores Store Management Performance Model ©2002 EPPIC, Inc. A. Staff Recruiting, Selection, and Training 1 = District Manager 2 = Store Manager 3 = Assistant Manager 4 = Clerk • New staff hired - Timely - Qualified • Identify need for  additional staff and  complete internal  paperwork • Create and place  local ads • Select candidates for  interviewing • Interview and select  candidates for offer • Make hiring offer(s) • Complete paperwork  to fill the position        • Too few candidates • Poor choice • Poor recruiting • Local economy • Neglect to check  references • References do not  provide key  information dK dE dK dE Example Area of Performance:  •  Key Outputs -  Measures Key Tasks Probable  Gap Cause(s) dE dK dI Roles/Responsibilities 1  2  3  4 dE = deficiency - Environment dK = deficiency - Knowledge/skill dI = deficiency - Individual attribute/ value Role: 1 = 2 = 3 = 4 =  Typical Performance Gaps Form Design ©2002 EPPIC, Inc. 4/99 Page 1 Area of Performance:  •  Key Outputs -  Measures Key Tasks Probable  Gap Cause(s) dE dK dI Roles/Responsibilities 1  2  3  4 dE = deficiency - Environment dK = deficiency - Knowledge/skill dI = deficiency - Individual attribute/ value Role: 1 = 2 = 3 = 4 =  Typical Performance Gaps Form 4/99 Page 1
Example Area of Performance:  A. Staff Recruiting, Selection, and Training  •  Key Outputs -  Measures Key Tasks Probable  Gap Cause(s) dE dK dI Roles/Responsibilities 1  2  3  4 dE = deficiency - Environment dK = deficiency - Knowledge/skill dI = deficiency - Individual attribute/ value Role: 1 =  District Manager 2 =  Store Manager 3 =  Assistant Manager 4 =  Clerk Typical Performance Gaps The Most Convenient Store Store Manager Performance Model Form Design ©2002 EPPIC, Inc. Page 1 Identify need for additional staff and complete internal paperwork Create and place local ads Select candidates for interviewing Interview and select candidates for offer Make hiring offer(s) Complete paperwork to fill the position New staff hired -  Timely -  Qualified continued        Too few candidates Poor choice Poor recruiting Local economy Neglect to check references References do not provide key information dK dE dK dE
Analysis Questions  AoPs and the Performance Model Performance Data Question(s) to Ask Areas of Performance What are the major phases or elements of the performance or process? What are the chunks of the job? How can we break this performance up into some logical segments (somewhere between five to nine is ideal)? Outputs Produced What are the key deliverables/outputs produced within this Area of Performance? What is left over when you are finished performing the tasks? Measures What are the measures/metrics that can be applied to the output? How can you tell a good output from a bad one? Standards What are the standards of acceptable performance given those measures? Tasks Performed What are the tasks performed to produce those outputs? Roles and Responsibilities Who is involved in this performance? For example, whose task responsibility is it to E = Execute S = Support I = Input to R = Review/give feedback A = Approve/reject Typical Performance Gaps Given those measures and standards, where do the performer’s outputs typically fall short in meeting the expectations?
Analysis Questions  AoPs and the Performance Model  -continued Performance Data Question(s) to Ask Probable Gap Cause(s) dE (Environment) Is the cause of the performance gap due to a lack of environmental supports? Information/data Organizational structure Procedures/policies Tools/equipment Materials Task interference Feedback Consequences dK (Knowledge/ Skill) Is the performance gap caused by a lack of the performer’s knowledge and/or skill? dI (Individual  Attribute/ Value) Is the performance gap caused by a poorly selected individual who has neither the physical, psychological, and/or intellectual attributes and/or values to perform or learn/acquire the skill?
Targeting the Gap Analysis Quarterly and End of Phase Project Reporting Area of Performance: Performance Model Typical Performance Gaps Key Tasks • Key Outputs - Measures dE dE dE dK dE Probable Gap  Cause(s) dE dK dI dE = deficiency  - Environment dK = deficiency  - Knowledge/skill dI = deficiency  - Individual attribute/value Codes: dE = deficiency  - Environment dK = deficiency  - Knowledge/skill dI = deficiency  - Individual attribute/value Codes:  2002 EPPIC, Inc. REPRODUCTION WITHOUT WRITTEN AUTHORIZATION IS STRICTLY PROHIBITED • ABC Report - Done quarterly - Complete • ABC Report - Done quarterly - Complete • XYZ Report - Timely - Complete - Accurate • XYZ Report - Timely - Complete - Accurate 1. Draft report 2. Conduct review 3. Finalize report 1. Draft report 2. Conduct review 3. Finalize report 1. Generate XYZ data 2. Review and forward 1. Generate XYZ data 2. Review and forward • Late • Incomplete • Incomplete • Inaccurate data • Too busy • Too busy • Required data is  unavailable • Required data is  unavailable • Input is late • Input is late were wrong • Numbers supplied  • Don’t know which  components are  required •
Example… Performance Model AoPs AAA  Cabin Attendant   -  Areas of Performance Boarding Passengers Pre-flight  Preparations In-flight Services Special Services Continuous Development Post-flight Clean Up “ De-Boarding” Passengers Emergency Responses A B C D E F G H
Page 21 E- Execute Task S- Support Task Execution I- Input to effort R-Review and Feedback A-Approve/Reject Performance Model Areas of Performance:  B - Boarding Passenger Key Outputs -Measures Key Tasks Roles/Responsibilities Typical Performance Gaps Probable Gap Cause(s) dE dK dI 1 2 3 4 Passenger Seated & Belted Safely, per procedures  Correctly Quickly Luggage/Carry-Ons stowed -Safely, per procedures  Correctly Quickly Greet passengers Answer any questions/provide directions and/or assistance Conduct passenger counts Check Seat Belts and seat/tray position Make “pre-take-off” announcement and demo/run announcement video Prepare cabin for take-off: restroom check, door latches, galley items, etc. E E E E E E S E S S S S S S S S S E E Passengers with same seat assignments -Luggage stowed in violations of procedures -Seats double booked by system -Passenger on wrong plane -Time rush to take-off -Avoiding potential conflict with a passenger dE dE dE dI Codes: 1= Head Cabin Attendant 2= Cabin Attendant 3= Associate Cabin Attendant 4= Pilot Crew dE = deficiency – Environment dK = deficiency – Knowledge/skill dI = deficiency – Individual attribute/value
Exercise…   Performance Modeling Work in same teams of two to construct a Performance Model chart for the other person’s Summer Job AoP framework created earlier. Repeat #2 for second person 7 Readouts    4 General debrief (10 minutes)  2.75 # Step Minutes Start Stop 1 2 3 4 5 Select an AoP of partner’s job   .25 Ask questions and complete PM chart on 8.5x11 paper 7 Start time:  Stop time:
Page 21 Performance Model Summer Job: _______________________ Area of Performance: ___________________________________________________________________________ Key Outputs -Measures Key Tasks Roles/Responsibilities Typical Performance Gaps Probable Gap Cause(s) dE dK dI 1 2 3 4 Codes: 1= 2= 3= 4= dE = deficiency – Environment dK = deficiency – Knowledge/skill dI = deficiency – Individual attribute/value
Exercise Debriefing… Performance Modeling
Performance Modeling Performance Models Enabler Matrices Human Asset Enablers Knowledge/skills Physical Attributes Psychological Attributes Intellectual Attributes Personal Values Environmental Asset Enablers Data/information Materials/supplies Tools/equipment Facilities/grounds Budget/headcount Culture/consequences Facilitates the systematic derivation of  the Human & Environmental Asset Enablers
2 Types of Process Enablers Human  and  Environmental Knowledge/Skills Attributes/Values L C S (Psychological, Physical, Intellectual) © 2002 EPPIC , Inc. EPPI - Tier 3 View Human Asset Enablers Environmental Asset Enablers Data & Information Facilities Machinery, Equipment, & Tools Materials & Supplies Consequences $$$ L C S L C S Process Map View Performance Model View Area of Performance: Key Outputs Key Tasks Roles/Responsibilities 1 2 3 4 5 Typical Perf . Gaps Prob. Gap Cause dE dK dI Role: < = Role 1 Role 2 Role 3 Role 4 Role 5 Process Map  View Performance Model  View Area of Performance: Key Outputs Key Tasks Roles/Responsibilities 1 2 3 4 5 Typical Perf . Gaps Prob. Gap Cause dE dK dI Role: Area of Performance: Key Outputs Key Tasks Roles/Responsibilities 1 2 3 4 5 Typical Perf . Gaps Prob. Gap Cause dE dK dI Role: < = Role 1 Role 2 Role 3 Role 4 Role 5 Role 1 Role 2 Role 3 Role 4 Role 5
Analysis Sets Human Enablers Enabling Knowledge/Skills Enabling  Intellectual Attributes Enabling  Psychological  Attributes Enabling Physical Attributes Enabling Values Environmental Enablers Data/Information Materials/Supplies Tools/Equipment Facilities/Grounds Budget/Headcount Culture/Consequences Process Performance Areas of Performance Performance Model data
Human Asset Requirements   Knowledge/Skill Categories* Knowledge/Skill  Matrices Category:  Records/Reports Category:  Tools/Equipment Category:  XYZ Category:  ABC * Plus the knowledge/skill of performance outputs and tasks and roles/responsibilities from the Performance Model 1. Company Policies/Procedures/ Practices/Guidelines 2. Laws, Regulations, Codes, Agreements, and Contracts 3. Industry Standards 4. Internal Organizations and Resources 5. External Organizations and Resources 6. Marketplace Knowledge 7. Product/Service Knowledge 8. Process Knowledge 9. Records, Reports, Documents, and Forms 10. Materials and Supplies 11. Tools/Equipment/Machinery 12. Computer Systems/Software/Hardware 13. Personal/Interpersonal 14. Management/Supervisory 15. Business Knowledge and Skills 16. Professional/Technical 17. Functional Specific ©2002 EPPIC, Inc.
Human Asset Requirements Attribute/Value Categories Attribute/Value Matrices Category:  Psychological Category:  Physical Category:  XYZ Category:  ABC 18. Psychological Attributes 19. Physical Attributes 20. Intellectual Attributes 21. Values ©2002 EPPIC, Inc.
Human Asset Enablers –  Knowledge/Skill Matrix AoP  AoP  Link Link Identifies the  segment of  the job  where the  knowledge  or skill  enables  performance K/S Item K/S Item Identifies the  discrete  knowledge  or skill item Depth Depth The level to  which any  training &  development  needs to go Volatility Volatility Ranks how often  and significantly  the knowledge  or skill will  change Difficulty Difficulty Ranks how difficult  the item is to learn Criticality Criticality Ranks the  relationship  between having  the knowledge  or skill and  performance  mastery Select/Train Select/Train Denotes whether  the item is a  selection criteria/  condition or  needs to be  covered in  training &  development AoP  AoP  Link Link Identifies the  segment of  the job  where the  knowledge  or skill  enables  performance K/S Item K/S Item Identifies the  discrete  knowledge  or skill item Depth Depth The level to  which any  training &  development  needs to go Volatility Volatility Ranks how often  and significantly  the knowledge  or skill will  change Difficulty Difficulty Ranks how difficult  the item is to learn Criticality Criticality Ranks the  relationship  between having  the knowledge  or skill and  performance  mastery Select/Train Select/Train Denotes whether  the item is a  selection criteria/  condition or  needs to be  covered in  training &  development Volatility  H/M/L Difficulty H/M/L Criticality  H/M/L Select/ Train S/T Link to Area of Performance K/S Item Knowledge/Skill Category: Volatility  H/M/L Difficulty H/M/L Criticality  H/M/L Select/ Train S/T Link to Area of Performance K/S Item Knowledge/Skill Category: <Company/Client Name> <Audience> Knowledge/Skill Matrix A = B = C =  D = E  = F =  G =  Criticality/Difficulty/Volatility H = High M  =  Medium L  =  Low Depth of Coverage A = Awareness K = Knowledge S = Skill Codes: Link to Area of Performance E D C B A Depth A/K/S Volatility  H/M/L Difficulty H/M/L Criticality  H/M/L Select/ Train S/T Link to Area of Performance K/S Item Knowledge/Skill Category: G F E D C B A Depth A/K/S Volatility  H/M/L Difficulty H/M/L Criticality  H/M/L Select/ Train S/T Link to Area of Performance K/S Item Knowledge/Skill Category: G F E D C B A Depth A/K/S Volatility  H/M/L Difficulty H/M/L Criticality  H/M/L Select/ Train S/T Link to Area of Performance K/S Item Knowledge/Skill Category: <Company/Client Name> <Audience> Knowledge/Skill Matrix A = B = C =  D = E  = F =  G =  Criticality/Difficulty/Volatility H = High M  =  Medium L  =  Low Depth of Coverage A = Awareness K = Knowledge S = Skill Codes: Link to Area of Performance Form Design ©2002 EPPIC, Inc. G F E D C B A Depth A/K/S G F E D C B A Depth A/K/S G F E D C B A Depth A/K/S G F
Existing Provisioning Systems Assessment Performance and Human & Environmental  Asset  Requirements  of the Targeted Performance Provides the Shopping  Criteria for Assessment of the “Fit to Need” Assess  the Existing Systems’ “Outputs as Inputs” to the Targets * From functions/systems such as Recruiting systems, processes, and instruments Job descriptions Etc. Performance  Requirements Enabler  Requirements
Existing Systems Assessment - ESA EAM Systems  & Processes Data &  Information Systems Materials & Supplies Systems Tools & Equipment Systems Facilities & Grounds Systems Financial Systems Culture & Consequence Systems HAM Systems &  Processes Organization & Job Redesign Systems Staffing & Succession Planning Systems Recruiting & Selection Systems Training & Development Systems Performance Appraisal & Management Systems Compensation & Benefits Systems Reward & Recognition Systems ISD EXAMPLE Primary Delivery Method Primary Delivery Method Primary methods/media used  in the training Special Requirements for  Special Requirements for  Delivery Delivery Identifies anything about the  training that limits its capacity,  delivery, location, etc. Provider Provider Resource responsible for delivery  (may be internal or external) Related Process( Related Process( es es ), Areas of  ), Areas of  Performance, or Tasks Performance, or Tasks Identify job performances  addressed by the training (see  the Performance Model) Course Owner/Contact Course Owner/Contact Internal resource for registration  and/or information Enabling Knowledge/Skill Items Enabling Knowledge/Skill Items Identifies supporting  knowledge/skill items addressed  by the training (see the  Knowledge/Skill Matrix) Use as Source Use as Source Indicates initial decision  regarding use of this training in  the Development/ Acquisition Phase Current Target Audience Current Target Audience Primary audience groups to  which the training is delivered Primary Delivery Method Primary Delivery Method Primary methods/media used  in the training Special Requirements for  Special Requirements for  Delivery Delivery Identifies anything about the  training that limits its capacity,  delivery, location, etc. Provider Provider Resource responsible for delivery  (may be internal or external) Related Process( Related Process( es es ), Areas of  ), Areas of  Performance, or Tasks Performance, or Tasks Identify job performances  addressed by the training (see  the Performance Model) Course Owner/Contact Course Owner/Contact Internal resource for registration  and/or information Enabling Knowledge/Skill Items Enabling Knowledge/Skill Items Identifies supporting  knowledge/skill items addressed  by the training (see the  Knowledge/Skill Matrix) Use as Source Use as Source Indicates initial decision  regarding use of this training in  the Development/ Acquisition Phase ©2002 EPPIC, Inc. TMC Stores Number: Title: Provider: Course Description Primary Delivery Method: GP  – Group - paced  Classroom  Lab 1 - 1  – One - on - one  S - OJT (training)  U - OJT SP  – Self - paced  Readings/Exercises  Web Site Pages  CBT  Videotape Other Special Requirements for Delivery  Equipment  Facility  Instructor  License Requirement  Other  Yes  No Course Fit Assessment Related Process( es ), Area(s) of Performance, or Tasks  Include as Is   Use as Source:   Materials Attached (e.g., course description)  Do not use  Continued on Side Two Notes: Enabling Knowledge/Skill Items: Class Size:  > 20  10  – 20  < 10  Other Depth/Level:  Awareness  Knowledge  Skill (EDP No.______) Current Target Audience:  All engineers   Other  Other Course Owner/Contact: Copyright Owner: Licensing Agreement: Phone: Length:  Hrs.  Pgs Schedule/Frequency: Assessment REPRODUCTION WITHOUT WRITTEN AUTHORIZATION IS STRICTLY PROHIBITE D v.1  4/99 Page 1 TMC Stores Number: Title: Provider: Course Description Primary Delivery Method: GP  – Group - paced  Classroom  Lab 1 - 1  – One - on - one  S - OJT (training)  U - OJT SP  – Self - paced  Readings/Exercises  Web Site Pages  CBT  Videotape Other Special Requirements for Delivery  Equipment  Facility  Instructor  License Requirement  Other  Yes  No Course Fit Assessment Related Process( es ), Area(s) of Performance, or Tasks  Include as Is   Use as Source:   Materials Attached (e.g., course description)  Do not use  Continued on Side Two Notes: Enabling Knowledge/Skill Items: Class Size:  > 20  10  – 20  < 10  Other Depth/Level:  Awareness  Knowledge  Skill (EDP No.______) Current Target Audience:  All engineers   Other  Other Course Owner/Contact: Copyright Owner: Licensing Agreement: Phone: Length:  Hrs.  Pgs Schedule/Frequency: Existing Materials REPRODUCTION WITHOUT WRITTEN AUTHORIZATION IS STRICTLY PROHIBITE D v.1  4/99 Page 1 TMC Stores Number: Title: Provider: Course Description Primary Delivery Method: GP  – Group - paced  Classroom  Lab 1 - 1  – One - on - one  S - OJT (training)  U - OJT SP  – Self - paced  Readings/Exercises  Web Site Pages  CBT  Videotape Other Special Requirements for Delivery  Equipment  Facility  Instructor  License Requirement  Other  Yes  No Course Fit Assessment Related Process( es ), Area(s) of Performance, or Tasks  Include as Is   Use as Source:   Materials Attached (e.g., course description)  Do not use  Continued on Side Two Notes: Enabling Knowledge/Skill Items: Class Size:  > 20  10  – 20  < 10  Other Depth/Level:  Awareness  Knowledge  Skill (EDP No.______) Current Target Audience:  All engineers   Other  Other Course Owner/Contact: Copyright Owner: Licensing Agreement: Phone: Length:  Hrs.  Pgs Schedule/Frequency: Assessment REPRODUCTION WITHOUT WRITTEN AUTHORIZATION IS STRICTLY PROHIBITE D v.1  4/99 Page 1 TMC Stores Number: Title: Provider: Course Description Primary Delivery Method: GP  – Group - paced  Classroom  Lab 1 - 1  – One - on - one  S - OJT (training)  U - OJT SP  – Self - paced  Readings/Exercises  Web Site Pages  CBT  Videotape Other Special Requirements for Delivery  Equipment  Facility  Instructor  License Requirement  Other  Yes  No Course Fit Assessment Related Process( es ), Area(s) of Performance, or Tasks  Include as Is   Use as Source:   Materials Attached (e.g., course description)  Do not use  Continued on Side Two Notes: Enabling Knowledge/Skill Items: Class Size:  > 20  10  – 20  < 10  Other Depth/Level:  Awareness  Knowledge  Skill (EDP No.______) Current Target Audience:  All engineers   Other  Other Course Owner/Contact: Copyright Owner: Licensing Agreement: Phone: Length:  Hrs.  Pgs Schedule/Frequency: Existing Materials REPRODUCTION WITHOUT WRITTEN AUTHORIZATION IS STRICTLY PROHIBITE D v.1  4/02 Page 1 Interviewing Skills 10342 Existing Systems Assessment ESA Output Provisioning System Targets for Assessment TMC Stores Number: Title: Provider: Course Description Primary Delivery Method: GP  – Group - paced  Classroom  Lab 1 - 1  – One - on - one  S - OJT (training)  U - OJT SP  – Self - paced  Readings/Exercises  Web Site Pages  CBT  Videotape Other Special Requirements for Delivery  Equipment  Facility  Instructor  License Requirement  Other  Yes  No Course Fit Assessment Related Process( es ), Area(s) of Performance, or Tasks  Include as Is   Use as Source:   Materials Attached (e.g., course description)  Do not use  Continued on Side Two Notes: Enabling Knowledge/Skill Items: Class Size:  > 20  10  – 20  < 10  Other Depth/Level:  Awareness  Knowledge  Skill (EDP No.______) Current Target Audience:  All engineers   Other  Other Course Owner/Contact: Copyright Owner: Licensing Agreement: Phone: Length:  Hrs.  Pgs Schedule/Frequency: Assessment Form ©2002  EPPIC, Inc. REPRODUCTION WITHOUT WRITTEN AUTHORIZATION IS STRICTLY PROHIBITE D v.1  4/99 Page 1 TMC Stores Number: Title: Provider: Course Description Primary Delivery Method: GP  – Group - paced  Classroom  Lab 1 - 1  – One - on - one  S - OJT (training)  U - OJT SP  – Self - paced  Readings/Exercises  Web Site Pages  CBT  Videotape Other Special Requirements for Delivery  Equipment  Facility  Instructor  License Requirement  Other  Yes  No Course Fit Assessment Related Process( es ), Area(s) of Performance, or Tasks  Include as Is   Use as Source:   Materials Attached (e.g., course description)  Do not use  Continued on Side Two Notes: Enabling Knowledge/Skill Items: Class Size:  > 20  10  – 20  < 10  Other Depth/Level:  Awareness  Knowledge  Skill (EDP No.______) Current Target Audience:  All engineers   Other  Other Course Owner/Contact: Copyright Owner: Licensing Agreement: Phone: Length:  Hrs.  Pgs Schedule/Frequency: Existing Materials REPRODUCTION WITHOUT WRITTEN AUTHORIZATION IS STRICTLY PROHIBITE D v.1  4/99 Page 1 Interviewing Skills 10342 Interviewing Skills 10342
Exercise… Selecting Enabler Categories Work in same teams of two to identify the Enabler Categories that would have been appropriate for one of your last 3 projects.  Select other partner’s project and use Category List to Down-select Categories Readouts    2 General debrief   1.5 # Step Minutes Start Stop 1 2 3 4 5 List your last 3 projects .5 Select one partner’s project and use Category List to Down-select Categories 3 Start time:  Stop time:  3
EPPI Enabler Categories 1. Company Policies/ Procedures/ Practices/ Guidelines 2.  Laws/ Regulations/ Codes/ Agreements/ Contracts 3. Industry Standards 4. Internal Organizations and Resources External Organizations and Resources Marketplace Knowledge 7. Product/Service Knowledge 8. Process Knowledge 9. Records, Reports, Documents, and Forms 10. Materials and Supplies 11. Tools/Equipment/Machinery 12. Computer Systems/Software/Hardware 13. Personal/Interpersonal 14. Management/Supervisory 15. General and Specific Business 16. Professional/Technical 17. Functional Specific 18. Psychological Attributes 19. Physical Attributes 20. Intellectual Attributes 21. Values 22. Data/Information 23. Materials/Supplies 24. Tools/Equipment 25. Facilities/Grounds 26.  Budget/Headcount 27.  Culture/Consequences Human Asset Enabling K/Ss Human Asset Enabling A/Vs Environmental Asset Enablers Additional sub and sub-sub-categories can be created for each of the above Projects: 1________________  2_________________  3___________________
Exercise Debriefing… Selecting Enabler Categories
 
Systematically Deriving Enablers AoP Performance Model Knowledge/Skill Matrices Step 1 :  Identify and link to AoP Step 2 :  Remaining columns  (Criticality, Difficulty, Volatility, Depth) 1.A 1.B 1.C 1.D K/S Category: 4 K/S Item Link to AoP Crit Diff Vol Dep K/S Category: 3 K/S Item Link to AoP Crit Diff Vol Dep K/S Category: 2 K/S Item Link to AoP Crit Diff Vol Dep K/S Category: 1 K/S Item Link to AoP Crit Diff Vol Dep AoP G AoP F AoP E AoP D AoP C AoP B AoP A A B C D E F G
K/S - Enabler Matrices Example Knowledge/Skill Matrix K/S Category:  Link to Area of Performance Select/ Train Volatility K/S Item ALL A B C D E F G H H/M/L The ABC Company [Target Audience(s)] Form Design   2002 EPPIC, Inc.   Page 1  K/S Item Identifies the knowledge or skill AoP Link Identifies the portion of the job/function where know-ledge or skill is needed Criticality Rank high, medium, low (H, M, L) the relationship between having the knowledge or skill and successful performance  Volatility Ranks how often and significantly knowledge or skill will change  Difficulty Ranks how difficult the item is to learn/teach Select/Train Denotes whether the item is a selection criteria/ condition or should be addressed by training Depth The deepest level of knowledge or skill the training should provide Difficulty H/M/L Depth A/K/S Criticality H/M/L
Analysis Questions   Enabler Matrices  -K/S Asset Version Knowledge/Skill Data Question(s) to Ask Item and Link to Performance Model’s AoPs (For new items): To perform [insert AoP], which [insert K/S category] knowledge/skills do you need? (For items identified earlier): Would you need [insert item] to perform [insert name of next AoP]? S/T: Select/Train Can someone get this job/role without this K/S? (If “yes,” then “T”) Criticality H — M — L How critical is this knowledge/skill to the overall performance? –  High – Medium – Low Learning Difficulty H — M — L How difficult will it be for the learner to acquire this knowledge/skill? –  High – Medium – Low Content Volatility H — M — L How often would training on this K/S need to be revised? –  High – Medium – Low Depth of Coverage Required A — K — S How far must the training content go in addressing this knowledge/skill item? A = Awareness level K = Knowledge level S = Skill level
Exercise… Systematically Deriving the Enablers Work in same teams of two to complete 2 Enabler Matrices charts for 2 Categories for your partner’s Summer Job – but only for 2 AoPs of the Performance Model created earlier. Ask questions and complete EM chart on 8.5x11 paper Readouts    3 General debrief   4 # Step Minutes Start Stop 1 2 3 4 5 Select categories & 2 AoPs  1 Ask questions and complete EM chart on 8.5x11 paper 6 Start time:  Stop time:  6
Enabler: K/S Matrix Form Design ©2002 EPPIC, Inc. Page 1 Codes: Link to Area of Performance Link to Area of Performance Depth A/K/S Enabler: K/S Category #  -  K/S Item A B C D E F G Select/ Train  S/T Criticality H/M/L Volatility H/M/L Difficulty H/M/L Criticality/Difficulty/Volatility H = High M = Medium L = Low Depth of Coverage A = Awareness K = Knowledge S = Skill Page 1 Codes: Link to Area of Performance Link to Area of Performance Depth A/K/S K/S Item A B C D E F G Select/ Train  S/T Criticality H/M/L Volatility H/M/L Difficulty H/M/L Criticality/Difficulty/Volatility H = High M = Medium L = Low Depth of Coverage A = Awareness K = Knowledge S = Skill
Exercise Debriefing…  Systematically Deriving the Enablers
The Big Picture of EPPI Enterprise Process Performance Improvement 2- The Human Asset Enablers Humans bring several types of attributes/ capabilities to the enterprise processes that they work in and to the environmental assets that they work with; these are  Awareness, knowledge, skills Physical attributes Psychological attributes Intellectual attributes Values What is required depends on both the performance requirements and the environmental supports available 3- The Environmental Asset Enablers The environment provides several types of enabling assets for the humans to use while performing the job; these include Data/Information Materials/Supplies Tools/Equipment Facilities/Grounds Budget/Headcount Culture/Consequences What is required depends on both the performance requirements and the human capabilities available 1- The Process  The process must be designed for efficient delivery to meet stakeholder metrics What is required depends on both the performance requirements and the human capabilities available C S L C S L C S L C S L C S L C S L C S L Performance  Model < = Process  Map Leadership Systems & Processes Core Systems & Processes Support Systems & Processes Attributes/Values Knowledge/Skills Human Asset  Requirements Environmental Asset Requirements Facilities/Grounds Tools/Equipment Materials/Supplies Data/Information Budget/Headcount Culture/Consequences
HAM Systems & Processes Organization & Job Redesign Systems Staffing & Succession Planning Systems Recruiting & Selection Systems Training & Development Systems Performance Appraisal & Management Systems Compensation & Benefits Systems Reward & Recognition Systems Performance and Human & Environmental  Asset  Requirements  of the Targeted Performance Provides the  Criteria for Assessment of the “Fit to Need” or for the “fixes” of the processes and outputs of the Enterprise’s HAMS and EAMS EAM Systems & Processes Information & Data Systems Materials & Supplies Systems Tools & Equipment Systems Financial Systems Facilities & Grounds Systems Culture & Consequence Systems Performance  Requirements Enabler  Requirements
Key Expertise Required Facilitator Group Facilitation Instructional Design (or “other intervention” design and its input requirements) Analysis Team Performance Mastery Communications skills Interpersonal skills
Additional References/Resources EPPI White Paper and Presentation Performance Modeling & Human Asset Enabler Analysis Lean-ISD via the PACT Processes for Training & Development Lean-ISD White Paper PACT Facilitation How to Build a Training System That Won’t Burn Down The Training Factor of the Quality Equation Technology Transfer Using the PACT Processes for T&D Balancing Conflicting Stakeholder Requirements Continuous Improvement and Training Managing Human Assets Using a Group Process to Create Models and Matrices see Resources Tab at  www.eppic.biz “ Gopher” more at eppic.biz
 

Modeling Mastery Performance

  • 1.
    Modeling Mastery Performanceand Systematically Deriving the Enablers Concurrent Session ISPI 2006 Spring Conference Dallas Guy W. Wallace, CPT
  • 2.
    Session Administrative OpenTerminal Performance Objectives Describe the expertise required, the process steps, and the “analysis questions” for facilitating a group of Master Performers and SMEs to generate a Performance Model and a set of Enabler Matrices data Describe the uses of the Performance Model and the Enabler Matrices data in downstream instructional and non-instructional interventions
  • 3.
    Session Map SessionOpen and Kick-off Analysis Process – Introduction & Orientation AoPs and Performance Modeling Categories and Systematically Deriving the Enablers Session Summary and Close = Application Exercises
  • 4.
    Session Participant PollWhat is the total number of ISD/HPT staff in your ISD/HPT function? Less than 5 Between 5 and 10 Between 10 and 50 Between 50 and 100 More than 100 How many distinct customer segments does your ISD/HPT function serve? Only 1 Between 2 and 5 Between 5 and 10 Between 10 and 20 More than 20 What, in your ISD/HPT function, is your role ? Leadership or Management/Supervisory or Individual Contributor or multi-role What is your department/function’s primary role ? ISD and/or HPT
  • 5.
    Enterprise Processes Types© 2002 EPPIC, Inc. 1 - Leadership Processes lead the system/process-set 2 - Core Processes are the reason for being for the organization 3 - Support Processes exist to enable L C S Leadership Core Support measures Downstream Value-Stream Processes Upstream Value Stream Processes Outputs Inputs
  • 6.
    Every Enterprise Systemand Process has Stakeholder Requirements to Meet measures Government Shareholders/Owners Board of Directors Executives Management Customers Employees Suppliers Community ©2002 EPPIC, Inc. measures One view of a… Stakeholder Hierarchy Downstream Value Stream Processes In-Process Measures Output Measures Outputs Inputs L C S
  • 7.
    Map and/or Model the Critical Processes Downstream Processes EPPI - Tier 2 View Upstream Processes Process Map View Performance Model View Area of Performance: Key Outputs Key Tasks Roles/Responsibilities 1 2 3 4 5 Typical Perf . Gaps Prob. Gap Cause dE dK dI Role: < = Role 1 Role 2 Role 3 Role 4 Role 5 Process Map View Performance Model View Area of Performance: Key Outputs Key Tasks Roles/Responsibilities 1 2 3 4 5 Typical Perf . Gaps Prob. Gap Cause dE dK dI Role: Area of Performance: Key Outputs Key Tasks Roles/Responsibilities 1 2 3 4 5 Typical Perf . Gaps Prob. Gap Cause dE dK dI Role: < = Role 1 Role 2 Role 3 Role 4 Role 5 Role 1 Role 2 Role 3 Role 4 Role 5 Outputs Inputs Outputs Inputs
  • 8.
    2 Types ofProcess Enablers Human and Environmental Knowledge/Skills Attributes/Values L C S (Psychological, Physical, Intellectual) © 2002 EPPIC , Inc. EPPI - Tier 3 View Human Asset Enablers Environmental Asset Enablers Data & Information Facilities Machinery, Equipment, & Tools Materials & Supplies Consequences $$$ L C S L C S Process Map View Performance Model View Area of Performance: Key Outputs Key Tasks Roles/Responsibilities 1 2 3 4 5 Typical Perf . Gaps Prob. Gap Cause dE dK dI Role: < = Role 1 Role 2 Role 3 Role 4 Role 5 Process Map View Performance Model View Area of Performance: Key Outputs Key Tasks Roles/Responsibilities 1 2 3 4 5 Typical Perf . Gaps Prob. Gap Cause dE dK dI Role: Area of Performance: Key Outputs Key Tasks Roles/Responsibilities 1 2 3 4 5 Typical Perf . Gaps Prob. Gap Cause dE dK dI Role: < = Role 1 Role 2 Role 3 Role 4 Role 5 Role 1 Role 2 Role 3 Role 4 Role 5
  • 9.
    Analysis Sets HumanEnablers Enabling Knowledge/Skills Enabling Intellectual Attributes Enabling Psychological Attributes Enabling Physical Attributes Enabling Values Environmental Enablers Data/Information Materials/Supplies Tools/Equipment Facilities/Grounds Budget/Headcount Culture/Consequences Process Performance Areas of Performance Performance Model data
  • 10.
    Areas of Performance- AoPs Areas of Performance Segment process/performance into “chunks” for analysis efforts Take a process/performance orientation versus topical/ content orientation To segment, look first for linear process flows or “cycles” within the performance scope and then all other job/performance “components” Cycles within cycles Separate cycles AKA: Key result areas, accomplishments, duties, etc. Example Example AoPs Payroll, Banking, and Financial Management Payroll, Banking, and Financial Management G. Staff Recruiting, Selection, and Training Staff Recruiting, Selection, and Training Work Scheduling Work Scheduling A. B. Progressive Discipline Progressive Discipline Store Operations Store Operations Customer Service Customer Service Inventory Management Inventory Management TMC Stores Store Manager PERFORMANCE MODEL Areas of Performance C. D. E. F. ©1999 CADDI, Inc. Example Example AoPs Payroll, Banking, and Financial Management Payroll, Banking, and Financial Management G. Staff Recruiting, Selection, and Training Staff Recruiting, Selection, and Training Work Scheduling Work Scheduling A. B. Progressive Discipline Progressive Discipline Store Operations Store Operations Customer Service Customer Service Inventory Management Inventory Management TMC Stores Store Manager PERFORMANCE MODEL Areas of Performance C. D. E. F. Example Example AoPs Payroll, Banking, and Financial Management Payroll, Banking, and Financial Management G. Staff Recruiting, Selection, and Training Staff Recruiting, Selection, and Training Work Scheduling Work Scheduling A. B. Progressive Discipline Progressive Discipline Store Operations Store Operations Customer Service Customer Service Inventory Management Inventory Management TMC Stores Store Manager PERFORMANCE MODEL Areas of Performance C. D. E. F. Payroll, Banking, and Financial Management Payroll, Banking, and Financial Management G. Staff Recruiting, Selection, and Training Staff Recruiting, Selection, and Training Work Scheduling Work Scheduling A. B. Progressive Discipline Progressive Discipline Store Operations Store Operations Customer Service Customer Service Inventory Management Inventory Management TMC Stores Store Manager PERFORMANCE MODEL Areas of Performance C. D. E. F. ©2002 EPPIC, Inc.
  • 11.
    AoP Segments Goal: Minimize overlaps and gaps of AoP “content segments” Good No gaps or overlaps Gaps Overlaps Bad AoP AoP AoP AoP AoP AoP AoP AoP AoP AoP Example Segmentation
  • 12.
    Performance Segments Goal: Minimize overlaps and gaps of AoP “content segments” Good No gaps or overlaps Gaps Overlaps Bad AoP AoP AoP AoP AoP AoP AoP AoP AoP AoP Example Segmentation Customer Contact Customer Service Active Listening Requirements Definition Conduct Project Meetings with Client Electrical Engineering Customer Satisfaction Design Solution Oversee Installation
  • 13.
    Performance Segments Goal: Minimize overlaps and gaps of AoP “content segments” Good No gaps or overlaps Gaps Overlaps Bad AoP AoP AoP AoP AoP AoP AoP AoP AoP AoP Example Segmentation Project Planning Analysis Design Development Pilot Test Update Roll Out Recruiting Support Special Assignments
  • 14.
    Processing a GroupWhen identifying AoPs Start by wasting a flip chart page…and announcing your intent to do so…to rough it out before finalizing First thing said gets written, and then ask the group to react after a “stake has been planted.” Then try to “plant” another one…upstream or downstream Ask for/listen for Outputs /deliverables/outcomes/results Key performance cycles Natural breaks in work flow Clean-up Minimize gaps/overlaps Sequence AoPs last
  • 15.
    Do one ofthe following… Example _____________ Example _____________ Example _____________ Postal Delivery Person Gas Station Attendant Grocery Store Bagger
  • 16.
    Another Example TMCStores Store Manager PERFORMANCE MODEL Areas of Performance ©2002 EPPIC, Inc. Payroll, Banking, and Financial Management G. Staff Recruiting, Selection, and Training A. Work Scheduling B. Progressive Discipline C. Store Operations D. Customer Service E. Inventory Management F.
  • 17.
    Exercise… Segmenting theAoPs Work in teams of two as assigned to construct an AoP framework for a “past” Summer Job for each person. Switch roles (Analyst-Performer) 3 Readouts 2 General debrief (10 minutes) 1.5 # Step Minutes Start Stop 1 2 3 4 5 Select past Summer Job to use .5 Select other person’s Summer Job and identify the AoPs 3 Start time: Stop time:
  • 18.
    Exercise… Segmenting the AoPs Self-test Questions: Does everything about this performance fit within one of these AoP “buckets”? Are there no overlaps? Will others accept this configuration? Summer Job:
  • 19.
    Exercise Debriefing… Segmenting the AoPs
  • 20.
  • 21.
    PM- Performance ModelAreas of Performance (AoPs) AoPs segment the performance into chunks Linear performance chunks Nonlinear performance chunks Example: Convenient Store Manager Payroll, Banking, and Financial Management Payroll, Banking, and Financial Management G. Staff Recruiting, Selection, and Training Staff Recruiting, Selection, and Training Work Scheduling Work Scheduling A. B. Progressive Discipline Progressive Discipline Store Operations Store Operations Customer Service Customer Service Inventory Management Inventory Management TMC Stores Store Manager PERFORMANCE MODEL Areas of Performance C. D. E. F. ©2002 EPPIC, Inc. Simple Example
  • 22.
    EPPI Analysis Method#2 Performance Model Chart The Performance Model establishes “mastery performance” as the benchmark criterion Key Tasks Describes the key activities needed to produce the outputs Roles/Responsibilities Clarifies who is typically responsible for performing the tasks Deficiency dE=Environment dK=Knowledge/skill dI=Individual attribute/value Key Outputs and Metrics or Measures Describes what is produced from doing the job tasks and identifies key performance measures of each output Typical Performance Gaps Identifies any typical ways the output or task does not meet performance standards Probable Gap Cause(s) Identifies most likely causes for each typical performance issue/ deficiency The Most Convenient Stores Store Management Performance Model ©2002 EPPIC, Inc. A. Staff Recruiting, Selection, and Training 1 = District Manager 2 = Store Manager 3 = Assistant Manager 4 = Clerk • New staff hired - Timely - Qualified • Identify need for additional staff and complete internal paperwork • Create and place local ads • Select candidates for interviewing • Interview and select candidates for offer • Make hiring offer(s) • Complete paperwork to fill the position        • Too few candidates • Poor choice • Poor recruiting • Local economy • Neglect to check references • References do not provide key information dK dE dK dE Key Tasks Describes the key activities needed to produce the outputs Roles/Responsibilities Clarifies who is typically responsible for performing the tasks Deficiency dE=Environment dK=Knowledge/skill dI=Individual attribute/value Key Outputs and Metrics or Measures Describes what is produced from doing the job tasks and identifies key performance measures of each output Typical Performance Gaps Identifies any typical ways the output or task does not meet performance standards Probable Gap Cause(s) Identifies most likely causes for each typical performance issue/ deficiency The Most Convenient Stores Store Management Performance Model ©2002 EPPIC, Inc. A. Staff Recruiting, Selection, and Training 1 = District Manager 2 = Store Manager 3 = Assistant Manager 4 = Clerk • New staff hired - Timely - Qualified • Identify need for additional staff and complete internal paperwork • Create and place local ads • Select candidates for interviewing • Interview and select candidates for offer • Make hiring offer(s) • Complete paperwork to fill the position        • Too few candidates • Poor choice • Poor recruiting • Local economy • Neglect to check references • References do not provide key information dK dE dK dE Example Area of Performance: • Key Outputs - Measures Key Tasks Probable Gap Cause(s) dE dK dI Roles/Responsibilities 1 2 3 4 dE = deficiency - Environment dK = deficiency - Knowledge/skill dI = deficiency - Individual attribute/ value Role: 1 = 2 = 3 = 4 = Typical Performance Gaps Form Design ©2002 EPPIC, Inc. 4/99 Page 1 Area of Performance: • Key Outputs - Measures Key Tasks Probable Gap Cause(s) dE dK dI Roles/Responsibilities 1 2 3 4 dE = deficiency - Environment dK = deficiency - Knowledge/skill dI = deficiency - Individual attribute/ value Role: 1 = 2 = 3 = 4 = Typical Performance Gaps Form 4/99 Page 1
  • 23.
    Example Area ofPerformance: A. Staff Recruiting, Selection, and Training • Key Outputs - Measures Key Tasks Probable Gap Cause(s) dE dK dI Roles/Responsibilities 1 2 3 4 dE = deficiency - Environment dK = deficiency - Knowledge/skill dI = deficiency - Individual attribute/ value Role: 1 = District Manager 2 = Store Manager 3 = Assistant Manager 4 = Clerk Typical Performance Gaps The Most Convenient Store Store Manager Performance Model Form Design ©2002 EPPIC, Inc. Page 1 Identify need for additional staff and complete internal paperwork Create and place local ads Select candidates for interviewing Interview and select candidates for offer Make hiring offer(s) Complete paperwork to fill the position New staff hired - Timely - Qualified continued        Too few candidates Poor choice Poor recruiting Local economy Neglect to check references References do not provide key information dK dE dK dE
  • 24.
    Analysis Questions AoPs and the Performance Model Performance Data Question(s) to Ask Areas of Performance What are the major phases or elements of the performance or process? What are the chunks of the job? How can we break this performance up into some logical segments (somewhere between five to nine is ideal)? Outputs Produced What are the key deliverables/outputs produced within this Area of Performance? What is left over when you are finished performing the tasks? Measures What are the measures/metrics that can be applied to the output? How can you tell a good output from a bad one? Standards What are the standards of acceptable performance given those measures? Tasks Performed What are the tasks performed to produce those outputs? Roles and Responsibilities Who is involved in this performance? For example, whose task responsibility is it to E = Execute S = Support I = Input to R = Review/give feedback A = Approve/reject Typical Performance Gaps Given those measures and standards, where do the performer’s outputs typically fall short in meeting the expectations?
  • 25.
    Analysis Questions AoPs and the Performance Model -continued Performance Data Question(s) to Ask Probable Gap Cause(s) dE (Environment) Is the cause of the performance gap due to a lack of environmental supports? Information/data Organizational structure Procedures/policies Tools/equipment Materials Task interference Feedback Consequences dK (Knowledge/ Skill) Is the performance gap caused by a lack of the performer’s knowledge and/or skill? dI (Individual Attribute/ Value) Is the performance gap caused by a poorly selected individual who has neither the physical, psychological, and/or intellectual attributes and/or values to perform or learn/acquire the skill?
  • 26.
    Targeting the GapAnalysis Quarterly and End of Phase Project Reporting Area of Performance: Performance Model Typical Performance Gaps Key Tasks • Key Outputs - Measures dE dE dE dK dE Probable Gap Cause(s) dE dK dI dE = deficiency - Environment dK = deficiency - Knowledge/skill dI = deficiency - Individual attribute/value Codes: dE = deficiency - Environment dK = deficiency - Knowledge/skill dI = deficiency - Individual attribute/value Codes:  2002 EPPIC, Inc. REPRODUCTION WITHOUT WRITTEN AUTHORIZATION IS STRICTLY PROHIBITED • ABC Report - Done quarterly - Complete • ABC Report - Done quarterly - Complete • XYZ Report - Timely - Complete - Accurate • XYZ Report - Timely - Complete - Accurate 1. Draft report 2. Conduct review 3. Finalize report 1. Draft report 2. Conduct review 3. Finalize report 1. Generate XYZ data 2. Review and forward 1. Generate XYZ data 2. Review and forward • Late • Incomplete • Incomplete • Inaccurate data • Too busy • Too busy • Required data is unavailable • Required data is unavailable • Input is late • Input is late were wrong • Numbers supplied • Don’t know which components are required •
  • 27.
    Example… Performance ModelAoPs AAA Cabin Attendant - Areas of Performance Boarding Passengers Pre-flight Preparations In-flight Services Special Services Continuous Development Post-flight Clean Up “ De-Boarding” Passengers Emergency Responses A B C D E F G H
  • 28.
    Page 21 E-Execute Task S- Support Task Execution I- Input to effort R-Review and Feedback A-Approve/Reject Performance Model Areas of Performance: B - Boarding Passenger Key Outputs -Measures Key Tasks Roles/Responsibilities Typical Performance Gaps Probable Gap Cause(s) dE dK dI 1 2 3 4 Passenger Seated & Belted Safely, per procedures Correctly Quickly Luggage/Carry-Ons stowed -Safely, per procedures Correctly Quickly Greet passengers Answer any questions/provide directions and/or assistance Conduct passenger counts Check Seat Belts and seat/tray position Make “pre-take-off” announcement and demo/run announcement video Prepare cabin for take-off: restroom check, door latches, galley items, etc. E E E E E E S E S S S S S S S S S E E Passengers with same seat assignments -Luggage stowed in violations of procedures -Seats double booked by system -Passenger on wrong plane -Time rush to take-off -Avoiding potential conflict with a passenger dE dE dE dI Codes: 1= Head Cabin Attendant 2= Cabin Attendant 3= Associate Cabin Attendant 4= Pilot Crew dE = deficiency – Environment dK = deficiency – Knowledge/skill dI = deficiency – Individual attribute/value
  • 29.
    Exercise… Performance Modeling Work in same teams of two to construct a Performance Model chart for the other person’s Summer Job AoP framework created earlier. Repeat #2 for second person 7 Readouts 4 General debrief (10 minutes) 2.75 # Step Minutes Start Stop 1 2 3 4 5 Select an AoP of partner’s job .25 Ask questions and complete PM chart on 8.5x11 paper 7 Start time: Stop time:
  • 30.
    Page 21 PerformanceModel Summer Job: _______________________ Area of Performance: ___________________________________________________________________________ Key Outputs -Measures Key Tasks Roles/Responsibilities Typical Performance Gaps Probable Gap Cause(s) dE dK dI 1 2 3 4 Codes: 1= 2= 3= 4= dE = deficiency – Environment dK = deficiency – Knowledge/skill dI = deficiency – Individual attribute/value
  • 31.
  • 32.
    Performance Modeling PerformanceModels Enabler Matrices Human Asset Enablers Knowledge/skills Physical Attributes Psychological Attributes Intellectual Attributes Personal Values Environmental Asset Enablers Data/information Materials/supplies Tools/equipment Facilities/grounds Budget/headcount Culture/consequences Facilitates the systematic derivation of the Human & Environmental Asset Enablers
  • 33.
    2 Types ofProcess Enablers Human and Environmental Knowledge/Skills Attributes/Values L C S (Psychological, Physical, Intellectual) © 2002 EPPIC , Inc. EPPI - Tier 3 View Human Asset Enablers Environmental Asset Enablers Data & Information Facilities Machinery, Equipment, & Tools Materials & Supplies Consequences $$$ L C S L C S Process Map View Performance Model View Area of Performance: Key Outputs Key Tasks Roles/Responsibilities 1 2 3 4 5 Typical Perf . Gaps Prob. Gap Cause dE dK dI Role: < = Role 1 Role 2 Role 3 Role 4 Role 5 Process Map View Performance Model View Area of Performance: Key Outputs Key Tasks Roles/Responsibilities 1 2 3 4 5 Typical Perf . Gaps Prob. Gap Cause dE dK dI Role: Area of Performance: Key Outputs Key Tasks Roles/Responsibilities 1 2 3 4 5 Typical Perf . Gaps Prob. Gap Cause dE dK dI Role: < = Role 1 Role 2 Role 3 Role 4 Role 5 Role 1 Role 2 Role 3 Role 4 Role 5
  • 34.
    Analysis Sets HumanEnablers Enabling Knowledge/Skills Enabling Intellectual Attributes Enabling Psychological Attributes Enabling Physical Attributes Enabling Values Environmental Enablers Data/Information Materials/Supplies Tools/Equipment Facilities/Grounds Budget/Headcount Culture/Consequences Process Performance Areas of Performance Performance Model data
  • 35.
    Human Asset Requirements Knowledge/Skill Categories* Knowledge/Skill Matrices Category: Records/Reports Category: Tools/Equipment Category: XYZ Category: ABC * Plus the knowledge/skill of performance outputs and tasks and roles/responsibilities from the Performance Model 1. Company Policies/Procedures/ Practices/Guidelines 2. Laws, Regulations, Codes, Agreements, and Contracts 3. Industry Standards 4. Internal Organizations and Resources 5. External Organizations and Resources 6. Marketplace Knowledge 7. Product/Service Knowledge 8. Process Knowledge 9. Records, Reports, Documents, and Forms 10. Materials and Supplies 11. Tools/Equipment/Machinery 12. Computer Systems/Software/Hardware 13. Personal/Interpersonal 14. Management/Supervisory 15. Business Knowledge and Skills 16. Professional/Technical 17. Functional Specific ©2002 EPPIC, Inc.
  • 36.
    Human Asset RequirementsAttribute/Value Categories Attribute/Value Matrices Category: Psychological Category: Physical Category: XYZ Category: ABC 18. Psychological Attributes 19. Physical Attributes 20. Intellectual Attributes 21. Values ©2002 EPPIC, Inc.
  • 37.
    Human Asset Enablers– Knowledge/Skill Matrix AoP AoP Link Link Identifies the segment of the job where the knowledge or skill enables performance K/S Item K/S Item Identifies the discrete knowledge or skill item Depth Depth The level to which any training & development needs to go Volatility Volatility Ranks how often and significantly the knowledge or skill will change Difficulty Difficulty Ranks how difficult the item is to learn Criticality Criticality Ranks the relationship between having the knowledge or skill and performance mastery Select/Train Select/Train Denotes whether the item is a selection criteria/ condition or needs to be covered in training & development AoP AoP Link Link Identifies the segment of the job where the knowledge or skill enables performance K/S Item K/S Item Identifies the discrete knowledge or skill item Depth Depth The level to which any training & development needs to go Volatility Volatility Ranks how often and significantly the knowledge or skill will change Difficulty Difficulty Ranks how difficult the item is to learn Criticality Criticality Ranks the relationship between having the knowledge or skill and performance mastery Select/Train Select/Train Denotes whether the item is a selection criteria/ condition or needs to be covered in training & development Volatility H/M/L Difficulty H/M/L Criticality H/M/L Select/ Train S/T Link to Area of Performance K/S Item Knowledge/Skill Category: Volatility H/M/L Difficulty H/M/L Criticality H/M/L Select/ Train S/T Link to Area of Performance K/S Item Knowledge/Skill Category: <Company/Client Name> <Audience> Knowledge/Skill Matrix A = B = C = D = E = F = G = Criticality/Difficulty/Volatility H = High M = Medium L = Low Depth of Coverage A = Awareness K = Knowledge S = Skill Codes: Link to Area of Performance E D C B A Depth A/K/S Volatility H/M/L Difficulty H/M/L Criticality H/M/L Select/ Train S/T Link to Area of Performance K/S Item Knowledge/Skill Category: G F E D C B A Depth A/K/S Volatility H/M/L Difficulty H/M/L Criticality H/M/L Select/ Train S/T Link to Area of Performance K/S Item Knowledge/Skill Category: G F E D C B A Depth A/K/S Volatility H/M/L Difficulty H/M/L Criticality H/M/L Select/ Train S/T Link to Area of Performance K/S Item Knowledge/Skill Category: <Company/Client Name> <Audience> Knowledge/Skill Matrix A = B = C = D = E = F = G = Criticality/Difficulty/Volatility H = High M = Medium L = Low Depth of Coverage A = Awareness K = Knowledge S = Skill Codes: Link to Area of Performance Form Design ©2002 EPPIC, Inc. G F E D C B A Depth A/K/S G F E D C B A Depth A/K/S G F E D C B A Depth A/K/S G F
  • 38.
    Existing Provisioning SystemsAssessment Performance and Human & Environmental Asset Requirements of the Targeted Performance Provides the Shopping Criteria for Assessment of the “Fit to Need” Assess the Existing Systems’ “Outputs as Inputs” to the Targets * From functions/systems such as Recruiting systems, processes, and instruments Job descriptions Etc. Performance Requirements Enabler Requirements
  • 39.
    Existing Systems Assessment- ESA EAM Systems & Processes Data & Information Systems Materials & Supplies Systems Tools & Equipment Systems Facilities & Grounds Systems Financial Systems Culture & Consequence Systems HAM Systems & Processes Organization & Job Redesign Systems Staffing & Succession Planning Systems Recruiting & Selection Systems Training & Development Systems Performance Appraisal & Management Systems Compensation & Benefits Systems Reward & Recognition Systems ISD EXAMPLE Primary Delivery Method Primary Delivery Method Primary methods/media used in the training Special Requirements for Special Requirements for Delivery Delivery Identifies anything about the training that limits its capacity, delivery, location, etc. Provider Provider Resource responsible for delivery (may be internal or external) Related Process( Related Process( es es ), Areas of ), Areas of Performance, or Tasks Performance, or Tasks Identify job performances addressed by the training (see the Performance Model) Course Owner/Contact Course Owner/Contact Internal resource for registration and/or information Enabling Knowledge/Skill Items Enabling Knowledge/Skill Items Identifies supporting knowledge/skill items addressed by the training (see the Knowledge/Skill Matrix) Use as Source Use as Source Indicates initial decision regarding use of this training in the Development/ Acquisition Phase Current Target Audience Current Target Audience Primary audience groups to which the training is delivered Primary Delivery Method Primary Delivery Method Primary methods/media used in the training Special Requirements for Special Requirements for Delivery Delivery Identifies anything about the training that limits its capacity, delivery, location, etc. Provider Provider Resource responsible for delivery (may be internal or external) Related Process( Related Process( es es ), Areas of ), Areas of Performance, or Tasks Performance, or Tasks Identify job performances addressed by the training (see the Performance Model) Course Owner/Contact Course Owner/Contact Internal resource for registration and/or information Enabling Knowledge/Skill Items Enabling Knowledge/Skill Items Identifies supporting knowledge/skill items addressed by the training (see the Knowledge/Skill Matrix) Use as Source Use as Source Indicates initial decision regarding use of this training in the Development/ Acquisition Phase ©2002 EPPIC, Inc. TMC Stores Number: Title: Provider: Course Description Primary Delivery Method: GP – Group - paced  Classroom  Lab 1 - 1 – One - on - one  S - OJT (training)  U - OJT SP – Self - paced  Readings/Exercises  Web Site Pages  CBT  Videotape Other Special Requirements for Delivery  Equipment  Facility  Instructor  License Requirement  Other  Yes  No Course Fit Assessment Related Process( es ), Area(s) of Performance, or Tasks  Include as Is  Use as Source:  Materials Attached (e.g., course description)  Do not use  Continued on Side Two Notes: Enabling Knowledge/Skill Items: Class Size:  > 20  10 – 20  < 10  Other Depth/Level:  Awareness  Knowledge  Skill (EDP No.______) Current Target Audience:  All engineers   Other  Other Course Owner/Contact: Copyright Owner: Licensing Agreement: Phone: Length:  Hrs.  Pgs Schedule/Frequency: Assessment REPRODUCTION WITHOUT WRITTEN AUTHORIZATION IS STRICTLY PROHIBITE D v.1 4/99 Page 1 TMC Stores Number: Title: Provider: Course Description Primary Delivery Method: GP – Group - paced  Classroom  Lab 1 - 1 – One - on - one  S - OJT (training)  U - OJT SP – Self - paced  Readings/Exercises  Web Site Pages  CBT  Videotape Other Special Requirements for Delivery  Equipment  Facility  Instructor  License Requirement  Other  Yes  No Course Fit Assessment Related Process( es ), Area(s) of Performance, or Tasks  Include as Is  Use as Source:  Materials Attached (e.g., course description)  Do not use  Continued on Side Two Notes: Enabling Knowledge/Skill Items: Class Size:  > 20  10 – 20  < 10  Other Depth/Level:  Awareness  Knowledge  Skill (EDP No.______) Current Target Audience:  All engineers   Other  Other Course Owner/Contact: Copyright Owner: Licensing Agreement: Phone: Length:  Hrs.  Pgs Schedule/Frequency: Existing Materials REPRODUCTION WITHOUT WRITTEN AUTHORIZATION IS STRICTLY PROHIBITE D v.1 4/99 Page 1 TMC Stores Number: Title: Provider: Course Description Primary Delivery Method: GP – Group - paced  Classroom  Lab 1 - 1 – One - on - one  S - OJT (training)  U - OJT SP – Self - paced  Readings/Exercises  Web Site Pages  CBT  Videotape Other Special Requirements for Delivery  Equipment  Facility  Instructor  License Requirement  Other  Yes  No Course Fit Assessment Related Process( es ), Area(s) of Performance, or Tasks  Include as Is  Use as Source:  Materials Attached (e.g., course description)  Do not use  Continued on Side Two Notes: Enabling Knowledge/Skill Items: Class Size:  > 20  10 – 20  < 10  Other Depth/Level:  Awareness  Knowledge  Skill (EDP No.______) Current Target Audience:  All engineers   Other  Other Course Owner/Contact: Copyright Owner: Licensing Agreement: Phone: Length:  Hrs.  Pgs Schedule/Frequency: Assessment REPRODUCTION WITHOUT WRITTEN AUTHORIZATION IS STRICTLY PROHIBITE D v.1 4/99 Page 1 TMC Stores Number: Title: Provider: Course Description Primary Delivery Method: GP – Group - paced  Classroom  Lab 1 - 1 – One - on - one  S - OJT (training)  U - OJT SP – Self - paced  Readings/Exercises  Web Site Pages  CBT  Videotape Other Special Requirements for Delivery  Equipment  Facility  Instructor  License Requirement  Other  Yes  No Course Fit Assessment Related Process( es ), Area(s) of Performance, or Tasks  Include as Is  Use as Source:  Materials Attached (e.g., course description)  Do not use  Continued on Side Two Notes: Enabling Knowledge/Skill Items: Class Size:  > 20  10 – 20  < 10  Other Depth/Level:  Awareness  Knowledge  Skill (EDP No.______) Current Target Audience:  All engineers   Other  Other Course Owner/Contact: Copyright Owner: Licensing Agreement: Phone: Length:  Hrs.  Pgs Schedule/Frequency: Existing Materials REPRODUCTION WITHOUT WRITTEN AUTHORIZATION IS STRICTLY PROHIBITE D v.1 4/02 Page 1 Interviewing Skills 10342 Existing Systems Assessment ESA Output Provisioning System Targets for Assessment TMC Stores Number: Title: Provider: Course Description Primary Delivery Method: GP – Group - paced  Classroom  Lab 1 - 1 – One - on - one  S - OJT (training)  U - OJT SP – Self - paced  Readings/Exercises  Web Site Pages  CBT  Videotape Other Special Requirements for Delivery  Equipment  Facility  Instructor  License Requirement  Other  Yes  No Course Fit Assessment Related Process( es ), Area(s) of Performance, or Tasks  Include as Is  Use as Source:  Materials Attached (e.g., course description)  Do not use  Continued on Side Two Notes: Enabling Knowledge/Skill Items: Class Size:  > 20  10 – 20  < 10  Other Depth/Level:  Awareness  Knowledge  Skill (EDP No.______) Current Target Audience:  All engineers   Other  Other Course Owner/Contact: Copyright Owner: Licensing Agreement: Phone: Length:  Hrs.  Pgs Schedule/Frequency: Assessment Form ©2002 EPPIC, Inc. REPRODUCTION WITHOUT WRITTEN AUTHORIZATION IS STRICTLY PROHIBITE D v.1 4/99 Page 1 TMC Stores Number: Title: Provider: Course Description Primary Delivery Method: GP – Group - paced  Classroom  Lab 1 - 1 – One - on - one  S - OJT (training)  U - OJT SP – Self - paced  Readings/Exercises  Web Site Pages  CBT  Videotape Other Special Requirements for Delivery  Equipment  Facility  Instructor  License Requirement  Other  Yes  No Course Fit Assessment Related Process( es ), Area(s) of Performance, or Tasks  Include as Is  Use as Source:  Materials Attached (e.g., course description)  Do not use  Continued on Side Two Notes: Enabling Knowledge/Skill Items: Class Size:  > 20  10 – 20  < 10  Other Depth/Level:  Awareness  Knowledge  Skill (EDP No.______) Current Target Audience:  All engineers   Other  Other Course Owner/Contact: Copyright Owner: Licensing Agreement: Phone: Length:  Hrs.  Pgs Schedule/Frequency: Existing Materials REPRODUCTION WITHOUT WRITTEN AUTHORIZATION IS STRICTLY PROHIBITE D v.1 4/99 Page 1 Interviewing Skills 10342 Interviewing Skills 10342
  • 40.
    Exercise… Selecting EnablerCategories Work in same teams of two to identify the Enabler Categories that would have been appropriate for one of your last 3 projects. Select other partner’s project and use Category List to Down-select Categories Readouts 2 General debrief 1.5 # Step Minutes Start Stop 1 2 3 4 5 List your last 3 projects .5 Select one partner’s project and use Category List to Down-select Categories 3 Start time: Stop time: 3
  • 41.
    EPPI Enabler Categories1. Company Policies/ Procedures/ Practices/ Guidelines 2. Laws/ Regulations/ Codes/ Agreements/ Contracts 3. Industry Standards 4. Internal Organizations and Resources External Organizations and Resources Marketplace Knowledge 7. Product/Service Knowledge 8. Process Knowledge 9. Records, Reports, Documents, and Forms 10. Materials and Supplies 11. Tools/Equipment/Machinery 12. Computer Systems/Software/Hardware 13. Personal/Interpersonal 14. Management/Supervisory 15. General and Specific Business 16. Professional/Technical 17. Functional Specific 18. Psychological Attributes 19. Physical Attributes 20. Intellectual Attributes 21. Values 22. Data/Information 23. Materials/Supplies 24. Tools/Equipment 25. Facilities/Grounds 26. Budget/Headcount 27. Culture/Consequences Human Asset Enabling K/Ss Human Asset Enabling A/Vs Environmental Asset Enablers Additional sub and sub-sub-categories can be created for each of the above Projects: 1________________ 2_________________ 3___________________
  • 42.
  • 43.
  • 44.
    Systematically Deriving EnablersAoP Performance Model Knowledge/Skill Matrices Step 1 : Identify and link to AoP Step 2 : Remaining columns (Criticality, Difficulty, Volatility, Depth) 1.A 1.B 1.C 1.D K/S Category: 4 K/S Item Link to AoP Crit Diff Vol Dep K/S Category: 3 K/S Item Link to AoP Crit Diff Vol Dep K/S Category: 2 K/S Item Link to AoP Crit Diff Vol Dep K/S Category: 1 K/S Item Link to AoP Crit Diff Vol Dep AoP G AoP F AoP E AoP D AoP C AoP B AoP A A B C D E F G
  • 45.
    K/S - EnablerMatrices Example Knowledge/Skill Matrix K/S Category: Link to Area of Performance Select/ Train Volatility K/S Item ALL A B C D E F G H H/M/L The ABC Company [Target Audience(s)] Form Design  2002 EPPIC, Inc. Page 1 K/S Item Identifies the knowledge or skill AoP Link Identifies the portion of the job/function where know-ledge or skill is needed Criticality Rank high, medium, low (H, M, L) the relationship between having the knowledge or skill and successful performance Volatility Ranks how often and significantly knowledge or skill will change Difficulty Ranks how difficult the item is to learn/teach Select/Train Denotes whether the item is a selection criteria/ condition or should be addressed by training Depth The deepest level of knowledge or skill the training should provide Difficulty H/M/L Depth A/K/S Criticality H/M/L
  • 46.
    Analysis Questions Enabler Matrices -K/S Asset Version Knowledge/Skill Data Question(s) to Ask Item and Link to Performance Model’s AoPs (For new items): To perform [insert AoP], which [insert K/S category] knowledge/skills do you need? (For items identified earlier): Would you need [insert item] to perform [insert name of next AoP]? S/T: Select/Train Can someone get this job/role without this K/S? (If “yes,” then “T”) Criticality H — M — L How critical is this knowledge/skill to the overall performance? – High – Medium – Low Learning Difficulty H — M — L How difficult will it be for the learner to acquire this knowledge/skill? – High – Medium – Low Content Volatility H — M — L How often would training on this K/S need to be revised? – High – Medium – Low Depth of Coverage Required A — K — S How far must the training content go in addressing this knowledge/skill item? A = Awareness level K = Knowledge level S = Skill level
  • 47.
    Exercise… Systematically Derivingthe Enablers Work in same teams of two to complete 2 Enabler Matrices charts for 2 Categories for your partner’s Summer Job – but only for 2 AoPs of the Performance Model created earlier. Ask questions and complete EM chart on 8.5x11 paper Readouts 3 General debrief 4 # Step Minutes Start Stop 1 2 3 4 5 Select categories & 2 AoPs 1 Ask questions and complete EM chart on 8.5x11 paper 6 Start time: Stop time: 6
  • 48.
    Enabler: K/S MatrixForm Design ©2002 EPPIC, Inc. Page 1 Codes: Link to Area of Performance Link to Area of Performance Depth A/K/S Enabler: K/S Category # - K/S Item A B C D E F G Select/ Train S/T Criticality H/M/L Volatility H/M/L Difficulty H/M/L Criticality/Difficulty/Volatility H = High M = Medium L = Low Depth of Coverage A = Awareness K = Knowledge S = Skill Page 1 Codes: Link to Area of Performance Link to Area of Performance Depth A/K/S K/S Item A B C D E F G Select/ Train S/T Criticality H/M/L Volatility H/M/L Difficulty H/M/L Criticality/Difficulty/Volatility H = High M = Medium L = Low Depth of Coverage A = Awareness K = Knowledge S = Skill
  • 49.
    Exercise Debriefing… Systematically Deriving the Enablers
  • 50.
    The Big Pictureof EPPI Enterprise Process Performance Improvement 2- The Human Asset Enablers Humans bring several types of attributes/ capabilities to the enterprise processes that they work in and to the environmental assets that they work with; these are Awareness, knowledge, skills Physical attributes Psychological attributes Intellectual attributes Values What is required depends on both the performance requirements and the environmental supports available 3- The Environmental Asset Enablers The environment provides several types of enabling assets for the humans to use while performing the job; these include Data/Information Materials/Supplies Tools/Equipment Facilities/Grounds Budget/Headcount Culture/Consequences What is required depends on both the performance requirements and the human capabilities available 1- The Process The process must be designed for efficient delivery to meet stakeholder metrics What is required depends on both the performance requirements and the human capabilities available C S L C S L C S L C S L C S L C S L C S L Performance Model < = Process Map Leadership Systems & Processes Core Systems & Processes Support Systems & Processes Attributes/Values Knowledge/Skills Human Asset Requirements Environmental Asset Requirements Facilities/Grounds Tools/Equipment Materials/Supplies Data/Information Budget/Headcount Culture/Consequences
  • 51.
    HAM Systems &Processes Organization & Job Redesign Systems Staffing & Succession Planning Systems Recruiting & Selection Systems Training & Development Systems Performance Appraisal & Management Systems Compensation & Benefits Systems Reward & Recognition Systems Performance and Human & Environmental Asset Requirements of the Targeted Performance Provides the Criteria for Assessment of the “Fit to Need” or for the “fixes” of the processes and outputs of the Enterprise’s HAMS and EAMS EAM Systems & Processes Information & Data Systems Materials & Supplies Systems Tools & Equipment Systems Financial Systems Facilities & Grounds Systems Culture & Consequence Systems Performance Requirements Enabler Requirements
  • 52.
    Key Expertise RequiredFacilitator Group Facilitation Instructional Design (or “other intervention” design and its input requirements) Analysis Team Performance Mastery Communications skills Interpersonal skills
  • 53.
    Additional References/Resources EPPIWhite Paper and Presentation Performance Modeling & Human Asset Enabler Analysis Lean-ISD via the PACT Processes for Training & Development Lean-ISD White Paper PACT Facilitation How to Build a Training System That Won’t Burn Down The Training Factor of the Quality Equation Technology Transfer Using the PACT Processes for T&D Balancing Conflicting Stakeholder Requirements Continuous Improvement and Training Managing Human Assets Using a Group Process to Create Models and Matrices see Resources Tab at www.eppic.biz “ Gopher” more at eppic.biz
  • 54.

Editor's Notes